Geotech & Material Consultant PROFILE
INTRODUCTION AS GEOTECH & MATERIAL CONSULTANT FOR
ALL KIND OF CIVIL ENGINEERING PROJECTS
We would like to share this opportunity to introduce our firm to you as Geotech & Material
Consultant. In order to let you know about our credentials, we feel pleasure in informing you
that we are engaged in providing consultancy services in the fields of Geotech Investigation,
Material Testing, Plate Load Test, Pile Load Test, Electrical Resistivity, Benkelman Beam
Deflection Survey, Concrete/Bituminous Mix Proportioning, Topography Survey by Total
Station, Compressive Strength Test by Rebound Hammer (NDT), TRL Dynamic Cone
Penetration Test and Axle Load Survey.
All the necessary relevant tests for all these Investigation/Testing Jobs in the field and in the
laboratory are carried out in our well-equipped laboratory reinforced with all the necessary field
and lab equipments. We do have a team of experts to scrutinize and analyze the results with
the help of in-house advanced computer facility available with us supported by requisite
softwares as well.
During our existence of last twenty five years, we have worked with many a esteemed clients
for various Testing Works which include many Engineering Colleges/Institutes like IITK, IITR,
IET Lucknow, CBRI, IISc Bangalore, Central Government Departments like CPWD,
TELECOM, RITES, IRCON, NCR, NR, NER, MES, NBCC, Public Sector Enterprises, Uttar
Pradesh State Government Departments like UPPWD, UPRNN, UPSBC, UP Jal Nigam, UP
Irrigation, UPPCL, RES, UPSKNN, etc., some reputed Architects of UP, New Delhi, Noida &
Mumbai and leading Indian/International consultants with pan India presence. We have also
worked with many Infrastructure companies in the field of Highways, Bridges, Mobile Service
Providers, Power Sector, Sugar/Cement/Chemical Industries, etc. and many other private
builders/contractors and other clients as well.
We are also empanelled with MoRTH under Category IV: List of Consultants Approved for
Undertaking Geo-Technical Investigation Works for Highway and Bridge Projects of
Government of India Ministry of Road Transport and Highways as well are NABL accredited as
per ISO/IEC: 17025-2005 under Department of Science & Technology of Government of India.
Geotech & Material Consultant PROFILE
NABL CERTIFICATION WITH SCOPE
Geotech & Material Consultant PROFILE
Geotech & Material Consultant PROFILE
EMPANELLED WITH MORT&H UNDER
CATEGORY IV: GEOTECHNICAL INVESTIGATION
Geotech & Material Consultant PROFILE
Geotech & Material Consultant PROFILE
Geotech & Material Consultant PROFILE
Geotech & Material Consultant PROFILE
Geotech & Material Consultant PROFILE
EMPANELLED WITH CENTRAL PUBLIC WORK DEPARTMENT (CPWD)
Geotech & Material Consultant PROFILE
Geotech & Material Consultant PROFILE
EMPANELLED WITH MILITARY ENGINEER SERVICES (MES)
Geotech & Material Consultant PROFILE
Geotech & Material Consultant PROFILE
EMPANELLED WITH UTTAR PRADESH AWAS VIKAS PARISHAD
Geotech & Material Consultant PROFILE
Geotech & Material Consultant PROFILE
Geotech & Material Consultant PROFILE
SERVICES PROVIDED BY US
Sl. No. Name of Test Min. Qty. Required IS code No.
(A) Coarse Aggregate 1 Sieve Analysis and
Fineness Modulus 30 kg. 2386 (Part I) : 1963
2 Material Finer than 75 micron 20 kg. 2386 (Part I) : 1963 3 Flakiness and Elongation
Index 50 kg. 2386 (Part I) : 1963
4 Specific Gravity 10 kg. 2386 (Part III) : 1963 5 Water Absorption 10 kg. 2386 (Part III) : 1963 6 Bulk Density 50 kg. 2386 (Part III) : 1963 7 Aggregate Crushing Value 50 kg. 2386 (Part IV) : 1963 8 Abrasion Value 20 kg. 2386 (Part IV) : 1963 9 Aggregate Impact Value 20 kg. 2386 (Part IV) : 1963
10 Soundness (Loss with Na2SO4 or MgSO4)
20 kg. 2386 (Part V) : 1963
11 Aggregate 10% Fine Value 20 kg. 2386 (Part IV) : 1963 12 Deleterious material 1 kg. 2386 (Part II) : 1963 13 Organic impurities 1 kg. 2386 (Part II) : 1963
(B) Fine Aggregate 1 Sieve Analysis and Fineness
Modulus 5 kg. 2386 (Part I) : 1963
2 Material Finer than 75 micron 2 kg. 2386 (Part I) : 1963 3 Organic impurities 2 kg. 2386 (Part II) : 1963 4 Natural Moisture Content 5 kg. 2386 (Part III) : 1963 5 Specific Gravity 1 kg. 2386 (Part III) : 1963 7 Soundness
(Loss with Na2SO4 or MgSO4) 20 kg. 2386 (Part V) : 1963
(C) Cement Concrete 1 Compression Test (Sample
received in the form of Cube) 3 Nos
(Minimum) 516 : 1959
(D) Paver Block 1 Compression Test (Sample
received in the form of & Paver block/Tiles)
3 Nos (Minimum)
15658 : 2006
2 Flexural Strength 1 Nos (Minimum)
15658 : 2006
3 Abrasion Resistance 1 Nos (Minimum) 15658 : 2006
(E) Concrete Mix Proportioning
Cement 100kg. Coarse Sand -200 kg. Coarse Agg. - 400 kg.
10262 : 2009
(F) Portland /Pozzolona Cement
1 Physical Tests 15 kg. For all tests a, b, c, d & e
(a) Consistency 4031 (Part 4) : 1996
Geotech & Material Consultant PROFILE
SERVICES PROVIDED BY US
Sl. No. Name of Test Min. Qty. Required IS code No. (b) Fineness by Blain 4031 (Part 2) : 1988 (c) Soundness Expansion 4031 (Part 3) : 1988 (d) Setting time 4031 (Part 5) : 1988 (e) Compressive Strength 4031 (Part 6) : 1988
(G) Water
1. Suitability of Water for
Concrete/Mortar (pH value, Harmful salts and Physical Test)
2.00 litre 3025 : 1964
(H) Bitumen
1 Specific Gravity 2 kg. 1202-1978 2 Softening Point 2 kg. 1205-1978 3 Penetration 2 kg. 1203-1978 4 Ductility 2 kg. 1208-1978 5 Loss on Heating 3 kg. 1212-1978 6 Material Soluble in Carbon
Disulphide/Carbon Tetra Chloride
2 kg. 1216-1978
7 Elastic Recovery 2 kg. IRC SP 53 : 2010 8 Binder Content of Tar
Aggregate Mixture 5 kg. IRC SP 11 : 1988
9 Striping value 5 kg.
(I) Miscellaneous
1 Bituminous Mix Design 2 bag each material ASTM D 1559 -71 2 Adhesion characteristics of
aggregate with Tar or Bitumen by Water Immersion Test (Stripping value)
1.5 kg. Aggregate mix with Bitumen or Tar
6241 : 1971
(J) Bricks (a set of 7 bricks) For all tests a, b, c & d
(a) Examination of size and
general quality including warpage
20 bricks 3495 (PART IV) : 1992
(b) Compressive strength ----do------ 3495 (PART I) : 1992
(c) Water absorption ----do------ 3495 (PART II) : 1992
(d) Efflorescence ----do------ 3495 (PART III) : 1992
(K) SOILS
1 Sieve Analysis 1.0 kg. 2720 (Part I) : 1983
Geotech & Material Consultant PROFILE
SERVICES PROVIDED BY US
Sl. No. Name of Test Min. Qty. Required IS code No. 2 Liquid Limit, Plastic Limit &
Plasticity Index
1.0 kg. 2720 (Part V) : 1985
3 Particle Size Analysis
(by Sedimentation)
2.0 kg. 2720 (Part IV) : 1985
4 Optimum Moisture Content
and Maximum Dry Density by
Proctor Test Method
(a) Light 20.0 kg. 2720 (Part VII) : 1980
(b) Modified 20.0 kg. 2720 (Part VIII) : 1983
5 Moisture Content 0.500 kg. 2720 (Part II) : 1973
6 Specific Gravity 0.500 kg 2720 (Part III) : 1980
7 Shrinkage Factors 0.500 kg 2720 (Part VI) : 1972
8 Silt Factor 2.0 kg
9 Harmful Salts
(a) Total Soluble Salts 1.0 kg. 2720(Part XXVI) : 1977
(b) Sulphate Content
(c) Corbonate Content
(d) Bicarbonate
(e) Chloride
1.0 kg.
2720(Part XXVII) : 1977
1.0 kg.
1.0 kg.
1.0 kg.
10 pH value 1.0 kg. 2720 (Part XX VI) : 1987
11 Organic matter 1.0 kg. 2720 (Part XX VI) : 1972
12 Total carbonate 1.0 kg. 2720 (Part XX VI) : 1987
13 Direct Shear Test for
Determination of cohesion &
angle of internal friction (c &
Φ)
As required
2720 (Part XIII) : 1986
14 Triaxial Test for Determination
of cohesion & angle of internal
friction (c & Φ)
2720 (Part XI) : 1981
15 Unconfined Compressive
Strength
2720 (Part X) : 1973
16 Swelling Pressure 2720 (Part XXXXI) : 1977
17 Differential Free Swell Index 2720 (Part XXXXI) : 1977
18 Consolidation Test 2720 (Part XV) : 1986
19 Original Dry Density from
undisturbed sample to be
supplied by party
2720 (Part XVI) : 1986
20 California Bearing Ratio 20 kg. 2720 (Part XVI) : 1986
Geotech & Material Consultant PROFILE
SERVICES PROVIDED BY US
Sl. No. Name of Test Min. Qty. Required IS code No. (CBR) with Classification and
MDD
21 Permeability Test 10 kg. 2720 (Part XVII) : 1986
L) Test on existing Road for strengthening
1 Benkelman Beam Deflection
Test for strengthening of road per kilometer / Lane - When loaded Truck is provided by the Party - When loaded Truck is arranged by us (additional Rs. 5000.00 shall be charged for first 5 Km and further Rs. 500.00 per Km. for sixth Km. and onwards survey) *
IRC: 81 : 1997
(M) COMPLETE SUB-SOIL INVESTIGATION FOR FOUNDATION
0-10 meter - - 0-20 meter - - 0-30 meter - - 0-40 meter - -
(N) Job Mix Formula 1 Granular Sub-Base (GSB) 50 Kg each of every
ingredient MoRTH Section 400
2 Wet Mix Macadam (WMM) 50 Kg each of every ingredient
MoRTH Section 400
3 Water Bound Macadam (WBM)
50 Kg each of every ingredient
MoRTH Section 400
4 Blanketing Material 20 Kg each of every ingredient
GE:IRS-2 (Final)
21 Steel Test (Physical)
a. Dimension & Mass Per Meter IS 1786 :2008
b. Tensile Strength Per Set (No. of Three Bars)
IS 1608:2005/ISO6892:1998
IS:2062:2006 c. Yield Stress IS
1608:2005/ISO6892:1998 IS:2062:2006
d. Percentage Elongation IS 1608:2005/ISO6892:1998
IS:2062:2006
Geotech & Material Consultant PROFILE
SERVICES PROVIDED BY US
Sl. No. Name of Test Min. Qty. Required IS code No. e. Reduction in Area IS
1608:2005/ISO6892:1998 IS:2062:2006
f. Bend Test IS:1599:2012:ISO 10065:1990
g. Re-Bend Test IS 1786:2008
22. Non Destructive Test a. Rebound Hammer Per Sample IS:13311(Part-2)-1992
23. GSB Sample a. Gradation 30 kg. 2386 (Part I) : 1963 b. Atterberg Limits (LL,PL & PI) 1.0 kg 2720(Part-V):1985 c. Aggregate Impact Value 20 kg. 2386 (Part IV) : 1963 d. Proctor Density Test (Modified) 20.0 kg 2720 (Part-VII):1980 e. Proctor Density Test (Light) 20.0 kg 2720 (Part-VIII):1983 f. CBR With Classification & MDD 20.0 Kg 2720(Part-XVI):1986 g. Water Absorption 10 kg. 2386 (Part III) : 1963 h. Soundness a. Loss with Na2SO4 20 kg. 2386 (Part V) : 1963 b. Loss with MgSO4 20 kg. 2386 (Part V) : 1963 i. 10% Fine Value 20 kg. 2386 (Part IV) : 1963
24. Cement Concrete Core Test a. Compressive strength Per Sample 516:1959
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
FINANCIAL YEAR 2019‐20
1
Geotechnical Investigation Between Jaunpur To
Akbarpur, Northern Railway In Connection With Doubling Of
Railway Track M/s K & J PROJECTS PRIVATE LIMITED
11/02/2019
K&JIHO/wO/2018-19/063
12.25 102 bore
holes
2
Sub Soil Investigation For Proposed Construction Of Bridge No. 76, Between Jaunpur To Jafarabad,
Northern Railway In Connection With Doubling Of
Railway Track 3 Sub Soil Investigation Between
Phaphamau To Jhangai , Northern Railway In Connection With Doubling Of Railway Track
M/s K & J PROJECTS PRIVATE LIMITED
16/03/2019
K&J/HO/w0I2018‐19/066
11.55 815.00 metre
4
Geotechnical Investigation Of Major/Minor Bridges/Robs/Rubs For Katghora – Dongargarh Project (Reach-3 From Km 150.000 To Km 258.000 Including Spur Lines) Under Jurisdiction Of Chhattisgarh Railway Corporation Limited In The State Of Chhattisgarh.
CHHATTISGARH RAILWAY CORPORATION LTD. (A Joint venture of Govt. of Chhattisgarh & Ministry of Railways), Raipur-492013
02/02/2019
CRCL/Tender/2019/SLT/GT-
3/Reach-3 65.00
40 Nos. Structures Investigatio
n
5 Eight Lane Expressway Starting Before Kmp Expressway And Ends At Ch 7+000 Near Khanpur Ghati (Km 18+500 To Km 47+000) Section Of Delhi Vadodra Green Field Alignment (Nh 148n) On Epc Mode Under Bharatmala Pariyojna In The State Of Haryana (Package Ii)
APCO INFRATECH PRIVATE LIMITED
22/03/2019
WO/APCO/TE/2018-19/037 71.81
9138.00 metre
6 Sub Soil Investigation For Preparation Of Feasibility Report Cum Details Project Report (Dpr) Of 4 Laning Of Agra Bypass (Northern) Connecting Left Over Portion Of Various National
M/s MSPARK FUTURISTICS & ASSOCIATES
08/04/2019
MSPARK/WO/AGRA
BYPASS/2018-191295
4.48 310.00 metre
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
Highways / Expressways Surrounding The Agra City In The The State Of Uttar Pradesh (Part-A & B)
7 Major Bridge At Ch. 433+347 Rhs For Four Laning With Paved Shoulder Of Porbandar - Dwarka Section Of Nh-8e From Km. 356.766(Design Chainage Km. 379.100) To Km. 473.000(Design Chainage Km. 496.848) In The State Of Gujarat Through Public Private Partnership (Ppp) On Hybrid (Annuity) Mode.
M/s G R INFRAPROJECTS LIMITED
19/04/2019
3700014922 48.97 1990.00 metre
8 Sub Soil Investigation For Preparation Of Detailed Project Report For Development Of Economic Corridors, Inter Corridors, Feeder Routes And Coastal Roads To Improve Efficiency Of Freight Movement In India (Lot-1/Madhya Pradesh/Package-1) Khandwa - Deshgaon Strech
M/s LEA Associates South Asia Pvt. Ltd.
13/03/2019
LASNGE0173579/2019/491
6.33
41.00 METRE SOIL & 91.00
METRE Hard Rock
CR>25
9 Purvanchal Expressway Package-Iii From Jaraikala (Dist. Amethi) To Sidhi Ganeshpur (Dist. Sultanpur)
M/s B&S ENGINEERING CONSULTANTS PVT. LTD.
25-04-2019
bsec/I807/akl358 9.99
1270.00 metre
10 Sub-Soil Investigation For Proposed Construction Of Eight Lane Divided Carriageway Starting At Ch.47+000 Near Khanpur Ghati To Haryana-Rajsthan Border (Ch.47+000 To 78+800) Section Of Delhi-Vadodara Greenfield Alignment (Nh-148) On Epc Mode Under Bharatmala Pariyojna In The State Of Haryana
M/S ACCRETE CONSULTING ENGINEERS(PVT) LTD.
28-05-2019
ACE/ASL/WO/1920/03
8.86 465.00 metre
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
11 Four Laning Of Imphal - Moreh Section Of Nh 39 From Km.330+000 To 350+000 In The State Of Manipur ( Package 1) On Epc Mode
G R INFRAPROJECTS LIMITED
07-09-2019 NIL - -
FINANCIAL YEAR 2018‐19 1 Carryout Sub-soil Investigation
(Geo Tech Investigation) at Stretch from Palia Shajahanpur via Hardoi-Lucknow for “Consultancy Services for Feasibility Study & Preparation of Detailed Project Report for Improvement and up-gradation of in principle declared National Highways in the state of Uttar Pradesh-package-Vi. (Stretch from Palia Shajahanpur via Hardoi-Lucknow) Length 270 KM.”
Wadia Techno Engineering Services Ltd.
23-03-18 MOU 29.80 2260.00 metre
2 Consultancy Services for Preparation of Detailed Project
Report for Development of Economic Corridors, Inter
Corridors, Feeder Routes Under Bharatmala Pariyojna (Lot-
2/Punjab?Package-2)
LEA Associates South Asia Pvt. Ltd.
13-04-18 LASA/
GEO/73583/2018/632j
27.72 1610.00 metre
3 Rehabilitation and Upgradation of existing 2 lane to 4 lane standards from End of Kamakhyanagar Bypass-Dubri Section (Ch. 336+90 to Ch. 388+000) of NH 200 (new NH 53) in the state of Odisha on EPC Mode
G.R. Infra project Limited
09-06-18 3700010852 11.33 988.00 metre
4 GEOTECHNICAL INVESTIGATIONS For Betul Khandwa-MP
LEA Associates South Asia Pvt. Ltd.
21-05-18 LASAIGEO/735
79/2018/858 39.35 847.00 metre
5 GEOTECHNICAL INVESTIGATIONS For Vidisha –Malthone Madhya Pradesh-Section of NH-346
LEA Associates South Asia Pvt. Ltd.
08-06-18 LASAlGE01735
80/2018/970 19.79
549.00 metre
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
6 NH-24 Extension 4-lane bypass starting from Behta Road and terminating at Sitapur Road Chainage 479.500 (bypass chainage from K111. 32.000/3 1.490 to Km. 64.900/64.380 average length 32.895 Km) in the State of Uttar Pradesh on EPC Mode (Package-2)
M/s Sadbhav Engineering Limited
16-06-18 SEL/LRR.I
ASLI'LIFY 18-19/00783
22.23 1755.00 metre
7 Sub Soil Investigation for Nagpur Mumbai Expressway Project (Ch. 494.218 km to Ch. 502.752 km)
M/s Larsen & Toubro Limited, Construction
17-10-18 EG892WOR800
0008 24.09 482.00 metre
8
Gorakhpur Link Expressway Under UPEIDA
KITCO Limited, Femith's, P.B. No: 4407, Puthiya Road, NH Bypass Vennala, Kochl 682 028, Kerala, India
24-09-18 DP 955 BAH:
2018 28.25 2034.00 metre
FINANCIAL YEAR 2017‐181 Six Laning of Gurgaon - Kotputli -
Jaipur section of section of NH-8 from Km 42.700 to Km 273.000 (length 225.600 Km) in the state of Haryana and Rajasthan to be executed as BOT (Toll) on DBFO pattern under NHDP Phase-V
M/s Aarvee Associates, Architects Engineers & Consultants Pvt. Ltd., Hyderabad
20-03-18 AA/HW/ 2162-
WO/17-18/1826 16.75 720.00 metre
2 Lakhimpur Sisiyer road in the Stare U.P
Accret Consulting Engineering Privete Limited
22-04-17 ACE/ARNSOL /WO/170224/17
2
3 Different Bridge for Eastern Dedicated Freigh Corridoor Project in the state of Uttar Pradesh
GMR Infrastructure Limited
01-03-17 Different Orders 15.00
many bore holes of 10, 20, 30 & 40.00 metre depth
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
4 Burhwal-Sitapur doubling Project Deputy Chief Engineer Office (Constriction) of The NE Railway Hazratganj, Lucknow
26-05-17
W/247/BG/LJN/BUW-STP/Soil Investigation/
W/247/BG/LJN/TESTING OF SOIL /MINOR
BRIDGES
8.68 680.00 metre
5 Jaunpur to Tanda Northen Railway in Connection With Doubling of Railway Track
Anurag Progect Management Consltants Pvt. Ltd.
14-06-17 APMC/NR/JN/0
1 12.00
800.00 metre
6 Rail Based mass Transit System at Shayama Devi Balika School for Metro Depot on Corridor 1 (Shyam Nagar to Sooha Bazar) Gorakhpur
Rites Limited RITES Bhawan,1 Sector-29 Gurgaon-122001 (Haryana)
11-07-17 RITES/UT/CO/
GKP/MRTS/647/2017
6.99 945.00 metre
7 Techno Economic Services and DPR for Mass Rapid Transit System in Allahabad
Rites Limited RITES Bhawan,1 Sector-29 Gurgaon-122001 (Haryana)
24-07-17 RITES/UT/ALLAHABAD/GT/01/
2017 11.18
1335.00 metre
8 Upgradation of the Stretch Giddalur-Cumbum-Thakapalli-Vindukonda. Narasaraopet & Terminatin at it & Junction with NH-16 at Guntur of NH-544D in the State of Andhra Pradesh
Stup consultants Pvt Ltd 1112, Vishal Tower Janakpuri Dist. Crentre New Delhi - 110058
09-09-17 13/E/12519/PV: GU/ Accts-210
39.18 -
9 Bridges in Connection with Gauge Conversion of Pilibhit Shahjahanpur Section
Dy. Chief Engineer, Construction North-Eastern Railway, Izzatnagar
15-11-17 W/Con/247/LZN/Quotation/I/PB
E-SZP 3.61
294.00 metre
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
10 Geotechnical Investigations For NH Connectivity to Backward areas/Religiousrrourisl places (BRT): From "Chitrakool (NH-35) to Rajapur to Manjhanpur to Palhana (NH•19) [Section: Design Chainage I.e. 0+060 Km to 73+650 Km]" & Part of "Satna to Kotar to Semaria to Sirmaur 10 Jawa on NH-35 near Shankargarh [Section: Design Chalnage I.e. 100+000 Km to 125+440 Km]
Lea Associates South Asia P. Ltd., C-45, Sitapur Road , Jankipuram Extension, Lucknow.226021
13-01-18 LASA/GEO/73539/2017/2020
38.37 1350.00 metre
11 25 KV, 50 HZ, single phase, AC electrification including OHE and TSS works as composite Electrical work in Surandra Nagar(Excl.) Pipvav (incl.) Group-223 in Bhavnagar Divi. of Western Railway under RE project Ahmedabad
M/s Kalpataru Power Transmission Limited
16-02-18 2400036672 3.13 56 Nos. boreholes
12 Four/Six Laning of Aurangabad (km 290.200) to Karodi (km 320.104) road section of NH-211(new NH No. 52); (existing length 29.904 km; design length 30.215 km) in the state of Maharashtra under NHDP Phase IV – B on EPC mode
LARSEN AND TOUBRO LTD- TRANSPORTATION IC,
26-03-18 EH561WOR8000002
38.71 958.00 metre
Geotech & Material Consultant PROFILE
CLIENT LIST
Engineering Institutes
Institute of Engineering and Technology, Lucknow
Indian Institute of Technology, Kanpur
Indian Institute of Technology, Roorkee
Central Building Research Institute, Roorkee
Department Of Civil Engineering, Indian Institute Of Science, Bangalore-560012
Government Departments
Uttar Pradesh State Government Departments
Uttar Pradesh Rajkiya Nirman Nigam Limited
Uttar Pradesh Public Works Department
Uttar Pradesh State Bridge Corporation Limited
Uttar Pradesh State Tourism Development Corporation Limited
Uttar Pradesh Samaj Kalyan Nirman Nigam Limited
Uttar Pradesh Rajkiya Kisan Union Mandi Parishad
Uttar Pradesh Projects Corporation Limited
Uttar Pradesh Jal Nigam
Uttar Pradesh Irrigation Department
Construction & Design Services, U.P. Jal Nigam
Uttar Pradesh Power Corporation Limited.
Town Planning Department, Uttar Pradesh
Uttar Pradesh Processing & Construction Co-Operative Federation Ltd. (PACCFED)
Rural Engineering Services
Lucknow Development Authority
Varanasi Development Authority
Bareilly Development Authority, Bareilly
Chandigarh Water Supply Undertaking, Chandigarh.
Nagar Palika,Lakhimpur
Nagar Nigam, Lucknow
Nagar Palika, Orai
Hapur Development Authority
District Urban Development Authority, Jaunpur
Khadi Gramodyog Board, Lucknow
Geotech & Material Consultant PROFILE
Central Government Departments
Central Public Works Department
Telecom
North Central Railway, Kanpur & Allahabad
Indian Railway Welfare Organization, New Delhi
Industrial Toxicology Research Centre, Lucknow
Northern Railway, Lucknow
Military Engineer Services, Taalbehat & Allahabad
Commandar Works Engineer, Military Engineer Services, Lucknow.
Central Government Employee Welfare Housing Oraganisation, New Delhi
National Bureau of Fish Genetic Resources, Telibagh, Lucknow
RITES Limited
National Building Construction Corporation
Public Sector Enterprises
Hindustan Petroleum Corporation Limited
Bharat Petroleum Corporation Limited
Indian Oil Corporation Ltd.
Bharat Heavy Electricals Limited (through AXIS Consultants, Mumbai)
Architects / Consultants
Civil Consultants, Lucknow
ANB Consultants, Lucknow
Chandra & Associates, Gomti Nagar, Lucknow
Rajeev & Associates, Lucknow
Dhaon Associates, Lucknow
Architectural Associates, Lucknow
Skyline Architectural Associates, Lucknow
Spanco Architects, Lucknow
Anand Sharan Architects and Engineers Pvt. Ltd., Lucknow
Mathur & Daniel Architects & Interior Designers, Lucknow
Vastu Vinyas Architects, Engineers, Lucknow
Construction & Design Group, Lucknow
Arch en Design Centre, Lucknow
Ardeco, Lucknow
Geotech & Material Consultant PROFILE
Vaastu Srajan, Neha Complex, Faizabad Road, Lucknow
Architect Goverdhan Mittal
Architect Munish Chandra
Neo Design Group, New Delhi
Gian P. Mathur & Associates, New Delhi
Design Shelter, Lucknow
ORIGIN, Lucknow
Architect Sunil Srivastava
Architect Dinesh Lal
Architect R. N. Chaterjee
Architect R. N. Tiwari
Span Structures, Lucknow
CPCS Transcom, New Delhi
Archtech Consultants, Calcutta
MC Consulting Engineers Pvt. Ltd., New Delhi
Construction Companies
Sahara India Housing, Lucknow
Ansal Properties & Infrastructure Limited
Parsvnath Developers Limited, Lucknow
Nitishree Infrastructural Limited
Rohtas Projects Ltd., Lucknow
Ansal Housing and Construction Pvt. Ltd., Lucknow
OMAXE Constructions, Lucknow
Fairdeal Housing Ltd. Lucknow
Eldeco Housing & Industries Ltd., Lucknow
Drosia Constructions, Lucknow
Sahara India Commercial Corporation Ltd., Lucknow
Alina Construction Company, Lucknow
Unitech Ltd., Lucknow
R. K. Builders, Lucknow
Pee Kay Builders, Lucknow
Sultan Construction Ltd., Lucknow
Tariq Pvt. Construction Company, Lucknow
Hariom Builders, Indira Nagar, Lucknow
Geotech & Material Consultant PROFILE
M.I. Builders, Lucknow
Vijay Constructions, Lucknow
Gangotri Enterprises, Lucknow
SMART Constructions, Lucknow
Raj Ganga Developers, Lucknow
Abhyuday Housing & Constructions (P) Limited, Lucknow
Rakesh Kumar & Construction Company, New Delhi
Infrastructure Companies
Highways
STUP consultants Pvt Ltd, 1112, Vishal Tower, Janakpuri Dist. Centre, New Delhi
LEA Associates South Asia Pvt. Ltd.
Aarvee Associates, Architects Engineers & Consultants Pvt. Ltd., Hyderabad
Wadia Techno Engineering Services Ltd.
Sadbhav Engineering Limited, Ahmedabad
K & J PROJECTS PRIVATE LIMITED
KITCO Limited, Kerala, India
CHHATTISGARH RAILWAY CORPORATION LTD. (A Joint venture of Govt. of
Chhattisgarh & Ministry of Railways), 1st Floor, CSIDC Commercial Complex, Mahadev
Ghat Road, Raipura Chowk, Raipur-492013
APCO INFRATECH PRIVATE LIMITED
MSPARK FUTURISTICS & ASSOCIATES
G R INFRAPROJECTS LIMITED
B&S ENGINEERING CONSULTANTS PVT. LTD.
Dilip Buildcom Limited
Accrete Consulting Engineering Pvt. Ltd., Gurgaon (Haryana)
SAI Consulting Engineers Pvt. Ltd., Ahmedabad
S.P. Singla Construction Private Limited Lucknow
RCC ECO Build Systems Ltd., 14 Gf, Vipul Agora, Mg Road, Gurgaon
AFCONS INFRASTRUCTURE Ltd.
J. Kumar Infraprojects Ltd., Andheri (W) Mumbai-400053
LARSEN AND TOUBRO LTD- TRANSPORTATION IC,
Geotech & Material Consultant PROFILE
SOWIL, Noida
MECON Ltd., Bangalore
CES-DAS, Lucknow
DHV Consultants BV, Gomtinagar, Lucknow
Consulting Engineering Services India Private Limited
Meinhardt Singapore Pte. Ltd. (India Branch), New Delhi
Voyants Solutions Pvt. Ltd., Gurgaon
GPT Infraprojects Limited, GPT Centre, Jc-25, Sector-Iii, Salt Lake, Kolkata
Hindustan Construction Company Limited
Gammon India Limited
PRAKASH-ATLANTA JV, Mumbai
AMEYA Developers, Pune.
CE CONS Limited, New Delhi
LG Engineering and Construction Corp. Ltd., Kudra, Bihar
ARVIND TECHNO Engineers Pvt. Limited, New Delhi
LARSEN & TOUBRO Limited, ECC Division
PUNJ LLOYD Limited
Nagarjuna Construction Company Limited
IVRCL Infrastructures & Projects Limited
D2S Infrastructures Pvt. Ltd., I-1603, Chittaranjan Park, New Delhi-110019
DSC Limited, Lucknow
NKG Infrastructure Limited
DS Construction Limited
Ramky Infrastructure Limited
Vilaiti Ram Mittal Limited, Mumbai
Progressive Constructions Limited, Varanasi
TRG Infrastructure Pvt. Ltd., Unnao
Broadway Links Pvt. Ltd.
Power
Power Grid Corporation of India
KEC International Limited, Mumbai
U.P. Power Corporation, Lucknow
Reliance Energy Limited, Noida
Vijai Electricals Limited , Kanpur
Geotech & Material Consultant PROFILE
Voltech Projects Private Limited, Chennai
G.E.T. Engineering Construction Pvt. Limited, Chennai
Southern Petrochemical Industries Corporation Limited
Sterling and Wilson Electricals Private Limited, Noida
Avadh Transformer Pvt. Ltd., Lucknow
Mobile Service Providers
HUTCH (through Telecom Infrastructural Consultancy Services Ltd.)
Bharti Airtel Limited
Tata Tele Services Ltd.
Bharat Sanchar Nigam Limited (through CH2M Hill Construction India Pvt. Ltd.)
Builders / Contractors
Gupta Brothers and Naini Contractor Pvt. Ltd., Lucknow
Sigma Construction, Engineers & Contractors, Kolkata - 17
Jyoti Builtech, Lucknow
J.P. Singh, Contractor, Azamgarh
J.S. Anand, Contractor, Allahabad
Gupta Constructions, Varanasi
Earth Resources, Madhya Pradesh
Basera Builders, Kanpur
UPAL Developers Pvt. Limited, Lucknow
ANSAL API PVT. LTD., Lucknow
Parsvanath developers limited, lucknow
Nanda Engineering Pvt. Ltd., Lucknow
Samiah International Builders Pvt. Ltd
Ansal Properties & Infrastructure Ltd., Lucknow
Other Clients / Educational Institutes / Industries, etc.
Indian Institute of Technology, Institute Works Division-I, Kanpur
THERMAX Limited, Pune.
Bajaj Electricals Limited, Lucknow
Reserve Bank Of India, Gomti Nagar, Lucknow
Pashupati Laminator Private Limited
UPTEC Computer Consultancy Limited, Lucknow
United Spirits Limited
Sair Exports India Pvt. Ltd.
Geotech & Material Consultant PROFILE
TESI Pvt. Ltd.
Gujarat Isotope Pvt. Ltd.
J. K. Cotton Mills Limited, Kanpur
Hydroair Tectonics (Pcd) Ltd., Navi Mumbai
W M Bluechip Investment Services Pvt. Ltd.
Reliance Engineering Associates Limited, Lucknow
Milkmade Bread Factory, Lucknow
Cane Union Development Society
LAND & COAST Surveyors and Contractors, Navi Mumbai
M/s Vishwa Surveying Technologies Private Limited, Delhi
Elegant Consulting Engineers, Ghaziabad
U.P. Asbestos Ltd., Lucknow
Uttar Pradesh Badminton Association, Lucknow
Chandan Hospital Ltd., Lucknow
Good Bakery, Lucknow
Telecom Infrastructural Consultancy Services Ltd., Lucknow
CH2M Hill Construction India Pvt. Ltd., New Delhi.
Sarawasti Kisaan Sahkari Chini Mills Ltd., Nanpara, Bahraich
Bihar Caustic & Chemicals Ltd. C/o Aditya Birla Group, Palamau
Goel Sugar Industries, Lakhimpur Kheeri
Bajaj Hindusthan Limited
Reliance Petro Marketing Ltd.
Reliance Industries Limited
Reliance Retail Limited
Seth M. R. Jaipuria School, Gomti Nagar, Lucknow
City Montessori School, Lucknow
Babu Banarasi Das Institute of Technology and Management, Lucknow.
Maharishi Vidya Mandir
Pranveer Singh Institute of Technology at Bhaunti, Kanpur
St. Paul School, Lucknow
Surya Bux Pal Charitable Trust, Gomtinagar, Lucknow
Delhi Public School
Lucknow Public College
Asian Pacific Management Institute, Sultanpur Road, Lucknow
Geotech & Material Consultant PROFILE
STRUCTURE OF COMPANY
Sl.
No.
Name Designation Academic &
Professional
Qualifications*
Experience
related to
Present
work (In
years) 1 Er. Niranjan Singh Chairman
B.E.(Civil), University of Roorkee, 1968, Diploma in Public Administration, Diploma in Journalism, LL.B., Diploma in Foreign Affairs Life Member: - Indian Geotechnical Society Institution of Engineers (India) Indian Roads Congress Indian Science Congress Association
48 Years
2 Mr. Arun Kumar Singh Managing Director B.Com., LL.B. 29 Years
3 Mr. Radha Govind Pramanik Director (Test House) B.Sc. Life Member Indian Geotechnical Society
48 Years
4 Mr. Anurag Kapoor Quality Manager B.Tech. (Civil), M.Tech. (Geotech), PGDM(Finance), Life Member: - Indian Geotechnical Society Indian Roads Congress
25 Years
5 Mr. A.K. Srivastava Dy. Technical Manager (Field Work)
Diploma in Civil Engineering Life Member Indian Geotechnical Society
21 Years
6 Mr. Dharmendra Saxena Dy. Director Finance B.Com., ICWA I, MBA (Finance) 3 Years
7 Mr. Sudhir Pandey Dy. Director (Business Development)
B.A., P.G.D.C.A. 21 Years
8 Er. Deepika Srivastava Dy. Quality Manager B.Tech. in Civil 2 Year
9 Mr. Sonu Kumar Accountant M.Com., MBA 13 Years
10 Mr. Vishal Kumar Rajbhar Assistant Accountant B.Com. 4 Years
11 Er.Danish Geotechnical Engineer M.Tech. in Geotech 3 Months
12 Mr. Abdul Quadir Assistant Geologist M.Sc. (Applied Geology) 2 Months
13 Er. Sameer Singh Senior Assistant Engineer B.Tech. in Civil 5 Years
14 Er. Harshit Srivastava Senior Assistant Engineer B.Tech. in Civil 1 Year
15 Er. ShabeenaBano Assistant Engineer B.Tech. in Civil 6 Months
16 Er. Santosh Kumar Vishwakarma Assistant Engineer B.Tech. in Civil 6 Months
17 Er. Mona Kushwaha Assistant Engineer B.Tech. in Civil 6 Months
18 Er. Manoo Singh Assistant Engineer B.Tech. in Civil 6 Months
19 Er. Rahul Kumar Assistant Engineer B.Tech. in Civil 6 Months
20 Er. Surya Prakash Panday Assistant Engineer B.Tech. in Civil 6 Months
21 Er. Rahul Yadav Assistant Engineer B.Tech. in Civil 53 Months
22 Er. Anuj Verma Assistant Engineer B.Tech. in Civil 5 Months
23 Er. Praveen Kumar Assistant Engineer B.Tech. (Civil) 5Months 24 Mr. Akhilesh Pratap Singh Dy. Director (Material & Chemical) B.Sc. 15 Years
25 Mr. Sanjay Roy Lab Co-ordinator BA 19 Years
26 Mr. Nitin Malik Computer Operator BA 2 Years
27 Mr. Raj Kumar Singh Lab Technician Diploma in Civil Engineering 10 Years
28 Mr. Brijesh Kumar Lab Technician Diploma in Civil Engineering 2 Years
Geotech & Material Consultant PROFILE
29 Anshika Verma Lab Technician B.Sc. (PCM), M.Sc. (Forensic) 1 Years
30 Mr. Manish Kumar Mishra Lab Technician B.Sc. 1 Year
31 Miss Nidhi Dubey Lab Technician Diploma in Civil Engineering 4 Months 32 Mr. Vijay Kumar Lab Technician Diploma in Civil Engineering 2 Months 33 Ankur Maurya Lab Technician B.Sc. 6 Months 34 Mr. Rajat Sharma Lab Technician M.Sc. (Industrial Chemistry) 1 Months
35 Md. Riyaz Lab Technician B.Sc. (ZBC), M.Sc. (Plant Science) 1 Months
36 Ajay Supporting Lab Staff - 8 Years
37 Ram Gopal Supporting Lab Staff Intermediate 3 Years
38 Rajkumar Verma Supporting Lab Staff B.A. 1 Years
39 Deepak Gupta Supporting Lab Staff - -
40 Pradeep Yadav Supporting Lab Staff - -
41 Dinesh Jaiswal Supporting Lab Staff - -
42 Mukul Verma Supporting Lab Staff Intermediate 1 Years
43 Abhishek Verma Supporting Lab Staff High School 1 Years
44 Kamlesh Kumar Supporting Lab Staff - -
45 Amit Kumar Maurya Field Staff Diploma in Civil Engineering 13 Years
46 Anuj Gupta Field Staff Diploma in Civil Engineering 5 Years
47 Mr. Raj Kumar Field Staff Intermediate 26 Years
48 Mr. Shiv Sharan Field Staff High School 21 Years
49 Mr. Ajeet Kumar Field Staff B.A. 17 Years
50 Mr. Manish Singh Field Staff Intermediate 14 Years
51 Mr. Rajesh Singh Field Staff B.A. 9 Years
52 Mr. Pradeep Singh Field Staff M.Com. 9 Years
53 Mr. Ashok Kumar Field Staff B.A. 8 Years
54 Mr. Anil Kumar Pandey Field Staff B.A. 9 Years
55 Mr. Ankit Vishwakarma Field Staff Intermediate 3 Year
56 Mr. Pradeep Kumar Field Staff Intermediate 5 Years
57 Mr. Dharmendra Pandey Field Staff B.A. 1 Year
58 Mr. Vikas Singh Field Staff B.A. 1 Years
59 Mr. Virendra Verma Field Staff Intermediate 21 Years
60 Mr. Hardwari Lal Field Staff Junior High School 4 Years
61 Mr. Ajay Kumar Field Staff High School 4 Years
62 Mr. Shiv Ram Field Staff High School 29 Years
63 Mr. ParvejAlam Field Staff - 3 Years
64 Mr. Salik Ram Viswakarma Field Staff - -
65 Mr. HarishchandViswakarma Field Staff - -
66 Mr. Nabi Alam Field Staff - -
67 Mr. Lochan Shah Field Staff - -
68 Mr. Shubham Field Staff - -
69 Mr. Pushpendra Field Staff - -
Address/Contact Nos./Mobile/website, e-mail, etc. ARUN SOIL LAB PVT. LTD.
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow - 226016 Phone: 0522-2341943; Fax 0522-4001043 Niranjan Singh - +9415105144 Arun Kumar Singh - +9415025566 Anurag Kapoor - +9415501637 A.K.Srivastava - +9415501638 Website: www.arunsoillab.com E-mail: [email protected]
Company Details a. 15.08.1990 to 16.07.2004 as Partnershipfirm b. 16.07.2004 till date as Private limited company registered by Registrar of Companies
Kanpur with Registration Number U74220UP2004PTC028864
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
FINANCIAL YEAR 2019‐20
1
Geotechnical Investigation Between Jaunpur To
Akbarpur, Northern Railway In Connection With Doubling Of
Railway Track M/s K & J PROJECTS PRIVATE LIMITED
11/02/2019
K&JIHO/wO/2018-19/063
12.25 102 bore
holes
2
Sub Soil Investigation For Proposed Construction Of Bridge No. 76, Between Jaunpur To Jafarabad,
Northern Railway In Connection With Doubling Of
Railway Track 3 Sub Soil Investigation Between
Phaphamau To Jhangai , Northern Railway In Connection With Doubling Of Railway Track
M/s K & J PROJECTS PRIVATE LIMITED
16/03/2019
K&J/HO/w0I2018‐19/066
11.55 815.00 metre
4
Geotechnical Investigation Of Major/Minor Bridges/Robs/Rubs For Katghora – Dongargarh Project (Reach-3 From Km 150.000 To Km 258.000 Including Spur Lines) Under Jurisdiction Of Chhattisgarh Railway Corporation Limited In The State Of Chhattisgarh.
CHHATTISGARH RAILWAY CORPORATION LTD. (A Joint venture of Govt. of Chhattisgarh & Ministry of Railways), Raipur-492013
02/02/2019
CRCL/Tender/2019/SLT/GT-
3/Reach-3 65.00
40 Nos. Structures Investigatio
n
5 Eight Lane Expressway Starting Before Kmp Expressway And Ends At Ch 7+000 Near Khanpur Ghati (Km 18+500 To Km 47+000) Section Of Delhi Vadodra Green Field Alignment (Nh 148n) On Epc Mode Under Bharatmala Pariyojna In The State Of Haryana (Package Ii)
APCO INFRATECH PRIVATE LIMITED
22/03/2019
WO/APCO/TE/2018-19/037 71.81
9138.00 metre
6 Sub Soil Investigation For Preparation Of Feasibility Report Cum Details Project Report (Dpr) Of 4 Laning Of Agra Bypass (Northern) Connecting Left Over Portion Of Various National
M/s MSPARK FUTURISTICS & ASSOCIATES
08/04/2019
MSPARK/WO/AGRA
BYPASS/2018-191295
4.48 310.00 metre
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
Highways / Expressways Surrounding The Agra City In The The State Of Uttar Pradesh (Part-A & B)
7 Major Bridge At Ch. 433+347 Rhs For Four Laning With Paved Shoulder Of Porbandar - Dwarka Section Of Nh-8e From Km. 356.766(Design Chainage Km. 379.100) To Km. 473.000(Design Chainage Km. 496.848) In The State Of Gujarat Through Public Private Partnership (Ppp) On Hybrid (Annuity) Mode.
M/s G R INFRAPROJECTS LIMITED
19/04/2019
3700014922 48.97 1990.00 metre
8 Sub Soil Investigation For Preparation Of Detailed Project Report For Development Of Economic Corridors, Inter Corridors, Feeder Routes And Coastal Roads To Improve Efficiency Of Freight Movement In India (Lot-1/Madhya Pradesh/Package-1) Khandwa - Deshgaon Strech
M/s LEA Associates South Asia Pvt. Ltd.
13/03/2019
LASNGE0173579/2019/491
6.33
41.00 METRE SOIL & 91.00
METRE Hard Rock
CR>25
9 Purvanchal Expressway Package-Iii From Jaraikala (Dist. Amethi) To Sidhi Ganeshpur (Dist. Sultanpur)
M/s B&S ENGINEERING CONSULTANTS PVT. LTD.
25-04-2019
bsec/I807/akl358 9.99
1270.00 metre
10 Sub-Soil Investigation For Proposed Construction Of Eight Lane Divided Carriageway Starting At Ch.47+000 Near Khanpur Ghati To Haryana-Rajsthan Border (Ch.47+000 To 78+800) Section Of Delhi-Vadodara Greenfield Alignment (Nh-148) On Epc Mode Under Bharatmala Pariyojna In The State Of Haryana
M/S ACCRETE CONSULTING ENGINEERS(PVT) LTD.
28-05-2019
ACE/ASL/WO/1920/03
8.86 465.00 metre
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
11 Four Laning Of Imphal - Moreh Section Of Nh 39 From Km.330+000 To 350+000 In The State Of Manipur ( Package 1) On Epc Mode
G R INFRAPROJECTS LIMITED
07-09-2019 NIL - -
FINANCIAL YEAR 2018‐19 1 Carryout Sub-soil Investigation
(Geo Tech Investigation) at Stretch from Palia Shajahanpur via Hardoi-Lucknow for “Consultancy Services for Feasibility Study & Preparation of Detailed Project Report for Improvement and up-gradation of in principle declared National Highways in the state of Uttar Pradesh-package-Vi. (Stretch from Palia Shajahanpur via Hardoi-Lucknow) Length 270 KM.”
Wadia Techno Engineering Services Ltd.
23-03-18 MOU 29.80 2260.00 metre
2 Consultancy Services for Preparation of Detailed Project
Report for Development of Economic Corridors, Inter
Corridors, Feeder Routes Under Bharatmala Pariyojna (Lot-
2/Punjab?Package-2)
LEA Associates South Asia Pvt. Ltd.
13-04-18 LASA/
GEO/73583/2018/632j
27.72 1610.00 metre
3 Rehabilitation and Upgradation of existing 2 lane to 4 lane standards from End of Kamakhyanagar Bypass-Dubri Section (Ch. 336+90 to Ch. 388+000) of NH 200 (new NH 53) in the state of Odisha on EPC Mode
G.R. Infra project Limited
09-06-18 3700010852 11.33 988.00 metre
4 GEOTECHNICAL INVESTIGATIONS For Betul Khandwa-MP
LEA Associates South Asia Pvt. Ltd.
21-05-18 LASAIGEO/735
79/2018/858 39.35 847.00 metre
5 GEOTECHNICAL INVESTIGATIONS For Vidisha –Malthone Madhya Pradesh-Section of NH-346
LEA Associates South Asia Pvt. Ltd.
08-06-18 LASAlGE01735
80/2018/970 19.79
549.00 metre
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
6 NH-24 Extension 4-lane bypass starting from Behta Road and terminating at Sitapur Road Chainage 479.500 (bypass chainage from K111. 32.000/3 1.490 to Km. 64.900/64.380 average length 32.895 Km) in the State of Uttar Pradesh on EPC Mode (Package-2)
M/s Sadbhav Engineering Limited
16-06-18 SEL/LRR.I
ASLI'LIFY 18-19/00783
22.23 1755.00 metre
7 Sub Soil Investigation for Nagpur Mumbai Expressway Project (Ch. 494.218 km to Ch. 502.752 km)
M/s Larsen & Toubro Limited, Construction
17-10-18 EG892WOR800
0008 24.09 482.00 metre
8
Gorakhpur Link Expressway Under UPEIDA
KITCO Limited, Femith's, P.B. No: 4407, Puthiya Road, NH Bypass Vennala, Kochl 682 028, Kerala, India
24-09-18 DP 955 BAH:
2018 28.25 2034.00 metre
FINANCIAL YEAR 2017‐181 Six Laning of Gurgaon - Kotputli -
Jaipur section of section of NH-8 from Km 42.700 to Km 273.000 (length 225.600 Km) in the state of Haryana and Rajasthan to be executed as BOT (Toll) on DBFO pattern under NHDP Phase-V
M/s Aarvee Associates, Architects Engineers & Consultants Pvt. Ltd., Hyderabad
20-03-18 AA/HW/ 2162-
WO/17-18/1826 16.75 720.00 metre
2 Lakhimpur Sisiyer road in the Stare U.P
Accret Consulting Engineering Privete Limited
22-04-17 ACE/ARNSOL /WO/170224/17
2
3 Different Bridge for Eastern Dedicated Freigh Corridoor Project in the state of Uttar Pradesh
GMR Infrastructure Limited
01-03-17 Different Orders 15.00
many bore holes of 10, 20, 30 & 40.00 metre depth
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
4 Burhwal-Sitapur doubling Project Deputy Chief Engineer Office (Constriction) of The NE Railway Hazratganj, Lucknow
26-05-17
W/247/BG/LJN/BUW-STP/Soil Investigation/
W/247/BG/LJN/TESTING OF SOIL /MINOR
BRIDGES
8.68 680.00 metre
5 Jaunpur to Tanda Northen Railway in Connection With Doubling of Railway Track
Anurag Progect Management Consltants Pvt. Ltd.
14-06-17 APMC/NR/JN/0
1 12.00
800.00 metre
6 Rail Based mass Transit System at Shayama Devi Balika School for Metro Depot on Corridor 1 (Shyam Nagar to Sooha Bazar) Gorakhpur
Rites Limited RITES Bhawan,1 Sector-29 Gurgaon-122001 (Haryana)
11-07-17 RITES/UT/CO/
GKP/MRTS/647/2017
6.99 945.00 metre
7 Techno Economic Services and DPR for Mass Rapid Transit System in Allahabad
Rites Limited RITES Bhawan,1 Sector-29 Gurgaon-122001 (Haryana)
24-07-17 RITES/UT/ALLAHABAD/GT/01/
2017 11.18
1335.00 metre
8 Upgradation of the Stretch Giddalur-Cumbum-Thakapalli-Vindukonda. Narasaraopet & Terminatin at it & Junction with NH-16 at Guntur of NH-544D in the State of Andhra Pradesh
Stup consultants Pvt Ltd 1112, Vishal Tower Janakpuri Dist. Crentre New Delhi - 110058
09-09-17 13/E/12519/PV: GU/ Accts-210
39.18 -
9 Bridges in Connection with Gauge Conversion of Pilibhit Shahjahanpur Section
Dy. Chief Engineer, Construction North-Eastern Railway, Izzatnagar
15-11-17 W/Con/247/LZN/Quotation/I/PB
E-SZP 3.61
294.00 metre
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
10 Geotechnical Investigations For NH Connectivity to Backward areas/Religiousrrourisl places (BRT): From "Chitrakool (NH-35) to Rajapur to Manjhanpur to Palhana (NH•19) [Section: Design Chainage I.e. 0+060 Km to 73+650 Km]" & Part of "Satna to Kotar to Semaria to Sirmaur 10 Jawa on NH-35 near Shankargarh [Section: Design Chalnage I.e. 100+000 Km to 125+440 Km]
Lea Associates South Asia P. Ltd., C-45, Sitapur Road , Jankipuram Extension, Lucknow.226021
13-01-18 LASA/GEO/73539/2017/2020
38.37 1350.00 metre
11 25 KV, 50 HZ, single phase, AC electrification including OHE and TSS works as composite Electrical work in Surandra Nagar(Excl.) Pipvav (incl.) Group-223 in Bhavnagar Divi. of Western Railway under RE project Ahmedabad
M/s Kalpataru Power Transmission Limited
16-02-18 2400036672 3.13 56 Nos. boreholes
12 Four/Six Laning of Aurangabad (km 290.200) to Karodi (km 320.104) road section of NH-211(new NH No. 52); (existing length 29.904 km; design length 30.215 km) in the state of Maharashtra under NHDP Phase IV – B on EPC mode
LARSEN AND TOUBRO LTD- TRANSPORTATION IC,
26-03-18 EH561WOR8000002
38.71 958.00 metre
FINANCIAL YEAR 2016‐17
1 RUB/Limitted height Subway at level crossing no. 134 b/n Adhinpur - Chaubisi Section in connection with balances 148.00 km. doubling of zajrabad to utratia of Lucknow division
Deputy Chief Emgineer, Northern Railway, Lucknow
13-04-16
30 bore holes of 15.00 metre depth each
2 Civil and Track works for Double Line Railway Involving Formation in Embankment/ Cutting. Ballast on Formation Track Works Bridges, Structure Building, Yards, Integration With IR Existing Railway System and Testing & Commissioning on
GMR Infrastructure Limited
15-02-16 GIL/DFCC/201/
C&C/2015-16/210
8.64
five bore holes of 30.00 metre depth each
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
Design Build Lump Sum Basis for Mugan Sarai to New Karehane Station of Freight Corridor Project- Geotechnical Exploration and quarry Core drilling at Hanumana Crusher
3 Proposed Construction of Structures at Different Chainages under Strenghing & Widening Project of Tanda-Varanasi road (NH-233)
Dilip Buildcom Limited 22-04-16
DBL/ Ghaghra Bridge to Varanasi section /HO/2016jWO/029
8.33 810.00 metres
4 OHE Foundation at Defrent changes of Zafarabad-Akbarpur-tanda Line with Trection Sub-Station at Sahaganj.
Zapdor Engineering Pvt.Ltd.
02-05-16 ZEPUASLPUGr. 19912016-17 1.83
21 bore holes of 8.00 metre depth each
5 Electrical Locomotive Factory & Township at Madhepur in Bihar Larsen &
Turbo 25-04-16 7.09
15X6=90 40X3=120 25X3=75
6 Elcvated Viadect, 8 Elcvated stations Vill- Transport Nagar, Krishna Nagar Singar Nagar Alambagh, Alambagh bus station,Muvaiya, Durgapuri and Charbagh Railway Station from charnage 68.7m to 9171.440m and connecting Elcvated Viaduct and Ramp Depot at P & C ground Transport Nagar on North South Corridor of LMRC. Lucknow
Lucknow Metro Project L&T Construction / Heavy Civil Infructructure IC
18-05-16 EF618WOR6000007
4.65
9bore holes of 40.00 metre depth each and 2 boreholes of 32.00 metre depth each
7 NH-56 4-Lane bypass connecting NH-56 at Km 174+400 and terminating near Behta Village Road (Bypass ch. From km 0.000 to km 32.000/31.489 average length 31.745 km) in The Uttar Pradesh Lucknow under NHDP Phase-VIII
JAIPRAKASH ASSOCIATES LIMITED, a company duly incorporated and validly existing under the Companies Act, 1956 and having its registered
04-07-16 JAL/BARA/2016
-17/182 25.77
2800.00 metres
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
office at Sector -128, Noida, Gautam Budh Nagar, U.P.
8 Multimadol TWT Terminal at Varanasi M/s AFCONS
INFRASTRUCTURE Ltd.
01-06-16 4451/AR/4498 8.65 140.00 metres
9 Ram Manohar Lohia Rajya Prashashan Evam Prabandhan Academy at D-14, C.G City, Sultanpur Road, Lucknow
J. Kumar Infraprojects
Ltd. 16-A, Andheri Ind. Estate, Veera Desai
Road, Andheri (W)
Mumbai-400053
04-07-16 1.44
2 bore holes of 60.00 metre depth each
10 Doubling of Rail track at Roja to Sitapur Railwayline. Northern
Railway, Moradabad
21-10-16 3.75
32 bore holes of 15.00 metre depth each
11 Bridges Under Allied works on Alam Nagar- Uttratia Bypass line in Connection with Alamnagar-Uttratia doubling of Lucknow Division of Northern Railway.
Emerging Infrastructure, Pvt. Ltd.
21-10-16 3.00
32 bore holes of 15.00 metre depth each
12 400 kv/D/c Transmission line on Monopolos from 400 kv Sub-station at Noida, Sector-148 to 400kv Sub-Station at Noida Sector-123
M/S Bajaj Electricals Limited
22-11-16
E & P BU / SB-SC / 0-301/UPPTCL/Soil investigation - 02
17.27
38 bore holes of 40.00 metre depth each
13 Different Bridge for Eastern Dedicated Freigh Corridoor Project in the state of Uttar Pradesh
GMR Infrastructure Limited
01-03-17 Different Orders 28.00
many bore holes of 10, 20, 30 & 40.00 metre depth
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
14 K.D. Singh Babu Stadium - Munshi Pulliya Section of North-South Coridoor of Lucknow Metro Project
Lucknow Metro Project L&T Construction / Heavy Civil Infructructure IC
01-03-17 EF618WOR600
0007 20.00
many bore holes of 10, 20, 30 & 40.00 metre depth
FINANCIAL YEAR 2015‐161 Jhansi-Bhimsen Doubling Project
Of Rail Vikas Nigam Limited Kec International Limited, 1st Floor, Building No 9A DLF City, Phase Iii, Gurgaon
KEC/RVNL/Erich-Usargaon/15-
16/246 1.75
20 NOS. SITES 1 BOREHOLE FOR EACH SITES
2 Staff Colony Of LMRC At The Campus Of Dr. Sampoornanand Prison Training Institute Near Ikchhupuri Crossing, Vip Road, Lucknow
Lucknow Metro Rail Corporation Limited, Administrative Building, Vipin Khand, Gomti Nagar, Lucknow
LMRC/D(W&I)/Staff
Quarters/2015 2.06
three bores holes of 10.00 metre depth and seven bores holes of 30.00 metre depth
3 PAC Campuss For 32, Pac Battalion At Transport Nagar Road, Lucknow
Lucknow Metro Rail Corporation Limited, Administrative Building, Vipin Khand, Gomti Nagar, Lucknow
LMRC-E-9-2015(Volume-3)
3.03
five bore holes of 30.00 metre depth each and five bore holes of 20.00 metre depth each
4 Rail Over Bridge, Vehicular Under Pass, Minor Bridge, Major Bridge For Munger-Mirzachauki 4 Lane Green Field Project In The State Of Bihar
M/S SAI Consulting Engineers Pvt. Ltd., Block-A,, Sai House, Satyam
SAI/TAD210026/1713/2015
12.68
40.00 metre, 20.00 metre depth boreholes, 2 nos.
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
Corporate Square, B/H Rajpath Club, Bodakdev, Ahmedabad
boreholes for each structure
5 Balanced Cantilever Span Approx. 255.00 M (Central Span Of 105.00 M And End Span Of Each Of 75.00 M Approx.) At Mawaiya Railway Crossing On North-South Corridor For Lucknow Metro At Lucknow
S.P. Singla Construction Private Limited Lucknow
SPS/LMRC/CC-02/LKO/WO/20
15/009 1.92
four bore holes of 45.00 metre depth each
6 Elevated Viaduct, 8 Elevated Stations Viz. Transport Nagar, Krishna Nagar, Singar Nagar, Alambagh, Alambagh Bus Station, Mavaiya, Durgapuri And Charbagh Railway Station From Chainage 687.140 M To 9171.440 M And Connecting Elevated Viaduct & Ramp To Depot At Pac Ground Transport Nagar On North - South Corridor Of Lucknow Metro At Lucknow, Uttar Pradesh
L & T Construction, Hc – Ic, Lucknow
L&T/LKCC-01/SUB-
CONTRACTS/LMRC
0.80
one bore hole of 40.00 metre depth each at all the seven stations
7 JSWMI Steel Service Centre Pvt. Ltd. At Baghola In District Palwal, Haryana
Rcc Eco Build Systems Ltd., 14 Gf, Vipul Agora, Mg Road, Gurgaon
RCCEBL/JSW-PALWAL/WO/3
33 1.47
three bore holes of 20.00 metre depth each, 1 NO PLT
8 Amrapali Yojna, Hardoi Road, Lucknow
M/S Shapoorji Pallonji And Company Pvt. Ltd. 9th Floor, Videocon Tower, Block E-I, Jhandewalan Extn., New Delhi-110055
SPCPL/DEL/2015/001
2.95
eight bore holes of 40.00 metre depth each
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
9 220/132 Kv.-2-100 Mva Sub-Station at Bansi in District Siddharta Nagar
Techno Fab Engineering Limited, 507 ERS Apartments, 56 Nehru Place New Delhi
3544/619 1.99
15*3, ERT, TOPOGRAPHY, DCPT, WATER TESTING
10 Enclave Residential Apartment at Kursi Road in District Lucknow
Ncc Limited, NCC House, Madhapur, Hyderabad
NCCL/SITE/Kursi/001/15-16
1.40
four bore holes of 40.00 metre depth each
FINANCIAL YEAR 2014‐151 Bhimsen-Usargaon Sub-Section
Of Kanpur-Jhansi Section Under Railway Electrification Project Of Rvnl In District Kanpur Dehat
M/S Zapdor Engineering (P) Limited
ZEPL/RE/Usargaon-BZM/SPT
1.01
three bore holes of 5.00 metre depth each FOR 6 NOS. SITES
2 Road Over Bridge at Km. 1038/30-32 Between Bakkas and Utraitia Railway Station on Sultanpur Lucknow Section
M/S Accrete Consulting Engineering Pvt. Ltd., Nm-8, 2nd Floor, Sona Tower, Old Dlf Commercial Complex, Sector-14, Gurgaon (Haryana)
ACE/ARNSOL/LOA/140911/107
0.59
one bore hole of 25.00 metre depth and one borehole of 30.00 metre depth
3 Bina-Jhansi Section, Babina In District Jhansi
M/S N K Rathod Engineering Contractor, “Keshav Smruti”, 239 Apr Colony, Katanga, Jabalpur-482001
- 12.00
2 borehole of 20 metre depth for nine nos. projects
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
4 Approaches For Yamuna Rail Bridge At Km. 1275/2 Of Jhansi-Bhimsen Section In District Jalaun
M/S Gpt Infraprojects Limited, GPT Centre, Jc-25, Sector-Iii, Salt Lake, Kolkata
GPT/WO/KALPI/14/027
0.35
two bore holes of 10.00 metre depth each
5 Bhakla Syphon at Ch. 50.900 On Rapti Main Canal In District Shravasti
The Executive Engineer, Saryu Nahar Khand-4, Bahraich
8171/Navam/S-4 7.52
thirteen bore holes of 35.00 metre depth each for
6 220/132 Kv Sub-Station at Patna In The State Of Bihar
M/S Kanohar Electricals Ltd., D-62, Ground Floor, Sector-2, Noida
KEL/BSPTCL/EXT/WO/185,186
,315,387-B/Soil/159
4.32
2 borehole of 10 metre depth for twenty six nos. projects and 12 nos. ERT
7 Ponding Gates Near Janeshwar Mishra Park In District Lucknow
The Executive Engineer, Irrigation Division, Irrigation Department, Lucknow
C-96 11.84
Twelve boreholes of 60.00 metre depth each
8 MMMIG, EWS and LIG Type Residential Apartments Under Devpur Para Scheme Of Lucknow Development Authority At Kabir Nagar, Lucknow
Sintex Industries Limited, Plastics Division, Kalol (N. Gujrat)
SIL/PF/S-PRK/2014/75/7
851 3.43
three bore holes of 25.00 metre and two bore holes of 40.00 metre depth each and seven bore holes of 40.00 metre depth each
Geotech & Material Consultant PROFILE
MAJOR PROJECTS DURING THE LAST 5 YEARS
S No.
Name of the Work & Location
Client's Name and Address
Date of Award
Agreement / Letter of
Award No.
Awarded Value in Lakhs
Remark
9 Multistorey Residential Apartments (KDA Height, KDA Green) at Kalyanpur, Kanpur
M/S Ramky Infrastructure Limited, Ramky Grandiose, 10th Floor, Sy. No. 136/2&4, Gachibowli, Hyderabad
RIL/KDA-Cont/Misc/14-
15/07 2.27
four bore holes of 30.00 metre depth each and four bore holes of 30.00 metre depth each
10 128 Men Barrack And Administrative Block At Ssb Batallion In District Balrampur
The Executive Engineer, L.C.D.-II, Central Public Works Department, Lucknow
02/K.Abhi./L.C.D.-II/14-15 2.08
ten bore holes of 15.00 metre depth each AND six bore holes of 15.00 metre depth each