MT-1 Basics:

A Comprehensive Overview of LOMAs and Discussion of

Common Application Setbacks

Page 2: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Introduction: Terminology

MT-1s vs. MT-2s

LOMAs vs. LOMRs

What is a LOMC?

Letters of Map Change (LOMCs)

• MT-1s Map Amendments or LOMAs

• MT-2s Map Revisions or LOMRs

Page 3: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Introduction: MT-1 Applications

Increased understanding of LOMC requirements

• Application submittals are complete

• Adhere to NFIP regulations

• Follow current FEMA guidelines

Will lead to:

• Quicker reviews

• Fewer additional data requests

• Faster determinations

• Happier stakeholders/requestors

• Happier FEMA

Page 4: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

MT-1 Agenda

Who may need a LOMA and why

Types of applications

Data requirements

OAS

Common issues

Zone A BFEs

ESA compliance

Community’s role

eLOMA

Page 5: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Who cares about LOMAs and why?

Lenders

Required lender actions through National Flood Insurance

Reform Act of 1994:

Determine whether building is located in SFHA

Document determination

Require that flood insurance to the appropriate limit be

maintained

Over the term of the loan, ensure flood insurance is

maintained or added if building subsequently becomes part

of SFHA

Page 6: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Who cares about LOMAs and why?

Community officials

Required community official actions:

Establish minimum regulatory standards

Review projects impacting the NFIP floodplain per 44 CFR

Ensure that permits are applied for

Page 7: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Who cares about LOMAs and why?

Property Owners

Required property owner actions:

Purchase flood insurance

or

Apply for LOMA, LOMR-F, etc. if they want have insurance

requirement removed

Page 8: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Types of applications

Map Amendments (MT-EZ and MT-1)

LOMA Letter of Map Amendment

CLOMA Conditional Letter of Map Amendment

LOMR-FW Letter of Map Revision in Floodway

LOMR-F Letter of Map Revision Based on Fill

CLOMR-F Conditional Letter of Map Revision Based on Fill

eLOMA Electronic Letter of Map Amendment

Page 9: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Types of applications

LOMA: A letter from DHS-FEMA stating that an existing

structure or parcel of land that has not been elevated by fill

(natural grade) would not be inundated by the base flood.

CLOMA: A letter from DHS-FEMA stating that a proposed

structure that is not to be elevated by fill (natural grade) would

not be inundated by the base flood if built as proposed.

Page 10: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Types of applications

LOMA or CLOMA

Results from limitations or inaccuracies in the base mapping

used for Flood Insurance Studies.

Based on natural ground, without fill or other physical

changes to the SFHA, NFIP regulatory floodway, or BFEs.

CLOMAs may be required by the community in order to

obtain a building permit. (Requires submittal of certified as-

build data after project completion for a LOMA to be issued).

Page 11: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Types of applications

LOMR-F: A letter from DHS-FEMA

stating that an existing structure or

parcel of land that has been

elevated by fill would not be

inundated by the base flood.

CLOMR-F: A letter from DHS-FEMA

stating that a parcel of land or

proposed structure that will be

elevated by fill would not be

inundated by the base flood if fill is

placed on the parcel as proposed

or the structure is built as

proposed.

Page 12: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Types of applications

LOMR-F or CLOMR-F

Fill placement is/will be outside the NFIP regulatory

floodway.

Community acknowledges the placement of fill and asserts

that all community floodplain management requirements

are/will be met.

CLOMR-Fs may be required by the community in order to

obtain a building permit. (Requires submittal of certified

as-built data after project completion for a LOMR-F to be

issued).

Page 13: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Types of applications

MT-1

• May be used for all LOMAs, CLOMAs, LOMRs, and

CLOMR-Fs

MT-EZ

• May only be used for LOMAs

• Single structure/lot

• Must be outside of floodway

Page 14: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Types of applications

Who can complete the MT-1 or MT-EZ form?

Where can the application form be found?

How long does it take to receive a determination?

Page 15: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Data requirements

Property Information

Form

Recorded deed or

plat map

Local tax map showing

property

Elevation Form or

Certificate

Effective FIRM Panel

Page 16: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Data requirements

Vicinity maps

Certified Site Survey

ESA Compliance: Procedure Memorandum No. 64

Metes and bounds descriptions and accompanying maps

BFEs for Zone A areas

Page 17: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Common Issues

0

1000

2000

3000

4000

5000

6000

7000

Frequency of MT-1 Data Requests Types

FY10

FY11

Page 18: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Common issues

Number 1: Failing to answer all the

questions, especially “Has fill been placed

on your property?”

Number 2:

Failing to provide contat information, or

sign and date the form

Page 19: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Common issues

Recorder’s

Stamp Document

Number

Legal

Description

Page 20: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Common issues

VS

Page 21: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Common issues

Page 22: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Common issues

Point of

Beginning

P.E. or L.S.

certification

Page 23: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Common issues

P.E. or L.S. certificationMetes and Bounds Area

Page 24: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Out As Shown Determinations

Determination type – not

an application

Use MT-EZ application

form

Situation where certified

elevations are not needed

Omit elevations

Page 25: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

BFEs for Zone A areas

BFE Calculation - 50 Lots/5 acres

Possible data sources include:

U.S Army Corps of Engineers

State/Commonwealth agencies (i.e. Department of Natural

Resources, Department of Environmental Quality,

Department of Transportation, etc.)

Local community’s Engineering, Planning, or Building

Department

Page 26: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Community’s role

When is the Community Acknowledgment form needed?

• Request is for a LOMR-F / CLOMR-F (Section A)

• Request involves a structure or property that has been

inadvertently included within the NFIP regulatory

floodway (Section B)

Why is the form needed?

• Provides FEMA written assurance that the community is

aware that the structure or property is located within the

NFIP regulatory floodway and meets all community

floodplain management requirements (Section B)

Page 27: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Community’s role

Why is the form needed (continued)?

• Provides FEMA with written assurance that the LOMR-F /

CLOMR-F request meets / will meet the minimum

floodplain management requirements of the NFIP (Section

60.3) and is reasonably safe from flooding (Section A)• Existing residential structures have their lowest floor elevated to or

above the BFE

• The community has issued all permits for existing or proposed

construction or other development

• There have been no encroachments to the NFIP regulatory floodway

Who can complete the form?

• Community official responsible for floodplain

management

Page 28: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Community’s role

Community

Acknowledgment

Form

Page 29: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

eLOMA Determination Tool

What is an eLOMA?

eLOMA is a Web-based application within the Mapping

Information Platform (MIP) that provides Licensed Land

Surveyors and Professional Engineers (Licensed

Professionals) with a system to submit simple Letter of Map

Amendment (LOMA) requests to FEMA.

Map determination companies that are NFDA members can

also submit eLOMAs (Certified Professionals).

Only existing single residential structures or entire legally

recorded properties qualify

Page 30: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

eLOMA Determination Tool

Why use it?

It is fast and easy

eLOMA requests audited by FEMA are processed within 5

business days of receiving all required supporting data

from the Licensed Professional

Business for your local engineer/surveyor

FEMA performs random audits of eLOMA submittals

Page 31: MT-1 Basics Lib… · build data after project completion for a LOMA to be issued). Types of applications LOMR-F: A letter from DHS-FEMA stating that an existing structure or parcel

Types of applications

eLOMA

• May be used for LOMA requests for single structures

or single lots

• eLOMA Limitations:

• Must not contain fill

• Must be in a detailed studied areas AE, A1-30, or AH

(No A, V, AO, or D zones)

• Must not be in a floodway

• No multi-lot requests

• Must not be a metes and bounds request