Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but...

29
1 Ir. Jan Gabriël , Head newbuilding and conversion department, DEME Schiedam 28 maart 2017 Nationaal LNG platform

Transcript of Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but...

Page 1: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

1

Ir. Jan Gabriël , Head newbuilding and conversion department, DEME

Schiedam 28 maart 2017Nationaal LNG platform

Page 2: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

2

Inhoud

1. DEME, wie zijn we wat doen we?

2. DEME schepen in aanbouw met dual fuel MGO/LNG

3. Waarom LNG? waarom dual fuel (DF) technologie?

4. LNG tanks aan boord

5. LNG bunker infrastructuur

6. LNG als brandstof aan boord - consequenties

Page 3: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

3

DEME : wie zijn we? Wat doen we? Global Solutions Provider

Dredging, renewables, offshore, environmental techniques.....

Owner and operator of floating plant

• 50+ major production units

• 150+ auxiliaries

4.700 colleagues

+2 billion EUR turnover, more than doubled over last 10 years

25% turnover in Europe – global company

2008-2012: invested for approx 700M EUR in new equiment

2014-2020: probably more.

Page 4: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

DEME: GLOBAL SOLUTIONS PROVIDER

DREDGING AND LAND RECLAMATION

ENVIRONMENTALSERVICES

FLUVIAL AND MARINE AGGREGATES

PROJECT DEVELOPMENT & CONCESSIONS

MARITIME SERVICES

MARINE & OFFSHORE SERVICES

Presenter
Presentation Notes
Page 5: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

5

DEME : 6 (DF) LNG schepen in aanbouw

1 “Living Stone”

2 x 630m³ C-type LNG tank

Page 6: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

6

Multi Purpose vessel

Living Stone DP3 cable layer (10.000 ton product), 12.000 ton fall pipe rock dumper

Offshore construction vessel

Lpp x B x D = 138 x 32,2m x 11,5

15 MW prime power.

o 4 gensets based on Wartsila engines 2 x 6LD4DF + 2 x 9L34DF

2 x 630m³ LNG tank. 3 weeks of autonomy

Enters fleet Q3 2017

Page 7: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

7

2 “Scheldt River” DP TSHD. Hopper of 8.000m³

Lpp x B x D = 110m x 25m x 9m

10,5 MW prime power. Dual fuel engines:

o 4,5 MW MCR Wartsila 9L34DF

o 6,0 MW MCR, Wartsila 12V34DF

Enters fleet Q2 2017

630m³ LNG tank, 1 week autonomy

DEME : 6 (DF) LNG schepen in aanbouw

Page 8: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

8

8.000m³ TSHD “Scheldt River”

630m³ C-type LNG tank

World’s 2nd LNG fuelled dredger

Page 9: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

9

8.000m³ TSHD “Scheldt River”

Drive trains Engine directly drives centrifugal dredge pump. Wartsila sep 2014: “DF OK!” Hybrid drive Wartsila tests late 2015: dynamic behaviour

“as diesel engine”

Page 10: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

Scheldt River in aanbouw.Plaatsen LNG tank

Page 11: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

11

3 “Minerva” TSHD. Hopper of 3.500m³

Lpp x B x D = 76m x 18m x 7,5m

4,8 MW prime power. Dual fuel engines:

o 2 x ABC 16DZD, MCR 2,4MW each.

Enters fleet Q1 2017

200m³ LNG tank, 1 week autonomy

DEME : 6 (DF) LNG schepen in aanbouw

Page 12: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

12

3500 m³ TSHD “Minerva”

200m³ C-type LNG tank

World’s 1st LNG fuelled dredger

Page 13: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

LNG fuel system on a TSHD

Presenter
Presentation Notes
GA + drive train (consumers) picture MN
Page 14: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

14

4 “Bonny River” TSHD. Hopper of 17.000m³

Lpp x B x D = 139m x 30m x 13,7m

16,0 MW prime power. Dual fuel engines:

o 2 x Wartsila 16V34DF, each MCR=8,0 MW

Enters fleet Q3 2018

630m³ + 440m³LNG tanks, 1 week+ of autonomy

DEME : 6 (DF) LNG schepen in aanbouw

Page 15: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

15

15.000m³ TSHD “Bonny River”

630m³ C-type LNG tank 440m³ C-type LNG tank

Page 16: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

16

5 “Spartacus” Cutter Suction Dredger. 44,2 M installed power

Lpp x B x D = 139m x 30m x 13,7m

16,0 MW prime power. Dual fuel engines:

o 4 x 9L46DF, each with MCR=10,305 MW

o 2 x 6L20DF, each with MCR = 1,11 MW

Enters fleet Q3 2019

1 x 2000m³ bi-lobe tank, approx. 2 wks of autonomy

DEME : 6 (DF) LNG schepen in aanbouw

Page 17: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

17

CSD Spartacus

Page 18: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

18

6 “Orion” Offsore Support/Construction Vessel - 44,2 M installed power

Lpp = 204m

Dual fuel engines:

o 4 x 9L46DF, each with MCR=10,305 MW

o 2 x 6L20DF, each with MCR = 1,110 MW

Enters fleet Q4 2019

2 x 1000m³ LNG tank, approx. 3 wks of autonomy

DEME : 6 (DF) LNG schepen in aanbouw

Page 19: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

19

ORION

Page 20: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

20

Waarom LNG? Waarom DF technologie?

Respect en zorg voor natuur is een DEME core value Oprechte interesse in technologie die schadelijke uitstoot verkleint

De vermindering van de uitstoot door met aardgas te werken ipv diesel olie is Aanzienlijk:

CO2 - Approx 25%SOx - Approx 80%NOx - Approx 80%PM Almost eliminated

Page 21: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

21

(MARPOL annex vi) emission regulations in (S)ECA’s trigger action.Waarom LNG? Waarom DF technologie?

SOx emissions NOx emissions

Page 22: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

22

Source: P Semolinos, “LNG as bunker fuel: challenges to be overcome”, Total gas & Power

DEME beschouwt LNG als een future-proof & duurzame oplossing

Waarom LNG? Waarom DF technologie?

Page 23: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

23

WaaromLNG?High Capex but low Opex

Source: DNV-GL, 2011

who can predict fuel prices?delta is what it’s all about!

Page 24: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

24

Dual Fuel omdat:

LNG supply chain verre van matuur.Indien geen LNG beschikbaar werk op diesel.Elimineert “LNG supply risk”

LNG tank grootte en dus actie radius gelimiteerd om business case gezond te houden. Bij oversteek: MGO als “range/autonomy extender”

Waarom LNG? Waarom DF technologie?

Page 25: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

25

LNG tanks - challengesSize, for comparable energy content

1178m³* Box in which the tank + insulation + saddle fits

A 630m³ LNG tank contains a heat value of:= approx 630m³ x 0,95 x 22GJ/m³ = 13.167,- GJ

The box shape equivalent bunker tank filled with MGO (DMA ISO 8217 contains:

= approx 1178m³ x 0,95 x 35GJ/m³ = 39,169,- GJ On board, LNG requires approx 3 times more space than MGO

630m³ LNG tank length diameterDimensions in m height widthStainless steel shell 19,10 6,58Box * 20,20 8,10 7,20

Page 26: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

26

LNG tanks - challenges

Price of LNG tanks are ....crippling: Market feedback for C type tanks

Advantage for single walled tanks. But only viable for larger volumes.

Approx size type Approx price75m³ Double walled 13k EUR/m³200m³ Double walled 10k EUR/m3600m³ Single walled 3,5k EUR/m³

Page 27: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

27

Bunkering

LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding rapidly, also outside Norway. Critical mass attained?

AGA’s “SeaGas” LNG barge moored to “Viking Grace”

Page 28: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

28

LNG BunkeringMooring-Imperative to limit movement during bunkering!Different bunker locations. Different mooring configurations. Bunker station on both sides?

Bunker connection - size of filling line?2”? 4”? 6”? 8”?50m³/h 200m³/h 400m³/h 800m³/hBunker barges: “2” max 50m³/hr. Too slow......”

Vapour return lines? Standaarden?

Bunker freqentie? Mix van LNG & MGO?

Page 29: Nationaal LNG platform · Bunkering LNG bunker infrastructure is developing, especially in SECA but still in infant stage. Chicken –Egg problem. Gas fuelled fleet now expanding

29

LNG als brandstof – consequenties

1) Investering & return

2) Bunkeren: zie voorgaande slides

3) Veiligheid aan boord – hazardous zones

4) Crew training & qualifications & staff training

Problem: no well established rules with most flag states

........can also be considered as an opportunity.

5) Insurance: DEME’s underwriters: no issue.

Overgang wind naar kolen & stoom| naar olie| naar gas

Multi-disciplinaire aanpak is vereist t.b.v. vlotte overgang.