NCHRP 15-54...Culvert Structure Elements: Shell Elements (3-noded flat), Linearly Elastic Isotropic...
Transcript of NCHRP 15-54...Culvert Structure Elements: Shell Elements (3-noded flat), Linearly Elastic Isotropic...
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
NCHRP 15-54Proposed Modifications to AASHTO Culvert Load Rating Specifications
AASHTO T-13 UpdateMARK MLYNARSKI, P.E. – MICHAEL BAKER INTERNATIONALCHAD CLANCY, P.E. – MODJESKI AND MASTERSTIM MCGRATH, PH.D, P.E.MIKE KATONA, PH.D.
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
NCHRP 15-54Panel MembersTIM ARMBRECHT, CHAIR, ILLINOIS DOTREGINALD ARNO, DISTRICT DOTTHOMAS KOCH, NORTH CAROLINA DOTYI QIU, TEXAS DOTHOLLY THOMASBRAD WAGNER, MICHIGAN DOTJAMES WITHIAMWASEEM DEKELBAB, NCHRPLUBIN GAO, FHWA
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Overview of research effort Phase I – Survey/Literature review Phase II – Analysis/Field Testing Plan
(Draft Report just submitted) Phase III - Field testing/ further
analysis Phase IV - Recommendations Q&A
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Disclaimer
“This investigation was sponsored by TRB under the NCHRP Program. Data reported are work in progress. The contents of this presentation has not been reviewed by the project panel or NCHRP, nor do they constitute a standard, specification, or regulation.”
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Phase I
Survey/Literature reviewCulvert selection8 models (2 provisional)
Phase I
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
SurveyResponses – Coverage: 37 states
Phase I
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Phase I Culvert Models
Phase I
Model Structure Type Description1 RC Box (Single) Precast
16’-20’2 RC Box (Multiple Cell) Cast in place
10’-12’ / cell3 RC Box New precast
> 10’4 Three-sided arch concrete 24’-36’5 Metal Arch 6x2”
corrugation30’-35’
6 Metal box culvert ~25’7* Deep corrugated metal culvert > 40’8* Three sided flat top culvert ~25’
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Phase II – Interim Report#2Culvert Selection ProcessAnalysis model preparation
3D models2D models
CANDE - toolboxBrDR – RC Box culverts
Proposed areas to review
Phase II
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Phase II – Interim Report#2Report submitted in MayPanel is reviewingPanel meeting scheduled end
of June/beginning of JulyPhase III begins upon
panel/NCHRP approval
Phase II
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Culvert Selection
5 states – PA, OH, MD, MA, IL Review database (PA) Contacts from the culvert industry
Ben Hurst/Brian Flint (Contech) Jerry Silagyi (Lane) Joel Hahm (Big R Bridge)
7 Models (1 field test)
Phase II
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Model 1 – RC BOXSingle Cell
Phase II
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Model 1 – RC BOXSingle Cell
Phase II
25’ span length 3D model LUSAS 2D CANDE, BrDR With/ without pavement/ varying fills
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Model 2 – RC BoxTwin Cell
Phase II
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Model 2 – RC BoxTwin Cell
Phase II
10’ spans 3D model LUSAS 2D CANDE, BrDR With/ without pavement/ varying fills
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Model 3 – RC BoxNew Precast
Phase II
Description
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Model 3 – RC BoxNew Precast
Phase II
12’ span 3D model LUSAS 2D CANDE, BrDR With/ without pavement/ varying fills
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Model 4 – RC Concrete3 sided Arch
Phase II
Description
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Model 4 – RC Concrete3 sided Arch
Phase II
36’ span 3D model LUSAS 2D CANDE (from fabricator) With/ without pavement/ varying fills
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Model 5 – Metal ArchPhase II
Description
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Model 5 – Metal ArchPhase II
23’ span 3D model LUSAS 2D CANDE With/ without pavement/ varying fills
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Model 6 – Metal BoxPhase II
Description
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Model 6 – Metal BoxPhase II
19’ span 3D model LUSAS 2D CANDE (from fabricator) With/ without pavement/ varying fills
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Model 7 – Metal CulvertDeep Corrugagted
Phase II
Additional CulvertNew constructionAvailable for load testing with
and without pavementAttleboro, MAField Tested (Later)
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Analysis ModelsPhase II
2D modelsCANDE – CANDE ToolboxAASHTOWare BrDR
3D models
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Analysis Models (2D)Phase II
CANDE Updated with NCHRP 15-282D element/ soil interactionDoes not perform LL analysisModeling can be difficult at
Level 3CANDE Toolbox
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Analysis Models (2D)Phase II
CANDE ToolboxGenerate Level 3 model
from Level 2Add pavement elements to
a level 3 modelSimulate live loadingCalculate a rating factor
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Analysis Models (2D)Phase II
CANDE ToolboxGenerate Level 3 model
from Level 2
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Analysis Models (2D)Phase II
CANDE Toolbox Generate Level 3 model from Level 2
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Analysis Models (2D)Phase II
CANDE ToolboxAdd pavement elements to
a level 3 model
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Analysis Models (2D)Phase II
CANDE ToolboxSimulate live loading
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Analysis Models (2D)Phase II
CANDE ToolboxSimulate live loading
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Analysis Models (2D)Phase II
CANDE ToolboxCalculate rating factors
loading
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Analysis Models (2D)Phase II
BrDR (AASHTOWare)Models 1-3 (Can be reviewed at
varying fills)CalTrans models (100+ models)Regression Testing – Modify and
check
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
3D Modeling
LUSAS FEA Software Culvert Structure Elements: Shell Elements (3-
noded flat), Linearly Elastic Isotropic shell elements are used for concrete, and
smooth metal culverts
Orthotropic shell elements are used for corrugated metal and profile wall culverts
Soil-culvert interface logic permits arbitrary interface strength and stiffness
Soil – 3D continuum (solid) elements)
Phase II
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
3D Modeling
Single Cell Culvert – 32K Axle – Vertical Displacement
Phase II
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
3D Modeling
Single Cell Culvert – 32K Axle – Top Fiber Von Mises Strain
Phase II
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
3D Modeling
Twin Cell Culvert – 32K Axle – Vertical Displacement of Solid Elements
Phase II
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
3D Modeling
Twin Cell Culvert – 32K Axle – Vertical Displacement of Culvert
Phase II
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Field Testing (Model 7)(other field testing in Phase III)
Phase II
New constructionTesting of with/without pavementNo pavement - May, 2017Pavement – June 2, 2017Larger corrugated archImprovement with pavement
(CANDE)
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Field Testing (Model 7)Phase II
56.5’ Inside span Temporary structure carrying I-95 near
Attleboro, Massachusetts
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Field Testing (Model 7)Phase II
Testing of with/without pavement
Larger corrugated arch
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Field Testing (Model 7)Phase II
Testing of with/without pavement
Larger corrugated arch
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Field Testing (Model 7)Phase II
Testing of with/without pavement
Larger corrugated arch
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Review of results(2D)Phase II
Shear capacity (2’ fill depth) (RC)Live load distribution at 2’ fill
depthEffects of deeper fill depthsEffects of pavementWith or without haunches (RC)LRFR/LFR ratings for RC boxes
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Review of results(2D)Phase II
Shear capacity (2’ fill depth) (RC)
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Review of results(2D)Phase II
Shear capacity (2’ fill depth) (RC)
Fill depthInv
RatingOper
Rating
ConcShear Resist
Vc(kips)
Steel Shear Resist
Vs(kips)
Shear Resist
Vr(kips)
Culvert M1C1 (1.99' fill) HL-93 (US) 0.727 0.943 14.9 0 12.7Culvert M1C1 (2.00' fill) HL-93 (US) 1.063 1.378 24.7 0 21.0
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Phase IIIPhase III
Field Testing of Models 1-6Refine analysisRecommendations for spec
changesRegression test spec
changes
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Phase IIIPhase III
Interim Report # 2 meeting end of June/beginning of July
T. J. McGrath, Ph.D. M.G. Katona, Ph.D.
Questions?