NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th...

38
1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR REPLIES” to be asked at a sitting of the National Assembly to be held on Friday, the 27th March, 2015 181. *Ms. Naeema Kishwar Khan: Will the Minister In-charge of the Aviation Division be pleased to state: (a) the percentage of the construction work of Islamabad Airport completed so far alongwith the details thereof; (b) the time by which the remaining work of the said airport will be completed; (c) the details of the construction work of the roads leading to the said airport completed so far alongwith the time by which the remaining construction work of the said roads will be completed; (d) the total number of runways constructed therefor; and (e) whether said runways have sufficient distance between each others? Minister In-Charge of the Aviation Division: (a) Overall physical progress of work is 79.58% as of 15th February, 2015. Details are enclosed as Appendix-A. (b) The remaining work of the said airport to make it operational is likely to be completed by October 2016. (c) The roads leading to the airport are being dealt by NHA.

Transcript of NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th...

Page 1: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

1

(20th Session)

NATIONAL ASSEMBLY SECRETARIAT

————

“QUESTIONS FOR ORAL ANSWERS AND THEIR REPLIES”

to be asked at a sitting of the National Assembly to be held on

Friday, the 27th March, 2015

181. *Ms. Naeema Kishwar Khan:

Will the Minister In-charge of the Aviation Division be pleased tostate:

(a) the percentage of the construction work of Islamabad Airportcompleted so far alongwith the details thereof;

(b) the time by which the remaining work of the said airport will be

completed;

(c) the details of the construction work of the roads leading to thesaid airport completed so far alongwith the time by which theremaining construction work of the said roads will be completed;

(d) the total number of runways constructed therefor; and

(e) whether said runways have sufficient distance between eachothers?

Minister In-Charge of the Aviation Division: (a) Overall physical

progress of work is 79.58% as of 15th February, 2015. Details are enclosed asAppendix-A.

(b) The remaining work of the said airport to make it operational islikely to be completed by October 2016.

(c) The roads leading to the airport are being dealt by NHA.

Page 2: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

2

(d) Two runways have been constructed i.e. main/primary runway andsecondary runway.

(e) Yes. The distance between two runways is as per International CivilAviation Organization (ICAO) standards.

182. *Ms. Naeema Kishwar Khan:

Will the Minister In-charge of the Cabinet Division for be pleased tostate:

(a) whether it is a fact that the officers of BPS-20 to 22 being utilizedthe official vehicles at present; if so, the steps being taken bythe Cabinet Division to control/check the misuse of said vehicles;

(b) the date of announcement of the monetization policy alongwiththe implementation ratio thereof;

Page 3: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

3

(c) whether it is also a fact that the said officers are getting ninetythousand rupees and using official vehicles also; if so, the detailsof the procedure to monitor and check the utilization of saidvehicles; and

(d) the steps being taken by the Government to control the

unjustified expenditure of the vehicles including petrol, CNGand maintenance thereof?

Minister In-Charge of the Cabinet Division: (a) After the

implementation of monetization policy, a mechanism has been placed to avoid anymisuse of pool vehicles in Ministries / Divisions / Departments, by limiting the totalnumber of vehicles (1300cc, 1000cc & 800cc) for each Ministry / Division, basedon the actual strength of officers.

(b) The Federal Government was pleased to approve the “CompulsoryMonetization of Transport Facility for Civil Servants in BS-20 to BS-22”implemented from 1st January, 2012. The policy has further been extended to theSemi Autonomous / Autonomous Bodies, Corporations etc. under theAdministrative control of Ministries / Divisions.

(c) The entitled officers availing the vehicle monetization scheme are notauthorized to use the official pool vehicles, except for official / operational duty.

As per Para (XVIII), of Policy for Monetization of Transport, theconcerned Principal Accounting Officer is responsible to ensure proper use ofGovernment transport for operational and general duties.

After the implementation of monetization policy, a mechanism has beenplaced to avoid any misuse of pool vehicles in Ministries / Divisions / Departments,by limiting the total number of vehicles (1300cc, 1000cc & 800cc) for each Ministry/ Division. The Principal Accounting Officer has been made responsible to checkand take action against any misuse of pool vehicles.

(d) The Finance Division (Expenditure Wing) is constantly pursuing thecompulsory / regular submission of monthly report on expenditure incurred onFuel and maintenance of operational / general duty vehicles by the Ministries /Divisions.

Page 4: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

4

183. *Ms. Khalida Mansoor:

Will the Minister In-charge of the Cabinet Division be pleased to statethe National Assembly Constituency-wise total amount of fundsprovided under Peoples Works Programme during the period from2008 to 2013?

Reply not received.

184. *Ms. Khalida Mansoor:

Will the Minister In-charge of the Capital Administration andDevelopment Division be pleased to state:

(a) whether there is any proposal under consideration of theGovernment to supply electricity through solar energy to theFederal Government Hospitals;

(b) if so, it will be implemented?

Reply not received.

185. *Sheikh Salahuddin:

Will the Minister for Information, Broadcasting and National Heritagebe pleased to state:

(a) whether it is a fact that Pakistan has been included in the list of

dangerous countries for Journalists; if so, the details thereof;

(b) the number of Journalists killed/injured/kidnapped during thelast five years alongwith the action taken by the Government in this regard; and

(c) the steps being taken by the Ministry for the security ofjournalists?

Transferred to Interior Division for answer on Next Rota Day.

Page 5: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

5

186. *Sheikh Salahuddin:

Will the Minister In-charge of the Cabinet Division be pleased to statewhether it is a fact that the Government land has been illegallyoccupied in Islamabad by various persons, mafia and bodies; if so,the action taken so far by the CDA in this regard?

Minister In-Charge of the Cabinet Division: Yes, the Government

land has been illegally occupied in Islamabad. CDA is in a process of eviction ofillegal occupants / encroachers on daily basis, followed by initiating criminalproceedings.

187. *Ms. Belum Hasnain:

Will the Minister In-charge of the Cabinet Division be pleased to state:

(a) the steps taken by the Government to resolve the issue ofmoratorium on opening the new Medical Colleges in the country;and

(b) whether there is any proposal under consideration of theGovernment to take stringent performance evaluation measureswith respect to PMDC; if so, when it will be implemented?

Transferred to National Health Services Regulation and CoordinationDivision for answer on Next Rota Day.188. *Ms. Belum Hasnain:

Will the Minister for Railways be pleased to state: (a) whether it is a fact that the Ministry has not formulated any

national transport policy in respect of Railways so far; if so, thetime by which it will be formulated; and

(b) whether there is any proposal under consideration of theGovernment to carryout Public Private Partnership to increasethe skills, financial and administrative capacity of Railways; ifso, the details thereof?

Minister for Railways (Khawaja Saad Rafique): (a) The formulation

of National Transport Policy pertains to Ministry of Communications. However,

Page 6: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

6

the Ministry of Railway has given its inputs for the said policy.

(b) The Ministry of Railway, under the framework of PPP Policy of theGovernment of Pakistan, is exploring the possibility o Joint Venture with privateinvestors for manufacturing o locomotives in its manufacturing facility at Risalpur.

In order to overcome energy crises Government of Punjab Governmentof Pakistan are in the process of establishing coal fired power plants at Sahiwal,Rahim Yar Khan Muzzafargarh and Jamshoro. Pakistan Railway has establishedFreight Transportation Company which will operate under PPP/JV mode.

In order to enhance the skills and administrative capacity of Railwaysofficers/ officials they are undergoing mandatory trainings in the Institutionsestablished by the Railways as well by the Government of Pakistan.

189. *Syed Waseem Hussain:

Will the Minister In-charge of the Capital Administration andDevelopment Division be pleased to state whether the facility of LiverTransplantation is available in the Federal Government Hospitals; ifso, the location-wise names thereof?

Reply not received.

190. *Syed Waseem Hussain:

Will the Minister for Railways be pleased to state:

(a) the total number of persons who illegally occupied the PakistanRailways land in Hyderabad, Sindh alongwith the details thereof;and

(b) the steps being taken by the Ministry to vacate the said land?

Minister for Railways (Khawaja Saad Rafique): (a) 1559 persons

have illegally occupied 45.5 acres railway land. Detail is enclosed as Annexure-A

Page 7: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

7

(b) Railway land measuring 8 acres have been retrieved during last threeyears in Hyderabad. Year wise breakup is as under:—

2013 = 1 acre

2014 = 3 acres

2015 = 4 acres

(upto February 2015)

Efforts are underway to retrieve the remaining land through anti-encroachment operation besides stepping up criminal & legal proceedings.Moreover, no fresh encroachment is reported in Hyderabad.

(Annexure has been placed in the National Assembly Library)

191. *Dr. Azra Fazal Pechuho:

Will the Minister In-Charge of the Establishment Division be pleasedto state whether the Federal Public Service Commission has thepower to convene a board for promotion of BPS-20 officers; if so,the reasons for the delay in this regard?

Minister Incharge of the Establishment Division: (i) In terms of section

9(3) of Civil Servant Act, 1973 promotion to post in basic pay scale 20 and 21and equivalent shall be made on the recommendation of a Selection Board whichshall be headed by the Chairman, Federal Public Service Commission.

(ii) In terms of section 2 (b) of Civil Servants (Appointment, Promotionand Transfer)Rules, 1973, selection board means a board constituted by the FederalGovernment, for the purpose of selection for promotion or transfer to posts inbasic pay scales 19 to 21 and equivalent, consisting of such persons as may beappointed by Government from time to time.

(iii) The Establishment Division is the secretariat for Central SelectionBoard and is responsible for convening the board for promotion of BPS-20. Asthe cases of promotions become ripe this Division request Chairman FPSC fora date and time at his convenience to chair the meeting of CSB as the ChairmanFPSC, is also mandated with other responsibilities besides chairing the meetingof CSB.

Page 8: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

8

(iv) Last meeting of CSB was held on 11-13th February, 2014 for thepromotion of officers to BS-20 and BS-21. The recommendations of CSB wereforwarded to the Prime Minister, being appointing authority for approval. However,the Prime Minister referred back the case of some officers for re-consideration bythe CSB to assess/evaluate them as to the attribute of ‘integrity/general reputation/perception’ in a comprehensive and objective manner. Aggrieved of this decisionof the Prime Minister, the officers whose cases were referred back approachedthe Courts of Law.

(v) The reason behind delay in convening the meeting of CSB is that, theHonorable Courts of Law, in some cases issued restraining orders for not consideringthe officers afresh, issued directions for issuing of promotion notifications, issueddirections for not holding thee meeting for promotion to BS-20. On the recentdirections of Lahore High Court, on 09-01-2015, the scheduled meeting of CSBfrom 12th January, 2015 to 15th January, 2015 was postponed.

(vi) Establishment Division has filed ICA and CPLA against the ordersof Honorable Courts and next meeting of CSB will be held on vacating of restrainingorders from the Courts of Law.

192. *Ms. Musarat Rafique Mahesar:

Will the Minister In-charge of the Cabinet Division be pleased to state:

(a) the steps taken by the Government to promote tourism in thecountry;

(b) the tourist sites utilized in the country for the development oftourism in the country during the period from 1-6-2013 till date;and

(c) the improvements made in the tourism during the said period?

Minister In-Charge of the Cabinet Division: (a) Detail of steps takenby PTDC for promotion of tourism is attached at annexure-I.

(b) The PTDC is currently running 39 Motels & Restaurants and oneFlashman’s Hotel at important tourist places of Pakistan. PTDC Motels havebeen providing comfortable, reliable, safe and quality accommodation to tourists.The list of PTDC Motels and Hotel is attached at annexure-II.

Page 9: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

9

(c) Improvements made in the tourism during the year 01-06-2013 totill date attached at annexure-III.

(Annexures have been placed in the National Assembly Library)

193. *Shamas Un Nisa:

Will the Minister In-charge of the Cabinet Division be pleased to statewhether there is any proposal under consideration of the Governmentto lift ban on You Tube in the country; if so, when it will beimplemented?

Minister In-Charge of the Cabinet Division:

Background

On September 17th, 2012, the Honorable Supreme Court ordered PTAin Constitutional Petition No. 104 of 2012 to block offending material on YouTubewebsite of any other website. As there was no technical solution available, whichcould block 100% objectionable material on the YouTube, in compliance with theSupreme Court’s orders, YouTube was blocked and compliance report wassubmitted to the Supreme Court accordingly. Matter has been reviewed severaltimes and the following steps have been taken to address the issue.

1438 URLs containing blasphemous movie, “Innocence of Muslims” onYouTube were blocked and warning messages has been displayed on 178 URLsby requesting YouTube as of 16 March 2015. Thereafter, due to copyright issuesand obeying US Court orders, Google removed the full-length movie. However,clips of smaller length are still available.

As a long term solution, an Intermediary Liability Protection (ILP) isrequired to be added in the law, as is done in other countries. Therefore, GoP isin the process of enacting the law through the Prevention of Electronic CrimeBill, 2014. It will then help towards the localization of YouTube in Pakistanprovided it is a business case for them. Once localized, they will respond tocourt orders from Pakistan.

Page 10: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

10

194. *Shamas Un Nisa:

Will the Minister In-charge of the Capital Administration andDevelopment Division be pleased to state whether it is a fact thatthe permanent chief of Private Educational Institutions RegulatoryAuthority has not been appointed by the Government since June,2013; if so, the reasons thereof?

Reply not received.

195. *Mr. Muhammad Muzammil Qureshi:

Will the Minister In-charge of the Aviation Division be pleased tostate:

(a) the steps being taken by the Government to improve the securityof Karachi, Lahore and Islamabad Airports; and

(b) whether those Airports have been cleared of the surroundingpopulated enclaves in view of the security concerns?

Minister In-Charge of the Aviation Division: (a)

(i) The steps being taken by the Government to improve the security ofKarachi, Lahore and Islamabad airports are appended below:-

Installation of Perimeter Security Surveillance System.ISS system initially installed at Lahore airport and 95% workhas been completed. The same system is required to be installedat Karachi & Islamabad airports on emergent basis, which ishowever, pending due to paucity of funds.Procurement of 10 x Security Vehicles Dragoon-2. HeavyIndustry Taxila (HIT) will provide 10 security vehiclesdragoon-2 to ASF. In this connection a contract has beensigned with HIT at a unit cost of Rs. 45 Million and a totalcost Rs. 450 Million. Rs. 500 Million have been released bythe Government and Rs. 450 Million have been paid to HeavyIndustry Taxila (HIT).

Page 11: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

11

Procurement of QRF Vehicles. 12 x Single Cabin vehicleshave been procured from the amount of remaining Rs. 50Million. QRF has been enhanced with dedicated vehicles anddeployed at different locations around the airport with a viewto respond promptly in case of any emergency.

(ii) Positioning of Army Unit at Old Airport Karachi. After terroristattack at Old Terminal Karachi, Army has voluntarily increased/deployed manpower at all the airports in Pakistan to assist ASF incase of any emergent situation in future.

(iii) Allowing One Visitor With One Passenger. To aver the rush ofvisitor at the airport, number of visitors accompanying the passengershave been minimized by allowing only 1 x visitor with a passenger.

(iv) Joint Mock Exercise. Joint Mock Exercise are being conductedregularly at all airports especially at Karachi, Lahore and Islamabadairports in coordination with all stakeholders to check the efficiencyand to prepare the troops for any emergency.

(v) Weapon Free Zone. After declaration of “Airport as Weapon FreeZone” no weapon is allowed to enter in the premises of all airports.

(vi) Deployment of Other LEAs at Airports. Army Rangers and Policedeply their contingent around Karachi, Lahore and Islamabad airportsat static posts and patrolling as well.

(b) Pertains to Ministry of Interior.

196. *Mr. Muhammad Muzammil Qureshi:

Will the Minister for Railways be pleased to state: (a) the details of expenditure incurred by Pakistan Railways on fuel

for operations of trains in the country during the last three yearsalongwith the system installed to conduct audit thereof;

(b) the outstanding dues against Pakistan Railways therefor; and

Page 12: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

12

(c) whether it is a fact that the Pakistan Railways incurred heftyexpenditure on fuel during the recent years; if so, the reasonsthereof alongwith the steps being taken to minimize theexpenditure thereof?

Minister for Railways (Khawaja Saad Rafique): (a) The detail of last

three years fuel expenditure is as under;——————————————————————————————

Year Fuel Expenditure in (Rs) Million——————————————————————————————

2012-2013 8.715

2013-2014 10.968

2014-2015 6.854 upto January 2015——————————————————————————————

In order to keep a close watch on the expenditure, Chief Internal Auditand Director General Audit conduct audit separately.

(b) Presently nothing is outstanding against Pakistan Railways, as theclaim of PSO worth Rs. 1.20 billion on account of HSD Oil and claim of PakistanRailways against PSO worth Rs. 1.25 billion on account of freight charges isunder settlement.

(c) Pakistan Railway is not incurring hefty expenditure on fuel rather isconserving resource. However, there is an increase of 20% in expenditure on fuelduring the financial year 2013-14 as compared to corresponding period due toincreased operational activity specially freight operations which have increasedfrom 15 trains per month in July, 2013 to 270 trains in February, 2015. (Averagenumber of freight locomotives availability has increased from 20 to 40 per day).

A monitoring mechanism for rationing of locomotives based on itsmechanical conditions of productivity is in place which helps to economize theconsumption of fuel. Budget for fuel has been revised downwards from Rs.13.300billion to Rs.12.473 billion during the current financial year. In addition PakistanRailway maintains oil reserve for about 16 days thus fuel to the tune of Rs.449million approximately is on hand.

Page 13: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

13

197. *Dr. Nafisa Shah:

Will the Minister In-charge of the Cabinet Division be pleased to state:

(a) the total number of persons displaced by the Metro Bus Projectso far; and

(b) the compensation awarded to the said persons so far?

Minister In-Charge of the Cabinet Division: (a) The Metro BusCorridor within Islamabad is on Right of Way. Therefore, no building except sixresidential plots has been affected.

(b) The Capital Development Authority has claimed compensation ofRs.352 million for the affected plots from Rawalpindi Development Authority(RDA).

198. *Dr. Nafisa Shah:

Will the Minister In-charge of the Cabinet Division be pleased to statethe prescribed criteria for the nomination of the Oil and GasRegulatory Authority members alongwith the details thereof?

Minister In-Charge of the Cabinet Division: As per Section 3(3) of

Oil and Gas Regulatory Authority (OGRA) Ordinance 2002, the authoritycomprises a Chairman and three additional members i.e Member (Gas), Member(Oil) and Member (Finance). These positions are not filled through nomination.They are merit - based and are filled by the Federal Government through opencompetition strictly in accordance with the relevant provisions of OGRAOrdinance, 2002.

The prescribed criteria for the selection of OGRA members as given inthe OGRA Ordinance,2002 is as under:—

Section The Member Oil shall be a person who holds an appropriate degree 3(5) in the relevant field and is an experienced, eminent professional of

known integrity and competence with a minimum of twenty years ofrelated experience in the field of oil, including the transportationthereof.

Page 14: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

14

Section The Member Gas shall be a person who holds an appropriate degree 3(6) in the relevant field and is an experienced, eminent professional of

known integrity and competence with a minimum of twenty years ofrelated experience in the field of natural gas, including the transmissionand distribution thereof.

Section The Member Finance shall be a person who holds an appropriate 3(7) degree in the relevant field and is an experienced, eminent professional

of known integrity and competence with a minimum of twenty yearsof related experience in the field of corporate finance or accounting.

Section The Member Oil and Member Gas shall be appointed by the Federal3(8) (b) Government for initial terms of three years and shall be eligible for

reappointment for a term of four years.

Section The Member Finance shall be appointed by the Federal Government3(8) (c) for an initial term of two years shall be eligible for re-appointment for

a term of four years.

Section The Chairman and the other Members shall retire on attaining the 3(9) age of sixty-five years.

199. *Shazia Marri:

Will the Minister In-charge of the Cabinet Division be pleased to state:

(a) the steps taken by the Government to lift the ban on You Tube;and

(b) the steps taken by the Government to implement the resolutionpassed by the National Assembly regarding You Tube?

Minister In-Charge of the Cabinet Division: (a) On September

17th, 2012, the Honorable Supreme Court ordered PTA in Constitutional PetitionNo. 104 of 2012 to block offending material on YouTube website or any otherwebsite. As there was no technical solution available, which could block 100%objectionable material on the YouTube, in compliance with the Supreme Court’sorders, YouTube was blocked and compliance report was submitted to the SupremeCourt accordingly. Matter has been reviewed several times and the following stepshave been taken to address the issue.

Page 15: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

15

(b) 1438 URLs containing blasphemous movie, “Innocence of Muslims”on YouTube were blocked and warning messages has been displayed on 178URLs by requesting YouTube as of 16 March 2015. Thereafter, due to copyrightissues and obeying US Court orders, Google removed the full-length movie.However, clips of smaller length are still available.

As a long term solution, an Intermediary Liability Protection (ILP) isrequired to be added in the law, as is done in other countries. Therefore, GoP isin the process of enacting the law through the Prevention of Electronic CrimeBill, 2014. It will then help towards the localization of YouTube in Pakistanprovided it is a business case for them. Once localized, they will respond tocourt orders from Pakistan.

200. *Shazia Marri:

Will the Minister for Information Technology and Telecommunicationsbe pleased to state:

(a) whether it is a fact that neither departmental representative northe Minister concerned appeared before the respective Courtsfor hearing of the cases on the You Tube ban;

(b) if so, the reasons thereof?

Minister for Information, Technology and Telecommunications: (a)& (b) Ministry of Information Technology has been represented at the requiredlevel in cases related to YouTube.

201. *Sahibzada Muhammad Yaqub:

Will the Minister for Climate Change be pleased to state:

(a) whether it is a fact that the Malakand Division has been badlyeffected by the floods; and

(b) the steps taken by the National Disaster Management Authorityfor the rehabilitation of the floods effectees of the saidareas during the present Government?

Page 16: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

16

Minister for Climate Change (Mr. Mushahid ullah Khan): (a) Yes.Malakand Division was badly affected by the floods-2010.

(b) National Disaster Management Authority (NDMA), raised in 2007.is the lead agency at the Federal level to deal with the whole spectrum of DisasterManagement activities. Disaster Management is a devolved subject andfundamental responsibility to manage the disasters rest with provinces. NDMAacts as a National backup support for provinces. In the wake of floods 2010,NDMA provided various relief items for the affected population of KhyberPakhtunkhwa (KPK) given at Annex-A. The primary responsibility of carryingout reconstruction and rehabilitation activities rest with the provincial governments.However, NDMA coordinated conducting of Damage Needs Assessment in 2010by Asian Development Bank and World Bank in collaboration with various federaland provincial Departments.

The Provincial Disaster Management Authority (PDMA). KPK hasintimated that the Provincial Government of Khyber Pakhtunkhwa compensatedthe owners of partially / fully damaged houses, injured persons and legal heirs ofthe dead persons due to natural calamity of Malakand Division with the amount ofRs. 178.35 million during 2013-15. Moreover, PDMA has also initiated thefollowing activities for reconstruction and rehabilitation of flood affectedinfrastructure in Malakand Division:

(I) Provincial ADP Scheme No. 725 Purchase of Land for FloodDamaged Schools in Khyber Pakhtunkhwa and Procurementof land for United Nations High Commission for Refuges(UNHCR) Warehouse (Rs. 350 million)

Under the above Annual Development Programme (ADP) Scheme No.725, in respect of “Purchase of land for flood damaged schools” (Rs. 39.1 Million)is in process in District Swat for the Financial Year 2014-15.

(II) Provincial ADP Scheme No. 724 Reconstruction andRehabilitation of Disaster Affected Infrastructure in KhyberPakhtunkhwa Rs. 384 million*

Under the above scheme, the following three sub-schemes are underimplementation in Malakand Division:

Page 17: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

17

(i) “Rehabilitation of Disaster Affected Roads and Bridges in DistrictChitral, through Communication and Works (C&W) Department ata cost of Rs. 148.00 Million”.

(ii) Reconstruction & Rehabilitation of Disaster Affected InfrastructureKhyber Pakhtunkhwa Irrigation Department (Rs. 150.00 Million).

(iii) “Construction/ Rehabilitation of 06 sub-schemes in District Chitral,PK-89 (Rs. 30 Million)

*Rs. 40 Million for Abbottabad (C&W Department) and Rs. 16Million for Peshawar (C&W Department)

(III) Rehabilitation of Flood Damaged Infrastructure underProvincial Reconstruction, Rehabilitation & SettlementAuthority(PaRRSA) in Malakand Division

Under PaRRSA, the following flood damaged schemes amounting toRs. 983.38 -Million are being reconstructed and rehabilitated under KhyberPakhtunkhwa Reconstruction Program in Malakand Division.

(i) Restoration of Amandara Headwork.

(ii) Reconstruction of Khwazakhela Bridge.

(iii) Reconstruction of Mingora Bridge.

(IV) Reconstruction of flood damaged schools under PaRRSA inMalakand Division

A total of 41 flood affected schools have been approved for reconstructionunder PaRRSA in Swat, Dir Lower, Dir Upper, Malakand and Shangla. (EstimatedCost Rs. 934.685 Million).

Page 18: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

18

202. *Ms. Aisha Syed:

Will the Minister for Federal Education and Professional Training bepleased to state the total number of registered Pakistani studentsproceeded to foreign countries for higher education from Pakistanduring the period from 1-6-2013 till date alongwith the names ofagencies thereof?Minister for Federal Education and Professional Training: A total

of nine hundred and nine (909) registered Pakistani students have been sent inforeign countries for higher studies by Higher Education Commission during theperiod from 01-06-2013 till date. The country wise detail is placed at Annex-A.

Page 19: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

19

203. *Ms. Aisha Syed:

Will the Minister In-charge of the Aviation Division be pleased tostate whether it is a fact that another aircraft of PIA has beengrounded; if so, the reasons thereof?

Minister In-Charge of the Aviation Division: No aircraft has been

grounded during the current year (2015). Aircraft are grounded only for routinemaintenance & checks according to the approved maintenance schedule.

204. *Ms. Asyia Naz Tanoli:

Will the Minister for Federal Education and Professional Training bepleased to state:

Page 20: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

20

(a) whether it is a fact that the quota for admission of students inthe Quaid-e-Azam University, Islamabad has been allocated foreach MNA; and

(b) whether it is also a fact that no quota has been allocated forMNAs in other Universities for admission of students; if so, thereasons thereof?

Minister for Federal Education and Professional Training: (a) No

quota has been allocated to MNAs for admission of students at Quaid-e-AzamUniversity, Islamabad. The University offers admissions to students purely on meritbasis observing the regional /provincial quota (attached at ANNEX-A).

(b) The fact is that no quota is allocated to MNAs for admission ofstudents in other universities.

For ensuring quality of higher education, an open, transparent, and meritbased process is percolated in accordance with admission rules and criteria formedand prescribed. Whereas all rules and regulations are considered and approvedby the statutory bodies / syndicate of the universities whereon public representative,judges eminent professional, are members as well.

Page 21: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

21

205. *Ms. Asyia Naz Tanoli:

Will the Minister for Federal Education and Professional Training bepleased to state:

(a) whether it is a fact that participation in National Testing Service(NTS) has been made compulsory for the candidates at the timeof admission in various Universities besides their educationalqualification;

(b) whether it is also a fact that huge fees are charged therefor; (c) whether it is further a fact that special centres have been set up

for the preparation of said tests; and

(d) whether the NTS test is a yard stick to check the qualification ofa person; if so, the justification thereof?

Minister for Federal Education and Professional Training: (a) Yes;

as per HEC Criteria for admission in MS/MPhil and PhD programs, NTS GAT(General) and GAT (Subject) were required for admission in MS/MPhil and PhDprograms, respectively. However, the Hon’ble Lahore High Court, Lahore, in itsjudgement under Writ Petition No. 28028/2014 dated 23-01-2014 inter aliaheld that “the existing arrangement between HEC and NTS shall only continue till30-05-2014 (cutoff date). HEC shall not enter into any arrangement/contract

Page 22: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

22

with NTS after the said cutoff date” [Para-10(vii)]. Additionally, under ICA 362-2014 dated 15-12-2014, cutoff date was extended for the last time up to31-01-2015. Therefore, currently the HEC requirement of NTS GAT (General)and GAT (Subject) for admission to MS/MPhil and PhD respectively is held inabeyance.

(b) At present, NTS charge Rs. 1000/- for GAT (General) andRs. 1500/- for GAT (Subject), respectively. However, HEC has not received anycomplaint yet.

(c) HEC has no information or record in this regard.

(d) No. NTS is not a yard stick to check the qualification of a person.Instead, it is a test instituted for efficient, transparent and international standardassessment of general and subject competency of candidates for admissions andscholarships. The NTS tests for MS/MPhil and PhD programs are entry leveltests and have been prescribed by HEC for improving quality of graduatesproduced by Pakistani Higher Education Institutions. These tests are not onlyimproving the international mobility of Pakistani graduates, but also building theircapacity to come up to internationally recognized academic and research output.

206. *Mr. Sher Akbar Khan:

Will the Minister In-charge of the Cabinet Division be pleased to state:

(a) the year and project-wise total amount of funds approved underPWP-II for the National Assembly Constituency No.28 (Buner)during the last five years; and

(b) the present status of those projects?

Minister In-Charge of the Cabinet Division: (a & b) The allocationunder PWP-II was made by the Prime Minister’s Secretariat while Cabinet Divisiononly disbursed the amount to the concerned executing agencies without knowingthe name of the beneficiary (Parliamentarian) or National Assembly constituency.

207. *Mr. Sher Akbar Khan:

Will the Minister In-charge of the Cabinet Division be pleased to state:

(a) the district wise total number of Dispensaries establishedunder the Peoples Works Programme in the country

Page 23: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

23

alongwith the details thereof; and

(b) whether those Dispensaries are functional at present; ifso, the district-wise details; if not, the reasons thereof?

Reply not received.

208. *Malik Muhammad Amir Dogar:

Will the Minister In-charge of the Aviation Division be pleased tostate:

(a) whether it is a fact that the construction work of the MultanInternational Airport has not been completed so far; if so, thereasons thereof;

(b) the time by which the construction work thereof will becompleted;

(c) the cost increased due to non-completion of construction workof the said Airport; and

(d) the names of responsibles thereof?

Minister In-Charge of the Aviation Division: (a & b) Construction ofMultan International Airport has been completed and its inauguration ceremonywas held on 9th March, 2015 by the Honourable Prime Minister of Pakistan.The airport operation from new Terminal building has started w.e.f. 12th March2015 and since then the commercial flights are being operated through newTerminal Building.

(c) No cost over-runs are involved. The project has been completed atthe cost of Rs. 9.128 Billion as per approved PC-I.

(d) Not applicable.

Page 24: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

24

209. *Ms. Shahida Akhtar Ali:

Will the Minister In-charge of the Establishment Division be pleasedto state:

(a) whether it is a fact that Rs.5.17 million for BPS-1 to 16, Rs.9.00million BPS-18 to 19 and Rs.10.00 million for BPS-20 to 22 willbe given as the Take Care amount to the members of bereavedfamily of Federal Government employees who die during servicevide O.M No.E-2/08/10/2013 dated October 20, 2014;

(b) if the answer to part (a) above is in the affirmative, the reasonsto constitute a committee on the implementation thereof?

Minister In-Charge of the Establishment Division: (a) There is no

provision for “Take Care” amount in the Assistance Package for the families ofGovernment Employees who die in service, notified vide Establishment Division’s0.M No. 8/10/2013 E-2 dated 20th October, 2014 (Annex-I).

However, Lump Sump Grant notified vide ibid OM is as under:———————————————————————————————

In Service Death Security Related death——————————————————————————————

Upto Rs.9 million according (a) Upto Rs.10 million accordingto following scales:- to following scales:-

——————————————————————————————BS Amount BS Amount

——————————————————————————————1-16 2.5 Million 1-16 3 Million17 4 Million 17 5 Million18-19 8 Million 18-19 9 Million20 above 9 Million 20 & above 10 Million

——————————————————————————————(b) Rs. 700,000/-to the officers/

officials incapacitated andreleased from service for havingbecome invalid as a result ofinjury in encounters /bomb blasts,

Page 25: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

25

riots/ watch and ward duty orterrorist activity.

(c) Rs. 500,000/- to the officers /officials incapacitated as a resultof the injury in accidents as statedin para “b” above but who arestill serving in the department.

——————————————————————————————

(b) A Committee has been constituted to re-examine the policy for deathbenefits alongwith financial implications for Lump Sum Grant, Pension,accommodation, Education, Cash payment in lieu of Plot of Land, Employment,Marriage Grant, Nomination of an officer as council, Special Lump Sum Grantfrom Benevolent Fund, Monthly Benevolent Grant, Pre requisite for facilitation offamily of deceased Govt. Employees, GP Fund, Payment of Pension through DirectCredit Scheme (DCS).

(Annexure has been placed in the National Assembly Library).210. *Ms. Shahida Akhtar Ali:

Will the Minister In-charge of the Capital Administration andDevelopment be pleased to state:

(a) whether it is a fact that the medicines and doctors are availablein the Federal Government Polyclinic Hospital (FGPH),Islamabad;

(b) whether it is also a fact that the Cardiology Ward of the FGPHis not up to mark at present;

(c) whether it is further a fact that the minimum facilities are

available in the Urology and Neurology Departments of theFGPH;

Page 26: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

26

(d) whether patients are referred to Pakistan Institute of MedicalSciences from the FGPH where medicines and proper attentionof doctors are not available;

(e) whether the Foreign Office, Argentina Ministry of Health andCDA have given NOCs to construct more Wards of the FGPHin the premises of Argentina Park adjacent thereto; if so, thetotal amount of funds allocated therefor; and

(f) the steps being taken by the Government to improve theconditions of the FGPH?

Minister In-Charge of the Capital Administration and Development

Division: (a) Medicines and Doctors are available in the Federal GovernmentPolyclinic Hospital, Islamabad.

(b) Non-Invasive cardiology department of FGPC is working properlywith the facility of ETT, ECG, ECHO and Gamma Camera.

The facility of Invasive Cardiology like Angiography, Angioplasty, CardiacSurgery etc are not available in current setup. However, these facilities will beincluded in new proposed extension of FGPC. Till such time PIMS & AFIC areproviding such services for our referred patients.

(c) Minimum facilities of Urology are available in FGPC. The Neurologydepartment facility is not available in the FGPC.

(d) Patients of those specialties which are not available in Polyclinic likeNeurosurgery, Burn Unit, Oncology, CT Scan, MRI, advance Cardiology etc arereferred to PIMS, where they are treated accordingly.

(e) The Argentina government has given his concurrence regarding changeof 1/3rd of Argentina Park into hospital. Moreover, CDA had given its concurrenceat initial stage and later on after the approval from former Prime Minster; CDAhad also issued the demand note for payment.

Now, Rs. 55.321 million are available for payment of cost of land toCDA and anticipatory allocation of Rs. 200 million is available in currentPSDP of CA&DD. Which will be mobilized only after completion of PC-II andpreparation / approval of PC-I for extension and reconstruction of FGPC.

Page 27: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

27

(f) An additional land 2.54 acres for the adjacent Argentina Park hasbeen allocated for this purpose. After acquiring the possession of land from CDA,Islamabad it is assured that a modernized building of the hospital will be constructedaccording to the present needs of increasing population and disease load. Thesummary in this regard already submitted to the Cabinet Division and approval ofland is awaited.

211. *Sahibzada Tariq Ullah:

Will the Minister In-charge of the Establishment Division be pleasedto state:

(a) the total number of Government bodies/departments whose

heads have not been appointed so far alongwith the names, theperiod for which the post remained vacant and reasons thereof,separately; and

(b) the time by which the Government intends to appoint the headsof the said departments/bodies?

Minister In-Charge of the Establishment Division: (a) List of

Government Organizations / Departments whose Chairman / Head have beenappointed are at Annex-A. List containing the names of Government Organizations/ Departments which are without Chairman / Head at present is at Annex-B.

(b) The Honourable Supreme Court of Pakistan vide judgment dated12-06-2013 pronounced in Constitution Petition No. 30/2013 filed by KhawajaMuhammad Asif, inter-alia, directed the Federal Government for the constitutionof Commission to ensure transparency in the appointments of heads of autonomous/ semi-autonomous bodies, regulatory authorities, companies and corporationsetc., established by or under the control of the Federal Government. Pursuantwhereof, Establishment Division vide notification dated 22-07-2013 constitutedFederal Commission for Selection of the Heads of Public Sector Organizations(FCHPSO) with the approval of the Prime Minister. Appointments against thevacant positions were being made in accordance with the procedure providedtherein. Later on, the Commission became dysfunctional due to resignation ofprivate members vide Prime Minister’s Office order dated 12-06-2014.Accordingly Establishment Division requested all Ministries / Divisions to expeditethe process of appointment of Heads of Organizations against the vacant posts asinitiation of Summary comes with the purview of administrative Ministry / Divisionin terms of Rule 15 (2) of Rules of Business, 1973. Further, on 14-11-2014,

Page 28: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

28

Honourable Supreme Court of Pakistan [in CMA No. 1079 & 4821/2014 inCivil Petition No. 2124/2013], was pleased to re-visit its order dated 12th June,2013 with the directions to finalize appointments of the heads of statutory bodies,autonomous bodies & semi-autonomous bodies under the respective applicableActs/Ordinances.

In compliance with the above directions, the Prime Minister constituted aSpecial Committee with specified TOR’s to oversee the selection process. TheCommittee with Kh. Zaheer Ahmed, Special Assistant to Prime Minister as itsConvener was composed of the following:—

1. Special Assistant to the Prime MinisterMember on Parliamentary Affairs

2. Chairman, Privatization Commission of PakistanMember

3. Cabinet SecretaryMember

4. Establishment SecretaryMember

5. Joint Secretary (IA-I), Prime Minister’s OfficeSecretary.

To determine the assigned matters for timely completion of the selectionprocess as per its TOR’s, the Committee held several meetings in which progressreported by various concerned Ministries/Divisions with respect to selections wasreviewed on case to case basis. Further efforts are also being made to fill theremaining posts.

(Annexures have been placed in the National Assembly Library).

212. *Ms. Parveen Masood Bhatti:

Will the Minister In-charge of the Cabinet Division be pleased to statewhether there is any proposal under consideration of the Governmentto include new deserving persons in the Banazir Income SupportProgramme for monthly financial assistance; if so, when it will beimplemented?

Page 29: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

29

Minister In-Charge of the Cabinet Division:

As most of BISP data is more than 4 years old now and secondlyaccording to the operational manuals of Un-conditional CashTransfers as well as the international practice, in vogue, NationalSocio-economic Registry (NSER) of BISP should be up-dated/revised in the coming year. Resurvey, is a costly, lengthy andtechnically complex process, which would require thoroughdeliberation and would involve multiple stakeholders including theMinistry of Finance, NADRA and our Development Partners likethe World Bank. Expected expenditure on this exercise would bearound Rs.10 billion as the last survey cost BISP more than Rs. 6Billion.

Though BISP, along with its development partners, has started thepreliminary deliberations on various options for resurvey yet the policyfor resurvey is yet to be finalized. It is further clarified that honorableparliamentarians, all provincial governments and other notables willbe taken onboard, once a final decision is taken by the Governmentand activities for resurvey start.

213. *Ms. Parveen Masood Bhatti:

Will the Minister In-charge of the Cabinet Division be pleased to statethe total number of Hotels located from Rawal Dam crossing toDhokri crossing in Islamabad, which have been allowed by CDA touse public/Government land for parking of vehicles?

Minister In-Charge of the Cabinet Division: No hotel located fromRawal Dam\ crossing to Dhokri crossing in Islamabad have been grantedpermission for the purpose of car parking.

214. *Mr. Imran Zafar Leghari:

Will the Minister In-charge of the Capital Administration andDevelopment Division be pleased to state:

(a) the year in which the last audit of accounts of the FederalGovernment Educational Institutions, Islamabad wasconducted;

Page 30: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

30

(b) whether any irregularity was found in the said audit; if so, thedetails thereof; and

(c) the action taken by the Government in the light of said auditseparately?

Minister In-Charge of the Capital Administration and Development

Division: (a) The last audit of accounts of Federal Government EducationalInstitutions has been conducted by Director General (Audit), Federal Governmentfor the audit year 2014-15.

(b) Various Audit observations were made by the audit team in respectof the following Colleges:———————————————————————————————

S. No. Name of Institutions——————————————————————————————

1 Islamabad Model College for Girls F-10/22 Islamabad Model College for Girls G-10/23 Islamabad Model College for Girls F-6/24 Islamabad Model College for Girls (Postgraduate) F-7/25 Islamabad Model Commerce College (PG), H-8/46 Islamabad College for Boys, G-6/37 Islamabad Model College for Boys, F-7/38 Islamabad Model College for Boys, I-8/39 Islamabad Model College for Girls, I-8/3

——————————————————————————————(c) A meeting of pre-departmental Accounts Committee was held on

26-11-2014 in Capital Administration & Development Division wherein auditobservations were discussed in detail. Appropriate action will be taken in line withthe decisions by the competent authority in due course of time.

215. *Mr. Imran Zafar Leghari:

Will the Minister In-charge of the Cabinet Division be pleased to statethe total amount charged by the Pakistan TelecommunicationsAuthority (PTA) from operators and mobile phone companies duringthe last two years alongwith the details of utilization thereof?

Page 31: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

31

Minister In-Charge of the Cabinet Division: 1. PTA charges InitialLicense/Spectrum Fee and Annual Fees which include Annual License Fee (ALF),Annual Radio Frequency Spectrum Fee (ARFSF), Annual Spectrum AdministrativeFee (ASAF), Annual Numbering Charges, and Radio Based Licensed Fee (RBS)from various operators including Mobile Operators. Such fees charged during thelast two years amounts to Rs. 50 billion. Head-wise breakup of fees is attached atAnnexure A. Surplus of receipts of these fees, after adjusting PTA approvedexpenditure, is transferred to the Federal Consolidated Fund (FCF) as per section12(3) of the Act.

2. The detail of PTA’s utilization during the last five years along withhead-wise breakup is attached as Annexure B.

3. PTA’s books of accounts (receipts as well as expenditure) are auditedannually by DG Audit, Pakistan Telephone & Telegraph (PT&T), as well as byPTA’s external auditors A.F Fergusons and Co.(PWC).

Page 32: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

32

Page 33: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

33

216. *Ch. Asad Ur Rehman:

Will the Minister In-charge of the Cabinet Division be pleased tostate the total funds allocated and utilized in respect ofvarious developments schemes launched in the Constituency No.94,District Toba Tek Singh during the period from 2008 to 2013alongwith the present status thereof?

Page 34: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

34

Minister In-Charge of the Cabinet Division: The detail of the funds

allocated and utilized in respect of various, development schemes in the ConstituencyNo.94 District Toba Tek Singh during the period 2008 to 2013 alongwith thepresent status is annexed.

(Annexure has been placed in the National Assembly Library).217. *Mr. Ibadullah:

Will the Minister In-charge of the Cabinet Division be pleased to state:

(a) whether it is a fact that the Petrol Pump located on KashmirHighway was allotted by Planning Wing, CDA; if so, the criteriaadopted therefor;

(b) whether it is also a fact that the said pump is located at theright side on the said Highway while entering Islamabad; if so, the authority that granted the approval for the allotment of plotfor the said Petrol Pump in violation of the layout plan;

(c) the total cost recovered from owner of the said plot alongwiththe market rate/value thereof;

(d) the total expenditure incurred by CDA on approach roads andstreet lights of the said petrol pump; and

(e) whether it is further a fact that CNG connection was provided/given from main CDA line to said pump; if so, the justificationthereof?

Minister In-Charge of the Cabinet Division: (a) Planning wing ofCDA, has not allotted Petrol Pump located on Kashmir Highway. However, PlaningWing,CDA, has issued NOC for establishment of petrol pump/CNG Station toM/s Al-Wahid Petroleum, on private land, in Right of Way (R.O.W) of KashmirHighway, Islamabad, on 17-12-2008.

(b) Yes, said pump is located on right side of Kashmir Highway whileentering Islamabad. CDA has not made any allotment of plot for the said PetrolPump; however, CDA has issued NOC for establishment of petrol pump/ CNGstation to M/S Al-Wahid Petroleum, on private land, on the planned Right of Way

Page 35: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

35

(R.O.W) of Kashmir Highway. The NOC was issued with the approval of thenChairman CDA.

(c) CDA has charged Landuse Conversion Fee amounting toRs.4,666,000/- (at the rate of Rs.1.000/- per Sq.yd)

(d) No expenditure has been incurred by CDA on approach roads andstreet lights of the said petrol pump.

(e) Provision of Gas connection falls in the jurisdiction of M/s SNGPL.The clarification may kindly be obtained form SNGPL please.

218. *Mr. Ibadullah:

Will the Minister In-charge of the Cabinet Division be pleased to state:

(a) the year-wise total funds allocated to the MaintenanceDirectorate, CDA for repair and maintenance of theGovernment Houses during the last five years till date alongwiththe details of work completed during the said period;

(b) the names of Contractors of the said work during the said period;

(c) the names of the Director Maintenance, CDA at presentalongwith his national and foreign engineering qualification;

(d) the details of any inquiries in NAB or other Investigation Agenciesagainst the said Director alongwith the present status thereof;and

(e) whether NOC was issued to said Director to achieve educationfrom abroad by the CDA; if so, the details; if not the reasonsthereof?

Minister In-Charge of the Cabinet Division: (a) Detail attached atAnnexure “ A”

(b) Detail attached at Annexure “B”

Page 36: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

36

(c) Mr. Manzoor Hussain Shah, Deputy Director (Civil) is presentlyworking as Director (Maintenance) on Current Charge basis.

Mr. Manzoor Shah is Pakistani National. As per Service Record, hisQualifications alongwith year as under:—

1984: 3 year Diploma in Civil, Government College of Technology,Khairpur.1988: B Tech Civil Engineering, Mehran University of Engineering& Technology, Jamshoro.

1994: B.Sc. Civil Engineering Southwestern University, Cebu City,Philippines.

(d) No case is presently pending / under process with NAB or otherinvestigation agencies against Mr. Manzoor Hussain Shah, Director(Maintenance) CDA.

(e) No NOC / prior permission for acquiring foreign qualification wasissued to Mr. Manzoor Hussain Shah.

(Annexures have been placed in the National Assembly Library)

MOHAMMAD RIAZ, Secretary.

ISLAMABAD:The 26th March, 2015.

Page 37: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

1

(20th Session)

NATIONAL ASSEMBLY SECRETARIAT

————

“UNSTARRED QUESTIONS AND THEIR REPLIES”

For Friday, the 27th March, 2015

267. Ms. Khalida Mansoor:(Deferred on 18-03-2015)

Will the Minister In-charge of the Capital Administration andDevelopment Division be pleased to state whether the verification ofeducational certificates of all Doctors and other staff of PIMS,Islamabad has been completed; if so, the details thereof?

Reply not received.

15. Ms. Khalida Mansoor:(Deferred on 18-03-2015)

Will the Minister In-charge of the Capital Administration andDevelopment Division be pleased to state the names of diseasesdepartments whereof are being developed under the extension projectof PIMS, Islamabad?

Reply not received.

41. Mr. Sher Akbar Khan:

Will the Minister for Information, Broadcasting and National Heritagebe pleased to state:

(a) the new projects initiated so far by the Government in DistrictBuner; and

(b) the present status of those projects?

Page 38: NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR … · 2015. 6. 11. · 1 (20th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR

2

Minister for Information, Broadcasting and National Heritage(Mr. Pervaiz Rashid): (a) No new project in District Buner has been initiated byMinistry of Information Broadcasting & National Heritage. However an on-goingPSDP project titled “Re-broadcast Station Buner”, being executed by PTVC, isunderway. The project was approved at a revised cost of Rs.55.444 million byDepartmental Development Working Party (DDWP) in its meeting held on 9thOctober, 2013. Out of approved cost of the project, an amount of Rs. 26.742million has been released to PTVC for this project.

(b) Physical progress of the project achieved so far is as under:

06 Kanal has been purchased, 90% work on boundary wall hasbeen completed, electronic equipment has been procured andexcavation for walls/columns footing is in progress.

The project is likely to be completed by June, 2016, subject to releaseof remaining amount of Rs.24 million out of the approved cost by theMinistry of Planning, Development and Reforms.

42. Mr. Sher Akbar Khan:

Will the Minister In-charge of the Establishment Division be pleasedto state:

(a) whether it is a fact that the post of Assistant has not beenupgraded from BPS-14 to BPS-16 so far; if so, the reasons thereof;and

(b) whether there is any proposal under consideration of theGovernment to upgrade the said post during the near future; ifso, when it will be implemented?

Reply not received.

MOHAMMAD RIAZ, Secretary.

ISLAMABAD:The 26th March, 2015.