Multi-use Pathway Connector Linking the Cape Cod Rail Trail to Cape Cod Bay DCR Town of Brewster Public Meeting Wednesday, October 18, 2017 6:30 p.m. 8 p.m. Brewster Town Hall, 2198 Main Street, Brewster, MA 02631

Transcript of Multi-use Pathway Connector Linking the Cape Cod Rail ...

Page 1: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Multi-use Pathway Connector

Linking the

Cape Cod Rail Trail to Cape Cod Bay

DCR – Town of Brewster Public Meeting

Wednesday, October 18, 2017 – 6:30 p.m. – 8 p.m.

Brewster Town Hall, 2198 Main Street, Brewster, MA 02631

Page 2: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Town of Brewster

Board of Selectmen James W. Foley

John Dickson

Peter G. Norton, Chair

Cynthia Bingham

David Whitney

Town Administrator

Michael Embury

Department of Natural Resources Chris Miller

Page 3: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Commonwealth of Massachusetts

Governor

Charles D. Baker

Lieutenant Governor

Karyn E. Polito

Energy and Environmental Secretary

Matthew A. Beaton

Department of Conservation and Recreation Commissioner

Leo P. Roy

Page 4: Multi-use Pathway Connector Linking the Cape Cod Rail ...

DCR Mission Statement

To protect, promote and enhance our

common wealth of natural, cultural

and recreational resources

for the well-being of all.

Page 5: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Purpose of Meeting

• To present preliminary design concepts for a multi-

use pathway connector extending from the Cape

Cod Rail Trail to Cape Cod Bay.

• To obtain early public input on this proposed

preliminary design.

Page 6: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Partnership Project

• The Town of Brewster apply for and received a 2 to

1 matching grant from the DCR to support the

design and permitting for this project

Page 7: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Project Goals

• Create a multi-use, bicycle and pedestrian, off-road, pathway connection between the Cape Cod Rail Trail / Nickerson State Park and Cape Cod Bay.

• Help relieve parking pressures at Linnell Landing and Crosby Landing.

• Work to minimize environmental, leaseholder and neighborhood impacts through the project.

Page 8: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Project History

• Concept that has been discussed for many years by DCR planning and the Town of Brewster

• Town of Brewster applied for a DCR Partnership Matching Grant - 2016

• Town warrant supporting funding

• DCR’s on-call trail design and permitting consultant Stantec engaged - Spring of 2017

• Completed survey, environmental assessment and preliminary design - Summer, 2017

• Initial public input meeting - October, 2017

• Revisions and final design - Winter, 2017/18

Page 9: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Consultant

• Full-service, multidiscipline design firm

• Recognized regional leader in trail projects – Over 500 miles of share use paths in planning,

design or already constructed

• Design Team: – Stantec – Shared-use path design

– SMC – Survey & basemapping preparation

– Woods Hole Group – Resource flagging and permitting

Cape Cod Rail Trail

Page 10: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Project Overview

N

Page 11: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Guiding Principles for Design

• 10-foot wide, multi-use, fully accessible pathway

• Maximum grades of 5% to ensure accessibility

• Safe crossing of Route 6A

• Avoid / minimize impacts to Cape Rep Theater operations and Crosby Mansion

• Avoid wetland impacts

Page 12: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Preliminary Design Concepts

N

Page 13: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Preliminary Design Concepts

Page 14: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Preliminary Design Concepts

N

Page 15: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Preliminary Design Concepts

Route 6A Crossing – Pedestrian Hybrid Beacon (formerly referenced as a HAWK signal)

Image Source: Michigan Complete Streets Coalition

• For midblock locations

• Motorist yielding rate greater than 95%

• Traffic control device

Page 16: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Preliminary Design Concepts

N

Page 17: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Preliminary Design Concepts

N

Page 18: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Preliminary Design Concepts

N

Page 19: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Preliminary Design Concepts

N

Page 20: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Q&A

Page 21: Multi-use Pathway Connector Linking the Cape Cod Rail ...

Next Steps

• Public comment period –

October 18, 2017 – November 2, 2017.

• Plan revisions and final design Winter, 2017/18

• Posted on DCR and Town Wed Pages

• Permitting:

– Conservation Commission

– Natural Heritage and Endangered Species Program

– Planning Board

– Old Kings Highway Historic District

• Construction: Pending approval and identification of funding

Page 22: Multi-use Pathway Connector Linking the Cape Cod Rail ...

For more information: https://www.mass.gov/service-details/brewster-trail-connection-partnership-

project If you have comments or suggestions on this project: Submit online: https://www.mass.gov/forms/dcr-public-comments Write: Department of Conservation and Recreation Office of Public Outreach 251 Causeway Street, Suite 600 Boston, MA 02114 Deadline: Wednesday, Thursday, November 2, 2017

If you wish to subscribe to a DCR general information or project-related listserv: contact DCR’s Office of Community Relations at 617-626-4973 or [email protected].

Additional Information