MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump...

23
MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components

Transcript of MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump...

Page 1: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

MSD II –Managerial PresentationSpring 2009

P09454: Design & Testing of Centrifugal Pump Components

Page 2: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Design Team:

Rishitha Dias - ISE – Project Manager

Kevin Klucher - ME – Lead Engineer

John Hayles - ME

Reme Meck - ME

Ammar Jangbarwala - ME

Page 3: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Project Background:

Project Family: Sustainable Technologies for the Global Marketplace

Project Track: Flow Visualization

Sponsor: Dresser-Rand Corp.

Faculty Guide: Dr. S. Day

Page 4: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Project Deliverable:

The goal of the project is to design, build, test and deliver to KGCOE, a centrifugal pump system for particle imaging velocimetry (PIV) studies, which can be used both as a teaching tool for undergraduate students as well as a research tool for graduate and faculty researchers.

Page 5: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Customer Needs:

Page 6: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Inherited Pump System:

Close-up view of Pump

Housing & Impeller

Sensors & Actuators

Tank

GUI

Page 7: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

System Architecture:

Page 8: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Design Concept Summary

Impeller &

Diffuser

Riser

Page 9: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Deliverable Status:

Page 10: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

P09454-105 P09454-106

P09454-102 P09454-103 P09454-104

Previous Impeller Design: New Impeller Designs:

Impeller Designs

Page 11: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Old Impeller Design:

Impeller Designs

Page 12: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Diffuser Designs

P09454-201

P09454-203

Page 13: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Pump Housing:

Page 14: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Project Status:

Page 15: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Budget:

> 40% of the $6,500 budget remaining

Component Manufacture & Materials costs are dominant.

Page 16: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Schedule: Product development Phase

Current Current Stage of Stage of DesignDesign

Phase 1

Phase 2

Phase 3

Phase 4

MSD IMSD I MSD IIMSD II

Planning

Concept Development

System Level Design

Testing & Refineme

nt

Page 17: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Schedule:

Project is on ScheduleProject is on Schedule

Component Manufacture Complete

Pump Assembly Complete

Flow Testing Complete

Documentation Complete

Page 18: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Characterize Various Flows5 Impellers & 2

Diffusers available to generate curves

Interchangeable Components

Assembly/Disassembly averages 3.5 minutes

Performance:

Measure Pressure, RPM & FlowBuilt into GUI

functionality

Control Flow, RPM, Pressure GUI Controls &

Valves

PIV Compatible Clear Acrylic

Components

Page 19: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Results:

Page 20: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.
Page 21: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Test Results

As head rises, the flow decreases, demonstrating basic pump curve relationships.

With the addition of a vaned diffuser, the head generated is increased versus flat ring diffusers.

P09454-102 Vaned   P09454-102 Flat Plate  Pressure

(psi)Flow (gpm) Head (ft)

Pressure (psi)

Flow (gpm) Head (ft)

3.5 8.4 8.077 2.6 7.5 6.000

3.6 8 8.308 2.7 7.2 6.231

4 7.8 9.231 2.8 7 6.462

5 7.2 11.538 3.6 6.3 8.308

6.8 5.4 15.692 4.2 5.5 9.692

8 4 18.462 4.7 4.6 10.846

8.8 2 20.308 5.8 2.5 13.385

9 1.5 20.769 6.2 1.2 14.308

9.1 1.25 21.000 6.2 1 14.308

9.25 0.75 21.346 6.4 0 14.769

P09454-103 Vaned   P09454-103 Flat Plate  Pressure

(psi)Flow (gpm) Head (ft)

Pressure (psi)

Flow (gpm) Head (ft)

3.5 8.5 8.077 2.5 7.4 5.769

3.5 8.1 8.077 2.8 7 6.462

4 7.9 9.231 3.1 6.7 7.154

4.8 7.25 11.077 4.2 5.3 9.692

5.65 6.7 13.038 4.9 4.5 11.308

6.6 5.4 15.231 5.3 3.7 12.231

7.75 3.6 17.885 5.8 2.7 13.385

9 2.1 20.769 6.2 1.7 14.308

9.2 1.4 21.231 6.4 1.2 14.769

9.75 0.75 22.500 6.5 0.7 15.000

Page 22: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Discussion

Pump provides 10x the options (impeller and diffuser) with 65% faster component switch time

Head generated is up to 60% greater than previous system benchmarks

Flow rate is not up to maximum theoretical value of 22.3 gpm. However, ~ 25% increase over previous iteration

Diffuser made a large difference in the amount of head generated, up to a 27% increase for the basic 102 impeller

New designs can be rapid prototyped and tested in the test loop within several days based on standard dimensions used for the components

Page 23: MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.

Questions?