DPR Study for Construction of New Bridge Across Varsova Creek on NH-8 at Km 497.292 Revisions Ph : 4086-3000, Fax 2685-5252 Prepared by Designed by Checked by Approved by File Name : A-8, Green Park, New Delhi - 110016 Intercontinental Consultants & Technocrats Pvt.Ltd, July. 2016 R0 Date Revisions INITIAL PLAN Description Checked by NATIONAL HIGHWAYS AUTHORITY OF INDIA 1:4000 DGPS MAP OF VARSOVA BRIDGE ROW ROW ROW PROW PROW PROW Legend:- Proposed Centerline Proposed Right of Way Existing Right of Way Diverted Forest Land (Mangrove) DRAWING NO:- NHAI/VARSOVA/DGPS/01/R0 HARPREET SODHI ANJU ASEEM PRABHAKAR B.K.SWAIN Paper size-A2
Transcript of NATIONAL HIGHWAYS 1:4000 on NH-8 at Km …forestsclearance.nic.in › writereaddata › FormA ›...
DPR Study for Construction of New Bridge Across Varsova Creekon NH-8 at Km 497.292
RevisionsPh : 4086-3000, Fax 2685-5252
Prepared by Designed by Checked by Approved by File Name :
A-8, Green Park, New Delhi - 110016
Intercontinental Consultants & Technocrats Pvt.Ltd,July. 2016R0
DateRevisions
INITIAL PLAN
Description Checked by
NATIONAL HIGHWAYSAUTHORITY OF INDIA
1:4000DGPS MAP OF
VARSOVA BRIDGE
ROW ROW ROW
PROW PROW PROW
Legend:-Proposed CenterlineProposed Right of WayExisting Right of WayDiverted Forest Land (Mangrove)
DRAWING NO:- NHAI/VARSOVA/DGPS/01/R0
HARPREET SODHIANJU ASEEM PRABHAKARB.K.SWAIN
Paper size-A2