NATPET Report

57
1 RC COLLEGES & INSTITUTES AT YANBU (Yanbu Industrial College) Centralized Committee for Coop and Summer Training Cooperative Training Report (MET 400) National Petrochemical Industrial Company Prepared By Anas Marwan Kaaki 3424012 Supervised By Turki Fikri Kutbi Summer, 2014-15

Transcript of NATPET Report

Page 1: NATPET Report

1

RC COLLEGES & INSTITUTES AT YANBU

(Yanbu Industrial College)

Centralized Committee for Coop and Summer Training

Cooperative Training Report

(MET 400)

National Petrochemical Industrial Company

Prepared By

Anas Marwan Kaaki

3424012

Supervised By

Turki Fikri Kutbi

Summer, 2014-15

Page 2: NATPET Report

2

Acknowledgement

First of all, I would like to thank Allah for his blessing and protection that he gives them to me

throughout my scientific & practical life and for helping me to finish my coop final report and for

completing most of my courses successfully.

Furthermore, I would like to give a big thank to Yanbu Industrial College specially Mechanical

Engineering Department for providing to me this great opportunity to have an experience in dealing

and communicating with other people from different nationalities and to be able to work in the field

under high pressure and also for supporting me during the 8 weeks of my coop training period. A

special thanks to Engr. Sarwar Pasha for his support and help throughout all my training period.

In addition, I would like to thank Natural Petrochemical Industrial Company (NATPET) and all the

employees that are working there for having me with them as a training student. Huge thanks to the

people who are working in the mechanical department, maintenance section. They were very

supportive and helpful during the training. Of Corse, I can’t forget my supervisor Engr. Turki Kutbi

for helping me a lot and giving me such a support.

At the end, I would like to thank my friends for their support and help during my studies. A special

thank goes to my parents for their kindness and support throughout my educational life.

Page 3: NATPET Report

3

Table of Content

Chapter 1

1. INTRODUCTON

1.1. About NATPET………………………………………………………………………...1

1.2. NATPET Product and its uses………………………………………………………….1

1.3. NATPET Plants……………………………………………………………………….. 1

1.4. NATPET Raw Materials and sources…………………………………………………..2

1.5. NATPET Vision, Mission & Goals…………………………………………………….2

Chapter 2

2. SAFETY

2.3. General Safety Rules that should be Followed in NATPET Company………………….4

2.4. Work Permits………………………………………………………………………….....4

2.4.1. Hot Work Permit………………………………………………………………...4

2.4.2. Cold Work Permit……………………………………………………………......4

2.4.3. Confined Space Entry Permit……………………………………………………5

2.5. Personal Protective Equipment (PPE)…………………………………………...………5

2.5.1. Head Protection…………………………………………………………..……...5

2.5.2. Eye Protection………………………………………………………………..….6

2.5.3. Ear Protection…………………………………………………………………....6

2.5.4. Hand Protection………………………………………..………………………...6

2.5.5. Body Protection…………………………………………..……………………...6

2.5.6. Foot Protection……………………………………………..……………………6

Chapter 3

3. FIELD EXPERIENCES

3.1. Work Order No.1 (Blower)…………………………………………………..…………..8

3.1.1. Equipment Name & Type…………………………………………………..……..8

3.1.2. Work Objective & Goal……………………………………………………..…….9

3.1.3. Work Details………………………………………………………………..……..9

3.1.3.1. Problem Description………………………………………………..…….9

3.1.3.2. Observations…………………………………………..………………….9

3.1.3.3. Recommendations………………………………………........................10

3.1.3.4. Work Procedure…………………………………………………………10

3.1.3.5. Action Performed……………………………………………………….10

3.1.4. Manpower & Duration…………………………………………………………..12

3.1.5. Result & Conclusion……………………………………………………………..12

3.2. Work Order No.2 (Feed Drier Regenerate Pump)……………………………………...13

3.2.1. Equipment Name & Type………………………………………………………..13

Page 4: NATPET Report

4

3.2.2. Work Objective & Goal…………………………………………………….……14

Case I

3.2.3. Work Details……………………………………………………………………..14

3.2.3.1. Problem Description…………………………………………………….14

3.2.3.2. Observations…………………………………………………………….15

3.2.3.3. Recommendations………………………………………………………15

3.2.3.4. Work Procedure…………………………………………………………16

3.2.3.5. Action Performed……………………………………………………….16

3.2.4. Manpower & Duration…………………………………………………………..17

3.2.5. Result & Conclusion……………………………………………………………..17

Case II

3.2.3. Work Details……………………………………………………………………..18

3.2.3.1. Problem Description…………………………………………………….18

3.2.3.2. Observations…………………………………………………………….18

3.2.3.3. Recommendations……………………………………………………....18

3.2.3.4. Work Procedure…………………………………………………………19

3.2.3.5. Action Performed……………………………………………………….19

3.2.4. Manpower & Duration…………….…………………………………………….19

3.2.5. Result & Conclusion……………………………………………………………..19

3.3. Work Order No.3 (Hydrogen Diaphragm Compressor)………………………………..20

3.3.1. Equipment Name & Type………………………………………………………..20

3.3.2. Work Objective & Goal………………………………………………………….21

3.3.3. Work Details……………………………………………………………………..21

3.3.3.1. Problem Description…………………………………………………….21

3.3.3.2. Observations…………………………………………………………….21

3.3.3.3. Possible Causes…………………………………………………............22

3.3.3.4. Recommendations………………………………………………………22

3.3.3.5. Action Performed……………………………………………………….23

3.3.4. Manpower & Duration…..………………………………………………………23

3.3.5. Result & Conclusion……………………………………………………………..23

3.4. Work Order No.4 (Rotary Feeder)……………………………………………………..24

3.4.1. Equipment Name & Type………………………………………………………..24

3.4.2. Work Objective & Goal………………………………………………………….24

3.4.3. Work Details……………………………………………………………………..25

3.4.3.1. Problem Description…………………………………………………….25

3.4.3.2. Observations…………………………………………………………….25

3.4.3.3. Recommendations………………………………………………………25

3.4.3.4. Work Procedure…………………………………………………………26

3.4.3.5. Action Performed……………………………………………………….26

3.4.4. Manpower & Duration…………………………………………………………..26

3.4.5. Result & Conclusion……………………………………………………………..26

3.5. Work Order No.5 (Vertical Pump)……………………………………………………..27

3.5.1. Equipment Name & Type………………………………………………………..27

3.5.2. Work Objective & Goal………………………………………………………….28

Page 5: NATPET Report

5

3.5.3. Work Details……………………………………………………………………..28

3.5.3.1. Problem Description…………………………………………………….28

3.5.3.2. Observations…………………………………………………………….28

3.5.3.3. Recommendations………………………………………………………30

3.5.3.4. Work Procedure…………………………………………………………30

3.5.3.5. Action Performed……………………………………………………….31

3.5.4. Manpower & Duration…………………………………………………………..32

3.5.5. Result & Conclusion……………………………………………………………..32

3.6. Tools Used……………………………………………………………………………...32

Chapter 4

4. Theoretical Background

4.1. Introduction to Mechanical Maintenance……………………………………………....34

4.1.1. What is Maintenance? …………………………………………………………34

4.1.2. Objectives of Maintenance………………………………………………………35

4.1.3. Types of Maintenance…………………………………………………………...35

4.1.4. Common Machinery Problems…………………………………………………..37

4.1.5. Description & Work Performance of Different Equipment………………………………….37

4.1.5.1. Pumps…………………………………………………………………...37

4.1.5.2. Compressors…………………………………………………………….39

4.1.5.3. Rotary Feeder…………………………………………………………...40

Chapter 5

5. Conclusion, References & Appendix

5.1. Conclusion……………………………………………………………………………...42

5.2. References……………………………………………………………………………...43

5.3. Appendix……………………………………………………………………………….44

Page 6: NATPET Report

6

List of Tables

Table 1.1: NATPET Raw Materials & Sources…………………..………………………………….2

Table 3.1: Clearance Readings…………………………………….………………………………..12

List of Figures

Figure 1.1: NATPET Company……………………………………..………………………………..1

Figure 2.1: Hot Work Permit………………………………………..………………..........................5

Figure 2.2: Cold Work Permit………………………………………..……………………………....5

Figure 2.3: Confined Space Entry Permit……………………………..………………….................. 5

Figure 2.4: Head Protection……………………………………………..…………………….……...5

Figure 2.5: Eye Protection………………………………………………..…………………….…….6

Figure 2.6: Hearing Protection……………………………………………..………………….……..6

Figure 2.7: Hand Protection…………………………………………………..…………………...…6

Figure 2.8: Body Protection……………………………………………………..……………...……6

Figure 2.9: Foot Protection………………………………………………………...……………..…. 6

Figure 3.1: Blower Equipment from Shaft Side……………………………………..…………….…8

Figure 3.2: Blower Equipment from Gears Side……………………………………..……………....8

Figure 3.3: Blower Equipment Diagram………………………………………………..……………8

Figure 3.4: Damaged Oil Seal on the Blower’s Shaft Side...........................................................…...9

Figure 3.5: New Oil Seal on The Blower’s Shaft Side…………………………………...…………11

Figure 3.6: Blower’s Rotor Timing Adjustment.........................................................................…...11

Figure 3.7: Measuring The Blower’s Lobes clearances…………………………………………….11

Figure 3.8: Blower Rotary Lobes……………………………………………………..…………….11

Figure 3.9: Clearance Readings……………………………………………………….…………….12

Figure 3.10: Feed Drier Regenerate Pump Pic.1.........................................................................…...13

Figure 3.11: Feed Drier Regenerate Pump Pic.2……………………………………………………13

Figure 3.12: Feed Drier Regenerate pump Diagram………………………………….…………….13

Figure 3.13: Isolation Blinds………………………………………………………………….…….14

Figure 3.14: Leaked Mechanical Seal on the Regenerate Pump……………………………...…….15

Figure 3.15: Suction Flange Oil Observation on the Regenerate Pump……………………….……15

Figure 3.16: New Mechanical Seal on the Regenerate Pump.....................................................…...16

Figure 3.17: New O-ring on the Regenerate Pump’s Flange…………………………….…………16

Figure 3.18: New Ball Bearing Fixed on the Regenerate pump’s Shaft…………………….……...17

Figure 3.19: New Cylindrical Bearing Fixed on the Regenerate Pump’s Shaft………………….…17

Figure 3.20: Broken Mechanical Seal’s Stationary Ring……………………………………...……18

Figure 3.21: Repaired Mechanical Seal Fixed on the Regenerate Pump…………………….……..19

Figure 3.22: Hydrogen Compressor Equipment…………………………………………………….20

Figure 3.23: Hydrogen Compressor Diagram………………………………………………...…….20

Page 7: NATPET Report

7

Figure 3.24: Pitting Marks on the Compressor’s Diaphragm......................................................…...21

Figure 3.25: Worn out Marks on the Compressor’s Valves…………………………..…………….22

Figure 3.26: New Valves for the Compressor………………………………………………………23

Figure 3.27: Three New Diaphragms for the Compressor………………………………….………23

Figure 3.28: Rotary Feeder Equipment………………………………………………….………….24

Figure 3.29: Rotary Feeder Diagram……………………………………………………..…………24

Figure 3.30: Damaged Radial Shaft Seal on the Rotary Feeder..................................................…...25

Figure 3.31: Damaged Labyrinth Seal on the Rotary Feeder......................................................…...25

Figure 3.32: New Radial Shaft Seal for the Rotary Feeder…………………………...…………….26

Figure 3.33: New Labyrinth Seal for the Rotary Feeder……………………………………………26

Figure 3.34: Vertical Pump Equipment.......................................................................................…...27

Figure 3.35: Vertical Pump Diagram…………………………………………….…………………27

Figure 3.36: Vertical Pump’s Shafts………………………………………………………………..28

Figure 3.37: Worn out Marks on the Sleeves & Pushing of the Pump’s Shaft…………………..…29

Figure 3.38: Damaged Sleeves on the Pump’s Shafts.................................................................…...29

Figure 3.39: Damaged Pushing on the Shaft’s sleeves………………………………..…………….29

Figure 3.40: New Sleeve for the Shaft…………………………………………………..………….31

Figure 3.41: New Pushing for the Sleeve…………………………………………………………...31

Figure 3.42: New Coupling to Couple the Pump’s Shafts………………………………………….31

Figure 3.43: New Circlip to Lock the Sleeve on the Shaft..........................................................…...31

Figure 3.44: Tools Used..............................................................................................................…...32

Figure 4.1: Component Failure Rate Over Time for Component Population………………………34

Figure 4.2: Maintenance Types…………………………………………………………..…………35

Figure 5.1: YIC Training Letter……………………………………………………………….........44

Figure 5.2: Training Plan……………………………………………………………………………45

Figure 5.3: Attendance Sheet……………………………………………………………………….46

Figure 5.4: Progress Report…………………………………………………………………………47

Figure 5.5: Plagiarism Report from Turnitin………………………………………………………..48

Page 8: NATPET Report

8

Abstract

On the 7th

of June, I have started my coop training program at National Petrochemical Industrial

Company (NATPET) that was for 8 weeks.

Therefore, I have to submit a final report to my college, Yanbu Industrial College (YIC) that

discusses the important activities that I have earned and learned during the training in NATPET

Company.

However, I have written a report that includes five chapters. The first chapter provides an

introduction to NATPET Company, such as information about NATPET, production of NATPET

and its uses, NATPET plants, raw materials and sources of NATPET, NATPET vision, mission and

goals, operation & management departments of NATPET, and NATPET quality policy.

The second chapter gives an overview about safety, such as safety rules, permits of work, and

focusses mostly on the Personal Protective Equipment (PPE).

The third chapter describes the different work activities that I have faced during my training period

in NATPET Company. It describes different things, such as the work objective and goal of this

work order, the work details, and the tools that have been used during the work.

The fourth chapter gives a theoretical background about the mechanical maintenance department,

such as the definition of maintenance, objectives of maintenance, maintenance types, common

machinery problems, and some working principles of different equipment.

The last chapter is about the conclusion & references.

Page 9: NATPET Report

9

CHAPTER.1

INTRODUCTION

Page 10: NATPET Report

10

1.1. About NATPET

National Petrochemical Industrial Company (NATPET) is a joint

stock Saudi company, it was established since 1999. Its location is on

Saudi Arabia’s west coast in Yanbu Industrial City. NATPET

Company produces a large quantity of Polypropylene that is suitable

for different applications. NATPET produces a capacity of 400,000

Metric Ton per Year of Polypropylene & Propylene since the year of

2008. The company is divided into two plants. These are:

Polypropylene Plant (PP). Propane Dehydrogenation Pant (PDH). In

the PDH plant, the company uses the technology of UOP’s Oleflex in

order to convert Propane gas into Propylene gas. In the PP plant, the

company uses the technology of the state of the art Lyondell Basel’s

Spheripol to convert Propylene gas into polypropylene pellets.

1.2. NATPET Product and its Uses

NATPET produces many different grades of Polypropylene product that are mixed of (Random

Terpolymers, Homopolymers, Random Copolymers, and specialty Impact copolymers) and selling

these products under name of Teldene.

Polypropylene (PP) product is a thermoplastic crystalline. It is the lightest in weight polymer

compared to the other thermoplastics. When this polypropylene is ignited, it burns with an acidic

smell and non-smoky flame. Actually, this product is tasteless and non-toxic. Polypropylene has

different properties, such as rigidity, light weight, high surface gloss, heat resistance, toughness, and

chemical resistance).

Polypropylene product has different applications, such as food packaging house ware, cosmetic,

medical, hosiery, films & sheets, fiber, caps & closures, engineering parts & tools, and automotive.

1.3. NATPET Plants

PDH- Propane Dehydrogenation

PDH plant uses UOP’s Oleflex technology to produce 400 KT/Y of Propylene gas from Propane

gas that is received from Aramco.

Figure.1.1 NATPET Company

Page 11: NATPET Report

11

PP- Polypropylene

PP plant uses Basell’s Spheripol technology to produce 400KT/Y of Polypropylene pellets from

Propylene gas that is received from PDH plant.

1.4. NATPET Raw Materials & Sources

Raw Material Source

Propane & Natural Gas Saudi Aramco Refinery

Ethylene SABIC - YANPET

Nitrogen SABIC - GAS

Water Royal Commission

Power (electricity) MARAFIQ

Hydrogen Own Generation

Catalyst & Chemicals Global Vendor

1.5. NATPET Vision, Mission & Goals

Vision

To be known as one of the major universal players in producing and selling the best top quality and

quantity of Polypropylene product.

Mission

NATPET militates & strives to be a company of the best and preferred choice in relation to its

society, employees, suppliers, customers, and stakeholders.

Goals

- To meet development needs of the Saudi’s society.

- To make the community richer through out each activity.

- To become the “employer of choice”.

- To provide opportunities for learning and growth to all the employees.

- To operate and work at the highest safety standards for our, assets, employees and

environment.

- To exceed the expectations of our customers.

- To add value to the needs of the shareholders.

Table 1.1 NATPET Raw Materials & Sources

Page 12: NATPET Report

12

CHAPTER.2

SAFETY

Page 13: NATPET Report

13

2.3. General Safety Rules that Should be Followed in NATPET Company:

Ensure your own safety and health at work.

Avoid putting any other person in danger.

Respect the traffic signs inside the plant.

Mobile phones are not allowed inside NATPET Company.

Don’t forget to put on your seat belt while driving.

Smoking is prohibited, except in demarcated and allocated smoking areas.

Eating and drinking inside the plant is not allowed, except in allocated areas.

Response to plant emergency alarm.

You must have permit to perform any activity inside the plant.

Full body harness with lanyards must be worn when working at height.

Proper Personal Protective Equipment (PPE) must be worn for the required work.

Follow proper and safe techniques when lifting heavy objects.

Use the right tool for the job.

2.4. Work Permits

The objective of the work permit is to ensure adequate safety precautions in non-routine and

maintenance activities. Work permit must be given when any type of work need to be done. There

are a number of different permits used on different jobs, these are:

1. Hot Work Permit.

2. Cold Work Permit.

3. Confined Space Entry Permit.

2.4.1. Hot Work Permit

Any heat source that is capable of creating and causing spark or ignition. Examples of works that

needs this type of permit: Welding, Grinding, Grilling, Burning, Chipping, Sandblasting, All open

flames, Soldering & Brazing.

2.4.2. Cold Work Permit

Any type of work activity that does not creates and cause spark or ignition. Examples of works that

needs this type of permit: Scaffolding, Painting, insulation work, use of hand tools, Housekeeping,

Lock-out & Tag-out.

Page 14: NATPET Report

14

2.4.3. Confined Space Entry Permit

Any type of work that involve entering into a confined, deep or small area that does not have

enough ventilation. Example of works that needs this type of permit: working inside Tanks,

Vessels, Reactors, Towers, Drums, Excavation areas, Pipes & Boilers.

2.5. Personal Protective Equipment (PPE)

Personal Protective Equipment is used to prevent or reduce injuries to workers. It can protect us

from different workplace hazards (Mechanical, Electrical, and Chemical).

Personal Protective Equipment (PPE) Requirements:-

Head Protection, Eye Protection, Hearing Protection, Hand Protection, Body Protection, Foot

Protection, Breathing Protection.

2.5.1. Head Protection: Hard Hat is used to protect the

workers from impacts that can injure them. It can protect our

head from falling objects, fixed objects, and sharp edges. It

must be at a good condition and must be worn all the time

when you are in the field or the workshop.

Figure 2.1 Hot Permit

Permir

Figure 2.2 Cold Permit Figure 2.3 Confined Space Permit

Figure 2.4 Head Protection

Page 15: NATPET Report

15

2.5.2. Eye Protection: Safety Glasses and Safety Goggles are used

to protect the worker’s eyes from any chemical splashes, dirt, small

chips and flying particles that may exist in the air. In addition, face

shield must be used when dealing with hot work activities, such as

welding, to protect the eyes from flame’s radiation. These

protections are used to prevent or reduce injuries to the worker’s

eyes. They must be worn at all the time when working inside the plant.

2.5.3. Hearing Protection: Earplugs or Earmuffs are used to protect

the worker’s ears from being damaged by high sound of machines

and equipment. They must be used at all times inside the field

especially at high noise situations.

2.5.4. Hand Protection: Safety gloves are used to protect the

worker’s hands from injuries. By wearing gloves, you will be able

to handle sharp edges, hot parts, and chemicals without injuring

your hands. These gloves can be from different materials, such as

cotton, cloth or leather.

2.5.5. Body Protection: It is used to protect the worker’s body

from any danger or hazards. It can be whether as a one piece

(coverall) or as two pieces. It must be worn all the time inside the

company.

2.5.6. Foot Protection: Safety shoes or boots are used to

protect the worker’s feet from any hazards that can injure them.

These hazards can be in the form of electrical shocks, falling of

heavy tools or equipment over your feet, injuries from splashes

liquids.

Figure 2.9 Foot Protection

Figure 2.7 Hand Protection

Figure 2.8 Body Protection

Figure 2.6 Hearing Protection

Figure 2.5 Eye Protection

Page 16: NATPET Report

16

CHAPTER.3

FIELD EXPERIENCES

Page 17: NATPET Report

17

3.1. Work Order No.1

Plant: PP (Polypropylene)

3.1.1. Equipment Name & Type

Equipment: Blower (GM 90 S)

Type: Rotary Positive Displacement Compressor (Lobe Type)

Figure.3.1 Blower Equipment from Shaft Side Figure.3.2 Blower Equipment from Gears Side

Figure.3.3 Blower Equipment Diagram

Page 18: NATPET Report

18

3.1.2. Work Objective & goal

To do corrective maintenance on the Blower.

To make the Equipment running normally and without any problem.

3.1.3. Work Details

3.1.3.1. Problem Description:

The guys who are working in the PP plant noticed that the Blower equipment was not running

normally. So, they told us (Mechanical Maintenance Department) to check what went wrong. After

we checked the equipment, we noticed three problems that caused this abnormal running. These are:

- Abnormal sound.

- Oil level reduced.

- Oil leak from shaft seal.

3.1.3.2. Observations:

We took the Blower into the workshop to see what cause that leaking and that high abnormal sound.

So after we opened the equipment, we observed the following:

- Seal edge of the shaft seal worn out (Oil seal is damaged).

- Wear in the internal ring.

- Changing in rotors timing.

Figure.3.4 Damaged Oil Seal on the Blower’s Shaft Side

Page 19: NATPET Report

19

3.1.3.3. Recommendations:

- Replace the old oil seal by a new one to prevent oil loss (If you kept the damaged seal for a

longer time, the oil will get fewer and that will make the inside components to run roughly

which will cause heat. As a result of that, many components will get damaged).

- Check the oil level weekly.

- Adjust the timing between blower rotors.

- Yearly check the machine clearances.

3.1.3.4. Work Procedure:

1. Bring the equipment to the workshop and remove the front & back cover by taking off all

the bolts & nuts using different tools.

2. Clean the two covers from inside and outside and also clean the shaft by using a spray,

rough paper & sharp tool to clean the edges.

3. Dry the equipment from oil by using air.

4. Removed the shaft’s key so that you can take off the bearings to make it easier for changing

the oil seal.

5. Change the damaged oil seal and the internal ring by new ones.

6. Insert the bearings back into the shaft by heating them using a special device (heater).

7. Fix the key back into the shaft.

8. Adjust the rotors timing (lobes) from the gear side by injecting some oil inside the gear so

that keeping a small distance between them to be rotated and adjusted freely.

9. Check the clearances of the two lobes inside the blower (suction & discharge) by using

different sizes of filler gauge tool.

10. Reassemble the equipment.

3.1.3.5. Actions Performed:

- All bearing visually inspected.

- Internal ring and shaft seal have been replaced by new parts.

- Timing between blower rotors has been adjusted.

- All the clearances of the two lobes inside the blower have been checked.

Page 20: NATPET Report

20

- Damaged oil seal replaced by new one, adjusting the rotors timing from the gear side

Taking clearances between the two lobes (Suction & Discharge)

Figure.3.

Figure.3.6 Blower’s Rotor Timing Adjustment Figure.3.5 New Oil Seal on the Blower’s Shaft Side

Figure.3.7 Measuring the Blower’s Lobes Clearances Figure.3.8 Blower Rotary Lobes

Page 21: NATPET Report

21

Clearance Reading:

Cylinder Side plate Timing Rotors Backl

ash

Bearing

Clearance

GM

90S

Dis. Suc. Timing

Gear

Pulley Dis. Suc. Axial

Range 10-12 33-37 18-21 39-51 14-22 39-52 6-12 9-14

As found 11 35 20 40 28 30 10 10

Final 11 35 20 40 16 50 10 10

3.1.4. Manpower & Duration:

- Manpower: 3 workers.

- Duration: 24 hours.

3.1.5. Result & Conclusion:

The Blower equipment was running normally and without any leakage or abnormal sound. In

addition, the work was performed successfully and without any incidents.

Table 3.1 Clearance Readings

Figure.3.9 Clearance Readings

Page 22: NATPET Report

22

3.2. Work Order No.2

Plant: PDH (Polypropylene)

3.2.1. Equipment Name & Type

Equipment: Feed Drier Regenerate Pump (P5001A/B)

Type: Centrifugal Pump

Figure.3.10 Feed Drier Regenerate Pump Pic.1

Figure.3.12 Feed Drier Regenerate Pump Diagram

Figure.3.11 Feed Drier Regenerate Pump Pic.2

Page 23: NATPET Report

23

3.2.2. Work Objective & Goal

To perform corrective maintenance on the centrifugal pump.

To replace and change any damaged parts that can cause the equipment to be damaged

completely.

Overhauling the equipment.

------------------------------------------------------- [Case I] --------------------------------------------------

3.2.3. Work Details

3.2.3.1. Problem Description:

People from the PDH plant called us and told us that the feed drier pump does not work properly

and does not give the required operation. So when we went there to see what the problem is, we

noticed the following:

- An Abnormal noise.

- Produce high vibration.

- A serious leaking from the bearing house side.

The moment we removed the pump to the workshop to be repaired, we put some blinds between the

flanges to isolate the system, see the figure.

Figure.3.13 Isolation Blinds

Page 24: NATPET Report

24

3.2.3.2. Observations:

We brought the equipment to the workshop to see what the problem is. When we opened the pump,

we observed the following:

- A gap between the stationary ring and the rotating ring of the mechanical seal that cause the

oil to leak through the drain. So, that is an indication of a mechanical seal (primary seal)

leakage.

- We observed that the bearings (ball & cylindrical), oil seals, O rings, and gaskets were not

changed or replaced since a long time.

3.2.3.3. Recommendations:

- Send the damaged mechanical seal to the manufacturer for repair. At the meantime, use

a new mechanical seal until the old one get back from the manufacturer.

- Replace all bearings, oil seals, O rings, and gaskets by new ones (overhaul the

equipment).

Figure.3.14 Leaked Mechanical Seal on the Regenerate Pump Figure.3.15 Suction Flange Oil Observation

Page 25: NATPET Report

25

3.2.3.4. Work Procedure:

1. Disassemble the equipment by taking off all the bolts & nuts using different tools.

2. Take off the cover which is mounted on the shaft from the motor side, actually it was stuck,

so we heated it until it expands after that we removed it.

3. Remove both covers DE (Drive End) & NDE (Non Drive End).

4. Take off all (Gaskets, O rings, and Oil seals) and change them by new ones.

5. Dry the oil that has leaked from the bearing house side (suction flange).

6. Remove the impeller which is fixed on the NDE side and clean it.

7. Take off the shaft.

8. Remove the mechanical seal to inspect it.

9. Remove all the bearings (hit them by hammer if they were stuck).

10. Change all the bearings (ball & roller) by new ones.

11. Insert all the three ball bearings back into the shaft from one side and the roller bearing from

the other side by heating them using a heater device.

12. Replace the damaged mechanical seal by new one.

13. Reassemble the equipment.

3.2.3.5. Action Performed:

- The damaged mechanical seal has been changed by new one and the old one has been sent

for repair.

- All bearings, oil seals, O rings, and Gaskets have been changed by new ones.

Figure.3.16 New Mechanical Seal on the Regenerate Pump Figure.3.17 New O-ring on the Regenerate Pump’s Flange

Page 26: NATPET Report

26

.

3.2.4. Manpower & Duration:

- Manpower: 3 Workers

- Duration: 20 hours.

3.2.5. Result & Conclusion

When we brought back the pump to the field, we wanted to fix it in its original place and remove all

the blinds. After we fixed the pump, we noticed that the pressure still high. So, we couldn’t remove

the blinds until the pressure is getting lower. We used a hose to suck some of the pressure and move

it to another area. Now, the pressure is at zero. So, we closed the valve to stop the flow and remove

all the blinds. Unfortunately, there was a problem with the valve. The fluid (Hydrocarbon) was still

flowing (passing). So when we tried to open the flange bolts, the fluid was going out. Then we

closed the valve and told the workers who are working in the PDH plant to repair it and inform us

when they finish. (The pump was not operating at that time).

Figure.3.18 New Ball Bearings Fixed Shaft Figure.3.19 New Cylindrical Bearing Fixed on the Shaft

Page 27: NATPET Report

27

--------------------------------------------------- [Case II] -----------------------------------------------------

3.2.3. Work Details

3.2.3.1. Problem Description:

People at the PDH plant informed us that they finished repairing the valve. So we went back to the

field to see the pump. Actually, we noticed some leaking from the same side that was leaking

before. So we have to take it back again to the workshop to inspect it and see what the problem is.

3.2.3.2. Observations:

When we opened the equipment, we found that the leaking was from the suction flange.

Unfortunately, the problem of this leaking was from the mechanical seal. We found the stationary

carbon ring of the mechanical seal broken and that caused by uneven press on the mechanical seal

to squeeze the springs inside.

* NOTE: - At that time, the old mechanical seal that was sent to the manufacturer has already been

repaired and received by the company.

3.2.3.3. Recommendations:

- Change the damaged mechanical seal by the one that has been repaired by the manufacturer.

- Check the oil level.

Figure.3.20 Broken Mechanical Seal’s Stationary Ring

Page 28: NATPET Report

28

3.2.3.4. Work Procedure:

- Preforming the same procedures that we did in [Case I] by changing only the mechanical

seal.

3.2.3.5. Action Performed:

- The damaged mechanical seal has been replaced by the one that was repaired by the

manufacturer.

- Oil level has been checked.

3.2.4. Manpower & Duration:

- Manpower: 2 People.

- Duration: 10 hours.

3.2.5. Results & conclusion:

- The valves was working successfully without any passing and the blinds was removed

without any fluid going out.

- The equipment was aligned using special tools and devices.

- The equipment was working normally without any leaking.

- The work performed successfully and without any injuries.

Figure.3.21 Repaired Mechanical Seal Fixed on the Pump

Page 29: NATPET Report

29

3.3. Work Order No.3

Plant: PDH (Propane Dehydrogenation)

3.3.1. Equipment Name & Type

Equipment: Hydrogen Diaphragm Compressor (C-4502)

Type: Reciprocating Positive Displacement Compressor-Diaphragm Type (Three-Diaphragms)

Figure.3.22 Hydrogen Compressor Equipment

Figure.3.23 Hydrogen Compressor Diagram

Page 30: NATPET Report

30

3.3.2. Work Objective & Goal

To prevent the equipment from being damaged.

To do corrective maintenance on the compressor.

To avoid unexpected shutdown.

3.3.3. Work Details

3.3.3.1. Problem Description:

The people who are working in the PDH plant told us that there is a problem with the Hydrogen

Compressor while operating. The flow rate of the compressor was not enough through the

discharge. The compressor was giving less flow ranged between 4.5 to 6.5 Kg/hr. actually; the

required flow rate should be between 7 to 9 Kg/hr. abnormal sound was also observed with no sign

of any leakage.

3.3.3.2. Observations:

After we opened the top cover of the compressor, the following were observed:

- Pitting marks were observed on the three diaphragm’s surfaces.

- Some worn out marks were found in the suction & discharge valves and gaskets.

Figure.3.24 Pitting Marks on the Compressor’s Diaphragms

Page 31: NATPET Report

31

3.3.3.3. Possible Causes:

- The diaphragms were losing their efficiency because there were already passing their

lifetime of running hours (6 months). For that reason, the discharge pressure and flow rate

were affected.

- The suction & discharge valves were passing. They were always in the open state (didn’t

close) and that was caused because some of the particles were stuck inside resulting in less

discharge flow.

- Oil limiter was not calibrated to the desired oil pressure.

3.3.3.4. Recommendations:

- Replace all three diaphragms by new ones; diaphragms have to be replaced after every 4000

running hours (6 months).

- Check the oil condition for any particles from time to time so that no particles will be stuck

in the valves or enter the compressor and damage the diaphragm.

- Yearly drain and replace the oil.

- Check the oil plate condition.

- Adjust the oil limiter.

Figure.3.25 Worn out Marks on the Compressor’s Valves

Page 32: NATPET Report

32

3.3.3.5. Action Performed:

- Diaphragms have been changed with new ones.

- Suction & discharge valves and gaskets have been replaced.

- Oil plate has been checked for foreign particles, and no particles were found.

- Oil plate’s O-rings have been replaced.

- Oil limiter has been adjusted.

3.3.4. Manpower & Duration:

- Manpower: 4 workers.

- Duration: 5 hours.

3.3.5. Result & Conclusion

The Hydrogen Compressor was handed over to operation ant it was started healthy and working

normally with a discharge flow ranged between 7 to 9 Kg/hr.

Figure.3.26 New Valves for the Compressor Figure.3.27 Three New Diaphragms for the Compressor

Page 33: NATPET Report

33

3.4. Work Order No.4

Plant: PP (Polypropylene)

3.4.1. Equipment Name & Type

Equipment: Rotary Feeder

Type: Rotary Lock Valves (Nitrogen)

3.4.2. Work Objective & Goal

To be aware of unexpected shutdown.

To make the Rotary Feeder working normally & healthy.

To make corrective maintenance for the equipment.

Figure.3.28 Rotary Feeder Equipment

Figure.3.29 Rotary Feeder Diagram

Page 34: NATPET Report

34

3.4.3. Work Details

3.4.3.1. Problem Description:

Workers in the PP plant told us to check the Rotary Feeder equipment because it was not working

normally. They noticed some powder leakage. So, we went there to see what went wrong.

Normally, the nitrogen is injected into the rotary feeder to help it while moving the powder resin

from one section to another (simplifying the moving of powder) and this nitrogen goes out to the

atmosphere.

Currently, the nitrogen gas was not going out to the atmosphere alone. Actually, some powder was

going out with the gas too.

3.4.3.2. Observations:

When we opened the equipment to investigate the problem, the following were observed:

- We found that the main cause of this leakage was from the seal (two types of seal were

damaged, radial shaft seal & labyrinth seal).

- We observed that all ball bearings were not changed for a long time.

3.4.3.3. Recommendations:

- Remove all damaged seals and replace them by new seals.

- Change all ball bearings with the shim ring between them to avoid unexpected damage.

- Remove & clean the powder that was leaked from the equipment.

Figure.3.31 Damaged Labyrinth

Seal

Figure.3.30 Damaged Radial Shaft Seal

Page 35: NATPET Report

35

3.4.3.4. Work Procedure:

1. Remove the socket head cap screws.

2. Remove the cover.

3. Remove the two ball bearings and the shim ring between them.

4. Take off the Hex. Head bolt & washer to remove the second cover.

5. Remove the end plate.

6. Take off both the radial shaft seal and the labyrinth seal.

7. Replace the ball bearings by new ones because we noticed that they were not changed for a

long time.

8. Replace both the radial shaft seal and the labyrinth seal.

9. Reassemble the parts to the equipment.

3.4.3.5. Action Performed:

- All damaged seals have been replaced with new seals.

- All ball bearings with their shim rings have been replaced with new ones.

- Leaked powder have been removed & cleaned.

3.4.4. Manpower & Duration:

- Manpower: 4 Workers.

- Duration: 2 hours.

3.4.5. Result & Conclusion

After we changed all damaged parts, the Rotary Feeder was operating and running without any

problem and without any powder leaking.

Figure.3.33 New Labyrinth Seal Figure.3.32 New Radial Shaft Seal

Page 36: NATPET Report

36

3.5. Work Order No.5

Plant: PP (Polypropylene)

3.5.1. Equipment Name & Type

Equipment: Vertical Pump (P-9803 A/B)

Type: Multi-Stage Centrifugal Pump

Figure.3.35 Vertical Pump Diagram Figure.3.34 Vertical Pump Equipment

Page 37: NATPET Report

37

3.5.2. Work Objective & Goal

To run the equipment without any problem.

To prevent the equipment from being damaged completely.

To avoid unplanned shutdown.

3.5.3. Work Details

3.5.3.1. Problem Description:

The employees who are working in the condition monitoring department (vibration section) told us

that there is an abnormal sound in the vertical pump which is in the PP plant. They told us that they

observed very high vibration on the pump. So, we went to the plant to investigate the equipment.

Actually when we went there we did not notice any sign of leakage. We believed that the main

problem was from one of the rotating parts inside the pump. So, we took the equipment to the

workshop to detect the problem.

3.5.3.2. Observations:

When we brought the equipment to the workshop to see what cause that high vibration, we

disassemble it and observed that the problem was from the shaft.

Fortunately, the shaft was not running without protection. There were sleeves that coved that shaft

and pushing that covered the sleeves. Also, we observed some worn out marks on the internal wall

of the coupling part. So, the damaged parts were the pushing, the sleeves and the coupling. But the

shaft was safe. If the shaft was running without protection, it would cost us a very high cost to buy a

new one.

Figure.3.36 Vertical Pump’s Shafts

Page 38: NATPET Report

38

Figure.3.38 Damaged Sleeves

Figure.3.37 Worn out Marks on the Sleeve & Pushing

Figure.3.39 Damaged Pushing

Page 39: NATPET Report

39

3.5.3.3. Recommendations:

- Remove all sleeves and pushing and replace them by new ones.

- Change the coupling that holds the two shafts together and replace it by new one.

- Check the shaft’s runout and make sure that it is straight.

- Make sure to use the correct sleeve & pushing, by measuring their diameters with reference

to the shaft diameter.

- Replace all circlips with new ones.

3.5.3.4. Work Procedure:

1. Remove the two covers (Brackets) from both sides.

2. Disassemble the equipment so that yiu can remove the shaft freely.

3. Take off the two shafts the are connected together through a coupling from the pump and

carry them carefully by using a movable crane.

4. Remove the dameged coupling from the two shaft and change it by new one.

5. Remove all damaged sleeves & pushing from the shaft and change them by new onse.

6. Heat and hammer all sleeves & pushings if they don’t want to come out (stuck).

7. Clean the shaft by using a rough paper.

8. Check the shaft’s runout by using a dial indicator gauge.

9. Measure the dsiameters of all sleeves & pushing with reference to the shaft by using both

micrometer & telescopic gauges.

10. Oil the parts to simplify the inserting of sleeves into the shaft and the pushing into the

sleeves.

11. Insert all the sleeves into the shaft and make sure that they are engagrd with the shaft

through the key.

12. Use new circlips to lock the sleeve so that it connot move.

13. Insert all the pusing into the sleeves.

14. Do the sme steps from 4 to 12 with the other shaft.

15. Couple the two shafts together again by the new coupling part.

16. Reassemble the equipment.

Page 40: NATPET Report

40

3.5.3.5. Action Performed:

- All pushing & sleeves have been replaced.

- The coupling part the connect the two shafts together has been changed.

- All circlips have been changed with new clips.

- Diameters of shaft, pushing & sleeves have been checked.

- The shaft’s runout has been checked.

Figure.3.41 New Pushing for the Sleeve

Figure.3.43 New Circlip to Lock the Sleeve on the Shaft

Figure.3.40 New Sleeves for the Shaft

Figure.3.42 New Coupling to Couple the Pump’s Shafts

Page 41: NATPET Report

41

3.5.4. Manpower & Duration:

- Manpower: 3 workers.

- Duration: 60 hours.

3.5.5. Result & Conclusion

The equipment was handed back to operation and every thing was normal and there was no sign of

high vibration.

3.6. Tools Used

There are many different tools that were used during the work procedures to accomplish all the

work orders that I have mentioned before. These are: Dial indicator, Micrometer, Telescopic gauge,

Soft hammer, Hard hammer, Allen key, Chuck key, Spanner, Adjustable spanner, Screw driver,

Chipping tool, filler gauge, Wire brush, Bearing heater, Oil injector, Rough paper, and Spray.

Figure.3.44 Tools Used

Page 42: NATPET Report

42

Chapter.4

Theoretical Background

Page 43: NATPET Report

43

4.1. Introduction to Mechanical Maintenance

During the 8 months of my co-op training period, I was assigned to the Mechanical Maintenance

Department to work as a trainee student. As an introduction to mechanical maintenance, there are

many things that I would like to discuss in this section. These are:

- What is Maintenance?

- Objectives of Maintenance.

- Types of Maintenance.

- Common Machinery Problems.

- Description & Work Performance of Different Equipment.

- Mechanical Seal Fundamentals.

4.1.1. Definition of Maintenance:

It can be defined as “The work of keeping something in good and better condition”. Maintenance is

the action of preventing an equipment or component from being damaged & failed, or to repair

normal equipment and keep it in a good working condition.

Maintenance is like a war. Your enemies are the damages, deterioration and any types of

unexpected events. Your soldiers are the workers in the maintenance department, and the tools that

used are their weapons. The civilians that you have to protect are the office workers, production

workers, drivers, and all the other users of the industry’s equipment.

Figure.4.1 Component Failure Rate over Time for component population

Page 44: NATPET Report

44

4.1.2. Objectives of Maintenance:

To achieve the best performance for the industry’s equipment, devices, and different

facilities.

To reduce the risks that may result from operation working conditions into lower levels.

To keep the device or equipment in a proper working condition so as to reduce unplanned

shutdown.

To protect the equipment from unexpected damages and unplanned events.

Ensuring that the equipment have achieved their full service life time.

To increase functional reliability of the production facilities.

To extend the useful life of the device or equipment.

Minimizing the operating cost of the total production.

Increasing the capacity of production from the equipment resources available.

To enhance the manpower’s safety.

4.1.3. Types of Maintenance:

Breakdown Maintenance.

Preventive Maintenance, include (Periodic Maintenance, Predictive Maintenance).

Corrective Maintenance.

Maintenance Prevention.

Figure.4.2 Maintenance Types

Page 45: NATPET Report

45

o Breakdown Maintenance

Meaning that people waits for the equipment until it fails and then repair it. This type of

maintenance could be used when the failing of the equipment doesn’t create any significant loss or

effect on the production and operation accept for the repairing cost.

o Preventive Maintenance

It is daily process maintenance, such as inspection, oiling, cleaning, and re-tightening). This type of

maintenance is designed to keep the equipment running in a healthy condition and to prevent any

type of failure through the prevention of damages and deteriorations, condition diagnosis or

periodic inspection. This type of maintenance consists of periodic maintenance and predictive

maintenance.

a. Periodic Maintenance

It also called as “Time based maintenance”. This type of maintenance consists of different

processes, such as servicing and cleaning equipment, periodically inspecting, and replacement of

parts in order to prevent unexpected failure or any problems in process.

b. Predictive Maintenance

It also called as “Condition Based Maintenance”. The function of this type of maintenance is based

on predicting the service life of important parts in the equipment through diagnosis or inspection, so

that the parts can be used to their service life’s limits.

o Corrective Maintenance

It upgrades equipment and its parts and components in order to carry out preventive maintenance

reliably. Machines with designed weakness should be redesigned again in order to improve

maintainability and reliability.

o Maintenance Prevention

This type of maintenance is based on indicating the design of new machines. Weakness of different

current equipment are studied well enough (easier maintenance and prevents of defects, safety and

ease of manufacturing) and are integrated and inserted before dealing out with new equipment.

Page 46: NATPET Report

46

4.1.4. Common Machinery Problems

When some components parts are broken-down, they will often cause a further damage which may

lead to mechanical failure and after that to equipment shutdown. Some of these common problems

are:

Unbalance.

Misalignment.

Looseness.

Defective Bearings.

Resonance.

Eccentricity.

Worn Gears.

Motor Electrical Problems.

Drive Belt Problems.

Distortion.

4.1.5. Description & Work Performance of Different Equipment

4.1.5.1. Pumps:

Centrifugal Pump

The centrifugal pump uses centrifugal energy, just as its name implies. It uses a rotating device

called an impeller to move fluid by steering it faster and faster in a circular motion and then

changing its speed into pressure. As the impeller steers the fluid in a rapid circular motion, the

centrifugal force is created that gives the pump its name. it has the advantage to move higher

volume of fluid. They don’t have the ability to exert as much pressure on the fluid as positive

displacement pumps. They usually must be primed.

Multi-Stage Pump: this type of pump uses multiple impellers in order to increase the discharge

pressure, depending on the requirements.

Positive Displacement Pump

The positive displacement pumps impart their energy by capturing a given amount of liquid in a

chamber and then expelling it. They generally have the ability to exert as high pressure on the fluid.

Page 47: NATPET Report

47

- Reciprocating Pump:

There are two general types of reciprocating pumps: The Piston Pump & the Diaphragm Pump.

These types of pumps are operated by using a reciprocating piston or diaphragm. The liquid enters a

pumping chamber via an inlet valve and is pushed out via an outlet valve by the action of the piston

or diaphragm.

Piston: Piston pumps use a plunger or piston to move media through a cylindrical chamber. The

piston pump operates with a suction stroke and a discharge stroke. The suction stroke occurs when

the piston pulls out of the cylinder; a low pressure vacuum is created causing the suction side to

open and the discharge side to close. On the return stroke, the suction valve is closed and the fluid is

forced out of the discharge.

Diaphragm: the Diaphragm pump operates in a simple manner to the piston pump but it uses a

flexible sheet or diaphragm to displace the fluid. An advantage to the diaphragm pump is that it

eliminates contact between the media being pumped and the energy source used to operate the

pump. As the eccentric wheel turns, the diaphragm moves up & down creating the pumping action

required to operate the pump. When the diaphragm is up, the suction valve is open. On the down

stroke the suction valve is force shut and the discharge is opened allowing the fluid to pass through.

- Rotary Pump:

A Rotary Positive Displacement Pump uses the rotating motion of components to create vacuum

that captures & draws in the media (liquid), such as gears, screws, and lobes.

Gear: Is the pump that moves fluid using a rotary motion of the pumping elements. Mostly it

consists of two gears, one is the driving gear and the other is the driven gear. The driving gear gets

the motion from the engine through a shaft. This motion will be transmitted to the other gear

because of the engagement between them. The flow of fluid happens through the casing portion and

trap between the teeth of the gears under high pressure.

Screw: Screw pumps carry the media (fluid) in the gaps or spaces between the threads of the screw.

The media (fluid) is displaced in an axial way as the screws mesh.

Lobe: Fluid is moving between the pumping chamber and the teeth of the rotor. Continuous sealing

is created by the rotor’s surfaces. The timing gears synchronize & drive both gears. This type of

lobe pump is used in the “Blower Equipment”.

Page 48: NATPET Report

48

4.1.5.2. Compressors:

Compressors are the mechanical equipment that increases the gas pressure by reducing its volume.

As the gas is compressed, the temperature is increased.

Centrifugal Compressor:

They are non-positive displacement compressors. Through a rotating impeller, Kinetic Energy (KE)

is imparted to the air. As air is passing through the diffuse, it will be converted Potential Energy

(PE).

Positive Displacement Compressor:

Positive Displacement Compressors are used to trap the gas physically between two relative

components. Therefore, lowering its volume and increasing its pressure.

- Reciprocating Compressor:

The reciprocating positive displacement compressors press (compress) the gas in a chamber

(cylinder) opposite to a cylinder head by the help of a reciprocating piston; therefore, decreasing the

volume and increasing the pressure.

Diaphragm: it is a type of the reciprocating positive displacement compressor. It is used to

compress different types of gases. The compression process is done by means of a moving piston

and a flexible diaphragm. Such as “Hydrogen Diaphragm Compressor” which was already

mentioned before in chapter 3.

- Rotary Compressor:

The function of the Rotary Compressor is to displace a fixed amount of gas with every revolution. It

is used to compress different types of gases into a smaller volume between to rotating elements.

Screw: it is the compressor that is operated by two rotors (helical type) which move and rotate

against each other, and that cause the screw teeth to mesh. One rotor is rotating clockwise and the

other rotor is rotating counterclockwise, which will cause the gas to trap in the central cavity

between the two rotors.

Page 49: NATPET Report

49

Lobe: this type of compressor is using two rotary lobes that are mounted on the shaft. One lobe is

rotating clockwise and the other one is rotating counterclockwise; therefore, decreasing the gas

volume and causing it to trap in the central cavity between the two lobes. The two lobes are not in

touch with each other. There is a very small clearance between the two lobes and also between the

casing and the lobe’s surface.

4.1.5.3. Rotary Feeder:

Rotary feeder is also called as Rotary valve or airlock valve. It is an important equipment of

pneumatic conveying and batching. The main objective of the rotary feeder is to control the flow of

powder resin from silo under gravity, vacuum and pressure conditions; and also move the powder

from one section to another with the help of nitrogen gas.

Page 50: NATPET Report

50

Chapter 5

Conclusion, References &

Appendix

Page 51: NATPET Report

51

5.1. Conclusion

In this report, I have talked about an introduction to NATPET Company. In addition, I have

discussed different subjects about safety which must be followed and applied in NATPET

Company. After that, I have provided different work activities that have been completed in the

mechanical department during my coop training. Furthermore, I have mentioned a brief overview

about the mechanical maintenance department.

Actually, the training in NATPET Company was a very great experience for me. During training, I

have learned how practical work is performed. Also, I have met and communicated with new

people from different nationalities. Absolutely, seeing the field’s nature of work and working in a

group was a very interesting experience for me.

Finally, I would like to thank Allah for his blessing to accomplish my training program and

finishing my final coop report successfully.

I hope that you enjoyed reading my report and it gained your interest.

Page 52: NATPET Report

52

5.2. References

Jim Henderson. (2011). Maintenance, Repair, and Operations. Wikipedia. Accessed on July 22,2015,

from https://en.wikipedia.org/wiki/Maintenance,_repair,_and_operations

Denver Colorado. (2009). Maintenance Scheduling for Mechanical Equipment. Reclamation.

Accessed July 15,2015, from http://www.usbr.gov/power/data/fist/fist4_1a/4-1A.pdf

Diksha Kashyap. (2015). Maintenance Management: Objectives, Costs, and Policies.

YOURARTICLELIBRARY. Accessed on July 27,2015, from

http://www.yourarticlelibrary.com/maintenance-management/maintenance-management-

objectives-costs-and-policies/57438/

Abhik Rathod. (2014). Types of Maintenance. Slideshare. Accessed on August 5,2015, from

http://www.slideshare.net/AbhikRathod/types-of-maintenance-33037550

Personal Protective Equipment. GoogleImages. Accessed on August 15,2015, from

https://www.google.com.sa/search?hl=en&site=imghp&tbm=isch&source=hp&biw=1467&bih=723

&q=personal+protective+equipment&oq=Personal+Protective+&gs_l=img.1.0.0l10.5641.19069.0.2

3841.26.24.1.0.0.1.1240.5548.5-2j4j1.7.0....0...1ac.1.64.img..19.7.4998._re3Hx8Hoic

www.natpet.com

My progress reports.

My daily logbook.

Page 53: NATPET Report

53

5.3. Appendix

YIC Training Letter:

Figure.5.1 YIC Training Letter

Page 54: NATPET Report

54

Training Plan:

Figure.5.2 Training Plan

Page 55: NATPET Report

55

Attendance Sheet:

Figure.5.3 Attendance Sheet

Page 56: NATPET Report

56

Progress Report:

Figure.5.4 Progress Report

Page 57: NATPET Report

57

Plagiarism Report from Turnitin:

Figure.5.5 Plagiarism Report from Turnitin