Muhanad CV
-
Upload
muhanad-zain -
Category
Documents
-
view
59 -
download
0
Transcript of Muhanad CV
![Page 1: Muhanad CV](https://reader031.fdocuments.net/reader031/viewer/2022030311/58efbbe91a28ab1c6a8b45fb/html5/thumbnails/1.jpg)
Muhanad Zain Elabdin MohammedÉ‹ß=·ÈÉf_ƒ◊^=·Èà=ɇ‰€
![Page 2: Muhanad CV](https://reader031.fdocuments.net/reader031/viewer/2022030311/58efbbe91a28ab1c6a8b45fb/html5/thumbnails/2.jpg)
EDUCATION
COURSES
LANGUAGES
SITE
CIV
IL E
NG
INEE
R
CONTACT
PROFIL SKILLSA registered member of SEC and a Civil Engineer with 6+ years of experience.Capable of working independently with minimum supervision, and committed to providing high quality service to every project.With focus on health, safety and environmental issues.Professional, capable, and motivated individual who consistently performs in challenging environments.
2008
3 MonthesAUTOCAD
2010
EFFECTIVE PROJECT MANAGEMENT
PRIMAVERA.
2011
PROJECT MANAGEMENT PROFESSIONAL PREPARATORY
2016
MS PROJECT
1985Born in KSA
1996Primary School
KSA
2002High School
Sudan
1999Intermediate Scool
KSA
2006SUST University
AUTOCAD
ILLUSTRATOR
PHOTOSHOP
+249 9 122 0 31 29+249 12 36 592 36
Sudan-KhartoumKhartoum bahryShambat-Block17
Arabic
English
ONLINE INFO
/MuhanadZain
/Muhanad.zainelabdin
@MuhanadZain
www.linkedin.com/pub/muhanad-zain/66/b06/a46/
![Page 3: Muhanad CV](https://reader031.fdocuments.net/reader031/viewer/2022030311/58efbbe91a28ab1c6a8b45fb/html5/thumbnails/3.jpg)
WORK EXPERINCE
DAL GROUPDAL for Design and Construction
July 2012 - Up to Date
Civil EngineerSite Civil Engineer-Construction
Site Cost Controller-Construction
Quality Control Engineer-Facilities Management Department
-Supervise and be responsible of all construction works on site.-Prepare the weekly Payment.-Site quantity survey.-Prepare the bill of quantities for the variance projects.-Prepare the initial budget for the projects.-Prepare the weekly &monthly Report.-Prepare the Cost Control Report.-Prepare the Status, Progress, Variance Reports.-Preparing Bills of Quantities & pricing the activities of the project.-Material purchasing.-Review design changes issued in drawings and prepare updated quantities accordingly.-Participating in Preparation of monthly progress reports.-Documentation and archiving for all works done by the office.-Monitoring of the fuel consumed by equipment & vehicles of the project.-Update the quantities according to variation orders and determine the final project estimates.-Review and Re-estimate the quantity and cost of the project activities.
![Page 4: Muhanad CV](https://reader031.fdocuments.net/reader031/viewer/2022030311/58efbbe91a28ab1c6a8b45fb/html5/thumbnails/4.jpg)
PROJECTS
DAL Group Portsudan headquarter – Rehabilitation.DAL Group Portsudan -new area.DAL Group Portsudan – Social Responsibility Projects.DAL Group - SAYGA silos – Portsudan-Main Workshop.DAL Group Portsudan-Bond area project.DAL Group Portsudan – Portsudan city entrance fountain.DAL Group - SAYGA – New flour mill project – Multi floor project (3 Million USD cost).DAL Group-Khartoum-Sutrac Company-West Entrance project.
Sayga Flour Mill L Project Sayga Flour Mill L Project-Slip Form
Pelleting Building Sayga Flour Mill L Project-Store
Sayga Flour Mill L Project-Catwalk-a Suspended bridge with 72 Meter length
Sudan-Portsudan City Entrance Fountain
![Page 5: Muhanad CV](https://reader031.fdocuments.net/reader031/viewer/2022030311/58efbbe91a28ab1c6a8b45fb/html5/thumbnails/5.jpg)
GrosvenorServices Ltd.
May 2012Facilities Engineer
-Supervise and be responsible of all construction works on site.-Prepare the weekly Payment.-Site quantity survey.-Prepare the Status, Progress, Variance Reports.
DAL GROUPDAL for Design and Construction
July 2008 - Oct 2011
Civil EngineerSite Civil Engineer-Construction
Site Cost Controller-Construction
-Supervise and be responsible of all construction works on site.-Prepare the weekly Payment.-Site quantity survey.-Prepare the bill of quantities for the variance projects.-Prepare the initial budget for the projects.-Prepare the weekly &monthly Report.-Prepare the Cost Control Report.-Prepare the Status, Progress, Variance Reports.
![Page 6: Muhanad CV](https://reader031.fdocuments.net/reader031/viewer/2022030311/58efbbe91a28ab1c6a8b45fb/html5/thumbnails/6.jpg)
PROJECTS
Sayga Flour Mills Projects:Retail Stores-Phase 1.-Retail Offices-Phase 2.-F&G Tower.-Mill E & D-Modifications and maintenance Work.
Alwaha Agricultural projects:Alwaha Steel Structure.-Minor 11,12,13,14 ,10 projects.-Linear Area.-Bore whole Pivots-Main Panel Room.Alwaha Main Pipes.
Alilfon Dairy Farm Project:Hatchery Building.-Fish Pond Area.
PitchingGenerator Pad
Water SumWater Sum
Pump TrenchExcavation