National Power Corporation Roadmap and Strategic Plan 2014 ...
Transcript of National Power Corporation Roadmap and Strategic Plan 2014 ...
National Power Corporation Roadmap and Strategic Plan 2014-2016: Towards Operational Reliability and Financial Sustainability
Urbano C. Mendiola, Jr.VP-Corporate Affairs, National Power Corporation
Briefing for DILG Usec. Edwin R. Enrile
30 June 2014
Presentation Outline
2
I. Mandates, Thrusts and Strategic Framework
• A. Supply of Electricity in the Missionary Areas
• B. Supply of Electricity from the Undisposed Generation Assets and IPP Contracts in the Main Grids
• C. Watershed Management and Climate Change Mitigation
• D. Dams Management and Flood Mitigation
• E. Business Development
II. Roadmap 2014-2016
III. Challenges, Strategies and Targets
3
I. Mandates, Thrusts and Strategic Framework
Mandates and Thrusts
4
Enhanced Missionary Electrification
Improved Watershed Management
Improved Dams Management
Generation and sale of electricity from
undisposed generating assets and IPP contracts
Reasonable Entry of Renewable Energy in the
Off-grids and Islands
Business development endeavors on power-
related services
[Section 70, RA 9136]
[Section 47 (f) and (j) of RA 9136]
[RA 6395; Sec. 34, RA 9136; Sec. 6c, Rule 23, RA 9136-IRR; E.O. 224]
[Sec. 3 (l), RA 6395] [Section 12, RA 9513]
[RA 6395; Sec. 6d , Rule 23, RA 9136-IRR]
Perform missionary electrification function through the Small Power Utilities Group (SPUG) and shall be responsible for providing power generation and associated power delivery systems in areas that are not connected to the main grids (Section 70 of RA 9136)
Operate and maintain undisposed generating assets, including Agus and Pulangi complexes [Section 47 (f) and (j) of RA9136]
Manage and rehabilitate watersheds and dams
• Continue to be responsible for watershed rehabilitation and management (Sec. 6(c), Rule 23 of RA 9136 IRR)
• Continue to be responsible for dam structure and all other appurtenant structure necessary for the safe and reliable operation of the hydropower plants (Sec. 6(d), Rule 23 of RA 9136 IRR)
• Enter into an operations and maintenance agreement with the private operator of the power plant to cover the dam structure and all other appurtenant facilities (Sec. 6(d) Rule 23 of IRR of RA No. 9136)
5
Mandate – RA 9136 (EPIRA)
Undertake the development of hydroelectric generation of power and the production of electricity from nuclear, geothermal and other sources
Establishment of subsidiaries pursuant to Section 3(l)
• Initiate the creation of business units pursuant to Item 6 of NPB Resolution No. 2009-28
6
Mandate – RA 6395 (Revised NPC Charter)
Section 2: Declaration of Policies
Accelerate the exploration and development of renewable energy resources such as, but not limited to, biomass, solar, wind, hydro, geothermal and ocean energy resources, including hybrid systems, to achieve energy self reliance.
Chapter IV: Off-Grid Renewable Energy Development
Section 12: Off-Grid Areas – “…NPC-SPUG or its successors-in-interest and/or qualified third parties in off-grid areas shall, in the performance of its mandate to provide missionary electrification, source a minimum percentage of its total annual generation upon recommendation of the NREB from available RE resources in the area concerned, as may be determined by the DOE.”
7
Mandate – RA 9513 (RE Law)
Strategic Framework
8
Customer
Internal ProcessFinancial
Learning & Growth
Sustainability and Customer Satisfaction
Supply of electricity from the undisposed generating assets and
IPP contracts in the Main Grids
Supply of Electricity in Missionary Areas
Productivity and Wellness
Employee Fitness Employee Competency
Net Income
Collection Efficiency
Vision We play a vital role in the electric power industry. With our wealth of experience and technical expertise, we uplift the quality of life in the country and its islands. We extend the same values of sustainability, reliability and safety
to the management of power systems, dams and watershed areas. This is our commitment to the Filipino people.
Mission With social progress as our ultimate goal, we shall be a partner in nation-building. We shall electrify the country to its farthest communities and manage our assets to ensure their sustainability. We commit to continuously improve
ourselves to better serve the public. All these for God and Country.
Core Values, Principles and Goals
S.T.A.R. Values: Sustainability, Savings Transparency, Teamwork Action, Ability, Accountability Reforms, Resiliency
Corporate Culture: (1) Customer Satisfaction; (2) Concern for Employees and Communities; (3) Performance Excellence and Transparency; (4) Creativity and Adaptability; (5) Best Practices and Processes
Revenue Generation
Performance of Missionary Electrification functions
Watershed Protection, Dams Management & Flood Forecasting
Operation & Maintenance of Undisposed generating assets and
IPP ContractsEngineering and Support services
9
II. Roadmap 2014-2016
II. Roadmap 2014-2016
10
A. Supply of Electricity in the Missionary Areas
2014 Missionary Electrification Coverage
11
Davao
Del Sur
Quezon
Catanduanes
Batanes
Mindoro
Palawan
Cebu
Bohol
IloiloAntique
Basilan
Sulu
Tawi-Tawi
Sultan
Kudarat
Cagayan
KalingaApayao
Isabela
Aurora
Romblon
MarinduqueAlbay
Samar
Leyte
Davao
Del Norte
Siquijor
Masbate
NPC-SPUG Power Plants 296No. of NPPs/QTPs 17Total Installed Capacity 352 MWTotal Dependable Capacity 282 MWBeneficiary Households 768,077Municipalities 207Provinces 36Service Areas 231Distribution Utilities (Electric Coops and LGUs) 49Total Length of Transmission Line 770 circuit-kilometersNo. of Substations 10Total Substation Capacities 170 MVA
*As of May 2014
SPUG Plants
12
Note:Additional New plants such as Atulayan DPP and Cabulan DPPExcluded Cabilao DPP, Paluan, PB110, PB111 and Palumbanes DPP(Not yet operational)
TOTAL NUMBER OF PLANTS: 296 Plants
SPUG Operating Hours
13
Note:Additional New plants such as Atulayan DPP and Cabulan DPPExcluded Cabilao DPP, Paluan, PB110, PB111 and Palumbanes DPP(Not yet operational)
TOTAL NUMBER OF PLANTS:
296 Plants
SPUG Rated Capacity
14Note:Included Rental Genset Capacity : 70.22 MW
TOTAL RATED CAPACITY: 211.109 MW(OWNED & RENTAL)
SPUG Gensets (Owned)
15Note:Excluded 57 Rental Gensets with Capacity of 70.22 MW
TOTAL RATED CAPACITY: 140.889 MWTOTAL NUMBER GENSETS: 505 Gensets
Household Distribution
16
Note:Additional New plants such as Atulayan DPP and Cabulan DPPExcluded Cabilao DPP, Paluan, PB110, PB111 and Palumbanes DPP(Not yet operational)
TOTAL NUMBER OF HOUSEHOLDS:
768,077
Household Distribution
17
TOTAL NUMBER OF HOUSEHOLDS:
768,077
Note:Additional New plants such as Atulayan DPP and Cabulan DPPExcluded Cabilao DPP, Paluan, PB110, PB111 and Palumbanes DPP(Not yet operational)
Privatization Status in the First Wave AreasAreas NPP
InstalledCapacity
Privatization Status Recommendations
1. Bantayan IslandBantayan Island Power
Corp. (BIPCOR)8.3-MW bunker Fully privatized
Remaining NPC facilities to be transferred to other areas; disposal of non-power assets
2. Masbate DMCI Masbate15.6-MW bunker
5.6-MW dieselFully privatized
Remaining NPC facilities to be transferred to other areas; disposal of non-power assets
3. Oriental Mindoro
Power One 9-MW bunker
Fully privatizedRemaining NPC facilities to be transferred to other areas; disposal of non-power asset
Ormin Power 6.4-MW bunker
Mindoro Grid Corp. (MGC)
10-MW diesel
Linao Mini Hydro 2.1-MW hydro
4. Mainland Palawan
Palawan PowerGeneration (PPGI)
19-MW bunker
Almost fully privatized (Roxas, Taytay, El Nido,
Rizal, San Vicente)
Lease of NPC generating assets to NPP (PPGI)
Power Source Phils Inc. 0.21 MW diesel
Delta P 16-MW bunker
DMCI Palawan Corp. 29.3-MW diesel
5. Catanduanes
Catanduanes Power Generation (CPGI)
3.6-MW bunker
Partially privatized
• Lease of NPC generating assets to NPP
• 3MW capacity for installation, but for transfer to other areas after privatization.
• EC should be responsible forprocuring its ancillary power requirements
Sunwest Water and Electric (SUWECO)
3.6-MW hydro
18
Privatization Status in the First Wave Areas
Areas NPP Privatization Status Recommendations
6. Siquijor SIPCORCSP completed, plant construction in progress (2.65 MW bunker)
Continue NPC operation until NPP plant commissioning
7. Camotes Sinag EnergyCSP completed, plant construction in progress
Continue NPC operation until NPP plant commissioning
8. Occidental Mindoro
Island Power CSP under TRO Extend rental
9. Marinduque 3i PowerCSP under TRO; with PSA but without any generating equipment installed
Extend rental
10. Tablas 3i Power CSP under TRO; with PSA but without any generating equipment installed
Extend rental
11. Romblon
3i Power CSP and NPP plant completed but operation is uncertain
Extend rental
Cantingas Mini-Hydro
0.90 MW hydro
12. Basilan Coastal PowerWith PSA but without any generating equipment installed
Acquire permanent facility instead of rental
13. Sulu (Jolo) --- Not yet feasible for NPPsAcquire permanent facility instead of rental
14. Tawi-Tawi --- Not yet feasible for NPPsAcquire permanent facility instead of rental
19
Privatization Status – Qualified Third Parties
20
Area QTP Installed Capacity Status NPC Task
1. Rio Tuba, Palawan
Power Source 0.21 MW diesel Fully taken over UCME Disburser
2. Busuanga, Palawan
Calamian Island Power Corp
(CIPC)
0.70 MW diesel7.74 MW diesel
CSP completed, plant construction in progress. Target commercial operation: August 2014
Extend rental until NPP plant commissioning
3. Malapascua, Cebu
Power Source Phils. Inc.
0.25 diesel/solar QSSC for endorsement to ERC
UCME Disburser
4. Casiguran, Aurora
Eco-Market Solutions
(RE Developer)
0.25 MW biomass • Only one unit commissioned
• Area is ready for interconnection to the main grid
Discontinue payment of UCME upon interconnection
2014-2016 SPUG Capacity Addition Program
21
AREAS
2014 2015 2016 TOTAL
Cap Add (MW)
Costs (MP)
Cap Add (MW)
Costs (MP)
Cap Add (MW)
Costs (MP)
Cap Add (MW)
Costs (MP)
LARGE AREAS 3.0 63.234 30.00 1,486.80 4.00 94.73 37.0 1,644.764
MEDIUM AREAS
6.0 69.171 6.40 63.21 1.50 - 13.9 132.381
SMALL AREAS 4.910 88.603 13.05 99.25 2.20 36.93 20.16 224.783
TOTAL 13.91 221.01 49.45 1,649.26 7.70 131.66 71.06 2,001.93
NEW AREAS 1.3 38.750 2.16 50.98 2.76 53.13 6.22 142.86
GRAND TOTAL 15.21 259.76 51.61 1,700.24 10.46 184.79 77.28 2,144.79
2014-2016 SPUG Transmission Line Program
22
SCHEDULE OF TRANSMISSION LINE PROJECTS
PROJECT NAME 2014 2015 2016
TOTAL
KMS.PROJECT
ESTIMATED COST (PHP)
TOTAL LENGTH, KMS. 128.23 108.91 214.31 451.45 2,719,633,141.00
OCCIDENTAL MINDORO 3.81 62.63-
66.44 155,026,350.00
CATANDUANES-
46.28 -
46.28 541,745,910.00
ORIENTAL MINDORO- -
47.31 47.31 188,244,960.00
PALAWAN 5.00-
167.00 172.00 1,501,439,491.00
MASBATE 119.42- -
119.42 333,176,430.00
2014-2016 SPUG Substation Program
23
SCHEDULE OF SUBSTATION PROJECTS
PROJECT NAME 2014 2015 2016
TOTAL
MVAPROJECT
ESTIMATED COST (PHP)
TOTAL CAPACITY, MVA. - 30.00 15.00 45.00666,314,780.00
CATANDUANES - 20.00 0.00 20.00287,836,000.00
ORIENTAL MINDORO - 10.00 5.00 15.00155,476,150.00
PALAWAN - 0.00 10.00 10.00223,000,000.00
Overview of the Existing Major NPC SPUG’s Rates
PURPOSE
COST
ADJUSTMENT
MECHANISMSICERA
UCME
To cover for the change in foreign
disbursements due to the changes in foreign
currency exchange rates
Subsidized Approved Generation Rate – to
recover partial cost of service approved by
ERC at 2003 level. No margin included.
To cover for the change in operating costs
due to the changes in prices of fuel and cost
of power purchased from IPPs
BASIC
CHARGE
To recover the cost of service not covered by
the SAGR. Approved by the ERC and
collected from all electricity end-customers,
subsidizing the cost of electricity service in
the island grid. No margin included.
* Prior to granting of other adjustments such as the P0.30/kWh MRR & 3% PPD, among others.
UNIVERSAL
CHARGE
NPC-
TCGR
True-Up To recover the difference between approved
UCME and the actual UCME requirements.
SAGR
GRAM
Transmission
RatesTo recover the cost of the transmission
network facilities.
24
NPC-SPUG RATES
ACTUAL and PROJECTED ENERGY SALES
PSP Areas -NPC
Other Areas -NPC
PSP Areas –NPP/QTP
Total Energy Sales
26
ACTUAL AND PROJECTED UC-ME SUBSIDY REQUIREMENTS
PSP Areas -NPC
Other Areas -NPC
PSP Areas
–
NPP/QTP
Total Required UCME
27
II. Roadmap 2014-2016
28
• 1. Angat HEP and Power Barges 101 to 104
• 2. Agus and Pulangi HEPC (Mindanao Generation)
• 3. Decommissioned and Mothballed Plants
• 4. IPP Contracts Management
B. Supply of Electricity from the Undisposed Generation Assets and IPP Contracts in the Main Grids
Plans for the O&M of Undisposed Generation Assets and IPP Contracts in the Main Grids 2014-2016
29
• Continue O&M until turnover to successor generating companies
Angat HEP and Power Barges 101 to 104
• Pursue capacity improvement projects
• Continue O&M until Congress decides on the privatization plan
Agus and Pulangi HEPC (Mindanao Generation)
• Continue preservation until privatizationDecommissioned and
Mothballed Plants
• Continue administration of IPP contracts until transfer to IPPA
IPP Contracts Management
Plans for O&M of Agus-Pulangi HEPC 2014-2016
30
Programs 2014 2015 2016 Budget
1. Uprating of Units 1 & 2 of Agus 6 HEP - - 14 P 1.596 Bn
2. Rehabilitation of Unit #4, Agus 6 HEP - 15 - P 496 Mn
3. Maximize capacity (60 MW) of Agus 2 HEP through implementation of Balo-I Plains Flood Control Project
- - 60 P 1.9 Bn
4. Increase Energy Output of Pulangi 4 HEP through Selective Dredging
- - - P 265 Mn
TOTAL CAPACITY (MW) FOR AGUS & PULANGI HYDRO COMPLEXES
982 997 1,071 P 4.257 Bn
OPTIMIZED PLANT GENERATION FORECAST (KWH)
5,696,856 4,916,029 4,996,621
NOTE:
• Generation forecast for 2015 & 2016 is affected when Uprating of Units 1 & 2 and the Rehabilitation of Unit No. 4 both of
Agus 6 HEP shall commence;
• Generation forecast for 2017 will increase to 5,064,199 kWh, with the assumptions that the Agus 6 HEP Projects are
completed and that the indicative power projects for Mindanao are already on-line/operational.
II. Roadmap 2014-2016
31
C. Watershed Management and Climate Change Mitigation
Watershed Management
32
Reduction of
sedimentation
in the
reservoirs
Improvement
and stabilization
of hydrologic
regime
Mitigation of the
environmental
impacts of
power
generation
Sustainability of
watershed
resources
OVERALL OBJECTIVES:
LUZON
VISAYAS
MINDANAO
Upper Agno Watershed(123,000 hectares covering the
province of Benguet)
Makiling-Banahaw Watershed(162,000 hectares covering the province of
Laguna, Batangas and Quezon)
Angat Watershed(57,000 hectares covering the
province of Bulacan and Rizal)
Caliraya Watershed(10,772 hectares covering the province
of Lagunal)
San Roque Watershed(9,550 hectares covering the province of
Pangasinan and Benguet)
Tiwi Watershed(17,661 hectares covering the
province of Albay)
Pulangi Watershed(16,584 hectares covering the
province of Bukidnon)
Lake Lanao-Agus Watershed(43,066 hectares covering the province of
Lanao del Norte and Lanao del Sur)
Magat Watershed(4,300 hectares covering the
province of Ifugao)
Pantabangan Watershed(14,166 hectares covering the province of
Nueva Ecija)
Buhi-Barit Watershed(18,370 hectares covering the
province of Camarines Sur)
Under EO 224
MOA with DENR/NIA
Total Open Areas for
Rehabilitation
155,100 ha
Areas Vested to NPC
476,469 ha
11 Watershed Reservations Under NPC Management
Watershed Management Program 2014-2016
34
CY 2014
Ecotourism Development Program
• Due Diligence and Partnership Agreement for Angat
• Framework Development for Caliraya-Lumot
CY 2015
• Ecotourism Park Development for Angat
• Partnership Agreement for Caliraya-Lumot
• Ecotourism Plan for 5 watersheds
CY 2016
• Operationalization of Ecotourism Program in Angat and Caliraya (6,000 visitors/year/ watershed)
• Partnership Agreement and Ecotourism Park Development for 5 watersheds
II. Roadmap 2014-2016
35
D. Dams Management and Flood Mitigation
Dams Management
36
Ensure that
downstream
communities
are not exposed
to risks from
dam operation
Compliance to
requirements of
responsible dam
ownership and
environmental
protection
Manage flood
forecasting and
reservoir
inflow/outflow to
optimize
revenues
Preserve the
long-term value
of NPC dams,
reservoirs and
waterways
OVERALL OBJECTIVES:
17 Dams Under NPC Management
37
Dam Safety Monitoring
Mandatory semi-annual inspection
Information Educational Campaign
Updating of Dam Protocol, Dam
Safety Program & EAP
Reservoir Sedimentation Survey (Bathymetric
Survey)
Continue to Operate FFWS Stations
Dams Management Program 2014-2016
II. Roadmap 2014-2016
39
• 1. Establishment of Major Repair and Maintenance Department (MRMD) as Profit Center
• 2. Watershed Agro-Forestry and Eco-Tourism
• 3. Business Plan for NPC Training Institute
E. Business Development
Establishment of MRMD as Profit Center
40
Major Repair and Maintenance Dept. (MRMD)
Services Offered
• Calibration
• Repair & Re-conditioning
• Fabrication
• Dynamic Balancing
• Rehabilitation
• Installation
• Alignment/ Overhauling
• Inspection & Assessment
• Testing
Business Development Plan 2014-2016
41
• Continue offering MRMD services and invest in machineries/equipment as necessary
MRMD as Profit Center
• Pursue Watershed Agro-forestry and Eco-tourism operationalizationWatershed Business
• Explore the setting up of NPC Training Institute to offer plant operation and maintenance and other technical services courses
• Pursue NPC Training Institute if business plan study is sound
Training Institute
42
III. Challenges, Strategies and Targets
Challenges in Fulfilling the Mandates
43
High Production Cost• About 60% of cost is fuel
and 40% is O&M and support
• Fuel cost per kWh is influenced by Fuel price and Fuel rate
• Manpower conversion rate is low, MW/personnel
Privatization Issues and Concerns• Indeterminate privatization, disposal and turnover schedules• Increased contractual issues with IPPs• Privatization scheme for Agus Complex considering its nature
of cascading hydro plants• Proposal to create the Mindanao Power Corporation• Effects on the Sharing Scheme and Implications with the
Bangsamoro Entity
SUPPLY OF ELECTRICITY FROM THE UNDISPOSED GENERATING ASSETS AND IPP CONTRACTS IN THE MAIN GRIDS
SUPPLY OF ELECTRICITY IN MISSIONARY AREAS
Unreliable Power Supply• Most of the large existing
units are old and inefficient• Huge overdue account of
BASULTA ECs• Impact of Sitio
Electrification Program (SEP) and Barangay Line Extension Program (BLEP)
Uncertain Private Sector Entry
• Legal impediments in SPUG privatization
• Non-performing NPPs with existing contracts with ECs
Delayed Entry of AddionalCapacity from Private
Sector• Deferred plant
preventive maintenance due to low grid supply situation
Challenges in Fulfilling the Mandates
44
Open/Denuded forest cover
• Total of 155,100 has. open areas for rehabilitation
DAMS MANAGEMENT AND FLOOD MITIGATION
WATERSHED MANAGEMENT AND CLIMATE CHANGE MITIGATION
Protection of watershed resources
• Forest Law enforcement
• Biodiversity conservation
• Land Occupancy
Availability of funds
• Delay in UC-EC approval
Natural and Man made calamities
• Structural and vegetative erosion
• Unabated exploitation of minerals and forest resource
FFWSDO Equipment/ Technology
• To upgrade as to minimize
maintenance cost and lack of
equipment spares
Dam Safety and Integrity
• Review/Study of existing rules in
order to conform with the recent seismic design
considerations and floods due to
climate change
Manpower Succession
• Challenging knowledge management/ succession
LGU intervention during flooding
operations• Can endanger
the safety of the dam structure
Strategies
45
KR
AST
RA
TEG
IES
OB
JEC
TIV
ES To provide the necessary infrastructure in areas that will remain with NPC-SPUG to achieve
total electrification
To achieve operational reliability in areas where NPC-
SPUG operates
Supply of Electricity in the Missionary Areas
MFO
Financial Sustainability
1. Pursue timely approval of required UCME and updating of SAGR
2. Pursue funding of CAPEX from other sources
3. Improve collection efficiency
4. Consider Municipal Power Association (MUPA) concept
5. Reduce production cost
Power Supply Adequacy
1. Augment capacity thru acquisition
2. Include N-1 provision3. Acquire gensets for
emergency purposes 4. Electrify new areas5. Increase plant
operating hours6. Adopt renewable
energy options7. Put up transmission
line and substation projects in Large areas
Transfer of missionary areas to private sector
1. Delineate missionary areas for EC CSP or for inclusion in NPC plan
2. Consolidate the areas/ capacities to attract investors
3. Offer existing plants for O&M by private sector
4. Come up with UCME Graduation Program
5. Promote the privatization program
6. Adopt rentals or install modular gensets with assignability option
Plant Operational Efficiencies
1. Refleet ageing/ inefficient gensets
2. Manage maintenance schedules and spare parts availability
3. Adhere to Fuel Operations Manual by managing the fuel supply chain and improving fuel economy
4. Adopt “industry best practices” in plant operations
5. Install fuel oil storage tanks, flow meters and reclosers
To enhance the inflow of private capital in the
missionary areas
To ensure funding for Missionary Electrification
Strategies
46
KR
AST
RAT
EGIE
SO
BJE
CTI
VES To operate and maintain the undisposed
generating assets with optimum efficiency and least cost to support power requirements in the main grids.
Supply of electricity from the undisposed generating assets and IPP contracts in the Main Grids
MFO
Plant Operational Efficiencies
1. Properly implement maintenance programs
2. Efficient and safe loading of the units3. Efficient operation of turbine generator
units and auxiliaries using available water in-flows
4. Implement various MinGen projects aimed at enhancing capacity for the grid
5. Vigilant monitoring of operating performance parameters
To assure the delivery of energy output from IPPs
To normalize the NPC book of accounts
Accurate and Timely processing of IPP billings
Reconciliation of Accounts Retained under the NPC
Temporary Registry + Asset in Trust with NPC
1. Prompt and accurate validation of billings submitted by IPPs
2. Proper and close coordination with IPPs. Regular Steering Committee meetings. Involve OLC and Finance as necessary
1. Continuous validation and analysis of accounts
2. Complete documents by conducting ocular inspection of the assets
Strategies
47
KR
AST
RA
TEG
IES
OB
JEC
TIV
ES To provide watershed support for the hydro and geothermal power plants and provide
livelihood in the communities surrounding the watershed areas.
Watershed Management
MFO
Reforestation of Open Areas
1. Fast Track rehabilitation and restoration of open , denuded and marginal lands within the watershed through increased UC-EC funding, partnerships with New Plant Owners and IPP's, Private groups and LGU's.
2. Protection of the remaining forests through forest patrol and vigilance, partnerships with volunteers, Peoples organizations, military and other government agencies.
3. Develop income generating programs in the watershed thru agroforestry, agribusiness ventures, ecotourism, carbon trading etc.
4. Mobilizing the citizens for a shared responsibility in watershed management
To ensure dam safety and flood mitigation.
1. Conduct dam safety assessment twice a year
2. Procure Independent or 3rd Party safety inspection at 5-year intervals
3. Reservoir Sedimentation monitoring
4. Procure updated FFWSDO equipment
5. Propose a Dam Safety Bill
Dams Management
Eco-tourism Development for Angat
and Caliraya
Mandatory Dam Inspections and
Monitoring
Community Development/ Disaster
Preparedness
1. Conduct public awareness about NPC dams and reservoirs particularly during TD/TS
2. Mitigation and Risk Reduction on the consequence of flooding/ dam breach
3. Effective and efficient communication with dams stakeholders
Our Targets for 2014-2016
48
END OF 2016
ACCOMP-
LISHMENT
1st Sem 2nd Sem 1st Sem 2nd Sem 1st Sem 2nd Sem
Quality 1: Percentage of
Readiness of Existing Plants
(Equivalent Availability Factor)% 64.52% 65.44% 65.44% 66.280% 66.280% 68.64% 68.64% 68.64%
Quality 2: Percentage of
Unexpected Power Interruption
(Forced Outage Rate)% 0.284% 0.280% 0.280% 0.278% 0.278% 0.274% 0.274% 0.274%
Quality 3: Plant Operation
Efficiency (Net Heat Rate)Btu/kWh 10,813 10,813 10,813 10,937 10,937 10,975 10,975 10,975
Quality 4: Plant Operational
Efficiency (Production Cost) P/kWh 15.207 15.28 14.60 17.71 17.71 17.40 17.40 17.40
Quality 5a: Collection
Efficiency with BASUTA
Customers% 49.16% 24.70% 49.41% 24.82% 49.65% 24.95% 49.90% 49.90%
Quality 5b: Collection
Efficiency without BASUTA
Customers% 96.52% 48.26% 96.52% 48.26% 96.52% 48.26% 96.52% 96.52%
2015 2016
MFO 1: Supply of Electricity in Missionary Areas
PERFORMANCE MEASURESBASELINE
DATATARGETS
DESCRIPTION UNIT 2013
2014
Our Targets for 2014-2016
49
END OF 2016
ACCOMP-
LISHMENT
1st Sem 2nd Sem 1st Sem 2nd Sem 1st Sem 2nd Sem
Quantity 1a: Completed
Capacity Additions- Lease MW 51.9 55.80 55.80 29.9 29.9 0 0 0
Quantity 1b: Completed
Capacity Additions-
CommissionedMW 6.00 2.400 13.425 0 19.244 30.000 3.600 68.669
Quantity 2: Transmission Lineckt. km N/A 0 128.23 0 141.22 15 242.1 526.55
Quantity 3: Substation
FacilitiesMVA N/A 0 0 10 20 0 15 45
Financial 1: Net Operating
Income/(Loss) without UCME P Billion (4.939) (3.125) (3.013) - (6.582) - (6.853) (6.853)
Financial 2: Net Operating
Income/(Loss) with UCME P Billion 2.289 0.583 2.170 - 3.786 - 2.224 2.224
Re-fleeted Capacity MW 0 0.000 0.000 4.50 7.80 0 10.2 22.50
New Areas Electrified No. 3 0 3 0 26 0 20 49
Areas with Increased Service
HoursNo. 1 0 20 0 92 0 20 132
2015 2016
MFO 1: Supply of Electricity in Missionary Areas
PERFORMANCE MEASURESBASELINE
DATATARGETS
DESCRIPTION UNIT 2013
2014
Our Targets for 2014-2016
50
END OF 2016
ACCOMP-
LISHMENT
1st Sem 2nd Sem 1st Sem 2nd Sem 1st Sem 2nd Sem
Quality 1: Percentage of
Readiness of Existing Plants
(Availability Factor)% 91.20% 85.38% 85.38% 86.20% 86.20% 87.06% 87.06% 87.06%
Quality 2: Percentage of
Unexpected Power Interruption
(Forced Outage Rate)% 0.326% 0.280% 0.280% 0.273% 0.273% 0.285% 0.285% 0.285%
Quality 3: Plant Operational
Efficiency (Production Cost) P/kWh 0.512 0.580 0.580 0.600 0.600 0.600 0.600 0.600
Quantity 1: Reforestation of
Open Areas Hectares 498 0 530 0 670 0 762 1,962
Quantity 2: Number of
Mandatory Dam Inspection No. 10 5 5 5 5 5 5 30
MFO 3: Management of Dams and Watershed
2015 2016
MFO 2: Supply of Electricity in the Main Grid (Agus and Pulangi HEPP)
PERFORMANCE MEASURESBASELINE
DATATARGETS
DESCRIPTION UNIT 2013
2014