Natural Heritage Presentation

download Natural Heritage Presentation

of 22

Transcript of Natural Heritage Presentation

  • 8/7/2019 Natural Heritage Presentation

    1/22

    Town of Collingwood

    Steering Committee Meeting

    August 12, 2010

  • 8/7/2019 Natural Heritage Presentation

    2/22

    Natural heritage system what is it?

    and review needed?

    Pro osed work sco e Phase 1

    Development of the system (Phase 2)

    (Phase 3)

  • 8/7/2019 Natural Heritage Presentation

    3/22

    . .

    protected for the long term.. .

    natural features in an area, and the long-term

    ecolo ical function and biodiversit of natural

    heritage systems, should be maintained, restored or,

    where possible, improved, recognizing linkages

    between and among natural heritage features and

    areas, surface water features and ground water

    .

  • 8/7/2019 Natural Heritage Presentation

    4/22

    Significant wetlands (MNR)

    Significant habitat threatened and endangered species

    (MNR)

    Significant woodlands

    Significant areas of natural and scientific interest

    Any other areas deemed by the planning authority asimportant for their environmental and social values as a

    legacy of the natural landscapes of an area

  • 8/7/2019 Natural Heritage Presentation

    5/22

  • 8/7/2019 Natural Heritage Presentation

    6/22

  • 8/7/2019 Natural Heritage Presentation

    7/22

  • 8/7/2019 Natural Heritage Presentation

    8/22

  • 8/7/2019 Natural Heritage Presentation

    9/22

    (pieces of the puzzle)

    Provincially Significant Wetland mapping (1980s-1990s and 2005 boundary update; MNR)

    Simcoe County Greenlands (1996 and 2009)

    Black Ash Creek Subwatershed Study (NVCA,2000)

    Background Environmental Study (Gartner Lee,2004)

    NVCA wetland mapping updates (2005 to present)

    Private sector studies (Environmental ImpactStudies)

  • 8/7/2019 Natural Heritage Presentation

    10/22

    Significant new information to consider i.e.

    NVCA wetlands, Simcoe CountyGreenlands update

    Need for a holistic, function-oriented

    s stems a roach buildin on historical

    work

    Heritage Reference Manual (MNR, 2010)

  • 8/7/2019 Natural Heritage Presentation

    11/22

  • 8/7/2019 Natural Heritage Presentation

    12/22

    Natural Heritage Reference

    Manual (MNR, 2010) ec n ca gu ance or mp emen ng e

    natural heritage policies of the PPS, 2005

    recommen e tec n ca cr ter a an

    approaches for being consistent with thePP n protect on natura er tage eatures

    and area and natural heritage systems in

    ntar o

    reference tool for municipalities, planning

    boards and other approval authorities

  • 8/7/2019 Natural Heritage Presentation

    13/22

    unique considerations in planning for

    natural heritage systems

    integration of NHS with other planning

    considerations as an iterative process

    (balance)

    Need to ensure that NHS is not identified in

    isolation broader landsca e contextimportant)

  • 8/7/2019 Natural Heritage Presentation

    14/22

    Existing built-up areas focus on protecting remaining

    significant features and their functions and connecting

    features or improving them wherever possible

    natural features that will retain the long-term ecological

    function, once development has been established aroundthe system

    Final NHS should be designated and zoned in municipal

    - ,to be implemented with more prescriptive or restrictive

    land use designations and zones

  • 8/7/2019 Natural Heritage Presentation

    15/22

    Manual (MNR, 2010)

    natural heritage planning can be

    commun ty ase act v ty nvo v ng

    multiple stakeholders workingcooperat ve y w t t e p ann ng aut or ty

    and its expert advisors on natural heritage to

    ent y an protect natura er tage

    systems, features and areas

  • 8/7/2019 Natural Heritage Presentation

    16/22

    Town of Collingwood NHS

    Committee Structure

    development. This committee will meet everyh r m n h m r fr n l if r ir

    discuss study progress.

    A technical advisor committee which will meet

    on an ad-hoc basis to discuss technical, science-

    based issues as they arise during project

    development.

    Purpose to ensure full range of stakeholder

    participation in study process

  • 8/7/2019 Natural Heritage Presentation

    17/22

    Classification of all natural heritage features in the Town of

    Classification (ELC) approximation approach. Use of ELC mapping from various development applications

    will be combined with classification of previously unmapped

    areas. Unmapped area classification will be undertaken using a, ,

    interpretation and field surveys (where access is available on

    public lands only).

    shoreline features (natural and anthropogenic) will be mapped to

    better understand these features and their functions.

    Watercourses and associated valle lands and fish habitat will

    also be identified.

  • 8/7/2019 Natural Heritage Presentation

    18/22

    ELC Community Typing and

    opograp c e at ons ps

  • 8/7/2019 Natural Heritage Presentation

    19/22

    Town of Collingwood NHS Phase 2

    Feature evaluation and natural heritage system development will

    be based on accepted natural heritage theory embodied within

    the PPS and associated support documents (and supported by

    EIS and other inventory data)

    combined with functional knowledge of interactions between

    these communities and watercourses/valleylands and theGeorgian Bay shoreline will allow for a functional assessment

    that goes beyond most municipal natural heritage approaches

    which tend to focus on landsca e-scale associations. A draft Natural Heritage System report documenting the results

    of the natural heritage feature assessment and development of a

    propose natura er tage system w e prov e at t e en oPhase 2.

  • 8/7/2019 Natural Heritage Presentation

    20/22

    Following preparation of the Natural Heritage System report,

    e na s ep w e o wor w own s a an counc o

    develop updated natural heritage schedules and policies toprotect and enhance the Town Natural Heritage System. This

    will be a consultative process with the Town and the public.

    The Natural Heritage Strategy is intended to be incorporated

    update processes. Through appropriate policy, the NHS can be

    used to facilitate: protection of identified significant natural

    areas, development application review, stewardship initiatives

    involving restoration and rehabilitation, and long-term land

    securement decision-makin .

    TASK 2010 2011

  • 8/7/2019 Natural Heritage Presentation

    21/22

    TASK 2010 2011

    July/

    Aug

    Sept/

    Oct

    Nov/

    Dec

    Jan/

    Feb

    Mar/

    Apr

    May/

    June

    July/

    Aug

    NH STRATEGY

    Background Info. Coll.

    .

    Ground Truthing (Phase 1)Digitizing (Phase 2)

    Assessment/Ranking (Phase 2)

    Draft Report

    Policy Development (P3)

    Steering Committee

    Technical Committee

    Committee Presentation

    Public Open House (1)

  • 8/7/2019 Natural Heritage Presentation

    22/22