Muhanad CV

6
Muhanad Zain Elabdin Mohammed É‹ß ·ÈÉf_ƒ◊^ ·Èà ɇ‰€

Transcript of Muhanad CV

Page 1: Muhanad CV

Muhanad Zain Elabdin MohammedÉ‹ß=·ÈÉf_ƒ◊^=·Èà=ɇ‰€

Page 2: Muhanad CV

EDUCATION

COURSES

LANGUAGES

SITE

CIV

IL E

NG

INEE

R

CONTACT

PROFIL SKILLSA registered member of SEC and a Civil Engineer with 6+ years of experience.Capable of working independently with minimum supervision, and committed to providing high quality service to every project.With focus on health, safety and environmental issues.Professional, capable, and motivated individual who consistently performs in challenging environments.

2008

3 MonthesAUTOCAD

2010

EFFECTIVE PROJECT MANAGEMENT

PRIMAVERA.

2011

PROJECT MANAGEMENT PROFESSIONAL PREPARATORY

2016

MS PROJECT

1985Born in KSA

1996Primary School

KSA

2002High School

Sudan

1999Intermediate Scool

KSA

2006SUST University

AUTOCAD

ILLUSTRATOR

PHOTOSHOP

+249 9 122 0 31 29+249 12 36 592 36

Sudan-KhartoumKhartoum bahryShambat-Block17

[email protected]

Arabic

English

ONLINE INFO

/MuhanadZain

/Muhanad.zainelabdin

@MuhanadZain

www.linkedin.com/pub/muhanad-zain/66/b06/a46/

Page 3: Muhanad CV

WORK EXPERINCE

DAL GROUPDAL for Design and Construction

July 2012 - Up to Date

Civil EngineerSite Civil Engineer-Construction

Site Cost Controller-Construction

Quality Control Engineer-Facilities Management Department

-Supervise and be responsible of all construction works on site.-Prepare the weekly Payment.-Site quantity survey.-Prepare the bill of quantities for the variance projects.-Prepare the initial budget for the projects.-Prepare the weekly &monthly Report.-Prepare the Cost Control Report.-Prepare the Status, Progress, Variance Reports.-Preparing Bills of Quantities & pricing the activities of the project.-Material purchasing.-Review design changes issued in drawings and prepare updated quantities accordingly.-Participating in Preparation of monthly progress reports.-Documentation and archiving for all works done by the office.-Monitoring of the fuel consumed by equipment & vehicles of the project.-Update the quantities according to variation orders and determine the final project estimates.-Review and Re-estimate the quantity and cost of the project activities.

Page 4: Muhanad CV

PROJECTS

DAL Group Portsudan headquarter – Rehabilitation.DAL Group Portsudan -new area.DAL Group Portsudan – Social Responsibility Projects.DAL Group - SAYGA silos – Portsudan-Main Workshop.DAL Group Portsudan-Bond area project.DAL Group Portsudan – Portsudan city entrance fountain.DAL Group - SAYGA – New flour mill project – Multi floor project (3 Million USD cost).DAL Group-Khartoum-Sutrac Company-West Entrance project.

Sayga Flour Mill L Project Sayga Flour Mill L Project-Slip Form

Pelleting Building Sayga Flour Mill L Project-Store

Sayga Flour Mill L Project-Catwalk-a Suspended bridge with 72 Meter length

Sudan-Portsudan City Entrance Fountain

Page 5: Muhanad CV

GrosvenorServices Ltd.

May 2012Facilities Engineer

-Supervise and be responsible of all construction works on site.-Prepare the weekly Payment.-Site quantity survey.-Prepare the Status, Progress, Variance Reports.

DAL GROUPDAL for Design and Construction

July 2008 - Oct 2011

Civil EngineerSite Civil Engineer-Construction

Site Cost Controller-Construction

-Supervise and be responsible of all construction works on site.-Prepare the weekly Payment.-Site quantity survey.-Prepare the bill of quantities for the variance projects.-Prepare the initial budget for the projects.-Prepare the weekly &monthly Report.-Prepare the Cost Control Report.-Prepare the Status, Progress, Variance Reports.

Page 6: Muhanad CV

PROJECTS

Sayga Flour Mills Projects:Retail Stores-Phase 1.-Retail Offices-Phase 2.-F&G Tower.-Mill E & D-Modifications and maintenance Work.

Alwaha Agricultural projects:Alwaha Steel Structure.-Minor 11,12,13,14 ,10 projects.-Linear Area.-Bore whole Pivots-Main Panel Room.Alwaha Main Pipes.

Alilfon Dairy Farm Project:Hatchery Building.-Fish Pond Area.

PitchingGenerator Pad

Water SumWater Sum

Pump TrenchExcavation