Mud Circulation Principals,Execution & Importance

download Mud Circulation Principals,Execution & Importance

of 70

Transcript of Mud Circulation Principals,Execution & Importance

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    1/70

    DRILLING FLUIDSDRILLING FLUIDS 

    -- AN OVERVIEWAN OVERVIEW

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    2/70

    DRILLING FLUIDS: HISTORYDRILLING FLUIDS: HISTORY

    AND DEFINITIONAND DEFINITION::

    ANY COMPOSITION, WHICH ISANY COMPOSITION, WHICH IS

    USED TO AID IN PRODUCTION ANDUSED TO AID IN PRODUCTION AND

    REMOVAL OF CUTTINGS FROM THEREMOVAL OF CUTTINGS FROM THEWELL BORE, IS TERMED AS DRILLINGWELL BORE, IS TERMED AS DRILLING

    FLUID.FLUID.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    3/70

    1 - SELECTION OF RIGHT DRILLING FLUID1 - SELECTION OF RIGHT DRILLING FLUID

    AND MAINTENANCE OF RIGHT PROPERTIESAND MAINTENANCE OF RIGHT PROPERTIES

    INFLUENCEINFLUENCE2 - THE TOTAL NUMBER OF RIG DAYS REQUIRED2 - THE TOTAL NUMBER OF RIG DAYS REQUIRED

    DRILLING A WELL WHICH DEPEND UPONDRILLING A WELL WHICH DEPEND UPON

     3 - RATE OF PENETRATION AND AVOIDANCE OF3 - RATE OF PENETRATION AND AVOIDANCE OFDELAYS CAUSED BY STUCK DRILL PIPE,DELAYS CAUSED BY STUCK DRILL PIPE,

    SLOUGHING SHALES AND LOSS OFSLOUGHING SHALES AND LOSS OF

    CIRCULATION ALL OF WHICH ARE INFLUENCEDCIRCULATION ALL OF WHICH ARE INFLUENCED

    BY THE PROPERTIES OF THE MUD.BY THE PROPERTIES OF THE MUD.

    ..

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    4/70

    FUNCTIONSFUNCTIONS

    TRANSPORT DRILLED CUTTINGS ANDTRANSPORT DRILLED CUTTINGS ANDCAVINGS TO THE SURFACECAVINGS TO THE SURFACE

    SUSPEND DRILLED CUTTINGS AND CAVINGSSUSPEND DRILLED CUTTINGS AND CAVINGS

    WHEN CIRCULATION IS STOPPEDWHEN CIRCULATION IS STOPPED CONTROL SUBSURFACE PRESSURECONTROL SUBSURFACE PRESSURE

    COOL AND LUBRICATE BIT AND DRILL STRINGCOOL AND LUBRICATE BIT AND DRILL STRING

    SUPPORT THE WALLS OF THE WELL BORESUPPORT THE WALLS OF THE WELL BORE

    HELP SUSPEND THE WEIGHT OF THE DRILLHELP SUSPEND THE WEIGHT OF THE DRILL

    STRING AND CASINGSTRING AND CASING

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    5/70

    FUNCTIONSFUNCTIONS

    DELIVER HYDRAULIC ENERGY UPONDELIVER HYDRAULIC ENERGY UPON

    THE FORMATION BENEATH BIT ANDTHE FORMATION BENEATH BIT AND

    PROVIDE SUITABLE MEDIUM FOR WIREPROVIDE SUITABLE MEDIUM FOR WIRE

    LINE LOGSLINE LOGS

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    6/70

    TYPES OF WATER BASED MUDTYPES OF WATER BASED MUD

    SYSTEMSSYSTEMS CONTD.CONTD. 

    !"!" FRESH WATER MUDS: TECHNICALLY,FRESH WATER MUDS: TECHNICALLY, FRESHFRESHWATER MUDS ARE DEFINED ASWATER MUDS ARE DEFINED AS ANY WATERANY WATERCLAY MUD CONTAININGCLAY MUD CONTAINING LESS THAN ONELESS THAN ONEPERCENT 1#" SALTPERCENT 1#" SALT AND 12$ PPM CALCIUM.AND 12$ PPM CALCIUM.

    THESE ARE OF FOLLOWING TWO TYPES.THESE ARE OF FOLLOWING TWO TYPES.%"%" NATIVE OR SPUD MUDS: IT HAS BEENNATIVE OR SPUD MUDS: IT HAS BEEN

    OBSERVED AT MANY DRILLING LOCATIONS THATOBSERVED AT MANY DRILLING LOCATIONS THATWHILE DRILLING THE SHALLOW SUBSURFACEWHILE DRILLING THE SHALLOW SUBSURFACEPORTIONS OF WELL, THE CLAYEY MATTER OFPORTIONS OF WELL, THE CLAYEY MATTER OFFORMATIONS GETS READILY DISPERSED IN THEFORMATIONS GETS READILY DISPERSED IN THEWATER BEING USED FOR DRILLINGWATER BEING USED FOR DRILLING RESULTING INRESULTING INSUSPENSIONS THAT PERFORM WELL AS DRILLINGSUSPENSIONS THAT PERFORM WELL AS DRILLINGFLUIDS. SUCH MUDS ARE, THEREFORE, KNOWNFLUIDS. SUCH MUDS ARE, THEREFORE, KNOWN

    AS NATIVE MUDS OR SPUD MUDS.AS NATIVE MUDS OR SPUD MUDS.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    7/70

    TYPES OF WATER BASED MUDTYPES OF WATER BASED MUD

    SYSTEMSSYSTEMS CONTD.CONTD. 

    &"&" TREATED MUDS: UNLIKE NATIVETREATED MUDS: UNLIKE NATIVEMUDS, CLAY MOSTLY BENTONITE ISMUDS, CLAY MOSTLY BENTONITE IS

    ADDED TO FRESH WATER FOLLOWEDADDED TO FRESH WATER FOLLOWED

    BY OTHER ADDITIVES.BY OTHER ADDITIVES.

      SEVERAL TYPES OF DRILLING FLUIDSSEVERAL TYPES OF DRILLING FLUIDS

    CONFIRM TO THIS DEFINITION. THESECONFIRM TO THIS DEFINITION. THESEDRILLING FLUIDS CAN BE PUT INDRILLING FLUIDS CAN BE PUT IN

    FOLLOWING FOUR BROADFOLLOWING FOUR BROAD

    CATEGORIESCATEGORIES

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    8/70

    TYPES OF WATER BASED MUDTYPES OF WATER BASED MUD

    SYSTEMSSYSTEMS CONTD.CONTD. '"'" SALT WATER MUDSSALT WATER MUDS

    ("(" CALCIUM TREATED MUDSCALCIUM TREATED MUDS

    )")" LIGNOSULPHONATE MUDSLIGNOSULPHONATE MUDS

    *"*" POLYMER MUDSPOLYMER MUDS

    A CAREFUL ANALYSIS OF ABOVE TYPES OFA CAREFUL ANALYSIS OF ABOVE TYPES OFINHIBITIVE MUDS REVEALS THAT A MUD CAN BEINHIBITIVE MUDS REVEALS THAT A MUD CAN BE

    CONVERTED TO INHIBITIVE OR INERT TYPES EITHERCONVERTED TO INHIBITIVE OR INERT TYPES EITHER

    BY: -BY: -

    THE ADDITION OF ELECTROLYTES MONOVALENT ORTHE ADDITION OF ELECTROLYTES MONOVALENT ORPOLYVALENT" TO THE SYSTEM.POLYVALENT" TO THE SYSTEM.

    THE ADDITION OF ORGANIC POLYELECTROLYTES.THE ADDITION OF ORGANIC POLYELECTROLYTES.

    THE ADDITION OF POLYMERS.THE ADDITION OF POLYMERS.

    THE APPLICATION OF COMBINATION OF ANY OF THETHE APPLICATION OF COMBINATION OF ANY OF THE

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    9/70

    POTASSIUM CHLORIDE MUDSPOTASSIUM CHLORIDE MUDS

    AN INTERESTING E+AMPLE OF USE OFAN INTERESTING E+AMPLE OF USE OF

    POTASSIUM MUD IS KCL-K-LIGNITE SYSTEMPOTASSIUM MUD IS KCL-K-LIGNITE SYSTEM

    FOR HIGH TEMPERATURE ONES. KCL USEDFOR HIGH TEMPERATURE ONES. KCL USED

    IN THE RAGE OF 3# TO # BY WT." SERVEDIN THE RAGE OF 3# TO # BY WT." SERVED

    TO INHIBIT SHALE HYDRATION WHERE AS K-TO INHIBIT SHALE HYDRATION WHERE AS K-LIGNITE IS USED FOR FLUID LOSS CONTROLLIGNITE IS USED FOR FLUID LOSS CONTROL

    AT HIGH TEMPERATURES.AT HIGH TEMPERATURES.

    IN ALL KCL BASED MUDS, KOH IS USED,IN ALL KCL BASED MUDS, KOH IS USED,INSTEAD OF NAOH FOR CONTROL OF PH TOINSTEAD OF NAOH FOR CONTROL OF PH TO

    AVOID ANY CONVERSION OF K TYPE CLAY TOAVOID ANY CONVERSION OF K TYPE CLAY TO

    NA TYPE CLAYS.NA TYPE CLAYS.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    10/70

    TYPES OF WATER BASEDTYPES OF WATER BASED

    MUD SYSTEMSMUD SYSTEMS!!"!!" &"&" CALCIUM MUDS INHIBITION BYCALCIUM MUDS INHIBITION BY

    POLYVALENT CATIONS"POLYVALENT CATIONS"  LIME TREATED MUDS:LIME TREATED MUDS:  GYPSUM MUDS:GYPSUM MUDS:  CALCIUM CHLORIDE MUDS:CALCIUM CHLORIDE MUDS:

    !!"!!" '"'" LIGNOSULFONATE MUDS LIGNOSULFONATE MUDS INHIBITION BY ORGANIC POLYELECTROLYTES":-INHIBITION BY ORGANIC POLYELECTROLYTES":-

    THE MOST IMPORTANT E+AMPLE OFTHE MOST IMPORTANT E+AMPLE OF

    LIGNOSULFONATE MUDS, WHICH IS MOSTLIGNOSULFONATE MUDS, WHICH IS MOSTCOMMONLY USED, IS CL/CLS SYSTEM. THECOMMONLY USED, IS CL/CLS SYSTEM. THECOMPRISES OF CHROME LIGNITE FOR FLUIDCOMPRISES OF CHROME LIGNITE FOR FLUIDLOSS CONTROL AT HIGH TEMPERATURE,LOSS CONTROL AT HIGH TEMPERATURE,OPTIMUM 0H OF . TO 1$.OPTIMUM 0H OF . TO 1$.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    11/70

    SHALE STABILIATION IS ANOTHER AREA WHERESHALE STABILIATION IS ANOTHER AREA WHEREPOLYMERS ARE UTILIED. POLYMERS HAVEPOLYMERS ARE UTILIED. POLYMERS HAVEBEEN DEVELOPED THAT ATTACH TO CLAYBEEN DEVELOPED THAT ATTACH TO CLAYPLATELETS ON THE WALLS OF THE BOREHOLESPLATELETS ON THE WALLS OF THE BOREHOLES

    AND HELP PREVENT SHALE SLOUGHING ORAND HELP PREVENT SHALE SLOUGHING ORDISPERSING.DISPERSING.

    1.1. UNDESIRABLE SOLIDS CAN BE MINIMIEDUNDESIRABLE SOLIDS CAN BE MINIMIED

    2.2. DRILLED SOLIDS FINES CAN BE CHEMICALLYDRILLED SOLIDS FINES CAN BE CHEMICALLY

    REMOVED THROUGH FLOCCULATION.REMOVED THROUGH FLOCCULATION.3.3. DESIRABLE BENTONITE SOLIDS CAN BE KEPT TODESIRABLE BENTONITE SOLIDS CAN BE KEPT TO

    A MINIMUM BECAUSE YIELD IS DOUBLED WITHA MINIMUM BECAUSE YIELD IS DOUBLED WITHPOLYMER BENEFICIATION.POLYMER BENEFICIATION.

    LOW SOLIDS NON-DISPERSEDLOW SOLIDS NON-DISPERSED

    MUD SYSTEMSMUD SYSTEMS

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    12/70

    4.4. DESIRABLE SPURT LOSS AND REASONABLEDESIRABLE SPURT LOSS AND REASONABLEFLUID LOSSES ARE ATTAINABLE.FLUID LOSSES ARE ATTAINABLE.

    .. LOWER SOLIDS ACCUMULATION MEANS LOWERLOWER SOLIDS ACCUMULATION MEANS LOWERFLUID DENSITIES AND LOWER HYDROSTATICFLUID DENSITIES AND LOWER HYDROSTATIC

    PRESSURES.PRESSURES.5.5. SHEAR THINNING CHARACTERISTICS PRODUCESHEAR THINNING CHARACTERISTICS PRODUCE

    VISCOSITY APPROACHING THAT OF WATER ATVISCOSITY APPROACHING THAT OF WATER ATTHE BIT.THE BIT.

    6.6. FLE+IBILITY ENCOURAGES HOLE CLEANINGFLE+IBILITY ENCOURAGES HOLE CLEANINGAND WELL BORE STABILITY.AND WELL BORE STABILITY.

    7.7. STABLE AT HIGH BOTTOM-HOLE TEMPERATURE.STABLE AT HIGH BOTTOM-HOLE TEMPERATURE.

    LOW SOLIDS NON-DISPERSEDLOW SOLIDS NON-DISPERSED

    MUD SYSTEMSMUD SYSTEMS CONTD.CONTD. 

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    13/70

    DISADVANTAGES OF LOW SOLIDSDISADVANTAGES OF LOW SOLIDS

    NON-DISPERSED MUDSNON-DISPERSED MUDS

    1.1. HYDRATABLE SOLIDS IN FAST DRILLINGHYDRATABLE SOLIDS IN FAST DRILLINGAREAS CAN NOT BE SATISFACTORILYAREAS CAN NOT BE SATISFACTORILYCONTROLLED CHEMICALLY ORCONTROLLED CHEMICALLY ORMECHANICALLY FOR EFFECTIVEMECHANICALLY FOR EFFECTIVE

    MAINTENANCE.MAINTENANCE.2.2. NON-DISPERSED POLYMER MUDS WILLNON-DISPERSED POLYMER MUDS WILL

    NOT TOLERATE SALT CONCENTRATIONSNOT TOLERATE SALT CONCENTRATIONSABOVE 1$,$$$ MG/1ABOVE 1$,$$$ MG/1

    3.3. THESE MUDS REQUIRE SOLIDS REMOVALTHESE MUDS REQUIRE SOLIDS REMOVALEQUIPMENT WHICH IS INSUFFICIENT INEQUIPMENT WHICH IS INSUFFICIENT INMOST CASES, IMPROPERLY INSTALLED,MOST CASES, IMPROPERLY INSTALLED,POORLY ARRANGED OR NOT ADEQUATELYPOORLY ARRANGED OR NOT ADEQUATELY

    MAINTAINED.MAINTAINED.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    14/70

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    15/70

    OIL BASE MUD SYSTEM ANDOIL BASE MUD SYSTEM AND

    THEIR APPLICATIONSTHEIR APPLICATIONS CONTD.CONTD. 

    IN ADDITION TO PROVIDING A MEANS FORIN ADDITION TO PROVIDING A MEANS FOR

    AVOIDING THESE OB8ECTIONABLE FEATURESAVOIDING THESE OB8ECTIONABLE FEATURES

    OF WATER MUDS: OIL MUDS OFFER SOMEOF WATER MUDS: OIL MUDS OFFER SOME

    POTENTIAL ADVANTAGES:POTENTIAL ADVANTAGES:

    BETTER LUBRICATING PROPERTIESBETTER LUBRICATING PROPERTIES

    HIGHER BOILING POINTSHIGHER BOILING POINTS

    LOWER FREEING POINTSLOWER FREEING POINTS

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    16/70

    OIL BASE MUD SYSTEMSOIL BASE MUD SYSTEMS

    OIL BASE MUDS ARE WATER IN OILOIL BASE MUDS ARE WATER IN OIL

    EMULSIONS IN WHICH OIL IS A CONTINUOUSEMULSIONS IN WHICH OIL IS A CONTINUOUSPHASE9 WATER IS A DISPERSED PHASE,PHASE9 WATER IS A DISPERSED PHASE,ELECTRICALLY NON-CONDUCTIVE ANDELECTRICALLY NON-CONDUCTIVE ANDHAVING OIL AS FILTRATE RATHER THANHAVING OIL AS FILTRATE RATHER THANWATER.WATER.

    THE TERMS OIL BASE MUD ANDTHE TERMS OIL BASE MUD ANDINVERT EMULSION MUD SOMETIMES USEDINVERT EMULSION MUD SOMETIMES USEDTO DISTINGUISH BETWEEN TYPES OF OILTO DISTINGUISH BETWEEN TYPES OF OILMUDS.MUDS.

    A"A" OIL BASE MUDOIL BASE MUD

    B"B" INVERT EMULSION MUDINVERT EMULSION MUD

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    17/70

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    18/70

    PROPERTIES OF D/FLUIDSPROPERTIES OF D/FLUIDS 

    ?? WEIGHTING MATERIALS MAY BE ADDEDWEIGHTING MATERIALS MAY BE ADDEDTO THE DRILLING FLUIDS TO INCREASETO THE DRILLING FLUIDS TO INCREASE

    THEIR DENSITY SO THAT THE HYDROSTATICTHEIR DENSITY SO THAT THE HYDROSTATIC

    HEAD PRESSURE BECOMES CLOSE TO THATHEAD PRESSURE BECOMES CLOSE TO THAT

    OF FORMATION PORE PRESSURE. IN ORDEROF FORMATION PORE PRESSURE. IN ORDER

    TO PREVENT THE INFLOW OF FORMATIONTO PREVENT THE INFLOW OF FORMATION

    FLUIDS AND TO LAY DOWN A THIN, LOWFLUIDS AND TO LAY DOWN A THIN, LOW

    PERMEABLE FILTER CAKE ON THE WALLS OFPERMEABLE FILTER CAKE ON THE WALLS OFTHE HOLE, THE PRESSURE OF MUD COLUMNTHE HOLE, THE PRESSURE OF MUD COLUMN

    MUST E+CEED THE PORE PRESSURE BY ATMUST E+CEED THE PORE PRESSURE BY AT

    LEAST 2$$ PSI 14 K/'>LEAST 2$$ PSI 14 K/'>22".".

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    19/70

    PROPERTIES OF D/FLUIDSPROPERTIES OF D/FLUIDS 

    THREE TYPES OF SPECIFIC WEIGHTS ORTHREE TYPES OF SPECIFIC WEIGHTS OR

    DENSITY" ARE COMMONLY USED IN DRILLINGDENSITY" ARE COMMONLY USED IN DRILLINGFLUID CALCULATIONS: 1" STATIC 2"FLUID CALCULATIONS: 1" STATIC 2"EQUIVALENT CIRCULATION AND 3" ANNULAR.EQUIVALENT CIRCULATION AND 3" ANNULAR.

    STATIC OR SURFACE SPECIFIC WEIGHT ISSTATIC OR SURFACE SPECIFIC WEIGHT IS

    DETERMINED AT THE SURFACE CONDITIONSDETERMINED AT THE SURFACE CONDITIONSWITH A MUD BALANCE. ON THE OTHER HANDWITH A MUD BALANCE. ON THE OTHER HANDEQUIVALENT CIRCULATING DENSITY ECD" ATEQUIVALENT CIRCULATING DENSITY ECD" ATANY DEPTH IN A HOLE IS A FUNCTION OFANY DEPTH IN A HOLE IS A FUNCTION OFANNULAR PRESSURE LOSS, WHICH IN TURN ISANNULAR PRESSURE LOSS, WHICH IN TURN ISRELATED TO FACTORS SUCH AS CIRCULATIONRELATED TO FACTORS SUCH AS CIRCULATIONRATE AND HOLE CONDITIONS.RATE AND HOLE CONDITIONS.

    E.C.D. @ DRILLING FLUID DENSITY ANNULARE.C.D. @ DRILLING FLUID DENSITY ANNULARPRESSURE LOSS + 1/DEPTHPRESSURE LOSS + 1/DEPTH

    G G S

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    20/70

    WEIGHTING MATERIALSWEIGHTING MATERIALS

    COMMONLY ADDED TO MUDSCOMMONLY ADDED TO MUDSMATERIALMATERIAL S0.G S0.G 

    CALCIUMCALCIUMCARBONATECARBONATE

    2.612.61 ACID SOLUBLE WEIGHTINGACID SOLUBLE WEIGHTINGMATERIAL FOR DRILLING,MATERIAL FOR DRILLING,COMPLETION AND WORK OVERCOMPLETION AND WORK OVERFLUIDS.FLUIDS.

    IRONIRONCARBONATECARBONATE 3.3. WEIGHTING AGENT IN WORK OVERWEIGHTING AGENT IN WORK OVERFLUIDSFLUIDS

    BARYTESBARYTES 4.24.2 WEIGHTING MATERIAL IN BOTHWEIGHTING MATERIAL IN BOTHWATER AND OIL BASE FLUIDS.WATER AND OIL BASE FLUIDS.

    ILIMENITEILIMENITEF)O.T!OF)O.T!O22""4.74.7 WEIGHTING MATERIAL IN BOTHWEIGHTING MATERIAL IN BOTHWATER AND OIL BASE FLUIDS.WATER AND OIL BASE FLUIDS.

    HEMATITEHEMATITEF)F)22OO33""

    .$.$ WEIGHTING MATERIAL IN BOTHWEIGHTING MATERIAL IN BOTHWATER AND OIL BASE FLUIDS.WATER AND OIL BASE FLUIDS.

    GALENAGALENA 5.6-65.6-6 HIGH DENSITY MATERIAL FORHIGH DENSITY MATERIAL FORHIGH WEIGHT MUDS.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    21/70

    CALIBRATIONCALIBRATION

    THE INSTRUMENT SHOULD BETHE INSTRUMENT SHOULD BE

    CALIBRATED FREQUENTLY WITH FRESHCALIBRATED FREQUENTLY WITH FRESH

    WATER. FRESH WATER SHOULD GIVE AWATER. FRESH WATER SHOULD GIVE A

    READING OF 7.33 LB/GAL OR 52.3 ;&/'&.*=.READING OF 7.33 LB/GAL OR 52.3 ;&/'&.*=.

    OR 1,$$ >/'&.'>. AT 6$OR 1,$$ >/'&.'>. AT 6$$$F. 21F. 21$$C".C".

    IF IT SHOWS WRONG READING THENIF IT SHOWS WRONG READING THEN

    THE BALANCING SCREW SHOULD BETHE BALANCING SCREW SHOULD BE

    AD8USTED.AD8USTED.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    22/70

    VISCOSITY GEL STRENGTHVISCOSITY GEL STRENGTH

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    23/70

    VISCOSITY GEL STRENGTHVISCOSITY GEL STRENGTHVISCOSITY IS DEFINED AS THEVISCOSITY IS DEFINED AS THE

    RESISTANCE TO FLOW WHILE THE GELRESISTANCE TO FLOW WHILE THE GEL

    STRENGTH IS THE THI+OTROPIC PROPERTYSTRENGTH IS THE THI+OTROPIC PROPERTY

    OF MUD I.E. MUD TENDS TO THICKEN UP IFOF MUD I.E. MUD TENDS TO THICKEN UP IF

    LEFT UNAGGETATED FOR SOME TIME.LEFT UNAGGETATED FOR SOME TIME.

    VISCOSITY IS USUALLY MEASURED BYVISCOSITY IS USUALLY MEASURED BY

    MARSH FUNNEL. IT IS THE TIMED RATE OFMARSH FUNNEL. IT IS THE TIMED RATE OF

    FLOW AND MEASURED IN SECONDS PERFLOW AND MEASURED IN SECONDS PER

    QUART OR IN METRIC UNITS, SECONDS PERQUART OR IN METRIC UNITS, SECONDS PER

    1$$$ ML. HOWEVER FUNNEL VISCOSITY1$$$ ML. HOWEVER FUNNEL VISCOSITY

    DOES NOT REPRESENT THE CORRECT VALUEDOES NOT REPRESENT THE CORRECT VALUE

    OF THE ACTUAL VISCOSITY OF MUD.OF THE ACTUAL VISCOSITY OF MUD.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    24/70

    VISCOSITY GEL STRENGTHVISCOSITY GEL STRENGTH CONTD.CONTD. 

    MORE MEANINGFUL INFORMATIONMORE MEANINGFUL INFORMATION

    CONCERNING VISCOSITY AND ITS CONTROLCONCERNING VISCOSITY AND ITS CONTROLCAN BE OBTAINED WITH A ROTATIONALCAN BE OBTAINED WITH A ROTATIONALVISCOMETER. VISCOSITY AND GELVISCOMETER. VISCOSITY AND GELSTRENGTH INCREASE DURING DRILLINGSTRENGTH INCREASE DURING DRILLING

    PENETRATION OF THE FORMATIONS BY THEPENETRATION OF THE FORMATIONS BY THEBIT, CONTRIBUTES THE ACTIVE SOLIDS,BIT, CONTRIBUTES THE ACTIVE SOLIDS,INERT SOLIDS AND CONTAMINANTS TO THEINERT SOLIDS AND CONTAMINANTS TO THESYSTEM. THIS CAN CAUSE INCREASEDSYSTEM. THIS CAN CAUSE INCREASED

    VISCOSITY AND / OR GEL STRENGTH TOVISCOSITY AND / OR GEL STRENGTH TOLEVEL, WHICH MAY NOT BE ACCEPTABLE. INLEVEL, WHICH MAY NOT BE ACCEPTABLE. INGENERAL, WHEN THESE INCREASES OCCUR,GENERAL, WHEN THESE INCREASES OCCUR,WATER OR CHEMICALS THINNERS" OR BOTHWATER OR CHEMICALS THINNERS" OR BOTH

    MAY BE ADDED TO CONTROL THEM.MAY BE ADDED TO CONTROL THEM.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    25/70

    MUD ADDITIVES COMMONLY USEDMUD ADDITIVES COMMONLY USED

    FOR IMPARTING VISCOSITYFOR IMPARTING VISCOSITY

    AND REDUCING VISCOSITYAND REDUCING VISCOSITYNAMENAME FUNCTIONSFUNCTIONS

    BENTONITEBENTONITECLAYCLAY

    VISCOSIFIER AND FLUID LOSSVISCOSIFIER AND FLUID LOSSREDUCER IN FRESH WATER.REDUCER IN FRESH WATER.

    ATTAPUL-GITEATTAPUL-GITE VISCOSIFIER AND FLUID LOSSVISCOSIFIER AND FLUID LOSSREDUCER FOR SALT WATER BASEREDUCER FOR SALT WATER BASESYSTEM WHERE SALINITY E+CEEDSSYSTEM WHERE SALINITY E+CEEDS3.#.3.#.

    ASBESTOSASBESTOS VISCOSITIES:FRESH AND SALT WATERVISCOSITIES:FRESH AND SALT WATERSYSTEMSYSTEM

    CARBO+YCARBO+YMETHYLMETHYLCELLULOSECELLULOSE

    SELECTIVE FLOCCULANT, VISCOSITIESSELECTIVE FLOCCULANT, VISCOSITIESAND FLUID LOSS REDUCING AGENT.AND FLUID LOSS REDUCING AGENT.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    26/70

    MUD ADDITIVES COMMONLY USEDMUD ADDITIVES COMMONLY USED

    FOR IMPARTING VISCOSITYFOR IMPARTING VISCOSITY

    AND REDUCING VISCOSITYAND REDUCING VISCOSITYNAMENAME FUNCTIONSFUNCTIONS

    THINNER ORTHINNER ORDISPERSANTSDISPERSANTS

    CHEMICALS FOR REDUCINGCHEMICALS FOR REDUCINGVISCOSITYVISCOSITY

    FERROCHROMEFERROCHROMELIGNOSULPHONLIGNOSULPHONATEATE

    DISPERSANT WHICH CONTRIBUTES TODISPERSANT WHICH CONTRIBUTES TOFLUID LOSS CONTROL AT HIGHETFLUID LOSS CONTROL AT HIGHETTEMPERATUARETEMPERATUARE

    CHROME FREECHROME FREELIGNOSULPHONLIGNOSULPHONATEATE

    DISPERSANT WHICH CONTRIBUTES TODISPERSANT WHICH CONTRIBUTES TOFLUID LOSS CONTROL AT HIGHERFLUID LOSS CONTROL AT HIGHERTEMPERATURESTEMPERATURES

    MODIFIEDMODIFIEDTANNINTANNIN

    THINNER FOR FRESH WATER ANDTHINNER FOR FRESH WATER ANDSALT WATER SYSTEMSSALT WATER SYSTEMS

    CUTCHCUTCH THINNER FOR HIGH 0H FRESH WATERTHINNER FOR HIGH 0H FRESH WATERBASE SYSTEMBASE SYSTEM

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    27/70

    PLASTIC VISCOSITY P"PLASTIC VISCOSITY P"UNIT OF MEASUREMENT CENTIPOISE :UNIT OF MEASUREMENT CENTIPOISE : MUD IS COMPOSED OF SOLIDS THATMUD IS COMPOSED OF SOLIDS THATCONTRIBUTE TO APPARENT VISCOSITY.CONTRIBUTE TO APPARENT VISCOSITY.

    PLASTIC VISCOSITY IS THAT PART OF FLOWPLASTIC VISCOSITY IS THAT PART OF FLOW

    RESISTANCE, WHICH IS CAUSED BYRESISTANCE, WHICH IS CAUSED BY

    MECHANICAL FRICTION. THIS FRICTIONMECHANICAL FRICTION. THIS FRICTION

    OCCURS 1" BETWEEN THE SOLIDS IN MUD 2"OCCURS 1" BETWEEN THE SOLIDS IN MUD 2"

    BETWEEN THE SOLIDS AND LIQUIDS THATBETWEEN THE SOLIDS AND LIQUIDS THAT

    SURROUND THEM 3" WITH THE SHEARING OFSURROUND THEM 3" WITH THE SHEARING OFTHE LIQUID ITSELF. FOR PRACTICAL FIELDTHE LIQUID ITSELF. FOR PRACTICAL FIELD

    PURPOSE, HOWEVER THE PV DEPENDS UPONPURPOSE, HOWEVER THE PV DEPENDS UPON

    THE CONCENTRATION OF MUD SOLIDS.THE CONCENTRATION OF MUD SOLIDS.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    28/70

     YIELD POINT Y0" YIELD POINT Y0" ::

    MEASURED ! ;&/1$$

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    29/70

     YIELD POINT Y0" YIELD POINT Y0" ::

    MEASUREDMEASURED ! ;&/1$$

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    30/70

     YIELD POINT Y0" YIELD POINT Y0" ::

    MEASURED ! ;&/1$$

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    31/70

     YIELD POINT Y0" YIELD POINT Y0" ::

    MEASURED ! ;&/1$$

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    32/70

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    33/70

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    34/70

    APPARENT VISCOSITY:APPARENT VISCOSITY: THE APPARENT VISCOSITY IN CENTIPOISETHE APPARENT VISCOSITY IN CENTIPOISE

    EQUALS THE 5$$ 0> READING DIVIDED BY 2EQUALS THE 5$$ 0> READING DIVIDED BY 2A.V. @5$$/2 IN CENTIPOISEJA.V. @5$$/2 IN CENTIPOISEJ

    PLASTIC VISCOSITY PV":PLASTIC VISCOSITY PV": 

    FRICTION FORCE BETWEEN TWO PARTICLESFRICTION FORCE BETWEEN TWO PARTICLESIS KNOWN AS PLASTIC VISCOSITY READINGIS KNOWN AS PLASTIC VISCOSITY READINGAT 5$$ 0> - READING AT 3$$ 0>.AT 5$$ 0> - READING AT 3$$ 0>.P.V. @ 5$$ -  3$$ IN CENTIPOISEJP.V. @ 5$$ -  3$$ IN CENTIPOISEJ

     YIELD POINT: YIELD POINT:3$$ 0> READING - PLASTIC VISCOSITY3$$ 0> READING - PLASTIC VISCOSITYY0 @ 3$$ - PV IN ;&/1$$

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    35/70

    APPLICATION OF FANNAPPLICATION OF FANN

    VISCOMETERVISCOMETER1.1. DETERMINATION OF APPARENTDETERMINATION OF APPARENTVISCOSITY, PLASTIC VISCOSITY ANDVISCOSITY, PLASTIC VISCOSITY AND

     YIELD POINT. YIELD POINT.

    2.2. DETERMINATION OF GEL STRENGTH ORDETERMINATION OF GEL STRENGTH ORTHI+OTROPIC PROPERTIES OF THETHI+OTROPIC PROPERTIES OF THE

    DRILLING FLUIDS.DRILLING FLUIDS.

    GE STRENGTH

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    36/70

    GEL STRENGTHGEL STRENGTHTHI+OTROPY CAN BE ESTIMATED BYTHI+OTROPY CAN BE ESTIMATED BY

    OBSERVING THE CHANGE IN STRENGTHOBSERVING THE CHANGE IN STRENGTHTAKING PLACE IN A GEL AS FUNCTION OFTAKING PLACE IN A GEL AS FUNCTION OFTIME. TWO VALUES, THE 1$ SECOND GELTIME. TWO VALUES, THE 1$ SECOND GELSTRENGTH IS KNOWN AS GEL$ AND THE 1$STRENGTH IS KNOWN AS GEL$ AND THE 1$MINUTE STRENGTH IS KNOWN AS GEL1$.MINUTE STRENGTH IS KNOWN AS GEL1$.

    THESE TWO VALUES CAN BETHESE TWO VALUES CAN BEDETERMINED AS FOLLOWS. ALLOW THE MUDDETERMINED AS FOLLOWS. ALLOW THE MUDTO STAND UNDISTURBED FOR 1$ SECONDS.TO STAND UNDISTURBED FOR 1$ SECONDS.

    THEN SLOWLY AND STEADILY ROTATE AT 3THEN SLOWLY AND STEADILY ROTATE AT 30>. ALLOW THE MUD TO STAND STATIC FOR0>. ALLOW THE MUD TO STAND STATIC FOR1$ MINS. THEN AGAIN SLOWLY ROTATE AT 31$ MINS. THEN AGAIN SLOWLY ROTATE AT 30>. BY THIS CALCULATE GEL$ AND GEL1$0>. BY THIS CALCULATE GEL$ AND GEL1$

    IN ;&/1$$

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    37/70

    FILTRATION LOSSFILTRATION LOSS

    THE FILTRATION PROPERTY OF A DRILLINGTHE FILTRATION PROPERTY OF A DRILLING

    FLUID IS INDICATIVE OF THE ABILITY OF THEFLUID IS INDICATIVE OF THE ABILITY OF THE

    SOLID COMPONENTS OF THE MUD TO FORM ASOLID COMPONENTS OF THE MUD TO FORM A

    FILTER CAKE AND THE MAGNITUDE OF CAKEFILTER CAKE AND THE MAGNITUDE OF CAKE

    PERMEABILITY. THE LOWER THEPERMEABILITY. THE LOWER THEPERMEABILITY, THE THINNER IS THE FILTERPERMEABILITY, THE THINNER IS THE FILTER

    CAKE AND LOWERS THE VOLUME OFCAKE AND LOWERS THE VOLUME OF

    FILTRATE FROM MUD. FILTRATION PROPERTYFILTRATE FROM MUD. FILTRATION PROPERTYIS DEPENDENT UPON THE AMOUNT ANDIS DEPENDENT UPON THE AMOUNT AND

    PHYSICAL STATE OF COLLOIDAL MATERIAL INPHYSICAL STATE OF COLLOIDAL MATERIAL IN

    THE MUD.THE MUD.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    38/70

    FILTRATION LOSSFILTRATION LOSS CONTD.CONTD. IF THE COLLOIDAL CONTENT OF MUD IS LOWIF THE COLLOIDAL CONTENT OF MUD IS LOW

    AND THE INERT SOLIDS CONCENTRATION ISAND THE INERT SOLIDS CONCENTRATION IS

    HIGH, IT WILL RESULT IN A THICK FILTERHIGH, IT WILL RESULT IN A THICK FILTER

    CAKE ON THE WALLS OF THE BOREHOLE. ACAKE ON THE WALLS OF THE BOREHOLE. A

    THICK FILTER CAKE IS UNDESIRABLE AS ITTHICK FILTER CAKE IS UNDESIRABLE AS ITCONSTRICTS THE WALLS OF THE BOREHOLECONSTRICTS THE WALLS OF THE BOREHOLE

    AND ALLOWS E+CESSIVE AMOUNT OFAND ALLOWS E+CESSIVE AMOUNT OF

    FILTRATE TO MOVE INTO THE FORMATIONFILTRATE TO MOVE INTO THE FORMATIONRESULTING IN FURTHER PROBLEMS SUCH ASRESULTING IN FURTHER PROBLEMS SUCH AS

    CAVING, TIGHT PULLS, HELD UPS, STUCKUPSCAVING, TIGHT PULLS, HELD UPS, STUCKUPS

    ETC.ETC.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    39/70

    FILTRATION LOSSFILTRATION LOSS CONTD.CONTD. THEREFORE A SATISFACTORY FLUID LOSSTHEREFORE A SATISFACTORY FLUID LOSS

    VALUE AND DEPOSITION OF A THIN,VALUE AND DEPOSITION OF A THIN,

    IMPERMEABLE FILTER CAKE ARE OFTEN THEIMPERMEABLE FILTER CAKE ARE OFTEN THE

    DETERMINING FACTORS FOR SUCCESSFULDETERMINING FACTORS FOR SUCCESSFUL

    PERFORMANCE OF A DRILLING FLUID.PERFORMANCE OF A DRILLING FLUID.

    THERE ARE TWO TYPES OFTHERE ARE TWO TYPES OF

    FILTRATIONS NAMELY DYNAMIC FILTRATION,FILTRATIONS NAMELY DYNAMIC FILTRATION,WHEN THE MUD IS CIRCULATING, AND STATICWHEN THE MUD IS CIRCULATING, AND STATIC

    FILTRATION WHEN THE FLUID IS AT REST.FILTRATION WHEN THE FLUID IS AT REST.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    40/70

    FILTRATION LOSSFILTRATION LOSS CONTD.CONTD. DYNAMIC FILTRATION DIFFERS FROMDYNAMIC FILTRATION DIFFERS FROM

    STATIC FILTRATION IN THAT THE FLOW OFSTATIC FILTRATION IN THAT THE FLOW OF

    MUD BY THE WALLS OF THE BOREHOLEMUD BY THE WALLS OF THE BOREHOLE

    TENDS TO ERODE AWAY THE FILTER CAKE ASTENDS TO ERODE AWAY THE FILTER CAKE AS

    THE FILTRATION PROCESS DEPOSITS IT. THETHE FILTRATION PROCESS DEPOSITS IT. THE

    FILTRATION CAKE BUILDS UP UNTIL THEFILTRATION CAKE BUILDS UP UNTIL THE

    RATE OF DEPOSITION EQUALS THE RATE OFRATE OF DEPOSITION EQUALS THE RATE OF

    EROSION. WHEN THE FILTER CAKEEROSION. WHEN THE FILTER CAKE

    REACHES AN EQUILIBRIUM THICKNESS THEREACHES AN EQUILIBRIUM THICKNESS THE

    RATE OF FILTRATION BECOMES CONSTANT.RATE OF FILTRATION BECOMES CONSTANT.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    41/70

    FILTRATION LOSSFILTRATION LOSS CONTD.CONTD. HOWEVER IN STATIC FILTRATION THEHOWEVER IN STATIC FILTRATION THE

    CAKE CONTINUES TO GROW THICKER WITHCAKE CONTINUES TO GROW THICKER WITH

    TIME AND THE RATE OF FILTRATIONTIME AND THE RATE OF FILTRATION

    CONTINUES TO DECREASE. IN THE SAMECONTINUES TO DECREASE. IN THE SAME

    PERIOD OF TIME, A STATIC FILTER CAKE WILLPERIOD OF TIME, A STATIC FILTER CAKE WILL

    BE THICKER THAN A DYNAMIC FILTER CAKEBE THICKER THAN A DYNAMIC FILTER CAKE

    AND THE STATIC RATE OF FILTRATION WILLAND THE STATIC RATE OF FILTRATION WILL

    BE LESS THAN DYNAMIC RATE.BE LESS THAN DYNAMIC RATE.

    SOME CHEMICALS USED FORSOME CHEMICALS USED FOR

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    42/70

    SOME CHEMICALS USED FORSOME CHEMICALS USED FOR

    CONTROLLING FLUID LOSSCONTROLLING FLUID LOSSCHEMICALCHEMICAL FUNCTIONSFUNCTIONS

    CARBO+Y METHYL CELLULOSECARBO+Y METHYL CELLULOSE SELECTIVE FLOCCULANT,SELECTIVE FLOCCULANT,

    CMC L.V H.V"CMC L.V H.V" VISCOSIFIER FLUID LOSSVISCOSIFIER FLUID LOSS CONTROL INCONTROL IN

    FRESH ANDFRESH AND BRACKISH WATER, IMPARTSBRACKISH WATER, IMPARTS DISPERSINGDISPERSING

    PROPERTIES TOPROPERTIES TO

    SALT WATER SYSTEM.SALT WATER SYSTEM.

    PREGELATINISED STARCHPREGELATINISED STARCH FLUID LOSS CONTROL IN SALTFLUID LOSS CONTROL IN SALT

    WATER SYSTEM CALCIUMWATER SYSTEM CALCIUM MUD SYSTEM.MUD SYSTEM.

    CARBO+Y METHYL STARCHCARBO+Y METHYL STARCH VISCOSITIES AND FILTRATIONVISCOSITIES AND FILTRATION

    REDUCER.REDUCER.

    SOME CHEMICALS USED FOR

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    43/70

    SOME CHEMICALS USED FORSOME CHEMICALS USED FOR

    CONTROLLING FLUID LOSSCONTROLLING FLUID LOSS CONTD.CONTD. CHEMICALCHEMICAL FUNCTIONSFUNCTIONSPOLYANIONIC CELLULOSEPOLYANIONIC CELLULOSE FLUID LOSS CONTROL INFLUID LOSS CONTROL IN PAC"PAC"

    L.VR.G"L.VR.G" FRESH AND SALT WATERFRESH AND SALT WATER SYSTEM ANDSYSTEM AND

    VISCOSIFIER.VISCOSIFIER.

    HT-STABLE RESIN LIGNITEHT-STABLE RESIN LIGNITE FILTRATION CONTROL UNDERFILTRATION CONTROL UNDER

    HIGH TEMPERATUREHIGH TEMPERATURE CONDITIONS.CONDITIONS.

    SYNTHETIC POLYMERSSYNTHETIC POLYMERS VISCOSITIES AND FILTRATEVISCOSITIES AND FILTRATE REDUCER.REDUCER.

    +-C POLYMER+-C POLYMER PRIMARY VISCOSIFYINGPRIMARY VISCOSIFYING POLYMER FOR ALLPOLYMER FOR ALL

    WATERWATER BASE MUDS.BASE MUDS.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    44/70

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    45/70

    0H:0H:

    0H IS THE MEASUREMENT OF RELATIVE0H IS THE MEASUREMENT OF RELATIVE

    ACIDITY OR ALKALINITY OF A LIQUID. MUD 0HACIDITY OR ALKALINITY OF A LIQUID. MUD 0H

    AFFECTS THE DISPERSIBILITY OF CLAYS,AFFECTS THE DISPERSIBILITY OF CLAYS,

    SOLUBILITY OF VARIOUS PRODUCTS ANDSOLUBILITY OF VARIOUS PRODUCTS AND

    CHEMICALS CORROSION OF STEELCHEMICALS CORROSION OF STEEL

    MATERIALS, AND MUD RHEOLOGICALMATERIALS, AND MUD RHEOLOGICAL

    PROPERTIES. TYPICAL 0H RANGE IS .$ TOPROPERTIES. TYPICAL 0H RANGE IS .$ TO1$.9 HOWEVER, HIGH 0H MUDS CAN RANGE1$.9 HOWEVER, HIGH 0H MUDS CAN RANGE

    UP TO 12. TO 13.$.UP TO 12. TO 13.$.

    PAPER TEST STRIPSPAPER TEST STRIPS

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    46/70

    PAPER TEST STRIPSPAPER TEST STRIPS

    DESCRIPTION:DESCRIPTION:THE TEST PAPER IS IMPREGNATED WITHTHE TEST PAPER IS IMPREGNATED WITH

    DYES OF SUCH NATURE THAT THE COLOURDYES OF SUCH NATURE THAT THE COLOUR

    IS DEPENDENT UPON THE PH OF THEIS DEPENDENT UPON THE PH OF THE

    MEDIUM IN WHICH THE PAPER IS PLACED.MEDIUM IN WHICH THE PAPER IS PLACED.

    A STANDARD COLOUR CHART IS SUPPLIEDA STANDARD COLOUR CHART IS SUPPLIED

    IN A WIDE RANGE TYPE, WHICH PERMITSIN A WIDE RANGE TYPE, WHICH PERMITS

    ESTIMATION OF PH TO $. UNIT, AND INESTIMATION OF PH TO $. UNIT, AND INNARROW RANGE PAPERS WITH WHICH THENARROW RANGE PAPERS WITH WHICH THE

    PH CAN BE ESTIMATED TO $.2 UNIT.PH CAN BE ESTIMATED TO $.2 UNIT.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    47/70

    GLASS ELECTRODE 0H METER:GLASS ELECTRODE 0H METER:

    DESCRIPTION:DESCRIPTION:

    THE GLASS ELECTRODES PH METERTHE GLASS ELECTRODES PH METER

    CONSISTS OF A GLASS ELECTRODECONSISTS OF A GLASS ELECTRODE

    SYSTEM, AN ELECTRONIC AMPLIFIER AND ASYSTEM, AN ELECTRONIC AMPLIFIER AND A

    METER CALIBRATED IN PH UNITS.METER CALIBRATED IN PH UNITS.THE ELECTRODE SYSTEM IS COMPOSED OF:THE ELECTRODE SYSTEM IS COMPOSED OF:

    I.I. THE GLASS ELECTRODES, WHICH CONSISTSTHE GLASS ELECTRODES, WHICH CONSISTS

    OF A THIN WALLED BULB MADE OF SPECIALOF A THIN WALLED BULB MADE OF SPECIAL

    GLASS WITHIN WHICH IS SEALED AGLASS WITHIN WHICH IS SEALED A

    SUITABLE ELECTROLYTE AND ELECTRODE.SUITABLE ELECTROLYTE AND ELECTRODE.

    GLASS ELECTRODEGLASS ELECTRODE

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    48/70

    GLASS ELECTRODEGLASS ELECTRODE

    0H METER0H METER CONTD.CONTD. 

    II.II. THE REFERENCE ELECTRODE, WHICH IS,THE REFERENCE ELECTRODE, WHICH IS,SATURATED CALOMEL CELL. ELECTRICALSATURATED CALOMEL CELL. ELECTRICAL

    CONNECTION WITH THE MUD ISCONNECTION WITH THE MUD IS

    ESTABLISHED THROUGH A SATURATEDESTABLISHED THROUGH A SATURATED

    SOLUTION OF POTASSIUM CHLORIDESOLUTION OF POTASSIUM CHLORIDE

    CONTAINED IN A TUBE SURROUNDING THECONTAINED IN A TUBE SURROUNDING THE

    CALOMEL CELL. THE ELECTRICALCALOMEL CELL. THE ELECTRICAL

    POTENTIAL GENERATED IN THE GLASSPOTENTIAL GENERATED IN THE GLASSELECTRODE SYSTEM BY THE HYDROGENELECTRODE SYSTEM BY THE HYDROGEN

    IONS IN THE DRILLING MUD IS AMPLIFIEDIONS IN THE DRILLING MUD IS AMPLIFIED

    AND OPERATES THE CALIBRATED METER,AND OPERATES THE CALIBRATED METER,

    WHICH INDICATES PH.WHICH INDICATES PH.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    49/70

    CATION E+CHANGE CAPACITY ORCATION E+CHANGE CAPACITY OR

    METHYLELENE BLUE TEST MBT"METHYLELENE BLUE TEST MBT"

    IT INDICATES THE AMOUNT OF ACTIVEIT INDICATES THE AMOUNT OF ACTIVE

    CLAY IN THE MUD. IT MEASURES THE TOTALCLAY IN THE MUD. IT MEASURES THE TOTAL

    CEC OF THE CLAY BY TITRATING WITHCEC OF THE CLAY BY TITRATING WITH

    STANDARD METHYLENE BLUE SOLUTION.STANDARD METHYLENE BLUE SOLUTION.

    BENTONITE CONTENT ACTIVE CLAY" CAN BEBENTONITE CONTENT ACTIVE CLAY" CAN BE

    ESTIMATED IF OTHER ADSORPTIVEESTIMATED IF OTHER ADSORPTIVE

    MATERIALS ARE NOT PRESENT", BASED ONMATERIALS ARE NOT PRESENT", BASED ON

    AN E+CHANGE CAPACITY OF 6 MILLAN E+CHANGE CAPACITY OF 6 MILL

    EQUIVALENT PER1$$ GM OF DRYEQUIVALENT PER1$$ GM OF DRY

    BENTONITE.BENTONITE.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    50/70

    METHYLENE BLUE TEST FORMETHYLENE BLUE TEST FOR

    CATION E+CHANGE CAPACITYCATION E+CHANGE CAPACITY

    PRECISE DRILLING MUD CONTROLPRECISE DRILLING MUD CONTROLREQUIRES THAT SOME MEASUREMENT BEREQUIRES THAT SOME MEASUREMENT BEMADE TO GIVE INFORMATION ABOUT THEMADE TO GIVE INFORMATION ABOUT THENATURE AND TYPES OF CLAYS THAT ARENATURE AND TYPES OF CLAYS THAT ARE

    PRESENT IN MUD, AND THE SAMEPRESENT IN MUD, AND THE SAMEINFORMATION IS REQUIRED ABOUT THEINFORMATION IS REQUIRED ABOUT THECLAYS AND SHALES THAT ARE BEINGCLAYS AND SHALES THAT ARE BEINGDRILLED, SINCE THEY MAY BECOME PART OFDRILLED, SINCE THEY MAY BECOME PART OFTHE MUD SYSTEM.THE MUD SYSTEM.

    THE METHYLENE BLUE TEST FOR CATIONTHE METHYLENE BLUE TEST FOR CATIONE+CHANGE CAPACITY OF CLAYS IS SUCH AE+CHANGE CAPACITY OF CLAYS IS SUCH AMEASUREMENT. THE FOLLOWING MATERIALSMEASUREMENT. THE FOLLOWING MATERIALSARE REQUIRED TO ESTIMATE THE CATIONARE REQUIRED TO ESTIMATE THE CATIONE+CHANGE CAPACITY OF DRILLING MUDE+CHANGE CAPACITY OF DRILLING MUDSOLIDS OR CLAYS: -SOLIDS OR CLAYS: -

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    51/70

    METHYLENE BLUE TEST FORMETHYLENE BLUE TEST FOR

    CATION E+CHANGE CAPACITYCATION E+CHANGE CAPACITY

    I.I. METHYLENE BLUE SOLUTIONMETHYLENE BLUE SOLUTION

    3.64 GM U.S.P. GRADE METHYLENE3.64 GM U.S.P. GRADE METHYLENEBLUE PER 1$$$ CUB.CM."BLUE PER 1$$$ CUB.CM."

    1CM @ $.$1 MILLE EQUIVALENT.1CM @ $.$1 MILLE EQUIVALENT.HYDROGEN PERO+IDE - 3# SOLUTION.HYDROGEN PERO+IDE - 3# SOLUTION.

    II.II. DILUTE SULFURIC ACID APPRO+. N"DILUTE SULFURIC ACID APPRO+. N"

    III.III. ONE 2. CUB.CM. OR 3 CUB.CM.ONE 2. CUB.CM. OR 3 CUB.CM.

    SYRINGESYRINGEIV.IV. FLASK, BURETTE, GRADUATEDFLASK, BURETTE, GRADUATEDCYLINDER, HOT PLATE, FILTER PAPERCYLINDER, HOT PLATE, FILTER PAPER ETC.ETC.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    52/70

    LUBRICITYLUBRICITY

    REQUIREMENT FOR LUBRICATION IS CRITICALREQUIREMENT FOR LUBRICATION IS CRITICAL

    ESPECIALLY IN DIRECTIONAL WELL" TOESPECIALLY IN DIRECTIONAL WELL" TO

    REDUCE TORQUE AND DRAG. LUBRICATINGREDUCE TORQUE AND DRAG. LUBRICATING

    TESTERS ARE MODIFIED TO MEASURETESTERS ARE MODIFIED TO MEASURE

    LUBRICITY COEFFICIENT AND FILM STRENGTHLUBRICITY COEFFICIENT AND FILM STRENGTH

    EP TEST". BASED ON WHICHEP TEST". BASED ON WHICH

    RECOMMENDATIONS ARE GIVEN FORRECOMMENDATIONS ARE GIVEN FORTREATMENT OF THE MUD WITH LUBRICATINGTREATMENT OF THE MUD WITH LUBRICATING

    AGENTS.AGENTS.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    53/70

    SAND CONTENTSAND CONTENT

    EQUIPMENT:EQUIPMENT:SAND CONTENT OF MUD IS ESTIMATED BYSAND CONTENT OF MUD IS ESTIMATED BY

    THE USE OF A SAND SCREEN SET. THE SETTHE USE OF A SAND SCREEN SET. THE SET

    CONSISTS OF A 2$$ MESH SIEVE 2 1/2 INCHCONSISTS OF A 2$$ MESH SIEVE 2 1/2 INCH

    53. MM" IN DIAMETER, A FUNNEL TO FIT TO53. MM" IN DIAMETER, A FUNNEL TO FIT TOSCREEN AND GLASS MEASURING TUBE. THESCREEN AND GLASS MEASURING TUBE. THE

    MEASURING TUBE IS MARKED FOR THEMEASURING TUBE IS MARKED FOR THE

    VOLUME OF MUD TO BE ADDED IN ORDER TOVOLUME OF MUD TO BE ADDED IN ORDER TO

    READ DIRECTLY THE PERCENTAGE OF SANDREAD DIRECTLY THE PERCENTAGE OF SANDIN THE BOTTOM OF THE TUBE, WHICH ISIN THE BOTTOM OF THE TUBE, WHICH IS

    GRADUATED FROM $ TO 2$ PERCENT.GRADUATED FROM $ TO 2$ PERCENT.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    54/70

    LIQUIDS AND SOLIDSLIQUIDS AND SOLIDS

    EQUIPMENT:EQUIPMENT:A RETORT IS USED TO DETERMINE THEA RETORT IS USED TO DETERMINE THEQUANTITY OF LIQUIDS AND SOLIDS IN THEQUANTITY OF LIQUIDS AND SOLIDS IN THEDRILLING FLUID.DRILLING FLUID. MUD IS PLACED IN A STEELMUD IS PLACED IN A STEELCONTAINER AND HEATED UNTIL THE LIQUIDCONTAINER AND HEATED UNTIL THE LIQUIDCOMPONENTS HAVE BEEN VAPORIED. THECOMPONENTS HAVE BEEN VAPORIED. THEVAPOURS ARE PASSED THROUGH AVAPOURS ARE PASSED THROUGH ACONDENSER AND COLLECTED IN A GRADUATEDCONDENSER AND COLLECTED IN A GRADUATED

    CYLINDER AND THE VOLUME OF LIQUID ISCYLINDER AND THE VOLUME OF LIQUID ISMEASURED. SOLIDS, BOTH SUSPENDED ANDMEASURED. SOLIDS, BOTH SUSPENDED ANDDISSOLVED ARE DETERMINED BY DIFFERENCE.DISSOLVED ARE DETERMINED BY DIFFERENCE.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    55/70

    FILTRATE ANALYSISFILTRATE ANALYSIS

    SUCH CHEMICAL TESTS ARE MADE ONSUCH CHEMICAL TESTS ARE MADE ONMUD FILTRATES TO DETERMINE THE PRESENCEMUD FILTRATES TO DETERMINE THE PRESENCE

    OF CONTAMINANTS, SUCH AS SALT OROF CONTAMINANTS, SUCH AS SALT OR

    ANHYDRITE, OR TO ASSIST IN THE CONTROL OFANHYDRITE, OR TO ASSIST IN THE CONTROL OF

    MUD PROPERTIES. FOR E+AMPLE, THE TESTMUD PROPERTIES. FOR E+AMPLE, THE TEST

    FOR ALKALINITY IN HIGH PH MUDS. THE SAMEFOR ALKALINITY IN HIGH PH MUDS. THE SAME

    TESTS CAN BE APPLIED TO MAKE UP WATERS,TESTS CAN BE APPLIED TO MAKE UP WATERS,

    WHICH IN SOME AREAS CONTAIN DISSOLVEDWHICH IN SOME AREAS CONTAIN DISSOLVEDSALTS, WHICH AFFECT MUD TREATMENT.SALTS, WHICH AFFECT MUD TREATMENT.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    56/70

    ALKALINITY DETERMINATIONSALKALINITY DETERMINATIONS

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    57/70

    ALKALINITY DETERMINATIONSALKALINITY DETERMINATIONS2.2. ADD 2 TO 3 DROPS OFADD 2 TO 3 DROPS OF

    PHENOLPHTHALEIN INDICATORPHENOLPHTHALEIN INDICATORSOLUTION.SOLUTION.

    3.3. ADD $.$2 NORMAL N/$" SULFURICADD $.$2 NORMAL N/$" SULFURICACID FROM AN AUTOMATIC BURETTEACID FROM AN AUTOMATIC BURETTE OROR

    A PIPETTE, STIRRINGA PIPETTE, STIRRING CONTINUOUSLY,CONTINUOUSLY,UNTIL THE SAMPLEUNTIL THE SAMPLE TURNS FROM PINK TOTURNS FROM PINK TOCOLOUR LESS, IFCOLOUR LESS, IF THE SAMPLE IS SOTHE SAMPLE IS SOCOLOURED WITHCOLOURED WITH CHEMICALS THAT THISCHEMICALS THAT THIS

    END POINT ISEND POINT IS MASKED, THE END POINT ISMASKED, THE END POINT ISTHENTHEN TAKEN WHEN THE PH DROPS TOTAKEN WHEN THE PH DROPS TO7.37.3 USING THE GLASS ELECTRODES 0HUSING THE GLASS ELECTRODES 0H

    METER.METER.

    ALKALINITY DETERMINATIONSALKALINITY DETERMINATIONS

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    58/70

    ALKALINITY DETERMINATIONSALKALINITY DETERMINATIONSTHE NUMBER OF CUB.CMS. OFTHE NUMBER OF CUB.CMS. OF $.$2$.$2

    NORMAL N/$" SULFURIC ACID DIVIDEDNORMAL N/$" SULFURIC ACID DIVIDEDBY THE CUB.CMS. OF SAMPLE TAKEN ISBY THE CUB.CMS. OF SAMPLE TAKEN IS

    CALLED THE P ALKALINITY OF THECALLED THE P ALKALINITY OF THE

    FILTRATE PF".FILTRATE PF".

    4.4. TO THE SAMPLE, WHICH HAS BEENTO THE SAMPLE, WHICH HAS BEENTITRATED TO THE P END POINT, ADD 2TITRATED TO THE P END POINT, ADD 2

    TO 3 DROPS OF METHYL ORANGETO 3 DROPS OF METHYL ORANGE

    INDICATOR SOLUTION. ADD STANDARDINDICATOR SOLUTION. ADD STANDARD

    ACID DROP BY DROP FROM THEACID DROP BY DROP FROM THE

    PIPETTE WHILE STIRRING UNTIL THEPIPETTE WHILE STIRRING UNTIL THE

    COLOUR OF THE SOLUTION CHANGESCOLOUR OF THE SOLUTION CHANGES

    FROM ORANGE TO PINK.FROM ORANGE TO PINK.

    ALKALINITY DETERMINATIONSALKALINITY DETERMINATIONS

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    59/70

    ALKALINITY DETERMINATIONSALKALINITY DETERMINATIONSRECORD AS MF TO TOTAL VOLUME OFRECORD AS MF TO TOTAL VOLUME OF

    ACID IN THE CUB.CMS. USED TO REACHACID IN THE CUB.CMS. USED TO REACHTHE METHYL ORANGE END POINT,THE METHYL ORANGE END POINT,INCLUDING THAT OF THE P END POINT.INCLUDING THAT OF THE P END POINT.IF THE SAMPLE IS SO COLOURED THATIF THE SAMPLE IS SO COLOURED THAT

    THE CHANGE IN COLOUR IS NOT EVIDENT,THE CHANGE IN COLOUR IS NOT EVIDENT,THE END POINT IS TAKEN WHEN THE PHTHE END POINT IS TAKEN WHEN THE PHDROPS TO 4.3 AS MEASURED WITH THEDROPS TO 4.3 AS MEASURED WITH THEGLASS ELECTRODE PH METER.GLASS ELECTRODE PH METER.

      .. REPORT THE METHYL ORANGEREPORT THE METHYL ORANGEALKALINITY OF THE FILTRATE, ML, AS THEALKALINITY OF THE FILTRATE, ML, AS THETOTAL CUB.CMS. OF $.$2 NORMAL ACIDTOTAL CUB.CMS. OF $.$2 NORMAL ACIDPER CUBIC CM OF FILTRATE REQUIRED TOPER CUBIC CM OF FILTRATE REQUIRED TOREACH METHYL ORANGE END POINT.REACH METHYL ORANGE END POINT.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    60/70

    SALT CONCENTRATIONSALT CONCENTRATION

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    61/70

    SALT CONCENTRATIONSALT CONCENTRATION

    CHLORIDEJ TESTCHLORIDEJ TEST 

    THE TEST IS MADE ON A PORTION OF THETHE TEST IS MADE ON A PORTION OF THE

    ORIGINAL FILTRATE, OR ON THE SAMPLEORIGINAL FILTRATE, OR ON THE SAMPLE

    FROM THE ALKALINITY TEST TO WHICH AFROM THE ALKALINITY TEST TO WHICH A

    PINCH OF CALCIUM CARBONATE HAS BEENPINCH OF CALCIUM CARBONATE HAS BEEN

    ADDED. THE CHLORIDE CONTENT TESTADDED. THE CHLORIDE CONTENT TEST

    PROCEDURE FOLLOWS: -PROCEDURE FOLLOWS: -

    1.1. MEASURE A SAMPLE OF ANYMEASURE A SAMPLE OF ANY

    CONVENIENT VOLUME, FROM ONE CCCONVENIENT VOLUME, FROM ONE CC TO 1$TO 1$CC, INTO THE CONICAL FLASKCC, INTO THE CONICAL FLASK AND DILUTE TOAND DILUTE TO

    ABOUT $ CC WITHABOUT $ CC WITH DISTILLED WATER.DISTILLED WATER.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    62/70

    SALT CONCENTRATIONSALT CONCENTRATION

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    63/70

    SALT CONCENTRATIONSALT CONCENTRATION

    CHLORIDEJ TESTCHLORIDEJ TEST 

    4.4. ADD STANDARD SILVER NITRATEADD STANDARD SILVER NITRATE

    SOLUTION A DROP AT A TIME STIRRINGSOLUTION A DROP AT A TIME STIRRING

    CONTINUOUSLY. THE END POINT OF THECONTINUOUSLY. THE END POINT OF THETITRATION IS REACHED WHEN THETITRATION IS REACHED WHEN THE

    SAMPLE FIRST CHANGES TO ORANGE ORSAMPLE FIRST CHANGES TO ORANGE OR

    BRICK RED.BRICK RED.

    CALCULATE THE CHLORIDE C;" CONTENT ASCALCULATE THE CHLORIDE

    C;" CONTENT AS

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    64/70

    CALCULATE THE CHLORIDE C;" CONTENT ASCALCULATE THE CHLORIDE C;" CONTENT ASFOLLOWS: -FOLLOWS: -

    C; CONTENT IN > PER LITER OR 0>C; CONTENT IN > PER LITER OR 0>

    CC OF SILVER NITRATECC OF SILVER NITRATE + 1,$$$+ 1,$$$

     @ -------------------------------------------------- @ --------------------------------------------------  CC OF SAMPLE  CC OF SAMPLE

    IF IN THE STANDARD SOLUTION.IF IN THE STANDARD SOLUTION.

    IF I.$ CC @ 1 MG C;, OR 4.61$ > OF ANOIF I.$ CC @ 1 MG C;, OR 4.61$ > OF ANO33 PER LITER $.$272N"PER LITER $.$272N" OROR

    CL - CONTENT IN MG PER LITER OR PPM.CL - CONTENT IN MG PER LITER OR PPM.

    CC OF SILVER NITRATECC OF SILVER NITRATE + 1$,$$$+ 1$,$$$

    @@ ------------------------------------------------------------------------------------------  CC OF SAMPLECC OF SAMPLE

    IF IN THE STANDARD SOLUTIONIF IN THE STANDARD SOLUTION

    IF I.$CC @ 1$ > C;, OR 46.1$ > OF ANOIF I.$CC @ 1$ > C;, OR 46.1$ > OF ANO33  ,,

    PER LITER $.272N"PER LITER $.272N"

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    65/70

    Hole cleaningHole cleaning

    FLUID ANNULAR VELOCITY IS A KEYFLUID ANNULAR VELOCITY IS A KEY

    PARAMETER IN CUTTINGSPARAMETER IN CUTTINGS

     TRANSPORT. IF AN HOLE CLEANING TRANSPORT. IF AN HOLE CLEANING

    PROBLEM EXISTS , CUTTINGPROBLEM EXISTS , CUTTING TRANSPORT MAY BE IMPROVED BY TRANSPORT MAY BE IMPROVED BY

    INCREASING FLOW RATE TO ITSINCREASING FLOW RATE TO ITS

    MAXIMUM VALUE WITH FLOW REGIMEMAXIMUM VALUE WITH FLOW REGIMEAND PUMP LIMITATIONS.AND PUMP LIMITATIONS.

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    66/70

    IN LAMINAR FLOW , HIGHER YIELDIN LAMINAR FLOW , HIGHER YIELD

    POINT / PLASTIC VISCOSITY ( YP / PV )POINT / PLASTIC VISCOSITY ( YP / PV )

    RATIOS IMPROVE CUTTINGSRATIOS IMPROVE CUTTINGS

     TRANSPORT ; IN TURBULANT FLOW , TRANSPORT ; IN TURBULANT FLOW ,MUD RHEOLOGY HAS LITTLE EFFECTMUD RHEOLOGY HAS LITTLE EFFECT

    ON CUTTINGS TRANSPORT. THISON CUTTINGS TRANSPORT. THIS

    APPEARS TO BE TRUE IN ALL RANGESAPPEARS TO BE TRUE IN ALL RANGESOF INCLINATION .OF INCLINATION .

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    67/70

    PIPE ECCENTRICITY MAKES CUTTINGSPIPE ECCENTRICITY MAKES CUTTINGS

     TRANSPORT MORE DIFFICULT AS FLUID TRANSPORT MORE DIFFICULT AS FLUID

    VELOCITY IS REDUCED IN THE MOREVELOCITY IS REDUCED IN THE MORE

    NARROW PORTIONS OF THE ANNULAS .NARROW PORTIONS OF THE ANNULAS .

    WHEN ANNULAR FLUID IS LAMINAR , THIN ,WHEN ANNULAR FLUID IS LAMINAR , THIN ,

     TURBULANT SWEEPS FOLLOWED BY THICK TURBULANT SWEEPS FOLLOWED BY THICK

    SWEEPS MAY AID HOLE CLEANING BYSWEEPS MAY AID HOLE CLEANING BY

    FIRST STIRRING THE CUTTINGS , THENFIRST STIRRING THE CUTTINGS , THENSWEEPING THEMOUT OF THE HOLE .SWEEPING THEMOUT OF THE HOLE .

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    68/70

    HYDRAULIC HOLE CLEANING MAY BEHYDRAULIC HOLE CLEANING MAY BE

    SUPPLEMENTED BY MECHANICALSUPPLEMENTED BY MECHANICAL

    MEANS . WIPER TRIPS ANDMEANS . WIPER TRIPS AND

    DRILLSTRING ROTATION ( WHENDRILLSTRING ROTATION ( WHENPOSSIBLE ) DISTURB THE CUTTINGSPOSSIBLE ) DISTURB THE CUTTINGS

    BED AND ENCOURAGE TRANSPORT .BED AND ENCOURAGE TRANSPORT .

     TOP DRIVES ARE BENEFICIAL BY TOP DRIVES ARE BENEFICIAL BYALLOWING PIPE ROTATION ANDALLOWING PIPE ROTATION AND

    CIRCULATION WHILE TRIPPING .CIRCULATION WHILE TRIPPING .

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    69/70

    SPE PAPER - 14167 OKRAN@8NI, )=. %;"H;) I';!%=! H;) ';)%!

      0 - 450 - Laminar flow with higher YP/PV ratio.Cuttings bed can begin to form on lower side.

      45 - 550 - Laminar flow turbulent flow ha!esimilar results. "igher YP/PV ratio hel#s in laminarflow. Cuttings bed ma$ slide down hole.

     

  • 8/15/2019 Mud Circulation Principals,Execution & Importance

    70/70

    H;) I';!%=! H;) ';)%!

    55 - %00 - &urbulent flow #ro!idesbetter cuttings

    trans#ort.

    - "igher YP/PV ratio im#ro!estrans#ort in laminar flow.

    - Cuttings beds generall$ willnot slide down hole.