NBOS 4 RTC Gopeng (Lojing)

36
NATIONAL BLUE OCEAN NATIONAL BLUE OCEAN STRATEGY (NBOS) STRATEGY (NBOS) JABATAN PERTANIAN NEGERI KELANTAN

description

Kepentingan RTC gopeng

Transcript of NBOS 4 RTC Gopeng (Lojing)

Page 1: NBOS 4 RTC Gopeng (Lojing)

NATIONAL BLUE OCEAN NATIONAL BLUE OCEAN STRATEGY (NBOS)STRATEGY (NBOS)

JABATAN PERTANIAN NEGERI KELANTAN

Page 2: NBOS 4 RTC Gopeng (Lojing)

Pejabat Pertanian Jajahan Gua Musang,18300 Bandar Baru, Gua Musang, KelantanNo. Tel : 09 - 9121230No. Fax : 09 - 9123872

Page 3: NBOS 4 RTC Gopeng (Lojing)

NBOS : 5 – EXPANSION OF RTC’s, MINI RTC’s / CONVERTING JKKs INTO RURAL TRANSFORMATION AGENTS

FOCAL POINT : JABATAN PERTANIAN

JABATAN PELAKSANA

: JABATAN PERTANIAN

PROJEK : TKPM Lojing, Gua Musang

OBJEKTIF : Expansion of RTC’s, Mini RTC’s

Page 4: NBOS 4 RTC Gopeng (Lojing)

LOKASILOKASI Jajahan Gua Musang, Daerah Bertam,

Mukim Ulu Nenggiri. 88 km dari Gua Musang 7 km dari Blue Valley, 35 km dari Tanah

Rata Cameron Highland Ketinggian 900 – 1,000 meter dari

paras laut Suhu antara 18-27 0C

Page 5: NBOS 4 RTC Gopeng (Lojing)

LOKASI TKPM LOJING 1

TKPM LOJING

GUA MUSANG

Page 6: NBOS 4 RTC Gopeng (Lojing)

Luas Fizikal 72.18 haLuas Tidak Sesuai Dibangun 23.98 ha(33.3%)Luas Boleh Dibangunkan 48.20 ha (66.7%)Luas kawasan Belum Dibangunkan 5.0 ha (6.9%) Luas Kawasan Telah Dibangunkan 43.20 ha (59.8%)Luas Fizikal Boleh Bertanam (2013) 15.60 ha (21.6%)

Luas Pembangunan Insfastruktur/ 27.60 ha (38.2%)Tidak Boleh Bertanam

KESESUAIAN & KEGUNAAN TANAHKESESUAIAN & KEGUNAAN TANAH

Page 7: NBOS 4 RTC Gopeng (Lojing)

TRANSFORMASI TKPMTRANSFORMASI TKPMLOJING 1LOJING 1

Page 8: NBOS 4 RTC Gopeng (Lojing)

Kawasan Asal: Hutan Tanah Tinggi

Hutan Tanah Tinggi dan Laluan Utama Gua Musang melalui Jalan/Trek Lori Balak

Page 9: NBOS 4 RTC Gopeng (Lojing)

Kawasan Sekitar Lojing Tempat Kediaman dan Rayauan Orang Asli

Page 10: NBOS 4 RTC Gopeng (Lojing)

Pusat Pertanian Lojing 1997-Jabatan Pertanian

Kerja-kerja Tinjauan dan Lokasi Tapak Pusat Pertanian Lojing

Jabatan Kayu Sungai Balatop Ke Pusat Pertanian

Permandangan Awal Pusat Pertanian Lojing

Jalan Masuk Ke Pusat Pertanian

Page 11: NBOS 4 RTC Gopeng (Lojing)

Kerja-Kerja Pembersihan Kawasan dan Penyediaan Tanah

Page 12: NBOS 4 RTC Gopeng (Lojing)

Pembinaan Tandak dan Pemasangan Sistem Pengairan

Page 13: NBOS 4 RTC Gopeng (Lojing)

Pembinaan Rumah Kediaman Pegawai dan Peserta

Page 14: NBOS 4 RTC Gopeng (Lojing)

Bekalan Bahan & Logistik Dari Lundang

Page 15: NBOS 4 RTC Gopeng (Lojing)

Kemasukan peserta pertama (9 orang Beliatani) 1/9/1998

Page 16: NBOS 4 RTC Gopeng (Lojing)

Aktiviti Peserta (Beliatani) Di Pusat Pertanian Lojing

Page 17: NBOS 4 RTC Gopeng (Lojing)

Di Perakukan sebagai TKPM pada 19/6/2000Diwartakan pada 25/5/2006 (WK 540/2006):Di bawah kawalan Pengarah

Pertanian Negeri

Page 18: NBOS 4 RTC Gopeng (Lojing)

PESERTA TKPM LOJING 1

Mohd Nasir

BadrulhissamHussin Nashruddin

Izudin Nafis

Al Edi

Muhamad

PESERTA TKPM 2001

Arif

PESERTA BARU

Md Bakri Adnan

Page 19: NBOS 4 RTC Gopeng (Lojing)

TKPM LOJING 1 SEHINGGA DISEMBER TKPM LOJING 1 SEHINGGA DISEMBER 20132013 Luas Fizikal : 72.18 ha Luas Fizikal Dibangunkan : 23.214 ha Keluasan SPH : 6.024 ha Ladang Terbuka : 7.9 ha Bilangan Usahawan : 11 orang (2

peserta baru) Jenis Tanaman Utama -

Tomato,Kacang Buncis,Cili & Kubis (selingan)

Page 20: NBOS 4 RTC Gopeng (Lojing)

KEMUDAHAN ASAS DISEDIAKANKEMUDAHAN ASAS DISEDIAKAN ASRAMA PESERTA/KABIN 2 UNIT RUMAH SEMI-D 2 UNIT KUARTERS PEGAWAI 1 UNIT RUMAH PEKERJA SURAU CHALET EXCO PUSAT PENGUMPULAN HASIL

8 UNIT KOLAM TAKUNGAN SISTEM PENGAIRAN RENJIS PERALATAN LADANG KAWALAN HAKISAN

SPH

JALAN LADANG

PENGAIRAN RENJIS

ASRAMA

KOLAM TAKUNGAN

KAWALAN HAKISAN

PUSAT PENGUMPULAN HASIL

Page 21: NBOS 4 RTC Gopeng (Lojing)

ANALISA KOS 1996-2013ANALISA KOS 1996-2013

NILAI PENGELUARAN : RM 13,046,969.35

KOS PEMBANGUNAN :RM7,092,426.55

B/C RATIO :1.83

Page 22: NBOS 4 RTC Gopeng (Lojing)

STATUSSTATUS PENGELUARAN JAN - DISEMBER 2013 PENGELUARAN JAN - DISEMBER 2013

Page 23: NBOS 4 RTC Gopeng (Lojing)

PERANCANGANPERANCANGAN PENGELUARAN TAHUN 2014 PENGELUARAN TAHUN 2014

Page 24: NBOS 4 RTC Gopeng (Lojing)

STATUS SIJIL SALMSTATUS SIJIL SALM8 Usahawan mendapat Sijil SALM.

3 Permohonan Usahawan telah dihantar ke Bahagian Kualiti untuk proses Auditan.

Page 25: NBOS 4 RTC Gopeng (Lojing)

TKPMBil Peserta

Sasaran memohon SALM

Belum Pohon

Permohonan diperingkat Negeri/Daerah

Telah Hantar Permohonan Ke Urusetia

Telah Lulus

Catatan

Bil Tarikh Luput

Lojing 11 11 0 0 3 8 Mei 2015

Rekod ladang dan Sampel Sayur

Jumlah 11 11 0 0 3 8

Kemajuan Sehingga Disember 2013

Page 26: NBOS 4 RTC Gopeng (Lojing)

CADANGAN PEMASARAN CADANGAN PEMASARAN DENGAN FAMADENGAN FAMA

Forward Aggrement (FA)-Peringkat awal, tumpuan kepada tanaman tomato.

Perbincangan pada 07/07/2013, dipersetujui bekalan 3 mt/minggu.

Harga yang dipersetujui RM 1.30/kg.

Semua 11 usahawan adalah peserta Ladang Kontrak FAMA.Telah isi Borang LK 1.

Page 27: NBOS 4 RTC Gopeng (Lojing)
Page 28: NBOS 4 RTC Gopeng (Lojing)

TKPM TKPM LOJING 2LOJING 2

(NKEA EPP7)(NKEA EPP7)

Page 29: NBOS 4 RTC Gopeng (Lojing)

Jajahan Gua Musang, Daerah Bertam, Mukim Ulu Nenggiri.

Terletak kira-kira 105 km daripada Gua Musang melalui Lebuh Raya Gua Musang – Cameron Highland ,300 km daripada Kota Bharu,7 km dari simpang Lebuh Raya Gua Musang Cameron Highland

Bersempadan dengan Cameron Highland jarak 19 km daripada Blue Valley, dan 27 km daripada Kg Raja, dan 45 km daripda Brincang,50 km daripada Tanah Rata.

Jarak 15 km daripada TKPM Lojing 1, laluan Lojing Gua Musang

LOKASI

Page 30: NBOS 4 RTC Gopeng (Lojing)

LOKASI TKPM LOJING 2LOKASI TKPM LOJING 2

107 km dari gua musang

19 km dari Blue Valley, 50 km dari tanah rata, Cameron Highlands.

Ketinggian 2,500 - 3,200 kaki atas paras laut

Suhu antara 18-27 0c

Page 31: NBOS 4 RTC Gopeng (Lojing)
Page 32: NBOS 4 RTC Gopeng (Lojing)

Kesesuaian tanah

Jenis tanah ialah siri Ringlet

Topografi tanah adalah berombak, berbukit, sangat berbukit & curam dan Kawasan hutan.

Sesuai dibangunkan: 40.80 ha ( 20.3 %).Tidak sesuai: 159.3.0 ha( 79.7%).

Punca air diperolehi daripada Sg. Rengit yang merentangi tapak projek.

Page 33: NBOS 4 RTC Gopeng (Lojing)
Page 34: NBOS 4 RTC Gopeng (Lojing)

Jenis Kerja Juruperunding Kos RM Status

1.Reka Bentuk Jalan Masuk 10 KM

NJA Consultant & Service Sdn Bhd

320,000.00 Mula 4/4/2012Siap 3/9/2012

2.Laporan Kerja Ukur Topografi

Juruukur Amran Consultant

170,000.00 Mula 22/3/2012Siap 21/6/2012

3.Kerja Survey Topo Jalan Masuk 10 KM

ATR Sdn. Bhd 130,000.00 Siap(Mei 2012)

Kerja-Kerja Diseliakan oleh BPSP

STATUS TKPM LOJING 2

Page 35: NBOS 4 RTC Gopeng (Lojing)

TKPM LOJING 2TKPM LOJING 2