N Figure 9 - Transport Scotland...Aerial Photography C00 Drawing Status A– PR OV ED S TG C M L...
Transcript of N Figure 9 - Transport Scotland...Aerial Photography C00 Drawing Status A– PR OV ED S TG C M L...
Ashton Farm
A9
IN VERN ESS
HIGHLAN D MAIN
LIN E RAILW AY
SMITHTON
CULLODEN
A96
IN SHES
IN VERN ESS CAMPUS
ABERDEEN TO IN VERN ESSRAILW AY LIN E
MORAY FIRTH
CRADLEHALL
RESAURIE
STRATTON
C1032 BARNCHURCH ROAD
B9006 CULLODENROAD
RAIGMOREIN TERCHAN GE
U1124 CAULFIELDROAD
IN VERN ESS RETAILAN D BUSIN ESS PARK
U1058 CAULFIELDROAD N ORTH
?
N
© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.5 10.25 Kilometres
Figure 9.2
Le ge nd
A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study AreaConsented Development UnderConstruction (as of April 2019)
A96 Dualling Inve rne ss to N airn (inc lud ingN airn Bypass) Land sc ape MitigationProposals
Landscape Planting ProposalsEcological and Landscape PlantingProposalsDeciduous WoodlandMixed WoodlandRiparian WoodlandScrub WoodlandFeathered Tree PlantingSpecies Rich GrasslandWet Grassland MixHedgerows
!( Deciduous Tree
Client
ProjectA9/A96 Inshe s to Sm ithton
95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000
www.jacobs.com
Rev
Drawing title
Scale
Drawing number
Jacobs No.DO N OT SCALE@ A3
© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
B2103501BIM No.
Figure 9.2
DMRB Stage 3 EIARPropose d Sc he m e onAe rial Photography
C00
Drawing Status A – APPROVED AS STAGE COMPLETEShe e t 1 of 1
1:15,000
Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/Dwn
A9-A96IS-JAC-EGN -X X X -FG-EN -0902
Proposed Scheme(DMRB Stage 3 design)
Note:Aerial Imagery source Getmapping 2015
CSSEPT 2019C00 MKEIAR Publication KL DGC