MTE internal review 1
MTE: Statistics of kickers faultsEtienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus
19 October 2015
2
Estimation of fast failure rates for MTE kickers (faulty shots) and comparison with other system (KFA71-79)
Slow failure statistics
Impact of additional user cycles
Ageing effect & concerns
Outline
19 October 2015 MTE internal review
319 October 2015 MTE internal review
4
System Number of pulses
(millions)
Faulty shots (spontaneous)
Fault rate per million pulses
KFA13-21, Gen #1 4.939 272 55
KFA13-21, Gen #2 5.890 758 130
KFA13-21, Gen #3 4.526 217 48
KFA 4, Gen #1 with east & TOF
5.6375.637
106381192
1900200
Main switchDump switch
KFA 4, Gen #1 MTE only (25 Sept)
0.1700.170
02
012
Main switchDump switch
For comparison :
KFA71-79 Total 90.135 4726 52Ratio Max/min
143KFA71-79 min 5.719 8 1.4
KFA71-79 max 4.548 914 200
19 October 2015 MTE internal review
Thyratron spontaneous triggering : beam losses, unclosed bump …
Estimation of fast failure rateNot detected before extraction
5
KFA13-21 generators• HT50 Lemo connectors: 4 (switch to spare =1/2 days off)
1 man·day to repair
KFA4 generators• Magnet spark: 100, operation resume normally
Missing pulse; other possible cause• Timing error, or open contact in the timing chain• Thyratron trigger unit, or open contact in the triggering
chain
Estimation of fast failure rateNot detected before extraction
19 October 2015 MTE internal review
6
KFA13-21 generators• Capacitor unit: 2 (few hours off)• Charge Control unit: 9 (few hours off, now fixed)• HV Capacitor in PFN: 1 (switch to spare =1/2 days off)
4 man·week to repair
KFA4 generators• Thyratron: 2 (1/2 days off)• Thyratron bias unit: 2 (1/2 days off)• Charge Control unit: 1 (few hours off)• Accidental water in oil system: 1 (2 weeks off)
4 man·week to repair
Slow failure statisticsDetected before extraction
19 October 2015 MTE internal review
7
Fast failure rate largely dependant of individual thyratron
Additional user cycles will increase fast failure:• Proportionally to number of shots• Additional fault due to varying the operational voltage
Impact of additional user cycles
19 October 2015 MTE internal review
8
Limited components life time, depending of applied voltage• Thyratron, regularly changed (20 kCHF + 2 man.days)
require increasing adjustment effort with age(1 thyratron = 15% of PS kicker budget);
• Capacitors• Contacts• (Transmission cables)• (Step-up charge transformer)
Concerns• KFA 13-21: Adapted from design for short pulses • KFA 13-21: no spare• KFA 4 : one spare magnet module, no tank
Ageing effect & concerns
19 October 2015 MTE internal review
9
Conclusion• Large range of statistics for fast failure rate • Additional users will increase fault rate more than
proportionally• Ageing effect can impact availability• No spare magnet / tank
Detailed implications to be defined (consolidation strategy, spares, controls, exploitation budget, manpower);
Justify maintaining the CT operational as fall back for the fixed target.