Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu...

93
ORODHA YA MIRADI MBALIMBALI INAYOTEKELEZWA VIJIJINI KUPITIA MPANGO WA PAYMENT BY RESULTS (PbR) SN REGION LGA Project Name Village WP Popln Budget 2019/20 Tota l Names 1 ARUSHA Monduli Dc Rehabilitation of MONALO Water Supply Project at Naalarami Naaralami 18 4,500 14,408,292 Meru Dc Rehabilitation of water project suply at Shimbumbu and Kimundo Villages 2 Shimbumbu and Kimundo 20 4,250 20,058,561 Meru Dc Rehabilitation of water project at Kikwe Village, 1 Kikwe 17 3,750 25,000,000 Meru Dc Rehabilitation of water project at Malula Village 1 Malula 8 750 25,000,000 Meru Dc Rehabilitation of water project at Olukungabo Village 1 Olukungabo 56 13,500 28,000,000 Meru Dc Rehabilitation of water project at Maji ya chai and Imbaseni Villages 1 Maji ya chai and Imbaseni Villages 52 12,500 25,000,000 Meru Dc Rehabilitation of water project at Mbuguni Village 1 Mbuguni Village 13 2,500 17,000,000 Meru Dc Rehabilitation of water project at Kikatiti and Maroroni Villages 2 Kikatiti and Maroroni Villages 57 13,500 30,000,000 Meru Dc Rehabilitation of water project at Ambureni Moivaro Village 1 Ambureni Moivaro Village 23 5,250 20,000,000 Meru Dc Rehabilitation of 2 water projects at Mkuru and Nkuruny Sub Villages, 2 Mkuru and Nkuruny Sub Villages 22 4,750 20,000,000 Arusha Dc Olchovorus Water supply scheme 1 Olchovorous 8 1,000 34,505,779 Arusha Dc Kiseliani Water supply scheme 3 Keselya,Majimoto ,Mlangarini 10 2,500 28,000,000

Transcript of Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu...

Page 1: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

ORODHA YA MIRADI MBALIMBALI INAYOTEKELEZWA VIJIJINI KUPITIA MPANGO WA PAYMENT BY RESULTS (PbR)

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

1 ARUSHA Monduli Dc Rehabilitation of MONALO Water Supply Project at Naalarami Naaralami 18 4,5

00 14,408,2

92

    Meru Dc Rehabilitation of water project suply at Shimbumbu and Kimundo Villages 2 Shimbumbu and

Kimundo 20 4,250

20,058,561

    Meru DcRehabilitation of water project at Kikwe Village, 1 Kikwe 17 3,7

50 25,000,0

00

    Meru DcRehabilitation of water project at Malula Village 1 Malula 8 7

50 25,000,0

00

    Meru Dc Rehabilitation of water project at Olukungabo Village 1 Olukungabo 56 13,5

00 28,000,0

00

    Meru Dc Rehabilitation of water project at Maji ya chai and Imbaseni Villages 1 Maji ya chai and

Imbaseni Villages 52 12,500

25,000,000

    Meru Dc Rehabilitation of water project at Mbuguni Village 1 Mbuguni Village 13 2,5

00 17,000,0

00

    Meru Dc Rehabilitation of water project at Kikatiti and Maroroni Villages 2 Kikatiti and Maroroni

Villages 57 13,500

30,000,000

    Meru Dc Rehabilitation of water project at Ambureni Moivaro Village 1 Ambureni Moivaro

Village 23 5,250

20,000,000

    Meru Dc Rehabilitation of 2 water projects at Mkuru and Nkuruny Sub Villages, 2 Mkuru and Nkuruny

Sub Villages 22 4,750

20,000,000

    Arusha Dc Olchovorus Water supply scheme 1 Olchovorous 8 1,000

34,505,779

    Arusha Dc Kiseliani Water supply scheme 3 Keselya,Majimoto,Mlangarini

10

2,500

28,000,000

    Arusha DcRehabilitation of Tarakwa water supply scheme 2 Tarakwa and

Siwandeti 6 1,500

42,000,000

    Longido Dc Noondoto water projects. 1 Noondoto 6 750

10,318,000

    Longido Dc Oworendeke Water Supply Project. 1 Oworendeke 14 3,7 3,150,0

Page 2: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

80 00

    Longido Dc Olchoronyokie water project. 1 Olchoronyokie 2 250

450,000

    Longido Dc Mangula water project. 1 Mangula 2 250

400,000

    Longido Dc Erkejuloongishu water project 3 Orkejuloongishu, Lopoloseki, Maangula. 28 3,5

00 6,393,9

96

    Longido Dc Olmologi water supply project 1 Olmolog 4 1,000

4,000,000

    Longido Dc Tingatinga water supply Project. 1 Tingatinga 0   6,500,000

    Longido Dc Kamwanga Water Project. 1 Kamwanga 2 500

4,200,000

    Longido Dc Ngoswak Water Project 1 Ngoswak 6 750

2,250,000

    Longido Dc Sinonik water project. 1 Sinonik 18 2,250

1,500,000

    Longido Dc Gelai Lumbwa water project. 1 Gela ilumbwa 4 500

900,000

    Longido Dc Losirwa water project. 1 Losirwa 4 500

900,000

    Longido Dc Elerai water project 1 Elerai 6 500

10,000,000

    Longido Dc Kimokouwa water project 1 Kimokouwa 10 1,250

10,000,000

    Longido Dc Mairowa water project. 5 Mairowa, Mundarara, Tinga, Karao, Orgila 4 5

00 800,00

0

    Karatu Dc Getamock/Mahhahha water project which has borehole capacity of 40,000lt/hour 2 Getamock &

Mahhahha 46 6,652

82,782,671

    Karatu Dc Endonyawet water project which has borehole capacity of 18,000 Lts/h 1 Endonyawet

50 3,9

56 30,000,0

00

Page 3: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

   Karatu Dc

Rehabilitation of 40 water points in 11 villages and construction of 10 water points in 6 vilages 1 Dumbechand 1 60 8,4

00 47,000,0

00

    Karatu Dc   1 Mbuga Nyekundu 2      

    Karatu Dc   1 Endamaghan 1      

    Karatu Dc   1 Kambi ya Faru 2      

    Karatu Dc   1 Great Arusha 2      

    Karatu Dc   1 Karatu Mjini 4      

    Karatu Dc   1 Malechand 6      

    Karatu Dc   1 Mang'ola Barazani 9      

    Karatu Dc   1 Huduma 2      

    Karatu Dc   1 Kilimamoja 2      

    Karatu Dc   1 Kambi ya simba5      

    Karatu Dc   1 Rhotia 4      

    Karatu Dc   2 Getamock/Mahhahha 3      

    Karatu Dc   1 Qaru 1      

    Karatu Dc   1 Qurus 1      

    Karatu Dc   1 Kitete 2      

    Karatu Dc   1 Slahhamo 3      

Page 4: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Ngorongoro Endulen water project 2 Enduleni, Nasiporing 9 2,250

12,000,000

    Ngorongoro Njoroi water project 1 Njoroi 7 1,750

15,000,000

    Ngorongoro Kisangiro water project 1 Kisangiro 9 2,250

18,000,000

    Ngorongoro Arash water project 1 Arash 1 250

5,000,000

    Ngorongoro Oldonyosambu water project 1 Oldonyosambu 2 500

40,000,000

    Ngorongoro Soitsambu Water project 1 Soitsambu 4 1,000

43,600,000

   

Ngorongoro

Rehabilitation and Extension of all Function but need Repair (FNR) Wps in 19 Villages 19

Kirtalo, Samunge, Sale, Wasso, Ololosokwan, Oloipir, Loliondo, Oloirobi, Ngoile, Nainokanoka, Bulati, Malambo, Madukani, maalon, Mgholo, Kisangiro, Engarasero, Nasiporiong and Arash

77 19,250

18,471,309

Sub Total Arusha 87   685 132,788

  DODOMA Kongwa Dc Maintenance of Chamae Water project 1 Chamae 18 4,3

16 18,000,0

00

    Kongwa DcMaintenance of Msunjulile A Water Project 1 Msunjulile A 14 6,1

92 18,000,0

00

    Kongwa DcRehabilitation of Sejeli Village Water Scheme 1 Sejeli 8 4,6

37 18,000,0

00

    Kondoa Dc Rehabilitation of Bukulu water supply scheme 1 Bukulu 8 2,000

5,000,000

Page 5: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

   Kondoa Dc Rehabilitation of Sambwa-Idindiri Water Supply

Scheme 2 Sambwa and Idindiri 10 2,500

3,000,000

   Kondoa Dc

Rehabilitation of Soera Water Supply Scheme 1 Soera 6 1,500

4,500,000

   Kondoa Dc Rehabilitation of Bereko-Kurasini Water Supply

Scheme 1 Bereko 6 1,500

3,500,000

   Kondoa Dc Rehabilitation of Kwamafunchi Water Supply

Scheme 1 Kwamafunchi 2 500

1,000,000

   Kondoa Dc Rehabilitation of Masawi-Kichangani Solar

Pump Borehole 1 Masawi 1 250

1,519,455

    Kondoa Dc Rehabilitation of Isari Borehole 1 Mtiryangwi(Isari) 2 500

1,519,455

    Kondoa Dc Rehabilitation of Itundwi Borehole 1 Itundwi 3 750

1,500,000

   Kondoa Dc

Rehabilitation of Ihari Water Supply Scheme 1 Ihari 3 750

2,500,000

   Kondoa Dc Rehabilitation of Hondomairo Water Supply

Scheme 1 Hondomairo 3 750

1,000,000

    Kondoa Dc Rehabilitation of Ikengwa Borehole 1 Ikengwa 2 500

1,500,000

    Kondoa Tc Rehabilitation of Chemchem water supply scheme 1 Chemchem 9 2,2

50 13,000,0

00

   Kondoa Tc

Rehabilitation of Tampori water supply scheme 1 Tampori 6 1,500

12,000,000

   Kondoa Tc

Rehabilitation of Choka water supply scheme 2 Choka and Gubali 16 4,000

11,000,000

   Kondoa Tc

Rehabilitation of Kolo Water Supply Scheme 1 Kolo A 4 1,000

9,855,367

    Bahi Rehabilitation of Mkakatika Water Supply project 2 Mkakatika and Bahi

Sokoni 14

3,500

12,000,000

Page 6: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    BahiRehabilitation of Kigwe Water Supply project 2 Kigwe and Mapinduzi

12 3,0

00 26,136,0

00

    BahiRehabilitation of Zejele water supply project 1 Zejele

4 1,0

00 2,500,0

00

    BahiRehabilitation of Mpalanga water supply project 1 Mpalanga  

- 8,500,0

00

    Bahi Rehabilitation of Kisima cha ndege water supply scheme 1 Kisima cha Ndege

6 1,5

00 3,850,0

00

    BahiRehabilitation of Mwitikira water supply scheme 1 Mwitikira

4 1,0

00 9,000,0

00

    Bahi Rehabilitation of Nondwa water supply scheme 1 Nondwa 2

500

2,800,000

    Bahi Rehabilitation of Chipanga B water supply scheme 1 Chipanga B  

- 5,000,0

00

    Bahi Rehabilitation of Chipanga A water supply project 1 Chipanga A  

- 6,000,0

00

    Mpwapwa Chinyanghuku Water supply project 1 Chinyanghuku 12 1,500

12,403,276

    Mpwapwa Chunyu water supply project 1 Chunyu 30 4,525

25,830,000

    Mpwapwa Kimagai Water supply project 1 Kimagai 4 1,000

2,800,000

    Mpwapwa Iwondo water supply project 1 Iwondo 6 1,500

4,200,000

    Mpwapwa Kibakwe water supply project 1 Kibakwe 12 1,500

8,400,000

    Mpwapwa Luhundwa water supply project 1 Luhundwa 2 500

1,400,000

    Mpwapwa Makutupa water supply project 1 Makutupa 2 500

1,400,000

    Mpwapwa Chogola water supply project 1 Chogola 2 500

1,400,000

    Mpwapwa Kisokwe water supply project 1 Kisokwe 2 5 1,400,0

Page 7: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

00 00

    Mpwapwa Sazima water supply project 1 Sazima 4 1,000

2,800,000

    Mpwapwa Mtamba water supply project 1 Mtamba 6 1,500

4,200,000

    Mpwapwa Manghangu water supply project 1 Manghangu 2 500

1,400,000

    Mpwapwa Wangi water supply project 1 Wangi 2 500

1,600,000

    Mpwapwa Lwihomelo water supply project 1 Lwihomelo 1 250

700,000

    Mpwapwa Mwanawota water supply project 1 Mwanawota 1 250

700,000

    Chamwino Dc Rehabilitation of Raising main distribution lines and 6 DPs at Nhinhi water supply project 1 Nhinhi 12 3,0

00 12,000,0

00

   Chamwino Dc Rehabilitation of 5 Water Points at Mgunga

water project 1 Mgunga 10 2,500

11,500,000

   Chamwino Dc Rehabilitation of 5 Water Points at Mnase water

project 1 Mnase 10 2,500

12,000,000

   Chamwino Dc Rehabilitation of 4 Water Points at Segala water

project 1 Segala 8 2,000

14,000,000

   Chamwino Dc Rehabilitation of 6 Water Points at Makoja

water project 1 Makoja 12 3,000

11,500,000

   Chamwino Dc Rehabilitation of 3 Water Points at Wiliko

water project 1 Wiliko 6 1,500

16,379,961

   Chamwino Dc Rehabilitation of 3 Water Points at Itiso water

project 1 Itiso 6 1,500

5,000,000

    Chemba Rehabilitation of Itirikwi water supply scheme 1 Itirikwi 8 2,000

4,000,000

   Chemba

Rehabilitation of Goima water supply scheme 1 Goima 14 3,500

42,309,001

Page 8: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

   Chemba Rehabilitation of Kwamtoro water supply

scheme 1 Kwamtoro 18 4,500

3,919,947

    Chemba Rehabilitation of Mtakuja water supply scheme 1 Mtakuja 10 2,500

4,750,000

   Chemba Rehabilitation of Makorongo water supply

scheme 1 Makorongo 5 1,250

5,000,000

    Chemba Rehabilitation of Humekwa water supply scheme 1 Humekwa 4 1,0

00 13,850,0

00

    Chemba Rehabilitation of Dalai water supply scheme 1 Dalai 6 1,500

2,500,000

    Dodoma Cc Rehabilitation of Kikombo Water Project 2 Kikombo Makulu and Mnadani 20 5,0

00 28,627,7

66

     Dodoma Cc Rehabilitation of Chololo Water Project 1 Chololo 14 3,000

5,000,000

Sub Total Dodoma   63   414 102,170

465,150,228

  GEITA Chato Dc Rehabilitation of borehole fitted with hand pump at Buzirayombo village 1 Buzirayombo 1 2

50 4,500,0

00

 GEITA Chato Dc Rehabilitation of borehole fitted with hand pump

at Nyabilezi village 1 Nyabilezi 1 250

4,500,000

 GEITA Chato Dc Rehabilitation of borehole fitted with hand pump

at Rumasa village 1 Rumasa 1 250

4,500,000

 GEITA Chato Dc Rehabilitation of borehole fitted with hand pump

at Ihanga village 1 Ihanga 1 250

4,500,000

 GEITA Chato Dc Rehabilitation of borehole fitted with hand pump

at Bwanga village 1 Bwanga 1 250

4,500,000

 GEITA Chato Dc Rehabilitation of borehole fitted with hand pump

at Bwera village 1 Bwera 1 250

4,500,000

 GEITA Chato Dc Rehabilitation of borehole fitted with hand pump

at Igando village 1 Igando 1 250

4,500,000

 GEITA Chato Dc Rehabilitation of borehole fitted with hand pump

at Busaka village 1 Busaka 1 250

4,500,000

Page 9: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

 GEITA Chato Dc Rehabilitation of borehole fitted with hand pump

at Ichwankima village 1 Ichwankima 1 250

4,500,000

 GEITA Chato Dc Rehabilitation of borehole fitted with hand pump

at Ilemela village 1 Ilemela 1 250

4,500,000

 GEITA Chato Dc Rehabilitation of borehole fitted with hand pump

at Kachwamba village 1 Kachwamba 1 250

4,500,000

 GEITA Chato Dc Rehabilitation of Shallow well fitted with hand

pump at Majengo village 1 Majengo 1 250

2,000,000

 

GEITA Chato Dc Rehabilitation of borehole fitted with hand pump and two shallow well fitted of hand pump at Nyisanzi village

1 Nyisanzi 3 750

9,184,564

 GEITA Chato Dc Rehabilitation of two Shallow well fitted with

hand pump at Mkombozi village 1 Mkombozi 2 500

4,000,000

 GEITA Chato Dc Rehabilitation of Shallow well fitted with hand

pump at Muganza village 1 Muganza 1 250

2,000,000

 GEITA Chato Dc Rehabilitation of two Shallow well fitted with

hand pump at Nyabilele village 1 Nyabilele 2 500

4,000,000

 GEITA Chato Dc Rehabilitation of Shallow well fitted with hand

pump at Magiri village 1 Magiri 1 250

2,000,000

 GEITA Chato Dc Rehabilitation of borehole fitted with hand pump

at Rubambangwe village 1 Rubambangwe 1 250

4,500,000

 GEITA Chato Dc Rehabilitation of borehole fitted with hand pump

at Nyakakarango village 1 Nyakakarango 1 250

4,500,000

 GEITA Chato Dc Rehabilitation of borehole fitted with hand pump

at Kanyindo village 1 Kanyindo 1 250

4,500,000

 GEITA

Bukombe Dc Rehabilitation of 40 shallow wells in 19 Villages of Bukombe District 1 Nyamakunkwa 3 7

50 1,569,0

00

  GEITA Bukombe Dc   1 Kabagole 3 750

1,660,000

Page 10: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

  GEITA Bukombe Dc   1 Kazibizyo 2 500

355,000

  GEITA Bukombe Dc   1 Bufanka 1 250

275,000

  GEITA Bukombe Dc   1 Msasani 1 250

485,000

  GEITA Bukombe Dc   1 Katome 2 500

1,542,000

  GEITA Bukombe Dc   1 Butinzya 2 500

1,070,000

  GEITA Bukombe Dc   1 Silamila 4 1,000

838,000

  GEITA Bukombe Dc   1 Kabuhima 1 250

405,000

  GEITA Bukombe Dc   1 Uyovu 1 250

1,300,000

  GEITA Bukombe Dc   1 Msonga 2 500

1,771,000

  GEITA Bukombe Dc   1 Ng'anzo 6 1,500

1,266,000

  GEITA Bukombe Dc   1 Mtinga 3 750

2,325,000

  GEITA Bukombe Dc   1 Bulega 2 500

405,000

  GEITA Bukombe Dc   1 Imalanguzu 2 500

977,000

  GEITA Bukombe Dc   1 Igulwa 1 250

273,000

  GEITA Bukombe Dc   1 Kagwe 1 250

105,000

  GEITA Bukombe Dc   1 Bulangwa 2 500

105,000

  GEITA Bukombe Dc   1 Msangila 2 500

475,000

 GEITA Bukombe Dc Rehabilitation of Msasa Water Supply Scheme

in Bukombe District 1 Msasa 6 1,500

12,094,064

Page 11: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

 

GEITA Bukombe DcImprovement of 3 deep wells by installation of hand pumps to 4 villages of Bukombe District (Rehabilitation)

3 Businda, Bugelenga and Iyogelo 3 7

50 12,000,0

00

 GEITA Bukombe Dc Rehabilitation of Ibambilo Water Supply

Scheme in Bukombe District 1 Ibambilo 4 1,000

6,000,000

 GEITA

Mbogwe Dc Rehabilitation of 50 non functional shallow wells 29 Bugalagala 2 500

2,570,000

  GEITA Mbogwe Dc     Bunigonzi 2 500

2,640,000

  GEITA Mbogwe Dc     Ibambula 1 250

1,450,000

  GEITA Mbogwe Dc     IkunguigazI 1 250

1,520,000

  GEITA Mbogwe Dc     Kagera 2 500

2,375,000

  GEITA Mbogwe Dc     Mwingilo 2 500

2,300,000

  GEITA Mbogwe Dc     Ilolangulu 3 500

3,900,000

  GEITA Mbogwe Dc     Mubamba 3 750

3,534,000

  GEITA Mbogwe Dc     Ishigamva 1 250

1,590,000

  GEITA Mbogwe Dc     Kiseke 2 500

2,530,000

  GEITA Mbogwe Dc     Kakumbi 1 250

2,250,000

  GEITA Mbogwe Dc     Nyikonga 1 250

2,300,000

  GEITA Mbogwe Dc     Ilangalae 4 1,000

5,400,000

  GEITA Mbogwe Dc     Nyambubi 1 250

1,550,000

Page 12: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

  GEITA Mbogwe Dc     Muungano 1 250

1,470,000

  GEITA Mbogwe Dc     Nanda 5 1,250

6,520,000

  GEITA Mbogwe Dc     Nyang'wale 2 500

1,430,000

  GEITA Mbogwe Dc     Bulongo 1 250

1,450,000

  GEITA Mbogwe Dc     Bwendamwizo 2 250

1,430,000

  GEITA Mbogwe Dc     Nyanhwiga 1 250

1,350,000

  GEITA Mbogwe Dc     Ngemo 1 250

1,330,000

  GEITA Mbogwe Dc     Nyitundu 2 500

3,105,000

  GEITA Mbogwe Dc     Lwazeze 1 250

1,600,000

  GEITA Mbogwe Dc     Kasaka 1 250

1,531,000

  GEITA Mbogwe Dc     Mlange 3 750

3,970,000

  GEITA Mbogwe Dc     Nyasato 2 500

2,500,000

  GEITA Mbogwe Dc     Nhomolwa 1 250

1,650,000

  GEITA Mbogwe Dc     Bukandwe 2 500

2,950,000

  GEITA Mbogwe Dc     Shibutwe 1 250

1,476,150

 GEITA Mbogwe Dc Rehabilitation 20 functional needs repair

shallow wells 18 Bugalagala 6 1,500

3,500,000

  GEITA Mbogwe Dc     Busabaga 2 500

1,400,000

  GEITA Mbogwe Dc     Ikobe 1 250

640,000

Page 13: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

  GEITA Mbogwe Dc     Ibambula 2 500

1,300,200

  GEITA Mbogwe Dc     Ikunguigazi 1 250

670,000

  GEITA Mbogwe Dc     Kanangwe 2 500

1,740,000

  GEITA Mbogwe Dc     Iponya 2 500

1,617,000

  GEITA Mbogwe Dc     Isebya 1 250

860,000

  GEITA Mbogwe Dc     Kashelo 1 250

850,000

  GEITA Mbogwe Dc     Kabanga, 1 250

810,000

  GEITA Mbogwe Dc     Mtakuja 1 250

860,000

  GEITA Mbogwe Dc     Ilangale 5 1,250

3,800,000

  GEITA Mbogwe Dc     Nyakasaluma 2 500

2,150,000

  GEITA Mbogwe Dc     Lubeho 3 750

2,600,000

  GEITA Mbogwe Dc     Nyasato 2 500

1,660,000

  GEITA Mbogwe Dc     Mwabukwalule 1 250

852,800

  GEITA Mbogwe Dc     Ushetu 1 250

810,000

  GEITA Mbogwe Dc     Buzigula 1 250

780,000

 GEITA

Geita Tc Rehabilitation of borehole fitted with handpump at Mbabani village 1 Mbabani 1 2

50 280,00

0

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Wigembya village 1 Wigembya 1 250

2,100,000

Page 14: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Nyakato village 1 Nyakato 1 250

280,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Bumanji village 1 Bumanji 1 250

375,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Majengo village 1 Majengo 1 250

620,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Ibanda village 1 Ibanda 1 250

280,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Nyambogo village 1 Nyambogo 1 250

280,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Mpomvu village 1 Mpomvu, 1 250

280,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Samina village 1 Samina 1 250

620,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Nyaseke village 1 Nyaseke 1 250

333,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Nyamahuna village 1 Nyamahuna 1 250

78,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Mshinde village 1 Mshinde 1 250

560,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Shinamwendwa village 1 Shinamwendwa, 1 250

280,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Kakonda village 1 Kakonda 1 250

620,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Kasamwa village 1 Kasamwa 1 250

78,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Mwembeni village 1 Mwembeni 1 250

280,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Mkolani village 1 Mkolani 1 250

420,000

Page 15: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Mwilima village 1 Mwilima 1 250

78,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Nyakahongola village 1 Nyakahongola 1 250

78,000

 GEITA Geita Tc Rehabilitation of borehole fitted with handpump

at Nyabubele village 1 Nyabubele 1 250

280,000

 GEITA Geita Tc

Rehabilitation of Kigoma Road water supply 1 Kigoma Road 16 4,000

3,800,000

 GEITA

Geita Dc Rehabilitation of Katoro W/S Project 1 Katoro 10

2,500

8,303,688

 GEITA Geita Dc Rehabilitation of 2 boreholes fitted with

handpump at Kaseme village 1 Kaseme 2

500

6,387,500

 GEITA Geita Dc Rehabilitation of borehole fitted with handpump

at Bugogo village 1 Bugogo 1

250

3,198,750

 GEITA Geita Dc Rehabilitation of borehole fitted with handpump

at Ikina village 1 Ikina 1

250

3,198,750

 GEITA Geita Dc Rehabilitation of (2) boreholes fitted with

handpump at Bugulula village 1 Bugulula 2

500

6,387,500

 GEITA Geita Dc Rehabilitation of (2) borehole fitted with

handpump at Katoro village 1 Katoro 2

500

4,393,750

 GEITA Geita Dc Rehabilitation of (2) boreholes fitted with

handpump at Lwamgasa village 1 Lwamgasa 2

500

6,387,500

 GEITA Geita Dc Rehabilitation of 3 shallow wells fitted with

handpump at Lubanga village 1 Lubanga 3

750

779,545

 GEITA Geita Dc Rehabilitation of 2 shallow wells fitted with

handpump at Mtakuja village 1 Mtakuja 2

500

779,545

 GEITA Geita Dc Rehabilitation of 2 shallow wells fitted with

handpump at Ibisabageni village 1 Ibisabageni , 2

500

779,545

Page 16: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

 GEITA Geita Dc Rehabilitation of shallow wells fitted with

handpump at Nyakaduha village 1 Nyakaduha 1

250

779,545

 GEITA Geita Dc Rehabilitation of shallow wells fitted with

handpump at Bufunda village 1 Bufunda, Mnekezi, Kasesa

1

250

779,545

 GEITA Geita Dc Rehabilitation of shallow wells fitted with

handpump at Mnekezi village 1 Mnekezi 1

250

779,545

 GEITA Geita Dc Rehabilitation of shallow wells fitted with

handpump at Kasesa village 1 Kasesa 1

250

779,545

 GEITA

Nyang'wale Dc Rehabilitation of 24 hand pump wells. 20 Bukwimba 1 250

350,000

  GEITA Nyang'wale Dc     Kasubuya 1 250

420,000

  GEITA Nyang'wale Dc     Izunya 1 250

1,250,000

  GEITA Nyang'wale Dc     Mwamakiliga 2 500

2,170,000

  GEITA Nyang'wale Dc     Lushimba 1 250

1,715,000

  GEITA Nyang'wale Dc     Bukungu 1 250

1,470,000

  GEITA Nyang'wale Dc     Shibalanga 2 500

2,450,000

  GEITA Nyang'wale Dc     Shibumba 1 250

1,150,000

  GEITA Nyang'wale Dc     Nyang'hwale 2 500

600,000

  GEITA Nyang'wale Dc     Nyaruguguna 1 250

1,603,080

  GEITA Nyang'wale Dc     Isonda 1 250

2,800,000

  GEITA Nyang'wale Dc     Kijinga 1 250

1,500,000

  GEITA Nyang'wale Dc     Nyugwa 1 2 780,00

Page 17: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

50 0

  GEITA Nyang'wale Dc     Mimbili 1 250

450,000

  GEITA Nyang'wale Dc     Kaboha 1 250

350,000

  GEITA Nyang'wale Dc     Nyashilanga 1 250

450,000

  GEITA Nyang'wale Dc     Mwasabuka 1 250

670,000

  GEITA Nyang'wale Dc     Iyenze 1 250

750,000

Sub Total   

146   253 62,750

306,693,114

  IRINGA Iringa Dc Rehabilitation of Mwambao water gravity scheme 1 Mwambao 0 8

36 7,000,0

00

 IRINGA Iringa Dc

Rehabilitation of Ikengeza Pumping schemes 1 Ikengeza 12 2,265

35,000,000

 

IRINGA Iringa DcRehabilitation of 49 Dps from 6 villages within the LGA 6

Igingilanyi, Kihorogota, Kitapilimwa, Mboliboli, Idodi, Migoli, Chamdindi, Mbugani

98 12,250

14,400,000

 IRINGA Iringa Dc

Rehabilitation of Matembo pumping water scheme ( sub village) at Mfyome village 1 Mfyome 4 5

00 26,479,7

05

 IRINGA Iringa Dc Rehabilitation of Kikombwe water supply

project 2 Kikombwe and Igunda 28 3,430

29,800,000

  IRINGA Iringa Mc Rehabilitation of Ugele water project 1 Ugele   780

7,972,391

 IRINGA

  Change of technology from hand pump to solar pump at Ilangila water project 1 Ilangila 2 3

56 22,250,0

00

Page 18: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

 IRINGA

Kilolo Dc Rehabilitation of water project at Ilamba Village 1 Ilamba 0 -

8,000,000

 IRINGA Kilolo Dc Rehabilitation of water project at Ipalamwa

Village 2 Ipalamwa and Lulindi 0 -

7,000,000

 IRINGA Kilolo Dc Rehabilitation of grouped water project at five

Villages 5Kipaduka, Ikuka, Vitono, Iwungi and Ng'osi

7 1,500

38,000,000

 IRINGA Kilolo Dc Rehabilitation of water project at Kwalamo

Village 1 Kiwalamo 16 4,000

42,500,000

 IRINGA Kilolo Dc

Rehabilitation of Image water project 8Image, Lyasa, Ilawa, Uhaminyi, Iyai, Ibumu, Kilala, Kilumbwa

5 1,250

25,000,000

 IRINGA

Mufindi Dc Rehabilitation of Kasanga pumping water supply project 1 Kasanga 5 2,7

18 30,340,8

89

 IRINGA Mufindi Dc Rehabilitation of Udumuka pumping water

supply project 1 Udumuka 12 2,347

17,000,000

 IRINGA Mufindi Dc

Rehabilitation of Usokami and Kibengu pumping water supply project 2 Usokami and Kibengu 64 8,0

00 20,000,0

00

 IRINGA Mufindi Dc Repair of submerssible pump for Sawala water

supply project 1 Sawala 16 4,000

37,000,000

 IRINGA Mufindi Dc Rehabilitati of Ikimilinzowo pumping water

supply project 1 Ikimilinzowo 0 2,863

7,000,000

 

IRINGA Mufindi DcRehabilitation of 10 medium and deep water wells 5

Mapanda , Igeleke, Mapogoro, Igombavanu and Ugesa

10 2,500

5,000,000

 IRINGA

Mafinga Tc Rehabilitation of Rungemba water supply scheme 1 Rungemba 0 2,1

01 10,000,0

00

Page 19: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

 IRINGA

 Mafinga Tc Rehabilitation of 9 water wells at Matanana , Kisada and Isalavanu villages 3 Matanana, Kisada and

Isalavanu 9 2,250

9,000,000

Sub Total   

45 0 288 53,946

398,742,985

  KATAVI Mpanda Dc Rehabiltation of Hand pump for 20 villages 20

Bulamata(3) ,Busongola(3), Mchakamchaka(2), Lwega(1),Karema(2) ,Mnyagala(2), Kapalamsenga(3), Songambele(2), Mgansa(3), Ipwaga(3), Rugufi(4), Mlibansi(2),Ifumbul(2)a, Isengule(1), Katuma(2), Mpembe(1), Ilangu(1), Isumbwe(1), Isubangala(2) and Mazwe(1)

40 10,000

86,611,382

  KATAVI Mpanda MC Milala Water Project 1 Milala 14 3,500

42,157,080

  KATAVI Mpanda MC Mtakumbuka water supply project 1 Mtakumbuka 14 3,500

2,950,000

 

KATAVI Mpanda MC

Hand pumps/deep well for 8 villages 9

Makongoro (1), Makanisani (1), Kalfesi A (2), Sugar (1), Shongo (1), Kalfesi B (1), Society (1) and Nguvumali (1)

9 2,250

9,042,300

 KATAVI

Mpimbwe Dc Rehabilitation of two hand pump for Ikuba and Luchima villages 2 Ikuba and Luchima 2 5

00 500,00

0

Page 20: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

 KATAVI

Nsimbo Dc Rehabilitation of Isinde water supply project 1 Isinde 7 3,500

20,000,000

 

KATAVI

 Nsimbo Dc Rehabilitation of Hand pumps at 15 Villages 15

Mnyaki(1), Ibindi(1), Kaburonge(1), Kambuzi Halt(1), Kaminula(1), Nduwi(1), Sokoine(1), Iwimbi(1), Ivungwe(1), Nzaga(1), Tambazi(1), Usense(1), Tumaini,Kapalala and Katambike

15 3,750

35,070,409

 KATAVI

Mlele Dc Rehabilitation of three hand pump at Ipwaga,Utende and Ilunde villages 3 Ipwaga,Utende and

Ilunde 3 750

1,500,000

 KATAVI

 Mlele Dc Rehabilitation of Imala uduki water supply project 1 Imalauduki 7 3,5

00 74,404,1

72 Sub

Total

      53   111 31,250

272,235,343

  KIGOMA Buhigwe Dc Rehabilitation of 4 shallow wells at Nyamgali 1 Nyamgali 3 750

5,760,000

 KIGOMA Buhigwe Dc

Rehabilitation of 1 shallow wells at Mkatanga 1 Mkatanga 1 250

1,920,000

 KIGOMA Buhigwe Dc

Rehabilitation of 3 shallow wells at Munanila 1 Munanila 3 750

5,760,000

 KIGOMA Buhigwe Dc

Rehabilitation of 5 shallow wells at Kitambuka 1 Kitambuka 5 1,250

9,600,000

 KIGOMA Buhigwe Dc

Rehabilitation of 3 shallow wells at Bulimanyi 1 Bulimanyi 3 750

5,760,000

Page 21: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

 KIGOMA Buhigwe Dc Rehabilitation of 2 shallow wells at Mulungu

village. 1 Mulungu 2 500

3,840,000

 KIGOMA Buhigwe Dc

Rehabilitation of 4 shallow wells at Kibande 1 Kibande 4 1,000

7,680,000

 KIGOMA Buhigwe Dc

Rehabilitation of 4 shallow wells at Kilelema 1 Kilelema 4 1,000

7,680,000

 KIGOMA Buhigwe Dc

Rehabilitation of 20 Springs at Mwayaya village 1 Mwayaya 20 5,000

25,148,180

 KIGOMA Buhigwe Dc Rehabilitation 10DPs at Nyakoronko Water

Supply scheme. 1 Nyankoronko 10 2,500

3,488,372

 KIGOMA Buhigwe Dc Rehabilitation 16 DPs at Buhigwe Water Supply

Project. 1 Buhigwe 16 4,000

5,581,395

 KIGOMA Buhigwe Dc Rehabilitation 17 DPs at Mulera Water supply

project. 1 Mulera 17 4,250

5,930,233

 KIGOMA Buhigwe Dc Rehabilitation DPs at 7 Janda Water Supply

Project. 1 Janda 7 1,750

19,002,192

 KIGOMA Buhigwe Dc Dermacation of Mubanga Water Supply Intake

for Source Protection. 1 Mubanga   -

5,429,198

  KIGOMA Buhigwe Dc Rehabilitation Bukuba Village WS 1 Bukuba 8 2,000

21,716,791

 KIGOMA

Kakonko Dc Rehabilitation of 2 Boreholes at Nyamtukuza 1 Nyamtukuza 2 500

5,000,000

 KIGOMA Kakonko Dc

Rehabilitation of 1 Boreholes at Kiga 1 Kiga 1 250

2,400,000

 KIGOMA Kakonko Dc

Rehabilitation of 1 Boreholes at Mugunzu 1 Mugunzu 1 250

1,000,000

 KIGOMA Kakonko Dc

Rehabilitation of 1 Boreholes at Kasuga 1 Kasuga 1 250

2,500,000

 KIGOMA Kakonko Dc

Rehabilitation of 2 Shallow wells at Kasongati 1 Kasongati 1 250

2,000,000

Page 22: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

 KIGOMA Kakonko Dc

Rehabilitation of 1 Shallow wells at Kanyonza 1 Kanyonza 1 250

1,800,000

 KIGOMA Kakonko Dc

Rehabilitation of 1 BH at Kasanda village. 1 Kasanda 1 250

 KIGOMA Kakonko Dc

Rehabilitaion of Muhange Water supply Scheme 2 Muhange and Muhange Juu 2 1,0

00 2,200,0

00

 KIGOMA Kakonko Dc Supply and Installation of electrical power at

Kiga Water Supply Project. 1 Kiga 17 4,250

3,500,000

 KIGOMA

Kasulu DC Rehabilitation of 2 shallow wells at Nyarugusu. 1 Nyarugusu 2 5,000

4,000,000

 KIGOMA

  Rehabilitation of 4 boreholes at Shunguliba 1 Shunguliba 4 2,000

7,200,000

 KIGOMA

  Rehabilitation of Kwaga water supply scheme. 1 Kwaga 9 9,532

21,000,000

 KIGOMA Kasulu DC

Rehabilitation of Muzye Water Supply Scheme 1 Muzye 39 13,828

23,300,000

 KIGOMA Kasulu DC

Rehabilitation of Lugoma water supply scheme. 1 Lugoma 28 5,250

17,000,000

  KIGOMA Kasulu DC Bugaga Water Supply Scheme. 1 Bugaga 37 9,250

31,000,000

 KIGOMA Kasulu DC

Rehabilitation of 5 boreholes at Titye village. 1 Titye 5 1,250

8,392,946

 KIGOMA Kasulu DC

Rehabilitation of Nyenge water project 1 Nyenge 5 5,667

10,500,000

 KIGOMA Kasulu DC

Rehabilitation of 3 boreholes at Kitanga. 1 Kitanga 3 750

5,500,000

 KIGOMA Kasulu DC Rehabilitation of Nyachenda Water Supply

Scheme. 1 Nyachenda 47 9,103

13,000,000

 KIGOMA

Kasulu Tc Rehabilitation of Mwanga B water supply scheme 1 Mwanga B 8 4,0

00 39,049,2

51

Page 23: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

 KIGOMA Kasulu Tc Rehabilitation of Msambara water supply

scheme 1 Msambara 40 11,139

59,049,251

 KIGOMA Kasulu Tc

Rehabilitation of Murufiti water supply scheme 1 Murufiti 14 15,908

49,049,252

 KIGOMA Kasulu Tc Rehabilitation of Nyansha/Nyantare water

supply scheme 1 Nyansha 13 13,406

67,229,251

 KIGOMA

Uvinza Dc Rehabilitation & Extension of Katete Water Supply Scheme 1 Katete 4 2,0

00 1,500,0

00

  KIGOMA Uvinza Dc           750,000

  KIGOMA Uvinza Dc           10,580,000

 KIGOMA Uvinza Dc Rehabilitation and installation of Hand Pumps

at Basanza Village 1 Basanza -

-

7,200,000

  KIGOMA         4 1,000

1,325,694

 KIGOMA

Kibondo Dc Rehabilitation of 5 non functioning DPs and construction of 5 new Dps at Kichananga village 1 Kichananga 10 5,0

00 7,000,0

00

 KIGOMA Kibondo Dc

Rehabilitation of 5 non functioning BH at Bitare 1 Bitare 5 1,250

5,000,000

 KIGOMA Kibondo Dc Rehabilitation of 3 non functioning BH at

Kumbanga village 1 Kumbanga 3 750

2,200,000

 KIGOMA Kibondo Dc Rehabilitation of 4 non functioning BH at

Kumwambu. 1 Kumwambu 3 750

7,200,000

 KIGOMA Kibondo Dc Rehabilitation of Gravity water supply scheme at

Nyaruyoba village. 1 Nyaruyoba 10 5,000

6,000,000

 KIGOMA Kibondo Dc Rehabilitation of Uswahilini water supply

scheme 1 Uswahilini 4 975

3,000,000

 KIGOMA

Kigoma Dc Rehabilitation of Mkongoro II water Supply scheme. 9 Chankabwimba,

Kabanga, Mahembe 170 27,500

74,000,000

Page 24: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

kati, Mahembe mama, Msimba, Kamala, Simbo, Machazo and Kasuku.(rehab)

Sub Total   56   597 183,308

486,725,646

  KILIMANJARO Mwanga Dc Vulue water supply 2 Vuchama ngofi and

mangio 7 4,834

14,000,000

 KILIMANJARO

Mwanga DcKitoghoto water supply 1 Kitoghoto 4 4

12 13,000,0

00

 KILIMANJARO

Mwanga Dc Kiverenge water supply 1 Kiverenge 14 1512 16,400,0

00

 KILIMANJARO

Mwanga DcMsangeni/ Mamba water supply 2 Msangeni and

mamba 31 3695 4,700,000

 KILIMANJARO

Mwanga DcLambo water supply 1 Lambo 5 2575 19,344,0

00

 KILIMANJARO

Mwanga Dcmshewa water supply 1 Mshewa 5 2,088 15,710,0

00

 KILIMANJARO Moshi Dc Utaruni Water Supply Projects

(Rehabilitation) . 9 Utaruni. 12 2,151

39,500,000

   Moshi Dc Marangu West Water Supply scheme

( Rehabilitation).  Kyala,Mbahe,Komalyangoe,Kitowo,Kiraracha and Nduweni.

12 3,545

39,500,000

    Moshi Dc Boro Water Supply scheme ( rehabilitation).   Boro 2 2,6

35 10,000,0

00

    Moshi Dc Kilema South Water Supply Project (rehabilitation) 1 Kilema Pofo   6,1

97 5,000,0

00

    Same Dc Gonjanza water supply (Rehabilitation) 1 Gonjanza, 0 1,250

12,000,000

Page 25: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Same Dc Ruvu Kombo water Suppy project (Rehabilitation) 1 Ruvu Kombo 1 9

35 10,000,0

00

    Same DcKizungo water supply scheme (Rehabilitation) 2 Kizungo and Minyala 15 2,2

50 25,000,0

00

    Same Dc Myombo/Sambweni water supply schemes (Rehabilitation) 2 Myombo & Sambweni 15 1,7

50 12,000,0

00

    Same Dc Marien Makanya water supply project (Rehabilitation) 4 Marieni,Kasapo,Mgwa

si and Makanya 15 3,500

36,000,000

    Rombo Mahida/Mahango Water Supply Scheme 1 Mahango 14 3,500

41,391,136

    Hai Dc Losaa-Kia water supply scheme 10

Losaa,Kyuu, Nkwasira, Mungushi ,Sanyastation,Tindigani,Mtakuja, Kia ,Chemka na Eneo la Mlima shabaha katika mji mdogo wa Hai

2 -

123,750,000

      Machame Water Supply Scheme 2 Kingereka and Lerai 0 -

1,800,000

     HAI DC Lyamungo/Umbwe water Supply Scheme 1 Ngosero 0 -

24,525,289

Sub Total   40   88 32,959

463,620,425

  LINDI Kilwa Dc Rehabilitation of hand pump at Kipindimbi Village 1 Kipindimbi 1 2

50 3,750,0

00

    Kilwa Dc Rehabilitation of Kipatimu Water Supply Scheme 1 Kipatimu 14 2,5

00 7,200,0

00

    Kilwa Dc Rehabiliatation of Mandawa Water Supply Scheme 1 Mandawa 26 5,6

26 8,420,0

00

    Kilwa DcRehabilitation of 2 hand pumps at Miguruwe 1 Miguruwe 1 2

50 4,750,0

00

Page 26: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Kilwa Dc Rehabilitation of Hand pump at Nakiu Sec School 1 Nakiu 1 2

50 1,800,0

00

    Kilwa DcRehabilitation of 3Hand pumps at Hongwe 2 Hongwe 3 7

50 6,750,0

00

    Kilwa DcRehabilitation of 4Hand pumps at Namayuni 1 Namayuni 4 1,0

00 9,000,0

00

    Kilwa DcRehabilitation of Hand pump at Nandete 1 Nandete 3 7

50 5,362,1

23

    Kilwa DcRehabilitation of Hand pump at Zinga Kibaoni 1 Zinga Kibaoni 1 2

50 2,250,0

00

    Kilwa DcRehabilitation of Hand pump at Somanga 1 Somanga 2 5

00 4,500,0

00

    Kilwa DcRehabilitation of Hand pump at Nandembo 1 Nandembo 1 2

50 2,250,0

00

    Kilwa DcRehabilitation of Hand pump at Malalani 1 Malalani 1 2

50 2,250,0

00

    Kilwa Dc Rehabilitation of Hand pump at Marendengo Dispensary 1 Marendego 1 2

50 2,250,0

00

    Kilwa DcRehabilitation of Hand pump at Mtoni-Miteja 1 Mtoni-Miteja 1 2

50 4,750,0

00

    Kilwa DcRehabilitation of Hand pump at Likawage 1 Likawage 1 2

50 2,250,0

00

    Kilwa DcRehabilitation of Hand pump at Kichonda 1 Kichonda 1 2

50 2,250,0

00

    Liwale Rehabilitation of water project at Mikuyu Village 1 Mikuyu 3 750

3,000,000

    Liwale Rehabilitation of water project at Kimambi Village 1 Kimambi 3 7

50 3,000,0

00

    Liwale Rehabilitation of water project at Namakololo Village 1 Namakololo 3 7

50 3,000,0

00

Page 27: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Liwale Rehabilitation of water project at Naujombo Village 1 Naujombo 3 7

50 3,000,0

00

    LiwaleRehabilitation of water project at Nahoro Village 1 Nahoro 3 7

50 3,000,0

00

   Liwale

Rehabilitation of 5 water wells 5Mkundi, Kipelele, Kiangala, Mitunguni and Makata

5 1,250

2,724,792

    Nachingwea Rehabilitation of Water Supply Village at Mnero Miembeni village 2 Mnero Miembeni and

Mkonjela Chini 12 3,000

10,000,000

    Nachingwea Rehabilitation of Water Supply Scheme at Ruponda village 2 Ruponda and

Mwananyamala 25 4,005

40,478,132

   Nachingwea

Rehabilitation and extension of Water Supply Scheme at Mkonjela Juu village 1 Mkonjela Juu 10 8

20 11,000,0

00

    Ruangwa Dc Rehabilitation of 2 water wells at Liugulu Village 1 Liugulu 2 500

7,200,000

    Ruangwa Dc Rehabilitation of one water well at Likwachu Village 1 Likwachu 1 2

50 3,600,0

00

    Ruangwa Dc Rehabilitation of two water wells at Mmawa Village 1 Mmawa 2 5

00 5,000,0

00

    Ruangwa Dc Rehabilitation of one water wells at Chunyu Village 1 Chunyu 1 2

50 2,500,0

00

    Ruangwa Dc Rehabilitation of two water wells at Chimbila A Village 1 Chimbila A 2 5

00 5,000,0

00

    Ruangwa Dc Rehabilitation of one water well at Namichiga Village 1 Namichiga A 1 2

50 3,600,0

00

    Ruangwa DcRehabilitation of one water well at Ipingo Village 1 Ipingo 1 2

50 3,600,0

00

    Ruangwa Dc Rehabilitation of two water wells at Litama Village 1 Litama 2 5

00 7,200,0

00

Page 28: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

   Ruangwa Dc Rehabilitation of two water wells at Chinongwe

Village 4Juhudi A, Juhudi B, Chinongwe A and Chinongwe B

2 500

7,200,000

    Ruangwa Dc Rehabilitation of one water well at Makanjiro Village 1 Makanjiro 1 2

50 3,600,0

00

    Ruangwa Dc Rehabilitation of one water well at Likunja Village 1 Likunja 1 2

50 3,600,0

00

    Ruangwa Dc Rehabilitation of water Scheme at Machang'anja village 1 Mchang'anja 6 7

75 14,000,0

00

    Ruangwa Dc Rehabilitation of water Scheme at Chibula Village 1 Chibula 4 1,0

00 14,000,0

00

    Ruangwa Dc Rehabilitation of Mihewe Water Supply Scheme. 1 Mihewe 10 1,1

53 35,160,0

00

    Ruangwa Dc Rehabilitation of Mbekenyera water supply project 2 Mbekenyera and

Naunambe 0 -

16,280,000

    Ruangwa DcRehabilitation of Nkowe Water Project 1 Nkowe Village 4 1,0

00 4,514,8

79

    Lindi Mc Rehabilitaion of Mkanga Chini Water Supply Scheme 1 Mkanga chini 10 4

84 6,500,0

00

     Lindi McRehabilitation of 6 water points (hand pumps) at Nagiriki,Mkanga Chini, Ng'apa, Mbanja, Mitonga and Tandangongoro Villages

6

Nagiriki,Ng'apa, Mbanja,and Tandangongoro, Mitonga

6 1,500

11,553,438

    Lindi Dc Rehabilitation of Nyangao Water supply Projects 4

Nyangao A,Nyangao B, Mtakuja, and Cheleweni

20 5,000

46,500,000

    Lindi DcRehabilitation of Mtua Water Supply Projects 1 Mtua 9 2,2

50 33,226,0

61

    Lindi DcRehabilitation of Lihimilo Water supply Projects 1 Lihimilo 1 2

50 3,500,0

00 Sub Total   65   215 43,8  

Page 29: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

63

  MOROGORO Morogoro Mc Rehabilitation of Lugala water project 1 Lugala 14 2,9

99 20,567,6

10

    Morogoro Dc Rehabilitation of of Pangawe Water Project 1 Pangawe 12 1,500

38,000,000

     Morogoro Dc Rehabilitation of Kidugalo Water Supply Project 1 Kidugalo 3 750

16,500,000

    Gairo Dc Rehabilitation of Madege - Chakwale Water supply 6

Madege, Chakwale, Sanganjelu, Ngholongo, Kimashale and Kilimani

20 14,275

8,454,673

    Kilosa Dc Rehabilitation of 6 handpumps at Maguha ward 1 Inyunywe 3 651

4,800,000

        1 Chaumbele 3 679

4,800,000

    Kilosa DcRehabilitation of 6 handpumps at Tindiga ward 1 Malui 3 8

55 5,700,0

00

    Kilosa Dc   1 Malangali 3 711

5,740,000

    Kilosa Dc Replacement of handpumps 1 Ulelingombe 3 660

4,970,000

    Kilosa Dc Rehabilitation of hand pumps 1 Mlunga 1 410

2,300,000

    Kilosa Dc Rehabilitation of hand pumps 1 Kihelezo 14 2,009

25,200,000

    Kilosa Dc Rehabilitation of hand pumps 1 Kitete Msingazi 6 1,866

9,940,000

    Kilosa Dc Rehabilitation of hand pumps 1 Ulaya Mbuyuni 10 3,100

13,300,000

    Kilosa Dc Rehabilitation of hand pumps 1 Malolo B 4 1,230

6,600,000

    Kilosa DcRehabilitation of shallow wells at Mhenda 1 Mhenda 18 4,1

11 28,800,0

00

Page 30: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Kilosa DcSupply and installation of solar parnel at Dumila 3 Dumila Juu, Dumila

Kati and Matongolo 112 17,500

40,588,985

    Ifakara Tc Rehabilitation of Kilama/Kikwawila water supply project 2 Kilama and Kikwawila 10 2,6

03 28,091,0

54

    Ifakara TcRehabilitation of Kibaoni water supply project 1 Kibaoni 14 3,5

00 40,000,0

00

   

Ifakara Tc

Rehabilitation of 31 tube wells, installation of Hand pumps at 1.Michenga 2, 2.Kining'ina 2, 3.Machipi 2, 4.Mbasa 3, 5.Mlabani 3, 6.Lipangalala 2, 7.Kibaoni 3, 8.Katindiuka 3, 9.Ihanga 2, 10.Ifakara 4 , 11.Viwanja sitini 3 and 12. Lumemo 2

12

1.Michenga 2.Kining'ina 3.Machipi 4.Mbasa 5.Mlabani 6.Lipangalala 7.Kibaoni 8.Katindiuka 9.Ihanga 10.Ifakara 11.Viwanja sitini and 12. Lumemo

31 7,750

13,000,284

    Kilombero Rehabilitation of Idete Water Supply 1 Idete 2 400

33,309,289

    KilomberoRehabilitation of Mofu Secondary Water Supply 1 Mofu 6 3

50 8,600,0

00

    KilomberoRehabilitation Namwawala Water Supply 1 Idandu 12 6

20 10,000,0

00

    KilomberoRehabilitation Kamwene Water Supply 1 Kamwene 24 4,6

58 8,000,0

00

Page 31: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Kilombero Rehabilitation Masagati Secondary School Water Supply 1 Masagati 3 7

50 10,000,0

00

    Kilombero Rehabilitation Uchindile Secondary School Water Supply 1 Uchindile 3 1

50 18,044,9

15

   

Kilombero

Rehabilitation of 50 Handpumps/water points 50

Msalise Village, Mbingu Secondary, Muhelule Secondary, Mpanga, Masagati, Ipinde, Msolwa,Miwangani,Idete,Namwawala,Idandu,Mofu,Ikwambi,Mchombe,Mngeta,Lukolongo,Njage,Mkusi,Mkangawalo,Ikule,Igima,Kalengakelo,Mlimba,Kamwene,Matema,Viwanja 60,Ngwasi,Mikoleko,Induindembo,Utengule,Taweta,Tanganyika,Chita,Merera,Makutano,Sagamaganga,Msolwa,Signal,Kiberege,Kisawasawa,Mpanga,Mwaya,Mang'ula,Mkula,Katurukila,Magombera,Kitete,Msolwa mlimba,ujamaa,Sanje,Mgudeni,Mkamba,Nyange,Uchindile,Chisano,Mgugwe,

58 7,500

45,000,000

    Mvomero Rehabilitaion of 20 handpumped wells 10

Mziha(5) Bwage(2),kanga (2), Mangae(5), Mbogo(3), Manyinga(3)

20 13,200

48,125,226

Page 32: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

     Mvomero Rehabilitation of Kwadoli village Water scheme 1 Kwadoli 18 3,600

59,252,256

    Ulanga Rehalibitation of dug wells 3 1 Kituti 1 231

1,850,000

    Ulanga Rehalibitation of dug wells 3 1 Iputi 3 658

5,000,000

    Ulanga Rehalibitation of dug wells 3 1 Idunda 3 690

4,980,000

    Ulanga Rehalibitation of dug wells 3 1 Luhombero 3 676

4,990,000

    Ulanga Rehabilitation of dug wells 3 1 Namhanga 2 463

3,360,000

    Ulanga Rehabilitation of dug wells 3 1 Mdindo 1 231

1,950,000

    Ulanga Rehabilitation of dug wells 3 1 Milola 1 231

1,710,000

    Ulanga Rehabilitation of dug wells 3 1 Kivukoni 3 672

4,980,000

    Ulanga Rehabilitation of dug wells 3 1 Mavimba 3 693

5,650,000

    Ulanga Rehabilitation of dug wells 2 1 Mbuyuni 1 236

1,690,000

    Ulanga Rehabilitation of dug wells 3 1 Nakafuru 1 227

1,650,000

    Ulanga Rehabilitation of dug wells 2 1 Ikangao 1 237

1,650,000

    Ulanga Rehabilitation of dug wells 2 1 Nanungu 1 231

1,650,000

    Ulanga Rehabilitation of dug wells 2 1 Chigandugandu 3 651

4,950,000

    Ulanga Rehabilitation of dug wells 2 1 Kidugaro 2 462

3,300,000

    Ulanga Rehabilitation of dug wells 3 1 Mbuga 3 693

4,950,000

    Ulanga Rehabilitation of dug wells 3 1 Kichangani 3 694

4,950,000

Page 33: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Ulanga Rehabilitation of dug wells 3 1 Chikuti 2 467

3,300,000

    Ulanga Rehabilitation of dug wells 3 1 Magereza 3 695

4,650,000

    Ulanga Rehabilitation of dug wells 1 1 Iragua 1 230

1,640,000

    Ulanga Rehabilitation of dug wells 2 1 Nkongo 2 463

4,000,000

    Ulanga Rehabilitation of dug wells 2 1 Euga 2 467

3,300,000

    Ulanga Rehabilitation of dug wells 3 1 Mwaya 3 642

6,350,000

    UlangaRehabilitation of Minepa water Supply project 1 Minepa 25 5,5

25 30,500,0

00

    Malinyi Rehabilitation of Itete and Mtimbira water supply projecst. 4

Mtimbira, Usangule,Njiwa and Itete

100 14,560

11,000,000

    Malinyi Rehabilitation and Extension of Lupunga water Supply 1 Lupunga 7 1,0

00 23,000,0

00

    Malinyi Rehabilitation and Extension of Lupunga water Supply 1 Lupunga 7 1,0

00 23,000,0

00

Sub Total   135   617

131,412

727,684,292

4 MTWARA Masasi Dc Rehabilitation of Water project at Lupaso and

Lipumbulu villages 2 Lupaso, Lipumbulu 20 1,000

4,000,000

   Masasi Dc Rehabilitation of water project at Nanganga

Villages 5NangangaA, NangangaB, Mkang'u, Chipite, Namihungo

32 1,259

6,500,000

   Masasi Dc

Rehabilitation of water project at Nambawala, Nambaya, Mkalapa and Chikundi Villages 4

Nambawala, Nambaya, Chikundi, Mkalapa

36 1,500

4,500,000

    Masasi Dc Rehabilitation of water project at Namajani Villages 2 Namajani, Ngalole 10 5,0

00 55,165,5

10

Page 34: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Nanyumbu Tc Extension/rehabilitation of Water Supply Project, Mangaka Town 1 Mangaka Town 20 2,5

00 10,461,7

95

    Mtwara Dc Rehabilitation of Mbawala water projects 11

Mbawala, Maili kumi, Mdui, Nachenjele, Mwindi, Kawawa, Nanyati, Nyengedi, Naliendele, Mkangala, Mbawala chini

24 9,220

39,206,624

    Mtwara Mc Rehabilitation of hand pumps at Mikindani, Rwelu and Ufukoni project 3

Mikindani,Rwelu,Ufukoni

4 3,100

8,193,904

    Nanyamba Tc Rehabilitation and extension of Malongo water project 2 Malongo, Migombani 14 1,8

64 31,766,9

20

    Newala Dc Rehabilitation of pipe network from Malatu Shuleni to Malatu Chini. 3

Malatu Juu,Mdimba,malatu chini

36 5,343

3,352,573

    Tandahimba   1 Malamba 10 2,500

2,274,179

    Tandahimba Rehabilitation of(35 FNRWP & NFWP)water points in 16 villages 1 Mihambwe 2 5

00 909,67

2

    Tandahimba   1 Kidoo 2 500

454,836

    Tandahimba   1 Likolombe 2 500

454,836

    Tandahimba   1 Mchichira 8 2,000

1,819,343

    Tandahimba   1 Ghana juu na Chini 6 1,500

1,364,507

   Tandahimba

  3Mundamkulu, Mchichira na Nanyuwila

6 1,500

1,364,507

    Tandahimba   1 Mnyawa 8 2,000

1,819,343

    Tandahimba   1 Mchichira 8 2,0 1,819,3

Page 35: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

00 43

    Tandahimba   1 Nakayaka 6 1,500

1,819,343

    Tandahimba   1 Maundo juu 4   15,919,253

   Tandahimba

Rehabilitation of 63mm diameter pipeline from Mkonjowano to Litehu villages 2 Litehu and Libobe 40   6,950,0

00

Sub Total   48   298 45,286  

  MWANZA Kwimba Rehabilitation of ten wells at Solwe, Ibindo,

Mwakuba and Nyamilama Villages 4Solwe, Ibindo,Mwakuba and Nyamilama

10 2,500

30,475,211

     Kwimba Rehabilitation of water project at Dodoma Village 1 Dodoma 12 3,0

00 65,000,0

00

    Sengerema Rehabilitation of water supply scheme at chamabanda Nyanta kubwa and Kasungamile 3

chamabanda, Nyanta kubwa and Kasungamile

38 9,500

46,020,000

      Rehabilitation of 30 Shallow and Boreholes. 30

Igaka (Ilamata na Center), Kanyelele (Ilongamala), Kagunga (Nyarubanga, Sigu na Mwang'alanga), Nyasigu (Bulanda and Nyasigu B), Lubungo (, Nyanchenche (Nyakahunga),Nyampande (Centre), Ngoma B (Centre), Sota (Nyashimba na Kaningu), Ngoma A (Mliman and Nyabila), Nyamtelela (Kwa Peter na Isamilo),

30 7,500

19,910,109

Page 36: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

Nyamizeze (Iseni 2 and Kang'washi), Mami (Mwamadulu), Kamanga (Chamagati and Kamanga B), Nyamatongo (Buzuluga A, Kachaa and Mkorani), Sima (Ishingisha and Ishingisha A), Chinfunfu (Nyegega), Mulaga (Centre), Mulaga (Centre), Butonga (Kashindaga), Lubungo (Centre and P/school), Sota (Nghano and Kaningu),

    Mwanza CcRehabilitation of water project at Nhobola, Fumagila East and Fumagila West streets in Kishiri ward

3Nhobola, Fumagila East and Fumagila West

7 1,750

9,600,000

   Mwanza Cc

Rehabilitation of water project at Buhongwa, Mahina, Lwanhima, Igoma and Mkolani wards 5

Kigoto,Igelegele,Sahwa,Kakebe and Nyamazobe

3 750

3,021,553

   Mwanza Cc

Rehabilitation of water project at Buhongwa, Mahina, Lwanhima, Igoma and Mkolani wards 5 Mkapa,Ipuli,Kasese,Is

ebanda and Bulale 2 500

2,778,592

    Ilemela Mc Rehabilitation of 10 handpump (shallow well and borehole) 10

Masemele, Igogwe, Isanzu, Magaka, Wilunya, Ilekako, Nkoroto, Kihili, Bujimile and Igombe

10 2,500

10,000,000

Page 37: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Misingwi Dc Rehabilitation of Fella water supply system 3 Fella, Ngereka and Bujingwa 42 10,5

00 18,000,0

00

   Misingwi Dc

Rehabilitation of Usagara piped water scheme 2 Usagara and Sanjo 8 2,000

16,000,000

   Misingwi Dc

Transmision and Installation of TANESCO Power to the existing Isesa water supply source 1 Isesa 24 6,0

00 5,666,1

01

   

Misingwi Dc

Rehabilitation of 15 existing boreholes 15

Isesa, Nyamatala, Ngudama, Kabale,Mabuki,Kijima, Isakamawe, Chole, Ibongoya A, Iteja, Mamaye, Mhungwe, Kanyelele Mwasonge and Igumo

15 3,750

36,000,000

      Rehabilitation of 16 existing boreholes and Shallow wells 16

Buganda ,Mwagala, Igenge,Bukumbi,Mwasubi, Ntulya,Maganzo,Mondo,Koromije, Sanjo, Isenengeja, Nyang'homango(Sayona) and Mwaniko

16 4,000

32,000,000

    Magu Dc Rehabilitation of Nyashimba Water Supply Project 1 Nyashimba 12 3,0

00 31,072,1

38

   Magu Dc

Rehabilitation of Kisesa B Water Projects 1 Kisesa B 4 1,000

16,500,000

   

Magu Dc

Rehabilitation of 20 Deep Boreheoles 20

Shishani,Ihushi,Sese,Kayenze B, Iseni, Lumeji, Nyang'hanga,Bugatu,Jinjimili, Ihushi C,Mondo,Lubugu, Nkungulu,Nyashoshi,

20 5,000

70,130,642

Page 38: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

Misungwi,Ng'haya,Nyamahanga,Bundilya,Isangijo and Bukandwe

    Ukerewe Dc Rehabilitation of Kazirankanda Water Project 1 Muhula 4 1,000

20,000,000

     Ukerewe Dc Rehabilitation of Kazirankanda Water Project 1 Buhima 5 1,250

30,000,000

    Buchosa Dc Rehabilitaton of 10 BHS 10

Isenyi (Nyamafuluka, Kamuzizi, Mutukuka, Nyakwanzu), Nyakasas (Nyabintu, Kagomba and Luhiza), Kasheka (Centre), Luhama (Uwanjani), Nyamadoke (Centre and Primary), Migukulama (Centre), Nyashitale (Itobe), Buhama (Chingala), Nyamkolechiwa (Bugombe and Nyamkolechiwa B), Luholongoma (Magharibi na Kaskazini), Igwanzozu (Mkuyuni), Kabaganga (Byelele), Buswelu (Mashariki), Nyehunge (Mwabasabi), Bilulumo(1), Maisome (3), Iligamba (2)

30 7,500

21,339,981

Sub Total   132   292 73,000

483,514,326

  MANYARA Mbulu Tc Rehabilitation of hand pumps in tlawi 1 Tlawi 3 7

50 6,500,9

52

Page 39: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Mbulu Tc Rehabilitation of hand pumps in tlawi 1 Bargish Uwa      

    Mbulu Tc Rehabilitation of hand pumps in tlawi 1 Kainam      

    Simanjiro Shambarai water supply project (REH) 1 Shambarai 11 2,750

10,800,000

    Simanjiro M/Tembo, Magadini and Narakauo water supply project 1 M/Tembo   7,5

00 22,731,4

62

    Simanjiro   1 Magadini 30    

    Kiteto Laiseri water supply project 1 Laiseri 16 4,000

18,414,430

    Babati Dc Maganjwa Water supply Project 1 Maganjwa 11 2,500

40,000,000

    Babati Dc Minjingu-Olasiti water supply project 2 Minjingu,Olasiti 20 5,000

52,500,000

    Babati DcWaloha-Mwikantsi water supply project 1 Mwinkatsi 1 2

50 2,500,0

00

    Babati Dc Gidabagar Water Well 1 Gidabaghar, 1 250

2,500,000

    Babati Dc Gijedabong Water Well 1 Gijedabong, 1 250

2,500,000

    Babati Dc Endadoshi Water Well 1 Endadosh 1 250

2,500,000

    Babati Dc Sangara Water Well 1 Sangara 1 250

2,500,000

    Babati Dc Long Water Wells 1 Long 1 250

2,500,000

    Babati Dc Boahay Water Supply 1 Boahay 1 250

3,500,000

    Babati Dc Endaberg water supply project 1 Endaberg 14 3,500

36,500,000

    Babati Dc Seleto Water Supply Projct 1 Seleto 0 800

5,197,541

    Hanang Dc Gidagharbu Water Supply Project 1 Gidagharbu 20 2,5 59,218,0

Page 40: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

00 57

     Hanang Dc Galangala water supply project 1 Galangala 14 3,500

7,000,000

    Mbulu Dc Rehabilitation of seven (7) hand pumps in five villages 1 Eshkesh 7 1,7

50 31,245,3

06

    Mbulu Dc   1 Domanga 2      

    Mbulu Dc   1 Endalat      

    Mbulu Dc   1 Yaeda Chini 2      

    Mbulu Dc   1 Endadubu      

    Mbulu Dc Rehabilitation of five (5) hand pumps in five villages 1 Genda 5 1,2

50 35,445,3

22

    Mbulu Dc   1 Ngorati      

    Mbulu Dc   1 maretadu juu      

    Mbulu Dc   1 Endahagichan      

    Mbulu Dc   1 labay      

   Mbulu Dc

Flushing and pump test at Geterer, Bashay and Maretadu Chini Villages 1 Geterer   7

50 6,000,0

00

    Mbulu Dc   1 Yaeda Kati/Bashay secondary 3    

    Mbulu Dc  1

Maretadu Chini      

Sub Total Manyara   34   161 38,300  

1 MBEYA Kyela Dc Rehabilitation of Ngamanga water supply project 3 Mpanda, Kyangala,

Lukama 80 3,048

28,000,000

Page 41: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Kyela DcRehabilitation of Makwale water supply project 1 Makwale 32 1,9

58 25,956,5

74

    Kyela DcRehabilitation of Matema water project 1 Ikombe(Lyulilo) 6 7

50 18,000,0

00

    Rungwe Dc Rehabilitation of Nzunda Water Supply scheme 1 Nzunda 10 2,5

00 20,000,0

00

    Rungwe DcRehabilitation of Nsyamba Water Supply 2 Mpuga& Igalamu 15 3,7

50 37,375,5

53

    Rungwe DcRehabilitation of Mbeye-1 Water Supplyproject 2 Mbeye-1 and Idweli 10 2,5

00 72,387,3

34

    Mbalali Dc Rehabilitation of Mbarali Water project 2 Urunda, Mbarali 10 4,421

11,400,000

     Mbalali Dc Rehabilitation of Chimala Water Project 5 Chimala,Mengele,Lyambogo,Isitu,Igumbilo 8 2,9

65 32,575,1

62

    Chuya Dc Rehabilitation of Handpumps Water Projects at Kambikatoto Village 1 Kambikatoto 4 1,0

00 4,100,0

00

    Chuya Dc Rehabilitation of Handpumps Water Projects at Bitimanyanga Village 1 Bitimanyanga 2 5

00 2,480,0

00

    Chuya Dc Rehabilitation and Extension of Handpumps Water Projects at Lupa 2 Lupatingatinga and

Ifuma 10 2,500

4,992,630

    Chuya Dc Rehabilitation of Handpumps Water Projects at Mwiji Village 1 Mwiji 2 5

00 690,00

0

   Chuya Dc

Rehabilitation and Extension of Mapogoro Village Water Supply Project 1 Mapogoro 13 3,2

50 9,050,0

00

    Mbeya Dc Rehabilitation of Isangala water project 5Lusungo, Malowe, Isangala, Nsambya, Mwaselela

25 3,750

20,000,000

    Mbeya Dc Rehabilitation of Santilya project 1 Santilya 5 1,250

14,045,000

Page 42: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Mbeya Dc Rehabilitation of Igoma, Kimondo, Mwanzanzi Project 3 Igoma, Kimondo

Mwanzazi 11 1,600

20,000,000

    Mbeya DcRehabilitation of Usoha/Muungano project 2 Usoha

Muungano 3 750

17,000,000

      Rehabilitation of Iwiji water project 1 Iwiji 10 2,500

16,411,948

    Busekelo Dc Rehabilitation of Kabembe Group Water Supply Project 2 Kabembe and Kibole 6

6 1,50

0

    Busekelo Dc Rehabilitation of Nyandege Water Supply Project 3 Luteba, Kilasi and

Mpunguti 12 12

3,000

    Busekelo DcRehabilitation of Kilugu Water Supply Project 1 Kilugu 5

5 1,25

0

    Busekelo DcRehabilitation of Kifunda water scheme 1 Kifunda 9

9 75

0

    Mbeya Cc Rehabilitation and construction of Mwasanga water supply project 2 Ndunguya, Isoso 24 2,5

00 25,856,9

01

     Mbeya Cc Improvement of Mwansekwa water supply project 1 mwansekwa 4 2,2

43 10,000,0

00

Sub Total   45   316 44,267

390,327,602

  RUKWA Sumbawanga Dc

Rehabilitation of Kinambo gravity water supply project 3 Kinambo,Mahenje,Lya

nza 33 6,892

9,994,625

   Sumbawanga Dc

Rehabilitation of Solola gravity water supply project 1 Solola 12 3,1

77 13,000,0

00

   Sumbawanga Dc Rehabilitation of malolwa protected spring 1 Malolwa 8 2,0

00 4,305,3

75

   Sumbawanga Dc Rehabilitation of Miangula gravity water supply 1 Miangalua 3 1,5

00 5,000,0

00

Page 43: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

   Sumbawanga Dc

Rehabilitation of 3 Protected Spring at Sandulula Village 1 Sandulula 9 2,2

50 1,500,0

00

   Sumbawanga Dc Rehabilitation of 2 Boreholes at Kapenta Village 1 Kapenta 2 5

00 6,000,0

00

   Sumbawanga Dc

Rehabilitation of One Borehole at Kalakala Village 1 Kalakala 1 2

50 3,000,0

00

   Sumbawanga Dc

Rehabilitation of three Borehole at Mbuze Village 1 Muze 6 1,5

00 5,500,0

00

   Sumbawanga Dc Rehabilitation of 5 Boreholes at Kavifuti Village 1 Kavifuti 5 1,2

50 10,000,0

00

   Sumbawanga Dc Rehabilitation of One Borehole at Kipeta village 1 Kipeta 1 2

50 1,000,0

00

   Sumbawanga Dc Rehabilitation of 3 Boreholes at Mnokola Village 1 Mnokola 3 7

50 9,000,0

00

   Sumbawanga Dc Rehabilitation of 2 Boreholes at Mshani Village 1 Mshani 2 5

00 6,000,0

00

   Sumbawanga Dc Rehabilitation of 2 Boreholes at Kalole Village 1 Kalole 2 5

00 2,700,0

00

   Sumbawanga Dc Rehabilitation of 3 Boreholes at Tunko Village 1 Tunko 3 7

50 8,000,0

00

   Sumbawanga Dc Rehabilitation of 2 Boreholes at Movu Village 1 Movu 2 5

00 6,000,0

00

    Sumbawanga Rehabilitation of 2 Boreholes at Mpui Village 2 Mpui A&Mpui B 2 5 2,000,0

Page 44: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

Dc 00 00

   Sumbawanga Dc

Rehabilitation of One Shallow Well at Mbwilo Village 1 Mbwilo 1 2

50 2,000,0

00

   Sumbawanga Dc

Rehabilitation of 2 Shallow wellls at Mpwapwa Village 1 Mpwapwa 2 5

00 4,000,0

00

   Sumbawanga Dc

Rehabilitation of 3 Shallow Wells at Kianda Igonda Village 1 Kianda Igonda 2 5

00 4,000,0

00

   Sumbawanga Dc

Rehabilitation of 2 Shallow Wells at Kasekela Village 1 Kasekela 2 5

00 4,000,0

00

   Sumbawanga Dc

Rehabilitation of 3 Shallow Wells at Mkunda Village 1 Mkunda 3 7

50 8,000,0

00

    Sumbawanga Mc

Rehabilitaion of Kankwale water supply scheme 1 Kankwale 10 3,4

34 42,188,2

96

   Sumbawanga Mc Rehabilitaion of Kisumba water supply scheme 1 Kisumba 15 3,7

08 1,740,0

00

   Sumbawanga Mc

Rehabilitaion of Isesa, ulinji, Ntendo, Nambogo,fyengelezya and Luwa water supply schemes

5Isesa, ulinji, Ntendo,Nambogo fyengelezya and Luwa

36 1,250

60,000,000

   Sumbawanga Mc Rehabilitation of Malonje water supply scheme 1 Malonje 6 1,5

00 6,900,0

00

    Kalambo Dc Rehabilitation of Kisungamile village 1 Kisungamile 4 1,850

7,222,889

   Kalambo Dc Rehabilitation of two villages at Msoma and

Mpenje 2 Msoma and Mpenje 6 2,798

5,872,889

Page 45: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

   Kalambo Dc Rehabilitation of Kasanga Village Water

Supply Scheme 1 Kasanga 4 1,500

5,950,000

     Kalambo Dc

Rehabilitation of 13 boreholes by installing new hand pumps at Kalemasha 2, Mbuluma 2, Katapulo 2, Selengoma 2, Ilonga 1, Mlenje 1, Mkowe 1, and Mbuza 1 villages

8

Kalemasha, Mbuluma , Katapulo , Selengoma , Ilonga , Mlenje , Mkowe , and Mbuza villages

13 3,250

52,000,000

    Nkasi Dc Rehabilitation of Sintali water supply scheme 1 Sintali 4 1,000

7,455,457

   Nkasi Dc

Rehabilitation of 1 borehole at Lunyala Village 1 Lunyala 1 250

1,950,000

   Nkasi Dc

Rehabilitation of 4 boreholes at Myula Village 1 Myula 4 1,000

3,240,000

   Nkasi Dc

Rehabilitation of 1 borehole at Nkomolo Village 1 Nkomolo 1 250

3,600,000

   Nkasi Dc

Rehabilitation of 1 borehole at Kipili Village 1 Kipili 1 250

1,450,000

   Nkasi Dc

Rehabilitation of 2 boreholes at Mwai Village 1 Mwai 2 500

3,850,000

   Nkasi Dc

Rehabilitation of 6 boreholes at Kabwe Village 1 Kabwe 6 1,500

6,460,000

   Nkasi Dc Rehabilitation of 2 boreholes at Milundikwa

Village 1 Milundikwa 2 500

3,300,000

   Nkasi Dc

Rehabilitation of 3 boreholes at Isale Village 1 Isale 3 750

3,600,000

   Nkasi Dc

Rehabilitation of 2 shallow wells at Kalila Village 1 Kalila 2 500

2,500,000

Sub Total   54   224 51,359

334,279,530

Page 46: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

  RUVUMA Tunduru Dc Rehabilitation of water project at Ndenyende Village 1 Ndenyende 6 1,5

00 22,000,0

00

   Tunduru Dc Rehabilitation of water project at

NaluwaleVillage 2 Naluwale and Mkwajunii 8 8

18 10,000,0

00

   Tunduru Dc Rehabilitation of water project at Lipopo, Nalasi

and Chilundundu. 3 Lipepo, Nalasi and Chilundundu 48 12,0

00 20,000,0

00

   

Tunduru Dc Rehabilitation of Hand pumps at Misechela,Ligoma,Angalia, Mchekeni, Jakika, Legezamwendo, Mbatamila, and Machemba Villages

8

Misechela,Ligoma,Angalia, Mchekeni, Jakika, Legezamwendo, Mbatamila, and Machemba

8 2,000

21,707,932

    Mbinga Tc Rehabilitation of water project at Kitanda and Masimeri Village 2 Kitanda and Masimeri 15 1,0

00 21,279,0

98

    Mbinga Dc Rehabilitation of water project at Matanga Village 1 Matanga 13 1,6

90 11,123,4

60

   Mbinga Dc Rehabilitation of water project Kindimba juu

village 1 Kindimba 25 2,305

21,393,269

   Mbinga Dc

Rehabilitaion of water project at Unango Village 1 Unango 14 2,300

5,989,555

    Numtumbo Dc Rehabilitation of Namabengo & Nambalama Water Supply project 2 Namabengo/

Nambalama 31 7,714

15,520,064

     Numtumbo Dc Rehabilitation of Handpumps in 29 Villages. 29 Magazini,Likusanguse, Litola,Kumbara,Mageuzi,Mlilayoyo,Luhangano,Lumeha,Msindo,Utwango,Mdwema,Lihimbalilo,Namahoka, Matepwende,Ulamboni,,Lusewa,Mironji,Kilimasesa,Songambele,Mgombasi,Mtumbatimaji,Nambecha,Chengena

63 9,363

136,751,000

Page 47: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

,Namanguli,,Ligunga,Mtonya,Ligera,Mtonya,Ligunga

    Songea Mc Rehabilitation of 17 Hand pumps. 17

Makambi, Merikebu, Lilambo A, Lilambo B, Likuyufusi,Londoni, Mahilo, Mkuzo, Namanyigu, Namanditi and Masigira

17 3,500

16,357,954

    Songea Dc Rehabilitation of Ndongosi piped gravity water project, 1 Ndongosi 11 1,4

00 24,567,0

00

   Songea Dc Rehabilitation of Namatuhi piped gravity water

project, 1 Namatuhi 9 2,000

23,650,000

   Songea Dc Rehabilitation of Mgazini piped gravity water

project, 1 Mgazini 4 600

21,340,000

   Songea Dc Rehabilitation of 4 natural wells at Ngahokora

village. 1 Ngahokora 4 600

19,246,367

   Songea Dc

Rehabilitation of 110 shallow wells fitted with hand pumps at Liweta village. 9

Liweta, Litisha, Magagura, Maposeni, Mpitimbi A & B, Kizuka and Nakawale

110 8,997

76,890,000

    Nyasa Dc Rehibilitation of Mtipwili water supply scheme 1 Mtipwili 28 2,300

37,591,790

      Rehibiltation of Mitomoni water supply scheme 1 Mitomoni 5 1,250

16,200,000

    Madaba Dc Rehabilitation of Gravity Water Supply at Matetereka village 1 Matetereka 21 1,8

50 15,040,5

00

     Madaba Dc Rehabilitation of hand pumps 7

Likarangilo,Luhimba,Gumbiro,Lutukila,Mbangamawe,Ngadinda and Mtyangimbole

14 2,800

23,822,787

Sub Total   90   454 65,987

560,470,776

Page 48: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

  SONGWE Songwe Dc Rehabilitation of Ifwenkenya water supply

project 1 Ifwenkenya 24 5,107

7,985,643

     Songwe Dc Rehabilitation of Mwambani water scheme project 1 Mwambani 10 4,8

72 3,619,0

17

    Mbozi Dc Rehabilitation/ Construction of treatment plant and fencing at Ihanda village water source 1 Ihanda 26 5

00 30,000,0

00

   

Mbozi DcRehabilitation and expansion of improved of four traditional wells at Mlangali, Chimbuya, and Mpera Villages

3 Chimbuya, Mlangali and Mpera 3 2,2

50 16,000,0

00

   Mbozi Dc

Water sources protection and demacations 4 Idiwili,Chimbuya,Mkabgali and Mpera

0 -

6,000,000

    Momba Dc & Tunduma Tc

Rehabilitation of Kamsamba water supply project 1 kamsamba 2 5

00 4,485,6

43

   Momba Dc & Tunduma Tc

Rehabilitation of 6 borehole at katete and mpemba village 2 Mpemba and Katete 6 1,5

00 3,500,2

50

   

Momba Dc & Tunduma Tc

Rehabilitation of 14 water borehole at 14 villages, 14

Mkutano,Chindi,Ipata,Ntinga,Chuo,Tontela,Kapele,Nyenjele,Mpui,Nkangamo,Mweenemba,Chiwanda,Lwatwe and Namchinka.

14 3,500

5,981,919

    Ileje Dc Rehabilitation and extension of Igumila Water Project 1 Igumila 8 1,8

85 35,000,0

00

   Ileje Dc Rehabilitation of Yenzebwe, Ibezya, Mapogolo

and Msia hand Pump 4 Yenzebwe, Ibezya, Mapogolo and Msia 5 7,9

12 14,000,0

00

Page 49: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

   Ileje Dc

Rehabilitation of Sub gravity water project for Sange Secondary and Ngulugulu Dispensary 2 Sange and Ngulugulu 4 1,5

00 25,000,0

00

   Ileje Dc

Water Sources Protection and Demarcation 0   0   21,671,107

Sub Total   34   102 29,526

173,243,579

  SINGIDA Iramba Dc Rehabilitation of 2 hand pump at Kidaru Village 1 Kidaru 2 500

29,600,000

    Iramba Dc Rehabilitation of 1 hand pump at Ndulungu Village 1 Ndulungu 1 2

50  

    Iramba DcRehabilitation of 1 hand pump at Luono Village 1 Luono 1 2

50  

    Iramba DcRehabilitation of 2 hand pump at Kisana Village 1 Kisana 1 2

50  

    Iramba Dc Rehabilitation of Sumersible Pump at Tyme Water Supply Project 1 Tyme 18 3,6

00  

    Iramba DcRehabilitation of 1 hand pump at Igumo 1 Igumo 1 2

50  

    Iramba DcRehabilitation of 1 hand pump at Ulemo Village 1 Ulemo 1 2

50  

    Iramba DcRehabilitation of 1 hand pump at Nsunsu Village 1 Nsunsu 1 2

50  

    Iramba Dc Rehabilitation of 1 hand pump at Lunsanga Village 1 Lunsanga 1 2

50  

    Iramba DcRehabilitation of 1 hand pump at Ussure Village 1 Ussure 1 2

50  

    Manyoni Dc Rehabilitation of MSEMEMBO water supply project 1 Msemembo 22 4,4

00 26,500,0

00

Page 50: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Manyoni Dc Rehabilitation of Chibumagwa water supply project 1 Chibumagwa 6 1,5

00 9,314,0

00

    Manyoni DcRehabilitation of Mitoho Wind mill water scheme 1 Mitoo 2 5

00 5,000,0

00

    Manyoni Dc Rehabilitation of MKOMBOZI Water Supply Project. 1 Chilejeho 2 5

00 3,000,0

00

    Manyoni Dc Rehabilitation of 3 hand dug wells in Kintinku village 1 Kintinku 3 7

50 8,250,0

00

    Manyoni Dc Rehabilitation of 1 hand dug well in Sasajila village 1 Sasajila 1 2

50 2,750,0

00

    Manyoni Dc Rehabilitation of Sanza/Ntope water supply project 2 Sanza and Ntope 8 2,0

00 9,700,0

00

    Itigi Mwanagembe Ws 1 Mwamagembe 10 2,000

5,000,000

     Itigi Rehabilitation of hand pumps for Gurungu WS 1 Gurungu 2 500

5,119,058

    Mkalama Rehabilitation of 2 hand pumps in Nkungi village 1 Nkungi 2 500

2,000,000

    Mkalama Rehabilitation of 2 hand pumps in Gumanga village 1 Gumanga 2 5

00 2,000,0

00

    Mkalama Rehabilitation of 3 hand pump in Nkalakala village 1 Nkalakala 3 7

50 3,000,0

00

    Mkalama Rehabilitation of 2 hand pumps in Mwangeza village 1 Mwangeza 2 5

00 2,000,0

00

    Mkalama Rehabilitation of 2 hand pumps in Matongo village 1 Matongo 2 5

00 2,000,0

00

    MkalamaRehabilitation of 1 hand pump in Senene village 1 Senene 1 2

50 1,000,0

00

    MkalamaRehabilitation of 1 hand pump in Ilunda village 1 Ilunda 1 2

50 1,000,0

00

Page 51: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    MkalamaRehabilitation of 2 hand pumps in Tumuli village 1 Tumuli 3 7

50 3,000,0

00

    MkalamaRehabilitation of 2 hand pumps in Ilongo village 1 Ilongo 2 5

00 2,000,0

00

    MkalamaRehabilitation of 3 hand pumps in Malaja village 1 Malaja 3 7

50 3,000,0

00

    Mkalama Rehabilitation of 2 hand pumps in Iguguno village 1 Iguguno 2 5

00 2,000,0

00

    Mkalama Supply and installation of 3 new handpumps in Msingi village at 30m 1 Msingi 3 7

50 12,600,0

00

   Mkalama

Supply and installation of 3 new handpumps in Kinampundu village at 24 1 Kinampundu 3 7

50 12,600,0

00

   Mkalama

Supply and installation of 1 new handpumps in Matongo village at 30m 1 Matongo 1 2

50 4,200,0

00

    Mkalama Supply and installation of 1 new handpump in Mbigigi village at 24 1 Mbigigi 1 2

50 4,200,0

00

    Mkalama Supply and installation of 1 new handpumps in Mpako village at 33m 1 Mpako 1 2

50 4,200,0

00

   Mkalama

Supply and installation of 1 new handpump in Mwangeza village at 21m 1 Mwangeza 1 2

50 4,200,0

00

    Mkalama Supply and installation of 1 new handpump in Malaja village at 30m 1 Malaja 1 2

50 4,200,0

00

   Mkalama

Supply and installation of 1 new handpumps in Iguguno village at 24m 1 Iguguno 1 2

50 4,200,0

00

    Mkalama Supply and installation of 2 new handpumps in Nkungi village at 30m 1 Nkungi 2 5

00 8,400,0

00

Page 52: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    MkalamaReabilitation of Miganga water supply project 1 Miganga 18 4,5

00 6,862,4

18

    MkalamaRehabilitation of Kikhonda Water Supply Project 1 Kikhonda 38 9,5

00 8,000,0

00

    Singida Dc Rehabilitation of four (4) hand pumps at Minyaa village. 1 Minyaa 4 1,0

00 11,093,3

32

    Singida Dc Rehabilitation of one (1) hand pump at Nduu village. 1 Nduu 1 2

50 2,773,3

33

   Singida Dc

Rehabilitation of one (1) hand pump at Mkulu Subvillage in Nduamughanga village. 1 Nduamughanga 1 2

50 2,773,3

33

    Singida Dc Rehabilitation of four (4) hand pumps at Ng'ongoampoku village. 1 Ng'ongoampoku 4 1,0

00 11,093,3

32

    Singida Dc Rehabilitation of one (1) hand pump at Msimihi village. 1 Msimihi 1 2

50 2,773,3

33

    Singida Dc Rehabilitation of one (1) hand pump at Ntondo village. 1 Ntondo 2 5

00 5,546,6

66

    Singida Dc Rehabilitation of one (1) hand pump at Semfuru village. 1 Semfuru 1 2

50 2,773,3

33

    Singida Dc Rehabilitation of two (2) hand pumps at Kibaoni village. 1 Kibaoni 2 5

00 5,546,6

66

    Singida Dc Rehabilitation of one (1) hand pump at Mikuyu village. 1 Mikuyu 1 2

50 2,773,3

33

    Singida Dc Rehabilitation of two (2) hand pumps at Merya village. 1 Merya 2 5

00 5,546,6

66

    Singida Dc Rehabilitation of one (1) hand pump at Minyenye village. 1 Minyenye 1 2

50 2,773,3

33

    Singida Dc Rehabilitation of one (1) hand pump at Ntunduu village. 1 Ntunduu 1 2

50 2,773,3

33

Page 53: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Singida Dc Rehabilitation of one (1) hand pump at Kilimo- Ughandi "A" village. 1 Ughandi "A" 1 2

50 3,773,3

33

   Singida Dc

Rehabilitation of water pump and construction of pump house at Msange Village 1 Msange

- 3,9

00 24,126,6

72

    Singida Dc Rehabilitation of three (3) DPs at Ikhanoda village. 1 Ikhanoda 6 1,2

00 30,000,0

00

    Singida Mc Rehabilitati of three (3) hand pumps. 1 Mtamaa 3 750

4,402,000

     Singida Mc Rehabilitation of two (2) hand pump at Unyianga village. 1 Unyianga 2 5

00 2,934,6

66

    Ikungi Dc Rehabilitation and extension of water project at Issuna A Village 1 Issuna A 14 3,3

64 58,545,7

77

     Ikungi Dc Rehabilitation of Mgungira water supply 1 mgungira 24 4,705

15,500,000

Total   61   248 61,669

398,417,917

1 PWANI Kisarawe Dc Rehabilitation of Chole Water Suuply Scheme 1 Chole 2 500

5,900,000

    Kisarawe DcRehabilitation of Kisanga Water Supply Scheme 1 Kisanga 10 1,0

00 4,000,0

00

    Kisarawe DcMaintanace of Ngongele water scheme 1 Ngongele 4 8

69 4,500,0

00

    Kisarawe Dc Rehabilitation of Kibuta water project 1 Kibuta 12 2,496

4,079,790

    Chalinze Dc Rehabilitation of 1 Borehole at Kwamsanja village. 1 Kwamsanja 1 2

80 6,000,0

00

    Chalinze DcRehabilitation of 1 Well at Kwamduma village. 1 Kwamduma 1 3

00 3,500,0

00

    Chalinze DcRehabilitation of 1 Well at Kwaruhombo village. 1 Kwaruhombo 1 3

00 10,000,0

00

Page 54: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Chalinze Dc Rehabilitation of Kidogozero/Kitonga Water Supply Scheme. 1 Kitonga 2 3

46 12,000,0

00

    Chalinze DcRehabilitation of Saadani Water Supply Scheme 1 Saadani 17 1,8

00 10,000,0

00

    Chalinze DcRehabilitation of Kibindu Water Supply Scheme. 1 Kibindu 0

- 14,500,0

00

    Chalinze Dc Rehabilitation of Matuli/Mdaula Water Supply Scheme. 2 Matuli and Mdaula 6 1,5

43 8,000,0

00

    Bagamoyo Dc Rehabilitation of Water Supply Project 1 Mangesani 3 500

6,400,000

     Bagamoyo Dc Rehabilitation of water hand pumps 2 Nianjema and Yombo 9 2,2

50 18,400,0

00

    Kibaha Tc Rehabilitation of Sofu water project and Kidugalo water Project 2 Sofu and Kidugalo 4 1,0

00 7,262,0

33

    Kibaha Dc Rehabilitation of Ngeta water supply scheme 7

Ngeta, Kikongo, Lupunga, Mwanabwito, Kisabi, Madimla and Msongola

32 8,000

30,000,000

    Mkuranga Rehabilitation of 12 Hand Pump in 8 Villages 8 Tipo 2 500

9,000,000

    Mkuranga   1 Kitomondo 3 750

6,000,000

    Mkuranga   1 Mbezi 1 250

2,000,000

    Mkuranga   1 Msufini 2 500

4,000,000

    Mkuranga   1 Sunguvuni 1 250

2,000,000

    Mkuranga   1 Mbulani 1 250

2,000,000

    Mkuranga   1 Mlamleni 2 500

9,500,000

Page 55: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

   Mkuranga

Rehabilitation of 2 Water Supply Projects at Panzuo Secondary and Shungubweni Village 2 Shungubweni and

Mbulani 15 3,750

18,000,000

    Rufiji Dc Rehabilitation of Mbwara water supply 1 Mbwara 2 500  

    Mafia Dc Rehabilitation of 29 Shallow wells 1 Ndagoni, 2 400

3,972,414

    Mafia Dc Rehabilitation of chunguruma water supply scheme 1 Chunguruma, 4 1,3

00 7,944,8

28

    Mafia Dc Rehabilitation of Marimbani water supply scheme 1 Marimbani, 2 1,6

00 3,972,4

14

    Mafia DcRehabilitation of Kibada water supply scheme 1 Kibada 1 1,7

60 1,986,2

07

    Mafia DcRehabilitation of Kungwi water supply scheme 1 Kungwi 3 2

60 5,958,6

21

    Mafia DcRehabilitation of Jimbo water supply scheme 1 Jimbo 2 4

50 3,972,4

14

    Mafia DcRehabilitation of Kilindoni water supply scheme 1 Kilindoni 3 4

00 5,958,6

21

    Mafia DcRehabilitation of Kiegeani water supply scheme 1 Kiegeani 3 1,3

20 5,958,6

21

    Mafia DcRehabilitation of Dongo water supply scheme 1 Dongo 3 2,2

52 5,958,6

21

    Mafia DcRehabilitation of Gonge water supply scheme 1 Gonge 2 1,3

00 3,972,4

14

    Mafia DcRehabilitation of Micheni water supply scheme 1 Micheni 4 9

58 7,944,8

28

    Kibiti Dc Rehabilitation of Ruaruke water supply scheme 2 Ruaruke A and Ruaruke B 18 4,3

73 13,803,1

72 Sub Total   54   180 44,8 268,444,99

Page 56: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

07 5

  TABORA Igunga Simbo water supply project 2 Simbo and Idubula 18 4,500

65,000,000

    Igunga Mwandihimiji water supply project 2 Mwandihimiji and Mwamagobo 10 2,5

00 7,000,0

00

    Igunga Bulangamilwa water supply project 1 Bulangamilwa 18 4,500

8,000,000

    Igunga Bulumbela wate supply r project 1 Bulumbela 12 3,000

3,000,000

    Igunga Ulaya water project 1 Ulaya 2 2,000

6,000,000

    Igunga Choma wate supply project 2 Choma cha nkola and Chamalendi 8 2,0

00 12,000,0

00

   

Igunga

Rehabilitation of 30 boreholes 13

Uswaya 6, Buhekela 2 , Itumba 2, Lugubu 1, Igumo 2, Mwakabuta 1,Mizanza 1, Chapela 2, Busomeke 1, Simbo 1, Iborogelo 3, Majengo 6, Utuja 2 (Pump cylinders and other related fittings)

30 7,500

24,937,945

    Urambo Songambele water Scheme 1 Songambele 56 4,250

5,494,042

     Urambo 13 boreholes 13

Ukondomoyo (1),Vumilia (1) ,Yelayela (1),Nsogolo(1),Tebela (1),Ugalla (1),Jionee-Mwenyewe(1),Muungano(1),Uyogo (1),Igunguli (1),Ussoke-Mjini(1),Izimbili(1)

13 3,250

12,600,000

    Urambo Usisya Water scheme Village 1 Usisya 18 2,560

5,237,616

Page 57: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Urambo water Project at Ukondamoyo Village 1 Ukondamoyo 40 4,1

50 5,500,0

00

    Uyui Dc Msimba and mwakashindye water supply project (rehabilitation) 2 Msimba and

Mwakashindye 9 8,000

6,501,300

    Uyui Dc Borehole (Rehabilitation) 1 Ishihimulwa 12 3,000

30,000,000

    Uyui Dc   1 Inonelwa 3 750

6,710,130

    Uyui Dc   1 Kilungu 8 2,271  

    Uyui Dc   1 Igoko 7 1,750

11,000,000

    Uyui Dc   1 Ikonola 5 674  

    Uyui Dc   1 Ilalwansimba 11 2,750  

    Uyui Dc   1 Isila 8 2,000

27,600,000

    Uyui Dc   1 Kasisi B 3 750  

    Uyui Dc   1 Mbola 7 1,750  

    Uyui Dc   1 Kigwa 21 5,250  

    Uyui Dc   1 Kinamagi 4 1,000  

    Uyui Dc   1 Nzigala 5 1,250  

    Uyui Dc   1 Matanda 1 1,250  

    Uyui Dc   1 Mwakadala 5 2,000  

    Uyui Dc Nkutu Borehole 1 Nlutu 2 500

5,000,000

    Sikonge Dc Ipole Pipe Water Supply Project 4 Ipole, Udongo, Makazi 20 5,0 9,000,0

Page 58: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

and Ugunda 00 00

   

Sikonge Dc

Mibono Pipe water supply scheme 8

Kiloleli,Kanyamsenga, Ukondamoyo,Mibono mpya,Imalampaka,Mtakuja,Songambele,Lembel

31 62

15,803,887

   

Sikonge Dc

30 boreholes. 11

Pangale (2),Tutuo (3),Mole (3),Igigwa (1),Mpombwe (4),Mkolye (3),Chabutwa (3),Kisanga (2), Msuva (2),Mwenge (3), Kasandalala (4)

30 30

20,000,000

     Sikonge Dc Majojoro water supply project 1 Majojoro 3 750

2,380,216

    Nzega Dc Mihama Water Supply Scheme 3 Nkiniziwa, Ngukumo, and Mwambaha 30 7,5

00 3,000,0

00

    Nzega Dc Nata Water Supply Scheme 2 Nata and Mwamalulu 64 7,886

30,000,000

    Nzega Dc Bukene Water Supply Scheme 1 Bukene 4 1,000

2,000,000

    Nzega Dc Sojo Water Supply Scheme 1 Sojo 8 2,000

8,819,478

    Nzega Dc Itobo Water Supply Scheme 1 Itobo 6 1,500

500,000

    Nzega Dc Mwaluzwilo Water Supply Scheme 1 Mwaluzwilo 4 1,000

500,000

    Nzega Dc Nawa Water Supply Scheme 1 Nawa 4 1,000

500,000

   

Nzega Dc

Rehabilitation of Boreholes 35

Isanzu , Shigamba, Sojo, Mbutu, Mambali, Ibushi, Ugembe II, Mwakashanhala, Iyombo-Itima, Kilabili, Isanga, Mwasala,

70 17,500

146,194,785

Page 59: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

Bujulu, Kakulungu, Luhumbo, Usalala, Selemi, Malolo, Kabanga, Sigili, Bulambuka, Kasela, Nindo, Kikonoka, Shilago, Wella, Kigandu, Kilino A, Ifumba, Kabale, Kanolo, Usong'wanhala, Nindo, Ibelafinga, and Magukula

    Tabora Municipal

Procurement of piping materials and fittings (3km of pipes ) and rehabilitation works (Procurement of piping materials and fittings (3km of pipes ) and rehabilitation works

1 Kalunde 10 2,500

32,975,266

    Kaliua Rehabilitation Boreholes project 18

Silambo(2),Kazaroho(2),Zugimlole(2), UkumbiSiganga(2), Kashishi(2),Sasu(2),,Usenye(2),Usinge(2),Igagala(2),Ushokola(2), Kamsekwa(2),Seleli(2) , Usinga(1), Pozamoyo(1), Ibambo(1), Uyowa(1), mongozo(1) and Usimba(1)

30 7,500

38,869,031

    Nzega Tc Rehabilitation of Boreholes 9

Butandula, Ijanija, Kitangili, Mbogwe, Itilo, Miguwa Undomo, Zogolo na Idudumo

32 8,000

81,475,270

Total 152   682 138,3 633,598,96

Page 60: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

   

83 7

  TANGA Pangani Dc Rehabilitation of Mikinguni-Stahabu 2 mikinguni and stahabu 14 4,221

42,407,498

     Pangani DcRehabilitation of RUWASA OFFICE Infrastructure and Telephone (TTCL & Internet) infrastructure

        9,268,947

    Handeni Dc Rehabilitation of water project at Msomera Village 1 Msomera 8 2,0

00 2,424,2

52

    Mkinga Dc Rehabilitation of Moa-Mayomboni Piped Water Scheme 4

Zingibari, Moa, Ndumbani and Mayomboni

14 4,221

500,000

     Mkinga Dc Rehabilitation of Daluni Kibaoni Village Piped Water Scheme 3

Daluni Kibaoni, Ng'ombeni and Mtoni Bombo

0 5,500

12,600,000

     Mkinga Dc Rehabilitation of Mwanyumba Piped Water Scheme 1 Mwanyumba 6 1,5

00 1,500,0

00

    Korogwe Tc Rehabilitation of Kilole Pumping Station 3 Kwamngumi,Manzese and Bagamoyo 0 8,7

40 29,000,0

00

   Korogwe Tc

Rehabilitation of 5 Handpumps 5Kitifu,Lwengera,Mahenge,Mgambo and Msambiazi

5 1,250

5,000,000

    Korogwe TcRehabilitation of Mtonga Pumping Station 3 Msambiazi,Mtonga

and Kwamkole 0 10,369

32,000,000

    Korogwe Dc Rehabilitation of 3 water projects (Magoma,Mnyuzi/Mkwakwani and Mazinde) 7

Makangara,Mkwajuni-Sekioga, Mkwakwani, Gereza,Mheza,Bagamoyo and Mabogo

30 7,500

50,604,898

     Korogwe Dc Rehabilitation of Magunga mziya water project and 1 Shallow well. 2 Magunga mziya and

Mgobe 5 1,250

8,000,000

    Muheza DC Rehabilitation of piped water supply scheme at Misozwe village 2 Misozwe &

Kwemingoji 10 2,810

30,000,000

Page 61: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Muheza DC Rehabilitation of piped water supply scheme at Kigombe /Msakangoto 2 Kigombe &

Msakangoto 22 4,599

40,000,000

    Muheza DC Rehabilitation of Kibanda Nkumba water supply scheme 2 KibandaNkumba &

Mamboleo Nkumba 12 1,670

11,112,164

    Lushoto Dc Rehabilitation and extension of water supply project at Langoni A VILLAGE 1 Langoni A 10 1,2

50 42,000,0

00

    Lushoto Dc Rehabilitation of water supply project at Mgwashi Juu village 1 Mgwashi Juu 40 5,0

00 35,000,0

00

   Lushoto Dc

Rehabilitation of 24 non-functional WP to functional at different water supply projects 3

Rangwi, Sunga,Ngulwi, Kwekanga, Lunguza and Migambo

48 6,000

42,782,052

    Kilindi Dc Rehabilitation of 5 domestic water points at chamtui water supply scheme 3 Chamtui, Nyamaleni,

Mtakuja 10 3,923

5,000,000

    Kilindi DcRehabilitation of 02 Shallow Wells (SWN) 1 Sangeni 4 1,2

00 3,200,00.00

    Kilindi DcRehabilitation of 01 Shallow Well (SWN) 1 Kigunga 2 5

00 1,600,0

00

    Kilindi Dc Rehabilitation of 01 Shallow Well with Nira Pump 1 Mswaki 2 1,2

50 3,350,0

00

    Kilindi Dc Rehabilitation of 01 Shallow Well with Nira Pump 1 Mafulila 2 7

50 3,350,0

00

    Tanga Cc Rehabilitation of Shallow wells with Hand pump 6Ndaoya, Chongoleani, Kibafuta, Mleni, Mwarongo, Mapojoni

20 2,500

12,474,130

    55 0 264 78,003

419,973,941

  NJOMBE Njombe Tc Rehabilitation of water project at Yakobi Village 1 YAKOBI 9 544

36,000,000

Page 62: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Njombe TcRehabilitation of water project at Miva Village 1 MIVA 24 7,0

00 60,000,0

00

    Njombe TcRehabilitation and Extension at Kifanya Village 1 KIFANYA 15 1,1

02 45,000,0

00

    Njombe TcRehabilitation of water project at Matola Village 1 MATOLA 15 7

28 35,000,0

00

    Njombe TcRehabilitation of water project at Iboya Village 1 IBOYA 12 8

40 50,180,0

00

    Njombe TcRehabilitation and Extension at Utengule Village 1 Utengule 10 2,5

00 50,000,0

00

    Ludewa Dc Rehabilitaion of Ludende water supply scheme 2 Ludende and Madindo 14

14 14,000,0

00

    Ludewa DcRehabilitaion Kipingu water supply scheme 1 Kipingu 16

16 4,000,0

00

    Ludewa DcConstruction of water project at Mbongo Village 1 Mbongo 4

8 60,000,0

00

    Ludewa Dc Rehabilitation of water project at Lihagule , Lifua, and Kingole Village 3 Lihagule , Lifua, and

Kingole Village 12 12

43,000,000

    Ludewa Dc Rehabilitation of Ludewa (K) Village water project 1 Ludewa K 10

16 17,000,0

00

    Ludewa Dc Rehabilitation of water project at Mkongobaki Village 1 Mkongobaki 3

6 12,000,0

00

    Ludewa Dc Rehabilitation of water project at Lumbila Village 1 Lumbila 7

7 115,000,0

00

    Ludewa DcRehabilitation of water project at Luvuyo Village 1 Luvuyo 26

26 5,000,0

00

    Ludewa Dc Rehabilitation of water project at Mangalanyene Village 1 Mangalanyene 6

12 20,000,0

00

Page 63: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Makete Dc Rehabilitation of 2 non functioning water Points for Ilolo water supply project 1 Ilolo 2

2 705,50

0

   Makete Dc

Rehabilitation of 4 non functioning water Points for Imehe water supply project 1 Imehe 4

4 1,530,0

00

   Makete Dc

Rehabilitation of 9 non functioning water Points for Magoma-Bulongwa water supply project 3 Bulongwa, Nkunga

and Unyangogo 9 9

2,962,500

   Makete Dc

Rehabilitation of 7 non functioning water Points for Ikuwo water supply project 1 Nkondo 7

7 2,677,5

00

   Makete Dc

Rehabilitation of 6 non functioning water Points for Ipelele water supply project 2 Ipelele and Masiwa 6

6 2,337,5

00

   Makete Dc

Rehabilitation of 2 non functioning water Points for Ubiluko water supply project 1 Ubiluko 2

2 697,00

0

   Makete Dc

Rehabilitation of 2 non functioning water Points for Ndulamo water supply project 1 Ndulamo 2

2 713,92

2

   Makete Dc

Rehabilitation of 5 non functioning water Points for Kigala water supply project 1 Kigala 5

5 1,817,3

00

   

Makete DcRehabilitation of 2 non functioning WPs and renavate intake and gravity main for Ukwama water supply project

1 Ukwama 2 2

53,686,095

Page 64: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

   Makete Dc

Rehabilitation of 1 non functioning water Points for Utweve water supply project 1 Utweve 1

1 382,50

0

   Makete Dc

Rehabilitation of 7 non functioning water Points for Ipepo water supply project 1 Ipepo 7

7 2,678,7

06

    Makete Dc Rehabilitation of Mlengu-Matenga water supply project 1 Mlengu 12

12 63,005,2

87

    Makete Dc Rehabilitation of water supply scheme at Makwaranga 1 Makwalanga 0

- 2,375,7

46

    Makete Dc Rehabilitation of water supply scheme at Usalimwani 1 Usalimwani 0

- 34,380,0

78

    Makete Dc Rehabilitation of water supply scheme at Lupila 1 Lupila 0

- 15,918,8

43

    Makete Dc Rehabilitation of water supply scheme at Usililo 1 Usililo 0

- 2,402,1

00

    Makete Dc Rehabilitation of Madihani Water supply project phase-I 1 Madihani 1

1 47,720,2

50

    Makambako Tc

Rehabilitation and extension of Utengule water project 1 Utengule 5 3,0

93 5,766,9

63

   Makambako Tc           5,766,9

63

   Makambako Tc           10,200,0

00

   Makambako Tc

Rehabilitation and extension of Mawande water projecte 1 Mawande 5 3,7

39 35,000,0

00

Page 65: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

   Makambako Tc           5,766,9

63

   Makambako Tc            

    Wanging'ombe Dc

Rehabilation of 23 villages' water supply schemes 23

Ujindile, Igosi, Ivigo,Chalowe, Wanging'ombe, Ufwala, Kijombe, Ikwavila, Lyamluki, Ukomola, Uhenga,Itengelo, saja,Matowo, Usuka, Korintho,Mpanga, Mambegu, Lyadebwe, Itulahumba, Ihanja, Mayale, Mng'elenge

165 18,006

93,000,000

     Wanging'ombe Dc

Improvement/rehabilitation of pumping water supply schemes at Uhenga, Mapogolo,Ukomola and Saja Villages

4 Uhenga, Mapogolo, Ukomola, Saja 25 6,2

59 300,000,0

00

Sub Total   67   443 43,988

1,257,671,716

1 SIMIYU MEATU Nkoma water supply project 1 Nkoma 10 5,000

66,000,000

      Ngh'oboko water Supply project 1 Ngh'oboko 9 4,500

10,000,000

     MEATU Rehabilitation of 127 shallowell 21

Itinje,Mwagayi,Mwasungura,Kisesa, Mwandu Kisesa,Mwaukoli,Nguguno,Ntobo,Isangijo,Mwandu,Baluli,Mwabuma,Mwakasumbi,Mwan

127 31,750

112,679,292

Page 66: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

unda,Mwanunda,Mwashata,Lata,Usiulize,Longalonigha,Malwilo Mnadani,Matale,sakasaka

    Maswa DC Rehabilitation of water Non-functional Shallow in the Districts 40

Igunya, jija, Kakola,Mwaliga, Mwatumbe,Shishiyu,Mwabulimbu, Mwanghonoli,Nganzu,zawa,jihu,Ikungu,Muhida,Bukangilija,Nyashimba,Nhelela,Igwata,Mwabagalu,Mwakulilima,Mwanhegele,Lali,Nyabubinza,Mwandu,Mwamihanza,Mwabayanda,Kulimi,ilamata,kadoto,Malekano,Mwanganda,Dulungwa,Malampaka,Bukigi,Gulugwashi,chugambuli,mwabalogi,Ilambamakono,Mwamahindike,Mwashegeshi,Ngulinguli

100 25,000

155,500,000

     Maswa DC   1 Ng'haya 12 3,000

2,000,000

        1 Bukigi 12 3,000

40,546,770

    Itilima Zanzui water supply scheme 1 Zanzui 22 5,500

10,000,000

    Itilima Luguru water supply scheme 1 Luguru 12 3,000

5,548,961

    Itilima Inalo water supply scheme 1 Inalo 18 4,500

15,000,000

    Itilima Nkoma water supply 1 Nkoma   118,544,0

Page 67: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

- 65

   

Itilima

Shallow wells Projects 57

Chinamili,nanga, kinamweli,laili,nyishakanadi, nguno,sunzula, madiana,mwalali,mwamalizi, ndolelezi, mwabunyege, sagata,mahende,sawida, kashishi, zanzui, mwanunui,ndoselo, mwamapalala.mwamuhu,ndeme,ndasina,mwamigagani, ngwamita, nkoma bumala, mbugani itilima and kiali

57 14,250

90,383,939

   

Itilima

Rehabilitation of Handpumps in 63 villages 63

budalabujiga,chinamili,nanga ,senani,Sali ikindilo, mwanogesha,mtenga,nyangombe,sengwa,kinamel, mwamnemba,magilana,mhunze,manasubi,mwamalizi, chilungala, sagata and idoselo

63 15,750

35,092,500

    Itilima Lagangabilili water supply 1 lagangabilili 4 1,000

5,250,000

    Itilima kabale water supply 1 Bukingwamizi 4 1,000

5,250,000

    Busega DC Rehabilitation of Non-functional Shallow wells 47

Mwamagigisi, malangale, ngasamo, sanga, jisesa, imalamate, ng’wang ’wenge,, malili, mwamigongwa,

60 15,000

150,860,000

Page 68: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

nyangoko, ngunga, gininiga, mwamgoba, mkula, ng’wanhale, kijilishi, chabutwa, lutubiga, mwakiloba, mwasamba, mwangika, chamgasa, bushigwamhala, mayega, nyaluhande, mwamkala, mwagindi, kabita, shimanilwe,nyakaboja, nyamikoma a, nyamikoma b, bukabile, bulima, mwagulanja, , milambi, mwanangi, yitwimila a, yitwimila b, ijitu, ihale, ilumya, badugu, mwaniga, busami, nyamatembe,ihayabuyaga,

    Bariadi DC Rehabilitation of shallow wells 50 Segerema, sakwe Nyamisagusa , Nkololol,Ngulyati , ng'alita , Matondo, Mwashegeta , Mwanzuya, Mwangimu, Mwandoana, Matondo, kilalo, kasoli , itumbukilo, ikungulyandili , ikungulabasheshi B, ikungulabasheshi A, Igegu , Igaganulwa,

50 12,500

92,534,726

Page 69: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

Halawa, Gasuma, Damidami

    Bariadi TC Rehabilitation of shallow wells 16

Giriku , Imalilo, Kidalimanda Sima, Yoma ,Somanda , Nyangokolwa , Ngogote ,Mbugani , Shimbale, Bupandagila , Gagabali, Bipyayi, Matale, Izunya, Matale

50 12,500

39,236,314

Sub Total   304   610 157,250

954,426,567

38 KAGERA Karagwe DC Rehabilitation of Nyakagoyagoye W/S project 3 Nyakagoyagoye, Chabalisa, Nyamieli 26 6,5

00 20,000,0

00

    Karagwe DC Rehabilitation of Bukangara water supply scheme 1 Bukangara 5 1,2

50 5,000,0

00

   Karagwe DC

Rehabilitation of 9 handpumps 4Nyakaiga, Igurwa, Kijumbura and Nyaishozi

9 2,250

28,750,129

    Rehabilitation of Shanga-Mugoma water supply project 2 Shanga and Mugoma 6 1,5

00 11,000,0

00

    Ngara DC Rehabilitation of Murusagamba water supply project 1 Murusagamba 4 1,0

00 11,000,0

00

   Ngara DC

Rehabilitation of 9 shallow Wells by purchasing and reinstalling of 9 complete nira pumps 5

Kanyinya, Nyamawa, Keza, Murusagamba and Kashinga

9 2,250

27,000,000

   

Ngara DC

Rehabilitation of 23 shallow wells by supply nira pump spare parts 12

kanyinya, Nyamawa, Keza, Murusagamba, Kashinga, Nyamihaga, Chivu, Mugoma, Ibuga, Juruligwa, Bugarama and Bukiriro

23 5,750

14,000,000

Page 70: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

   

Ngara DCRehabilitation of 16 shallow wells by supplying and installing India mark III pump spare parts (risers & roads, Cylinder complete, head, rubber, valve and bearings)

8

Rulenge, Mbuba, Murubanga, Ntanga, Kumbuga, Magamba, Mumiramira and Rwinyana

16 4,000

13,000,000

    Ngara DCRehabilitation of Bulengo water supply project 1 Bulengo 6 1,5

00 10,000,0

00

   Ngara DC

Rehabilitation of 5DPs and Construction of spring intake for Magamba Village 1 Magamba 5 1,2

50 12,000,0

00

    Ngara DC Rehabilitation of Nyarusange water supply project 1 Nyarusange 8 2,0

00 6,000,0

00

    Ngara DCRehabilitation of Murutabo water supply project 1 Murutabo 12 3,0

00 21,000,0

00

    Ngara DC Rehabilitation of Kashinga and Kabanga water supply projects 2 Kashinga and

kabanga 14 3,500

25,000,000

    Ngara DCRehabilitation of Runzenze water supply project 1 Runzenze 5 1,2

50 9,359,4

23

    Ngara DCRehabilitation of Ntobeye water supply project 1 Ntobeye 9 2,2

50 15,000,0

00

    Ngara DCRehabilitation of Nyamahwa water project 1 Nyamahwa 6 1,5

00 11,000,0

00

    Muleba DC Rehabilitation of 1.4 km transmission main for Nshamba W/S 3 Nshamba,

Bunyagongo, Rutenge 19 9,500

38,002,991

    Muleba DC Rehabilitation of 11 shallow wells and 8 water springs

15 Bushagara, Ibale, Kabutaiga,Mafumbo, Ngenge, Nyakahama, Rugando, Kamishango, Kishuro, Mayondwe, Mlela, Bukoki, Ilemele,

20 5,000

38,000,000

Page 71: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

Buleza, Rulanda

    Muleba DC Rehabilitation of Iroba W/S 1 Iroba 28 3,048

22,000,000

    Muleba DC Rehabilitation of Ruteme W/S 1 Ruteme 38 4,950

15,000,000

    Muleba DC Fencing of water source and BPT at Katoke W/S 2 Katoke, Kahumulo 0

- 5,000,0

00

    Bukoba MC Rehabilitation of 3 tradition water sources at Kabanyoro, Kanyokampisi and Kabalekangaiza 3 Magoti, Migera and

Kabalekangaiza 3 800

4,376,012

     Bukoba MC Rehabilitation of Bulibata water project 1 Bulibata 12 1,760

8,196,398

     Bukoba MC Rehabilitation of Ihyoro 2 Nyarubanja and Lubumba 2 4

20 2,397,1

44

    Bukoba DC Rehabilitation of Kitaya water supply project 1 Kitaya 40 10,000

29,000,000

    Bukoba DC Improvement of water Quality at Bituntu water supply project 1 Bituntu 34 5,3

01 10,000,0

00

   Bukoba DC

Rehabilitation of Shallow Wells 6Omubweya,Ruhunga,Mashule,Rubale,Ngarama and Katoro

20 2,500

10,000,000

    Bukoba DCRehabilitation of Improved water Sources 5 Bushasha,Igombe,Rus

haka,Kishogo,Kasharu 10 2,500

10,000,000

    Misenyi DC Rehabilitation of 16 shallow wells. 14

Kalagala, Kigazi, Mushasha, Kabingo, Kassambya, Kakindo, Bukwali, Kikono, Byamtemba, Igayaza, Ngando, Byeju, Gabulanga and Nyabihanga.

31 7,750

74,199,533

     Misenyi DC Rehabilitation of Rukurungo piped water scheme 1 Rukurungo 12 1,8

74 13,000,0

00

Page 72: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    Biharamulo DC Rehabilitation of Mavota W/S 1 Mavota 8 1,2

50 19,242,5

00

   

Biharamulo DC

Rehabilitation of 20 hand pumps 10

Nyarubungo, Kabukome, Katerela, Kasozibakaya, Ntungamo and Ruganzu,Lusahunga,Musenyi,Kaluguyu,Kanyoni

30 7,500

77,000,000

    Biharamulo DC Rehabilitation of Kabindi water supply 3 Kabindi,chebitoke and kikomakoma 8 2,0

00 44,378,7

50

    Biharamulo DC Rehabilition and extension of Nemba water supply 5 Nemba 7 1,7

50 5,000,0

00

   

Biharamulo DCRehabilitation of 10 shallow well and 10 Boreholes 9

Ntungamo,Lusahunga,Nyamahanga,Songambele,Kasato,Kasozibakaya,Nyantakara,Nyamigogo,Nyabusozi

20 5,000

6,000,000

    Kyerwa DC Rehabilitation of kihinda and songambele Water supply schemes 3 Kihinda ,Rwenkende

and songambele 26 6,500

9,247,027

   

Kyerwa DCRehabilitaion of 20 Shallow Wells at Kibale 1, Magoma 1, Nyamiaga 1 ,Nkwenda 2, Songambele 3, Rwabwere 3,Kitwechenkura2, Nyakatuntu 4, Kibingo4

9

Kibale , Magoma , Nyamiaga ,Nkwenda , Songambele , Rwabwere ,Kitwechenkura, Nyakatuntu , Kibingo

20 5,000

9,000,000

    Kyerwa DC Rehabilitation of Rwabikagate water supply Scheme 1 Rwabikagate 18 4,5

00 9,500,0

00 Sub Total  142   569 129,6

53 697,649,90

7

  MARA TARIME DC & TC Korotambe Water Supply Scheme 1 Korotambe 20 4,3

13 16,189,4

00

Page 73: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

   TARIME DC & TC Nyamwaga Water Supply Scheme 1 Nyamwaga 17 4,7

11 4,500,0

00

   TARIME DC & TC Nyarwana 1 Nyarwana 30 5,8

35 6,807,5

34

   

TARIME DC & TC

Rehabilitation of hand pumps for 14 boreholes 14

Kangarian, Kiterere, Masanga,Mtana, Rosana, Musege,Bungurere, Nyantira, Itiryo, kanisani, Matongo, Kerende, Kyoruba & Nyabisaga

14 5,600

4,500,000

    RORYA DC Kirogo water Scheme at Kirogo and Wamaya Villages 2 Kirogo and Wamaya 54 13,5

00 11,671,7

56

    BUNDA DC& TC Rehabilitation of hand pumps in 12 villages 12

Kiroleri,Sarawe,Bukama,Nyangere,Tiring'ati.Nyang'arang'a,Ragata,Namalebe,Sikiro,Kurusanga,Kasuguti,Butimba.

20 10,000

33,209,449

   BUNDA DC& TC

Rehabilitation of Mgeta-Nyang'aranga piped scheme Project 2 Mgeta and

Nyang'arang'a 4 6,850

10,000,000

   BUNDA DC& TC

Kihumbu water supply scheme AT SABASITA (UNDP). 1 Kihumbu 4 10,0

00 2,000,0

00

    SERENGETI DC

Rehabilitation of Nyiboko gravity water supply scheme 1 Nyiboko 14 3,5

00 9,000,0

00

    SERENGETI DC Sele gravity water supply scheme 1 Sele 4 1,000

7,500,000

    SERENGETI DC Busawe gravity water supply scheme 1 Busawe 12 1,5

00 8,500,0

00

Page 74: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    SERENGETI DC Musati gravity water supply scheme 1 Musati 10 2,500

14,000,000

   SERENGETI DC

Rehabilitation of existing 20 handpump of deep boreholes in Busawe water suupply Scheme 4

Nyansurura, Kiisangura, Sedeko, Nyanungu

20 5,000

63,847,068

    BUTIHAMA DC Magunga water supply project 1 Magunga 44 4,0

00 11,605,4

10

    BUTIHAMA DC Bukabwa water supply project 1 Bukabwa 26 3,250

3,760,217

    BUTIHAMA DC Kongoto water supply project 1 Kongoto 16 2,000

3,253,033

    MUSOMA DC Musanja water project 2 Musanja and Nyabaengere 20 5,0

00 5,000,0

00

     MUSOMA DCRehabilitation of ten (10) Hand pumps(Bukumi1, Wanyere1, Nyambono1, Buira1,Busambara 1,Tageruka 2, Mayani 1, Katalyo 2)

8

Bukumi, Wanyere, Nyambono, Busambara,Tageruka, Mayani, Katalyo,Buira

10 2,500

11,779,136

Sub Total   55   339 91,059

227,123,002

  SHINYANGA KAHAMA TC Rehabilitation of Mpera ,Sagehe and

Kidungashi(MPEISA) Water Supply Project 3 Mpera, Kidunyashi na Isagehe 20 5,0

00 28,818,7

19

   

KAHAMA TCRehabilitation of 38 shallow wells at Sunge-2, Kahanga-3, Wendele-2, Nyambula-4, Katungulu-1, Nyandekwa-3, Lowa-3, Kilengwe-3, Bujika-2, Malenge-1, Gembe-1, Ufala-1, Ishiki-1,Ilungu-1, Kilago-2, Tulole-2,Shininga-1, Nyanhembe-2, Buduba-1,Tumaini-1 and Wame-1

21

Bujika, shininga, Tulole, Ilungu, Kilengwe, Nyambula, Katungulu, Lowa, Malenge, Ishiki, Tumaini, Nyanhembe, wame, Gembe,Ufala, Kilago, sunge, wendele,Kahananga, Buduba

38 9,500

61,173,885

Page 75: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

    KAHAMA TC Rehabilitation of Ubilimbi and Butegwa water Project to 0.348km 1 Ubilimbi and Butegwa 10 2,5

00 6,450,4

00

    KISHAPU DC Rehabilitation of 20 water wells in 10 villages 9

Mipa 3, Itilima 3, ,sekebugoro 3 Lubaga 1, ngunga 1, Nhobola 1 Mwakipoya 1,mwigumbi 5, Mwamasololo 2

20 5,000

22,320,000

     KISHAPU DC Rehabilitation of 4 Deep water wells in 4 villages 4 Iboja, Buchambi, Nyenze and Sekeididi 4 1,0

00 9,700,0

00

    SHINYANGA DC

Rehabilitation of Distribution main/ system, Domestic Point and diesel engine generator 1 Bunonga 8 4,5

49 34,532,5

50

   SHINYANGA DC Rehabilitation of diesel engine generator 3

DidiaChembeli and Bukumbi

25 8,555

16,700,000

   SHINYANGA DC

Rehabilitation and Extension of Mahembe water supply Project 1 Mahembe 8 2,0

00 36,903,8

85

    USHETURehabilitation of 20 shallow wells at Uyogo , ushetu Kinamapula, Butibu, Ulewe, Idahina, Chona and Igwamano Villages

8

Uyogo , ushetu Kinamapula, Butibu, Ulewe, Idahina, Chona and Igwamano

20 5,000

64,860,592

    MSALALA DCRehabilitation of 15 Boreholes at Bushing'we, Ntobo, kalagwa, Buyange, Busindi, Nundu, Busangi and Igwamanoni

8

Bushing'we, Ntobo, Kalagwa, Buyange,Busindi,Nundu,Buasangi and Igwamanoni

23 5,750

58,000,000

     MSALALA DC

Driiling of 1 Bore holes at Mwazimba village and Rehabilitation of 20 shallow wells at Bugarama, Ilogi, Buyange, Ikinda, Lunguya, Shilela, Mega, Chela, Masabi, Mhandu, Busangi, Nyamigege, Buganzo na Nyakandoni

20

Mwazimba, Bugarama, Ilogi,Byange, Ikinda,Lunguya, Shilela, Mega, Chela,

33 3,837

52,000,000

Page 76: Mwanzo | Wizara ya Maji · Web viewKambi ya Faru 2 Karatu Dc 1 Great Arusha 2 Karatu Dc 1 Karatu Mjini 4 Karatu Dc 1 Malechand 6 Karatu Dc 1 Mang'ola Barazani 9 Karatu Dc 1 Huduma

SN REGION LGA Project NameVillage

WP Popln Budget 2019/20 Total Names

Masabi, Mhandu, Busangi, Nyamigege, Buganzo na Nyakandoni.

     MSALALA DC Rehabilitaion of Chela water supply project 1 Chela 22 5,5

00 14,000,0

00

    SHINYANGA MC

Rehabilitation of water infrastructure at Bushola village. 1 Bushola 8 1,9

77 10,000,0

00

     MSALALA DC

Rehabilitation of 09 Shallow wells at Bugayambele (2),Mwawaza (3), Bugimbagu (1) Ihapa (2), Iwelyangula (1),and installation of 09 new hand pumps.

6Bugayambelele,Mwawaza.Bugembagu,Ihapa , and Iwelyangula.

9 5,740

30,000,000

Sub Total   87   248 65,908

445,460,030

8,698

1,932,891 10,365,454,888