12/6/2011
1
MT‐1, MT‐2, Elevation Certificates & the Role of Surveyors
Rocky Mountain Surveyors Summit
March 3, 2016
2
“Floods are acts of God, but flood losses
are largely acts of man.”
- Dr. Gilbert Whitethe father of floodplain management
3
another way to say it….
“Building in a floodplain is like
pitching your tent on a highway
when there are no cars coming.”
Dr. Vicki Miller, University of Montana
12/6/2011
2
4
National Flood Insurance Program
5
Definitions & Acronyms FIRM - Flood Insurance Rate Map: The official map in which FEMA
has delineated flood hazard areas applicable to the community.
FIS – Flood Insurance Study: The report that supports the FIRM.
SFHA - Special Flood Hazard Area: The land within a community subject to a one-percent or greater chance of flooding in any given year.
BFE - Base Flood Elevation: The water surface elevation of the flood having a one percent chance of being equaled or exceeded in any given year.
LOMC - Letter of Map Change: An amendment or revision through the MT-1 or MT-2 process.
• LOMA
• LOMR-F
• LOMR
CLOMR – Conditional Letter of Map Revision: FEMA’s comment on a proposed project. Does NOT revise the effective FIRM.
6
Definitions ‐ continued Basement: Any area of a building having its floor subgrade (below ground
level) on all sides.
Enclosure: Enclosed/walled areas below an elevated building used only for building access, vehicle parking, and/or storage that automatically equalizes hydrostatic pressure.
Lowest Floor: The lowest floor of lowest enclosed area (including basement and crawl space).
• See Building Diagrams in the Elevation Certificate
12/6/2011
3
7
Fill Fill: Defined as any material that is brought in, used or grading that as
a result has elevated that existing conditions above the elevation of what it use to be.
• The common construction practice of removing unsuitable existing material (topsoil) and backfilling with select structural material is not considered the placement of fill if the practice does not alter the existing (natural grade) elevation.
• Fill that is placed before the date of the first NFIP map showing the area in a SFHA is considered natural grade.
Check with the Community Status Book to determine when the community entered the NFIP.
8
Floodway
Means the Channel of the Watercourse and the adjacent overbank land areas that must be reserved in order to discharge the Base Flood Elevation without cumulatively increasing the water surface elevations more than a designated amount.
Sometimes referred to as the “Regulatory Floodway”.
No development unless demonstrated through a hydrologic and hydraulic analysis that it causes a 0.00’ rise.
CLOMR
You may be asked to survey pre & post project fill!
9
Floodway Schematic
SURCHARGE
FLOODWAYFLOODWAYFRINGE
FLOODWAY + FLOODWAY FRINGES = FLOODPLAINSURCHARGE NOT TO EXCEED 1.0 FOOT
100-YEAR FLOODPLAIN
0.5’ on Colorado
12/6/2011
4
10
Flood Zone Designations
11
Flood Zone Designations
12
Flood Zone Designations
12/6/2011
5
13
Flood Insurance
Flood is not typically covered under standard homeowners policy.
May be required by the property owner’s lender if there is a federal backed loan.
Rates usually equal the risk.
Write Your Own (WYO)
25% of historic claims are outside the SFHA Do you have a policy?
14
Pre‐ or Post‐FIRM
http://www.fema.gov/national-flood-insurance-program-community-status-book
15
Floodplain ManagementFEMA does not regulate floodplains, this is a
local responsibility!
44 CFR 60.3
New and Substantial Improvements must be built “floodsafe”
Higher Standards• Colorado Rules and Regulations for Floodplains
Permit is required for all “development” in the SFHA
12/6/2011
6
16
Development
“Any man‐made change to improved or unimproved real estate, including but not limited to buildings or other structres, mining, filling, grading, paving, excavation, drilling operations or storage of equipment or materials.”
17
Flood Hazard Boundary Map: FHBM
18
Flood Insurance Rate Map: FIRM
12/6/2011
7
19
Flood Insurance Study: FIS A Flood Insurance Study is a
book that contains information regarding flooding in a community and is developed in conjunction with the FIRM and FHBM
The FIS contains flood profiles, floodway data tables, summaries of elevations as well as a narrative of the flood history of a community and discusses the engineering methods used to develop the FIRMS
20
Floodway Data Table
Presents the results of the
floodway analysis at the cross sections shown on the
FIRM or FHBM
21
Flood Profile
12/6/2011
8
22
Determining a BFE
When determining a
BFE for a property or
structure, the FIRM and
Profile should be utilized.
23
Determining a BFE
24
Determining a BFE in a Zone A
FEMA 265
• Simplified Methods
Contour Interpolation
Data Extrapolation
• Detailed Methods
Quick 2
12/6/2011
9
25
Contour Interpolation
26
Contour Interpolation
27
Contour Interpolation
12/6/2011
10
28
Data Extrapolation
29
Data Extrapolation
30
Data Extrapolation
12/6/2011
11
31
Map Service Center: www.msc.fema.gov
Current Effective FIRM & FIS
Preliminary Information
Historic Information
LOMCs
GIS Databases
FREE DOWNLOADS!!
https://msc.fema.gov/portal/howto
32
Map Service Center
Search by address
33
Map Service Center
or search by product
12/6/2011
12
34
Arvada Center
35
Arvada Center
36
Creating a FIRMette Move highlighted box to select area to include in
FIRMetteSelect Scale and Title Block
Choose format –PDF or TIF
Don’t forget to select page size!!!
12/6/2011
13
37
Finished FIRMette
38
FIRMette tutorial
39
Possible base map issues
12/6/2011
14
40
National Flood Hazard Layer
Interactive
Community must have digital data
Google Earth
FEMA’s Geoplatform
41
Geoplatform
42
Geoplatform – Arvada Center
12/6/2011
15
43
Geoplatform – Arvada Center
44
Geoplatform‐ Denver
45
Geoplatform‐ Denver
12/6/2011
16
46
Geoplatform‐ Denver
47
Letters of Map Change: LOMC The boundaries for the SFHAs on the NFIP maps are prepared using the best
topographic data available. Due to limitations of scale or topographic definition of the source map used to prepare a community’s NFIP map, a property may be shown within the SFHA, but be on ground that is actually above the BFE for the site. As a result, the LOMC process was developed to amend or revise the published community maps by letter.
FEMA has established several types of map changes. Changes that revise BFEs or published floodway information are Letters of Map Revision (LOMRs) and Physical Map Revisions (PMRs). Changes that do not revise BFEs include Letters of Map Amendments (LOMAs) and Letters of Map Revision Based on Fill (LOMR-Fs). In addition, FEMA provides comments on proposed projects, these conditional LOMCs do not amend or revise the effective NFIP maps.
48
LOMC Types Amendments:
• Structures or legally defined parcels
• Does not involve H&H analysis (Unless Zone A)
• Requires submittal of MT-1 Forms• Does not involve changes in BFE• Can not be used for properties in an
Alluvial Fan
Revisions:
• More complex map changes
• Not usually lot or structure specific• Typically involves H&H analysis
• Requires submittal of MT-2 Forms
MT-1
LOMA
LOMR-F
Conditional
LOMR-FW (Floodway)
MT-2
PMR
LOMR
Conditional
12/6/2011
17
49
Amendments (MT‐1)
Letter of Map Amendment (LOMA)
• Request for exclusion of individual structure(s) and or legally defined parcel(s) of land that were inadvertently included in the SFHA
• Process outlined in Part 70 of NFIP Regulations
Letter of Map Revision Based on Fill (LOMR-F)
• Request for exclusion of individual structure(s) and or legally defined parcel(s) of land that were elevated by earthen fill
50
Amendments (MT‐1)
Conditional Letter of Map Amendment (CLOMA)• A letter from FEMA stating that a proposed structure that is not to be elevated by
fill (natural grade) would not be inundated by the base flood if built as proposed.
• Process outlined in Part 70 of NFIP Regulations
Conditional Letter of Map Revision Based on Fill (CLOMR-F)
• A letter from FEMA stating that a parcel of land or proposed structure that will be elevated by fill would not be inundated by the base flood if fill is placed on the parcel as proposed or the structure is built as proposed.
• Process outlined in Part 65 of NFIP Regulations
51
Conditional LOMA or LOMR‐F
CLOMA or CLOMR-F:
• Does not amend the NFIP map
• NOT a building permit!
• Simply a comment document stating whether a structure/parcel of land will be safe from flooding if built as proposed
• Mostly the same data requirements as LOMA or LOMR-F request, but with proposed data
• CLOMR-F must show compliance with the Endangered Species Act
12/6/2011
18
52
Would this Structure likely be removed from the SFHA? Why?
53
Letter of Map Amendment: LOMALetter of Map Amendment: LOMA
54
LOMA Data Requirements
Completed MT-1 Property Information Form 1 (or MT-EZ)
Copy of the NFIP Map indicating the subject property location
• FEMA Map Service Center – view effective FIRM and create FIRMette
Copy of recorded Deed or Plat map
Copy of tax map showing property location
Completed MT-1 Elevation Form or Elevation Certificate
Metes & bounds description and map, if request is for portion of property
BFE, and supporting data, if in unnumbered Zone A• FEMA will determine if no BFE is provided but will be conservative.
12/6/2011
19
55
Legal Description of Deed
Recorded Deed
Can be based on recorded deed or recorded plat
Must be from the County, not from a title company
56
Legal Description of Deed
Lot 16, Block 3 Kingsborough Subdivision Filing No. 6, as described in the Warranty
Deed recorded as Reception No. 02143120, in the Office of
the Register of Clerk and Recorder, Arapahoe County,
Colorado
Legal Description from Deed
57
Legal Description of a Plat
12/6/2011
20
58
Requirements for Metes and Bounds
Description of portion of property above 1% annual chance flood elevation and accompanying map (one must be certified by a professional surveyor or engineer)
Certified elevation for lowest point within metes and bounds
The metes and bounds description must match that of the map
Descriptions are incorporated into legal description with phrase:
• “… the portion is more particularly described by the following metes and bounds”
The MT-EZ and the MT-1 instructions contain examples of the standard metes and bounds description
59
Metes and BoundsMetes and bounds map or
description must be certified
60
Common Problems of Metes and Bounds
Map and written description do not match
Topographic map submitted shows portion of metes and bounds below BFE
Metes and bounds are not certified
No tie-in to Point of Beginning
Starting and ending points do not come together
May cause issues with lenders for insurance purposes
Point of Commencing not displayed on the map• Point of Commencing not a definable point
12/6/2011
21
61
Metes and Bounds Determination
62
Tax Assessor’s Map
63
Survey and/or Site Plan
Required for most requests where property is located in floodway
Must be certified
Must include scale, North arrow, and vertical datum
May be required for a submittal for an Out-As-Shown submittal
12/6/2011
22
64
What about basements and crawlspaces?
Any area of the building having its floor subgrade (below ground level) on all sides is considered a basement, unless it meets the definition of a crawlspace.
The construction of a residential building in an identified SFHA with the lowest floor below the BFE is a violation of the floodplain management requirements set forth in CFR 60.3(c)(2)
Basements below the BFE are only allowed in communities that have obtained a basement exception from FEMA.
Floodproofed non-residential basements are allowed.
65
What about basements and crawlspaces?
Technical Bulletin 11-01
66
Building Diagram 9 and TB 11‐01
•Per Technical Bulletin 11-01, some distinguishing features are:
• The interior grade of the crawlspace cannot be more than 2 feet below the LAG •Shown as item D in the diagram on the left
•The difference between the crawlspace elevation and that of bottom of floor joist cannot exceed 4 feet
•Shown as item L on above diagram•This limitation will prevent crawlspaces from being converted into habitable spaces•The height limitation was determined using engineering analyses and building code requirements for flood hazard areas (page 7 of Technical Bulletin 11-01)
•Further restrictions apply and should be referenced to Technical Bulletin 11-01•This pertains more to community compliance and documentation
12/6/2011
23
67
BFE
Letter of Map Revision based on Fill: LOMR-F
68
Letter of Map Revision Based on Fill
Revision to the SFHA with no change to the BFE
In areas with special flood hazard, it may be feasible to elevate areas with fill above the BFE
69
Criteria for a LOMR‐F If structure is involved:
LAG and lowest floor 1 percent annual chance flood elevation
Community must sign the Community Acknowledgement Form
Fill must be engineered Compaction Erosion protection
12/6/2011
24
70
LOMR‐F Data Requirements
In addition to LOMA Data requirements, need:
• Completed MT-1 Form 4 (Community Acknowledgement Form)
• Appropriate Fee
• If applying for a CLOMR-F, need ESA documentation
71
MT‐1 Review by FEMA
FEMA is required to notify the applicant in writing within 60 days form the date of receipt of all data
Requesters may check on status of all Letter of Map Change requests by contacting the FEMA Map Information eXchange toll-free at 877-FEMA MAP (336-2627).
72
Determination Document
Once you get a determination, make sure to read the entire document.
12/6/2011
25
73
Conditional Letter of Map Amendment: CLOMA
Extremely Rare….. Probably better to submit traditional LOMA.
74
Conditional Letter of Map Revision based on Fill: CLOMR‐F
FEMA’s comment on a proposed project
Does not change the map nor remove the requirement for flood insurance
Must be followed up with a LOMR-F
Compliance with the Endangered Species Act (ESA)
75
ESA Compliance ESA compliance must be documented to FEMA prior to the issuance of all
CLOMR-Fs (required for all requests received on or after October 1, 2010).
FEMA must receive confirmation of ESA compliance from the U.S. Fish & Wildlife Service (USFWS) or National Marine Fisheries Service (NMFS), collectively referred to as “the Services”.
Once the required ESA documentation is received, the data will be sent to the FEMA Area E PAM for concurrence. Once concurrence is received from FEMA, processing of the case can resume.
Acceptable documents demonstrating ESA compliance include the following:
• Incidental Take Permit
• Incidental Take Statement
• “Not likely to adversely affect” determination from the Services, or
• Documentation that the project has “No Effect” on listed species or critical habitat
12/6/2011
26
76
Additional Data
In certain instances, additional data that are not referenced on the MT‐1 or MT‐EZ forms may be required
• Grading plans, building permits, cross sections, etc.
77
A special note about alluvial fans
An alluvial fan is characterized by
high-velocity flows; active processes of
erosion, sediment transport, and deposition, and unpredictable
flowpaths
78
Alluvial fan on a FIRM
12/6/2011
27
79
Alluvial Fans and LOMCs
FEMA issues LOMC upon determining properties/structures should not be included within a SFHA The procedures that result in the issuance of LOMCs are provided in Parts 65
and 70 of the NFIP regulations
In areas subject to alluvial fan flooding, the provisions of these parts do not apply See Paragraph 65.13B of the NFIP regulations
Letters of Map Amendments can not be issued for any property, structure or portion of property that are located
within an Alluvial Fan
80
Online LOMC
Can be used to request Amendments or Revisions.
Online LOMC replaces the use of the MT‐1, MT‐EZ or MT‐2 paper forms.
Although it speeds the time to submit an application, it does shorten the actual processing time.
Unlike the eLOMA, anyone can utilize the online LOMC when submitting an application.
81
Why use the Online LOMC process?
Submit, pay and upload all data through one online platform.
Save information online and finish applying at your convenience.
Manage multiple LOMC requests with one login.
Check their application status in real‐time.
Efficiently communicate with LOMC processing staff.
12/6/2011
28
82
eLOMA Determination Tool
eLOMA is a MIP application designed to provide licensed land surveyors and professional engineers (Licensed Professionals or LPs) with a web-based system to submit and print simple LOMA requests
83
eLOMA Determination Tool
The eLOMA tool is designed to allow users to receive a determination from FEMA in minutes, and the user can
print a copy almost instantly
84
eLOMA Determination
eLOMA will make a comparison of the submitted BFE with the submitted Lowest Adjacent Grade (LAG) or Low Lot Elevation (LLE)
eLOMA will ensure that all required information has been entered
Natural Ground
12/6/2011
29
85
eLOMA Limitations
Limitations
• Requests for existing single residential Structures or Legally Recorded Parcels of Land not involving the placement of fill
• Detail Studied Areas (AE, A1-A30, AH)
• No Approximate A Zones, V, AO, or D zones
• No Floodways
• No multi-lot requests or portions of properties
Audit Procedures and Automatic Checks to Ensure Accuracy
86
Getting access to eLOMA Surveyor or Engineer must
set up an account through Mapping Information Platform (MIP) using individual certification information to become an eLOMA LP
The LP logs into the MIP to access eLOMA and has the option to:
• Create New Application
• Resume Previously Saved Application
87
eLOMA Data RequirementsUser Will Enter All
Applicable data:• Requestor Information
• Community Information (CID Number, etc…)
• Map Panel Information
• Latitude and Longitude Coordinates
• Elevation Information (LAG or LLE)
• Legal Property Description
• BFE (calculated using FIS text/profile)
12/6/2011
30
88
The Audit Process
The LP must submit supporting data to FEMA.
If APPROVED, the LP will receive an email notification that they can log-in and print the determination.
If REJECTED, a LOMA will be completed by NSP and the LP will be audited again on their next submittal.
After initial successful audit the LP will be able to generate determinations online. However, they will still be subject to random audits.
89
Common eLOMA audit mistakes
Issues with the eLOMA Audits
Supporting data from the LP is
often incomplete
Requests in unnumbered Zone A areas
LPs not using the approved
Legal Description
format
Previous LOMAs for the subject
property
90
Audits Requiring Additional DataThe Most Common Data
Items Not Submitted
Annotated FIS Flood Profile
FIS Summary of Stillwater Elevations table
Annotated copy of the effective FIRM panel
Conversion factor for the vertical datum
Unrecorded Plats or Deeds
Flood Profiles or Summary of Stillwater Elevation tables that were not annotated
Copies of the FIRM without the property location
Elevation Forms or Certificates without the vertical datum
The Most Common Incomplete Data Items
12/6/2011
31
91
The Qualifying Questions ensure that the application meets
the criteria for the eLOMA process. If the
application does not meet the eLOMA
criteria a notification appears that informs the
LP that they need to submit their request using the standard
LOMA (MT-1) process.
92
The LP enters their contact information. The email address
displayed is the address on file for the LP. If the email address is incorrect
the LP should contact MIP Help at [email protected] and have
their profile updated.
93
If the Subject is a structure the
LP enters information
about the construction
type.
12/6/2011
32
94
The LP confirms the Lat/Long and Property information.
95
The LP enters the Community that the Subject is located in
on the effective FIRM. They can
either use the dropdowns or the
CID free text field. The county and
community choices are based on the State that the LP entered on the
Property Description screen.
96
The LP selects the FIRM panel number that the
Subject is located on and enters the elevation information for the
Subject. The LP must indicate how they
determined the BFE. For more information on how
the BFE should be determined the LP can
click the link in the BFE Method section or contact the FEMA Map Assistance
Center at 1-877 FEMA MAP (1-877-336-2627).
The LP needs to make sure that the elevation datum
used for the Subject elevations is the same as the elevation datum used on the effective FIRM.
12/6/2011
33
97
The LP must answer the question about
Subsidence or Uplift. If the LP is unsure about
the answer to this question they can
contact the Floodplain Administrator in the
subject community for assistance.
98
The LP selects the Current and Resultant Flood Zones. The Resultant Flood Zone choices are based on the
elevations entered by the LP on the FIRM Info screen. If the LP enters a BFE that is below the LAG or LLE, the
Resultant Flood Zones choices will be B, X (shaded), C, and X (unshaded). The LP needs to make sure that the Resultant Zone they select
appears on the effective FIRM. Subjects should not be removed to Zone C if the zone is labeled X (unshaded) on the
effective FIRM. If the LP enters a BFE that is above the LAG or LLE, the Resultant Flood Zones choices will be
AE, A1-A30, and AH.
99
To add a Flooding Source enter the name in the field and click the Add
Flood Source button. The
screen will refresh and the added
Flooding Source will appear at the
bottom of the screen. The LP may Modify or
Delete the flooding source if
they choose.
12/6/2011
34
100
The LP should review the
information they entered
and return to a specific screen using the Edit button to make corrections if
necessary.
101
The LP must check the Penalty Clause box indicating that
the information they provided in the application is
accurate. At this point the LP should
view the draft versions of the
eLOMADetermination Letter and Cover Letter to
ensure the information they entered appears properly on the
documents.
102
If the LP sees this screen they must submit copies of their supporting data for the eLOMA Audit.
The required documents are detailed in the automated audit
notification email that the LP receives but if they are
unsure about what is required they can call the FEMA Map Assistance Center at 1-877 FEMA MAP (1-877-336-2627)
for help. The supporting data must be sent to the attention of the eLOMA
Coordinator.
12/6/2011
35
103
If the LP sees this screen they must submit copies of their supporting data for the eLOMA Audit.
The required documents are detailed in the automated audit
notification email that the LP receives but if they are
unsure about what is required they can call the FEMA Map Assistance Center at 1-877 FEMA MAP (1-877-336-2627)
for help. The supporting data must be sent to the attention of the eLOMA
Coordinator.
104
elOMA vs. Online LOMC
105
MT‐1 Fees (subject to change)
12/6/2011
36
106
MT‐1 Fees (subject to change)
107
MT‐1 CAN NOT be processed if:
Request involving changes in BFEs
Request involving changes in regulatory floodway bound delineations
Request for properties in alluvial fan areas
Request involving property and/or structures elevated by fill placed within the regulatory floodway, channelization projects, bridge/culvert replacement project, or other flood control improvements
These will fall under the MT-2 Process
108
Revisions (MT‐2)
Revisions that physically change the effective FIRM & FIS are either:• Letter of Map Revision (LOMR)
• Physical Map Revision (PMR)
Most will be processed as a LOMR but FEMA may upgrade to a PMR based on size of the revision.
LOMRs are needed (and may be required) to incorporate changes from new development.
12/6/2011
37
109
Letter of Map Revision: LOMR
LOMRs are needed for:• Physical change is watercourse or floodplain
boundaries due to development or natural forces.
• To incorporate better technical data into existing studies.
• To correct known study errors.
• To provide better hydrologic or hydraulic methodologies.
110
LOMR
111
Conditional Letter of Map Revision: CLOMR
Proposed projects prior to any construction.
Allows FEMA to comment on effects of project would have on FIRM & FIS.
Does not revise the FIRM.• Must be followed by a LOMR when project is
complete.
Not a permit.
12/6/2011
38
112
CLOMR Requirements
At the request of the community
Proposed project that:
• Encroaches upon the floodway and causes an increase > 0.00’
• Encroaches upon the floodplain when a floodway has not been established and cause an increase of >1.00’ (0.5’ in CO)
What is an increase?
• Comparison between pre-project (existing conditions) and post project (proposed conditions)
113
MT‐2 Application Required for all LOMRs & CLOMRs
• Completed MT-2 Application Forms
• Project Narrative
• Hydrologic and Hydraulic computation and digital model files
• Certified Topo Map with floodplain and floodway delineations
• Annotated FIRM showing changes due to the project
• Data certified by a registered processional engineer or licensed surveyor
• Revision request acknowled by all impacted communities.
• Notification of increases in BFE and/or SFHA as required by 44 CFR 65.12
• Fee Payment
Current fee schedule: https://www.fema.gov/flood-map-related-fees
114
What is the Elevation Certificate (EC) Used For? The Elevation Certificate is an administrative tool of the National Flood
Insurance Program (NFIP) and is to be used to provide elevation information necessary to:
• Ensure compliance with community floodplain management ordinances
• To determine the property insurance premium rate
• To support Letter of Map Change (LOMC) requests
Use of this certificate does not provide a waiver of the flood insurance purchase requirement
Only a LOMC can issue a determination document that removes the Federal mandate for a lending institution to require the purchase of flood insurance
12/6/2011
39
115
Elevation Certificates are……
Not required by FEMA to demonstrate compliance unless the community participates in the Community Rating System
116
EC and Flood Insurance
Required for buildings constructed:• Post-FIRM
• Pre-FIRM but rated under Post-FIRM rules
117
New EC Form
12/6/2011
40
118
Section A: Property Owner Information
119
Building Diagrams‐ A7
120
Building Diagrams‐ A7
12/6/2011
41
121
Building Diagrams‐ A7
122
Building Diagrams‐ A7
123
Building Diagrams‐ A7
12/6/2011
42
124
Building Diagrams‐ A7
125
Section B: FIRM Information
126
Information from FIRM
12/6/2011
43
127
BFE From Flood Profile
527
528
529
530
526
0 50 100 150
50-YEAR FLOOD
100-YEAR FLOOD
500-YEAR FLOOD
SU
TT
ER
BL
VD
BR
IDG
E
EL
EV
AT
ION
(F
EE
T N
GV
D)
STREAM DISTANCE IN FEET ABOVE CONFLUENCE WITH LAKE HIGHTOWER
531
532
B
MO
NT
ER
EY
AV
E B
RID
GE
10-YEAR FLOOD
CA D E
STREAM BED
128
Section C: Building Elevation Information
All machinery and/or equipment such as furnaces,
hot water heaters, heat pumps, a/c, and elevators,
etc., installed and the grading around the building
is completed.
129
Elevations by Building Type
12/6/2011
44
130
Section D: Certification
131
Section E: Elevations Without Survey
132
Section F: Owner’s Certification
12/6/2011
45
133
Section G: Community Information
134
Which Diagram Do You Use?
135
Which Diagram Do You Use?
Diagram 2
12/6/2011
46
136
Which Diagram Do You Use?
Enclosure
137
Which Diagram Do You Use?
Diagram 7
138
Which Diagram Do You Use?
12/6/2011
47
139
Resources
Local Floodplain Official
State NFIP Coordinator
• Jamie Prochno ‐ CWCB
www.fema.gov
www.floodsmart.gov
www.fema.gov/online‐tutorials
140
And now to Marsha for a local perspective……..
Matthew Buddie
Tom Birney