Transcript of MWV (MeadWestvaco) Energy Efficiency Virginia Governor’s Conference on Energy Bob Fledderman...
MWV (MeadWestvaco) Energy Efficiency
Virginia Governor’s Conference on Energy
Bob FleddermanManager, Emerging Issues
2
MWV
Business: Packaging (83%), Specialty Chemicals (14%), Land Management (3%)
Global employees: 16,000
Global sales: $US 5.46 billion (2012)
About 50% from outside US
Corporate headquarters: Richmond, VA
Paperboard mills:
US - Covington, VA; Evadale, TX; Cottonton, AL
Brazil - Tres Barras, Santa Catarina
India - Vapi, Gujarat; Morai, Gujarat
Over 50 manufacturing facilities in 18 countries
Governor's Conference on Energy, October 2013
3
Corporate Energy Targets
• Reduce fossil fuel use by 25% by 2015
• Reduce CO2 emissions by 25% by 2015
from a 2010 baseline
Governor's Conference on Energy, October 2013
4
Biomass Boiler & Turbine GeneratorCovington, VA
• Cost $285 million
• Displaces over 200,000 tons of coal
with forest and mill residual biomass
(bark, limbs, tops)
• Combined heat & power (CHP)
• Capacity 75 MW (electric)
• Capacity 650,000 lbs/hr (steam)
• Reduces power purchases
• Significant reductions in SO2, NOx and
PM10 & PM2.5 emissions.
• Can use waste material (WWT sludge)
previously landfilled
Governor's Conference on Energy, October 2013
5
Relighting ProjectCovington, VA
• Cost $5.5 million
• Saves 19,500 MWh/year
• $950,000 EPACT rebate
• Improved or replaced over 15,000 fixtures
• Donated recycled scape fixtures to a local enterprise the employs disabled
• Continuing to Low Moor, VA facility (additional 1.1 MWh/year savings
• Considering continuing to Covington, VA Specialty Chemical Plant
Governor's Conference on Energy, October 2013
6
New Printing PressLannett, AL
• Cost $14 million
• Saves 2,000 MWh/year
• Reduces waste by 800 tons/year
• Significantly reduces set-up times
Governor's Conference on Energy, October 2013
7
No/Low Capital Projects
• Air system management (fix leaks/low resistance lines)
• Steam trap management (more frequent checks/maintenance)
• Additional electric meters (make power costs a front line responsibility)
• Operating procedures (optimize energy use – winter/summer)
• Advanced process controls (optimize energy use with automation)
Governor's Conference on Energy, October 2013
8
Process Innovation
• Paperboard light weighting
Process change requires 6% less energy per square foot of paperboard
• Energy efficient pulping
Process is much more efficient regarding electric power than alternatives
Governor's Conference on Energy, October 2013
9
Product Innovation
Governor's Conference on Energy, October 2013
• Light weight plastic spray triggers (10% less resin (polypropylene)/replaces steel with plastic)
Versaplast All-Plastic Trigger Sprayer
• Replace plastic with paperboard (weighs 40% less)
ShellPak Renew (pharmaceutical package)
10
Property Assessed Clean Energy (PACE)
• Zero up-front cash investment
• Immediate positive cash flow
• Long-term financing (up to 20 years)
• PACE assessment stays with the property upon sale
• Low interest rates
• Preservation of borrowing capacity through off-balance–sheet financing
Governor's Conference on Energy, October 2013
11