NCR Root Cause and Corrective Action
-
Upload
chaitanya-purohit -
Category
Documents
-
view
212 -
download
0
Transcript of NCR Root Cause and Corrective Action
-
7/26/2019 NCR Root Cause and Corrective Action
1/4
Sl
NoNCR DESCRIPTION
PROBABLE ROOT
CAUSE
PROPOSED CORRECTIVE
ACTION
1 Internal Audit Plan forsecond cycle of audit isnot in place
Lack of awareness on therequirement of standard
Audit schedule shall beupdated to include next auditand area to be covered duringaudit
!o evidence to con"rmthat all the department #functional area coveredduring internal auditconducted in $ay%1&
'heck list (in place) wasnot used by internalauditor
Auditor has been instructedand made aware on auditprocess*
& +oot cause for the !'+raised during internaladuit was not analysedand section of !'+ format,Preventive action, waswrongly used*
Lack of awareness on therequirement of standard
-oth the !'+ to be analysedfor actual root cause andcorrective action to beestablished*Auditor shall be trained on theunderstanding of preventiveaction
. $+$ conducted was found
not e/ective and do notcover the requirement of0tandard and Procedure
ue to the transitionearlier employees(management level) werenot serious and $+$ wasconsidered 2ust fromality*
!ew $anagement has showntheir commitment duringAudit3 through this action planand workshop managementand other training program infuture*
!ext $+$ to be conducted in$onth of 4ctober with activeinvolvement of current 5op
-
7/26/2019 NCR Root Cause and Corrective Action
2/4
Sl
NoNCR DESCRIPTION PROBABLE ROOT CAUSE
PROPOSED CORRECTIVE
ACTION
6 Production Planning is notproper and e/ective* !o
proper documentedevidence to demonstratee/ective planning
!o formal software or formbeing used by 4$
7ormat and methodology to beestablish to plan manpower3
machinery and other resourcesfor each pro2ect and shall beupdated on monthly basis andcirculated to all 84s andmanagement
9 :ob 4rders being issued
internally to Production do
not contain tragetcompletion date and manyother important information
etails are not provided asthe form does not contain
the "eld ,+equired'ompletion ate,
7ormat to be revised and shallbe "lled by '$#-$ upon each
contract received and shall bereviewed by ;$ prior to issue toProduction # other dept*
< ata collected for the
Production ob2ectiveacheivement however
reasons for low productionare not recorded
+eason for low productiondiscussed and recordedthrough mail
communication
7ormat and methodology to beestablish to include constraintand cause for lower production
and shall be updated onmonthly basis and circulated toall 84s and management
= !o formal documentavailable to demonstratethe pre and post ordercontract review for :ob
order !o* >1&?1>
reviewes are being carriedout through mailcommunication only andno formal recording for
each area # elementreviewed*
5ender +eview and 'ontract+eview forms to be developedand review for all the proe2ctsawarded shall be maintained*
-
7/26/2019 NCR Root Cause and Corrective Action
3/4
Sl
NoNCR DESCRIPTION
PROBABLE ROOT
CAUSE
PROPOSED CORRECTIVE
ACTION
@ 'ustomer complaintreceived by 4$ and not
recorded3 analysed and nocorective action derrived*
ocumented 0ystem is inplace but not followed
A memo shall be issued to allthe department head to make
them aware of the systemrequireemnt and L'4documented procedure*
1> Analysis not being done onthea) orders lost during the
year against the quotedtendersb) Lower target (&*1$)achieved against target of6*1$
!o formal system is inplace currently*$anagement review is
being done however notrecorded formaly*
$ethodology to be establish toanalyse root cause for orderlost and target not achieved
and shall be recorded by'$#-$
11 lco is involved in designactivity however ther is no
documented control onpartially subcontratedelements of design
!o documented procedureavailable to de"ne the
scope and limit of elcoand design subcontractor
esign plan for each :ob order(when required) shall be
preapred by design engineer #Pro2ect $anager to identify thescope and limit for L'4 andesign subcontractor
1 Bendor re?evaluation is notbeing carried out
5hough the format isavailable3 due to lack ofawareness and resourceswithin department re?evaluation is not carried
Procurement personnel shall bemade aware of the system andisnructed to adhere to*+evaluation of Bendor on whomorder placed in last six months
-
7/26/2019 NCR Root Cause and Corrective Action
4/4
Sl
NoNCR DESCRIPTION
PROBABLE ROOT
CAUSE
PROPOSED CORRECTIVE
ACTION
1& 'ustomer 7eedbackprocess is docuemntedand not being followed
+esponsibility is with-usiness development$anager* As -$ was
not available since lastsix months3 it was notcarried out*
'$#-$ is on board and heis aware of the systemrequirement* 5he survey
will be carried out for orderscomleted in past six monthand shall be done for therunning orders at the end ofcompletion*