Transcript of NARIIN GOL GOLD MINE PRESENTATION 12.04.2016
NARIIN GOL (NARROW RIVER)GOLD MINE
2016
05/12/2014 1
OVERVIEW
• Two Existing Mining Licenses
MV-006364
MV-007700
• Tuv Aimag ~220 KM west of Ulaanbaatar in the Zaamar Ridge of the Khentei
Mountains, bordered on the south and west by the Tuul River
• Consists of ~80 different veins of gold
• Only 2 veins have been explored ~20.3 tones
• Exploration is required where reserves are highly expected to increase
• Existing gold mines (more than 20 different licenses) are located in the vicinity on the
northern side to the Zaamar Ridge
• Anticipate both surface and underground operations
• Some placer deposits are known to be present but have not been quantified
05/12/2014 2
LOCATION
Nariin Gol Gold
Mongolian Mineral Deposits
Ulaanbaatar Nariin Gol Gold
05/12/2014 3
06364A 07700A
Other License Areas
05/12/2014 4
NARIIN GOL (NARROW RIVER)
GOLD MINE
MV-006364
MV-007700
05/12/2014 5
POSITIONAL MAP
05/12/2014 6
PREVIOUS & CURRENT OWNERS
2000 ERDMASH GROUP
2007 ERDENET ALT CO., LTD
2009 NARIIN GOL GOLD, LLC
05/12/2014 7
HISTORY
1918: Russian geologists have done searching
1971: V.M. Yakilev and others to make 1:200000 scaled geological map.
1980: Au, Tin, Tungsten steel, Flour spar prognosis search
1982-1985: Balatova, N.Ya. Jabolovekaya, G. Dejidmaa, Gold
themed scientific studies.
1987-1991: Purewsuren and others to make 1:50000 scaled geological map.
1992-1994: Sh Enkhbaatar assessed
hypothesis resources 20.3 ton gold in quartz grains at Nariin Gol ore field.
1993-1995: Erdene Alt Co Ltd made 1:10000 scaled search, estimate on grain
41, 422 and drilled 9 boreholes which
contains 650m.
2003-2004: Erdene Alt Co Ltd 3 boreholes drilled which contains 216.6m and 1710
meter cube trench.
2006: Erdenet Alt Co Ltd registered for state reserve committee total weight
1734 kg, chemical pure 1638 kg gold as
(C1) category
2008: Erdenet Alt Co Ltd summarize and examine resource index via take
resample on grain 41, 422.
05/12/2014 8
NARIIN GOL (NARROW RIVER)
GOLD MINE
License MV-06364A
104 23’7.91” 48 05’31.82”
104 21’30.9” 48 05’31.82”
104 21’30.91” 48 06’35.82”
104 22’20.92” 48 06’35.82”
104 23’7.91” 48 06’14.82”
05/12/2014 9
ADDITIONAL ACTIONS TO BE UNDERTAKEN
MV-006364
1. Drilling of up to 5,230 meters by: Sant Sharga, LLC
2. Further evaluation of the placer potential
3. Assay analyses by: Alex Stewart, Mongolia
4. Reserve Calculations by: Sant Sharga LLC
5. Archaeological Survey by: Ulaanbaatar University
6. Environmental and Social Impact Assessment: Greentrends LLC
7. Government approval by: Government Contractor TBD
8. Mine Plan by: Mining Institute
9. Business Plan: Mining Institute
10. Financial & Risk Analyses: Agrar, LLC
11. Investor Presentation(s) by: Zamani Capital ltd.
05/12/2014 10
PLANNED WORK
1. Mapping: The research team of 5
geologists will drive the road and walk
in the total research site. The aerial
map will be used for observation.
1:5000 geological mapping, which
covers 365 hectares of MV-006364
licensed site will be conducted.
2. Ground Magnetics: The magnetic survey data could provide a target
signature where to drill on the
property. The purpose of this survey is
to help define the boundaries of the
rock units.
3. DDIP: Dipole dipole induced polarization.
4. Drilling:
We have planned 45 holes which
will contain around 5,230 meter of
drilling.
Atlas Copco Boyles C6C and C8C
2 core rigs will drill on site.
5. Borehole Geological Logging: On site logging of geological drill
holes for geologists purposes
6. Borehole Geophysical Survey: Borehole geophysics is the science of recording and
analyzing measurements of physical
properties made in test holes. Borehole
geophysical logging provides a highly
efficient means to determine the character
and thickness of the different geologic
materials.
05/12/2014 11
PLANNED WORK
7. Laboratory-ALS Group:
Detection limits ppm.
Au by screen fire assay with AAS finish.
8. Hydrogeology: Hydrogeology exploration will be done after the exploration drilling. We are
expecting drill at least 2 holes on MV-006364.
9. Topo mapping: Topo survey shows a variety of elevations and landforms. We will do scale
1:2000 topo mapping on MV-006364.
10. Resource and Reserve Estimation: Geology reports according to Mongolian Government
standard for reserve estimation reporting. Reserve classifications Mining resource and
mineable reserve calculation
11. Feasibility Study: Mine Designing ,Mining Equipment and facilities selection and capital
cost, Mine management and labor force assessment, Economic Evaluations including
forecasts of market analysis, transportations alternatives.
05/12/2014 12
DRILL PLAN
05/12/2014 13
NARIIN GOL (NARROW RIVER)
GOLD MINE
License MV007700
104 20’36.92” 48 06’45.81”
104 20’36.9” 48 05’41.82”
104 19’33.04” 48 05’41.82”
104 19’33.04” 48 05’49.55”
104 19’0.91” 48 05’49.55”
104 19’0.91” 48 06’45.81"
05/12/2014 14
NARIIN GOL (NARROW RIVER)
GOLD MINE
• No definitive exploration activity has been conducted;
only geophysical evaluation
• After receiving income from MV-06364, additional
exploration for this license will be undertaken
MV-007700
05/12/2014 15
NARIIN GOL (NARROW RIVER)
GOLD MINE
SUMMARY OF EXPLORATION COSTS 1. GEOLOGICAL SURVEY $ 250,000
2. MAGNETIC SURVEY $ 750
3. DDIP $ 6,250
4. DRILLING $ 836,000
5. GEOPHYSICAL LOGGING $ 62,760
6. LABORATORY $ 100,000
7. HYDROGEOLOGY EXPLORATION $ 100,000
8. TOPOGRAPHICAL MAPPING $ 5,000
9. RESOURCE AND RESERVE ESTIMATION $ 55,000
10. FEASIBILITY STUDY $ 60,000
11. MINE PLANNING $ 8,000
12. LICENSE BOUNDARY MARKER $ 3,000
13. ARCHAEOLOGY STUDY $ 3,650
14. PALEONTOLOGY STUDY $ 3,650
15. GENERAL ENVIRONMENTAL IMPACT ASSESSMENT $ 10,000
16. DETAILED ENVIRONMENTAL IMPACT ASSESSMENT $ 20,000
17. GOVERNMENT APPROVAL $ 50,000
SUBTOAL $ 1,574,860
VAT (10%) $ 157,486
TOTAL $ 1,732,346
05/12/2014 16
SALARIES (+INCOME AND SOCIAL
TAX)
$ 285,000
OFFICE, EQUIPMENT & SUPPLIES
$ 12,000
VEHICLE, LEASE TO OWN
$ 18,000
NARIIN GOL (NARROW RIVER)
GOLD MINE
OVERHEAD EXPENSES (9 MONTHS)
TOTAL
$ 305,000
05/12/2014 17
TOTAL EXPENSES (9 MONTHS)
EXPLORATION & PERMITTING $ 1,732,346
OVERHEAD EXPENSES $ 505,000
CONSULTANTS FEE $ 262,654
LICENSES PURCHASE $ 22 500 000
TOTAL $ 25,000,000
NARIIN GOL (NARROW RIVER)
GOLD MINE
05/12/2014 18
05/12/2014 19
INCORPORATION ADDRESS 1ST FLOOR YAMRAJ
BUILDING P.O. BOX 875,
ROAD TOWN ,TORTOLA ,
BRITISH VIRGIN ISLANDS
BUSINESS ADDRESS CYPRUS, NICOSIA 5
VISANTIOU STREET
SPYRIDIES
TOWER,2064 STROVOLOS
,+35722210000
BULGARIA ADDRESS VARNA 9000
,BULGARIA,MIHALIL
KOLONI 6
,+359877758222,
CONTACT
DETAILS