National LambdaRail Update Dave Jent NLR Layer 2/3 Service Center Indiana University
description
Transcript of National LambdaRail Update Dave Jent NLR Layer 2/3 Service Center Indiana University
light the futureN L R
National LambdaRail Update
Dave JentNLR Layer 2/3 Service Center
Indiana University
July 18, 2005
JT-Vancouver 2National LambdaRail
light the futureN L R
National LambdaRail Update
Installation update
Phase 2 Layer 1
Layer 2 deployment
Layer 3 deployment
Other
Credits
JT-Vancouver 3National LambdaRail
light the futureN L R
National LambdaRail Update
DAL
SYR
TUL
PENELP
PHO
BAT
ALB
HOU
WDC
OGDCLE
NYC
SAA
4
4
JAC4
4
4
44
4
4
4
4
4
4
4
4
4
4
4
44
44
4
44
4 4
SLC4
4
Level3 fiberWilTel fiber
LAX4
4
RAT4
Cisco 15808 terminalCisco 15808 OADMCisco 15454 terminalCisco 15454 OADM
8
4
4
8
STA
CHIKAN
PIT
BOI
CLE
ATL
POR
RAL
DENSVL
SEA
8
8
8
8
8 8
8
8
8
8
88
8
8
88
88
8
8
8
8
8
4
4
LAX 8
8
JT-Vancouver 4National LambdaRail
light the futureN L R
National LambdaRail Update
Phase II Layer I Deployment
DAL
SYR
TUL
PENELP
KAN
PHO
BAT
ALB
HOU
WDC
OGDCLE
NYC
SAA
DEN
4
4
JAC4
4
4
44
4
4
4
4
4
4
4
4
4
4
4
44
44
4
44
4 4
SLC4
4
Level3 fiberWilTel fiber
LAX4
4
RAT4
Cisco 15808 terminalCisco 15808 OADMCisco 15454 terminalCisco 15454 OADM
8
4
4
8
JT-Vancouver 5National LambdaRail
light the futureN L R
CRS-1
6509
1580815808
15500
1550015500
EastWest
Metro and Regional Optical Networks
NLR demarc
DWDM
1GE10GE or OC192
National LambdaRail Update
Phase I PoP Layout
JT-Vancouver 6National LambdaRail
light the futureN L R
National LambdaRail Update
Phase II PoP Layout
CRS-1
6509
1545415454
15500
1550015500
EastWest
Metro and Regional Optical Networks
NLR demarc
DWDM
1GE10GE or OC192
JT-Vancouver 7National LambdaRail
light the futureN L R
Provider Segment
OLA Site
s
OADM / Regen Sites
Terminal Sites
Install Start Date
Install Completion
Date
Test Start Date
Test Completion
DateInterconnect Ready Date
Targeted Equipment Ship Date
WilTel KC to Dallas 11 1 2 06/28/05 07/12/05
07/27/05 08/04/05
4/5/2005 5/2/2005
WilTelDallas to Houston 6 07/11/05 07/19/05 n/a 5/2/2005
WilTel
Houston to Baton Rouge 6 1 07/19/05 07/26/05 08/22/05 08/25/05 n/a 5/23/2005
Level 3 NYC to DC 7 2 07/28/05 08/05/05 08/31/05 09/03/05 5/2/2005 5/23/2005
WilTelNYC to Syracuse 9 1 08/04/05 08/16/05
09/08/05 09/16/05
5/2/2005 5/23/2005
WilTelSyracuse to Cleveland 10 1 08/16/05 08/26/05 3/15/2005 6/13/2005
WilTel/Level 3
Baton Rouge to Pensacola 6 1 08/29/05 09/07/05
10/21/05 10/29/05
TBD 6/13/2005
Level 3
Pensacola to Jacksonville 8 1 09/07/05 09/17/05 6/6/2005 6/13/2005
JT-Vancouver 8National LambdaRail
light the futureN L R
Provider SegmentOLA Sites
OADM / Regen Sites
Terminal Sites
Install Start Date
Install Completion
Date
Test Start Date
Test Completion
DateInterconnect Ready Date
Targeted Equipment Ship Date
Level 3 & WilTel
Ogden to Salt Lake City 1 1 * * ** ** TBD 5/9/2005
WilTelHouston to San Antonio 5 2 06/23/05 06/30/05
08/09/05 08/17/05
n/a 5/2/2005
WilTelSan Antonio to El Paso 14 1 07/05/05 07/20/05 n/a 5/9/2005
WilTelEl Paso to Phoenix 10 1 07/19/05 07/30/05
10/07/05 10/15/05
n/a 5/30/2005
WilTel Phoenix to LA 11 1 07/29/05 08/12/05 5/2/2005 5/30/2005
Level 3El Paso to Albuquerque 4 1 08/12/05 08/20/05
09/22/05 09/28/05
4/5/2005 6/13/2005
Level 3Albuquerque to Denver 7 1 1 08/22/05 09/07/05 5/6/2005 6/13/2005
JT-Vancouver 9National LambdaRail
light the futureN L R
National LambdaRail Update
Layer 2 Network Design
HOU
TUL
ELP
KAN
PHO
BAT
LAXALB
PIT
WDC
CLE
ATL
RAL
CHINYC
DENSVL
SEA
JAC
10GE wave10GE managed wave
Cisco 6509 switch
JT-Vancouver 10National LambdaRail
light the futureN L RLayer 2
• Completed and connected via 10GE:
Sunnyvale Denver Kansas City ChicagoCleveland Pittsburg Washington DC Raleigh
Jacksonville installation this week, Seattle next week
Atlanta scheduled for the week of August 1
Tulsa scheduled for the week of August 8,
Los Angles scheduled for the week of August 15.
Houston and EL Paso scheduled for the week of August 22.
Baton Rouge scheduled for the week of August 29.
New York City scheduled for the week of Sept 5.
Albuquerque scheduled for he week of OC 4.
FE's====FE"s are in from SNVA to PIT.JAC goes in next week.Atlanta is currently scheduled for the week of August 1. That could push back by up to 2 weeks.WDC is scheduled for the week of Aug 8.
JT-Vancouver 11National LambdaRail
light the futureN L R
National LambdaRail Update
Layer 3 Network
ALBPHO
BAT
RAL
JAC
TUL
PIT
HOU
LAX
WDC
ATL
CHINYC
DEN
SEA
Cisco CRS-1 router
10GE wave10GE managed wave
JT-Vancouver 12National LambdaRail
light the futureN L RLayer 3
Denver is complete
Chicago is complete
10GE circuit between DEN & CHI up.
Seattle scheduled for the week of JUL 25th
*Atlanta scheduled for the week of August 1. *Pending schedule adjustment
JT-Vancouver 13National LambdaRail
light the futureN L RLayer 3
WDC is scheduled for the week of Aug 8.
LAX is scheduled for the week of AUG 15.
HOU is scheduled for the week of AUG 22.
NYC is scheduled for the week of Sept 5.
DC, LA, HOU, NYC are dependent on the Wiltel schedule.
JT-Vancouver 14National LambdaRail
light the futureN L ROther
• Tom has Layer 1 pricing
• NLR Board is working setting prices for L2 and L3
• Anticipate some information soon
• Group B report impact, not, yet
• Layer 2/3 and Service Desk have renewed contracts for support of the network and users.
JT-Vancouver 15National LambdaRail
light the futureN L RCredits (IU)
Caren Litvanyi, Lead Technical Engineer, L2/3
Jon-Paul Herron, Project Manager
Grover Browning, Deployment Manager
Steve Peck and staff, Service Desk Manager
Caroline Carver
Jay Duncan
Andrew Lee
Chris (smokin’ hot) Robb
Brent Sweeny
Luke Fowler
Chris Small
Steve Kerby
JT-Vancouver 16National LambdaRail
light the futureN L RCredits (CENIC)
Sherilyn Evans Director of Technical Services
Cindy Abercrombie NOC Manager
Chris Costa
Darrell Newcomb
Heather Sherman
JT-Vancouver 17National LambdaRail
light the futureN L RCredits (MCNC)
• Mark Johnson
• Bonnie Phillips
• John Moore
• Tommy Jacobson
JT-Vancouver 18National LambdaRail
light the futureN L R
For more information…
NLR puts the control, the power and the promise of experimental
Contact Tom [email protected]
NLR: putting the control, the power and the promise of experimental network infrastructure in the hands of our nation’s scientists and researchers.
light the future
N L R