Mumbai western railway! Group no. 18th.pptx

download Mumbai western railway! Group no. 18th.pptx

of 17

Transcript of Mumbai western railway! Group no. 18th.pptx

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    1/17

    Mumbai

    WESTERN

    RAILWAY

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    2/17

    INDUSTRIAL FEASIBILITY

    The Western Line is the name given to all routes of the Mumbai Suburban

    Railway operated by Western Railways (WR).

    Public transit system serving the Mumbai Metropolitan Region.

    Emergence of Mumbai suburban section of the WR.

    23 hours of working.

    Six division of western railway:-

    Mumbai central

    Baroda

    Ahemdabad

    Rajkot

    Bhavnagar

    Ratlam.

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    3/17

    STRENGTHS

    Low cost Tickets.

    Time efficiency.

    High holding of passenger capacity.

    Special treatment for women.

    Improvement of trainfrequency.

    Escalators facility on few

    railway station.

    WEAKNESSES Outdated technology of locomotive.

    Small and inadequate rail network.

    Problem of financial crunch. Corruption within department.

    Lack of accident proof magnetic

    wheels in all trains.

    Lack of safety.

    Poor infrastructure.

    Delayed train. Over crowded train.

    Low space capacity.

    Shortage of coaches.

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    4/17

    OPPORTUNITY

    Profit through privatization.

    Air condition facility in local

    trains.

    Introduce separate track for long

    distance trains.

    Increase the speed limit.

    THREATS

    Air condition buses.

    Improvement of other

    infrastructures i.e. Roadways.

    Metro trains in western region.

    Monorails.

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    5/17

    OBSERVATIONS Number of Trains Per day, Up & Down is 1305 Services.

    Train Co-ordination is done by signalling system , speed restrictions are there

    for different signals.

    Peak hours of travelling:-

    Punctuality:-

    Morning Evening

    12 Car 15 Car Total 12 Car 15 Car Total

    119 3 122 110 3 113

    Year Punctuality%

    2009 - 10 96.4%

    2010 - 11 94.0%

    2011 - 12 96.4%

    2012 - 13 96.3%

    2013 - 14 94.8%

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    6/17

    Table Photo:-

    Number of Stations Coming Under Western Railway is 36.

    Electricity is provided by TATA Power Supply, at Khapoli they have hydroelectric power station.

    The consumption of electricity if 25000 voltage.

    Its been 160 years and more there has been no mishap in the supply ofelectricity, even for a moment.

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    7/17

    Average number of suburban trains per day during 2012-2013:-

    Average number of vehicles run per day during 2012-2013 is as under:-

    Open tenders are for everyone (includes electronics, tracks and infrastructure)and the lowest quotation will get the Contract.

    Limited tenders:- check for credibility.

    To chalk out monopoly there is always a tender laid out.

    Section DOWN UP

    CCG 465 460

    BA-ADH 461 462

    ADH-BVI 437 437

    BVI-VR 232 227

    Section Down up

    CCG-BA 1878 1826

    BA-ADH 1845 1832

    ADH-BVI 1745 1742

    BVI-VR 933 913

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    8/17

    Motor Man:- Shift of 6 Hours.

    Stand by motor man. Trains wont be cancelled because of motormans absence.

    Specific qualification isnt required there is some technical exam for selection ofmotorman.

    Profitability:-

    Freight rakes have proven to be much more beneficial for western

    Railway as compared to the local day to day rakes.

    Scheduling of trains:-

    Train schedule book is available which is for one year.

    Tracks:-

    CHURCHGATE BORIVALI VIRAR

    4 5

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    9/17

    EMPLOYEES Number of employees of western railway:- 14 lakh

    Unions:-

    Western railway majdoor sangh

    Western railway employees union

    Three kinds of accommodations:-Class 4 employees

    Class three employees,

    Officers (Grand road, Bandra pali hill, Mumbai central)

    House rent allowance:- 30% of basic salary.

    Medical Allowance:-

    Tie up with Jaslok and Bombay hospital

    In House hospital( Jagjivan Rao Hospital

    Accomodation:-Parle

    Santacruze

    Matunga

    Dahisar

    AndheriBandra(w)(e)

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    10/17

    MAINTENANCE 4 Service Centers:-

    Kandivali

    Lower parel

    Virar

    Mahalaxmi

    After every 2.5-3 months cleaning, car wash, Greasing and Servicing of trainsare done.

    After every 15 days overall check is done, which also includes any Internal orExternal Body Part Replacement of the Rakes, if required.

    For cleaning of train some private companies comes up with tenders andaccordingly they are chosen.

    Because of any reason trains breaks down there is a break van. Narrow chancesof diverting and controlling.

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    11/17

    FACILITIES FOR DIFFERENTLY

    ABLED Separate coaches in each train.

    9 cars: 05seats.

    12 cars: 38seats.

    15car: 57 seats.

    Beepers at stations for compartment location.

    Indicators audio visual.

    Indication on front/rear of trains.

    Checkered tiles to indicate platform edge.

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    12/17

    FACILITIES FOR LADY COMMUTERS

    Free pass to girl students up to graduation level.

    Pregnant females allowed in handicap compartments.

    Separate audio visual device for ACP

    Security helpline 1311

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    13/17

    CONCERNS

    Over crowded station sand trains.

    Long queue for tickets.

    Unhygienic conditions.

    Loopholes in security system.

    No maintenance.

    Improper foot over bridge.

    No proper ventilation system.

    Rude behaviours by employees.

    Ticketless travelling.

    Engine Failure.

    Theft.

    Mega Blocks (Every Sunday).

    Delay in trains.

    Pantograph.

    Failure.

    Trespassing Alarm Chain Pulling.

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    14/17

    NEW PROPOSED

    Various ticketing service to reduce the time:-

    Coupons

    Tourist ticket

    AVTM card machine

    There are over 300 million mobile phones in India and 11 million passenger

    travelling by local trains.

    5.2% growth in passenger traffic is expected in 2013-2014 (as per the budget by

    PAWAN BANSAL).

    The quality of seats and equipments used.

    SMS ticket service.

    Mammoth Project.

    Auxiliary warning system.

    Train management system.

    Automatic signalling system.

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    15/17

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    16/17

    RECOMMENDATIONS

    Systematised working of signalling system.

    Sentencing 3-4 days in jail for track crossing.

    Separate tracks for long distance trains.

    Improving ticketing service.

    Improvisation in track maintenance.

    Fine on spitting and throwing waste at the platform area.

  • 8/14/2019 Mumbai western railway! Group no. 18th.pptx

    17/17

    STRATEGIES TO INCREASE

    MARKET SHARE BY 5 %

    By Selling the Scrap that includes Aluminum Tracks, Broken Electric Wires.

    Increase the number of tracks.

    Improving infrastructure and hygiene condition of stations.

    Introduce separate tracks for long distance trains.

    Increase the speed limit.