Upham Quest – JV NH-66
1
IE - Monthly O&M Report for January’2016
NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF SHIPPING, ROAD TRANSPORT & HIGHWAYS)
MONTHLY OPERATION & MAINTENANCE REPORT
(Pondicherry to Tindivanam Km 0/000 to Km 37/920)
JANUARY’2016
Independent Engineer Services for Operation & Maintenance of 4-laning of Pondicherry
to Tindivanam Section of NH-66 from Km.0/000 to Km.37/920 in the State of Tamil Nadu
and 4-laning of Salem to Ulundurpet Section of NH-68 from Km. 0/313 to Km.136/670 of in
the State of Tamil Nadu
(Package No. NHDP-III/TN/IE/OM/SU&PT)
INDEPENDENT ENGINEER
UPHAM INTERNATIONAL CORPORATION
In Joint Venture With
QUEST ENGINEERS & CONSULTANTS PVT LTD.,
Main office:
Plot No.70, First floor, Govindammal Nagar, Seelanickenpatti, Salem – 636201.
Site office:
S.No. 142/1 & 2, Plot No. 152 & 153, Mahavishnu Nagar, Tindivanam Main Road,
Pattanur (Gorimedu), Auroville (P.O), Vaanur (TK), Villupuram District – 605101 (Pondicherry Border).
Upham Quest – JV NH-66
2
IE - Monthly O&M Report for January’2016
INDEX
S. No. DESCRIPTION
PAGE NO.
1
PREAMBLE
1.1 PROJECT BACKGROUND
1.2 SCOPE OF THE PROJECT
1.3 INDEPENDENT ENGINEER
1.4 KEY MAP
1.5 KEY PLAN
1 - 6
2 SALIENT FEATURES OF THE PROJECT
7- 8
3 IE - ORGANIZATION CHART
9 - 11
4. INSPECTION REPORT
12 – 29
5 PROJECT FACILITIES
30 – 41
APPENDIXES
APPENDIX A ACCIDENT / INCIDENT REPORT
42 - 45
APPENDIX B TOTAL TOLLED TRAFFIC
46 - 55
Upham Quest – JV NH-66
3
IE - Monthly O&M Report for January’2016
1. PREAMBLE
Upham Quest – JV NH-66
4
IE - Monthly O&M Report for January’2016
PREAMBLE
1.1. Background Information:
Name of the project : Four Laning of Pondicherry – Tindivanam Section of NH-66Length of the road:
37.920km (Actual Length 38.608 km)
Contract:
Design, Engineering, Finance, Construction, Operation, and Maintenance of Pondicherry – Tindivanam
Section from KM 0.000 to 37.920 Km ( Actual Length 38.608 Km ) of NH – 66 in the Union Territory of
Pondicherry and in the state of Tamilnadu under NHDP phase IIIA on Build, Operate and Transfer (BOT)
basis.
Description of Project:
The project Highway commences at ‘Indira Gandhi Square’ at Pondicherry and runs for a length of 3.600
Kms within the urban limits of Pondicherry. The projects Highway traverses towards north and runs through
A few rural/urban settlements viz, Tirucitrambalam, Killiyanur ,Tailapuram, Kondamur and Marakkanam
Junction and merges at Km 37.920 of the existing NH-66in Tindivanam Town in the state of Tamilnadu
The project highway stretch from Km 0.000 to3.600 lies in the Union Territory of Pondicherry and the
remaining Stretch of the project Highway from Km 3.6 to Km 37.920 of the existing NH-66 lies in the
Villupuram district of Tamilnadu State. A key Plan in Annexure A shows the project road.
1.2. Scope of Project:
The scope of project includes performance and execution by the concessionaire of all Design, Engineering,
Finance, Construction, Operation, and Maintenance of the Project Highway. It shall also include
strengthening & Maintenance of the existing carriage way from 0.000 km to 37.920km of NH-66 in the union
territory Pondicherry and the state of Tamilnadu& widening to 4/6 lane standards in and Operation &
maintenance. It shall also include the performance and fulfillment of the other obligations by the
concessionaire under this Agreement. The length of the main carriage way is increased from 37.920 Km to
38.608 due to the realignment in Tirucitrambalam and Killiyanur Bypasses. The concessionaire shall
undertake the obligation at their own cost & risk.
Concession Agreement;
The concession Agreement between the National Highways Authority of India (NHAI) and the
Concessionaire, M/s MAYTAS – NCC consortium (Pondicherry – TindivanamTollway Limited as a SPV) was
signed on 19 July 2007.
1.3. Independent Engineers (IE):
M/s.Upham International Corporation in JV with Quest Engineers & Consultants Pvt. Ltd. has been
appointed as Independent Engineer for operation and maintenance of NH-66 package. NHAI and the
Contract Agreement were signed on 03.11.2015. Subsequently, the IE has commenced their Operations on
16.11.2015 with main office at Salem and site office at Pondicherry. IE’s tenure is for 36 months.
Upham Quest – JV NH-66
5
IE - Monthly O&M Report for January’2016
1.4. KEY MAP
4-laning of Pondicherry to Tindivanam Section of NH-66 from Km.0/000 to Km.37/920 in the State of
Tamil Nadu
Upham Quest – JV NH-66
6
IE - Monthly O&M Report for January’2016
1.5. Key Plan.
Upham Quest – JV NH-66
7
IE - Monthly O&M Report for January’2016
2. SALIENT FEATURES OF THE PROJECT
Upham Quest – JV NH-66
8
IE - Monthly O&M Report for January’2016
2. Salient features of the Project
Project Name :
Design, Engineering, Finance, Construction,Operation and Maintenance of
Pondicherry-Tindivanam section from km 0.000 to 37.920 under NHDP
phase III a on Build Operation and Maintenance (BOT) basis.
Package No. : NHDP-III/BOT-I/TN/05
Client :
National Highways Authority of India, Chief General Manager (T) & RO
SRI Tower, 3rd Floor DP-34 (SP), Industrial Estate, Guindy,
Chennai 600 032
Independent Engineer :
M/s.Upham International Corporation in JV with Quest Engineers &
Consultants Pvt. Ltd,
Head Office: 103-104, CS-1 GyanKhand-II, Indrapuram, Ghaziabad(UP),
Main office: Plot No-70, First Floor, Govindammal Nagar,
Seelanaickenpatty, Salem – 636 201.
Site Office:R.S.No. 142/1 & 2, Plot No. 152 & 153, Mahavishnu Nagar,
Tindivanam Main Road, Pattanur (Gorimedu), Auroville (P.O), Vaanur
(TK), Villupuram District – 605101 (Pondicherry Border).
IE Period : 36 Months
Concessionaire : Pondicherry TindivanamTollway Ltd
Project Cost : Rs.285 Crores
Date of Agreement
(Concessionaire) : July 19, 2007
Appointed date : January 15, 2008
Concessionaire Appointed
Date : 15th January, 2008
Concession Period : 30 years (30 Moths of Construction Time)
Scheduled Project
Completion Date :
July 14, 2010
Date of Issue of
Provisional COD
: 13.12.2011
Upham Quest – JV NH-66
9
IE - Monthly O&M Report for January’2016
3. ORGANIZATION CHART OF IE
Upham Quest – JV NH-66
10
IE - Monthly O&M Report for January’2016
G.Srinivasan
Highway
Maintenance
Engineer
P.Sivakumar
Quality cum
Material
Expert
C.Kannan
Highway
Maintenance
Engineer
K.K.Ahuja
Road Safety
Expert
K.Srinivasan
Highway
Maintenance
Engineer
Nithyanand
Kumar
Pavement
Specialist
Hitesh
MadhukarPatil
HTMS/Toll
Expert
A.Laloria
Leagel
Expert
A.Chandra
Sekaran
Bridge/
Structural
Engineer
TBN
Quantity
Surveyor
TBN
Horticulture
Expert
TBN
Electrical
Engineer
TBN
CAD Expert
S. Yogananthan
AHME
K. Veeramuthu
AHME
C. Dhanaraaj
Assistant
Highway
Maintenance
Engineer
TBN
Survey
Engineer
K.Sandanaram
Computer
Operator
M.Subramani
Computer
Operator
SAravindaraj
Manager
cum
Accountant
K.Manokaran
Manager
cum
Accountant
P.Sakthimani
Office boy
N.Manikandan
Office Boy
S. Harikrishnan
Office boy
Team Leader
A.Arokia Robert Raj
Team Leader cum Sr. Highway Engineer
ORGANISATION CHART OF INDEPENDENT ENGINEERS
Upham Quest – JV NH-66
11
IE - Monthly O&M Report for January’2016
MOBILIZATION BY - IE
The Following Key Personnel and Sub-Professional have been mobilized.
1. Team Leader cum Highway Engineer : Mr. A. Arokia Robert Raj
2. Bridge/ Structural Engineer : Mr. Chandrasekar
3. Highway Maintenance Enginee-1 : Mr.G.Srinivasan , NH-68
4. Highway Maintenance Engineer-2 : Mr.K.Srinivasan, NH-66
5. Assistant Highway Maintenance Engineer -1 : Mr.C. Danaraj, NH-66
6. Assistant Highway Maintenance Engineer -2 : Mr.K. Veeramuthu, NH-68
7. Assistant Highway Maintenance Engineer -3 : Mr.S.Yogananthan, NH-68
Upham Quest – JV NH-66
12
IE - Monthly O&M Report for January’2016
4. INSPECTION REPORT
Upham Quest – JV NH-66
13
IE - Monthly O&M Report for January’2016
Operation and Maintenance for 4-laning of Pondicherry to Tindivanam Section of NH-66 from Km 0/000
to Km 37/920
IE - INSPECTION REPORT FOR THE MONTH OF JANUARY’ 2016
Sl.No Description of Work Chain age Remarks/action to
be taken
1 Pot holes
CH : 5+900 LHS CH : 7+800 RHS ( Shoulder )
CH : 0+520 Slip Road ( Tirchy to Tindivanam
Rectification to be done
2 Service roads
a) No Earthen Shoulder
b) Line Drain damaged
CH : 24+800 to 25+100 LHS To be rectified
3 Blinkers are not functioning at
all Median openings
CH : 3+540 Pondy Side CH : 4+620 Tindivaanam Side
To be rectified /
Restore
CH : 14+500 CH : 16+080 CH : 21+500 CH : 22+310 CH : 23+030 CH : 32+800 Ch : 35+400 CH : 37+500 CH : 37+850
BHS
CH : 19+030 CH : 27+550 CH : 29+500
Pole only
available (without backup and
lighting)
4 KM Stone- Not available and other some places the KM
Stones fall down
4KM - LHS 13KM- RHS 16KM -RHS
To be rectified /
Restored
Upham Quest – JV NH-66
14
IE - Monthly O&M Report for January’2016
5 No Sign Boards-
Minor Intersections
All 36 no of inter sections
To be restored
6
Bituminous surface fully damaged
No Sign Boards & Speed Brakes at intersections
CH : 5+860 CH : 28+230
Surface to be rectified and sign board to be
replaced
7 Median Plantation CH : 3+600 to 38+608 - 6284 No’s only available
Remaining plantations to be replanted as per
CA
8
Deformed Earthen Shoulders
MCW
CH : 3+700 to 5+800 BHS CH : 7+800 to 8+100 BHS
To be corrected by excavation/filling and
dressing and compaction to
MORTH specification
9
MCW at Kerb Edge silt/earth
deposited
For Example
CH : 5+200 LHS CH : 13+300 LHS
Cleaning to be done
10 Illegal Encroachments CH : 7+250 RHS CH : 26+100 RHS
Concessionaire shall be taken necessary
action
11 Sign Boards
CH : 22+700 – Cross road sign CH : 23+000 –
Stop sign
To be rectified
Upham Quest – JV NH-66
15
IE - Monthly O&M Report for January’2016
SITE INSPECTION PHOTO'S
MINOR JUNCTIONS AT CH: 4+580 RHS
POTHOLES AT CH: 7+800 RHS
Upham Quest – JV NH-66
16
IE - Monthly O&M Report for January’2016
SOLAR BLINKERS NOT FUNCTIONING AT CH: 19+030 MEDIAN
DAMAGED SIGN BOARDS AT CH: 23+000
Upham Quest – JV NH-66
17
IE - Monthly O&M Report for January’2016
DAMAGED SIGN BOARDS AT CH: 22+700
INTERSTCTION AT CH: 5-860 (ROAD DAMAGED, NO SPEED BREAKERS & NO SIGN BOARDS)
Upham Quest – JV NH-66
18
IE - Monthly O&M Report for January’2016
ROAD EDGE DAMAGED AT CH: 7+800 RHS
Upham Quest – JV NH-66
19
IE - Monthly O&M Report for January’2016
S.No Description of Work Chainage Remarks/action to be taken
12
Inadequate Man Power & machinery as per O&M programme submitted by Concessionaire
-
Man power and machinery to be fulfilled
13
No Safety arrangement and measures (PPE's)for the labors engaged for O&M Works.
-
To be provided PPE's for all the labors engaged and other Safety measures during maintenance works.
14 Unauthorized entry and exist including encroachments on the ROW/Project Site.
a) Illegal Encroachments on
the ROW
CH 13+100 to CH 13+300 LHS - 200mtr, CH 15+100 to 15+200 LHS-100mtr, CH 6+800 to CH 6+900 RHS
The Concession have to take necessary action to possess the land back and instructed to keep watch and ward 24hrs to avoid this issue in future.
CH 37+900 LHS Unauthorized access
b) Unauthorized Median opening
CH8+000, CH10+900, CH25+500
The median opening to be closed with immediate effect considering the safety of road users.
15 ROW Pillars Missing Locations
CH 3+600-3+650 LHS
To be restored
CH 4+400-5+650 LHS
CH 12+550-12+600 LHS
CH 13+800-13+850 LHS
CH24+400-24+500 LHS
CH25+500-25+600 LHS
CH27+700-27+800 LHS
CH29+600-29+800 LHS
CH30+000-30+040 LHS
16 Bushes and vegetation grown up between shoulder to ROW all along the entire length of the project and the following locations are severe
Shoulder to ROW CH3+800 -4+650 RHS
To be cleaned and disposed outside of ROW
CH 6+200-6+450 LHS
CH 7+200-8+400 LHS
CH 9+100-10+000 LHS
CH 12+100-12+600 LHS
CH 19+800-20+200 LHS
CH21+400-20+600 RHS
CH16+400 -15+600 RHS
CH23+400-23+200 RHS To be cleaned and disposed
outside of ROW CH15+400 -14+000 RHS
CH13+400-13+500 RHS
Upham Quest – JV NH-66
20
IE - Monthly O&M Report for January’2016
CH9+400-8+000 RHS
CH37+200-37+400 RHS
CH35+400-37+600 BHS
CH34+150 -ISLAND
CH 31+500–32+500 BHS
CH10+000-16+000 RHS
CH 8+000 –9+400 RHS
17
Bushes & vegetation in median and Up to ROW
i)Median plantation
CH 3+600– 38+608
Trimming and shaping and replantation as per CA required
ii) Avenue / road side trees affecting the visibility at road bends , accesses and signs – causing accident and major impact on road users
Planted tree to be maintained as per IRC:SP:21-1979, the
numbering & maintaining register in the ROW and Bushes cleaning
to be done.
18 Corrugation and shoving - Service road
CH 12+850 LHS S.R - 2SQM
Full depth patching to be done Ch 13+600 to 13+650 BHS Approaches (PUP 14/2)
CH 13+300 RHS MCW - 20mtr.
19 Edge cracking / Slippage in Service road portion
Ch.13+100 – 30mtr length Full depth patching to be carried
out and the shoulder to be reconstructed with good quality of
material as per MORTH & H specifications. The damaged side
canal/lined drain to be reconstructed after removal of
bushes & vegetation’s etc.,
Ch.24+400 to 24+700 (300mtr length), Ch.36+300 (30
meter)
20
Rain cut in shoulder Portion: Shoulders are deformed, scoured and are lower than 25mm from the adjacent C.W fromCh 3+600 to 37+920 and some few locations are very severe.
CH 6+000-6+020 LHS
To be corrected by excavation, filling and dressing and compaction
conforming to MORTH Specification.
CH 6+200-6+450 LHS
CH9+400-9+420 LHS
CH10+700-10+730 LHS
CH32+200- Near Culvert
CH23+400-27+00 LHS
CH 28+400 RHS
CH 23+800 RHS
CH 23+410 RHS
CH 22+450 RHS
CH21+400 RHS
CH19+700 RHS
CH17+600 RHS
CH16+800 RHS
CH16+400 RHS
C15+800 RHS
Upham Quest – JV NH-66
21
IE - Monthly O&M Report for January’2016
CH 15+800 to CH37+920 BHS
21
DRAIN : Silted up & blocked by waste material, Vegetation etc. causing obstruction of flow of water and over flowing over the road
Line Drain
CH 3+600-5+850 BHS
Line Drain – cleaning for bushes, vegetation, garbage & silted
materials
CH 12+500-13+100 LHS
CH13+400-13+850 BHS
CH24+400-25+100 RHS
CH28+400-28+800 RHS
CH29+300-29+900 RHS
CH36+300-36+800 LHS
CH 37+000-37+600 LHS
RCC Drain
CH 3+600-5+850 BHS
Line Drain – cleaning for bushes, vegetation, garbage & silted
materials And Cover Slab to be restored.
CH 12+500-13+100 LHS
CH13+400-13+850 BHS
CH24+400-25+100 RHS
CH28+400-28+800 RHS
CH29+300-29+900 RHS
CH36+300-36+910 LHS
CH29+000-29+600 RHS
CH 35+500-36+500 BHS
CH 37+000-37+600 LHS
22 No Lane Marking (Thermoplastic paint) and Invisible in several locations.
CH4+200-5+500 RHS
To be repainted in this location and to be renewed immediately&
adequate reflectivity to be insured.
CH7+100-8+300 RHS
CH9+700-10+050 RHS
CH10+200-12+500 RHS
CH12+600-13+150 RHS
CH17+500-17+600 RHS
CH19+200-20+000 RHS
CH14+000-16+000 RHS
CH 21+800-22+300 RHS
CH 22+800-23+000 RHS
CH25+200-27+600 RHS
CH28+000-28+300 RHS
CH28+800-29+400 RHS
CH29+600-32+200 RHS
CH2+600-33+000 RHS
CH34+800-35+000 RHS
CH 3+600- 7+780 LHS
CH8+000-8+350 LHS
CH10+000-12+200 LHS
CH13+800-15+200 LHS
CH15+600-18+200 LHS
CH 23+500-25+000 LHS
Upham Quest – JV NH-66
22
IE - Monthly O&M Report for January’2016
CH 25+400- 25+600LHS
CH 28+000-29+400 LHS
CH30+500-32+000 LHS
CH 32+200-35+000 LHS
CH 36+300-37+400 BHS
23 Kerb painting faded locations CH3+600-5+800LHS
CH5+900-8+200 LHS
CH10+000-11+200 LHS
CH11+300-11+400 LHS
CH14+000-14+850 LHS
CH15+200-19+200 LHS
CH20+200-20+800 LHS
CH21+500-21+600LHS
CH22+200-23+000LHS
CH23+600-23+900LHS
CH24+300-25+600 LHS
CH26+200-26+600 LHS
CH27+000-27+800 LHS
CH27+900-29+000 LHS
CH30+000-30+200 LHS
CH30+400-30+850 LHS
CH32+000-34+400 LHS
CH3+600-6+400 RHS
CH7+800-10+000RHS
CH10+400-10+600RHS
CH10+800-12+000 RHS
CH12+200-13+800 RHS
CH13+900-14+000 RHS
CH15+200-16+200 RHS
CH16+400-16+600 RHS
CH16+800-19+200 RHS
CH19+800-20+000 RHS
CH21+400-23+800 RHS
CH24+800-26+000 RHS
CH26+200-27+800 RHS
CH28+000-31+000 RHS
31+000-32+200 RHS
CH32+400+35+000RHS
24
Missed/ damaged/ Faded /nonrelative Sign boards in the project (Cautionary Sign Boards, Route Marker, Clusters, Hazard Object Marker information warning sign board etc., )
CH 3+600 to 37+920 To be restored
25 Blinkers are not functioning at the intersections
CH 18+100 To be rectified/restored.
CH19+900
Upham Quest – JV NH-66
23
IE - Monthly O&M Report for January’2016
CH31+250
CH34+150
26
Delineators are faded and missing
i)Delineators LHS CH 3+600-5+850 LHS
To be rectified/restored.
CH7+800-8+000 LHS
CH9+800-10+000 (MEDIAN)
CH12+400-12+600 LHS
CH12+700-13+100 LHS
CH 13+400-13+800 LHS
CH 14+000-14+080 LHS
CH 16+100-16+300 ( MEDIAN)
CH19+100-19+600 LHS
CH20+800-22+400 (MEDIAN)
CH22+850-23+020 (MEDIAN)
CH24+400-24+600 (MEDIAN)
CH 25+500-25+600 LHS
CH27+700-27+800 LHS
CH 29+800-30+000 LHS
CH 33+000-33+200 (MEDIAN)
CH 35+450-35+700 ( MEDIAN)
CH35+900-36+000 LHS
CH 36+100-36+650 (MEDIAN)
CH 36+900-37+200 LHS
ii)Delineators RHS CH 3+600-5+850
To be rectified/restored.
CH7+800-8+000
CH12+200-13+800
CH14+500-14+600
CH15+900-16+400
CH18+250+18+800
CH19+000-19+400
CH23+000-23+200
CH23+400-23+650
CH24+400-24+800
CH25+600-26+200
CH26+600-27+800
CH28+300-28+410
CH28+700-28+900
CH29+300-29+600
Upham Quest – JV NH-66
24
IE - Monthly O&M Report for January’2016
CH35+200-35+500
CH35+600-36+000
CH36+900-37+100
i)Delineators at Service road LHS
CH 3+600-5+850
CH 12+500-13+100
CH 13+400-13+900
CH24+400-22+200
CH28+400-28+900
CH29+300-29+900
CH36+300-37+400
ii) Delineators at Service road RHS
CH 3+600-5+850
CH 13+400-13+900
CH24+400-25+200
CH28+200-28+800
CH29+300-29+800
CH36+300-37+400
27
Guard rails - In bus shelters painting is faded and some guard rails are damaged /missed
CH22+400 LHS Repair/Replacement required in
this location
28
Bus shelter
Fully damaged by the accidents on 22/04/2014
CH22+400 LHS Repair/Replacement required in
this location Fully damaged by the accidents on 18/04/2015
CH 30+650 RHS
29
Stone Pitching in slip roads more than 3meters
i) Km.36+900 LHS Stone Pitching Damaged
ii)Pondicherry to Tirchy
Stone Pitching is
disturbed/damaged iii) Tirchy to Tindivavam
iv) Tindivanam to Chennai
iv) Chennai to Pondicherry
30
Turfing and Landscaping
i) Way side amenities CH31+295 LHS Bushes and vegetation to be cleaned and trimming to be done
up to 150mm height ii) Major intersections CH 37+500
31
Median Chute Drains – Cleaning of bushes, vegetation’s and silted sand (Some places level differences is there )
CH 9+800-10+200
To be rectified
CH 12+050-12+600
CH 14+050-14+100
CH 18+400-18+800
CH19+000-19+300
CH 20+000-21+200
CH 26+000-25+600
CH26+400-27+000
CH27+200+27+400
CH 27+600-27+800
Upham Quest – JV NH-66
25
IE - Monthly O&M Report for January’2016
32
Rain Water Harvesting chambers Were disturbed and not maintained Properly/ not functioning at Ch 5+960 and Ch 13+300 and other location buried and filled up with Mud and earth
69 Nos. To be restored/rectified
33 Highway lighting is not properly illuminated
Ch.06+460
Fully not Functioning
Ch.06+460 No proper illumination
Ch.06+600 Fully not Functioning
Ch. 06+600 No proper illumination
Ch. 31+300 No proper illumination
Ch. 37+300 No proper illumination
Ch. 37+550 No proper illumination
Ch. 00+590 No proper illumination
Ch. 00+590 Fully not Functioning
Ch. 37+820 No proper illumination
Ch. 00+780 Fully not Functioning
34
Major, Minor Bridge, Box Culvert. a) Plants, bushes found in approaches & Vents (resulting obstruction in flow & causes erosion of revetment apron -bed level) b) Quadrennial revetment damaged partially
To be removed & restored
35 Structure number marking not visible To be restored
36 Expansion joint found with dust deposition and LHS Parapet wall damaged at Major Bridge CH: 26+400 and Stone Pitching and Chute drain to be rectified
To be cleaned and restored.
37 Deck drainage spout cleaning required at all Major Bridges/Minor bridges/PUP
To be cleaned
38 Bridge D/S side and U/S catch basin occupied by plants & Bushes.
To be cleaned
39 Bed level erosion/ Apron revetment damaged, more slit formation on bed level found in minor Bridge at CH: 16+300
To be cleaned and restored.
40 Unauthorized painting covered in crash barriers of culvers. To be removed
41 10. Toll Plaza underground walkways have collection of seepage water found.
Remedial measures to be implemented
42 Proper chainge marking not done to identify the damages. To be marked properly at site
Upham Quest – JV NH-66
26
IE - Monthly O&M Report for January’2016
SITE INSPECTION PHOTO'S
Description Photo's
Bushes and vegetation grown up between shoulder to ROW all along the entire length of the project and the following locations are severe
Line Drain
RCC Drain
Upham Quest – JV NH-66
27
IE - Monthly O&M Report for January’2016
No Lane Marking (Thermoplastic paint) and Invisible in several locations.
Kerb painting faded locations
Missed/ damaged/Faded/non reflective Sign boards in the project (Cautionary Sign Boards, Route Marker, Clusters, Hazard Object Marker information warning sign board etc., )
Upham Quest – JV NH-66
28
IE - Monthly O&M Report for January’2016
Delineators are faded and missing
Bus shelter
Deck drainage spout cleaning required at all Major Bridges/Minor bridges/PUP
Upham Quest – JV NH-66
29
IE - Monthly O&M Report for January’2016
Bed level erosion/ Apron revetment damaged, more slit formation on bed level found in minor Bridge at CH: 16+300
Upham Quest – JV NH-66
30
IE - Monthly O&M Report for January’2016
5. PROJECT FACILITIES
Upham Quest – JV NH-66
31
IE - Monthly O&M Report for January’2016
5. PROJECT FACILITIES.
SL.NO DESCRIPTION KM /NOS
1 Length of Main Carriage Way 38.608 Kms.
2 Length of service roads
1. In Tamilnadu= 8.143 km As per CA
2. In Pondicherry = 2.786km- As per CA
3. PUP locations= 4.033 km- Extra as per the demand from IC/NHAI
3 Length of slip roads As per DPR 3.369 km’s
4 Total length of Bypasses 11.805 km’s
5 Bus bays 16 x 2 nos. = 32 No’s
6 Junctions & cross roads 36 nos.
7 Major Bridges 1 no.
8 Minor Bridges 5 nos.
9 Box Culverts
In Tamilnadu = 33* nos.
In Pondicherry = 2 no Against 33nos. as per CA
10 Pipe Culverts 28nos.
11 Pedestrian Underpasses 5 nos.
12 Utility Ducts 25 nos.
13 Toll Plaza 1 no.
14 Way Side Amenity 1 no.
Upham Quest – JV NH-66
32
IE - Monthly O&M Report for January’2016
1. Length of Main carriage way
Sl No
Chainage
Side Length (km) Width (m) From To
1 0+000 38+608 BHS 38.608 8.50
2. Length of service roads.
S. No KM From To Side Meters Length
Remarks
Service Road in Pondicherry.
1 1+607 2+950 BHS 2.686km Varies
2 2+950 3+050 RHS 0.100km Varies
Service Road in Tamilnadu
1 3.550 5.832 BHS 2.282 7.000 3+552 to 3+620 LHS pending due to LA
2 12+533 13+130 LHS 0.597 7.000 LHS only
3 13+395 13+900 BHS 0.505 7.000
4 24+400 25+180 BHS 0.780 7.000
5 28+400 28+860 LHS 0.460 7.000
6 28+230 28+860 RHS 0.630 7.000
7 29+355 29+965 BHS 0.610 7.000
8 36+300 37+370 BHS 1.070 7.000
3. Length of slip roads.
1 0+000 0+620 0.620 7.000 T-T
2 0+000 0+590 0.590 7.000 P-T
3 0+000 0+818 0.818 7.000 T-C ( 0+000 - 0+270
PENDING DUE TO COURT CASE)
4 0+000 0+820 0.820 7.000 P-C
4. Total length of Bypasses : 11.805 kms
Upham Quest – JV NH-66
33
IE - Monthly O&M Report for January’2016
5. Bus bays : 16x2 nos. = 32 nos.
6. Junctions & cross roads.
Sl No Location Side Leading to Place Remarks
1 03+652 RHS Kalaivanarnagar road Acceleration will be
done after LA
2 4+368 RHS Mattukaranchavadi road
3 04+580 RHS Navakulam road
4 05+458 RHS Nalakulam road
5 05+860 RHS Mahasripradhyanveera deva nagar road
6 06+814 RHS Auroville road
7 06+881 LHS Thiruchitrambalamkoot road
8 08+766 LHS&RHS Irumbai village
road&thiruchatrambalamkoot road
9 10+980 LHS&RHS Acharampattu road
&thiruchitrambalamkoot road
10 12+533 LHS 1 bypass ends to thiruchitrambalamkoot
road
11 13+325 RHS Thoruvai road
12 13+550 LHS Pulichipullam road
13 14+507 RHS Andiyarpalam road
14 15+513 RHS Olunthiapattu road
15 16+084 LHS Vanur road from katrampakkam
16 16+960 LHS Katrampakkam road
17 18+553 RHS ii bypass starts to killiyanur road
18 19+012 LHS&RHS Kenipattu road &killyanur road
19 21+536 LHS&RHS Agaram road &killiyanur road
20 22+323 LHS&RHS Terkunamroad&killyanur road
21 23+028 RHS ii bypass ends to killiyanur road
22 24+729 LHS Adhanapattu road
23 27+575 LHS Aruvapakkam road
24 28+233 LHS Kodipakkam road
25 28+402 LHS Mailam road
26 28+422 RHS Kodipakkam road
27 29+680 LHS Omanthur school road
28 30+580 LHS Omanthur road
29 32+520 RHS Kovadi road
30 32+896 RHS Molasur road
31 34+164 RHS Endiyur road
32 35+475 LHS Varagupattu road
33 35+693 RHS Edayangulam road
34 36+662 LHS Iraiyanur village road
35 36+700 RHS Iraiyaur road(marakkanam road)
36 37+220 RHS Vallalarnagar
37 37+500 RHS Marakkanam road junction
Upham Quest – JV NH-66
34
IE - Monthly O&M Report for January’2016
7. Major Bridges:
Sl.no Chainage Structure number
Type of Structure
1 26+400 27/2 Major Bridge
8. Minor Bridges:
Sl.no Chainage Structure
Type of Structure number
1 15+590 16/3 Minor Bridge
2 19+575 20/2 Minor Bridge
3 20+340 21/4 Minor Bridge
4 23+685 24/3 Minor Bridge
5 30+875 31/1 Minor Bridge
9. Box Culverts:
Sl.no Chainage Type of Structure
1 0+638 1/1 Box Culvert
2 0+730 1/2 Box Culvert
3 4+393 5/1 Box Culvert
4 6+427 7/1 Box Culvert
5 6+735 7/2 Box Culvert
6 7+735 8/2 Box Culvert
7 9+973 10/3 Box Culvert
8 10+211 11/2 Box Culvert
9 10+940 11/4 Box Culvert
10 13+256 14/1 Box Culvert
11 13+932 14/3 Box Culvert
12 14+349 15/1 Box Culvert
13 15+261 16/1 Box Culvert
14 15+466 16/2 Box Culvert
Upham Quest – JV NH-66
35
IE - Monthly O&M Report for January’2016
10. Pipe Culverts
15 15+958 16/4 Box Culvert
16 16+405 17/1 Box Culvert
17 16+424 17/2 Box Culvert
18 17+237 18/1 Box Culvert
19 19+124 20/1 Box Culvert
20 23+582 24/2 Box Culvert
21 24+772 25/1 Box Culvert
22 25+195 26/2 Box Culvert
23 26+926 27/3 Box Culvert
24 27+726 28/1 Box Culvert
25 28+029 29/1 Box Culvert
26 28+411 29/2 Box Culvert
27 28+889 29/4 Box Culvert
28 29+086 30/1 Box Culvert
29 29+305 30/2 Box Culvert
30 32+202 33/1 Box Culvert
31 32+947 33/2 Box Culvert
32 35+560 36/2 Box Culvert
33 36/021 37/1 Box Culvert
34 37+700 38/1 Box Culvert
35 37+815 38/2 Box Culvert
S.No Chainage Structure
number Type of Structure
1 7+327 8/1 Pipe Culvert
2 7+987 8/3 Pipe Culvert
3 8+028 9/1 Pipe Culvert
Upham Quest – JV NH-66
36
IE - Monthly O&M Report for January’2016
11. Utility Ducts;
SL.NO Location of Utility Ducts Remarks
1 Km 3/700
2 Km 4/370
3 Km4/640
4 Km5/260
4 8+524 9/2 Pipe Culvert
5 9+120 10/1 Pipe Culvert
6 9+616 10/2 Pipe Culvert
7 10+017 11/1 Pipe Culvert
8 10+380 11/3 Pipe Culvert
9 11+160 12/1 Pipe Culvert
10 12+367 13/1 Pipe Culvert
11 18+831 19/1 Pipe Culvert
12 20+028 21/1 Pipe Culvert
13 20+107 21/2 Pipe Culvert
14 20+245 21/3 Pipe Culvert
15 21+217 22/1 Pipe Culvert
16 21+487 22/2 Pipe Culvert
17 21+571 22/3 Pipe Culvert
18 21+610 22/4 Pipe Culvert
19 21+862 22/5 Pipe Culvert
20 22+230 23/1 Pipe Culvert
21 22+339 23/2 Pipe Culvert
22 22+625 23/3 Pipe Culvert
23 23+248 24/1 Pipe Culvert
24 25+105 26/1 Pipe Culvert
25 26+065 27/1 Pipe Culvert
26 34+421 35/1 Pipe Culvert
27 35+494 36/1 Pipe Culvert
28
36+992
37/3
Pipe Culvert
Upham Quest – JV NH-66
37
IE - Monthly O&M Report for January’2016
5 Km5/500
6 Km6/750
7 Km6/910
8 Km8/745
9 Km12/600
10 Km13/460
11 Km15/480
12 Km16/950
13 Km18/565
14 Km22/320
15 Km22/990
16 Km25/050
17 Km27/550
18 Km30/620
19 Km33/000
20 Km35/400
21 Km36/300
22 Km36/760
23 Km37/300
24 Km 37/830(Tindivanam – Chennai
Partly Completed.
slip road )
25 Km38/430
12. Pedestrian Underpasses.
S.No Chainage Structure
Number
1 13+632 14/2
2 24+830 25/2
3 28+600 29/3
4 29+690 30/3
5 36/750 37/2
Upham Quest – JV NH-66
38
IE - Monthly O&M Report for January’2016
13. Toll Plaza;
14. Way Side Amenity
15. List of Bus Shelters.
S. No
Description Place
1
6+572 KM Morattandi
S. No Description Place
1 31+295KM Omandur
SL.NO. CHAINAGE SIDE
1 6+030 RHS
2 8+600 RHS
3 12+700 RHS
4 13+464 RHS
5 14+464 RHS
6 15+360 RHS
7 16+010 RHS
8 16+900 RHS
9 22+160 RHS
10 24+990 RHS
11 27+650 RHS
12 28+550 RHS
13 30+493 RHS
14 32+820 RHS
15 35+620 RHS
16 36+500 RHS
17 5+970 LHS
Upham Quest – JV NH-66
39
IE - Monthly O&M Report for January’2016
16. High Mast Lighting.
18 8+950 LHS
19 13+580 LHS
20 14+633 LHS
21 15+385 LHS
22 16+250 LHS
23 17+100 LHS
24 17+968 LHS
25 22+400 LHS
26 24+850 LHS
27 27+500 LHS
28 28+520 LHS
29 30+650 LHS
30 32+620 LHS
31 35+750 LHS
32 36+500 LHS
Sl No Chainage Height of the Pole
in meters Remarks
1 6+460 25
Toll Plaza 2 6+460 25
3 6+600 25
4 6+600 25
5 31+295 25 Way Side Amenities
6 37+300 25 Median
7 37+550 25 RHS
8 0+590 30 Pondy-Trichy Slip road
9 37+820 25 LHS
10 0+780 25 Tindivanam-Chennai Slip
road
Upham Quest – JV NH-66
40
IE - Monthly O&M Report for January’2016
OPERATION AND MAINTENANCE:
I. Operation and Maintenance of the project Highway :
The Concessionaire shall operate and maintain the project Highway in accordance with the provisions of
the concession Agreement, Specially Article 18, schedule L, schedule X and other relevant Articles of the
concession agreement and there to safety standards set out in Schedule S of the concession agreement.
II. Maintenance Programme:
The concessionaire shall in consultation with the Independent Engineer, prepare and provide
to the NHAI their Programme of preventive and other scheduled maintenance of the Project Highway not
later than forty five (45) days before the beginning of each accounting year as set forth in Sub – Article
18.3 of the concession Agreement.
However the concessionaire has not yet submitted their Maintenance Programme.
III. Toll Operations:
The Concessionaire has entrusted the responsibility of Toll Collection with M/s TBR Infra vide
the concessionaire letter reference PTTL/SS/PON/IC/2011/1150, dated November15,2011.
IV. Administrative, Operation and maintenance Base Camp:
The base camp is located on the LHS beside the TOLL Plaza at Km 6+572 and houses the following
facilities.
Main Control
Toll Audit and Data Processing Unit
Computer Room
Office Security
Cash Collection Center
Point of Sale (POS)
Canteen
Covered Parking
Power Substation and standby Generator (Supplies Room)
Highway Maintenance Room
Material Testing Laboratory
Upham Quest – JV NH-66
41
IE - Monthly O&M Report for January’2016
V. Way side Amenity/Truck lay bay :
1. Parking Area for Trucks & Buses
2. Parking Area for Cars
3. Circulation spaces
4. Public Toilets
5. Drinking water Kiosk
6. One High mast Light
Upham Quest – JV NH-66
42
IE - Monthly O&M Report for January’2016
APPENDIX A ACCIDENT / INCIDENT REPORT
Upham Quest – JV NH-66
43
IE - Monthly O&M Report for January’2016
Upham Quest – JV NH-66
44
IE - Monthly O&M Report for January’2016
PIU Viluppuram
Incident Management Data
Jan-16
Reference is made to NHAI HQ letter No. NHAI/CM/Inc. Man/2011 dated 24.05.2011 RO: Chennai
Sl . No. Descriptions General
Information
Route Patrol Vehicle
Ambulance Tow Away
Crane
Total Remarks / Reasons for non-compliance
1 PIU Viluppuram
2 NH Nos. 45 1 1 1
3 Stretch km 000+000 to
km38+608
4 Location of Incident management vehicle
6+572 6+572 6+572
5 Registration No. TN 32 .J. 2139 TN.32.J.3008 TN 32.J. 9559 3
6 Total number of accidents reported 15 8 13 2
7 Number of accident cases attended 15 8 13 2
8 Number of injured shifted to hospital 12 12
Upham Quest – JV NH-66
45
IE - Monthly O&M Report for January’2016
9 Number of other help provided by Route Patrol (other than accidents)
16 16
10 Number of help provided by Tow Away Vehicle (Other than accidents)
2 2
11 No. of vehicles painted in stripes as per approved colour scheme
1 1 1 3
12 No. of vehicles with requisite T & P and accessories as per contract
1 1 1 3
13 No. of vehicles as per approved illuminated boards on top
1 1 0 2
14 No. of vehicles with Requisite man power as per contract
1(9) 1(5) 1(2) 3(16)
15 No. of vehicles fitted with GPS/VTS 1 1 0 2
16 No. of reflective signages showing emergency contact no.
10
17 No. of plazas where emergency contact details boards are installed
10
18 No. of plaza where information is being printed on back of toll tickets
1 1
19 Date of last inspection by PD/RO
Upham Quest – JV NH-66
46
IE - Monthly O&M Report for January’2016
APPENDIX B TOTAL TOLLED TRAFFIC
Upham Quest – JV NH-66
47
IE - Monthly O&M Report for January’2016
National Highways Authority of India
PIU-Chennai
USER FEE COLLECTION PLAZA AT MORATTANDI ON NH -66 FOR THE MONTH OF JANAURY 2016 SHIFT WISE COLLECTION FOR THE DISTANCE FROM 0.000 KM TO 38.608 KM
Date Day Shift A Shift B Shift C
Total Cash pass Total Running Total Collection Pass Collection Pass Collection Pass
1-Jan-16 Fri 105,669 - 222,663 - 157,477 48,946 534,755 485,809 48,946 534,755 534,755
2-Jan-16 Sat 85,398 - 181,025 - 150,861 31,311 448,595 417,284 31,311 448,595 448,595
3-Jan-16 Sun 82,424 - 174,962 - 138,318 18,067 413,771 395,704 18,067 413,771 413,771
4-Jan-16 Mon 81,921 - 138,559 - 119,537 46,108 386,125 340,017 46,108 386,125 386,125
5-Jan-16 Tue 78,943 - 133,771 - 113,257 19,161 345,132 325,971 19,161 345,132 345,132
6-Jan-16 Wed 89,531 - 145,632 - 119,104 9,938 364,205 354,267 9,938 364,205 364,205
7-Jan-16 Thu 87,249 - 140,765 - 125,373 5,200 358,587 353,387 5,200 358,587 358,587
8-Jan-16 Fri 87,544 - 142,521 - 139,787 8,888 378,740 369,852 8,888 378,740 378,740
9-Jan-16 Sat 89,285 - 198,861 - 173,501 11,135 472,782 461,647 11,135 472,782 472,782
10-Jan-16 Sun 82,068 - 152,205 - 111,842 4,200 350,315 346,115 4,200 350,315 350,315
11-Jan-16 Mon 82,293 - 146,420 - 119,773 2,250 350,736 348,486 2,250 350,736 350,736
12-Jan-16 Tue 82,993 - 132,220 - 124,288 296,710 636,211 339,501 296,710 636,211 636,211
13-Jan-16 Wed 86,210 - 148,733 - 140,676 4,850 380,469 375,619 4,850 380,469 380,469
14-Jan-16 Thu 91,619
- 167,604
- 145,303
4,947 409,473 404,526 4,947 409,473 409,473
15-Jan-16 Fri 87,498 - 162,380 - 112,238 29,128 391,244 362,116 29,128 391,244
Upham Quest – JV NH-66
48
IE - Monthly O&M Report for January’2016
391,244
16-Jan-16 Sat 54,469
- 162,595
- 131,585
3,900 352,549 348,649 3,900 352,549 352,549
17-Jan-16 Sun 57,448
- 198,207
- 163,290
35,460 454,405 418,945 35,460 454,405 454,405
18-Jan-16 Mon 86,780
- 145,161
- 116,726
147,435 496,102 348,667 147,435 496,102 496,102
19-Jan-16 Tue 81,827
- 143,960
- 150,187
110,845 486,819 375,974 110,845 486,819 486,819
20-Jan-16 Wed 118,648
- 181,394
- 162,094
71,007 533,143 462,136 71,007 533,143 533,143
21-Jan-16 Thu 91,684 - 148,793 - 135,582 41,199 417,258 376,059 41,199 417,258 417,258
22-Jan-16 Fri 96,664 - 154,761 - 154,323 88,402 494,150 405,748 88,402 494,150 494,150
23-Jan-16 Sat 101,573 - 204,652 - 181,598 40,084 527,907 487,823 40,084 527,907 527,907
24-Jan-16 Sun 120,523 - 193,105 - 135,931 15,544 465,103 449,559 15,544 465,103 465,103
25-Jan-16 Mon 77,279 - 153,027 - 133,458 86,346 450,110 363,764 86,346 450,110 450,110
26-Jan-16 Tue 87,931 - 171,699 - 121,429 50,895 431,954 381,059 50,895 431,954 431,954
27-Jan-16 Wed 82,060 - 146,871 - 130,048 27,870 386,849 358,979 27,870 386,849 386,849
28-Jan-16 Thu 86,296 - 148,611 - 133,403 30,508 398,818 368,310 30,508 398,818 398,818
29-Jan-16 Fri 95,277 - 156,608 - 148,030 31,243 431,158 399,915 31,243 431,158 431,158
30-Jan-16 Sat 103,921 - 173,817 - 154,329 21,032 453,099 432,067 21,032 453,099 453,099
31-Jan-16 Sun 91,479 - 167,445 - 138,657 15,281 412,862 397,581 15,281 412,862 412,862
TOTAL 13,413,426
AVERAGE 432961
Upham Quest – JV NH-66
49
IE - Monthly O&M Report for January’2016
NATIONAL HIGHWAYS AUTHORITY OF INDIA
CHENNAI REGION
DETAILS OF TOLL COLLECTION AND NO. OF VECHILES USED TOLL PLAZA FOR THE MONTH OF JANAUARY-2016
Sl. No.
NH No
Stretch
Length of the
stretch (Km)
Chainage & Location of Toll Plaza
Name of PIU
Collection by NHAI/
BOT Operator
Toll Policy (1997 / 2008)
Date of commence ment of toll collection
Monthly Collection
(Amount in Rs.)
November 2015 No. of Vehicles used Toll Plaza
Car LCV Truck /
Bus MAV >2
axles
1 66
Pondicherry(Indra Gandhi Square) (Km.0/000) to
Tindivanam(Fly over) (Km.38/608)
38.608 Km 6/572 Morattandi
Viluppuram BOT (M/s
PTTL) 1997 13.12.2011
Nos.
365798 277459 26214 50206 11919
Amt.
13362815 7139819 1221595 2697522 2303879
Upham Quest – JV NH-66
50
IE - Monthly O&M Report for January’2016
NATIONAL HIGHWAYS AUTHORITY OF INDIA
CHENNAI REGION
DETAILS OF TOLL PLAZA IN OPERATION IN TAMIL NADU, MORATTANDI, AS ON 30.11.2015
S.No
NH No
Stretch
Length of the
stretch (Km)
Chainage & Location of Toll
Plaza
Name of PIU
Collection by NHAI/
BOT Operator
Toll Policy (1997 / 2008)
Date of commencement of toll collection
Average Daily
collection (Rs. in Lakhs)
Description
User fee rates in Rs
Car LCV Truck /
Bus MAV > 2 axles
1 66
Pondicherry(Indra Gandhi Square) (Km.0/000) to Tindivanam(Fly over) (Km.38/608)
38.608 Km 6/572 Morattandi
Villupuram BOT (M/s
PTTL) 1997 12/13/2011 4.33
Single 40 70 140 224
Multiple Journey
60 105 209 337
Monthly 1197 2094 4188 6731
Upham Quest – JV NH-66
51
IE - Monthly O&M Report for January’2016
Toll able Traffic Count Statement
DATE CAR / JEEP
LCV BUS TRUCK MAV TOTAL
1-Jan-16 6236 454 136 173 352 7351
2-Jan-16 4927 491 157 215 326 6116
3-Jan-16 5234 289 174 156 257 6110
4-Jan-16 3293 452 157 228 314 4444
5-Jan-16 2845 490 132 247 333 4047
6-Jan-16 3108 505 135 262 374 4384
7-Jan-16 3177 518 147 265 347 4454
8-Jan-16 3385 557 160 251 362 4715
9-Jan-16 5166 543 169 278 340 6496
10-Jan-16 4301 346 144 166 232 5189
11-Jan-16 3456 486 128 278 282 4630
12-Jan-16 3112 576 144 259 294 4385
13-Jan-16 3719 534 133 264 334 4984
14-Jan-16 5103 507 136 218 267 6231
15-Jan-16 5463 366 139 95 151 6214
16-Jan-16 5587 265 94 47 139 6132
17-Jan-16 7263 254 156 32 101 7806
18-Jan-16 4053 425 164 163 254 5059
19-Jan-16 3889 478 156 213 318 5054
20-Jan-16 5010 602 156 253 372 6393
21-Jan-16 3527 555 120 299 362 4863
22-Jan-16 3747 556 143 307 406 5159
23-Jan-16 5644 627 185 281 355 7092
24-Jan-16 5947 406 150 170 289 6962
25-Jan-16 3833 482 122 277 292 5006
26-Jan-16 4829 411 117 229 201 5787
27-Jan-16 3645 554 114 274 286 4873
28-Jan-16 3515 552 118 295 325 4805
29-Jan-16 4049 561 117 320 336 5383
30-Jan-16 4696 570 153 287 346 6052
31-Jan-16 5051 415 156 172 243 6037
136810 14827 4412 6974 9190 172213
Upham Quest – JV NH-66
52
IE - Monthly O&M Report for January’2016
Date Day
TOLL COLLECTIONS
POS TOTAL OF THE DAY
DATE OF DEPOSIT A-Shift
00.00 AM to 08.00
AM
B-Shift 08.00 AM to 04.00
PM
C-Shift 04.00 PM to 00.00
AM
Sub Total
1-Jan-16 FRI 105,669 222,663 157,477 485,809 48946 534,755
4-Jan-16
2-Jan-16 SAT 85,398 181,025 150,861 417,284 31311 448,595
3-Jan-16 SUN 82,424 174,962 138,318 395,704 18067 413,771 5-Jan-16
4-Jan-16 MON 81,921 138,559 119,537 340,017 46108 386,125 6-Jan-16
5-Jan-16 TUE 78,943 133,771 113,257 325,971 19161 345,132 7-Jan-16
6-Jan-16 WED 89,531 145,632 119,104 354,267 9938 364,205 8-Jan-16
7-Jan-16 THU 87,249 140,765 125,373 353,387 5200 358,587
11-Jan-16 8-Jan-16 FRI 87,544 142,521 139,787 369,852 8888 378,740
9-Jan-16 SAT 89,285 198,861 173,501 461,647 11135 472,782
10-Jan-16 SUN 82,068 152,205 111,842 346,115 4200 350,315 12-Jan-16
11-Jan-16 MON 82,293 146,420 119,773 348,486 2250 350,736 13-Jan-16
12-Jan-16 TUE 82,993 132,220 124,288 339,501 296710 636,211 14-Jan-16
13-Jan-16 WED 86,210 148,733 140,676 375,619 4850 380,469
18-Jan-16
14-Jan-16 THU 91,619 167,604 145,303 404,526 4947 409,473
15-Jan-16 FRI 87,498 162,380 112,238 362,116 29128 391,244
16-Jan-16 SAT 54,469 162,595 131,585 348,649 3900 352,549
Upham Quest – JV NH-66
53
IE - Monthly O&M Report for January’2016
17-Jan-16 SUN 57,448 198,207 163,290 418,945 35460 454,405 19-Jan-16
18-Jan-16 MON 86,780 145,161 116,726 348,667 147435 496,102 20-Jan-16
19-Jan-16 TUE 81,827 143,960 150,187 375,974 110845 486,819 21-Jan-16
20-Jan-16 WED 118,648 181,394 162,094 462,136 71007 533,143 22-Jan-16
21-Jan-16 THU 91,684 148,793 135,582 376,059 41199 417,258
25-Jan-16 22-Jan-16 FRI 96,664 154,761 154,323 405,748 88402 494,150
23-Jan-16 SAT 101,573 204,652 181,598 487,823 40084 527,907
24-Jan-16 SUN 120,523 193,105 135,931 449,559 15544 465,103
27-Jan-16
25-Jan-16 MON 77,279 153,027 133,458 363,764 86346 450,110
26-Jan-16 TUE 87,931 171,699 121,429 381,059 50895 431,954 28-Jan-16
27-Jan-16 WED 82,060 146,871 130,048 358,979 27870 386,849 29-Jan-16
28-Jan-16 THU 86,296 148,611 133,403 368,310 30508 398,818 30-Jan-16
29-Jan-16 FRI 95,277 156,608 148,030 399,915 31243 431,158
1-Feb-16
30-Jan-16 SAT 103,921 173,817 154,329 432,067 21032 453,099
31-Jan-16 SUN 91,479 167,445 138,657 397,581 15281 412,862 2-Feb-16
Upham Quest – JV NH-66
54
IE - Monthly O&M Report for January’2016
Details of Vehicle Passing In Month
No. of Monthly
Passes
Car/Jeep/Van LCV Truck/Bus MAV Total
2030 35 222 7 2294
Car/Jeep/Van LCV Truck / Bus MAV Total
No's % of
Grand Total
No's % of
Grand Total
No's % of
Grand Total
No's % of
Grand Total
No's % of
Grand Total
All types of single Entry
71715 25.85 8604 32.82 5387 10.72979 7436 62.38778 93142 25.4627
Multiple Entry
65095 23.46 6223 23.74 5999 11.94877 1754 14.716 79071 21.616
Re- Usage of Multiple
Entry Tickets
67353 24.27 7317 27.91 12224 24.34769 2256 18.92776 89150 24.3714
Re- Usage of Monthly
pass 45010 16.22 2032 7.752 19535 38.90969 309 2.592499 66886 18.285
Exemptions Recorded in the System
28286 10.19 2038 7.774 7061 14.06406 164 1.375954 37549 10.265
Grand Total 277459 26214 50206 11919 365798
Upham Quest – JV NH-66
55
IE - Monthly O&M Report for January’2016
5SCHEDULE – M
Name of Work: Design, Engineering, Construction, Development, Finance, Operation and Maintenance of 4 Laning the existing 2 lane section from Km (00+000 (Pondicherry) TO 37+920 ( Tindivanam) ) on NH-66 in the state of Tamil Nadu on Build Operate Transfer (BOT) basis.
1. Date Of Commencement Of fee collection:13TH DEC 2011 2. Report for month ending: January2016 3. Fee rates (In Rs.)
Vehicle Type Fee Rates on Commencement Rates during year before last year
w.e.f date
Rates during previous year applied w.e.f
date
Rates between Date: Present rates Applied w.e.f. Date
For single Journey
For Multiple Journey
For Single Journey
For Through Journey
For Single Journey
For Multiple Journey
Car/Van / Jeep 32 47 NA NA 39 59 40 60
LCV 55 83 NA NA 68 103 70 105
Truck/Bus 110 166 NA NA 137 205 140 209
Multi Axle Vehicle 177 266 NA NA 220 330 224 337
a. Collection during month under report Amount in Rs.13413426 in words (One Crore Thirty Four Lakhs Thirteen Thousand Four Hundred and Twenty Six only)Through Traffic and Revenue
Vehicle Type Previous Month Corresponding Month during the Previous
Year Current Month
No’s Amount No’s Amount No’s Amount No’s Amount No’s Amount No’s Amount
Single Journey Multiple Journey Single Journey Multiple Journey Single Journey Multiple Journey
Car/Van / Jeep 33610 1344400 29452 1767120 75652 2950428 59334 3500706 71715 2868600 65095 3905700
LCV 4565 264516 2994 314370 8504 505731 5169 532407 8604 499133 6223 653415
Truck/Bus 2712 324595 2930 612370 6159 643975 5057 1036685 5387 618135 5999 1253791
Multi Axle Vehicle 3540 792960 897 302289 7522 150440 1553 512490 7436 1665664 1754 591098
TOTAL 44426 2724455 36273 2996149 97837 4250574 71113 5582288 93142 5651532 79071 6404004
TOTAL (A) 12055536
b. Local Tolled Traffic
Vehicle Type Previous Month Corresponding Month during the
Previous Year Current Month
No’s Amount No’s Amount No’s Amount
Car/Van / Jeep 1726 323425 2017 354710 2030 365519
LCV 30 63020 32 65696 35 73590
Truck/Bus 213 838448
241 934538
222 871664
Multi Axle Vehicle 4 26924 5 32995
7 47117
TOTAL 1357890
TOTAL (B) 1357890
c. Traffic and Revenue
Vehicle Type Previous Month Corresponding Month during the Previous Year Current Month
No’s Amount No’s Amount No’s Amount No’s Amount No’s Amount No’s Amount
Single Journey Multiple Journey Single Journey Multiple Journey Single Journey Multiple Journey
Car/Van / Jeep 33610 1344400 29452 1767120 75652 2950428 59334 3500706 71715 2868600 65095 3905700
LCV 4565 264516 2994 314370 8504 505731 5169 532407 8604 499133 6223 653415
Truck/Bus 2712 324595 2930 612370 6159 643975 5057 1036685 5387 618135 5999 1253791
Multi Axle Vehicle 3540 792960 897 302289 7522 150440 1553 512490 7436 1665664 1754 591098
TOTAL 44426 2724455 36273 2996149 97837 4250574 71113 5582288 93142 5651532 79071 6404004
TOTAL (A) 12055536
TOTAL REVENUE (A)+(B) 13413426