MSD 1 Week 6 System design Review

25
MSD 1 WEEK 6 SYSTEM DESIGN REVIEW Team 15462 Rochester Institute of Technology College of Engineering P15462 10/2/2014 1

description

MSD 1 Week 6 System design Review. Team 15462 Rochester Institute of Technology College of Engineering. Agenda. System Analysis Function Decomposition Brainstorm Selection Criteria Pugh Chart Final System Selection Concept Feasibility Test Plan Updated Project Plan - PowerPoint PPT Presentation

Transcript of MSD 1 Week 6 System design Review

Page 1: MSD 1 Week 6  System design Review

P15462

MSD 1 WEEK 6 SYSTEM DESIGN REVIEW

Team 15462Rochester Institute of Technology

College of Engineering

10/2/2014 1

Page 2: MSD 1 Week 6  System design Review

P15462 2

AGENDA

Background Underlying Mission Problem Statement & Deliverables Customer Needs & Engineering Requirements Week 3 action item review

10/2/2014

System Analysis Function Decomposition Brainstorm Selection Criteria Pugh Chart Final System Selection Concept Feasibility Test Plan Updated Project Plan System Architecture Risk Assessment

Page 3: MSD 1 Week 6  System design Review

P15462 3

UNDERLYING MISSION

To Harvest Energy from High Altitude Winds

250m

100m

100m

250m10/2/2014

Page 4: MSD 1 Week 6  System design Review

P15462 4

PROBLEM STATEMENT & DELIVERABLES

The goal of this project is to design, build, and reliably test a powered, human-controlled tethered glider specifically for use as an airborne wind energy system (or AWT)

Tethered glider capable of continuous circular flight Integration with current base station 30 flights, each 3 minutes or longer, with tether tension and glider position recorded Functional simulation of flight path

10/2/2014

Page 5: MSD 1 Week 6  System design Review

P15462 5

CUSTOMER NEEDS

Customer Need #

Importance

Description

CN1 9 Tethered glider system (with electric prop assist for launching) that demonstrates at least 3 minutes of continuous circular flight path with taunt tether.

CN2 1 Clean appearanceCN3 9 Human controlled planeCN4 3 No special flight skill requiredCN5 9 Use existing base station designCN6 9 Tether tension is measured and recorded during flightsCN7 9 Tether direction is measured and recorded during flightsCN8 9 Videos with accompanying data files of all flight tests (even

ones that don’t work)CN9 9 Able to survive crashes with minor repairs (short downtime)CN10 9 Replaceable PartsCN11 3 Maintenance Guide

10/2/2014

Page 6: MSD 1 Week 6  System design Review

P15462 6

ENGINEERING REQUIREMENTS

rqmt. #Importanc

eSource Engr. Requirement (metric)

Unit of Measure

Marginal Value

Ideal Value

S1 9 CN1 Drag Coefficient -- 0.2 0.05S2 9 CN1 Lift Coefficient -- 0.7 1S3 9 CN6 Tether Tension lbs 5 23S4 9 CN7 Horizontal Potentiometer Recording deg    S5 9 CN7 Vertical Potentiometer Recording deg    S6 3 CN1 Wingspan ft 3.3 3S7 9 CN1 Weight lbs 4 3S8 3 CN4 Cooper-Harper Rating -- 3 1S9 3 CN3 Flight Stability Binary Marginal Complete

S10 9 CN1 Cost $ 500 400S11 3 CN9 Repair Downtime min 5 3S12 3 CN10 Repair Cost $ 100 50S13 3 CN11 Profile of Surface for Airfoil Manufacturing in 0.1 0.05S14 9 CN1 Service Ceiling ft <100 75S15 3 CN1 Flight Path Diameter ft  25 50 S16 9 CN1 Maximum Glider Speed mph 30 45

10/2/2014The Cooper–Harper Rating scale is a set of criteria used by test pilots and flight test engineers to evaluate the handling qualities of aircraft during flight test.

Page 7: MSD 1 Week 6  System design Review

P15462 7

HOUSE OF QUALITY

10/2/2014

Page 8: MSD 1 Week 6  System design Review

P15462 8

GLIDER PROTOTYPE STATUS (SHOWS SCOTT’S CAD

10/2/2014

Page 9: MSD 1 Week 6  System design Review

P15462 9

GLIDER PURCHASE

10/2/2014

Page 10: MSD 1 Week 6  System design Review

P15462 10

AERO CLUB FLIGHT VIDEO

10/2/2014

Page 11: MSD 1 Week 6  System design Review

P15462 11

AGENDA

Background Underlying Mission Problem Statement & Deliverables Customer Needs & Engineering Requirements Week 3 action item review

10/2/2014

System Analysis Function Decomposition Brainstorm Selection Criteria Pugh Chart Final System Selection Concept Feasibility Test Plan Updated Project Plan System Architecture Risk Assessment

Page 12: MSD 1 Week 6  System design Review

P15462 12

FUNCTIONAL DECOMPOSITION

10/2/2014

Page 13: MSD 1 Week 6  System design Review

P15462 13

AGENDA

Background Underlying Mission Problem Statement & Deliverables Customer Needs & Engineering Requirements Week 3 action item review

10/2/2014

System Analysis Function Decomposition Brainstorm Selection Criteria Pugh Chart Final System Selection Concept Feasibility Test Plan Updated Project Plan System Architecture Risk Assessment

Page 14: MSD 1 Week 6  System design Review

P15462 14

BENCHMARKING

Benchmarking Table

Products / Processes

ParamtersMaka

niAmpy

xKiteG

enEnergy Capturing System Yes Yes YesPowered Tether System Yes No NoPowered Reel System No Yes YesWingspan (m) 8 5.5 ?Autonomous Flight  Yes Yes Yes

Tether Length (m)40 -110

300-600 100 +

Kw Creation 30 ? 510/2/2014

Page 15: MSD 1 Week 6  System design Review

P15462 15

BRAINSTORM

10/2/2014

Page 16: MSD 1 Week 6  System design Review

P15462 16

SELECTION CRITERIA

10/2/2014

Page 17: MSD 1 Week 6  System design Review

P15462 17

PUGH CHART

10/2/2014

Page 18: MSD 1 Week 6  System design Review

P15462 18

AGENDA

Background Underlying Mission Problem Statement & Deliverables Customer Needs & Engineering Requirements Week 3 action item review

10/2/2014

System Analysis Function Decomposition Brainstorm Selection Criteria Pugh Chart Final System Selection Concept Feasibility Test Plan Updated Project Plan System Architecture Risk Assessment

Page 19: MSD 1 Week 6  System design Review

P15462 19

FINAL SYSTEM SELECTION

10/2/2014

Page 20: MSD 1 Week 6  System design Review

P15462 20

CONCEPT FEASIBILITY

10/2/2014

Page 21: MSD 1 Week 6  System design Review

P15462 21

AGENDA

Background Underlying Mission Problem Statement & Deliverables Customer Needs & Engineering Requirements Week 3 action item review

10/2/2014

System Analysis Function Decomposition Brainstorm Selection Criteria Pugh Chart Final System Selection Concept Feasibility Test Plan Updated Project Plan System Architecture Risk Assessment

Page 22: MSD 1 Week 6  System design Review

P15462 22

UPDATED PROJECT PLAN

SYST

EM DES

IGN REV

IEW

SUBSY

STEM

S DES

IGN REVIEW

DETAILE

D DES

IGN REVIEW

FINAL D

DR

Deliverables Deliverable Stage Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11Computer Simulator 1 1 1 1Aero Team's Trainer 1 1 1 1

1 1 1 1

1 1

1 1

Revise and Refine 1 1Concept Generation 1 1Critical Tech Analysis 1 1

Morph Chart Framework 1 1Alternative List 1 1Concept Selection 1 1Assess CapabilitiesRevisit Requirements

Systems Design Preperation

Funtiaonl Decomposition

Benchmark Existing RC Plane Parts

Existing Systems Benchmarking Table

Edge Site Upkeep and Review

Flight Experience

SYST

EM DESIG

N REVIEW

SUBSY

STEM

S DES

IGN REVIEW

DETAILE

D DESIGN REVIEW

FINAL D

DR

Section Deliverables Deliverable Stage Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15Computer Simulator 1 1 1 1 1Aero Team's Trainer 1 1 1 1 1 1

1 1 1 1 1 1

1 1

1 1

Revise and Refine 1 1Concept Generation 1 1Critical Tech Analysis 1 1

Morph Chart Framework 1 1Alternative List 1 1Concept Selection 1 1Assess CapabilitiesRevisit Requirements

Elevator Speech 1 1Feasbility Posters 1 1Invite SDR Attendees 1 1Solidify SD (see below) 1 1

SDR Action Items 1 1Test Plan 1 1Peer Reviews 1 1 1 1 1

Critical Interfaces 1 1Specs 1 1Sub- Decomposition 1 1Proof of Concept 1 1

Preliminary Design 1 1Final Design 1 1 1Preliminary Design 1 1Final Design 1 1 1Preliminary Design 1 1Final Design 1 1 1Preliminary Design 1 1Final Design 1 1 1Preliminary Design 1 1Final Design 1 1 1Preliminary Design 1 1Final Design 1 1 1Preliminary Design 1 1Final Design 1 1 1

Preliminary Design 1 1Final Design 1 1 1Preliminary Design 1 1Final Design 1 1 1Preliminary Design 1 1Final Design 1 1 1Preliminary Design 1 1Final Design 1 1 1Preliminary Design 1 1Final Design 1 1 1Preliminary Design 1 1Final Design 1 1 1

Preliminary Design 1 1Final Design 1 1 1Preliminary Design 1 1Final Design 1 1 1Preliminary Design 1 1Final Design 1 1 1

Preliminary Benchmark 1 1Final Code 1 1 1Preliminary Benchmark 1 1Final Code 1 1 1Preliminary Benchmark 1 1Final Code 1 1 1

List 1 1 1

MSD Project Process

Subsystem Design

Post SDR

Sytem Design

Systems Design Preperation

Funtiaonl Decomposition

Benchmark Existing RC Plane Parts

Existing Systems Benchmarking Table

Edge Site Upkeep and Review

Flight Experience

Wing Design

Aero and Structual Design

Controls

Bridal System

Simulation Code

Fuselage Design

On Plane Hardware

Tail Design

Propeller Design

Rudder Design

Structural Integrity

Control Surfaces

Electric Motor

Speed Controler

Linear Acuator Controls

Micro Controler Design

RC Design

Controls Algorithm

Maintenance Documentation

Tether Material

Base System Integration

Kinematic Simulation (MATLAB)

Aerodynamic Simulation (CFD)

Structual Analysis (ANSIS)

Replaceable Parts List

10/2/2014

Page 23: MSD 1 Week 6  System design Review

P15462 23

SYSTEM ARCHITECTURE

10/2/2014

Page 24: MSD 1 Week 6  System design Review

P15462 24

RISK ASSESSMENT

10/2/2014

Page 25: MSD 1 Week 6  System design Review

P15462 25

SOURCES

10/2/2014