IAC-07-D2.6.04 - Ares I-X Flight TestThe Future Begins Here
Figure 2. Ares I-X (right) follows NASA's tradition of incremental development through flight testing, whichhas included the Mercury, Gemini, and Saturn programs (left).
Mission Overview
The Ares I-X Flight Test Vehicle (FTV) willincorporate a mix of flight and mockup hardware(Figure 3), reflecting a mass and weight similarto the operational Ares I. It will be powered by afour-segment solid rocket motor currently in theSpace Shuttle inventory, and will be modified toinclude a fifth spacer segment that makes thebooster approximately the same size and weightas the five-segment SRB. The vehicle alsofeatures a new recovery system, including newmain parachutes. The new main chutes are 150
feet (47.7 m) across, compared to 136 feet (41.4m) across for the Shuttle. Ares I-X will be thefirst flight test of new main parachutes for Ares I.
The Ares I-X flight profile will closelyapproximate the flight conditions that Ares I willexperience through Mach 4.5, at an altitude ofabout 130,000 feet (39,600 m) and through amaximum dynamic pressure (Max Q) ofapproximately 800 pounds per square foot (38.3kPa) (Figure 4). By basing refinements of theAres I vehicle design on Ares I-X information,NASA moves one step closer to full-up test asyou fly scenarios. Each future flight will bestaged to affect future milestone reviews. Ares I-X supports the Ares I Critical Design Review(CDR), scheduled for 2010.
-
8/14/2019 NASA Ares I-X Flight Test plans
4/31
IAC-07-D2.6.04 - Ares I-X Flight TestThe Future Begins Here
Orion CrewModule / Launch
Abort System
Avionics (internalthroughout vehicle)
Upper StageSimulator
Figure 3. The Ares I-X provides an early opportunity to test the flight configuration of the Ares I crewlaunch vehicle.
Four-segmentMotor
FirstStage
Roll ControlSystem
First StageAvionics Module
(internal)
SeparationPlane
Simulated FifthSegment
-
8/14/2019 NASA Ares I-X Flight Test plans
5/31
IAC-07-D2.6.04 - Ares I-X Flight TestThe Future Begins Here
The Ares I-X mission will be NASAs firstflight test of a new human exploration vehiclesince 1981. As such, it returns the agency to itshistory as a pioneering organization, taking ontechnical risks to develop new space hardware.The five primary test objectives for the Ares I-Xflight test include:
Demonstrating the ascent flight controlsystem performance with dynamicallysimilar hardware.
Demonstrating separation between thefirst and upper stage.
Characterizing and mitigating the rolltorque due to first stage (FS) motorperformance and aerodynamic forces.
Testing the first stage parachute recoverysystem and separation/entry dynamics.
Validating assembly and processing flow,
as well as launch and recovery operations.
These objectives are all attainable using acombination of existing flight hardware andsimulator hardware equipped withenvironmental, acceleration, and other sensors.
Ares I-X provides the first opportunity to testnew assembly, integration, and test (AIT)functions at Kennedy Space Center (KSC).
When vehicle elements begin arriving at KSC byOctober 2008, they will be moved to theAssembly and Refurbishment Facility (ARF),where developmental flight instrumentation (DFI)will be integrated and the upper stage simulator(USS) segments will be stacked in smallersuper stacks to support final assembly of thevehicle in the Vehicle Assembly Building (VAB).
The vehicle will be launched from KSCLaunch Complex (LC) 39B, which will be used
as a backup launch-on-demand facility for theShuttle during the servicing mission (STS-125)in October 2008. Once STS-125 is completed,LC 39B will be transferred to the Ares Projectsfor use on the flight test. Because of its Shuttle-ready state, LC 39B will need to be modifiedslightly to support Ares I-X until a full tear-down
Ground Operations personnel to access theinside of the vehicle prior to launch. The groundsupport systems also include an environmentalcontrol system (ECS) to keep the avionics andground staff cool prior to liftoff. The ECS willhave a T-0 disconnect connection between theground systems and the Flight Test Vehicle(FTV), which remains intact until the first stageignition command (T-0) is issued.
Work continues on Ares I-X design andhardware fabrication. All of the individualelements are undergoing or have completed
CDRs, which were followed by a two-partintegrated vehicle CDR in March and July 2008.
Progress on Mission Hardware and Facilities
The Ares I-X mission was authorized toproceed in spring 2006. Given its rapiddevelopment cycle, hardware design andmanufacturing have occurred nearly
simultaneously to meet the launch date. Thus,while the CDR began in March 2008, much ofthe flight hardware was already well through thefabrication process. The CDR was completedsuccessfully July 24. The various hardwareelements are on schedule to begin deliveries toKSC by October 2008.
First Stage
As noted earlier, the first stage (Figure 5) isusing a four-segment solid rocket motor from theShuttle inventory. New forward structures arebeing manufactured by a contractor partner.These new structures will be heavier than theAres I hardware and will be made mostly ofsteel. The frustum and aeroshell on theoperational Ares I will not be reused and will bemade of carbon composites. The Ares I forward
skirt and forward skirt extension will be made ofaluminum.
-
8/14/2019 NASA Ares I-X Flight Test plans
6/31
IAC-07-D2.6.04 - Ares I-X Flight TestThe Future Begins Here
FrustumThe frustum connects the firststage to the upper stage. Machining on thefrustum was completed in June 2008.
Forward Skirt ExtensionThe forwardskirt extension, which houses the MainParachute Support System (MPSS), isscheduled to be delivered to the ARF in late July2008. The Ares I-X separation plane will bebetween the frustum and the forward skirtextension (Figure 6). A field test of theseparation system was conducted at ATKs
Promontory site in July 2008. Work also beganon installing MPSS hardware in July.
Forward SkirtThe forward skirt, whichhelps Ares I-X match the outer mold line of AresI, is due to be delivered to the ARF in late July2008.
Figure 6. The test of the forward skirtextensions separation system verified the
effectiveness of the linear shaped charge and itsshock effects.5th Segment Simulator (5SS)The
structure of the fifth segment simulator (alsocalled 5SS or the XL segment) is 10 percent
complete. The 5SS (Figure 7) houses the FirstStage Avionics Module (FSAM), the FlightTermination System (FTS), and othercomponents. The first of the 5SS componentsarrives at the ARF in July 2008, with additionalsections delivered in August 2008.
First StageAvionics Module(FSAM) S & A and
CRD Panel
Aft
Segment
CenterSegment
Forward
Segment
AccessDoor
Systems Tunnel
Connector Panels
Flight Safety
System (FSS)Antenna
Clevis-TangInterface
BoltedInterfaceLadder /
Cable Tray
S-BandAntenna
C-Band
Antenna
Hybrid andDirectionalCoupler Panel
AccessDoor
ECS
Ports
Batteries and
C-BandController
HeaterCableModule
C-Band
Transponder
-
8/14/2019 NASA Ares I-X Flight Test plans
7/31
IAC-07-D2.6.04 - Ares I-X Flight TestThe Future Begins Here
installed. The aft skirt for Ares I-X, whenoperational, will include eight BDMs and fourBTMs. A recent lean event at KSC helpedincrease the schedule margin for the skirt,resulting in a delivery to the RPSF by as muchas one month earlier than originally scheduled.The aft skirt is currently scheduled to bedelivered to the RPSF in October 2008.
Figure 8. The aft skirt, while Shuttle-legacyhardware, will have hardware added to meet the
requirements of Ares I-X.
Separation and DecelerationFivesuccessful drop tests of the parachute system(Figure 9) have been completed so far. Twoadditional tests are planned before April 2009.
Ares I-X will be the first qualification flight test ofthe new 150-foot-diameter main parachutes.
Figure 9. The main parachutes are in the process of fabrication and drop testing.
Avionics
Ares I-X will carry four types of avionicshardware:
commands between the Atlas Vcomponents and the solid-propellant first
erational Flight
stage
Developmental Flight Instrumentation(DFI) and Op
-
8/14/2019 NASA Ares I-X Flight Test plans
8/31
IAC-07-D2.6.04 - Ares I-X Flight TestThe Future Begins Here
launch date. Table 1 below lists the activitiesand delivery dates for the avionics.
Table 1. Anticipated delivery dates for Ares I-X avionics
Component(s)Current Status (As
Appropriate)Anticipated
Completion/DeliveryATVC CDR completed June 2007
Fabrication under wayOctober 2008
FSAM CDR completed April 2008 October 2008
Flight Software CDR completed March 2008Test Readiness Review
completed April 2008
March 2009
Ground Software (GroundControl, Command, andCommunications/GC3)
Formal testing under way Delivery to KSC October 2008Installation in MLP by May 2009
Systems Integration LaboratoryVehicle Flight Control TestingFlight Simulation Testing
OngoingOngoing
October 2008May 2009
OFI / DFI Sensors andHarnesses
Sensors acquired or on orderUndergoing Table Top Reviews
as completed
Cable Harnesses
CM/LAS October 2008USS October 2008FS October 2008
OFI HarnessesFS/USS October 2008
Fault Tolerant Inertial NavigationUnit (FTINU)
Qualification testing completeDelivered to United Launch
Alliance in March 2008
Delivery to KSC March 2009
SDA Fabrication begun December2007
August 2008
Upper Stage Simulator
The USS (Figure 10) is made up of cylindricalsegments that will be stacked and integrated atKSC for launch. The USS segments are beingfabricated by NASA personnel at GlennResearch Center (GRC) in Ohio. As notedearlier, GRC is completing the assembly of
these segments, along with their internalstructures (Figure 11).
-
8/14/2019 NASA Ares I-X Flight Test plans
9/31
IAC-07-D2.6.04 - Ares I-X Flight TestThe Future Begins Here
Figure 11. This image shows the interior ofthe USS
The USS is a mass simulator. It provides themajority of adjustable ballast for the vehiclesmass, center of gravity (CG), and moment ofinertia distribution. The 2-inch- (5-centimeter)thick ballast plates are approximately 7,000pounds (lbs.) (3,175 kilograms (kg)) each. The
US-1 segment holds 16 plates 2 plates,equaling approximately 112,000 lbs. (50,802 kg)The US-7 segment holds 5 plates 2 plates,weighing approximately 35,000 lbs. (15,875 kg)The total adjustable ballast is around 147,000lbs. (66,678 kg). These ballast plates simulatethe mass of the liquid hydrogen and liquidoxygen that would normally be present in theupper stage propellant tanks in Ares I.
The USS is designed with 11 segments: 5common segments (US-2, 3, 4, 5, 6), 2adjustable ballast segments (US-1 and 7), and 4complex segments (Interstage (IS)-1 and IS-2,Spacecraft Adapter (SA), and Service Module(SM)).
Each segment is approximately 9.5 feet (2.9m) tall to accommodate manufacturing andtransportation constraints. Outer Mold Line(OML) protuberances are all bolted on and
assembled on individual segments prior toshipping except the Ullage Motors (4x) and RollControl System (RoCS) Modules (2x) located onthe US-1 segment. These items will be shippedseparately. An internal access door on US-1 andplatforms and ladders provide access to theentire USS, the FS Frustum, and CM/LAS.
USS has successfully completed threeCritical Design Reviews, which were ordered bysegment complexity, with the Charge 1segments being the least complex and Charge3 incorporating the Roll Control System and
avionics. Charge 1 hardware has already beenfabricated. Charge 2 is due to be completed onschedule. Charge 3 hardware fabrication hasbeen started. Manufacturing processes andprocedures have been successfullydemonstrated. Most of the USS hardware is dueto be shipped to KSC by October 2008.
Roll Control System
The active roll control system (RoCS)provides rotational azimuth control forperforming a 90-degree roll maneuver to orientthe vehicles telemetry antennas after liftoff. Italso will mitigate against adverse roll torques(self- and aero-induced) during ascent. Thenumber of RoCS pulses will be measured inflight and will help inform the RoCS for the finalAres I design. The Roll Control System is anintegral, modular, bi-propellant propulsionsystem housed in the USS Interstage segment(Figure 12). The RoCS uses off-the-shelf andgovernment-furnished equipment (GFE)componentsincluding nitrogen tetroxide andmonomethyl hydrazine propellant tanks, heliumpressurization tanks, and engine nozzles. ThisGFE was harvested from Peacekeeper missiles,then re-integrated into a system for RoCS.
-
8/14/2019 NASA Ares I-X Flight Test plans
10/31
IAC-07-D2.6.04 - Ares I-X Flight TestThe Future Begins Here
Duty cycle testing for RoCS was conductedat the White Sands Test Facility in late 2007,and fuel tanking and detanking tests wereperformed at KSC in early 2008. This verificationtesting, performed at Hypergol MaintenanceFacility (HMF):
Demonstrated loading pressurant andpropellant (using de-ionized water) intoPeacekeeper tanks/fill valve configuration
Used HMF GSE planned for RoCS flightmodule loading
Verified and validated procedures andhardware well in advance of actualpropellant loading in flight modules.
The RoCS team is focused on completinghardware fabrication and integrating it into themodules, while working verification activities inparallel, leading to a Hardware AcceptanceReview early September 2008. The RoCS teamhas high confidence that it will meet its deliveryschedule for the 2009 launch.
Crew Module / Launch Abort System Simulator
Like the USS, the CM/LAS portion of Ares I-X will be simulator hardware (Figure 13). Theseforward sections differ slightly from the currentiteration of the Ares I design because Ares I-X
was baselined during an earlier design analysiscycle (DAC). However, the CM/LAS will stillprovide critical information about aerodynamicand acoustic loads on the Orion crew
exploration vehicle. A total of 362 DFI sensorswill be placed on and in the forward structures.The data from these sensors will be transmittedto the ground via telemetry. The sensors mightalso provide visibility into the thrust oscillationissue Ares I is studying. The CM/LAS CDR wascompleted in mid-March 2008. Hardwaredrawings have been completed, and thehardware itself is being fabricated. NASAsLangley Research Center (LaRC) is responsiblefor CM/LAS design and fabrication, installation
and checkout of DFI, plus handling groundsupport equipment (GSE).
Figure 13. The Ares I-X CM/LAS simulatorcompleted its CDR in February 2008.
The CM/LAS structure consists of severalprimary components, including the Orion crewmodule (CM) simulator, the LAS nozzles, thenosecone, and a transition structure between
the mast and the CM known colloquially as aparty hat (Figure 14).
-
8/14/2019 NASA Ares I-X Flight Test plans
11/31
IAC-07-D2.6.04 - Ares I-X Flight TestThe Future Begins Here
The GO and CM/LAS teams are workingtogether to ensure hardware integration andoperations in the Vehicle Assembly Building(VAB) once the CM/LAS arrives at KSC inNovember 2008. The LAS Tube segment(Figure 15) is currently being fabricated, as arethe attachments for the simulated motor nozzles.Upon completion of the tube, assembly ofCM/LAS party hat will commence.
Figure 15. The LAS tube section is in themidst of fabrication.
Ground Systems / Ground Operations (GS/GO)
The Ares I-X flight will provide valuableexperience for the KSC Ground Systems andGround Operations teams in integrating,
stacking, and launching Ares I. Most of theground systems to be built for Ares I-X haveundergone a 90 percent review and begunfabrication. Among the activities to be addressedare:
Transporting the vehicle elements toKSC
Loading RoCS propellants in theHypergol Maintenance Facility (HMF)
Processing the vehicle in the ARF and
RPSF Stacking the vehicle in the VAB Conducting vehicle rollout, and launch
and recovery operations.
The USS segments and CM/LAS will beassembled into five stacks and the DFI will betested in VAB High Bay 4. This will includeintegrating the first stage 5
thspacer segment
and forward structures into Stack 1. The FSsegments and the stacks will be integrated inHigh Bay 3. The baseline schedule includes tendays for integrated testing. Closeoutsexceptfor the Lower 5SS door (Ordnance Access)arecompleted prior to rolling to the pad (Figure 16).
-
8/14/2019 NASA Ares I-X Flight Test plans
12/31
-
8/14/2019 NASA Ares I-X Flight Test plans
13/31
National Aeronautics and Space Administration
www.nasa.gov
Stephan R. DavisDeputy Mission Manager
2009 International Astronautical Conference
Stephan R. DavisDeputy Mission Manager
2009 International Astronautical Conference
Ares I-X
Flight TestThe Future
Begins Here
Ares I-X
Flight TestThe Future
Begins Here
-
8/14/2019 NASA Ares I-X Flight Test plans
14/317465.2National Aeronautics and Space Administration
Constellation Manifest
Deliver crew and cargo formissions to InternationalSpace Station (ISS) and to
Moon and beyond
Continuing progress towarddesign, component testing,and early flight testing
Ares I Crew Launch Vehicle Will carry 6 crew to ISS, 4 toMoon
First flight test 2009
Initial Operating Capability 2015
Ares V Cargo Launch Vehicle
Will launch Earth departure stageand Altair lunar lander to lowEarth orbit for lunar missions
Largest launch vehicle ever
designed
Will begin detailed developmentwork in 2011
-
8/14/2019 NASA Ares I-X Flight Test plans
15/31
-
8/14/2019 NASA Ares I-X Flight Test plans
16/317465.4National Aeronautics and Space Administration
Vehicle Overview
Combines proven space flight andsimulated hardware
Space flight hardware includes:
Four-segment solid rocket booster (SpaceShuttle)
Atlas V-based avionics
Roll control system (Peacekeeper)
Separation system (Space Shuttle)
Parachutes deceleration system (SpaceShuttle)
Booster deceleration and tumble motors(Space Shuttle)
Developmental flight instrumentation
Simulator hardware
Upper stage
Orion crew module
Launch abort system
Fifth segment of booster
Simulated FifthSegment
Orion Crew Module/ Launch Abort
System Simulator
Four-segmentMotor
Upper StageSimulator
FirstStage
Avionics (internalthroughout vehicle)
Roll ControlSystem
Separation PlaneFirst StageAvionics Module
(internal)
-
8/14/2019 NASA Ares I-X Flight Test plans
17/317465.5National Aeronautics and Space Administration
Ares I-X Flight Test Objectives
P(1) Demonstrate control of a dynamicallysimilar, integrated Ares I/Orion, usingAres I relevant ascent control algorithms
P(2) Perform an in-flight separation/stagingevent between a Ares I-similar First Stageand a representative Upper Stage
P(3) Demonstrate assembly and recovery of
a new Ares I-like First Stage element at KSC
P(4) Demonstrate First Stage separationsequencing, and quantify First Stageatmospheric entry dynamics, and
parachute performance
P(5) Characterize magnitude of integratedvehicle roll torque throughoutFirst Stage flight
-
8/14/2019 NASA Ares I-X Flight Test plans
18/317465.6National Aeronautics and Space Administration
Ares I-X Development Flight Test
-
8/14/2019 NASA Ares I-X Flight Test plans
19/317465.7National Aeronautics and Space Administration
First Stage
Heritage Hardware
4 Segment Reusable Solid Rocket Motor
(RSRM) w/Nozzle
Thrust Vector Control (TVC)
Flight Termination System (FTS)
Nose Cap w/Thrusters
Booster Separation Motors (BSMs)
Modified Heritage Hardware
Shuttle Derived Avionics
Aft Skirt
New Developments for Ares I-X
Fifth Segment Simulator (5SS)
Forward Skirt (FS)
Forward Skirt Extension (FSE)
Main Parachute Support Structure (MPSS)
Frustum
Ares I Designs
Parachutes
FTS Extension to Aft Segment
Managed at the NASA Marshall Space
Flight Center, Huntsville, AL
-
8/14/2019 NASA Ares I-X Flight Test plans
20/317465.8National Aeronautics and Space Administration
Avionics
Primary avionics subsystems:
FSAM (located in First Stage fifthsegment)
Guidance & Control System
Ground Command, Control, andCommunication (GC3)
Managed at the NASA MarshallSpace Flight Center, Huntsville, ALFirst Stage Avionics Module (FSAM) (Lockheed
Martin Space Systems (LMSS))
Atlas V System Integration Lab(SIL) (LMSS)
Ascent Thrust Vector Controller (ATVC)(Honeywell International)
RedundantRate Gyro
(RRGU)
Fault TolerantInertial
Navigation Unit(FTINU)
RedundantRate Gyro
(RRGU)
-
8/14/2019 NASA Ares I-X Flight Test plans
21/317465.9National Aeronautics and Space Administration
Avionics Progress
Component(s) Current Status (As Appropriate) Anticipated
Completion/DeliveryATVC CDR completed June 2007 Oct-08
Fabrication under way
FSAM CDR completed April 2008 Oct-08
Flight Software CDR completed March 2008 Mar-09
Test Readiness Review completed April2008
Ground Software (Ground Control,Command, and Communications/GC3)
Formal testing under way Delivery to KSC October 2008Installation in MLP by May 2009
Systems Integration Laboratory
Vehicle Flight Control Testing Ongoing Oct-08Flight Simulation Testing Ongoing May-09
OFI / DFI Sensors and Harnesses Sensors acquired or on order Cable Harnesses
Undergoing Table Top Reviews ascompleted
CM/LAS July 2008
USS October 2008FS October 2008
OFI Harnesses
FS/USS October 2008
Fault Tolerant Inertial Navigation Unit
(FTINU)
Qualification testing complete Delivery to KSC March 2009
Delivered to United Launch Alliance inMarch 2008
SDA Fabrication begun December 2007 Aug-08
-
8/14/2019 NASA Ares I-X Flight Test plans
22/317465.10National Aeronautics and Space Administration
Upper Stage Simulator (USS)
USS is a mass and Outer MoldLimit (OML) simulator
Hardware includes:
Interstage (IS) Simulator
Upper Stage (US) Simulator
Spacecraft Adapter (SA) Simulator
Service Module (SM) Simulator
Developed at the NASA Glenn
Research Center, Cleveland, OH
SM
SA
US-7
US-6
US-5
US-4
US-3
US-2
US-1
IS-2
IS-1
USS to CM/LAS Interface
Service Module
Spacecraft Adapter
Ballast
Avionics in US-1 & US-7DFI throughout
Ballast
Internal Access Doorand ECS Service Panel
USS to RoCS Interface
Interstage
USS to FS Interface
-
8/14/2019 NASA Ares I-X Flight Test plans
23/317465.11National Aeronautics and Space Administration
USS Internal Access Concept
Provides access from the Frustumto the CM/LAS
Door in the IS-1 segment
Internal access platforms and ladders
Provides Environmental ControlSystem (ECS) ductwork to maintain asafe work temp, air flow andcontrolled humidity
Internal access door
Common accessplatforms with railings
Ballast platform
IS-1 Segment
FS Frustum
-
8/14/2019 NASA Ares I-X Flight Test plans
24/317465.12National Aeronautics and Space Administration
Roll Control System (RoCS)
Provides post-launch 90-degree roll
and mitigation against adverse roll
torques
Modular propulsion system housedin the Ares I-X USS Interstage
Proven space hardware harvested
from Peacekeeper 4th Stage
Managed at the NASA Marshall
Space Flight Center, Huntsville, AL
-
8/14/2019 NASA Ares I-X Flight Test plans
25/317465.13National Aeronautics and Space Administration
Instrumented for 924 measurements
Thermal
Structures
GNC/Trajectory
Aero
Shock
Cameras strategically located
Data to be retrieved via telemetry and a datarecorder box that is recovered from the FirstStage after flight
Managed at the NASA Langley ResearchCenter, Hampton, VA
Development Flight Instrumentation (DFI) and Video
Camera 3-1
Camera 3-2
Camera 4-1
Camera 3-3
Orion Crew Module/
-
8/14/2019 NASA Ares I-X Flight Test plans
26/317465.14National Aeronautics and Space Administration
Orion Crew Module/Launch Abort System (CM/LAS) Simulator
Outer mold limit (OML)
resembles earlier Ares I
design due to flight test
schedule
Developmental flight
instrumentation sensors
will measure
aerodynamic and
acoustic loads
Developed at the NASA
Langley Research Center,
Hampton, VA
Vehicle Assembly Building
-
8/14/2019 NASA Ares I-X Flight Test plans
27/317465.15National Aeronautics and Space Administration
Vehicle Assembly Building(VAB) Operations
The Upper Stage Simulator (USS) segments and Orion CrewModule/Launch Abort System (CM/LAS) will be assembledinto stacks and Development Flight Instrumentation (DFI)tested in VAB Hi-Bay 4
The First Stage segments and stacks will be integrated inHi-Bay 3
-
8/14/2019 NASA Ares I-X Flight Test plans
28/317465.16National Aeronautics and Space Administration
Hi-Bay 3 Stacks in VAB
LOX Ballast
Stack 1XL/S/SE/Frustrum/IS-1/IS-2
Stack 2US-1
Stack 3US-2/US-3/US-4/US-5
Stack 4US-6/US-7
Stack 5SA/SM/CM/LAS
LH2 Ballast
-
8/14/2019 NASA Ares I-X Flight Test plans
29/317465.17National Aeronautics and Space Administration
Pad 39B at NASA Kennedy Space Center, FL
Lightning Mastraised 100ft
Vehiclestabilizationconceptshown
-
8/14/2019 NASA Ares I-X Flight Test plans
30/31
7465.18National Aeronautics and Space Administration
Summary
Ares I-X is the firstflight of NASAs newConstellation Program
Ares I-X is adevelopmental testflight to supportthe Ares I
Ares I-X is ontrack for 2009 launchdate
For more information,see
http://www.nasa.gov/ares
-