M/s. Gujarat Dyestuff Industries Plot No. Z/25-28, Dahej...
Transcript of M/s. Gujarat Dyestuff Industries Plot No. Z/25-28, Dahej...
Post-Monsoon, 2016
M/s. Gujarat Dyestuff Industries
Plot No. Z/25-28, Dahej SEZ, Vill: Dahej,
Tehsil: Vagra, Dist: Bharuch
Gujarat
ENVIRONMENTAL IMPACT & RISK ASSESMENT REPORT FOR
PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE
ACETIC ANHYDRIDE AT DAHEJ SEZ
NABL Accredited Testing Laboratory
ISO 9001:2008 Certified Company
Aqua-Air Environmental Engineers P. Ltd.
403, Centre Point, Nr. Kadiwala School, Ring
Road, Surat – 395002 (Guj.)
Prepared By:
ENVIRONMENTAL IMPACT & RISK
ASSESSMENT REPORT
CLIENT
PROJECT TITLE
PROJECT NO.
:
:
:
M/s. GUJARAT DYESTUFF INDUSTRIES
PLOT NO. Z/25-28, DAHEJ SEZ, VILL: DAHEJ,
TEHSIL: VAGRA, DIST: BHARUCH (GUJ.)
ENVIRONMENTAL IMPACT & RISK ASSESMENT REPORT FOR
PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE
ACETIC ANHYDRIDE AT DAHEJ SEZ
537000
NABL Accredited Testing Laboratory
ISO 9001:2008 Certified Company
Aqua-Air Environmental Engineers P. Ltd.
403, Centre Point, Nr. Kadiwala School, Ring
Road, Surat - 395002
Prepared By:
NABL Accredited Testing Laboratory
ISO 9001:2008 Certified Company
Aqua-Air Environmental Engineers P. Ltd.
403, Centre Point, Nr. Kadiwala School, Ring
Road, Surat - 395002
NABL Accredited Testing Laboratory
ISO 9001:2008 Certified Company
Aqua-Air Environmental Engineers P. Ltd.
403, Centre Point, Nr. Kadiwala School, Ring
Road, Surat - 395002
Prepared By:
I- 1
INDEX
SR. NO. TITLE PAGE NO.
1 CHAPTER 1: INTRODUCTION
1.1 JUSTIFICATION & BACKGROUND 1-1
1.1.1 PROMOTERS& THEIR BACKGROUND 1-2
1.1.2 REGULATORY FRAMEWORK 1-2
1.2 PROJECT SETTING 1-11
1.2.1 KEY INFRASTRUCTURAL FEATURES AND SETTLEMENTS 1-12
1.3 PURPOSE OF EIA 1-15
1.4 OBJECTIVES OF EIA 1-15
1.5 METHODOLOGY FOR EIA 1-15
1.5.1 BASE LINE ENVIRONMENTAL CONDITION 1-15
1.5.2 IDENTIFICATION OF POLLUTION SOURCE 1-17
1.5.3 EVALUATION OF POLLUTION CONTROL AND ENVIRONMENTAL
MANAGEMENT SYSTEM
1-17
1.5.4 EVALUATION OF IMPACT 1-17
1.5.5 PREPARATION OF ENVIRONMENTAL MANAGEMENT PLAN 1-17
1.6 STRUCTURE OF REPORT 1-19
2 CHAPTER 2: PROJECT DESCRIPTION AND INFRASTRUCTURAL FACILITIES
2.1 BACKGROUND 2-1
2.1.1 TECHNICAL DETAILS OF THE PLANTS ALONG WITH DETAILS ON BEST
AVAILABLE TECHNOLOGIES (BAT), PROPOSED TECHNOLOGY AND
REASONS FOR SELECTING THE SAME
2-1
2.1.2 DETAILS ON END USE OF EACH PRODUCT 2-1
2.2 MANUFACTURING ACTIVITIES 2-2 to 2-4
2.3 RAW MATERIAL CONSUMPTION, STORAGE AND HANDLING 2-4
2.4 INFRASTRUCTURE FACILITIES 2-5
2.4.1 LAND 2-5
2.4.2 TRANSPORTATION FACILITIES 2-5
2.4.3 WATER AND WASTEWATER 2-5
2.4.3.1 TREATMENT PROCESS 2-7 to 2-10
2.4.4 AIR POLLUTION AND CONTROL SYSTEM 2-11
2.4.5 NOISE LEVEL AND CONTROL SYSTEM 2-12
2.4.6 HAZARDOUS AND SOILD WASTE GENERATIONS AND DISPOSAL SYSTEM 2-12
2.5 DETAILS OF UTILITIES 2-13
2.6 ELECTRICITY REQUIREMENT & FUEL REEQUIREMENT 2-13
3 CHAPTER 3: BASELINE ENVIRONMENTAL STATUS
3.1 MICRO-METEOROLOGY OF THE AREA 3-1
3.1.1 TEMPERATURE DETAILS 3-2
3.1.2 RELATIVE HUMIDITY (RH) 3-3
3.1.3 RAINFALL 3-4
3.1.4 WIND SPEED 3-5
3.2 AIR ENVIRONMENT 3-9
3.2.1 DESIGN OF NETWORK FOR AMBIENT AIR QUALITY MONITORING
LOCATIONS
3-9
I- 2
3.2.2 METHODOLOGY FOR AMBIENT AIR QUALITY MONITORING 3-10
3.3 NOISE ENVIRONMENT 3-16
3.3.1 METHODOLOGY FOR NOISE MONITORING 3-16
3.4 WATER ENVIRONMENT 3-21
3.4.1 RECONNAISSANCE 3-21
3.4.2 METHODOLOGY FOR WATER QUALITY MONITORING 3-21
3.5 LAND ENVIRONMENT 3-26
3.5.1 METHODOLOGY FOR SOIL MONITORING 3-26
3.5.2 SOIL CLASSIFICATIONS 3-29
3.6 GEOLOGICAL DATA 3-31
3.6.1 METHOD OF PREPARATION 3-31
3.6.2 DESCRIPTION OF GEOLOGICAL CLASSIFICATION AND AREA UNDER
DIFFERENT FORMATIONS
3-31
3.6.3 GEOLOGICAL MAP 3-31
3.7 LAND USE PATTERN 3-33
3.7.1 METHOD OF DATA PREPARATION 3-33
3.8 ECOLOGICAL INFORMATION 3-38
3.8.1 PHYSIOGRAPHY 3-39
3.8.2 FOREST 3-39
3.8.3 FLORA 3-40
3.8.4 FAUNA 3-43
3.9 SOCIO-ECONOMIC ENVIRONMENT 3-44
3.9.1 SETTLEMENTS AND DEMOGRAPHIC PATTERN 3-44
3.9.2 VEGETATION COVER AND FOREST BOUNDARIES 3-51
3.9.3 OCCUPATIONAL STRUCTURE 3-54
3.9.4 AMENITIES 3-54
3.9.5 GROUND WATER HYDROLOGY 3-58
3.9.6 DRAINAGE PATTERN 3-62
3.9.7 DIGITAL TERRAIN MODEL 3-63
4 CHAPTER 4: ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
4.1 IDENTIFICATION OF IMPACTS 4-1
4.2 EVALUATION AND PREDICTION OF IMPACTS 4-8
4.2.1 WATER ENVIRONMENT 4-8
4.2.2 AIR ENVIRONMENT 4-8
4.2.3 NOISE ENVIRONMENT 4-17
4.2.4 HAZARDOUS WASTE DETAILS 4-17
4.2.5 INFRASTRUCTURE AND SERVICES 4-17
4.2.6 ENVIRONMENTAL HAZARDS 4-18
4.2.7 HOUSING 4-18
4.2.8 ECOLOGY 4-18
4.3 MATRIX REPRESENTATION 4-22
4.3.1 CUMULATIVE IMPACT CHART 4-23
5 CHAPTER 5: ENVIRONMENTAL MONITORING PLAN
5.1 ENVIRONMENTAL MONITORING PLAN 5-1
5.1.1 LABORATORY FACILITIES 5-3
5.1.2 DOCUMETATION & RECORDS 5-3
I- 3
6 CHAPTER 6: ADDITIONAL STUDIES (RISK ASSESSMENT & DMP)
6.1 RISK ASSESSMENT 6-1
6.1.1 INTRODUCTION 6-1
6.1.2 APPROACH TO THE STUDY 6-1
6.1.3 METHODOLOGY 6-2
6.1.4 HAZARD IDENTIFICATION 6-4
6.1.5 CONSEQUENCE ANALYSIS 6-13
6.1.6 RISK ASSESSMENT SUMMARY 6-35
6.1.7 OTHER RISK REDUCTION OPPORTUNITIES 6-38
6.1.8 RECOMMENDATIONS FOR ALARP 6-38
6.1.9 FIRE FIGHTING SYSTEM 6-39
6.2 DISASTER MANAGEMENT PLAN 6-40
6.3 COMMMUNICATION SYSTEM 6-50
6.4 ACTION ON SITE 6-54
6.5 OFF – SITE EMERGENCY PLAN 6-65
6.6 OCCUPATIONAL HEALTH AND SAFETY 6-69
6.7 TRAINING, REHERASAL & RECORDS 6-77
6.8 HAZOP STUDY 6-79
7 CHAPTER 7: ENVIRONMENTAL MANAGEMENT PLAN
7.1 BACKGROUND 7-1
7.2 OBJECTIVES OF ENVIRONMENTAL MANAGEMENT PLAN 7-1
7.3 ENVIRONMENTAL MANAGEMENT CELL 7-2
7.3.1 ENVIRONMENT POLICY 7-4
7.3.2 CORPORATE ENVIRONMENT RESPONSIBILITY 7-6
7.3.3 MANAGEMENT RESPONSIBILITY 7-6
7.4 ENVIRONMENTAL MANAGEMENT PLAN 7-8
7.4.1 CONSTRUCTION PHASE 7-8
7.4.2 WATER ENVIRONMENT 7-11
7.4.3 AIR ENVIRONMENT 7-13
7.4.4 NOISE ENVIRONMENT 7-17
7.4.5 LAND ENVIRONMENT 7-20
7.5 GREEN BELT DEVELOPMENT 7-22
7.6 OCCUPATIONAL HEALTH AND SAFETY 7-25
7.7 MEASURES FOR CONSERVATION OF ENERGY 7-31
7.8 NATURAL RESOURCES CONSERVATION 7-32
7.9 SKILLED AND TRAINED MANPOWER 7-33
7.10 SOCIO ECONOMIC DEVELOPMENT ACTIVITIES 7-34
7.11 METHODOLOGY OF DE-CONTAMINATION AND DISPOSAL OF DISCARDED
CONTAINERS AND ITS RECORD KEEPING
7-35
7.12 ACTION PLAN FOR TRANSPORTATION OF RAW MATERIALS & PRODUCTS 7-36
7.13 CAPITAL COST FOR ENVIRONMENTAL MANGEMENT 7-37
8 CHAPTER 8: EXECUTIVE SUMMARY
8.1 PROJECT DESCRIPTION 8-2
8.2 DESCRIPTION OF THE ENVIRONMENT 8-3
8.3 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 8-5
8.4 ENVIRONMENTAL MONITORING PROGRAMME 8-8
8.5 ADDITIONAL STUDIES 8-9
I- 4
8.6 PROJECT BENEFITS 8-9
8.7 ENVIRONMENT MANAGEMENT PLAN 8-10
8.8 CONCLUSION 8-11
9 CHAPTER 9: DISCLOSURE OF CONSULTANTS ENGAGED
I- 5
LIST OF TABLES
TABLE
NO.
TITLE PAGE NO.
1.1 BREAK UP OF PROJECT COST 1-3
1.2 LAND BREAKUP 1-8
1.3 LIST OF PRODUCTS ALONGWITH PRODUCTION CAPACITY 1-10
1.4 DISTANCE OF NEAREST KEY INFRASTRUCTURE FEATURES FROM PROJECT
SITE
1-12
2.1 RAW MATERIAL REQUIREMENT 2-4
2.2 WATER CONSUMPTION & WASTE WATER GENERATION 2-5
2.3 HAZARDOUS & SOILD WASTE GENERATION QUANTITY, PHYSICAL
CHARACTERISTICS AND MODE OF DISPOSAL
2-12
3.1 TEMPERATURE DETAILS 3-2
3.2 RELATIVE HUMIDITY DETAILS 3-3
3.3 RAINFALL DETAILS 3-4
3.4 WIND SPEED DETAILS 3-5
3.5 SITE SPECIFIC METEOROLOGICAL DATA 3-6
3.6 DETAILS OF AMBIENT AIR QUALITY MONITORING LOCATIONS 3-11
3.7 AMBIENT AIR QUALITY STATUS 3-13 to 3-15
3.8A DETAILS OF AMBIENT NOISE QUALITY MONITORING LOCATIONS 3-17
3.8B BACKGROUND NOISE LEVELS 3-19
3.9 NOISE LEVELS DUE TO TRANSPORTATION 3-19
3.10 SAMPLING LOCATIONS FOR MONITORING SURFACE WATER AND GROUND
WATER QUALITY
3-22
3.11 WATER QUALITY- PHYSICAL PARAMETERS 3-24 to 3-25
3.12 SAMPLING LOCATIONS: SOIL QUALITY 3-26
3.13 PHYSICO-CHEMICAL CHARACTERISTICS OF SOIL 3-28
3.14 SOIL CHARACTERISTICS UNDER PROJECT AREA 3-29
3.15 GEOLOGICAL FEATURES 3-31
3.16 AREAS UNDER DIFFERENT LANDUSE 3-35
3.17 FLORA 3-40
3.18 FAUNA 3-43
3.19 DEMOGRAPHIC DATA 3-45
3.20 POPULATION DENSITY 3-46
3.21 LITERACY RATE 3-48
3.22 OCCUPATIONAL STRUCTURE 3-54
3.23 DETAILS OF AMENITIES AVAILABLE IN THE STUDY AREA 3-55
4.1 DETAILS OF EMISSION FROM STACKS 4-10
4.2 SUMMARY OF ISCST3 MODEL OUTPUT 4-16
4.3 PREDICTED AMBIENT AIR QUALITY 4-17
4.4 IMPACT IDENTIFICATION MATRIX 4-24 to 4-25
4.5 CONSTRUCTION & OPERATION STAGE POTENTIAL IMPACTS & MITIGATIVE
MEASURES
4-26
4.6 ENVIRONMENTAL IMPACT MATRIX 4-27
4.7 CUMULATIVE IMPACT CHART 4-28
5.1 PROJECT ENVIRONMENT MONITORING PLAN 5-2
6.1 STORAGE DETAILS OF HAZARDOUS CHEMICALS 6-6
I- 6
6.2 OTHER HAZARDS AND CONTROL 6-7
6.3 PROPERTIES OF CHEMICALS 6-8
6.4 POSSIBLE ACCIDENT SCENARIOS 6-23
6.5 FACILITIES TO BE MAINTAINED FOR FIRE FIGHTING 6-40
7.1 ENVIRONMENT MANAGEMENT PLAN 7-10
LIST OF FIGURES
FIGURE
NO.
TITLE PAGE NO.
1.1 LOCATION OF THE PROJECT SITE 1-4 to 1-8
1.2 PLANT LAYOUT 1-9
1.3 KEY INFRASTRUCTURE FEATURES AND SETTLEMENTS 1-13
1.4 SATELLITE IMAGERY ALONG WITH PRESENT LAND USE PATTERN 1-14
1.5 ACTIVITIES, SOURCES OF INFORMATION AND CONTENTS OF EIA REPORT 1-19
3.1 WIND ROSE DIAGRAM & STABILITY CLASS DISTRIBUTION 3-7 to 3-8
3.2 LOCATION OF AMBIENT AIR QUALITY MONITORING STATIONS 3-12
3.3 LOCATION OF NOISE LEVEL MONITORING STATIONS 3-18
3.4 LOCATIONS OF WATER SAMPLING STATIONS 3-23
3.5 LOCATIONS OF SOIL SAMPLING STATIONS 3-27
3.6 SOIL CHARACTERISTICS MAP 3-30
3.7 MAJOR GEOLOGICAL FEATURES 3-32
3.8 LAND USE/ LAND COVER 3-36
3.9 LANDUSE / LANDCOVER WITH VILLAGE LOCATIONS 3-37
3.10 POPULATION DENSITY 3-47
3.11 LITERACY DATA 3-50
3.12 VEGETATION CLASSIFICATION AND FOREST BOUNDARIES 3-53
3.13 GROUND WATER HYDROLOGY 3-64
3.14 DRAINAGE PATTERN 3-65
3.15 DIGITAL TERRAIN MODEL 3-66
4.1 IMPACT NETWORK 4-2 to 4-7
4.2 ISOPLETHS FOR SPM, SO2, NOX , HCL & ACID MIST 4-11 to 4-15
6.1 QRA METHODOLOGY 6-2
6.2 FLOW CHART FOR QUANTITATIVE RISK ASSESSMENT 6-3
6.3 SITE PLAN 6-5
7.1 ORGANOGRAM OF ENVIRONMENT MANAGEMENT CELL 7-3
I- 7
COPY OF TORs
I- 8
I- 9
I- 10
I- 11
Annexure-I
GENERIC TERMS OF REFERENCE (TOR) IN RESPECT OF INDUSTRY SECTOR
1. Executive Summary
2. Introduction
i. Details of the EIA Consultant including NABET accreditation
ii. Information about the project proponent
iii. Importance and benefits of the project
3. Project Description
i. Cost of project and time of completion.
ii. Products with capacities for the proposed project.
iii. If expansion project, details of existing products with capacities and whether adequate
land is available for expansion, reference of earlier EC if any.
iv. List of raw materials required and their source along with mode of transportation.
v. Other chemicals and materials required with quantities and storage capacities
vi. Details of Emission, effluents, hazardous waste generation and their management.
vii. Requirement of water, power, with source of supply, status of approval, water balance
diagram, man-power requirement (regular and contract)
viii. Process description along with major equipments and machineries, process flow sheet
(quantities) from raw material to products to be provided
ix. Hazard identification and details of proposed safety systems.
x. Expansion/modernization proposals:
a. Copy of all the Environmental Clearance(s) including Amendments thereto obtained for
the project from MOEF/SEIAA shall be attached as an Annexure. A certified copy of the
latest Monitoring Report of the Regional Office of the Ministry of Environment and
Forests as per circular dated 30th May, 2012 on the status of compliance of conditions
stipulated in all the existing environmental clearances including Amendments shall be
provided. In addition, status of compliance of Consent to Operate for the ongoing I
existing operation of the project from SPCB shall be attached with the EIA-EMP report.
b. In case the existing project has not obtained environmental clearance, reasons for not
taking EC under the provisions of the EIA Notification 1994 and/or EIA Notification 2006
shall be provided. Copies of Consent to Establish/No Objection Certificate and Consent
to Operate (in case of units operating prior to EIA Notification 2006, CTE and CTO of FY
2005-2006) obtained from the SPCB shall be submitted. Further, compliance report to
the conditions of consents from the SPCB shall be submitted.
4. Site Details
i. Location of the project site covering village, Taluka/Tehsil, District and State, Justification for
selecting the site, whether other sites were considered.
ii. A toposheet of the study area of radius of 10km and site location on 1:50,000/1:25,000 scale
on an A3/A2 sheet. (Including all eco-sensitive areas and environmentally sensitive places)
iii. Details w.r.t. option analysis for selection of site
iv. Co-ordinates (lat-long) of all four corners of the site.
v. Google map-Earth downloaded of the project site.
vi. Layout maps indicating existing unit as well as proposed unit indicating storage area, plant
area, greenbelt area, utilities etc. If located within an Industrial area/Estate/Complex, layout
of Industrial Area indicating location of unit within the Industrial area/Estate.
vii. Photographs of the proposed and existing (if applicable) plant site. If existing, show
photographs of plantation/greenbelt, in particular.
I- 12
viii. Landuse break-up of total land of the project site (identified and acquired),
government/private - agricultural, forest, wasteland, water bodies, settlements, etc shall be
included. (Not required for industrial area)
ix. A list of major industries with name and type within study area (10km radius) shall be
incorporated. Land use details of the study area
x. Geological features and Geo-hydrological status of the study area shall be included.
xi. Details of Drainage of the project upto 5km radius of study area. If the site is within 1 km
radius of any major river, peak and lean season river discharge as well as flood occurrence
frequency based on peak rainfall data of the past 30 years. Details of Flood Level of the
project site and maximum Flood Level of the river shall also be provided. (Mega green field
projects)
xii. Status of acquisition of land. If acquisition is not complete, stage of the acquisition process
and expected time of complete possession of the land.
xiii. R&R details in respect of land in line with state Government policy
5. Forest and wildlife related issues (if applicable):
i. Permission and approval for the use of forest land (forestry clearance), if any, and
recommendations of the State Forest Department. (if applicable)
ii. Landuse map based on High resolution satellite imagery (GPS) of the proposed site
delineating the forestland (in case of projects involving forest land more than 40 ha)
iii. Status of Application submitted for obtaining the stage I forestry clearance along with latest
status shall be submitted.
iv. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere
Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map
duly authenticated by Chief Wildlife Warden showing these features vis-à-vis the project
location and the recommendations or comments of the Chief Wildlife Warden there on
v. Wildlife Conservation Plan duly authenticated by the Chief Wildlife Warden of the State
Government for conservation of Schedule I fauna, if any exists in the study area
vi. Copy of application submitted for clearance under the Wildlife (Protection) Act, 1972, to the
Standing Committee of the National Board for Wildlife
6. Environmental Status
i. Determination of atmospheric inversion level at the project site and site-specific
micrometeorological data using temperature, relative humidity, hourly wind speed and
direction and rainfall.
ii. AAQ data (except monsoon) at 8 locations for PM10, PM2.5, SO2, NOX, CO and other
parameters relevant to the project shall be collected. The monitoring stations shall be based
CPCB guidelines and take into account the pre-dominant wind direction, population zone
and sensitive receptors including reserved forests.
iii. Raw data of all AAQ measurement for 12 weeks of all stations as per frequency given in the
NAQQM Notification of Nov. 2009 along with – min., max., average and 98% values for each
of the AAQ parameters from data of all AAQ stations should be provided as an annexure to
the EIA Report.
iv. Surface water quality of nearby River (100m upstream and downstream of discharge point)
and other surface drains at eight locations as per CPCB/MoEF&CC guidelines.
v. Whether the site falls near to polluted stretch of river identified by the CPCB/MoEF&CC, if
yes give details.
vi. Ground water monitoring at minimum at 8 locations shall be included.
vii. Noise levels monitoring at 8 locations within the study area.
viii. Soil Characteristic as per CPCB guidelines.
I- 13
ix. Traffic study of the area, type of vehicles, frequency of vehicles for transportation of
materials, additional traffic due to proposed project, parking arrangement etc.
x. Detailed description of flora and fauna (terrestrial and aquatic) existing in the study area
shall be given with special reference to rare, endemic and endangered species. If Schedule-I
fauna are found within the study area, a Wildlife Conservation Plan shall be prepared and
furnished.
xi. Socio-economic status of the study area.
7. Impact and Environment Management Plan
i. Assessment of ground level concentration of pollutants from the stack emission based on
site-specific meteorological features. In case the project is located on a hilly terrain, the AQIP
Modelling shall be done using inputs of the specific terrain characteristics for determining
the potential impacts of the project on the AAQ. Cumulative impact of all sources of
emissions (including transportation) on the AAQ of the area shall be assessed. Details of the
model used and the input data used for modelling shall also be provided. The air quality
contours shall be plotted on a location map showing the location of project site, habitation
nearby, sensitive receptors, if any.
ii. Water Quality Modelling – in case of discharge in water body
iii. Impact of the transport of the raw materials and end products on the surrounding
environment shall be assessed and provided. In this regard, options for transport of raw
materials and finished products and wastes (large quantities) by rail or rail-cum road
transport or conveyor-cum-rail transport shall be examined.
iv. A note on treatment of wastewater from different plant operations, extent recycled and
reused for different purposes shall be included. Complete scheme of effluent treatment.
Characteristics of untreated and treated effluent to meet the prescribed standards of
discharge under E (P) Rules.
v. Details of stack emission and action plan for control of emissions to meet standards.
vi. Measures for fugitive emission control
vii. Details of hazardous waste generation and their storage, utilization and management.
Copies of MOU regarding utilization of solid and hazardous waste in cement plant shall also
be included. EMP shall include the concept of waste-minimization, recycle/reuse/recover
techniques, Energy conservation, and natural resource conservation.
viii. Proper utilization of fly ash shall be ensured as per Fly Ash Notification, 2009. A detailed plan
of action shall be provided.
ix. Action plan for the green belt development plan in 33 % area i.e. land with not less than
1,500 trees per ha. Giving details of species, width of plantation, planning schedule etc. shall
be included. The green belt shall be around the project boundary and a scheme for greening
of the roads used for the project shall also be incorporated.
x. Action plan for rainwater harvesting measures at plant site shall be submitted to harvest
rainwater from the roof tops and storm water drains to recharge the ground water and also
to use for the various activities at the project site to conserve fresh water and reduce the
water requirement from other sources.
xi. Total capital cost and recurring cost/annum for environmental pollution control measures
shall be included.
xii. Action plan for post-project environmental monitoring shall be submitted.
xiii. Onsite and Offsite Disaster (natural and Man-made) Preparedness and Emergency
Management Plan including Risk Assessment and damage control. Disaster management
plan should be linked with District Disaster Management Plan.
I- 14
8. Occupational health
i. Plan and fund allocation to ensure the occupational health & safety of all contract and casual
workers
ii. Details of exposure specific health status evaluation of worker. If the workers’ health is being
evaluated by pre designed format, chest x rays, Audiometry, Spirometry, Vision testing (Far
& Near vision, Colour vision and any other ocular defect) ECG, during pre placement and
periodical examinations give the details of the same. Details regarding last month analyzed
data of above mentioned parameters as per age, sex, duration of exposure and department
wise.
iii. Details of existing Occupational & Safety Hazards. What are the exposure levels of hazards
and whether they are within Permissible Exposure level (PEL)? If these are not within PEL,
what measures the company has adopted to keep them within PEL so that health of the
workers can be preserved
iv. Annual report of heath status of workers with special reference to Occupational Health and
Safety.
9. Corporate Environment Policy
i. Does the company have a well laid down Environment Policy approved by its Board of
Directors? If so, it may be detailed in the EIA report.
ii. Does the Environment Policy prescribe for standard operating process / procedures to bring
into focus any infringement / deviation / violation of the environmental or forest norms /
conditions? If so, it may be detailed in the EIA.
iii. What is the hierarchical system or Administrative order of the company to deal with the
environmental issues and for ensuring compliance with the environmental clearance
conditions? Details of this system may be given.
iv. Does the company have system of reporting of non compliances / violations of
environmental norms to the Board of Directors of the company and / or shareholders or
stakeholders at large? This reporting mechanism shall be detailed in the EIA report
10. Details regarding infrastructure facilities such as sanitation, fuel, restroom etc. to be provided to
the labour force during construction as well as to the casual workers including truck drivers during
operation phase.
11. Enterprise Social Commitment (ESC)
i. Adequate funds (at least 2.5 % of the project cost) shall be earmarked towards the
Enterprise Social Commitment based on Public Hearing issues and item-wise details along
with time bound action plan shall be included. Socio-economic development activities need
to be elaborated upon.
12. Any litigation pending against the project and/or any direction/order passed by any Court of Law
against the project, if so, details thereof shall also be included. Has the unit received any notice
under the Section 5 of Environment (Protection) Act, 1986 or relevant Sections of Air and Water
Acts? If so, details thereof and compliance/ATR to the notice(s) and present status of the case.
13. ‘A tabular chart with index for point wise compliance of above TORs.
14. The TORs prescribed shall be valid for a period of three years for submission of the EIA-EMP
reports.
The following general points shall be noted:
i. All documents shall be properly indexed, page numbered.
ii. Period/date of data collection shall be clearly indicated.
iii. Authenticated English translation of all material in Regional languages shall be provided.
iv. The letter/application for environmental clearance shall quote the MOEF file No. and also
attach a copy of the letter.
I- 15
v. The copy of the letter received from the Ministry shall be also attached as an annexure to
the final EIA-EMP Report.
vi. The index of the final EIA-EMP report must indicate the specific chapter and page no. of the
EIAEMP Report
vii. While preparing the EIA report, the instructions for the proponents and instructions for the
consultants issued by MOEF vide O.M. No. J-11013/41/2006-IA.II (I) dated 4th August, 2009,
which are available on the website of this Ministry shall also be followed.
viii. The consultants involved in the preparation of EIA-EMP report after accreditation with
Quality Council of India (QCl) /National Accreditation Board of Education and Training
(NABET) would need to include a certificate in this regard in the EIA-EMP reports prepared
by them and data provided by other organization/Laboratories including their status of
approvals etc. Name of the Consultant and the Accreditation details shall be posted on the
EIA-EMP Report as well as on the cover of the Hard Copy of the Presentation material for EC
presentation.
TORs’ prescribed by the Expert Appraisal Committee (Industry) shall be considered for preparation
of EIA-EMP report for the project in addition to all the relevant information as per the ‘Generic
Structure of EIA’ given in Appendix III and IIIA in the EIA Notification, 2006. Where the documents
provided are in a language other than English, an English translation shall be provided. The draft EIA-
EMP report shall be submitted to the State Pollution Control Board of the concerned State for
conduct of Public Hearing. The SPCB shall conduct the Public Hearing/public consultation, district-
wise, as per the provisions of EIA notification, 2006. The Public Hearing shall be chaired by an Officer
not below the rank of Additional District Magistrate. The issues raised in the Public Hearing and
during the consultation process and the commitments made by the project proponent on the same
shall be included separately in EIA-EMP Report in a separate chapter and summarized in a tabular
chart with financial budget (capital and revenue) along with time-schedule of implementation for
complying with the commitments made. The final EIA report shall be submitted to the Ministry for
obtaining environmental clearance.
I- 16
COMPLIANCE OF ADDITIONAL TERMS OF REFERENCES (TORs)
Sr.
No.
TOR Point Compliance Status
1 Executive Summary Refer Chapter-8
2 Introduction
i Details of the EIA Consultant including NABET accreditation Refer Chapter-9 & Annexure - 14
ii Information about the project proponent Refer Chapter-1, Page No. 1-1 to 1-2
iii Importance and benefits of the project Refer Chapter-1, Page No. 1-1 to 1-2
3 Project Description
i Cost of project and time of completion Refer Chapter-1, Page No. 1-3
ii Products with capacities for the proposed project Refer Chapter-1, Page No. 1-10
iii If expansion project, details of existing products with capacities and
whether adequate land is available for expansion, reference of earlier
EC if any
Refer Chapter-1, Page No. 1-10
Refer Annexure - 10
iv List of raw materials required and their source along with mode of
transportation
Refer Chapter-2, Page No. 2-4
v Other chemicals and materials required with quantities and storage
capacities
Refer Chapter – 6, Page No. 6-6
vi Details of Emission, effluents, hazardous waste generation and their
management
Refer Chapter-2, Page No. 2-11
vii Requirement of water, power, with source of supply, status of
approval, water balance diagram, man-power requirement (regular
and contract)
Refer Chapter-2, Page No. 2-5 to 2-6 & 2-13
Refer Annexure - 8
viii Process description along with major equipments and machineries,
process flow sheet (quantities) from raw material to products to be
provided
Refer Chapter-2, Page No. 2-2 to 2-4
ix Hazard identification and details of proposed safety systems Refer Chapter – 6, Page No. 6-4 to 6-13
x Expansion/modernization proposals Expansion (Product Change)
a Copy of all the Environmental Clearance(s) including Amendments
thereto obtained for the project from MoEF/SEIAA shall be attached
as an Annexure. A certified copy of the latest Monitoring Report of
the Regional Office of the Ministry of Environment and Forests as per
circular dated 30th
May, 2012 on the status of compliance of
conditions stipulated in all the existing environmental clearances
including Amendments shall be provided. In addition, status of
compliance of Consent to Operate for the ongoing Existing operation
of the project from SPCB shall be attached with the EIA-EMP report
Refer Annexure – 10
Refer Annexure – 11
b In case the existing project has not obtained environmental
clearance, reasons for not taking EC under the provisions of the EIA
Notification 1994 and/or EIA Notification 2006 shall be provided.
Copies of Consent to Establish/No Objection Certificate and Consent
to Operate (in case of units operating prior to EIA Notification 2006,
CTE and CTO of FY 2005-2006) obtained from the SPCB shall be
submitted. Further, compliance report to the conditions of consents
from the SPCB shall be submitted.
Not Applicable
I- 17
4 Site Details
i Location of the project site covering village, Taluka/Tehsil, District
and State, Justification for selecting the site, whether other sites
were considered
M/s. Gujarat Dyestuff Industries proposes expansion
(product change) to produce Acetic Anhydride at Plot No.
Z- 25, 26, 27, 28, SEZ Dahej, Vill: Dahej, Tehsil: Vagra, Dist:
Bharuch (Guj.). The total area of the premises is 76,689.32
m2. Total cost of the expansion project will be Rs. 15
Crores.
Proposed Expansion is within the existing premises
ii A toposheet of the study area of radius of 10km and site location
on 1:50,000/1:25,000 scale on an A3/A2 sheet. (including all eco-
sensitive areas and environmentally sensitive places)
Refer Chapter-1, Page No. 1-7
iii Details w.r.t. option analysis for selection of site Proposed Expansion is within the existing premises
iv Co-ordinates (lat-long) of all four corners of the site Longitude 72°37'47.05"E, Latitude 21°42'10.00"N
v Google map-Earth downloaded of the project site Refer Chapter-1, Page No. 1-4 to 1-7
vi Layout maps indicating existing unit as well as proposed unit
indicating storage area, plant area, greenbelt area, utilities etc. If
located within an Industrial area/Estate/Complex, layout of
Industrial Area indicating location of unit within the Industrial
area/Estate
Refer Chapter-1, Page No. 1-6 to 1-9
Refer Chapter-1, Page No. 1-5
vii Photographs of the proposed and existing (if applicable) plant site.
If existing, show photographs of plantation/greenbelt, in particular
Refer Chapter-1, Page No. 1-4 to 1-9
viii Landuse break-up of total land of the project site (identified and
acquired), government/private - agricultural, forest, wasteland,
water bodies, settlements, etc shall be included. (not required for
industrial area)
Refer Chapter-1, Page No. 1-3
ix A list of major industries with name and type within study area
(10km radius) shall be incorporated. Land use details of the study
area
Refer Chapter-3, Page No. 3-20
Refer Chapter-3, Page No. 3-33 to 3-37
x Geological features and Geo-hydrological status of the study area
shall be included
Refer Chapter-3, Page No. 3-31 to 3-32
Refer Chapter-3, Page No. 3-58 to 3-62 & 3-64
xi Details of Drainage of the project upto 5km radius of study area. If
the site is within 1 km radius of any major river, peak and lean
season river discharge as well as flood occurrence frequency based
on peak rainfall data of the past 30 years. Details of Flood Level of
the project site and maximum Flood Level of the river shall also be
provided. (mega green field projects)
Refer Chapter-3, Page No. 3-62 & 3-65
xii Status of acquisition of land. If acquisition is not complete, stage of
the acquisition process and expected time of complete possession
of the land
Proposed Expansion is within the existing premises
xiii R&R details in respect of land in line with State Government policy Proposed Expansion is within the existing premises
5 Forest and wildlife related issues (if applicable)
6 Environmental Status
i Determination of atmospheric inversion level at the project site
and site-specific micrometeorological data using temperature,
relative humidity, hourly wind speed and direction and rainfall.
Refer Chapter-3, Page No. 3-2 to 3-8
ii AAQ data (except monsoon) at 8 locations for PM10, PM2.5, SO2,
NOx, CO and other parameters relevant to the project shall be
collected. The monitoring stations shall be based CPCB guidelines
and take into account the pre-dominant wind direction, population
zone and sensitive receptors including reserved forests.
Refer Chapter-3, Page No. 3-9 to 3-14
iii Raw data of all AAQ measurement for 12 weeks of all stations as
per frequency given in the NAQQM Notification of Nov. 2009 along
with – min., max., average and 98% values for each of the AAQ
parameters from data of all AAQ stations should be provided as an
annexure to the EIA Report
Refer Chapter-3, Page No. 3-15
I- 18
iv Surface water quality of nearby River (100m upstream and
downstream of discharge point) and other surface drains at eight
locations as per CPCB/MoEF&CC guidelines
Refer Chapter-3, Page No. 3-21 to 3-25
v Whether the site falls near to polluted stretch of river identified by
the CPCB/MoEF&CC, if yes give details
Not Applicable
vi Ground water monitoring at minimum at 8 locations shall be
included
Refer Chapter-3, Page No. 3-21 to 3-25
vii Noise levels monitoring at 8 locations within the study area Refer Chapter-3, Page No. 3-16 to 3-20
viii Soil Characteristic as per CPCB guidelines Refer Chapter-3, Page No. 3-26 to 3-30
ix Detailed description of flora and fauna (terrestrial and aquatic)
existing in the study area shall be given with special reference to
rare, endemic and endangered species. If Schedule-I fauna are
found within the study area, a Wildlife Conservation Plan shall be
prepared and furnished.
Refer Chapter-3, Page No. 3-40 to 3-44
x Socio-economic status of the study area Refer Chapter-3, Page No. 3-44 to 3-57
7 Impact and Environment Management Plan
i Assessment of ground level concentration of pollutants from the
stack emission based on site-specific meteorological features. In
case the project is located on a hilly terrain, the AQIP Modelling
shall be done using inputs of the specific terrain characteristics for
determining the potential impacts of the project on the AAQ.
Cumulative impact of all sources of emissions (including
transportation) on the AAQ of the area shall be assessed. Details of
the model used and the input data used for modeling shall also be
provided. The air quality contours shall be plotted on a location
map showing the location of project site, habitation nearby,
sensitive receptors, if any
Refer Chapter-4, Page No. 4-9 to 4-17
ii Water Quality modeling – in case of discharge in water body Refer Chapter-4, Page No. 4-9 to 4-17
iii Impact of the transport of the raw materials and end products on
the surrounding environment shall be assessed and provided. In
this regard, options for transport of raw materials and finished
products and wastes (large quantities) by rail or rail-cum road
transport or conveyor-cum-rail transport shall be examined
Refer Chapter-7, Page No. 7-36
iv A note on treatment of wastewater from different plant
operations, extent recycled and reused for different purposes shall
be included. Complete scheme of effluent treatment.
Characteristics of untreated and treated effluent to meet the
prescribed standards of discharge under E(P) Rules
Refer Chapter-2, Page No. 2-7 to 2-10
v Details of stack emission and action plan for control of emissions to
meet standards
Refer Chapter-2, Page No. 2-11
Refer Chapter-4, Page No. 4-10
vi Measures for fugitive emission control Refer Chapter-7, Page No. 7-15 to 7-17
vii Details of hazardous waste generation and their storage, utilization
and management. Copies of MOU regarding utilization of solid and
hazardous waste in cement plant shall also be included. EMP shall
include the concept of waste-minimization, recycle/reuse/recover
techniques, Energy conservation, and natural resource
conservation.
Refer Chapter-2, Page No. 2-12
Refer Chapter-7, Page No. 7-20, 7-21, 7-31 to 7-
33
viii Proper utilization of fly ash shall be ensured as per Fly Ash
Notification, 2009. A detailed plan of action shall be provided
Not Applicable
I- 19
ix Action plan for the green belt development plan in 33 % area i.e.
land with not less than 1,500 trees per ha. Giving details of species,
width of plantation, planning schedule etc. shall be included. The
green belt shall be around the project boundary and a scheme for
greening of the roads used for the project shall also be
incorporated
Refer Chapter-7, Page No. 7-22 to 7-24
x Action plan for rainwater harvesting measures at plant site shall be
submitted to harvest rainwater from the roof tops and storm water
drains to recharge the ground water and also to use for the various
activities at the project site to conserve fresh water and reduce the
water requirement from other sources
Refer Chapter-2, Page No. 2-5 to 2-6
Refer Chapter-7, Page No. 7-12 to 7-13
xi Total capital cost and recurring cost/annum for environmental
pollution control measures shall be included
Refer Chapter-7, Page No. 7-37
xii Action plan for post-project environmental monitoring shall be
submitted
Refer Chapter-5, Page No. 5-2
xiii Onsite and Offsite Disaster (natural and Man-made) Preparedness
and Emergency Management Plan including Risk Assessment and
damage control. Disaster management plan should be linked with
District Disaster Management Plan
Refer Chapter – 6, Page No. 6-23 to 6-40
Refer Chapter – 6, Page No. 6-40 to 6-68
8 Occupational health
i Plan and fund allocation to ensure the occupational health & safety
of all contract and casual workers
Refer Chapter – 7, Page No. 7-25 to 7-31
ii Details of exposure specific health status evaluation of worker. If
the workers’ health is being evaluated by pre designed format,
chest x rays, Audiometry, Spirometry, Vision testing (Far & Near
vision, Colour vision and any other ocular defect) ECG, during pre
placement and periodical examinations give the details of the
same. Details regarding last month analyzed data of above
mentioned parameters as per age, sex, duration of exposure and
department wise
Refer Chapter – 6, Page No. 6-69 to 6-74
Refer Chapter – 7, Page No. 7-25 to 7-31
iii Details of existing Occupational & Safety Hazards. What are the
exposure levels of hazards and whether they are within Permissible
Exposure level (PEL). If these are not within PEL, what measures
the company has adopted to keep them within PEL so that health
of the workers can be preserved
Refer Chapter – 6, Page No. 6-69 to 6-74
iv Annual report of heath status of workers with special reference to
Occupational Health and Safety.
Refer Chapter – 6, Page No. 6-69 to 6-74
Refer Chapter – 7, Page No. 7-25 to 7-31
9 Corporate Environment Policy
i Does the company have a well laid down Environment Policy
approved by its Board of Directors? If so, it may be detailed in the
EIA report
Refer Chapter – 7, Page No. 7-4
ii Does the Environment Policy prescribe for standard operating
process / procedures to bring into focus any infringement /
deviation / violation of the environmental or forest norms /
conditions? If so, it may be detailed in the EIA
Refer Chapter – 7, Page No. 7-4 to 7-8
iii What is the hierarchical system or Administrative order of the
company to deal with the environmental issues and for ensuring
compliance with the environmental clearance conditions? Details
of this system may be given.
Refer Chapter – 7, Page No. 7-4 to 7-8
iv Does the company have system of reporting of non compliances /
violations of environmental norms to the Board of Directors of the
company and / or shareholders or stakeholders at large? This
reporting mechanism shall be detailed in the EIA report
Refer Chapter – 7, Page No. 7-4 to 7-8
I- 20
10 Details regarding infrastructure facilities such as sanitation, fuel,
restroom etc. to be provided to the labour force during
construction as well as to the casual workers including truck
drivers during operation phase.
Refer Chapter – 2 Page No. 2-5
11 Enterprise Social Commitment (ESC)
i Adequate funds (at least 2.5 % of the project cost) shall be
earmarked towards the Enterprise Social Commitment based on
Public Hearing issues and item-wise details along with time bound
action plan shall be included. Socio-economic development
activities need to be elaborated upon
Refer Chapter – 7 Page No. 7-34 to 7-35
12 Any litigation pending against the project and/or any
direction/order passed by any Court of Law against the project, if
so, details thereof shall also be included. Has the unit received any
notice under the Section 5 of Environment (Protection) Act, 1986
or relevant Sections of Air and Water Acts? If so, details thereof
and compliance/ATR to the notice(s) and present status of the
case.
Not Applicable
13 A tabular chart with index for point wise compliance of above
TORs.
As Above
14 The TORs prescribed shall be valid for a period of three years for
submission of the EIA-EMP reports.
Complied
I- 21
I- 22
I- 23
I- 24
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-1
CHAPTER - 1
___________________________________________________________________________
INTRODUCTION
1.1 JUSTIFICATION AND BACKGROUND
M/s. Gujarat Dyestuff Industries, SEZ unit is a well established enthusiastic & professionally
managed manufacturing facility. The plant is located at Plot No. Z- 25, 26, 27, 28, SEZ Dahej,
Vill: Dahej, Tehsil: Vagra, Dist: Bharuch (Guj.) and proposes expansion (product change) to
produce Acetic Anhydride. The total area of the premises is 74,123.01 m2.
Gujarat Dyestuff Industries, SEZ (A Unit of Gujarat Dyestuff Industries), RLG Group began its
journey in 1974, when the company was established and formed by Sh. Ram Lal Goyal as a
Plasticizer manufacturing company. Today, the company has grown into a large & dynamic
business house, which currently occupies a leading position in the field of Chemical
Manufacturing, Pharmaceutical’s Manufacturing, Power Plant, Marketing & Exports in the
Domestic as well as the International Market.
Need for the project and its importance to the country and or region
The demand for products intended to be manufacture is increasing in the international
market. By expanding this unit, M/s. Gujarat Dyestuff Industries will be able to meet the
demand of proposed product in foreign countries. The project will earn forex. This will also
generate direct and indirect employment opportunity for various level of people in the state
of Gujarat.
Demand -Supply Gap
Based on our informal survey of the market with our current customers and various traders,
we have found that there is a big potential for the product we are planning. This product will
be an addition to the current range of our products at other locations.
Imports vs. Indigenous production
Raw materials are available in local market and if not available then we have to import from
international market.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-2
Domestic/Export Markets
Our products have good demand in international markets. We shall export substantial
output from the plant.
Employment Generation (Direct and Indirect) due to project.
M/s. Gujarat Dyestuff Industries have given direct employment to approx. 20 Nos. of people
based on qualification and requirement & after proposed expansion additional approx. 20
Nos. of people shall be employed. In addition to direct employment, indirect employment
shall generate additional business to some extent for the local population.
1.1.1 PROMOTERS AND THEIR BACK GROUND
Sr.
No.
Name Address Designation Contact No.
1. Sh. Shami Garg E- 19, Naveen Shahdara,
Near Tikona Park,
Delhi – 110032
Director 011 - 26515127
2. Sh. D.C. Sharma 2, Shri Ram Society No.2,
Near Vaibhav Park Soc.,
Near Natubhai Circle, Gotri
Road, Baroda – 390023
Director 0265 - 2326676
3. Sh. Om Prakash
Aggrawal
C - 122, Mahendra
Enclave, Azad Pur, Modal
Town, Delhi - 110033
Director 011 - 26515126
1.1.2 REGULATORY FRAMEWORK
For proposed expansion project; following assumption has been considered:
a. Capacity of Plant 1200 MT/Month
b. Total working days in a year 330
c. Raw material storage facility for two months
d. Solvent storage for 30 days
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-3
TABLE 1.1
BREAK-UP OF PROJECT COST
Total Project Cost for proposed project activity is Rs. 1500 Lakhs. Out of this around Rs. 121
Lakhs will be invested for pollution control measures.
Sr.
No. Description
Project Cost
(Rs in Lacs)
1 Land Cost 750
2 Building 100
3 Plant & Machinery 405
4 Lab Equipments 15
5 Environment Management System 121
6 Utilities 109
Total Project Cost 1500
TABLE 1.2
BREAK UP OF DIFFERENT LAND USE OF FACTORY
SR.
NO.
LAND USE BUILT UP AREA
(SQ. MT.)
1 Security Cabin 4.00
2 Visitors, Excise Room & Weigh Bridge 148.00
3 Store Room 800.00
4 Coal Storage & TFH Shed 1760.00
5 U.G. Water Tank 120.00
6 Plant-1 2142.00
7 Tank Farm-1 364.00
8 Tank Farm-2 364.00
9 Cooling Tower-1 72.00
10 Maintenance Area-1 399.00
11 FO Tank-1 270.00
12 Plant-2 2142.00
13 Coal Storage & TFH Shed 1760.00
14 Tank Farm-1 364.00
15 Tank Farm-2 364.00
16 Cooling Tower-2 72.00
17 Maintenance Area-2 313.50
18 FO Tank-2 270.00
19 Effluent Treatment Plant 2500.00
TOTAL 14228.50
20 Surrender Plot Area -2,566.31
21 Parking Area Provided 7,465.00
22 Open Land 27300.00
23 Green Belt Area Provided 25129.51
Total Plot Area 74123.01
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-4
FIGURE - 1.1
LOCATION OF THE PROJECT SITE
PROJECT SITEPROJECT SITE
Project
Site
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-5
KEY PLAN
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-6
GOOGLE IMAGE
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-7
GOOGLE IMAGE (10 KM RADIUS)
TOPOSHEET
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-8
PHOTOGRAPHS OF COMPANY (EXISTING)
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-9
FIGURE - 1.2
LAYOUT OF THE PLANT
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-10
TABLE 1.3
LIST OF PRODUCTS ALONG WITH PRODUCTION CAPACITY
QUANTITY
(MT/MONTH)
SR.
NO.
PRODUCT NAME
EXISTING ADDITIONAL
PROPOSED
TOTAL
CAS Nos. LD50
1
Vinyl Sulphone
(From Condensed VS as Raw
Material)
430 -430 0 77-77-0 32 mg/kg
2 Acetic Acid -92 % 100 -100 0 64-19-7 3310 mg/kg
3 Acetic Anhydride 0 1200 1200 108-24-7 1780 mg/kg
Total 530 1200 1200
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-11
1.2 PROJECT SETTINGS
M/s. Gujarat Dyestuff Industries will be located at longitude 72° 37’ 47.05” E and latitude
21° 42’ 10.00” N. Detailed Layout map of the plant is shown in Figure 1.2. M/s. Gujarat
Dyestuff Industries located near Bharuch and Vadodara which are all important industrial
and commercial centers of Gujarat and India. The nearest railway station is Dahej on broad
gauge section of Western Railway Line. The station is located at about 3.20 km from the
project site. Gujarat Dyestuff Industries is well connected from Bharuch-Dahej highway by
road transport. Nearest Airport is at Vadodara, which is located at a distance of about 75
km from project site.
The nearest large city is Vadodara, which is about 75 km away and has population of around
17.5 Lac. Water for industrial purpose shall be available from GIDC water supply.
Development of Communication systems is good in the region due to proximity to Bharuch
and Vadodara. The treated effluent shall be collected in central collection tank before it is
discharged in to deep sea via GIDC sewer. CETP, Dahej is under construction. Secured landfill
site and Common Incineration Facility operated by M/s. Bharuch Enviro Infrastructure Ltd. is
located at Dahej, about 4-5 km away from the project site.
The salient features of the site are as under:
1. Minimum distances:
a) From City : Vadodara 75 km
b) Village : Luvara 0.6 km South
c) Historical Site : None
d) Sanctuaries : None
e) Highway : State highway No. 64
f) Narmada Estuary : 2.3 km South
g) Secured landfill site : 4-5 km
2. Use of forest land : None
3. Use of prime agricultural land: None
4. Planned submergence : None
5. Displacement of population : None
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-12
1.2.1 KEY INFRASTRUCTURE FEATURES AND SETTLEMENTS
1.2.1.1 METHOD OF DATA PREPARATION
Key infrastructure features have been extracted from Survey of India (SoI) topographical
maps of 1:50,000 scale. The features have been updated using satellite data and have been
verified with ancillary information derived from TTK maps and guide maps. The locations of
the settlement have been extracted from Census of India (CoI) maps and verified by using SoI
topographical maps and satellite data.
1.2.1.2 DISTANCE OF NEAREST KEY INFRASTRUCTURE FEATURES FROM PROJECT SITE
The distance of railways and National and State highways are presented in Table 1.4 below.
TABLE 1.4
___________________________________________________________________________
DISTANCE OF NEAREST KEY INFRASTRUCTURE FEATURES FROM PROJECT SITE
Sr. No. Nearest Infrastructure Feature Distance from Project Area
1 Village Dahej 3.20 Km in West Direction
2 Village Jolva 1.80 Km in East Direction
2 NH-8 43.7 Km in East Direction
3 NH-8E 44.7 Km in West Direction
4 SH-6 0.44 Km in North Direction
5 SH-37 33.87 Km in West Direction
6 Railway line 1.0 Km in North-East Direction
7 Dahej, Nearest Railway Station 3.20 Km in West Direction
8 Narmada River 2.3 Km in South Direction
9 Bhavnagar Airport 30.0 Km in North-West Direction
1.2.1.3 MAP OF KEY INFRASTRUCTURE FEATURES AND SETTLEMENTS
A map depicting administrative boundaries up to Taluka level, showing locations of towns
and villages along with National and State highways, major and medium roads and railways
is presented as Figure 1.3. The map also shows the water bodies for better understanding of
project area. The map marks the area within 10 km with the project site as the center.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-13
FIGURE – 1.3
KEY INFRASTRUCTURE FEATURES AND SETTLEMENTS
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-14
FIGURE – 1.4
SATELLITE IMAGERY
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-15
1.3 PURPOSE OF EIA
The EIA study is carried out to assess the pollution potential and evaluate the adequacy and
efficiency of proposed Pollution Control & Environmental Management System.
1.4 OBJECTIVES OF EIA
The main objectives of the study are
1) To assess the background environmental status,
2) To identify potential sources of pollution,
3) To predict and evaluate the impact on environment along with pollution control
measures taken and
4) To prepare a comprehensive Environment Management Plan and Disaster
Management Plan.
1.5 METHODOLOGIES FOR EIA
Taking into consideration proposed expansion project activities and guidelines, an area of 10
km radius from the center of the project has been selected and is designated as the study
area for the purpose of EIA studies.
1.5.1 Base Line Condition
The samples of ambient air, ground and surface water and soil are collected and analyzed as
per the standard methods for establishing the baseline data and to determine the impact of
proposed activity on the same.
1.5.1.1 Ambient Air Environment
The air environment around the plant was studied by setting up seven locations within the
study area of 10 km radius from the project site and collection and monitoring the site
specific meteorological data, viz. wind speed, wind direction, humidity, rainfall and ambient
temperature was carried out. Design of network for ambient air quality monitoring locations
is based on guidelines provided by CPCB. The ambient air samples were collected and
analyzed for SPM, PM10, PM2.5, SO2, NOX, HCl, Cl2, O3, Pb, CO, NH3, C6H6, Benzo (a) Pyrene
(BaP), Arsenic (As), Nickel (Ni) & VOCs for identification, prediction, evaluation and
assessment of potential impact on ambient air environment.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-16
1.5.1.2 Ground And Surface Water Environment
The water required for domestic and industrial use is being made available from surface
water. Hence, to assess the physico-chemical quality of the water, a number of water
samples were collected and analyzed for pollution parameters viz., pH, TDS, Turbidity, BOD3,
COD, Fluorides, Chlorides, Sulphates, Nitrates, Ammonical Nitrogen, Hardness, Alkalinity, Oil
& Grease and some heavy metals in order to find out the contamination, if any.
1.5.1.3 Noise Environment
Noise pollution survey was conducted in the study zone. The anticipated noise sources were
industrial activities, which are likely to be increased due to proposed activity. Noise levels
were also recorded in surrounding villages for evaluating general scenario of the study area.
Hourly equivalent sound levels (Leq) were also recorded for calculating Day and Night noise
levels in the surrounding villages.
1.5.1.4 Soil Environment
Soil sampling and analysis was carried out to assess physico-chemical characteristics of the
soils and delineate existing cropping pattern, existing land use and topography, within the
study area.
1.5.1.5 Biological Environment
Keeping in view, the importance of biological component of total environment due to the
proposed project, biological characterization of terrestrial and aquatic environments,
changes in species diversity of flora and fauna in terrestrial as well as aquatic systems were
studied for impact analysis due to proposed project activity, if any.
1.5.1.6 Socio-economic Environment
Demographic and related socio-economic data was collected from website of Census Dept.,
GoI to assess socio-economic status of the study area. Assessment of impact on significant
historical, cultural, and archeological sites/places in the area and economic and employment
benefit arisen out from the project is given special attention.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-17
1.5.2 Identification of Pollution Source
Detailed study of manufacturing process for proposed scenario is carried out along with
input and output of materials, water, and wastewater as well as infrastructure facilities
available.
1.5.3 Evaluation of Pollution Control and Environmental Management System
The qualitative and quantitative analysis of various pollution sources as well as evaluation of
pollution control system is carried out.
1.5.4 Evaluation of Impact
A comprehensive evaluation of environmental impact with reference to proposed activities
is carried out.
1.5.5 Preparation of Environmental Management Plan
A comprehensive Environmental Management Plan has been prepared covering all the
aspects of pollution prevention measures, Air and Water Pollution Control measures,
Hazardous Waste Management, Environmental Surveillance and Environmental
Management Plan.
The present report is an EIA conducted during Post-Monsoon, 2016 (October 1, 2016 to
December 31, 2016). The baseline environmental conditions have been established through
field monitoring and literature survey. The contents of EIA report, details of data collection
and source of secondary data are presented in Figure 1.5.
1.6 STRUCTURE OF REPORT
The objective of the EIA study is preparation of Environment Impact Assessment (EIA) report
based on the guidelines of the Ministry of Environment and Forests (MoEF), CPCB and GPCB.
It incorporates the following.
• Chapter 1 is an Introduction to the Industry, their premises and surrounding areas. It
also expresses the basic objectives and methodologies for EIA studies and work to be
covered under each Environmental component.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 1-18
• Chapter 2 presents a Description of Project and Infrastructure facilities including all
industrial and environmental aspects of M/s. Gujarat Dyestuff Industries as well as
manufacturing process details. This chapter also gives information about raw
material storage and handling, water and wastewater quantitative details, air
pollution and control system, Hazardous Waste generation, storage facility and
disposal and utilities for expansion plant capacity. It also provides information about
proposed Environmental Management Facilities available at the project site.
• Chapter 3 covers Baseline Environmental Status including meteorological details,
Identification of baseline status of Environmental components of the surrounding
area covering air, water and land environment. Also presents a study of land use
pattern, Biological Environment & Socio-Economic Environment giving details about
District Bharuch, Taluka Vagra and the study area in terms of land use pattern,
biological environment, and socio-economic environment.
• Chapter 4 deals with Identification and Prediction of Impact, which provides
quantification of significant impacts of the proposed activities of plant on various
environmental components. Evaluation of the proposed pollution control facilities
has been presented.
• Chapter 5 deals with Environmental Monitoring Plan
• Chapter 6 describes Additional Studies i.e. Risk analysis and Disaster management
plan that shall be adopted by the company.
• Chapter 7 describes Environment Management Plan (EMP) to be adopted for
mitigation of anticipated adverse impacts if any and to ensure acceptable impacts.
• Chapter 8 describes Summary of the Project.
• Chapter 9 describes Details of Consultants Engaged.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
FIGURE 1.5
____________________________________________________________________________________________________________________
ACTIVITIES, SOURCES OF INFORMATION AND CONTENTS OF EIA REPORT
RECONNAISSANCE SURVEY OF PLANT ANNUAL REPORT
MARKET ASSESSMENT
PROJECT REPORT
INTRODUCTION
MONITORING OF AIR, WATER & SOIL QUALITY & NOISE
LEVELS
DATA ON METEOROLOGY, SOCIO-ECONOMIC STATUS &
BASIC AMENITIES
SITE VISITS AND INTERVIEWS WITH LOCALS
BASELINE
ENVIRONMENTAL
STATUS CENTRAL GROUND WATER BOARD
GUJARAT POLLUTION CONTROL BOARD (GPCB)
PUBLIC HEALTH ENGINEERING DEPT
AGRICULTURE DEPARTMENT
FOREST DEPARTMENT
IRRIGATION DEPARTMENT
EMPLOYMENT EXCHANGE
HEALTH CENTER
CENSUS OF INDIA
INDIAN METEOROLOGICAL DEPT
ENVIRONMETAL INFORMATION CENTRE
SOCIOECONOMIC
STATUS &
INFRASTRUCTURE
PROPOSED
EXPANSION
PLANT
FACILITY DESCRIPTION IMPACTS
METHODOLOGY OF
IMPACT
ASSESSMENT
IDENTIFICATION & ASSESSMENT OF IMPACTS
EVALUATION OF IMPACTS BY MATRIX METHOD
SOURCE OF INFORMATION OVERVIEW OF
E. I. A. STUDIES ACTIVITIES
ENVIRONMENTAL
MANAGEMENT PLAN DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR
POLLUTION CONTROL, HAZARDOUS WASTE
MANAGEMENT, GREEN BELT DEVELOPMENT
MONITORING PROGRAM
CONSEQUENCE ANALYSIS
PREPARATION OF DISASTER MANAGEMENT PLAN
RISK ASSESSMENT
STUDIES &
DISASTER
MANAGEMENT PLAN
SAFETY, HEALTH & ENVIRONMENTAL POLICY GUIDELINES BY
DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF LABOR
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 2-1
CHAPTER - 2
PROJECT DESCRIPTION AND INFRASTRUCTURAL FACILITIES
2.1 BACKGROUND
M/s. Gujarat Dyestuff Industries proposes expansion (product change) to produce Acetic
Anhydride at Plot No. Z- 25, 26, 27, 28, SEZ Dahej, Vill: Dahej, Tehsil: Vagra, Dist: Bharuch (Guj.).
2.1.1 TECHNICAL DETAILS OF THE PLANTS ALONG WITH DETAILS ON BEST AVAILABLE
TECHNOLOGIES (BAT), PROPOSED TECHNOLOGY AND REASONS FOR SELECTING THE SAME
• State-of-art plant for the manufacturing of Acetic Anhydride with automated operation.
Latest technology like DCS (distributed control system) considered with automated
sequential operation from centralized control room with monitoring and measuring
systems for safe operations.
• Emergency control center in the plant considered with display panel of the locations
• CC TV monitoring considered for critical operations.
2.1.2 DETAILS ON END USE OF EACH PRODUCT
• Organic Chemical Industry and Dye Intermediate industries using as a raw material or in
process.
• Agrochemical Industries.
• Pharmaceutical Industries using for manufacturing of Aspirin.
• In Starch industry used for the production of making modified starch.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 2-2
2.2 MANUFACTURING ACTIVITIES
Manufacturing activities proposed expansion project include various processes. The activities
shall also include operation of various utilities. The manufacturing process is described in
details in following sections. The list of products and their capacity is given in Table 1.3.
PROCESS DESCRIPTION
ACETIC ANHYDRIDE
Manufacturing Process:
The manufacture of Acetic Anhydride involves cracking down of Acetic Acid into Ketene at a
temperature of 600-700OC in a suitable designed Furnace and absorbing this Ketene gas into
Glacial Acetic Acid so as to form Acetic Anhydride.
Acetic acid will be vaporized and passed through a series of 3 cracking coils made of special
alloy steel, housed in a suitable furnace where a temperature of 10000C to 1100
0 C is
maintained. The products of cracking will be cooled in series of coolers where un-reacted acid
and water are removed, and the balance is taken to a series of absorption towers, where
Ketene is absorbed in acetic acid to form crude acetic anhydride. Crude acetic anhydride (75-85
%) as obtained from the first tower will be taken to the distillation and purification system
working under vacuum, where un-reacted acetic acid, will be returned to the absorption
system. The bottoms of this column are fed to a second column from which pure acetic
anhydride will be obtained as product from top. The dilute acid of 30-45 % strength is
concentrated in a separate plant for reuse.
Chemical Reaction:
CH3COOH 600O C -7 CH2CO +H2O –
CH2CO + CH3COOH (CH2CO)2 O + Heat
6000C -700
0C
Tri Ethyl
Phosphate
Acetic
Anhydride
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 2-3
Mass Balance:
Cracking Coil
In Furnace
Cracking of Acetic
Acetic Acid 800 kg
Heat
Mixture of Ketene & Acetic Acid
(420 Ketene +380 (Acetic acid +
water)
Series of coolers
380 (Acetic Acid+
water)
420 +600 (Acetic Acid+
Ketene)
Absorption
Tower
Crude AA
1st
Distillation
2nd
Distillation
1000 kg Pure Acetic
Acetic Acid recovery
plant
8 kg
Acetic acid =212 kg
Water=180 kg
Acetic Acid 600 kg
12 kg water
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 2-4
ACETIC ACID RECOVERY:
380 kg of Mixture (Acetic Acid + Water) is obtained from the series of coolers. This contains
55.8 % Acetic acid and 44.2% (212 kg acetic acid &180 kg water). Now this water has to be
separated from this acetic acid and this process is called recovery.
Mixture of water and acetic acid is treated with Ethyl Acetate, acetic acid will dissolve in Ethyl
Acetate and water will be separated, the water so separated is called condensate and mixture
of Ethyl Acetate and Acetic acid is separated through simple distillation.
2.3 RAW MATERIAL STORAGE AND HANDLING
The raw materials shall be received in M.S. tank, HDPE/fibre drums, Carboys and cylinders as
well as through tankers. All the storage tanks of hazardous flammable substances shall be
located within premises in separate storage area i.e. Tank farm area shall be stored in MS/SS
tank with all precautionary process instrumentation and safety appliances. Large area is
covered by well-designed warehouse, which shall be containing store office, raw material store,
finished product store, etc. The personnel protective equipments like hand gloves, safety shoes,
goggles, helmet, clothing, etc. are provided to those handling hazardous chemicals as per
requirement. All the motors and electrical connections are flame proof. List of raw materials
are given in Table-2.1.
TABLE – 2.1
LIST OF RAW MATERIALS
Sr. No. Name of Raw Material Quantity
MTPM
CAS Nos. LD50
1. Acetic Acid 1680 64-19-7 3310 mg/kg
2. Tri Ethyl Phosphate 0.1 78-40-0 1600 mg/kg
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 2-5
2.4 INFRASTRUCTURE FACILITIES
2.4.1 LAND
Total 74,123.01 sq. meter land area is available at site; out of this area about 25,129.51 sq.
meter (approx. 33.9%) area are covered as greenbelt and other forms of greenery.
2.4.2 TRANSPORTATION FACILITIES
Transportation of all the raw material and products shall be primarily by road only.
2.4.3 WATER AND WASTEWATER
Total water requirement is 34.5 KL/day [24 Fresh + 10.5 Reuse] which is met through GIDC
water supply. The wastewater generation is 14.5 KL/day in which the industrial 10.5 KL/Day
(processing 8.5 KL/Day is treated from inter reaction of RM, reused in cooling and 2.0 KL/Day is
cooling bleed off and utilized in greenbelt). So, there will be no industrial waste water
generation and Domestic Waste water generation 4 KL/Day is disposed in septic tank/soak pit.
Details of water consumption and wastewater generation are given in Table 2.2.
TABLE - 2.2
WATER CONSUMPTION AND WASTEWATER GENERATION
* W/w from inter reaction of RM will be reused in cooling
** Cooling bleed off will be utilize in greenbelt
Sr. No Sources Water consumption
KLD
W/W generation
KLD
A. Domestic 4.0 4.0
B. Gardening 2.0** --
C. Industrial
(i) Processing 0.0 8.5*
(ii) Cooling 28.5 (20+ 8.5*) 2**
Total Industrial 28.5 10.5
Total (A+B+C) 34.5 14.5
Less recycle 10.5 --
Fresh water 24 --
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 2-6
WATER BALANCE DIAGRAM
Water Balance Diagram
Total fresh water consumption = 34.5
{24.0 (fresh) +10.5 (reuse)}
Domestic 4.0 Process 0.0 Utility
20.0+8.5*=28.5
Greenbelt 2**
Cooling 28.5
Used for green belt
Bleed off 2** Total Volume 8.5 *
8.5 From
process Disposed to
sock pit 4.0
All units are in KLD
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 2-7
2.4.3.1 TREATMENT PROCESS
ETP DETAILS
There is waste water generation form process and cooling tower bleed off. This generated
waste water will be used for cooling tower make up and gardening purpose after proper
treatment.
The waste water generated from process shall pass through oil and grease removal trap where
oil and grease shall remove with oil and grease removal belt and collected Oil and Grease
collection tank. Then effluent shall be collected in Equalization cum Neutralization tank where it
is neutralize by hydrated lime. After neutralization the effluent is passed through filter press to
remove all the lime sludge and clear liquid is stored for further settling in the primary settling
tank. After this the effluent is stored in the treated effluent storage tank. The treated effluent is
further taken to cooling tower make up and gardening purpose.
In case of treated effluent having some impurities then treated effluent is further taken to the
incinerator for the necessary incineration. The Incinerator is designed as per the CPCB norms
having a capacity of 1000 kg/hr. the incinerator is having dual chambers in the primary chamber
the temperature is raised to 950 deg C and is further passed to the secondary chamber where
the maximum temperature 1150-1200 deg C is raised through the third chamber provided in
the secondary chamber. After secondary chamber there is a settling chamber from where all
the necessary heavy particles are arrested and flue gas so generated is passed to the scrubber
tank.
At the scrubber tank the circulation pump is provided to circulate and arrest the low density
particle in the flue gas so that the SPM level of the flue gas is attained as per the desired norms
of CPCB. After Scrubber tank a cyclonic separator is provided for further reducing the SPM level
before finally releasing the flue gas to a 30 m high chimney.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 2-8
ETP Flow Diagram:
W/w from
Process TSDF
Bleed off
If Required
ASH
Oil & Grease
removal
Trap
Equalization cum
Neutralization
Tank
FILTER
PRESS
INCINERATOR TREATED WATER
STORAGE TANK
PRIMARY
SETTLING TANK
TSDF,
NECL
Collection
Tank
Reuse in Cooling Tower
makeup and Gardening
Purpose
ETP UNIT SIZE
Sr. No. Name of Tank Size of Tank / Capacity No. of Tanks
1. Oil & Grease Removal Tank 3 m3 1
2. Equalization cum Neutralization Tank 20 m3 1
3. Chemical Dosing Tank - 1
3. Filter Press - 1
4. Primary Settling Tank 5 m3 1
5. Treated Water Storage Tank 20 m3 1
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 2-9
DETAILS OF INCINERATOR:
Incinerator technical details for 1000 kgs/ hour of Liquid Waste to be Incinerated
A GENERAL
1. Equipment Liquid Waste Incineator
2. Process Thermal destruction of Organic matter by mass
transport
3. Outlet Ash as residue
4. Waste feeding rate 1000 Liter per hour
5. Fuel Natural Gas
6. Power 30 KW, 420-450
7. Fuel Consumption 70 kgs per hour
8. Design Temperature 13000
C
B Incinerator
1. Installation Stationary
2. Installation Heating Load 6,00000 KCal/Hour, 3 burner
Incinerator Equipment List:
1. Furnace 2W* 6L* 2H MOC = MS 20625, 5mm thick plate inside 0.5 mm thick.
Asbestos sheet
25 mm cearawool lining
75 mm thick I.S. 8 insulation bricks lining
75 mm thick I.S. 8 insulation bricks lining
75 mm thick 70% high alumina lining
2. Chamber 3 Chambers.
1st
primary chamber temperature 9500 C
2nd
secondary chamber temperature 11000 C – 1200
0 C, Residence time for gas
2.3 sec in this chamber for complete combustion of fuel gases.
3rd
setting chamber for setting of particles in the gas flow.
3. Burner 2 burner for primary chamber each of 10 to 25 lit./hour.
1 burner for secondary chamber each of 10 to 25 lit./hour.
4. Ducting Incinerator to scrubber tank
MS 2062 with inside castable lining 25 mm thick.
5. Blower 5 H.P. 300 CFM, 2800 RPM for effective spraying of effluent, MOC = M.S. 2062.
6. Scrubber 900* 6 Mtr. Height with quenching & scrubbing system to bring down flue
gases below limits set by pollution control board.
7. Pumps (a). For Scrubber: 5 H.P. , R.P.M. = 1440
Capacity: 3 lit. per second, Head: 10 Mts.
(b) For effluent spray: 2 H.P., 1440 RPM
Capacity: 1 Lit/sec, Head: 10 Mts.
8. Tank Scrubbing Tank: 20 KL Capacity.
9. I.D. Fan 10 H.P., 4000 CFM, 1400 RPM, MOC: M.S. 2062.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 2-10
EXPECTED CHARACTERISTICS OF WASTEWATER BEFORE & AFTER TREATEMENT
Sr.
No.
PARAMETER Unit of
Measurement
Characteristics of
Untreated Waste
Water
Characteristics of
Treated Waste Water
1. pH - 5.0 – 9.0 6.5 -8.5
2. BOD mg/l 150 mg/L < 30 mg/L
3. COD mg/l 300 mg/L < 100 mg/L
4. TSS mg/l 800 mg/L < 100 mg/L
5. TDS mg/l 2100 mg/L < 2100 mg/L
6. Oil & Grease mg/l 10 mg/L < 10 mg/L
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 2-11
2.4.4 AIR POLLUTION AND CONTROL SYSTEM
Sr.
No.
Stack attached to Fuel Type Stack
Height/ dia
in m
APC measures Probable emission
� Existing Flue gas Stacks
1. Thermic Fluid Heater
(6 Lacs kcal/hr)
LDO/NG 20 _
2. D.G. Set (380 KVA) HSD 11 -
PM<150mg/Nm3
SO2 <100 ppm
NOx <50 ppm
� Existing Flue gas stack will be replaced after proposed expansion with following new stacks
1. Thermic Fluid Heater
(20 Lakh kcal/hrs)- 2
Nos
Coal 30 Air Pre heater
Multi cyclone
Bag filter
2. Furnace- 2 nos. FO 30 Air Pre heater
Heat recovery unit
Caustic Scrubber
PM<150mg/Nm3
SO2 <100 ppm
NOx <50 ppm
3. DG set ( stand by) HSD 11 -
4. Incinerator FO 30 Ventury scrubber
Packed bed
scrubber
Drop back
scrubber
PM<150mg/Nm3
SO2 <100 ppm
NOx <50 ppm
HCl <50mg/Nm3
CO <50mg/Nm3
TOC<20mg/Nm3
� Process Gas Stack : no Process Gas Stack
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 2-12
2.4.5 NOISE LEVEL AND CONTROL SYSTEM
Extensive oiling and lubrication and preventive maintenance shall be carried out to reduce
noise generation at source to the permissible limit. However, at place where noise levels can
exceed the permissible limit, Earplugs and Earmuffs are provided to those working in such area.
2.4.6 HAZARDOUS WASTE GENERATIONS AND DISPOSAL SYSTEM
Four Categories of Hazardous/Solid Wastes is generated from this Unit. Hazardous waste
generation after proposed expansion will be Used Oil @ 25 Lit/Month or 0.3 KL/Annum, ETP
Sludge @ 50 Kg/Month, Bags & Containers @ Nil and Incineration Ash @ 1.25 MT/Month. Used
Oil will be given to authorized recyclers. ETP Sludge & Incineration Ash will be sent to TSDF
facility i.e. NECL for land filling. Hazardous waste generation quantity, physical characteristics
and mode of disposal are given in Table-2.3.
TABLE-2.3
DETAILS OF HAZARDOUS WASTE AND ITS MODE OF DISPOSAL
Sr.
No
Waste
details
Category Existing
Quantity
Total
Proposed
MT/Month
Mode of Disposal
1. ETP Sludge 35.3 50 Kg/Month 50 Kg/Month Collection, storage,
transportation and disposal at
TSDF.
2. Incineration Ash 37.2 - 1.25
MT/Month
Collection, storage,
transportation and disposal at
TSDF.
3. Used Oil 5.1 25 Lit/Month 25 Lit/Month
Or
0.3 KL/Annum
Collection, storage,
transportation and selling to
authorized recyclers.
4. Bags and Containers 33.1 100
Nos. /Month
Nil Collection, storage,
transportation and selling to
authorized recyclers.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 2-13
2.5 DETAILS OF UTILITIES
Various utilities required for proper functioning of manufacturing plants. These utilities include
Boiler, Cooling Plant, Cooling Tower, DM Water Plant, Chilling Plant & Brine Unit, Air
Compressor, High Vacuum System, etc.
2.6 ELECTRICITY & FUEL REQUIREMENT
TOTAL POWER REQUIREMENT & SOURCE OF POWER
Estimated power requirement is 1200 KW. Power will be taken from Torrent Power. Stand by
DG set, 1 No. (1200 KVA each) will be used as emergency power back up.
FUEL REQUIREMENT
Sr.
No.
Fuel Requirement
1 Coal 20.16 TPD
2 FO (Furnace Oil) 4.64 KL/day
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 1
CHAPTER – 3
BASELINE ENVIRONMENTAL STATUS
The baseline status of environmental quality in the vicinity of project site serves as the basis
for identification, prediction and evaluation of impacts. The baseline environmental quality
is assessed through field studies within the impact zone for various components of the
environment, viz. air, noise, water, land and socio-economic. The baseline environmental
quality has been assessed in the Post-Monsoon Season of 2016 (October 1, 2016 to
December 31, 2016) in a study area of 10 km radial distance from the project site.
3.1 MICRO-METEOROLOGY OF THE AREA
The climate of Gujarat is varied, as it is moist in the southern districts and dry in the
northern region. The Arabian Sea and the Gulf of Cambay in the west and the forest-covered
hills in the east soften the rigours of climatic extremes, consequently reducing the
temperature and render the climate more pleasant and healthy. Bharuch lies along the
southern part of the state and experiences a climate with aridity index of 15 to 20 per cent
indicating adequate moisture availability in the soils for most part of the year. (Courtesy:
Environmental Information Centre, New Delhi)
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 2
3.1.1 TEMPERATURE DETAILS
Minimum, Maximum and Average Temperatures for Vadodara Station of the year 2016 are
given in Table 3.1.
TABLE 3.1
TEMPERATURE DATA
Month
(2016)
Minimum
Temperature
(0C)
Maximum
Temperature
(0C)
Average
Temperature
(0C)
January 12 30 22
February 11 36 24
March 17 41 29
April 24 42 31
May 27 44 36
June 26 42 31
July 23 26 30
August 25 35 29
September 21 38 30
October 17 39 29
November 15 36 28
December 10 34 21
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 3
3.1.2 RELATIVE HUMIDITY (RH)
Minimum, Maximum and Average Monthly Relative Humidity for Vadodara Station of the
year 2015 is given in Table 3.2.
TABLE 3.2
RELATIVE HUMIDITY DATA
Month
(2016) Minimum R.H.% Maximum R.H.% Average R.H.%
January 22 92 60
February 21 84 51
March 15 92 48
April 16 91 52
May 18 90 54
June 25 100 69
July 45 100 76
August 51 97 75
September 29 96 69
October 10 89 56
November 24 98 53
December 20 82 49
The mean monthly average of Relative Humidity values for Dahej station was recorded &
Relative Humidity is generally high during the period from June to September. The diurnal
variations are least during monsoon season. The diurnal variation is highest during summer
period.
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 4
3.1.3 RAINFALL
Rainfall data for Bharuch Station of the year 2016 is presented in Table 3.3.
TABLE 3.3
RAINFALL DATA
Month
(2016)
Monthly Total
(mm)
Numbers of Rainy Days
January 00 00
February 00 00
March 00 00
April 00 00
May 00 00
June 25 07
July 159 25
August 118 17
September 94 12
October 100 3
November 00 00
December 00 00
Total 496 64
Total rainfall, during the monsoon period, has been recorded as 496 mm.
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 5
3.1.4 WIND SPEED
Wind speed for Vadodara Station of the year 2016 is given in Table 3.4.
TABLE 3.4
WIND SPEED DATA
Sr. No. Month
(2016)
Average Wind speed
(KMPH)
1. January 08
2. February 07
3. March 10
4. April 13
5. May 15
6. June 16
7. July 18
8. August 14
9. September 12
10. October 09
11. November 07
12. December 08
Average 11.42
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 6
Site-specific mean meteorological data is given in Table-3.5. A meteorological station was
installed at the project site to know temperature, relative humidity, wind speed and wind
direction in Dahej SEZ during the study period:
TABLE - 3.5
___________________________________________________________________________
SITE SPECIFIC METEOROLOGICAL DATA
(PERIOD: OCTOBER, 2016 TO DECEMBER, 2016)
MONTH METEOROLOGICAL PARAMETER
OCTOBER’ 16 NOVEMBER’ 16 DECEMBER’ 16
Temperature (0C)
Min.
Max.
Avg.
16
36
26
13
34
27
12
31
23
Relative Humidity (%)
Min.
Max.
Avg.
18
98
56
20
97
57
19
89
52
Wind Speed (km/h)
Min.
Max.
Avg.
0
19
4
0
25
6
0
21
5
There was no rainfall during the study period. Diurnal shift in wind direction was not
observed during the study period. The wind rose diagram prepared from data collected at
site is shown in Figure 3.1A, while stability class diagram is shown in Figure 3.1B
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 7
FIGURE-3.1A
WIND ROSE DIAGRAM
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 8
0.4
83.7
8.7 7.1
0.2 0.0 0.00
10
20
30
40
50
60
70
80
90
100
%
Wind Class Frequency Distribution
Wind Class (m/s)Calms 0.50 - 2.10 2.10 - 3.60 3.60 - 5.70 5.70 - 8.80 8.80 - 11.10 >= 11.10
12.5
15.4
9.88.8
10.7
13.3
29.1
10
15
20
25
30
35
%
Stability Class Frequency Distribution
Stability ClassA B C D E F G
FIGURE-3.1B
STABILITY CLASS DISTRIBUTION
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 9
3.2 AIR ENVIRONMENT
3.2.1 DESIGN OF NETWORK FOR AMBIENT AIR QUALITY MONITORING LOCATIONS
The air quality status in the impact zone is assessed through a network of ambient air
quality monitoring locations. The tropical climatic conditions mainly control the transport
and dispersion of air pollutant emissions during various seasons.
The baseline studies for air environment include identification of specific air pollutants prior
to implementation of the project. The Environmental Impact Assessment (EIA) study
requires monitoring of baseline ambient air quality during one season. Accordingly, ambient
air quality monitoring was carried out in the pre-monsoon season from October 1, 2016 to
December 31, 2016. The main sources of air emissions in the study area are industrial
operations, vehicular emission, dust from paved and unpaved tracks, fuel burning for
domestic purpose, and wind blown dust from open land.
Nine Ambient Air Quality Monitoring (AAQM) locations were selected based on guidelines of
ambient air quality network siting criteria of CPCB. All AAQM locations were selected within
the study area of 10 km radial distance from the project site covering all zones i.e. industrial,
residential, rural & other area as per NAAQS and keeping in mind local topography and
meteorology of the area.
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 10
3.2.2 METHODOLOGY FOR AMBIENT AIR QUALITY MONITORING
The ambient air quality monitoring was carried out in accordance with National Ambient Air
Quality Standards (NAAQS) of CPCB. Ambient Air Quality Monitoring (AAQM) was carried
out at ten locations during the study period. The locations of the different stations with
respect to its distance and direction from project site are shown in Table-3.6 and Figure-3.2
respectively.
The conventional and project specific parameters such as Suspended Particulate Matter,
Respirable Suspended Particulate Matter (RSPM-PM10), Respirable Suspended Particulate
Matter (RSPM-PM2.5), Sulphur Dioxide (SO2), Oxides of Nitrogen (NOx), Ozone (O3), Lead
(Pb), Carbon Monoxide (CO), Ammonia (NH3), Benzene (C6H6), Benzo (a) Pyrene (BaP),
Arsenic (As), Nickel (Ni), Chlorine (Cl2), HCl & VOCs were monitored at site.
The values for mentioned concentrations of various pollutants at all the monitoring
locations were processed for different statistical parameters like arithmetic mean, minimum
concentration, and maximum concentration and percentile values. The existing baselines
levels of Suspended Particulate Matter, Respirable Suspended Particulate Matter (RSPM-
PM10), Respirable Suspended Particulate Matter (RSPM-PM2.5), Sulphur Dioxide (SO2),
Oxides of Nitrogen (NOx), Ozone (O3), Lead (Pb), Carbon Monoxide (CO), Ammonia (NH3),
Benzene (C6H6), Benzo (a) Pyrene (BaP), Arsenic (As), Nickel (Ni), Chlorine (Cl2) ), HCl & VOCs
are expressed in terms of various statistical parameters as given in Tables-3.7 National
ambient air quality standards are enclosed as Annexure-1.
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 11
TABLE - 3.6
___________________________________________________________________________
DETAILS OF AMBIENT AIR QUALITY MONITORING LOCATIONS
SR.
NO.
NAME OF VILLAGE BEARING
W.R.T.
PROJECT
SITE
APPROXIMATE RADIAL
DISTANCE FROM PROJECT
SITE (KM)
TYPE
OF
AREA
1 Project-site (A1) --- --- Industrial
2 Dahej (A2) W 3.20 Residential
3 Lakhigam (A3) SW 5.80 Residential
4 Luvara (A4) SW 6.20 Residential
5 Ambetha (A5) SW 3.00 Residential
6 Jageshwar (A6) SW 4.60 Residential
7 Vadadla (A7) N 1.60 Residential
8 Jolva (A8) E 1.80 Residential
9 Kadodara (A9) NNE 4.00 Residential
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 12
FIGURE - 3.2
___________________________________________________________________________
LOCATION OF AMBIENT AIR QUALITY MONITORING STATIONS
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 13
TABLE 3.7
___________________________________________________________________________
AMBIENT AIR QUALITY STATUS (October-16 to December-16) Unit: µg/m3
SPM PM10 PM2.5 SO2 NOx O3 SR.
NO.
SAMPLING
LOCATION AVERAGE
1 Project-site (A1) 121.60 81.06 44.83 17.64 19.48 10.93
2 Dahej (A2) 113.80 73.42 41.62 17.29 18.36 10.69
3 Lakhigam (A3) 116.00 77.05 41.99 16.06 17.69 10.38
4 Luvara (A4) 114.60 73.65 43.16 13.48 15.39 10.53
5 Ambetha (A5) 116.70 75.32 44.63 12.41 14.08 11.02
6 Jageshwar (A6) 119.60 78.02 43.97 16.56 18.48 10.77
7 Vadadla (A7) 112.90 72.67 45.99 11.97 14.06 10.73
8 Jolva (A8) 114.90 75.15 44.62 14.93 16.86 10.25
9 Kadodara (A9) 115.40 74.89 46.82 15.26 16.91 10.57
Limit 500 100 60 80 80 100
TABLE 3.7 (CONTD.)
___________________________________________________________________________
AMBIENT AIR QUALITY STATUS (October-16 to December-16)
Pb
(µg/m3)
NH3
(µg/m3)
CO
(mg/m3)
C6H6
(µg/m3)
BaP
(ng/m3)
As
(ng/m3)
Ni
(ng/m3)
SR.
NO.
SAMPLING
LOCATION
AVERAGE
1 Project-site (A1) 0.92 BDL 1.27 BDL BDL BDL 10.79
2 Dahej (A2) BDL 1.75 1.28 BDL BDL BDL 10.47
3 Lakhigam (A3) BDL 1.74 1.21 BDL BDL BDL 10.47
4 Luvara (A4) BDL 1.37 1.28 BDL BDL BDL 10.86
5 Ambetha (A5) BDL 1.61 1.26 BDL BDL BDL 10.75
6 Jageshwar (A6) BDL BDL 1.21 BDL BDL BDL 10.65
7 Vadadla (A7) BDL 1.71 1.24 BDL BDL BDL 10.48
8 Jolva (A8) BDL 1.58 1.20 BDL BDL BDL 10.44
9 Kadodara (A9) BDL BDL 1.23 BDL BDL BDL 10.49
Limit 1 400 4 5 1 6 20
Note: BDL = Below Detectable Limit
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 14
TABLE 3.7 (CONTD.)
___________________________________________________________________________
AMBIENT AIR QUALITY STATUS (October-16 to December-16) Unit: µg/Nm3
HC
(ppm)
HCl VOCs
(Isobutylene Equivalent)
(ppm)
SR.
NO.
SAMPLING
LOCATION
AVERAGE
1 Project-site (A1) BDL BDL 0.8
2 Dahej (A2) BDL BDL 0.8
3 Lakhigam (A3) BDL BDL 0.5
4 Luvara (A4) BDL BDL 0.7
5 Ambetha (A5) BDL BDL 0.6
6 Jageshwar (A6) BDL BDL 0.3
7 Vadadla (A7) BDL BDL 0.5
8 Jolva (A8) BDL BDL 0.6
9 Kadodara (A9) BDL BDL 0.7
Limit 160 - -
Note: ND – Not Detected
Note:
PARAMETER TEST METHOD
Particulate Matter (PM10) IS 5182 (PART 23):2006 (Cyclonic Flow Technique) Gravimetric Method
Particulate Matter (PM2.5) Gravimetric Method CPCB Method (Vol.I, May-2011)
Sulphur Dioxide (SO2) IS 5182 (PART-2):2001
Nitrogen Dioxide (NO2) IS 5182 (PART-6):2006
Ozone (O3) IS 5182 (PART-9) :1974 **
Lead (Pb) CPCB Method (Vol.I, May-2011)
Ammonia (NH3) Indophenol Blue Method *Carbon Monoxide (CO) Digital CO Analyzer
**Benzene (C6H6) IS 5182 (PART XI):2006/CPCB Method
**Benzo (α) Pyrene (BaP) CPCB Method (Vol.I, May)
**Arsenic (As) CPCB Method (Vol.I, May)
**Nickel (Ni) CPCB Method (Vol.I, May)
**Hydro Carbon (HC) Digital Gas Analyzer
VOC – Aeroqual Series 300 (Sensor 0 – 25 ppm)
Minimum Detectable Limit – 0.1 ppm
Minimum Detection Limit: **
Lead (as Pb) : 0.5 µg/m3
**Benzo (α) Pyrene (BaP) : 0.5 ng/m
3
Ammonia (NH3) : 1 µg/m3
**Arsenic (as As) : 2 ng/m
3
Carbon Monoxide(as CO) : 1.14 mg/m3
**Nickel (as Ni) : 10 ng/m
3
**Benzene (as C6H6) : 2 µg/m
3
**Hydrocarbon(HC) : 1 ppm
*Not in our NABL Scope,
**Analysed by Sub Contractor (Not in our NABL Scope)
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 15
TABLE 3.7 (CONTD.)
AMBIENT AIR QUALITY STATUS - MINIMUM, MAXIMUM, ARITHMETIC MEAN, 98TH
PERCENTILE VALUE & AVERAGE (24 HRS.)
(OCTOBER’2016 TO DECEMBER’2016) Unit: µg/m3
SR.
NO.
SAMPLING LOCATION PM10 PM2.5 SO2 NOx O3
1 Project-site (A1)
Average 81 45 18 19 11
Min – Max 77-84 41-49 13-19 13-21 9-14
Arithmetic Mean 81 45 18 20 11
98th
Percentile 84 49 19 21 14
2 Dahej (A2)
Average 73 42 17 18 11
Min – Max 72-79 38-44 12-19 11-22 8-14
Arithmetic Mean 73 42 17.5 19 10.5
98th
Percentile 77.16 44 19 22 14
3 Lakhigam (A3)
Average 77 42 16 18 10
Min – Max 73-80 41-45 10-18 10-19 7-14
Arithmetic Mean 77 42 16.5 18 10
98th
Percentile 80 44.54 18 19 14
4 Luvara (A4)
Average 74 43 13 15 11
Min – Max 71-79 30-46 10-17 12-19 8-14
Arithmetic Mean 73 43 13.5 15.5 10.5
98th
Percentile 78.08 46 17 19 13.54
5 Ambetha (A5)
Average 75 45 12 14 11
Min – Max 70-78 41-49 10-16 10-17 9-15
Arithmetic Mean 75 44.5 12 14 11
98th
Percentile 78 49 15.54 17 14.54
6 Jageshwar (A6)
Average 78 44 17 18 11
Min – Max 74-83 37-46 10-19 12-22 8-14
Arithmetic Mean 77.5 45 17 19.5 11
98th
Percentile 83 46 18.54 22 14
7 Vadadla (A7)
Average 73 46 12 14 11
Min – Max 71-81 42-49 9-15 9-16 7-14
Arithmetic Mean 72 46 11.5 14 11
98th
Percentile 80.08 49 15 16 13.54
8 Jolva (A8)
Average 75 45 15 17 10
Min – Max 70-78 41-49 12-19 12-19 7-15
Arithmetic Mean 75 44.5 14.5 17 10
98th
Percentile 78 49 19 19 14.54
9 Kadodara (A9)
Average 75 47 15 17 11
Min – Max 70-82 36-50 12-18 12-20 8-14
Arithmetic Mean 75 48 15.5 17 10.5
98th
Percentile 80.16 49.54 18 19.54 13.54
Limit 100 60 80 80 100
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 16
3.3 NOISE ENVIRONMENT
The objective of the noise pollution survey around the project site was to identify existing
noise sources and to measure background noise levels. Major noise sources in the study
area are industries, commercial, and vehicular movements. The noise monitoring locations
are given in Table-3.8A and shown in Figure-3.3 while the results of noise monitoring are
given in Table 3.8B.
3.3.1 METHODOLOGY FOR NOISE MONITORING
The noise monitoring was carried out at seven locations in day time during (6 am to 9 pm)
and at night time (9 pm to 6 am) in the study area covering all the areas i.e. industrial,
commercial, residential and silence zones as mentioned in Noise (Pollution and Control)
Rules, 2000. CPCB Recommendations for community noise exposure are attached as
Annexure – 3. Hourly Equivalent noise levels Leq (day) and Leq (night) were measured at
each monitoring locations. One day monitoring on December 02, 2016 during day and night
time was carried out at all the locations. Besides, damage risk criteria for hearing loss given
by Occupational Safety & Health Administration (OSHA) are enclosed as Annexure - 2.
The noise level measured in study area at different locations is given in Table 3.8. The noise
sources identified around the site are vehicular traffic, industrial and commercial activities.
CPCB recommendation for community noise exposure in different category of area (i.e.
residential, commercial, industrial and silence zone) is enclosed as Annexure - 3 while
Damage risk criteria for hearing loss given by occupational safety & health administration
(OSHA) is enclosed as Annexure - 2. The noise levels were below the stipulated standards of
CPCB.
Noise levels due to transportation were also measured at three different locations. The
equivalent noise level Leq (60 min average) measured at a distance of 10 m and 20 m from
the edge of the road at each of the locations are presented in Table 3.9. The communities
close to the project site are not exposed to major noise sources. The commercial activities
and transport apart from natural sources contribute to community noise levels.
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 17
TABLE - 3.8A
DETAILS OF AMBIENT NOISE QUALITY MONITORING LOCATIONS
SR.
NO.
NAME OF
VILLAGE
BEARING W.R.T.
PROJECT SITE
APPROXIMATE RADIAL
DISTANCE FROM PROJECT
SITE (KM)
1 Project-site (N1) --- ---
2 Dahej (N2) W 3.20
3 Lakhigam (N3) SW 5.80
4 Luvara (N4) SW 6.20
5 Ambetha (N5) SW 3.00
6 Jageshwar (N6) SW 4.60
7 Vadadla (N7) N 1.60
8 Jolva (N8) E 1.80
9 Kadodara (N9) NNE 4.00
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 18
FIGURE - 3.3
__________________________________________________________________________
LOCATION OF AMBIENT NOISE LEVEL MONITORING STATIONS
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 19
TABLE - 3.8B
___________________________________________________________________________
BACKGROUND NOISE LEVELS
SR.
NO.
LOCATION NOISE LEVEL IN
dB(A)
TIME
1 Project-site (N1) 50-52
41-45
Day
Night
2 Dahej (N2) 51-54
43-45
Day
Night
3 Lakhigam (N3) 51-54
42-45
Day
Night
4 Luvara (N4) 49-53
42-45
Day
Night
5 Ambetha (N5) 51-54
42-44
Day
Night
6 Jageshwar (N6) 47-53
42-44
Day
Night
7 Vadadla (N7) 50-53
42-44
Day
Night
8 Jolva (N8) 52-55
44-45
Day
Night
9 Kadodara (N9) 47-52
41-44
Day
Night
TABLE - 3.9
___________________________________________________________________________
NOISE LEVELS DUE TO TRANSPORTATION
SR.
NO.
SAMPLING LOCATION
NOISE LEVEL IN
dB(A)
TIME
1. N1(T): Near Jolva By-Pass 57-63
51-54
Day
Night
2. N2 (T): Near Kadodara By-Pass Road 56-63
50-54
Day
Night
3. N3 (T): Near Dahej SEZ 61-65
52-54
Day
Night
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 20
TABLE - 3.9 (CONTD.)
___________________________________________________________________________
INDUSTRIAL NOISE LEVELS
SR.
NO.
SAMPLING LOCATION
NOISE LEVEL IN dB(A) TIME
1. Nr. Hemani Intermediates Pvt. Ltd. 69-74
64-68
Day
Night
2. Nr. Gujarat Alkalies & Chemical Ltd. 68-74
64-68
Day
Night
3. Nr. Gujarat Fluoro Chemicals Ltd. 67-74
63-68
Day
Night
4. Nr. Luna Chemical Industries (P) Ltd. 69-73
65-68
Day
Night
5. Nr. NOCIL Ltd. 68-74
63-69
Day
Night
6. Nr. Meghmani Finechem Ltd. 68-73
62-66
Day
Night
7. Nr. Welspun Corp. Ltd. 68-69
63-67
Day
Night
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 21
3.4 WATER ENVIRONMENT
3.4.1 RECONNAISSANCE
The average annual rainfall in the region is about 496 mm. The baseline water quality status
in the region is established by analyzing surface water and ground water. Water
requirement at site would be met through GIDC water supply.
3.4.2 METHODOLOGY FOR WATER QUALITY MONITORING
Nine nos. of ground water and two nos. of surface water samples were collected from the
study area. These samples were analyzed for physic-chemical parameters to ascertain the
baseline status in the existing surface water and ground water bodies. Samples were
collected once, on December 1-10, 2016, during the study period and analyzed as per
standard methods of water and wastewater analysis (APHA). The Indian standard
specification for drinking water IS: 10500-2012 and CPCB water use criteria are enclosed as
Annexure – 5 & 6 respectively. The details of surface and ground water sampling locations
are given in Table 3.10. And sampling locations of water quality monitoring are shown in
Figure 3.4. The Indian standard specification for drinking water is enclosed as Annexure – 5.
The physico- chemical characteristics of the different water samples are presented in the
Tables 3.11.
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 22
TABLE – 3.10
SAMPLING LOCATIONS FOR MONITORING SURFACE AND GROUND WATER QUALITY
SR.
NO.
SAMPLING
LOCATIONS
BEARING
W. R.T.
PROJECT
SITE
APPROXIMATE
RADIAL DISTANCE FROM
PROJECT SITE
(KM)
1 Project-site (GIDC Water) --- ---
2 Dahej (GW1) W 3.20
3 Lakhigam (GW2) SW 5.80
4 Luvara (GW3) SW 6.20
5 Ambhetha (GW4) SW 3.00
6 Jageshwar (GW5) SW 4.60
7 Vadadla (GW6) N 1.60
8 Jolva (GW7) E 1.80
9 Kadodara (GW8) NNE 4.00
10 Vadadla Pond (SW1) N 1.60
11 Kadodara Pond (SW2) NNE 4.00
GW= Ground water, SW= Surface water
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 23
FIGURE - 3.4
__________________________________________________________________________
LOCATIONS OF WATER SAMPLING STATIONS
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 24
TABLE - 3.11
WATER QUALITY- PHYSICAL PARAMETERS
SR.
NO.
SAMPLING
LOCATION
pH TEMPERATURE
(0C)
TURBIDITY
(NTU)
T.D.S.
(mg/L)
T.S.S.
(mg/L)
1 Project-site (GIDC Water) 7.49 24.9 0.3 384 8
2 Dahej (GW1) 8.09 25.1 0.1 1036 6
3 Lakhigam (GW2) 7.02 25.2 0.6 230 2
4 Luvara (GW3) 7.88 25.2 0.5 342 46
5 Ambhetha (GW4) 7.09 25.1 0.3 198 2
6 Jageshwar (GW5) 7.80 25.0 0.3 3236 26
7 Vadadla (GW6) 7.88 25.0 0.2 206 3
8 Jolva (GW7) 7.68 25.1 0.2 224 8
9 Kadodara (GW8) 7.31 25.1 0.2 372 6
10 Vadadla Pond (SW1) 7.47 25.0 0.4 480 2
11 Kadodara Pond (SW2) 7.77 25.0 0.5 1200 18 GW= Ground water, SW= Surface water
TABLE - 3.11 (CONTD.)
WATER QUALITY - NUTRIENTS, OXYGEN DEMAND AND ORGANIC PARAMETERS
AMMONICAL
NITROGEN
DO COD BOD327
OIL &
GREASE
SR.
NO.
SAMPLING LOCATION
(mg/L)
1 Project-site (GIDC Water) <0.4 7.52 10.37 <1.0 <0.4
2 Dahej (GW1) <0.4 6.44 9.76 <1.0 <0.4
3 Lakhigam (GW2) <0.4 5.98 9.28 <1.0 <0.4
4 Luvara (GW3) <0.4 6.44 12.76 <1.0 <0.4
5 Ambhetha (GW4) <0.4 6.0 10.26 <1.0 <0.4
6 Jageshwar (GW5) <0.4 6.58 16.25 <1.0 <0.4
7 Vadadla (GW6) <0.4 6.44 19.52 <1.0 <0.4
8 Jolva (GW7) <0.4 6.38 19.28 <1.0 <0.4
9 Kadodara (GW8) <0.4 6.28 10.28 <1.0 <0.4
10 Vadadla Pond (SW1) <0.4 5.64 39.04 1.68 <0.4
11 Kadodara Pond (SW2) <0.4 6.0 48.84 5.64 <0.4 GW= Ground water, SW= Surface water
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 25
TABLE - 3.11 (CONTD.)
WATER QUALITY - INORGANIC PARAMETERS
T.H. =Total Hardness, C.H. =Calcium Hardness
TABLE - 3.11 (CONTD.)
WATER QUALITY - HEAVY METALS
Na T-Cr+3
Cu Pb Fe Zn K Ni Cd
SR.
NO.
SAMPLING
LOCATION (mg / L)
1 Project-site (GIDC
Water)
26.45 <0.005 BDL <0.005 BDL <0.022 1.50 BDL <0.001
2 Dahej (GW1) 417.91 <0.005 BDL <0.005 0.49 <0.022 101.8 BDL <0.001
3 Lakhigam (GW2) 10.76 <0.005 BDL <0.005 0.13 <0.022 1.6 BDL <0.001
4 Luvara (GW3) 11.8 <0.005 BDL <0.005 0.23 <0.022 1.9 BDL <0.001
5 Ambhetha (GW4) 42.24 <0.005 BDL <0.005 0.18 <0.022 19.8 BDL <0.001
6 Jageshwar (GW5) 608.6 <0.005 BDL 0.008 0.53 0.182 213.8 BDL <0.001
7 Vadadla (GW6) 14.52 <0.005 BDL <0.005 0.13 <0.022 1.7 BDL <0.001
8 Jolva (GW7) 12.88 <0.005 BDL <0.005 1.17 <0.022 1.4 BDL <0.001
9 Kadodara (GW8) 58.3 <0.005 BDL <0.005 0.44 <0.022 17.2 BDL <0.001
10 Vadadla Pond
(SW1)
57.6 <0.005 BDL <0.005 3.47 <0.022 6.3 BDL <0.001
11 Kadodara Pond
(SW2)
28.51 <0.005 BDL <0.005 3.79 <0.022 10.4 BDL <0.001
BDL= Below Detectable Limit
Minimum Detection Limit:
Phenol : 0.01 mg/L Total Iron (as Fe) : 0.01 mg/L
Copper (as Cu) : 0.05 mg/L **
Zinc (as Zn) : 0.022 mg/L **
Lead (as Pb) : 0.005 mg/L Nickel (as Ni) : 0.03 mg/L *Not in our NABL Scope,
**Analysed by Sub Contractor (Not in our NABL Scope)
TOTAL
ALKALINITY
(AS CaCO3)
T.H.
(AS
CaCO3)
C.H.
(AS
CaCO3)
Cl- SO4
—2 PHENOL Mg SR.
NO.
SAMPLING LOCATION
(mg/L)
1 Project-site (GIDC
Water)
162 149.6 67.42 62.18 39.62 BDL 19.96
2 Dahej (GW1) 99 135.1 80.64 110.84 10.56 BDL 13.22
3 Lakhigam (GW2) 99 112.9 78.69 79.28 10.29 BDL 8.32
4 Luvara (GW3) 99 133 88.70 144.6 69.62 BDL 10.77
5 Ambhetha (GW4) 84.15 171.4 86.68 68.32 9.75 BDL 20.57
6 Jageshwar (GW5) 237.6 1108.8 852.8 1080.2 204.4 BDL 62.21
7 Vadadla (GW6) 113.9 133.1 76.64 89.95 147.1 BDL 13.72
8 Jolva (GW7) 118.8 153.2 100.5 106.99 12.16 BDL 12.73
9 Kadodara (GW8) 99 167.3 94.75 73.91 16.84 BDL 17.63
10 Vadadla Pond (SW1) 138.6 116.9 76.62 68.43 15.64 BDL 9.79
11 Kadodara Pond (SW2) 420.8 231.8 195.6 340 48.39 BDL 8.81
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 26
3.5 LAND ENVIRONMENT
3.5.1 METHODOLOGY FOR SOIL MONITORING
Soil samples were collected from nine different locations during study on December 01-10,
2016 in the study area (0-20 cm depth). The locations selected for collection of soil samples
are shown in Figure 3.5 and presented in Table 3.12. The analysis results of soil samples are
given in Table 3.13.
TABLE - 3.12
SAMPLING LOCATIONS: SOIL QUALITY
SR.
NO.
SAMPLING
LOCATION
BEARING
W.R.T. PROJECT
SITE
APPROXIMATE RADIAL
DISTANCE
FROM PROJECT SITE
(KM)
1 Project-site (S1) --- ---
2 Dahej (S2) W 3.20
3 Lakhigam (S3) SW 5.80
4 Luvara (S4) SW 6.20
5 Ambetha (S5) SW 3.00
6 Jageshwar (S6) SW 4.60
7 Vadadla (S7) N 1.60
8 Jolva (S8) E 1.80
9 Kadodara (S9) NNE 4.00
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 27
FIGURE - 3.5
___________________________________________________________________________
LOCATIONS OF SOIL SAMPLING STATIONS
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 28
TABLE - 3.13
PHYSICO-CHEMICALS CHARACTERISTICS OF SOIL
Sr.
No.
Parameter Project
Site (S1)
Dahej
(S2)
Lakhigam
(S3)
Luvara
(S4)
Ambhetha
(S5)
Jageshwar
(S6)
Vadadla
(S7)
Jolva
(S8)
Kadodara
(S9)
1. pH 7.79 7.02 7.37 7.28 7.39 7.38 7.32 7.51 7.61
2. Temperature (0C) 24.9 25.2 25.2 25.2 25.2 25.2 25.2 25.2 25.2
3. Moisture (%) 12.88 12.31 10.12 11.80 12.49 11.01 10.91 11.78 10.35
4. SO4—2
(mg/kg) 129.6 8.7 252.7 232.6 668.4 148.3 2.67 592.2 77.54
5. Chloride (mg/kg) 172.5 3178 81.30 54.20 1330 172.4 172.4 1453 147.8
6. Total hardness (mg/kg) 745.9 1048.3 78.62 96.70 241.9 786.2 766 624.9 786.2
7. Organic Matter (&) 5.33 4.83 5.71 6.22 6.10 5.8 7.43 8.5 5.25
8. Bulk density (g/cm3) 1.37 1.26 1.18 1.26 1.25 1.18 1.18 1.34 1.25
9. Calcium (mg/kg) 153.5 298.9 16.96 23.43 48.4 282.8 266 210 145.4
10. WHC (%) 54.7 83.6 77.93 77.12 84.94 96.53 73.47 65 88.51
11. Porosity (%) 48.30 37.26 37.29 37.26 37.26 37.29 37.29 37.23 37.26
12. Grain Size (%)
Gravel 02 00 02 10 00 02 00 02 02
Coarse sand 03 03 12 04 04 03 06 02 03
Medium sand 06 05 34 11 06 08 11 12 13
Fine sand 07 10 09 18 03 08 06 12 12
Silt + Clay 82 82 43 57 87 79 77 72 70
TABLE - 3.13 (CONTD.)
PHYSICO-CHEMICALS CHARACTERISTICS OF SOIL (HEAVY METALS)
Sr.
No.
Parameter
(mg/kg)
Project Site
(S1)
Dahej
(S2)
Lakhigam
(S3)
Luvara
(S4)
Ambhetha
(S5)
Jageshwar
(S6)
Vadadla
(S7)
Jolva
(S8)
Kadodara
(S9)
1. Na 580 694 573 768 623 438 956 584 641
2. Cu+2
BDL BDL BDL BDL BDL BDL BDL BDL BDL
3. Fe+3
121.4 8.7 48.5 40.9 429.5 265.9 33 9.10 38.8
4. K 402 332 869 925 556 341 822 451 485
5. Ni+2
BDL BDL BDL BDL BDL BDL BDL BDL BDL
6. Pb+2
1.64 2.17 0.91 2.24 2.02 1.31 BDL BDL BDL
Note:
Minimum Detectable Limit:
Nickel – 0.1 mg/kg
Copper – 0.5 mg/kg
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 29
3.5.2 SOIL CLASSIFICATIONS
3.5.2.1 METHOD OF PREPARATION
The soil classification map has been prepared by extracting the areas under different soil
categories from the 1:500,000 scale maps prepared by National Bureau of Soil Survey and
Land use Planning (NBSS & LUP). The maps were scanned and geo-referenced before taking
out the information for the desired area. The study area, towns and village locations have
been added for ease of spatial reference. Locations of towns and villages have been extracted
from Census of India (CoI) maps, Survey of India (SoI) topographical maps and confirmed with
satellite data.
3.5.2.2 DESCRIPTION OF SOIL CHARACTERISTICS AND AREA UNDER DIFFERENT SOIL TYPES
Table 3.14 provides the soil type and area under different soils within the area of interest.
3.5.2.3 SOIL CHARACTERISTICS MAP
A map depicting the characteristics of major soil categories in the project area is presented
in Figure 3.6. The map also marks the area within 5 km with project site as a centre. Town
and village locations are also depicted to facilitate ease of reference.
TABLE 3.14
SOIL CHARACTERISTICS UNDER PROJECT AREA
CATEGORY AREA_
SQ KM DESCRIPTION TAXONOMY1 TAXONOMY2 CLASS SUB_CLASS
A 88.93
Very deep, moderately well drained,
calcareous, fine soils on very gently
sloping alluvial plain with slight
erosion and moderate salinity;
associated with very deep moderately
well drained, calcareous, fine soils
with moderate erosion.
Fine, montmorillonitic
(calcareous),
hyperthermic Typic
Chromusterts
Fine,
montmorillonitic
(calcareous)
hyperthermic Udic
Chromusters
Soils of west
coast (soils
of Gujarat
plain)
Soils of
alluvial
plains
C 108.64
Very deep, poorly drained, calcareous
fine-loamy soils on very gently sloping
coastal plain with moderate erosion
and strong salinity; associated with
very deep , imperfectly drained,
calcareous, fine soils with severe
erosion and strong salinity.
Fine-loamy, mixed
(calcareous),
hyperthermic Aeric
Halaquepts
Fine, mixed
(calcareous),
hyperthermic
Typic Halaquepts
Soils of west
coast (soils
of Gujarat
plain)
Soils of
coastal
plains
- 116.43 Sea - - - -
(Courtesy: Environmental Information Centre, New Delhi)
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 30
FIGURE-3.6
SOIL CHARACTERISTICS MAP
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 31
3.6 GEOLOGICAL DATA
3.6.1 METHOD OF PREPARATION
The geological classification map has been prepared by extracting the areas under different
geological classification from the 1:2 million scale maps prepared by Geological Survey of
India (GSI) for the Dahej, Taluka Vagra, and District: Bharuch of Gujarat. The map text has
been modified in consultations with the Department of Geology, University of Delhi. The
project area, towns and village locations have been added for ease of spatial reference.
Locations of towns and villages have been extracted from CoI maps, SoI topographical maps
and confirmed with satellite data.
3.6.2 DESCRIPTION OF GEOLOGICAL CLASSIFICATION AND AREA UNDER DIFFERENT
FORMATIONS
Table 3.15 provides the major geological features and area under different formations.
3.6.3 GEOLOGICAL MAP
A map depicting the major geological features in the project area is presented in Figure 3.7.
The map also marks the area within 10 km with project site as a centre. Town and village
locations are also depicted to facilitate ease of reference.
TABLE – 3.15
DESCRIPTION OF GEOLOGICAL CLASSIFICATION AND AREA UNDER DIFFERENT
FORMATIONS
AREA_SQKM INDEX AGE DESCRIPTION
197.58
Q = Undifferentiated
fluvial/ Aeolian/
coastal sediments.
Holocene in Quaternary period (1
million year to recent) Some gypsum
deposits are found in these
Quaternary sediments. High
potential for yielding significant
quantities of ground water.
Holocene in Quaternary period (1
million year to recent) Some
gypsum deposits are found in
these Quaternary sediments. High
potential for yielding significant
quantities of ground water.
116.38 Sea Area - -
(Courtesy: Environmental Information Centre, New Delhi)
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 32
FIGURE-3.7
MAJOR GEOLOGICAL FEATURES
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 33
3.7 LAND USE PATTERN
Land use, in general, reflects the human beings activities on land, whereas the word land
cover indicates the vegetation, agricultural and artificial manmade structures covering the
land surfaces. Identification and periodic surveillance of land uses and vegetation covers, in
the vicinity of any developmental activity is one of the most important components for an
environmental impact assessment, which would help determine the impact of the project
development activity on the land use pattern.
3.7.1 METHOD OF DATA PREPARATION
The land use / land cover has been presented in the form of a map prepared by using IRS P6
LISS-III and procured from the National Remote Sensing Agency (NRSA), Hyderabad. The
satellite data has been processed using ERDAS Imagine software supported with ground
checks and ground truth verification. Area and distance calculations have been carried out
using GIS software after geo-referencing the interpreted data with the help of Survey of India
(SoI) topographical maps of the scale 1:50,000.
A map depicting major land use/ land cover classes comprising lands under agriculture, fallow
land, open/degraded vegetation; lands falling under water bodies, scrub and lands under
inhabitations is presented at Figure 3.8. The map also marks the area within 10 km of the
project site as the area of interest. Land use and Land Cover with Towns and Village Locations
A map depicting major land use/ land cover classes along with the village locations in the area
of coverage is presented at Figure 3.9. The land use classification within a distance of ten
kilometers from the project location and the areas falling under the respective classifications
are as per the following:
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 34
Process Methodology
Procurement of Satellite
Imagery
Preparation of Base Map
using topographical maps
Data Preparation
- Radiometric correction
- Geometric correction
Preparation of Signature
Confusion Matrix
First Level Classification
Field Verification/Ground
Truth
Updated information
from field
Second Level
Classification
Accuracy Estimation Area Estimation Map Output
Pre field process
Field process
Post field process
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 35
TABLE – 3.16
AREAS UNDER DIFFERENT LANDUSE
(Courtesy: Environmental Information Centre, New Delhi)
Area Statistics of Landuse / Landcover Map
Sr.
No. Class Names
Area
(In Hectares)
Area
(In Sq.Km.) Area %
1 Water Body 1363.73 13.64 4.34
2 Open/Barren Land 5076.01 50.76 16.17
3 Agriculture Land 1159.56 11.60 3.69
4 Fallow Land 6291.40 62.91 20.04
5 Open/Degraded Vegetation 412.59 4.13 1.31
6 Vegetation Medium Density 397.40 3.97 1.27
7 River & Canal 23.25 0.23 0.07
8 Marshy Land 919.33 9.19 2.93
9 Salt Affected Land 128.45 1.28 0.41
10 Settlement & Habitation 324.50 3.25 1.03
11 Mud Flat 863.17 8.63 2.75
12 Jetty 32.91 0.33 0.10
13 Salt Pans 2083.03 20.83 6.63
14 Mangrove(Sparse) 117.30 1.17 0.37
15 Mangrove(Dense) 223.00 2.23 0.71
16 Marshy Vegetation 46.55 0.47 0.15
17 Industrial Area 290.32 2.90 0.92
18 Sea 11589.46 115.89 36.91
19 Seasonal Water Body 59.04 0.59 0.19
Total 31400.99 314.01 100.00
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 36
FIGURE – 3.8
LANDUSE / LANDCOVER
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 37
FIGURE – 3.9
LANDUSE / LANDCOVER WITH VILLAGE LOCATIONS
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 38
3.8 ECOLOGICAL INFORMATION
Introduction
Bharuch (formerly commonly known as Broach) in India, is a district in the southern part of
the Gujarat peninsula on the west coast of state of Gujarat with a size and population
comparable to that of Greater Boston. The Narmada River outlets into the Gulf of Khambhat
through its lands located in the central and northern parts of the sub-continent of India. The
geographical location of the district is 21.30° to 22.00° N Latitude and 72.45° to 73.15° E
Longitude. The district has eight Talukas, Bharuch (District Headquarter), Ankleshwar, Valia,
Jhagadia, Vagra, Aamos, Hansot and Jambusar. The total area of the district is 5,253 sq km,
as per the census of 2001; the population is 1.3 million, with 261 persons per sq. km. The
district is situated at the mouth of River Narmada. The major rivers flowing through the
district are: Narmadha, Dhadhar, Kim and Kaveri.
Climate
The weather of Bharuch district is hot and dry-starting from mid-march till mid-June, mid-
during summer season weather remains hot and dry. While from mid-June till end of
September weather remains humid and can be considered pleasant. From October-
November weather is bit hot. From December to February climate remains cool
Rainfall
The average rainfall of the district is 800 mm.
Biogeography
According to Rodgers and Panwar (1988), Gujarat has parts of four biogeographic zones:
Zone 3. The Indian Desert
Province 3A - Kutch
Zone 4. The Semi-arid Zone:
Province 4B - Gujarat – Rajputana
Zone 5. The Western Ghats:
Province 5A - Malabar Coast
Province 5B - Western Ghat Mountains
Zone 10. The Coast of India:
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 39
Province 10A - West Coast
The project area falls at Zone 4: The Semi-arid zone, Province 4B – Gujarat-Rajputana.
3.8.1 PHYSIOGRAPHY
The region provides a combination of most of the geo-environmental features for the
development of favorable ecosystems. The alluvial sediments and reasonable water
resources have provided impetus towards developing human induced ecosystems of
agricultural cropping agro-forestry and horticulture. The elevation range of the region is
about 20 m showing a very gentle flat gradient of 1:800 to 1:1000. The region shows more
or less a flat topography with a series of sections cut by deeply incised channels of rivers
flowing across the region. The riverbanks are generally marked by levee deposits, creating a
ridge type banks with higher elevations than the general ground level. The flat topography is
dotted by low height sandy mounds of stabilized dunes. Formation of ravine landscape is
quite common on most of the riverbanks due to deep gully erosion. The rivers are prone to
heavy floods and land erosion.
3.8.2 FOREST
Bharuch area is characterized by tropical dry deciduous forests. The total forest area of
district is 1449.68 sq.m. That accounts for 0.73 % of the total geographical area of the
district. (Courtesy: Environmental Information Centre, New Delhi)
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 40
3.8.3 FLORA
Some of the flora found in Bharuch area is listed below:
TABLE – 3.17
LIST OF FLORA
Sr.
No.
Scientific Name
Common Name Family
I Trees
1 Acacia aurriculifarmis Bangali Babool Mimoceae
2 A. leucopholia Aniar Mimoceae
3 A. catechu Khair Mimoceae
4 A. ferrungula Pandhara Khair Mimoceae
5 A. nilotica Babul Leguminoceae
6 A. lebbeck Siris Leguminoceae
7 A. procera Siris Leguminoceae
8 A. polycantha Garad Mimoceae
9 Adina cordifolia Hed Rubiaceae
10 Aegle marmelos Bela Rutaceae
11 Ailanthus excelsa Maharukh Simaroubaceae
12 Alangium salvifolium Ankol Alangiaceas
13 Albizia odoratissimus Siris Leguminoceae
14 Annogeissus latifolia Dhavda Combritaceae
15 Annona squamosa Sitafal Annonaceae
16 Azardirachta indica Nim Moraceae
17 Bahuania purpurea Kachamar Leguminosae
18 Bombax ceiba Semal Verbenaceae
19 Bridelia retusa Asta (Kathmohli) Leguminosae
20 B. squamosa Asan Leguminoceae
21 Buchanania lanzan Charoli Anacardiaceas
22 Butea monospesma Palas Leguminoceae
23 Callistemon lancealatus Bottlebrush Mytraceas
24 Casuarina equisetifoier Sura Casuarineae
25 Careya arborea Kumbh Mytraceae
26 Casearia elliptica Manjo Symydaceae
27 Caesearia graveoiens Dedak manio Samidacea
28 Cassia fistula Sunari Leguminoceae
29 Cestrum noctusnum Ralkirani Solana ceae
30 Cochiospermum religiosun Ganeri Cochlospermaceds
31 Cocas nicifera Nariyal Palmeae
32 Cordia dichotoma Gundi Boranginacea
33 Dalbergia paniculata Dhobin Leguminoceae
34 D. latifolia Sisso Leguminoceae
35 Murraya koenigii Karlilimb Rata ceae
36 Ixora parviflora Kara Rubiaceae
37 I. nigricans Kukeri Rubiaceae
38 Delonix elala Gulmohar Leguminoceae
39 Diosphyros melanoxylon Tendu Ebenaceae
40 Dolichandrone falcate Mallar sing Bignoniaceae
41 Elaeodendron roxburghii Alinar Ceiastracea
42 Eucalyptus globules Safeda Eucalyptaceae
43 Emblica officinalis Aonla Euphobiaceae
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 41
44 Erithina uliginosa Pungara Leguminoceae
45 Eramphis uliginosa Almi Rubiaceas
46 Ficus. Religiosa Pipal Moraceae
47 F. rumphii Pilari Moraceae
48 F. benghalensis Bara Moraceae
49 Flacourtia indica Rankdi Bixaceae
50 Garua pinnata Kakad Burseraceae
51 Griwia teliaefolia Dhaman Tiliaceae
52 Haidwickia bipinnata Aniar Caesalpiniacea
53 Holoptelia intigrifolia Valva Uticaceae
54 Kydia calycina Bhindi Malvaceae
55 Lagerstroemia lanceolata Nano Leguminoceae
56 L. parviflora Sidha Leguminoceae
57 Michellia champaca Champa Bignoneaceae
58 Lannea caromadalica Modad Anacardiaceae
59 Madhuca indica Mahua Sapotaceae
60 Mangifera indica Amm Anacardiaceae
61 Miliusa tomentosa Gulambh Annonacea
62 Milligntonia hortensis Indian Coral Tree Bignoniaceae
63 Mitragyna parvifolia Kalam Rubiaceae
64 Michelia Champaca Champa Magnoliaceae
65 Moringa oliefera Shevga Moringaceae
66 Musa paradisiacea Kela Musaceae
67 Oroxyium indicum Tetu Bignoniaceae
68 Phoenix sylvestris Shindi Palminae
69 Prosopis juliflora Babul Mimoceae
70 P. cinerarea Babul Mimoceae
71 Pithecelobium ducle Chisbalai Leguminoceae
72 Pongamia pinnata Karanja Leguminoceae
73 Pisidium guajava Guava Mutraceae
74 Pterocarpus marsupium Bija Leguminoceae
75 Punica grantalum Anar Pomegrannatae
76 Sapindus emerginatus Aritha Sapindaceae
77 Soymida febrifuga Rohan Meliaceae
78 Poleathia langifolia Ashok Apoctnaceae
79 Saraca indica Ashok Apoctnaceae
80 Thevetia neirifolia Pilakanton Apoctnaceae
81 Sterculia urens Kodaya Sterculiaceae
82 Syzygium cuminii Jamun Myrtaceae
83 Terminalia crenulata Sadad Leguminoceae
84 T. bellirica Behada Combretaceae
85 T. arjuna Arjun Combretaceae
86 T. caltapa Jangli badam Combretaceae
87 Tamarindus indica Tentuli Leguminoceae
88 Tecoma stans Nellow bell Bisgnonia ceae
89 Tectona grandis Sag Verbanaceae
90 Trema orientalis Gol Ulmaceae
91 Wrightia tinctoria Kudo Apocynacea
92 Zizyphus xylocarpus Ghatbor Rhamnaceae
93 Z. mauritiana Bordi Rhamnaceae
Shrubs
1 ARGEMONE MEXICANA Darudi Papaveraceae
2 CARANTHUS RESUS Sudufuli Apocyanaceae
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 42
3 C. CALATROPIS Mundar Asclepiadaceae
4 CALATOPIS GIGANTEAN Rui Asclepiadaceae
5 CARRISSA CARANDAS Karvand Apocyaninnae
6 CLERODENDRUM MULTYFOLIUM Multaiforum Verbenaeae
7 GYMNOSPORIA SPINOSA Spinosa Rekii Leguminoceae
8 LANTANA CAMERA Ghaneri Verbanaceae
9 OPUNTIA DILLENII Nivdang Cactacealea
10 EUPHORBIA NERIFOLIA Wavding Celastraceae
11 OCIUM GRATISSIUM Rantulro Labiateae
12 HELICTERIES ISORA Atai Sterculiaceae
13 FICUS HISPIDA Tet umaro Moraceae
14 DATURA FASTUASA Dhotara Solanaceae
15 VITEX NEGUNDO Nirgudi Verbaceae
16 CASSIA TORA Tarota Leguminoceae
17 ZIZYPHUS NUMMULARIA Beri Rhannaceae
18 EUPHORBIA TIRUCOLLI Thor Euphorbiaceae
Bamboos
1 DENDROCALAMUS STRICTUS Manvel Grammineae
2 ABRUS PRECATORIUS Gunj Leguminoceae
3 CAPPARIS SEPIRARIA Lamtjar Cappariaceae
4 COCCULUS HIRRUTUS Asanwel Menispermaceae
5 COMBRETUM OVALIFOLIUM Jal Combratae
6 CAYRATIA CARNOSA Khatumbo Vitaceae
Grasses
1 ANDROPOGON PUMILUS Kusal Gramineae
2 CENCHRUS SETGERUS Dhramnu Gramineae
3 CYNODON DACTYLON Durva Gramineae
4 CYMBOPOGEN MARINIL Rosha Gramineae
5 HETEROPOGON CONTORTUS Gawat Gramineae
6 SORGHUM HALEPENSE Baru Gramineae
7 THEMEDA TRIANDRA Bhathdu Gramineae
Crops
1 RICINUS COMMUNIS Arand Euphorbiaceae
2 SACCHARUM OFFICINARUM Ganna Gramineae
3 SORGHUM VULGAE Jowar Gramineae
4 ZEA MAYS Makea Gramineae
5 ARACHIS HYPOGAEA Ground nut Logumin
6 ORYZA SATIVA Chawar Gramineae
Macrophytes
1 EICHHORNIA CRASSIPES Jalkumbhi Pontederiace
2 IPOMEA AQUALICA Kalmisay Volvulaceae
3 TRAPA LATIFOLIA Water chestnual Volvulaceae
4 NELUMBO NUCIFERA Lotus Nymphaceae
5 AZOLLA PINNATA Common duckweed Lemnaceae
Source: Vegetation survey and data from State Forest Dept. Bharuch Gujarat
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 43
3.8.4 FAUNA
TABLE – 3.18
LIST OF FAUNA
Sr.
No.
Scientific Name Common Name Family
1 Acridothers tristis Common myna Sturnidae
2 A. ginginianus Bank myna Sturnidae
3 Athene brama Spotted owlet Striginae
4 Aegithina tiphia Common Lora Lrenidae
5 Ardeola grayee Pond Heron Ardeidae
6 Amaurornis phoenicurus Whitebrested Waterhen Phasinidae
7 Babulcus ibis Cattle Egret Ardeidae
8 Centropus cinensis Crow-phesant Cuculidae
9 Columba livia Blue Rock Pigeon Columidae
10 Corvus splendens House Crow Carvidae
11 Coracious benghalensis Indian Roller Coracidae
12 Dicrurus adsimilis Black Drongo Dieruridae
13 Dinophum benghalense Goldenbacked Woodpecker Picidae
14 Eudynamys scolopacea Koel Cuculidae
15 Fracolinus francollinus Black partiridge Pharianidae
16 Halcyon rustica Whitebrested Kingfisher Aicenidae
17 Hirundo rustica Common swallow Hirundinidae
18 Lanius exubitor Grey Shrike Daniidae
19 Launchura malabarica Whitethroated munia Estrildinae
20 Megalaima rubricapilla Smallgreen barbet Capilonidae
21 M. malabarica Crimsonbrestwd Barbet Capilonidae
22 Merops orientalis Littlegreen Bea-eater Miropidae
23 Milvus migrans Patih Kite Accipitridae
24 Motacilla maderatensis Large pied wagtail Motacillidae
25 Nactarinia asiatica Purplerumpled sunbird Nectarinidae
26 Nectarinia minima Small sunbird Nectarinidae
27 Oriolus oriolus Golden Oriole Oriolidae
28 Orthotomus sutorius Tailor Bird Pachycephaline
29 Passer domesticus House Sparrow Passerinae
30 Psittacula cyanocephala Blossamheaded parakeet Psittacidae
31 Pycnonotus caffer Redvented bulbul Pycnonotidae
32 Ploceus philipinensis Weaver bird Plocidae
33 Sexicoloides fulicate Indian Robin Corvidae
34 Sopsychus saularis Magpie Robin Corvidae
35 Streptopelia chinensis Spotted dove Columbidae
36 S. senegalensis Little brown dove Columbidae
37 Sternus pagodramus Brahiminy myna Sternidae
38 Turdoides caudatus Common Babbler Muscicapidae
39 Upupa epops Hoopoe Upupidae
40 Vanellus indicus Redwattled Lapwing Jacanidae
41 Metopidius indicus Brongewinged jacana Jacanidae
42 Ardea alba Large egrd Ardeidae
43 A. cinerea Grey Heron Ardeidae
44 Falica atra Coot Rallidae
45 Phalacrocorax niger Little cormorant Phalacrocoracidae
46 MUNTIACUS MUNTJAK Barking deer Bovidae
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 44
47 FALIS CHAUS Jungle cat Falidae
48 MYAENA HYAENA The striped hyana Canidae
49 PRESBYTIS ENTELLUS Hanuman langur colobinae
Source: Survey of Avifauna under the study area.
3.9 SOCIO - ECONOMIC ENVIRONMENT
An assessment of socio - economic environment forms an integral part of an EIA study.
Therefore, baseline information for the same was collected during the study period. The
baseline socio - economic data collected for the study region, before the proposed
expansion is operational, has been identified for the four major indicators viz. demography,
civic amenities, economy and social culture. The baseline status of the above indicators is
compiled in forthcoming sections.
3.9.1 SETTLEMENTS AND DEMOGRAPHIC PATTERN
3.9.1.1 METHOD OF DATA PREPARATION
The land use/land cover has been presented in the form of a map prepared by using the IRS-P
6 LISS-III, procured from the National Remote Sensing Agency (NRSA), Hyderabad. The
satellite data has been processed using ERDAS Imagine software supported with ground
checks and ground truth verification wherever required. Area and distance calculations have
been carried out using GIS software after geo-referencing the interpreted data with the help
of SoI topographical maps of 1:50,000 scale.
3.9.1.2 DEMOGRAPHIC DATA WITHIN THE REGION OF INTEREST
Table 4.4 provides the data on inhabitations falling within 500m, between 500m and 3 km,
between 3 km and 7 km and between 7 km and 10 km distance from the project site.
On an average, Taluka: Vagra has population density of about 94 persons per sq. km. (2001
Census data), 114 persons per sq. km. (2011 Census data), compared to the Bharuch District,
which has a population density of about 210 persons per sq. km. (2001 Census data), 238
persons per sq. km. (2011 Census data). Population density within 10 km radius of the site is
only 103 persons per sq. km. (2011 Census data), while population density within 5 km
radius of site is 324 persons per sq. km. (2011 Census data). The population details (i.e.
population distribution and population density) of the Taluka Vagra, District Bharuch and
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 45
the study area within 10 km radius and 5 km radius are given in Table 3.20. And their
graphical representations are shown in Figure 3.10.
TABLE – 3.19
DEMOGRAPHIC DATA
Sr.
No.
Village
Name
CD Block
Name
No. of
Household
Total
Population
Total
Male
Total
Female
Population
<06 years
Male<06
years
Female<06
years
1 Ambhetha Vagra 347 1552 807 745 167 89 78
2 Dahej Vagra 3426 13495 8345 5150 1604 840 764
3 Galenda Vagra 120 611 314 297 70 46 24
4 Jageshwar Vagra 383 1571 818 753 155 80 75
5 Jolva Vagra 338 1442 807 635 210 105 105
6 Kadodara Vagra 420 1995 1018 977 233 113 120
7 Lakhigam Vagra 1217 4938 3144 1794 566 296 270
8 Luvara Vagra 385 1663 873 790 202 112 90
9 Rahiyad Vagra 355 1694 862 832 252 132 120
10 Suva Vagra 413 1920 973 947 238 126 112
11 Vadadla Vagra 201 822 419 403 105 54 51
12 Vav Vagra 155 727 378 349 75 44 31
TABLE – 3.19 (CONTD.)
DEMOGRAPHIC DATA
Sr.
No. Village Name CD Block name
Population
Schedule
caste
Male
Schedule
caste
Female
Schedule
caste
Population
Schedule
tribe
Male
Schedule
tribe
Female
Schedule
tribe
1 Ambhetha Vagra 67 37 30 261 137 124
2 Dahej Vagra 542 279 263 2090 1097 993
3 Galenda Vagra 05 03 02 91 47 44
4 Jageshwar Vagra 18 08 10 146 73 73
5 Jolva Vagra 239 137 102 199 98 101
6 Kadodara Vagra 48 23 25 511 258 253
7 Lakhigam Vagra 87 52 35 584 308 276
8 Luvara Vagra 109 56 53 963 488 475
9 Rahiyad Vagra 105 51 54 104 51 53
10 Suva Vagra 63 28 35 354 193 161
11 Vadadla Vagra 76 37 39 341 166 175
12 Vav Vagra 28 15 13 163 90 73
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 46
TABLE – 3.20 ___________________________________________________________________________
POPULATION DENSITY
Name Population
(Persons)
Population Density
(Person / sq. km.)
Sex ratio
(No. of females per
1000 males)
Within 5 km Radius (2011) 25483 324 675
Within 10 km Radius (2011) 32430 103 728
Taluka Vagra (2001) 82569 94 916
Taluka Vagra (2011) 100044 114 870
District Bharuch (2001) 1370104 210 920
District Bharuch (2011) 1551019 238 925
(Courtesy: Census Dept., GOI)
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 47
FIGURE-3.10
POPULATION DENSITY
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 48
3.9.1.3 LITERACY RATE
The literacy rate is a major factor, which influences the socio-cultural condition of a
particular place. Details of literacy rate in District Bharuch, Taluka Vagra and within 10 km
radius and 5 km radius of project site are given in Table 3.21 while their graphical
representation is shown in Figure 3.11. It is observed that the literacy rate in Bharuch
District as per 2001 Census data is 72.09 as percentage of literate population to the total
population, with 83.43 % among male and 65.42% among female. Literacy rate in Bharuch
District, as per 2011 Census data is 72.09 %, with 77.32 % among male and 66.44% among
female. Literacy rate in Taluka Vagra as per 2001 Census data is 73.41 % with 84.24 %
among males and 61.48 % among females. Literacy rate in District Bharuch as per 2011
Census data is 70.47 % with 77.56 % among males and 62.32 % among females.
Within 10 km radius of the study area, the literacy rate is observed 75.83 % having 81.55 %
among males and 67.35 % among females, whereas literacy rate within 5 km radius of study
area is 75.44 % having 81.28 % among males and 67.42 % among females.
TABLE 3.21
LITERACY RATE
Name Male Literacy
(%)
Female Literacy
(%)
Total Literacy
(%)
Within 5 km Radius 81.55 67.35 75.83
Within 10 km Radius 81.28 67.42 75.44
Taluka Vagra (2001) 84.24 61.48 73.41
Taluka Vagra (2011) 77.56 62.32 70.47
District Bharuch (2001) 83.43 65.42 74.79
District Bharuch (2011) 77.32 66.44 72.09
(Courtesy: Census Dept., GOI)
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 49
TABLE 3.21 (CONTD.) ___________________________________________________________________________
LITERACY RATE
Sr.
No. Village Name CD Block name
Population
Literate
Male
Literate
Female
Literate
Population
Illiterate
Male
Illiterate
Female
Illiterate
1 Ambetha Vagra 1214 677 537 338 130 208
2 Dahej Vagra 9970 6704 3266 3525 1641 1884
3 Galenda Vagra 462 243 219 149 71 78
4 Jageshwar Vagra 1300 683 617 271 135 136
5 Jolva Vagra 1075 661 414 367 146 221
6 Kadodara Vagra 1369 801 568 626 217 409
7 Lakhigam Vagra 3966 2679 1287 972 465 507
8 Luvara Vagra 1197 672 525 466 201 265
9 Rahiyad Vagra 1310 690 620 384 172 212
10 Suva Vagra 1427 783 644 493 190 303
11 Vadadla Vagra 602 331 271 220 88 132
12 Vav Vagra 575 324 251 152 54 98
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 50
FIGURE-3.11
LITERACY DATA
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 51
3.9.2 VEGETATION COVER AND FOREST BOUNDARIES
3.9.2.1 METHOD OF PREPARATION
The vegetation cover for the area of interest has been prepared by extracting the areas under
fou-ID LISS III data for the past two years for the State of Gujarat. There is no Reserved
Forests and Protected Forests within the 25 km radius area from project site. The project site
and area of interest have been added for ease of spatial reference.
The vegetation classification criterion used for this study area is given as follows:
The forest cover is classified based on Forest Survey of India into Dense (> 40% crown density
r different vegetation classification provided by the Forest Survey of India (FSI) based on IRS),
open (between 10 to 40 % crown density) and Scrubs (shrubby bush of less than 10 % crown
density). The vegetation classification criterion used for this study area is given as follows:
Dense Vegetation is the lands with forest cover with canopy density of equal or more than
40 percent.
Medium Vegetation is the land with forest cover with canopy density of 10 to 40 percent.
Open Vegetation is the land with forest cover with canopy density less than 10 percent.
Scrubs are the lands generally in and around forest areas, having bushes and/or poor tree
growth chiefly of small or stunted trees with a canopy density less than 10 percent.
.
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 52
3.9.2.2 AREA UNDER DIFFERENT VEGETATION CLASSIFICATION
3.9.2.3 MAP OF VEGETATION CLASSIFICATION AND FOREST BOUNDARIES
A digital map comprising layers of vegetation classification, forest boundaries and town and
village locations to facilitate reference is attached as Figure – 3.12.
Area Statistics Forest Map
Sr.No. Class Names Area (In Hectares) Area (In Sq.Km.) Area %
1 Water Body 3054.94 30.55 1.56
2 Non Vegetation Area 86509.19 865.09 44.13
3 Mangrove(Sparse) 1095.81 10.96 0.56
4 Mangrove(Dense) 1468.63 14.69 0.75
5 Open/Degraded Vegetation 1284.38 12.84 0.66
6 Vegetation Medium Density 648.63 6.49 0.33
7 Plantation/Orchards 169.31 1.69 0.09
8 Marshy Vegetation 3495.94 34.96 1.78
9 River & Canal 4143.19 41.43 2.11
10 Sea 93914.75 939.15 47.91
11 River Bed 157.50 1.58 0.08
12 Seasonal Water Body 99.31 0.99 0.05
Total 196041.56 1960.42 100.00
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 53
FIGURE – 3.12
VEGETATION CLASSIFICATION AND FOREST BOUNDARIES
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 54
3.9.3 OCCUPATIONAL STRUCTURE
In economic development of the region its geographical location, natural resources,
business and employment, industries and manpower play vital role. Table 3.22 provides the
occupational patterns in all villages falling within the area of interest.
TABLE 3.22
OCCUPATIONAL STRUCTURE
Sr.
No.
Village
Name
CD
Block
name
Total
Work
Population
Main
worker
Population
Main
Cultivator
Population
Main
Agriculture
Population
Main
Household
Population
Main
Other
Population
Marginal
Worker
Population
Non
Worker
Population
1 Ambetha Vagra 482 234 06 00 53 175 248 1070
2 Dahej Vagra 5163 4476 113 14 12 4337 687 8332
3 Galenda Vagra 177 142 69 31 00 42 35 434
4 Jageshwar Vagra 479 465 03 05 00 457 14 1092
5 Jolva Vagra 569 489 48 60 02 379 80 873
6 Kadodara Vagra 887 579 225 107 06 241 308 1108
7 Lakhigam Vagra 2309 2177 49 22 13 2093 132 2629
8 Luvara Vagra 655 637 10 26 01 600 18 1008
9 Rahiyad Vagra 519 391 125 22 10 234 128 1175
10 Suva Vagra 523 303 38 10 01 254 220 1397
11 Vadadla Vagra 337 303 27 76 02 198 34 485
12 Vav Vagra 257 238 126 23 00 89 19 470
3.9.4 AMENITIES
Infrastructure resource base of the surveyed villages with reference to education, medical,
water resources, post and telegraph, communication, power supply is presented in Table
4.8.There are 16 villages within study area of 10 km radius of plant site. Significant
observations with respect to availability of amenities in study area are as follows.
All of the villages have primary schools, 3 villages have both primary and secondary
education schools. 14 villages have adult education facility. 4 villages have other education
institution. 13 villages in the impact zone have community health workers,3 villages have
primary health sub centre, 12 villages have registered private practitioners while 3 villages
have family planning center, 1 village have primary health center. In the study area drinking
water facilities are good as well water is available almost in all the villages, 4 villages have
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 55
tap water, 1 village have hand pumps, 1 villages have river water. Tank water is available in
15 villages.
Post office facility is available in 9 villages while 1 village has post and telegraph facility.
Telephone facility is available in 1 village. Almost all villages are well connected through a
network of Pucca road and Kachcha approach road. Bus is the main mode of transportation
and is available in all villages. All the villages get electricity for all purpose i.e. domestic,
agriculture and industrial.
TABLE 3.23
___________________________________________________________________________
DETAILS OF AMMENITIES AVAILABLE IN STUDY AREA
(Courtesy: Census Dept., GOI)
Taluka Village Educational Medical Drinking
Water
Post &
Telegrap
h
Communicati
on
Approac
h
to
Village
Nearest
Town
Power
Supply
Galenda P(2),Ac,O RP,CHW T,W,TK PO BS PR,KR Bharuch EA
Samatpor P(2),Ac RP,CHW W,TK -(-5 Kms) BS PR,KR Bharuch EA
Vav P(2),Ac RP,CHW T,W,TK,HP -(-5 Kms) BS,RS PR,KR Bharuch EA
Jolva P(2),Ac,O PHS,FPC,RP,CHW W,TK -(-5 Kms) BS,NW PR,KR Bharuch EA
Vadadla P(2),Ac CHW W,TK PO BS PR,KR Bharuch EA
Dahej
P(4),H,Ac(4),
O
PHC,D,FPC,RP,
CHW
T,W,TK PTO,
Phone
BS,RS,NW PR,KR Bharuch EA
Lakhigam P(2) PHS,RP,CHW W,TK po BS,NW PR,KR Bharuch EA
Luvara P(2),Ac RP,CHW W,TK -(-5 Kms) BS,NW PR,KR,NR Bharuch EA
Jageshwar P(2),Ac,H RP,CHW W,TK PO BS,NW PR,KR,NR Bharuch EA
Ambheta P(2),Ac CHW T,W,TK PO BS,NW KR,NR Bharuch EA
Suva P(2),Ac -(5-10 Kms) W,TK,R -(-5 Kms) BS,NW PR,KR,NR Bharuch EA
Rahiad P(2),Ac(2),O RP,CHW W,TK PO BS,NW PR,KR.NR Bharuch EA
Harinagar Un inhabited
Padariya P(2),Ac RP,CHW W,TK PO BS PR,KR Amod EA
Kadodara P(2),Ac(2),H PHS,FPC, RP,CHW W,TK PO BS PR,KR Bharuch EA
Vagra
Sambheti P(2),Ac -(10+Kms) W,TK PO BS,RS PR,KR Bharuch EA
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 56
ABBREVIATIONS
1. Education
P-Primary Elementary School
H-Matriculation or Secondary
O-Other Educational Institution
PUC-Higher Secondary/Intermediate/pre-University/junior Collage
Ac- Adult Literacy Class
Tr-Training School
2. Medical Facilities
RP-Registered Private Practitioner
PHS-Primary Health Sub-Centre
FPC-Family Planning Centre
PHC-Primary Health Centre
D- Dispensary
CHW - Community Health Worker/Health Worker
H - Hospital
NH - Nursing Home
MH - Maternity Home
PHC - Public Health Centre
CWC - Child Welfare Centre
TB - T.B Clinic
O – Others
3. Drinking Water
T-Tap Water
HP-Hand Pump
TK-Tank Water
W-Well Water
R-River Water
C-Canal
N - Nallah
S – Spring
TW- Tube well Water
4. Post & Telegraph
PO-Post Office
PTO-Post & Telegraph
Phone-Telephone Communication
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 57
5. Communication
BS-Bus Station
NW-Navigable Waterway
6. Approaches to Village
PR-Pucca Road
KR-Kuchcha Road
7. Power Supply
EA-Electricity for all purposes
EAG - Electricity for Agriculture
ED - Electricity for domestic
EO - Electricity for other purpose like Industrial, Commercial etc.
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 58
3.9.5 GROUND WATER HYDROLOGY
Introduction
The district is mainly grounded with alluvial rock formation. The tube well has been
constructed significantly in the depth of 65 to 230m. The state ground water Level ranges
from 2 to 35m bgl (below ground level). The tube well discharge ranges from 325 to 3400
litters per minute for duration ranges of 3 to 14 meters.
District: Bharuch
GROUND WATER MAP
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 59
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 60
Geology: Geologically the major part of the state is covered by hard rock comprising of
gneisses, schists, phyllites, sand stone and basalt. Remaining area in the north and central is
occupied by the soft rock including coastal alluvium. District Bharuch is mainly occupied by
the soft rocks like alluvium, tertiary in the north but as we move to the south the district is
covered with hard rocks and few hilly areas.
Hydrology: Hydrologically the areas have soft rock aquifers with dug wells at the depth of 10
to 25m, and tube wells at the depth of 50 to 100m. The level of ground water productivity of
this type of rocks are mapped by violet colour, the difference in the discharge is shown
through the difference in the intensity of the colour (light colour discharge-ipm) 200 to 300
in dug wells and 400 to 60 ipm in the tube well, and dark shade shows the discharge to 200
to 300 ipm in dug wells and 600 to 1200 ipm in tube wells.
The hard rock aquifers dug well are found at the depth of 10 to 25m and bore well at the
depth of 100 to 200m. The areas with extensive hard rock aquifers where pores space of
rocks have secondary permeability are called ‘fractured permeability’. The intensity can be
measured through the darkness in the colour, that is green which is used to map the hard
rock aquifers, the discharge varies from 60 to 150 ipm in dug wells areas, 100 to 300 ipm in
bore wells.
Groundwater Utilization (Critical Blocks)
Based on state of groundwater development, the various blocks/talukas in a district are
categorised as over-exploited, critical, semi critical & safe categories. In case, where annual
groundwater withdrawals are more than 100% of the annual recharge availability, it is
categorised as over-exploited, meaning that all the annually replenishable groundwater is
already being used up. In cases of talukas, where the annual withdrawals are in the ranges
of 90% to 100%, in relative to the annual available groundwater recharge, they are
categorised as critical blocks. The talukas/blocks, in which the range is 70 % to 90%, are
categorised as semi critical. The safe category of talukas/blocks has stage of groundwater
development below 70% in relative to annual recharge availability.
Accordingly the various talukas in the district, coming under the project area are categorised
as follows:
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 61
Groundwater Resource Availability, Utilization in Bharuch:
1 Annual Rainfall: There are two main types
For Monsoon season
a recharge from rainfall 20380 mm
b recharge from other resource 1994 mm
For non-monsoon season
a recharge from rainfall 0
b recharge from other resource 5504 mm
2 Total recharge: in Bharuch district the total recharge is 27878 mm
3 Net Annual Ground water Availability: 26484 mm
4 Annual ground water Draft: there are two types
a Irrigation 13349 mm
b domestic and industrial uses 1835 mm
c total annual ground water draft 15184 mm
5 Projected demand for Domestic and industrial uses up to 2025: 2729 mm
6 Stage of Ground water development in percentage: 57%
Decadal Water Level Data of Bharuch District of Gujarat:
District Location Decadal Mean Water
Level (1993-2002)
DTW
Nov-03
Decadal
Fluctuation
Bharuch Amayar 3.234 2.71 0.524
Arethi 6.126 4.18 1.946
Bhadkdra 6.128 6.25 -0.122
Bharuch 6.664 6.87 -0.206
Bhensli 4.985 3.35 1.635
Chikada 2.734 3.17 -0.432
Dahegam 9.709 6.88 2.829
Dediapada 5.888 4.6 1.288
Garudeshwar 11.478 7.1 4.378
Hirapura 4.86 8.1 -3.24
Llav 3.836 2.26 1.576
District Semi- critical Critical Over- exploited
Bharuch Amod - -
Jhagadia - -
- -
- -
- -
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 62
Jambusar 5.289 8.64 -3.351
Jambusar 8.048 2.35 5.698
Jesajpur 7.992 6.03 1.962
Jetpur 3.04 3.6 -0.56
Juna Borbhata 6.325 5.55 0.775
Kanbi Pitha 2.121 1.04 1.081
Kaswa 7.237 3.97 3.267
Kavachiya 4.253 3.36 0.893
Kavi 11.505 11.57 -0.065
Khota Amba 1.042 2.12 -1.078
Luhara 6.192 4.66 1.532
Mahegam 8.791 6.75 2.041
Modoliya 5.894 3.93 1.964
Mokhdi 5.889 6.2 -0.311
Motwan 2.074 2.47 -0.396
Nani Singlot 7.271 7.75 -0.479
Navetha 8.96 7.75 1.21
Nirnavi 7.454 8.5 -1.046
Panoli 3.087 1.85 1.237
Rasela 11.548 10.4 1.148
Raymal 3.843 1.45 2.393
Ringani 3.026 2.42 0.606
Roja Tankaria 10.439 12.05 -1.611
Sajod 3.536 1.2 2.336
Sarod 15.561 16.3 -0.739
Selemba 6.507 7.27 -0.763
Simodra 5.599 3.88 1.719
Tankari 2.852 2.18 0.672
Utraj 3.054 4.27 -1.216
3.9.6 DRAINAGE PATTERN
METHOD OF DATA PREPARATION
The drainage pattern has been captured from the satellite images and updated with the
help of various secondary data sources available. The study area of 10 km radius around the
Project Site is in the West and East of the Dahej Reserve Forest as well as that of Luvara
Reserve Forest which is in the South-West direction, within Taluka Vagra of District Bharuch
in Gujarat. The area is well drained by River Narmada, flowing in south direction of the study
area.
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 63
3.9.7 DIGITAL TERRAIN MODEL
Digital Terrain Model is defined as three dimensional model of earth’s surface, provided in a
digital form. This gives a quantitative model of landform. Often the terms of DTM are used for
model for containing discrete data on elevation. It is a computer simulation model to show
relief, based on three dimensional data. The DTM for the study area, within a 10 km buffer
around the project site, is extracted using Survey of India topographical sheet of 1:50,000
scale by capturing contours and spot heights.
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 64
FIGURE – 3.13
GROUND WATER HYDROLOGY
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 65
FIGURE – 3.14
DRAINAGE PATTERN
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 3- 66
FIGURE – 3.15
DIGITAL TERRAIN MODEL
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 1
CHAPTER - 4
___________________________________________________________________________
ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
4.1 IDENTIFICATION OF IMPACTS
Various sources of pollution with respect to wastewater, the flue gas / process emission,
hazardous waste and noise generation along with their qualitative and quantitative analysis
as well as measures taken to control them are discussed herein with details. The network
method was adopted to identify potential impact, which involves understanding of cause-
condition-effect relationship between an activity and environmental parameters. This
method involves the "road map" type of approach to the identification of second and third
order effect. The basic idea is to account for the project activity and identify the type of
impact that could initially occur followed by the identification of secondary and tertiary
impacts.
Identified potential impacts for the various components of the environment, i.e. air, noise,
water, land and socio-economic, are presented in Figure 4.1. It should be noted that in these
Illustrations the lines are to be read as "might have an effect on".
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 2
FIGURE – 4.1
IMPACT NETWORK ON AIR ENVIRONMENT
Project
Activity Construction Operation
Phase Phase
Release of Air Release of
Pollutants Heat
Primary Change in Impact on Particulates Climatic
Impacts Air Quality Visibility Deposition on Changes
Water, Land
Aesthetic Impact on Impact on
Impact Agricultural Flora & Fauna
Produce
Secondary Impact on Human
Impacts Health
Tertiary Impact on Impact on
Impacts Economic Output Socio - Cultural
Environment
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 3
FIGURE – 4.1 CONTD.
IMPACT NETWORK ON NOISE ENVIRONMENT
Project
Activity Construction Operational
Phase Phase
Noise Emission
Primary
Impacts Change in
Ambient
Noise Level
Secondary Health Risks Impact on Work Migration of Birds,
Impacts Output and Reptiles & Population
Efficiency
Tertiary Impact on Impact on
Impacts Economic Socio-cultural
Output Environment
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 4
FIGURE – 4.1 CONTD.
IMPACT NETWORK ON WATER ENVIRONMENT
Project
Construction Phase Operational Phase
Activity Change in Surface Releases of
Morphology Wastewater
Impact on Runoff/
Seepage
Primary Impact on Impact on Environmental
Impacts Hydraulics of Water Quality Health and
Water Courses Aesthetic Risk
Secondary Impact on Impact on Cost of Water Impact on
Impacts Hydraulic of Aquatic Life Treatment Amenity /
Water Cources Recreation
Impact on Economic Output Impact on Socio-Cultural
Impacts Environment
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 5
FIGURE – 4.1 CONTD.
IMPACT NETWORK ON GROUND WATER ENVIRONMENT
Project
Cnstruction Operational
Phase Phase
Activity Distrubance Release of
of Soil Waste-water
on Land
Primary Change in Groundwater Change in Structure Addition / Removal
Impacts Regime : Soil Moisture / of Soil : Ground of Substances or
water Level / Flow Level Heat to / form
Pattern / Salt Water the Soil
Instruction
Secondary Impact on Soil Biota Impact on Flora Impact on
Impacts and Fauna Landscape
Impact on Agriclutural Impact on Livestock
Production
Tertiary Impact on Impact on
Impacts Economic Socio - Cultural
Out Put Environment
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 6
FIGURE – 4.1 CONTD.
IMPACT NETWORK ON LAND ENVIRONMENT
Project
Activity Construction Operational
Phase Phase
Primary Disturbance Disposal of
Impacts of land Wastewater
& Sludge on Land
Change in soil Change in Ground Toxic Substances
Texture & Permeability Water Regime / Salt on Land, Particulate
Water Intrusion Deposition on Land
Secondary Impact on Soil Salinity Impact on
Impacts Landscape Flora & Fauna
Tertiary Impact on Impact on
Impacts Agricultural Produce Live Stock
Impact on Impact on Socio-
Economic Output Cultural Environment
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 7
FIGURE – 4.1 CONTD.
IMPACT NETWORK ON SOCIO-ECONOMIC & CULTURAL ENVIRONMENT
Project
Activity Operational Phase Construction Phase
Primary Economic Input Economic Output Demand for Wark Force
Impacts Capital/C&M Cost Product Cost
Net Income
Output
Secondary Change in Development Better Air, Water Empolyment Demand for Demand for Aesthetic
Impacts Economic Base of Ancillary Product Land, Noise Opportunity Communication Infrastructural Risk
of The Region Industries Avaliability Pollution Facilities Facilities
Saving of Foreign
Exchange Effect On Effect On Effect On Effect on
Human Health Agriculture & Visual Buildings
Fisheries Environment Materials
Mounments
Tertiary Effect On Water Supply, Effect On Educational Effect On Human, Nature &
Impacts Sewerage & Soild Waste Medical, Transport Recreational Facilities
Management Facilities Facilities
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 8
4.2 PREDICTIONS AND EVALUATION OF IMPACTS
An impact can be defined as any change in physical, chemical, biological, cultural and/or
socioeconomic environment that can be attributed to activities related to alternatives under
study for meeting the project needs. Impact methodology provides an organized approach
for prediction and assessing these impacts. Scientific techniques and methodologies based
on mathematical modeling are available for studying impacts of various project activities on
environmental parameters.
The nature of the impacts due to said project activities are discussed here in detail. Each
parameters identified in the proceeding chapter, is singularly considered for the anticipated
impact due to various activities listed. The impact is quantified using numerical scores 0, 1,
2, 3, 4 and 5 in increasing order of activity. In order to assess the impact accurately, each
parameter is discussed in detail covering the following:
1) Project activities likely to generate impact
2) Quantification and prediction of impact
4.2.1 WATER ENVIRONMENT
Water Consumption & Waste Water Generation is given in Table 2.2. Details of ETP are
discussed in Topic 2.4.3.1 of Chapter 2. Hence, overall there won’t be any significant adverse
impact due to proposed activity on the water environment. With the above, it can be said
that there will be no significant adverse impact on surface and ground water or soil quality.
4.2.2 AIR ENVIRONMENT
The dispersion of pollutants in the atmosphere is a function of several meteorological
parameters viz. temperature, wind speed and direction, mixing depths, inversion level, etc.
A number of models have been developed for the prediction of pollutant concentration at
any point from an emitting source. The Industrial Source Complex – Short Term (ISCST3)
dispersion model is a steady-state Gaussian plume model. It is most widely accepted for its
interpretability. It gives reasonably correct values because this obeys the equation of
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 9
continuity and it also takes care of diffusion, which is a random process. For the present
study, this model is used for the prediction of maximum ground level concentration (GLC).
The proposed air emissions at M/s. Gujarat Dyestuff Industries are SPM, SO2, NOx, HCl & CO.
The site specific and monitored details considered for input data for the software “ISC-
AERMOD View” by Lakes Environmental, Canada for prediction of impact on air
environment are given in Table 4.1. The site-specific hourly meteorological data measured
at site is given in Table 3.5. In order to conduct a refined air dispersion modeling using
ISCST3 and ISC-PRIME short-term air quality dispersion models, the site specific hourly
meteorological data measured at site is pre-processed using the U.S. EPA PCRAMMET and
U.S. EPA AERMET programs. Before starting air dispersion modeling with ISC-AERMOD View,
a building downwash analysis using BPIP View was done. BPIP View is a graphical user
interface designed to speed up the work involved in setting up input data for the U.S. EPA
Building Profile Input Program (BPIP) and Building Profile Input Program – Plume Rise Model
Enhancements (BPIP-PRIME).
The air pollution caused by the gaseous emissions from a single or small group of stacks is a
local phenomenon. Its impacts will occur at a distance ranging from within the immediate
vicinity of the stack to several kilometers away from the stack. Maximum ground level
concentration will occur within this range. All plumes at more downwind distances from the
source by stack emission become so diluted by diffusion in the ambient atmosphere, that
concentrations of pollutants become negligible. The maximum ground level concentration
for different parameters is given in Table 4.2. Isopleths for SPM, SO2, NOx, HCl, CO are given
in Figure 4.2. Adequate measures shall be taken to minimize air pollution by providing air
pollution control equipment. Flue gases are discharged from stacks at adequate height (as
per CPCB norms).
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 10
TABLE – 4.1
DETAILS OF EMISSION FROM STACK & VENTS
(* Permissible Limits)
STACK & VENTS ATTACHED TO:
1. Thermic Fluid Heater (20 Lakh KCal/Hr)
2. Thermic Fluid Heater (20 Lakh KCal/Hr)
3. DG Set
4. Furnace
5. Furnace
6. Incinerator
SOURCE OF EMISSION SR.
NO.
OPERATING
PARAMETER
UNIT
1 2 3 4 5 6
1. Stack height Meter 30 30 11 30 30 30
2. Diameter Meter 0.7 0.7 0.2 0.6 0.6 0.6
3. Flue Gas
Temperature
0K 438 438 515 452 452 453
4. Air Pollution
Control
Equipment
- Air Pre heater
Multi cyclone
Bag filter
- Air Pre heater
Heat recovery unit
Caustic Scrubber
Ventury
scrubber
Packed bed
scrubber
Drop back
scrubber
5. Flue Gas Velocity m/s 6.66 6.66 6.78 6.5 6.5 2.95
6. Emission
concentration
SPM
SO2
NOx
HCl
CO
mg/Nm3
mg/Nm3
mg/Nm3
mg/Nm3
mg/Nm3
150*
262*
94*
---
---
150*
262*
94*
---
---
150*
262*
94*
---
---
150*
262*
94*
---
---
150*
262*
94*
---
---
150*
262*
94*
50*
50*
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 11
FIGURE - 4.2
ISOPLETHS FOR PM
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 12
FIGURE - 4.2 (CONTD.)
ISOPLETHS FOR SO2
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 13
FIGURE - 4.2 (CONTD.)
ISOPLETHS FOR NOx
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 14
FIGURE - 4.2 (CONTD.)
ISOPLETHS FOR HCl
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 15
FIGURE - 4.2 (CONTD.)
ISOPLETHS FOR CO
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 16
TABLE -4.2
SUMMARY OF ISCST3 MODEL OUTPUT FOR PM, SO2, NOx, HCl & CO
As manufacturing activities have not yet started, the predictions were made using CPCB
permissible limit as these concentrations will in no case be exceeded. Ground level
concentrations calculated for proposed activities are superimposed on existing ambient air
quality monitoring results and combined values (Table 4.4) are found within permissible
National Ambient Air Quality Standards.
CONCENTRATION (µg/m3) SR.
NO
LOCATIONS CO-ORDINATES
(X, Y) PM NOx SO2 HCl CO
1. Project-site (A1) (0,0) 0.00 0.00 0.00 0.00 0.00
2. Dahej (A2) (-4429, 571) 0.03 0.02 0.05 0.00 0.00
3. Lakhigam (A3) (-8286, -1286) 0.01 0.01 0.02 0.00 0.00
4. Luvara (A4) (-8286, -3000) 0.01 0.01 0.02 0.00 0.00
5. Ambetha (A5) (-4000, -1429) 0.03 0.02 0.05 0.00 0.00
6. Jageshwar (A6) (-5857, -2857) 0.03 0.02 0.06 0.00 0.00
7. Vadadla (A7) (286, 2286) 0.02 0.01 0.03 0.00 0.00
8. Jolva (A8) (2286, 1000) 0.13 0.08 0.23 0.00 0.00
9. Kadodara (A9) (1429, 5571) 0.01 0.00 0.01 0.00 0.00
MAXIMUM CONCENTRATION (µg/m3) SR.
NO.
X, Y
CO-ORDINATES PM NOx SO2 HCl CO
1. (-1000, -2000) 0.657 - - - -
2. (-1000, -2000) - 0.0412 - - -
3. (-1000, -2000) - - 1.15 - -
4. (-1000, -2000) - - - 0.024 -
5. (-1000, -2000) - - - - 0.024
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 17
TABLE 4.3
___________________________________________________________________________
PREDICTED AMBIENT AIR QUALITY FOR PM, SO2, NOx Unit: µg/m3
SPM SO2 NOx HCl CO (mg/m3) SR.
NO.
SAMPLING
LOCATION AVERAGE
1. Project-site (A1) 121.60 17.64 19.48 BDL 1.27
2. Dahej (A2) 113.83 17.34 18.38 BDL 1.28
3. Lakhigam (A3) 116.01 16.08 17.70 BDL 1.21
4. Luvara (A4) 114.61 13.50 15.40 BDL 1.28
5. Ambetha (A5) 116.73 12.46 14.10 BDL 1.26
6. Jageshwar (A6) 119.63 16.62 18.50 BDL 1.21
7. Vadadla (A7) 112.92 12.00 14.07 BDL 1.24
8. Jolva (A8) 115.03 15.16 16.94 BDL 1.20
9. Kadodara (A9) 115.41 15.27 16.91 BDL 1.23
BDL – Below Detectable Limit
4.2.3 NOISE ENVIRONMENT
Noise level around the plant site was measured. These values (Table-3.8B & 9) represent
status of Noise levels. Adequate noise control measures such as mufflers, silencers at the air
inlet/outlet, anti vibration pad for equipment with high vibration, earmuff and earplugs to
the operators, etc. are provided. Housing / casing is provided for all noise generating
machines. The noise level within plant will be less than 75 dB(A).
4.2.4 HAZARDOUS WASTE DETAILS
Hazardous wastes generation is given in Table 2.3.
4.2.5 INFRASTRUCTURE AND SERVICES
The plant is located in a well-developed industrial area, which has all essential facilities such
as water, power, fuel, post, telecommunication, bank, etc. M/s. Gujarat Dyestuff Industries
shall get water from GIDC water supply. Estimated power requirement is 1200 KW. Power
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 18
will be taken from Torrent Power. Stand by DG set, 1 no. (1200 KVA each) will be used as
emergency power back up. The transportation of raw materials and finished products shall
be by road. As stated earlier, the site is near to National Highway no. 8. As a result of
proposed expansion project there will be a marginal increase in transportation activity as
compared to present total traffic upto plant premises. As a result of development of
industrial estate, the neighboring areas have developed for commercial use. The
infrastructure services e.g. roads, state transport, post and telegraph, communication,
education and medical facilities, housing, etc. have improved in the surrounding areas in
recent years.
4.2.6 ENVIRONMENTAL HAZARD
Raw material such as different chemicals etc. shall be transported by road and shall be
stored in the plant premises. On site emergency plan shall be prepared for storage and
handling of hazardous chemicals and shall also be submitted to relevant authorities. This
report will be prepared with the consideration of hazards associated with the chemicals and
care should be taken for all aspects of environmental hazards. The project proponent shall
consider all the safety aspects in planning, designing and operation of the plant as per
standard practices. Hence, no adverse impact on this account is anticipated.
4.2.7 HOUSING
Enough number of dwellings is available in nearby towns and villages for accommodating
extra workforce. On neighboring towns or villages, the impact on this account is minimal.
4.2.8 ECOLOGY
The impact due to operation of the project and its activities on the ecological parameters
like natural vegetation, cropping pattern, fisheries and aquatic life, forests and species
diversity could be summarized as below.
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 19
4.2.8.1 NATURAL VEGETATION
The industry will develop a green belt on the surrounding periphery. Since the effluents and
emissions generated from the project activities shall be treated and disposed as per the
EMP provisions, adverse impact over any of the ecological components of the environment
is reduced to minimum.
4.2.8.2 CROPS
Since, the project shall be on a non-agricultural land, it shall not alter the crop production of
the area. Further, the necessary environmental protection measures have been planned
under EMP e.g. air pollution control systems shall be designed to take care of even
emergency releases of the gaseous pollutants like SPM, SO2, NOx, HCl, CO and regular
environmental surveillance shall be done, so as not to have any short-term or cumulative
effect on the crops and the natural vegetation of the area.
4.2.8.3 FISHERIES AND AQUATIC LIFE
Since the effluents and emissions generated from the project activities shall be treated and
disposed as per the EMP provisions, proposed project shall not envisaged any adverse effect
on fisheries and aquatic life.
4.2.8.4 AESTHETIC ENVIRONMENT
The proposed activities and further plantation will enhance the aesthetic environment.
4.2.8.5 DEMOGRAPHY, ECONOMICS, SOCIOLOGY AND HUMAN SETTLEMENT
M/s. Gujarat Dyestuff Industries will give employment to about 40 employees (Including
Contract workers) (Existing – 20 + Additional – 20). In addition to direct employment,
indirect employment shall generate ancillary business to some extent for the local
population. There is a positive effect due to improved communication and health services,
which have lead to economic prosperity, better educational opportunities and access to
better health and family welfare facilities. There has been a beneficial effect on human
settlement due to employment opportunities from various industries in region in addition to
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 20
employment generated by M/s. Gujarat Dyestuff Industries after proposed project more
direct and indirect employment shall be generated.
Local quality of life has improved. This factor combined with all other mitigation measures,
like proper treatment and disposal of hazardous waste; liquid effluent and gaseous
emission, has minimized the adverse impact on ecology and has a beneficial impact on
human settlement and employment opportunities. There has been a beneficial impact on
the local socio-economic environment. There shall be no displacement of any population in
plant area. Any major activity that may lead to resettlement of the people is considered as
permanent impact. Hence, there is no permanent impact on this account. The increasing
industrial activity will boost the commercial and economical status of the locality up to some
extent.
Socio-Economic Environment
Environmental Impact Assessment is a study or an estimate of the probable positive or
negative impact a proposed project or expansion activity of an existing project could have
on the environment, consisting of natural, social and economic aspects. An assessment of
socio-economic environment forms an integral part of an EIA study. Therefore, base-line
information for the same was collected during the study period. The base-line S.E. data
collected for the study region has been identified in four major indicators namely-
Demography, civic amenities, Economy and social culture.
Employment:
During construction phase of the company, skilled and un-skilled manpower will be required
and their requirement will be met with from the local community. M/s. Gujarat Dyestuff
Industries will give employment to 40 employees (Including Contract workers) (Existing – 20
+ Additional – 20). With the employment opportunities, local people’s income will increase
and thereby, their economic status will boost up. Further, secondary jobs shall also increase
in the local area to provide day-to-day needs/services to the working men. Demand for
essential daily utilities in the market will also temporarily increase to some extent.
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 21
Public Health:
During construction period the workers will be provided wills safe water supply, low-cost
sanitation facilities, first Aid Treatment, necessary personal protective equipment etc, to
prevent an increase in diseases related to personal hygiene. With some other industrial
units coming up in the surrounding area, Govt. dispensary, medical check-up, medicines,
services of nurses & doctors etc. are likely to be increased with a view to taking care of
general health of the local community.
Education:
Presently, every village has a primary school up to VII std. and for higher standard education
except Dahej, the students, both boys and girls, have to go to Bharuch. With increase in
population due to industrial growth, the surrounding villages may start higher standards
upto X and XII. Not only male students but female students can also take advantage of the
some and thereby, percentage of literate population in the local area may increase.
Transport:
With increased employment opportunities and higher economic status of the local
community and with an increase in market conditions, transport facilities by way of buses,
two-wheeler & four-wheeler vehicles will develop in future. Thus, overall development of
the local community and their health is likely to become a matter of fact with the co-
operation and support of industrial organizations of the local area. To sum up, it could be
said that there will be a positive effect due to improved communication and health services,
which would lead to economic prosperity, better educational opportunities and access to
better health and family welfare facilities. There will be a beneficial effect on human
settlement due to employment opportunities from various industrial establishments in local
area in addition to employment generated by M/s. Gujarat Dyestuff Industries. There is
likely to be a beneficial impact on the local Socio-Economic environment. There shall be no
displacement of any population in the plant area. The increasing industrial activity will boost
up the commercial and economical status of the locality to some extent.
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 22
1. This project is on non-agricultural land and therefore, it is not likely to alter the crop
production.
2. The manufacturing unit will adopt comprehensive environmental plan covering
several environment protection measures, to reduce the environmental pollution
resulting from the project.
To control the emission from process and utility stacks, the company would regularly
examine, inspect and test its emission to make sure that the emission is below the
permissible limit. With this, the status of sanitation and community health of the area would
not change.
4.2.8.6 FOREST, NATIONAL PARKS / SANCTUARIES
There is no reserved forest & no national park or sanctuary within 10 km radius of the plant.
There shall be no impact on the same.
4.2.8.7 PLACES OF ARCHAEOLOGICAL/HISTORICAL/RELIGIOUS/TOURIST INTEREST
There is no place of archaeological, historical, religious or tourist interest within the study
area i.e.10 km radius of plant site. Hence, there shall be no impact on places of interest.
4.3 MATRIX REPRESENTATION
The parameters discussed are presented in the form of a matrix in Table 4.4. There is no
requirement of construction phase and the industry is in operation for existing products.
The impact matrix relating the parameters to the activities during operation phase and
construction phase is presented in Table 4.5. The quantification of impact is done using
numerical scores 0 to 5 as per the following criteria.
Score Severity criteria
0 No impact
1 No damage
2 Slight/ Short-term effect
3 Occasional reversible effect
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 23
4 Irreversible/ Long-term effect
5 Permanent damage
The scores for various parameters and activities are presented in Table 4.6.
4.3.1 CUMULATIVE IMPACT CHART
The total negative impact of various activities on any one parameter is represented as a
cumulative score and the cumulative scores of various parameters are given in the form of a
cumulative impact chart presented in Table 4.7. Any particular parameter having an
individual score greater than 5 or cumulative score of 20 implies serious effects due to the
project and calls for suitable mitigation measures. It is evident from the matrices that the
resultant impact is beneficial to the local population and due to export (and import
substitution) the resultant impact is beneficial to our country.
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 24
TABLE - 4.4
___________________________________________________________________________
IMPACT IDENTIFICATION MATRIX (CONSTRUCTION PHASE)
ACTIVITIES
DURING
CONSTRUCTI
ON PHASE
Air
Qualit
y
Noise
&
Odour
Water
Quality
Land
Quality
Infrast
ructur
e
Service
s
Env.
Hazard
s
Terrestrial
Ecology
Land use
Socio-
Econo
mic
Status
Aquatic
Ecology
Water
Requirement
× x x × × ×
Material
Storage/
Transport
× × × × × × × × x ×
Material
Handling
× × × × × × ×
Utilities × × × ×
Effluent
Discharge
× x × × × x
Gaseous
Emissions
× × x × x x x
Fugitive
Emissions
× × x × x x x
Solid Waste
Disposal
× × × × x × ×
Spills & Leaks × × × × × ×
Shutdown/
Startup
×
Equipment
Failures
× x
Transport of
Workers
× × × ×
Movement of
Vehicles
× × x × ×
Medical &
Other Needs
× ×
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 25
TABLE – 4.4 (CONTD.)
___________________________________________________________________________
IMPACT IDENTIFICATION MATRIX (OPERATION PHASE)
ACTIVITIES
DURING
OPERATION
PHASE
Air
Quality
Noise
&
Odour
Water
Qualit
y
Land
Quality
Infrastr
ucture
Services Env.
Hazards
Terrestrial
Ecology
Land use
Socio-
Economic
Status
Aquatic
Ecology
Water
Requirement
x X X
Raw material
Storage/
Transport
X X X X X
Raw Material
Handling
X X X X
Utilities X X X X
Effluent
Discharge
X X X X X X
Gaseous
Emissions
X X X
Fugitive
Emissions
X X X X
Solid Waste
Disposal
X X X X X X
Product
Storage/
Handling
X X X
Spills & Leaks X X X X X X X X
Shutdown/
Startup
X X X X
Equipment
Failures
X X X
Plant
Operations
X X X X X X X X
Transport of
Workers
X X X
Movement of
Vehicles
X X X
Medical &
Other Needs
X X X
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 26
TABLE - 4.5
__________________________________________________________________________
CONSTRUCTION & OPERATION STAGE POTENTIAL IMPACTS & MITIGATIVE MEASURES
ENVIRONMENTA
L COMPONENTS
POTENTIAL IMPACTS SOURCES OF IMPACT MITIGATIVE MEASURE REMARKS
Water Quality Deterioration of water
quality
Construction activity &
abstraction of water for
construction
requirement and
sanitation in housing
for workers.
Discharge of process
effluents, sewage and
utility wastewater
Proper management of
surface water run off
shall be made
Effluent treatment
plant (ETP)
Discharge standards
specified by authorities
are being met
Minor adverse impact
ZLD Plant
Air Quality Increase in SO2, NOX,
SPM & HCl & Cl2
concentrations in
ambient air
Process emissions,
Fugitive emissions &
Utility stack emissions
Control equipment for
fugitive emissions
Adequate stack heights
& APCE
No remarkable increase
in GLCs.
NAAQ Standards are
met
Minor adverse impacts
on ambient air quality
Socio-Economic Overall growth &
development of area,
increased employment,
improvement in
infrastructure and
growth of downstream
industries
Project activities General area planning
in advance by GIDC and
classified as notified
industrial estate by
GIDC
Beneficial change
Terrestrial
Ecology
Minor loss of habitat-
flora & fauna, loss of
agricultural land
Project activities Green belt Proper
management of solid
waste
No impact
Noise Increased noise level Project operation Noise abatement at
generation point &
green belt before
receptor
Marginal impact
Infrastructure &
Services
Improved
communication,
transport, housing,
educational & medical
facilities
Project Development has been
gradual
Beneficial impact
Environmental
Hazards
Risk to environment &
neighboring population
Handling and storage of
chemicals, solvents &
fuels
On site & off site
Disaster management
plan &
Safe practices
Insignificant adverse
impact
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 27
TABLE - 4.6
___________________________________________________________________________
ENVIRONMENTAL IMPACT MATRIX
Activities Environmental Parameter
Air
Quality
Noise &
Odour
Water
Quality
Land
Environ
ment
Infrastr
ucture
Servi
ces
Environ
mental
Hazard
Housing Terrestrial
Ecology/
Land use
Socioec
onomic
Status
Aquatic
Ecology
Water
Requirement
0 0 1 0 1 1 0 0 0 1 1
Effluent
Discharge
0 0 1 1 1 1 1 0 1 0 0
Gaseous
Emissions
2 0 0 0 0 0 1 0 1 0 0
Fugitive
Emissions
1 1 0 0 0 0 1 0 1 0 0
Solid Waste
Disposal
1 0 1 1 1 1 1 0 0 0 0
Raw Material
Storage/
Transport
1 1 0 2 2 1 1 0 1 1 0
Raw Material
Handling
1 1 0 1 0 0 1 0 1 0 0
Product
Storage
1 0 0 1 0 0 1 0 0 0 0
Spills & Leaks 1 1 1 1 1 1 1 0 1 0 0
Shut down/
Start up
1 1 1 0 1 1 0 0 1 1 0
Equipment
Failure
1 1 1 0 0 1 1 0 1 0 0
Plant
Operations
1 1 1 0 1 1 1 1 1 1 0
Transport of
workers
1 1 0 0 1 1 0 0 1 1 0
Movement of
Vehicles
1 1 0 0 1 1 0 0 1 1 0
Housing
Needs
0 1 0 1 1 1 0 1 0 1 0
Utilities 1 1 0 0 0 1 0 0 0 0 0
Cumulative
score
14 11 7 8 11 12 10 2 11 7 1
M/s. GUJARAT DYESTUFF INDUSTRIES
ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 4 - 28
TABLE - 4.7
___________________________________________________________________________
CUMULATIVE IMPACT CHART
ENVIRONMENTAL
PARAMETER
TOTAL CUMULATIVE
SCORE
Air Quality 14
Noise and Odour 11
Water Quality 7
Land Requirement 8
Infrastructure 11
Service 12
Environmental Hazards 10
Housing 2
Terrestrial Ecology/ Land use 11
Socio Economic Status 7
Aquatic Ecology 1
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 5 - 1
CHAPTER - 5
________________________________________________________________________
ENVIRONMENTAL MONITORING PLAN
5.1 PROJECT ENVIRONMENT MONITORING PLAN
M/s. Gujarat Dyestuff Industries will adopt comprehensive environmental monitoring
plan which is essential to take into account the changes in the environment. The
objective of monitoring is:
• To verify the result of the impact assessment study in particular with regards to
new developments.
• To follow the trend of parameters which have been identified as critical
• To check or assess the efficiency of controlling measures
• To ensure that new parameters, other than those identified in the impact
assessment study, do not become critical through the commissioning of new
project.
To monitor effectiveness of Control Measures:
• Monitor daily, Assess effectiveness of the Control Measures being implemented,
Explore the need to modify or add new Control Measures particularly if a
violation is observed & Report weekly.
• Regular monitoring of environmental parameters will be made to find out any
deterioration in environmental quality.
• Monitoring of the proposed project area will be regularly conducted. The
attributes, which merit regular monitoring, are specified underneath
Environment monitoring plan for proposed plant has described in Table:-5.1 along with
Environment Components, parameter, standards to be followed, location and
frequency.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 5 - 2
TABLE:-5.1
PROJECT ENVIRONMENT MONITORING PLAN
Environmental
Component
Parameters Standards Frequency
Air Environment
AAQM at plant site As prescribed by GPCB
including PM2.5, PM10, SO2,
NOx, HCl, HBr, HC & VOCs
Prescribed by
GPCB
Once in a month in upwind
and downwind direction.
Stack emission monitoring
of emissions sources
Parameters prescribed by
GPCB
In stack
Prescribed by
GPCB
Once In a Month
Fugitive emissions/ work
place monitoring within
the plant side
VOC Prescribed by
GPCB
Regular
Water Environment
Analysis of treated effluent Parameters prescribed by
GPCB
Prescribed by
GPCB
Once a day by Company,
Once a month by NABL Lab.
Ground water quality Colour, pH, TDS, TSS,
Sulphates, Chlorides, BOD3,
COD, oil and grease, etc.
Water quality
Standards
Once a Season
Noise Environment
Ambient Noise at plant site Noise level in dB(A) As per National
Noise Standards
Once In a Month
Soil Environment
At plant site Analysis of pH,
conductivity, Sulphates,
calcium, magnesium, Cl-
-- Pre and post monsoon season
by Company
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
____________________________________________________________________________________________________________ Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 5 - 3
5.1.1 LABORATORY FACILITIES
M/s. Gujarat Dyestuff Industries will develop its own laboratory equipped with different
equipment i.e. analytical balance, pH meter, COD heating apparatus, oven, incubator
and necessary glass-wares. In addition to that M/s. Gujarat Dyestuff Industries will also
develop quality control laboratory which is equipped with sophisticated equipments.
Equipment of quality control laboratory is also available for analysis of environment
parameters. M/s. Gujarat Dyestuff Industries will make plan of the regular monitoring to
ensure that pollution will be limited to below prescribed limits and to take corrective
action. In case the monitored results of environment pollution will be found to exceed
the prescribed limits, remedial actions will be taken through the concerned plant
authorities. The actual operation and maintenance of pollution control equipments of
each department will under respective department heads.
5.1.2 DOCUMETATION & RECORDS
The environmental department in respect of operation of pollution control facility will
maintain following records.
� Instruction manual for operation and maintenance of pollution control equipments.
� Log sheet for self-monitoring of pollution control equipments.
� Manual for monitoring of Air, water for Ambient conditions
� Instruction manual for monitoring of water, solid and gaseous parameter
discharged from the factory and also for various parameters of pollution control
facilities.
� Stationary records as per the Environmental Acts.
� Monthly and annual progress reports.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-1
CHAPTER - 6
___________________________________________________________________________
ADDITIONAL STUDIES (RISK ASSESSMENT & DISASTER MANAGEMENT PLAN)
In order to support the environment impact assessment and environment management
plan, following additional studies have been included in the report.
• Risk assessment
• Disaster Management Plan
• On site and off site emergency action plan
• Occupational Health and Safety Management System
6.1 RISK ASSESSMENT
6.1.1 INTRODUCTION
Hazard analysis involves the identification and quantification of the various hazards (unsafe
conditions). On the other hand, risk assessment deals with recognition and computation of
risks, the equipment in the plant and personnel are prone to, due to accidents resulting
from the hazards present in the plant. Risk assessment follows an extensive hazard analysis.
It involves the identification and assessment of risks the neighboring populations are
exposed to as a result of hazards present. This requires a thorough knowledge of failure
probability, credible accident scenario, vulnerability of population etc. Much of this
information is difficult to get or generate. Consequently, the risk assessment is often
confined to maximum credible accident studies. It provides basis for what should be type
and capacity of its on-site and off-site emergency plan also what types of safety measures
shall be required.
6.1.2 APPROACH TO THE STUDY
Risk involves the occurrence or potential occurrence of some accidents consisting of an
event or sequence of events. The risk assessment study covers the following:
• Identification of potential hazard area;
• Identification of representative failure cases;
• Visualization of the resulting scenarios in terms of fire and explosion;
• Assess the overall damage potential of the identified hazardous events and the
impact zones form the accidental scenarios;
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-2
• Furnish the recommendations on the minimization of the worst accident possibilities
• Preparation of Disaster Management Plan;
• Emergency Plan, which includes Occupational and Health Safety Plan;
6.1.3 METHODOLOGY
Quantitative risk assessment (QRA) is a means of making a systematic assessment of the
risks from hazardous activities, and forming a rational evaluation of their significance, in
order to provide input to a decision-making process. The term ‘quantitative risk assessment’
is widely used, but strictly this refers to the purely numerical assessment of risks without
any evaluation of their significance. The study has been conducted based on the premises of
a traditional Quantitative Risk Assessment. The key components of a QRA are explained
below, and illustrated in Figure-6.1 and Figure-6.2.
FIGURE – 6.1
QRA METHODOLOGY
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-3
FIGURE–6.2
FLOW CHART FOR QUANTITATIVE RISK ASSESSMENT
Start Identify Risk Areas
Select a Risk Area
Identify Failure Cases
Select a Failure Cases
Identify Consequence Outcomes
Select Consequence Outcomes
Determine Frequency
Estimate Consequence
Record Frequency and Consequence in a summary Table
Have all Consequence outcomes been studied?
Have all failure cases been studied?
Have all risk areas been studied?
Draw Risk Contours Finish
Yes
Next Next
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-4
6.1.4 HAZARD IDENTIFICATION
Identification of hazards in the proposed expansion activity is of primary significance of the
analysis, and quantification. Hazard states the characteristics of system/plant/process that
presents potential for an accident. All the components of a system/plant/process need to be
thoroughly examined to assess their potential for initiating or propagating an unplanned
event/sequence of events, which can be termed as an accident.
6.1.4.1 IDENTIFICATION OF HAZARDOUS AREAS
The procedure for QRA starts with identification of major risk areas in the installation.
Operation carried out in specialty and agrochemical Industries usually come under certain
board, general categories. At M/s. Gujarat Dyestuff Industries, major risk areas are as
follows:
• Bulk storage area for Raw Materials at ambient temperature and atmospheric
pressure.
• Process Plant involving pumping, transportation, reactors, distillation, heating, cooling,
etc.
• Bulk loading and unloading from storage tanks to road takers and vice versa.
6.1.4.2 IDENTIFICATION OF FAILURE CASES FOR HAZARDOUS AREAS
• Release due to catastrophic failure of storage tanks or process vessels.
• Rupture of connected pipe with storage tank or process vessels.
• Continuous release at significant rates for long durations transfer pipelines caused by
sudden, major break of the pipeline.
• Continuous release at low rate through small holes or cracks in piping and vessels, flange
leaks, and leakage from pump glands and similar seals.
It is to be noted that for Quantitative Risk Assessment, worst case scenarios has been
considered, though their frequency of occurrence is much lower than the cases of small
leaks.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-5
6.1.4.3 MAJOR HAZARDOUS AREAS
The hazardous chemical storage area is shown in Figure-6.3. The major Hazardous chemicals
to be stored, transported, handled and utilized within the plot area are summarized in the
Table-6.1. Other hazards and control measures are summarized in Table-6.2. Facilities /
System for process safety, transportation, fire fighting system and emergency capabilities to
be adopted are stated below.
FIGURE-6.3
HAZARDOUS CHEMICAL STORAGE AREA
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-6
TABLE-6.1
STORAGE AND HANDLING DETAILS OF HAZARDOUS CHEMICALS
Sr.
No.
Name of the chemicals Max.
quantity
Stored in MT
No. of
Tanks/Drums
Type of
Storage
Phase
of
chemical
Storage
Condition
Hazards
Involved
1 Acetic Acid 150 2 Tank Liquid Above ground /
NTP
Flammable
2 Tri Ethyl Phosphate 0.2 12 Drums Liquid Above ground /
NTP
Corrosive
3 Acetic Anhydride 200 2 Tank Liquid Above ground /
NTP
Flammable/
Corrosive
4 Dil. Acetic Acid 100 1 Tank Liquid Above ground /
NTP
Flammable
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-7
TABLE 6.2
OTHER HAZARDS AND CONTROL
SR.
NO.
NAME OF THE POSSIBLE
HAZARD OR
EMERGENCY
ITS SOURCES
&
REASONS
ITS EFFECTS ON
PERSONS, PROPERTY
& ENVIRONMENT
PLACE OF ITS
EFFECT
CONTROL MEASURES PROVIDED
1 BOILER
(1) Burning
(2) Physical injury
(3) Explosion
Over pressure in the boiler if
safety valve not working.
Water level indicator not
working. Low water level
indicator fail. High temp.
System fails.
Minor/Major Injury
Loss of human life
Loss of property (Loss
of Main/ Machine
Material)
Boiler House and
surrounding places
Lower & Upper Level Indication System provision. Safety valves
for pressure control fixed temp. & pressure indicator provided.
Blow down & blowing system provided for cleaning tube and
shell. Soft water used. Inter locking provided on pumps, FD fan, ID
fan. Periodical checking & inspection maintenance done. Yearly
inspection done by Boiler Inspector
2 ELECTRICITY
(1) Burning
(2) Fire
(3) Shock
Loose Contacts, Weak
earthling Short Circuit
Improper Insulation
Burning, Shock,
Death
Surrounding the
accident area
Proper Earthing, Periodical Checking of joints, proper insulations
of Equipments, etc. Flame proof fitting in solvent storage area,
bounding and jumpers to all solvent barrier lines provided.
3 HOUSE KEEPING
(1) Physical
(2) Burning
(3) Fire
(4) Chemical Exposure
Bad House keeping Physical / Chemical
Thermal Burn Injury
(Major / Minor)
In all surrounding
areas i.e. Storage,
Plants
Proper Handling, regular cleaning, Proper placement of material
(RIGHT THING AT THE RIGHT PLACE)
4 PIPE LINE LEAKAGES
Spillages etc.
(1) Corrosion
(2) Toxic gas release
Leaking of pipe line due to
corrosion, Loose contact etc.
Physical / Chemical
Thermal Burn Injury
(Major / Minor)
Plant area Proper maintenance, Proper Selection of Material for pipe lines,
Immediate attention, Earthing provided, flame proof fitting, NO
SMOKING Boards displayed.
5 Structural Failure Inside the factory (Corrosion) Injury/Death to
persons, damage to
property
Within the factory Automatic operation Periodic Testing of safety valves Regular
Inspection and Maintenance
6 Toxic Release from
outside
Outside the factory Injury/Death Within & outside
the unit
Alarm, Evacuation rescue & shelter/ Welfare
7 Natural Calamity Nature Injury / Death to
persons, damage to
property
Within & outside
the unit
Alarm, Evacuation rescue & shelter/ Welfare
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-8
TABLE 6.3
HAZARDOUS PROPERTIES OF THE CHEMICALS, COMPATIBILITIES, SPECIAL HAZARD
SR. NAME OF CHEMICAL HAZARD FLASH
POINT 0
C
BP 0
C
LEL % UEL
%
SP.GR.
20 0
C
VD SOLUBILITY
WITH WATER
at 20 0 C
NFPA
H F R
HAZARDOUS COMBUSTION
PRODUCT
TLV/
TWA
IDLH
LC50
LD50
Antidotes
1. Acetic Acid
CAS-64-19-7
F 40 118 4 16 1.049 2.1 Infinitely
Soluble
3 2 0 Carbon dioxide and carbon
monoxide may form when
heated to decomposition. May
also release toxic and irritating
vapors.
10 ppm - 5620 ppm 3310
mg/kg
Milk of
Magnesia
2. Acetic Anhydride
CAS-108-24-7
C/F 49 139.9 2 10.2 1.08 3.52 Soluble 3 2 1 Irritating vapors are generated
when heated
5 ppm 200 ppm 1000 ppm 1780
mg/kg
-
3. Triethyl Phosphate
CAS-78-40-0
C/F 130 215 1.2 10 1.072 6.28 Soluble 2 1 0 These products are carbon
oxides (CO, CO2).
- - 2050 ppm 1600
mg/kg
-
F = FIRE T = TOXIC C = CORROSIVE
E = Explosive R = REACTIVE
BP = BOILING POINT LEL = LOWER EXPLOSIVE LIMIT
UEL = UPPER EXPLOSIVE LIMIT SP.GR = SPECIFIC GRAVITY
VD = VAPOUR DENSITY ER = EVAPORATION RATE
H = HEALTH HAZARD CLASS F = FIRE HAZARD CLASS
R = REACTIVE HAZARD BR = BURNING RATE
TLV = THRESHOLD LIMIT VALUE PPM = PARTS PER MILLION
STEL = SHORT TERM EXPOSURE LIMIT NFPA = NATIONAL FIRE PROTECTION ASSOCIATION-USA
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-9
PRECAUTIONS DURING STORAGE AND TRANSPORTATION OF HAZARDOUS CHEMICALS
LIQUIDS
• Always use the road tankers having authorization for transporting the said liquids.
• Vendor will be asked to provide MSDS to Tanker Driver.
• Tankers will have clearly marked identification of material being contained with
mentioning Safety Card.
• Driver to have concerned Safety Officer’s contact details to contact him in case of
emergency.
• Provide muffler on exhaust while entering tanker within premises.
• Ensure Earthing Boss connection before starting any transferring.
• SOP to cover routine checking of Tank farm area to be carried out for checking any
spillage / leakage.
• Tanks will be inspected physically daily for having any visual abnormality.
• Readings of Temperature & Pressure will be noted, recorded & reported immediately for
abnormality.
• Safety instruments like rupture disc, safety valves will be checked at defined duration for
intakeness.
• Scheduled testing of tanks to be done for thickness testing.
• Tanks to be painted on regular interval defined as per laws to protect them from
atmospheric corrosion.
• Barrels to be checked for proper fixing of bungs before sending it outside the premises.
• Barrels to be monitored physically daily for developing any pressure or vacuum within it
on long storage.
• Concerned persons will be trained properly to use spill kit in case of observing any
spillage inside warehouse.
SOLIDS
• Vendor will be asked to provide MSDS to Truck Driver.
• Driver to have concerned Safety Officer’s contact details to contact him in case of
emergency.
• Provide muffler on exhaust while entering truck within premises.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-10
• SOP to cover routine checking of Bags & Containers for checking any damage.
• Containers to be tested for safe racking & transportation.
• Proper PPE to be used while handling the material & concerned persons to be trained for
usage of the same.
• Concerned persons will be trained properly to use spill kit in case of observing any
spillage inside warehouse.
The major hazards in the M/s. Gujarat Dyestuff Industries are described below.
• Toxic/Corrosive hazards due to leakage of hazardous chemicals from storage tank or
carboys.
• Electrical hazards due to the electrical major equipment/ machinery, operations,
welding, motors, and heavy lift devices, cabling, human intervention (short circuit
possibility), maintenance work (due to machinery breakdown etc.), plant lighting related
electrical hazards.
• Possibility of human injury due to working with mechanical machines, manual handling
etc.
• Possibility of injury during chemicals handled, during operations and due to intoxication.
• Major dropped objects hazard due to large number of physical handling steps /
operations involved with crane/ overhead lifting/ hoisting equipment.
• Fires in any part of the plant working areas – there is a possibility of rapid escalation if it
is not brought under control quickly.
• Possibilities of fire hazards at transformers, switchgear and other electrical equipment
etc.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-11
6.1.4.4 TRANSPORTATION, UNLOADING AND HANDLING PROCEDURE FOR HAZARDOUS
CHEMICALS
Transportation, Unloading and Handling Procedure
SR.
NO.
ACTIVITY TYPE OF POSSIBLE
HAZARD
MITIGATION MEASURES
Leakage& Spillage
• Check the source of leakage point.
• Do not touch damaged containers or spilled material
unless wearing appropriate protective clothing.
• Stop leak if you can do it without risk.
Fire,& explosion • Use water spray to reduce vapors; do not put water
directly on leak, spill area or inside container.
• Keep combustibles (wood, paper, oil, etc.) away from
spilled material.
1 Transportation of Solvents by
road tanker
Toxic release • Isolate the area
• Isolate the container
• Training will be provided to driver and cleaner
regarding the safe driving, hazard of Flammable
chemicals, emergency handling.
• TREM card will kept with TL.
• Fire extinguishers will be kept with TL.
• Flame arrestor will be provided to TL exhaust.
• Instructions will be given not to stop road tanker in
populated area.
• Clear Hazard Identification symbol and emergency
telephone number will be displayed as per HAZCHEM
CODE.
• Appropriate PPEs will be kept with TL.
2 Road tanker unloading at
project site.
Leakage& Spillage
• Check the source of leakage point.
• Do not touch damaged containers or spilled material
unless wearing appropriate protective clothing.
• Stop leak if you can do it without risk.
Fire,& explosion • Use water spray to reduce vapors; do not put water
directly on leak, spill area or inside container.
• Keep combustibles (wood, paper, oil, etc.) away from
spilled material.
Toxic release • Isolate the area
• Isolate the container
• Check the source of leakage point.
• Isolate the area
• Isolate the container
• Spray the water on leakage
• Priority will be given to Tanker to immediately enter the
storage premises at site and will not be kept waiting
near the gate or the main road.
• Security person will check License, TREM CARD, Fire
extinguisher condition; Antidote Kit, required PPEs as
per SOP laid down.
• Store officer will take sample as per sampling SOP from
sampling point.
• After approval of QC department unloading procedure
will be allowed be started.
Following precautions will be adopted during unloading
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-12
• Wheel stopper will be provided to TL at unloading
platform.
• Static earthing will be provided to road tanker.
• Tanker unloading procedure will be followed according
to check list and implemented.
• Flexible SS hose connection will be done at TL outlet
line.
• The quantity remaining in the hose pipeline will be
drained to a small underground storage tank, which will
be subsequently transferred by nitrogen pressure to the
main storage tank thus ensuring complete closed
conditions for transfer from road tanker.
• All TL valves will be closed in TL.
• Finally earthing connection and wheel stopper will be
removed.
• Only day time unloading will be permitted.
Leakage& Spillage • Check the source of leakage point.
• Do not touch damaged containers or spilled material
unless wearing appropriate protective clothing.
• Stop leak if you can do it without risk.
Fire, Explosion • Use water spray to reduce vapors; do not put water
directly on leak, spill area or inside container.
• Keep combustibles (wood, paper, oil, etc.) away from
spilled material.
3 Storage tank safety
Toxic release. • Isolate the area
• Isolate the container
• Check the source of leakage point.
• Isolate the area
• Isolate the container
• Spray the water on leakage
• SS storage tank will be provided as per IS code.
• Dyke wall will be provided to storage tank.
• Level transmitter will be provided with low level high
level auto cut-off provision.
• Vent will be connected to water trap and vent of water
trap will be provided with flame arrestor.
• Water sprinkler system will be provided to storage tank.
• Fire hydrant monitor with foam attachment facility will
be provided.
• Dumping / Drain vessel/alternate vessel will be
provided to collect dyke wall spillage material.
• FLP type pump will be provided.
• Nitrogen blanketing will be provided to storage tank.
• Double static earthing will be provided to storage tank.
• Double Jumper clip will be provided to all Solvent
handling pipeline flanges.
4 Solvent transfer from storage
tank to Day tank
Leakage& Spillage due to
Line rupture, Flange
Gasket failure, Fire,
Explosion, Toxic release.
• Double mechanical seal type FLP type pump will be
provided.
• Double on / off switch will provided at tank farm and
process area near day tank. Pump auto cut off with day
tank high level will be provided.
• Flame arrestor will be provided on day tank vent.
• Over flow will be provided for additional safety and it
will be connected to main storage tank.
• NRV will be provided on pump discharge line.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-13
• Double Jumper clip will be provided to all solvent
handling pipeline.
• Double static earthing will be provided to day tank.
5 Solvent transfer from Day
tank to reactor.
Leakage, Spillage due to
Line rupture, Flange
Gasket failure, Fire,
Explosion, Toxic release.
• Gravity transfer.
• Total quantity of day tank material will be charged in to
reactor at a time.
• NRV will be provided on day tank outlet line.
• Static earthing will be provided to storage tank.
• Double Jumpers will be provided to pipeline flanges.
6.1.5 CONSEQUENCE ANALYSIS
In a plant handling hazardous chemicals, the main hazard arises due to storage, handling &
use of these chemicals. If these chemicals are released into the atmosphere, they may cause
damage due to resulting fires or vapour clouds. Blast Overpressures depend upon the
reactivity class of material between two explosive limits.
Operating Parameters
Potential vapour release for the same material depends significantly on the operating
conditions. Especially for any liquefied gas, the operating conditions are very critical to
assess the damage potential. If we take up an example of ammonia, if it is stored at ambient
temperature, say 30oC, and then the vapour release potential of the inventory is much
higher as compared to the case if it is stored at 0oC.
Inventory
Inventory Analysis is commonly used in understanding the relative hazards and short listing
of release scenarios. Inventory plays an important role in regard to the potential hazard.
Larger the inventory of a vessel or a system, larger the quantity of potential release. The
potential vapour release (source strength) depends upon the quantity of liquid release, the
properties of the materials and the operating conditions (pressure, temperature). If all
these influencing parameters are combined into a matrix and vapour source strength
estimated for each release case, a ranking should become a credible exercise.
Loss of Containment
Plant inventory can get discharged to Environment due to Loss of Containment. Certain
features of materials to be handled at the plant need to the clearly understood to firstly list
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-14
out all significant release cases and then to short list release scenarios for a detailed
examination. Liquid release can be either instantaneous or continuous. Failure of a vessel
leading to an instantaneous outflow assumes the sudden appearance of such a major crack
that practically all of the contents above the crack shall be released in a very short time. The
more likely event is the case of liquid release from a hole in a pipe connected to the vessel.
The flow rate is depending on the size of the hole as well as on the pressure, which was
present, in front of the hole, prior to the accident. Such pressure is basically dependent on
the pressure in the vessel. The vaporisation of released liquid depends on the vapour
pressure and weather conditions. Such consideration and others have been kept in mind
both during the initial listing as well as during the short listing procedure. In the study,
Maximum Credible Loss accident methodology is to be used, therefore, the largest potential
hazard inventories have been considered for consequence estimation.
6.1.5.1 DAMAGE CRITERIA
In consequence analysis, use is made of a number of calculation models to estimate the
physical effects of an accident (spill of hazardous material) and to predict the damage
(lethality, injury, material destruction) of the effects. The calculations can roughly be divided
in three major groups:
a) Determination of the source strength parameters;
b) Determination of the consequential effects;
c) Determination of the damage or damage distances.
The basic physical effect models consist of the following.
Source strength parameters
* Calculation of the outflow of liquid, vapour or gas out of a vessel or a pipe, in case of
rupture. Also two-phase outflow can be calculated.
* Calculation, in case of liquid outflow, of the instantaneous flash evaporation and of
the dimensions of the remaining liquid pool.
* Calculation of the evaporation rate, as a function of volatility of the material, pool
dimensions and wind velocity.
* Source strength equals pump capacities, etc. in some cases.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-15
Consequential effects
* Dispersion of gaseous material in the atmosphere as a function of source strength,
relative density of the gas, weather conditions and topographical situation of the
surrounding area.
* Intensity of heat radiation [in kW/ m2] due to a fire or a BLEVE, as a function of the
distance to the source.
* Energy of vapour cloud explosions [in N/m2], as a function of the distance to the
distance of the exploding cloud.
* Concentration of gaseous material in the atmosphere, due to the dispersion of
evaporated chemical. The latter can be either explosive or toxic.
It may be obvious, that the types of models that must be used in a specific risk study
strongly depend upon the type of material involved:
- Gas, vapour, liquid, solid
- Inflammable, explosive, toxic, toxic combustion products
- Stored at high/low temperatures or pressure
- Controlled outflow (pump capacity) or catastrophic failure?
Selection of Damage Criteria
The damage criteria give the relation between extent of the physical effects (exposure) and
the percentage of the people that will be killed or injured due to those effects. The
knowledge about these relations depends strongly on the nature of the exposure. For
instance, much more is known about the damage caused by heat radiation, than about the
damage due to toxic exposure, and for these toxic effects, the knowledge differs strongly
between different materials.
In Consequence Analysis studies, in principle three types of exposure to hazardous effects
are distinguished:
1. Heat radiation, from a jet, pool fire, a flash fire or a BLEVE.
2. Explosion
3. Toxic effects, from toxic materials or toxic combustion products.
In the next three paragraphs, the chosen damage criteria are given and explained.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-16
Heat Radiation
The consequence caused by exposure to heat radiation is a function of:
• The radiation energy onto the human body [kW/m2];
• The exposure duration [sec];
• The protection of the skin tissue (clothed or naked body).
• The limits for 1% of the exposed people to be killed due to heat radiation, and for
second-degree burns are given in the table herein:
Damages to Human Life Due to Heat Radiation
Exposure
Duration
Radiation for
1% lethality
(kW/m2)
Radiation for 2nd
degree burns
(kW/m2)
Radiation for
first degree
burns (kW/m2)
10 Sec 21.2 16 12.5
30 Sec 9.3 7.0 4.0
Since in practical situations, only the own employees will be exposed to heat radiation in
case of a fire, it is reasonable to assume the protection by clothing. It can be assumed that
people would be able to find a cover or a shield against thermal radiation in 10 sec. time.
Furthermore, 100% lethality may be assumed for all people suffering from direct contact
with flames, such as the pool fire, a flash fire or a jet flame. The effects due to relatively
lesser incident radiation intensity are given below.
Effects Due To Incident Radiation Intensity
INCIDENT
RADIATION
kW/m2
TYPE OF DAMAGE
0.7 Equivalent to Solar Radiation
1.6 No discomfort for long exposure
4.0 Sufficient to cause pain within 20 sec. Blistering of skin (first degree burns are likely)
9.5 Pain threshold reached after 8 sec. second degree burns after 20 sec.
12.5 Minimum energy required for piloted ignition of wood, melting plastic tubing etc.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-17
Explosion
In case of vapour cloud explosion, two physical effects may occur:
* a flash fire over the whole length of the explosive gas cloud;
* a blast wave, with typical peak overpressures circular around ignition source.
As explained above, 100% lethality is assumed for all people who are present within the
cloud proper.
For the blast wave, the lethality criterion is based on:
* A peak overpressure of 0.1 bar will cause serious damage to 10% of the
housing/structures.
* Falling fragments will kill one of each eight persons in the destroyed buildings.
The following damage criteria may be distinguished with respect to the peak overpressures
resulting from a blast wave:
Damage Due To Overpressures
Peak Overpressure Damage Type
0.83 bar Total Destruction
0.30 bar Heavy Damage
0.10 bar
0.03 bar
Moderate Damage
Significant Damage
0.01 bar Minor Damage
From this it may be concluded that p = 0.17 E+5 pa corresponds approximately with 1%
lethality. Furthermore it is assumed that everyone inside an area in which the peak
overpressure is greater than 0.17 E+ 5 pa will be wounded by mechanical damage. For the
gas cloud explosion this will be inside a circle with the ignition source as its centre.
Intoxication
The consequences from inhalation of a toxic vapour/gas are determined by the toxic dose.
This dose D is basically determined by:
- Concentration of the vapour in air;
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-18
- Exposure duration.
Furthermore, of course, the breathing rates of the victim, as well as the specific toxic
mechanism unto the metabolism play an important role.
The dose is defined as D = Cn.t, with:
C = concentration of the toxic vapour, in [ppm] or [mg/m3];
t = exposure duration, in [sec] or [min];
n = exponent, mostly > 1.0; this exponent takes into account the fact that a high
concentration over a short period results in more serious injury than a low
concentration over a relatively longer period of exposure. The value of n
should be greater than zero but less than 5.
The given definition for D only holds if the concentration is more or less constant over the
exposure time; this may be the case for a (semi) continuous source. In case of an
instantaneous source, the concentration varies with time; the dose D must be calculated
with an integral equation:
D = ∫ Cn.dt
For a number of toxic materials, so-called Vulnerability Models (V.M.) has been developed.
The general equation for a V.M. (probit function) is:
Pr = a + b.ln (Cn.t), with
Pr = probit number, being a representation of the percentage of people suffering
a certain kind of damage, for instance lethality
Pr = 2.67 means 1% of the population;
Pr = 5.00 means 50% of the population;
a and b material dependent numbers;
Cn.t = dose D, as explained above.
The values for a and b are mostly derived from experiments with animals; occasionally,
however, also human toxicity factors have been derived from accidents in past. In case only
animal experiments are available, the inhalation experiments with rats seem to be best
applicable for predicting the damage to people from acute intoxication. Although much
research in this field have been done over the past decades, only for a limited number of
toxic materials consequence models have been developed. Often only quite scarce
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-19
information is available to predict the damage from an acute toxic exposition. Data
transformation from oral intoxication data to inhalation toxicity criteria is sometimes
necessary. Generally, in safety evaluations pessimistic assumptions are applied in these
transformation calculations. The calculated damage (distance) may be regarded as a
maximum. For the purposes of a response to a major incident, the IDLH value level has been
chosen for the ‘wounded‘criteria. This type of injury will require medical attention.
6.1.5.2 MAXIMUM CREDIBLE LOSS ACCIDENT SCENARIOS
A Maximum Credible Accident (MCA) can be characterised as the worst credible accident. In
other words: an accident in an activity, resulting in the maximum consequence distance that
is still believed to be possible. A MCA-analysis does not include a quantification of the
probability of occurrence of the accident. Another aspect, in which the pessimistic approach
of MCA studies appears, is the atmospheric condition that is used for dispersion
calculations. As per the reference of the study, weather conditions having an average wind
speed of 1.40 m/s have been chosen.
The Maximum Credible Loss (MCL) scenarios have been developed for the Facility. The MCL
cases considered, attempt to include the worst “Credible” incidents- what constitutes a
credible incident is always subjective. Nevertheless, guidelines have evolved over the years
and based on basic engineering judgement, the cases have been found to be credible and
modelling for assessing vulnerability zones is prepared accordingly. Only catastrophic cases
have been considered and not partial or small failures (as is the case in Quantitative Risk
Assessment where contributions from low frequency - high outcome effect as well as high
frequency - low outcome events are distinguished). The objective of the study is emergency
planning, hence only holistic & conservative assumptions are used for obvious reasons.
Hence though the outcomes may look pessimistic, the planning for emergency concept
should be borne in mind whilst interpreting the results.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-20
6.1.5.2.1 CONSEQUENCE ANALYSIS CALCULATIONS
The Consequence Analysis has been done for selected scenarios. This has been done for
weather conditions having wind speed 1.40 m/s. In Consequence Analysis, geographical
location of the source of potential release plays an important role. Consideration of a large
number of scenarios in the same geographical location serves little purpose if the dominant
scenario has been identified and duly considered.
6.1.5.2.2 SOFTWARE USED FOR CALCULATIONS
PHAST MICRO: Phast is the most comprehensive software available for performing Process
Hazard Analysis (PHA), Quantitative Risk Assessment (QRA) and Financial Risk Analysis (FRA).
Our extensively validated software for consequence and risk assessment is used by
governments and industry helping them to comply with local safety regulation and their
own corporate best practice. Phast contains all the discharge, dispersion, effects and risk
models you will need to accurately assess all your major hazards and associated risks. Phast
Consequence provides you with comprehensive hazard analysis facilities to examine the
progress of a potential incident from the initial release to its far-field effects.
TOXIC AND FLAMMABLE IMPACT
It calculates the initial discharge, as the material expands from its storage conditions to
atmospheric, through dispersion, as the material mixes with air and dilutes, and the
subsequent toxic or flammable effects. Phast includes a wide range of models for discharge
and dispersion as well as flammable, explosive and toxic effects.
DISCHARGE
• Phast requires basic information about storage or process conditions and material
properties in order to perform discharge calculations
• The software comes with an integrated material property database containing more
than 1,600 pre-defined pure component chemicals
• Various discharge scenario options have been implemented to represent common
process failures, and model their behaviour. These include:
� Leaks and line ruptures from long & short pipelines
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-21
� Catastrophic ruptures
� Relief valve and disc ruptures
� Tank roof collapse
� Vent from vapour spaces
� In building release effects
DISPERSION
The dispersion models within Phast are able to model the following phenomena
• Dispersion of gas, liquid and two-phase releases
• Liquid droplet thermo dynamics calculations and liquid droplet rainout
• Pool spreading and vaporization
• Building wake dispersion effects for vapour releases
FLAMMABLE EFFECTS
For releases of flammable material Phast calculates
• Radiation profiles and contours from a range of fire scenarios including pool fires,
flash fires, jet fires and fire balls, including cross-wind effects on a jet fire
• Vapour Cloud Explosion modeling using industry standards models including the
TNO Multi-energy, Baker Strehlow Tang and TNT Equivalence models
• Overpressure contours from Boiling Liquid Expanding Vapour Explosions
TOXIC EFFECTS
• Graphs of toxic concentration profile
• Indoor and outdoor toxic dose prediction
• Reporting of distance to specific dose and concentration
• Calculated exposure time and use as “averaging time” for passive dispersion effects
PHAST RISK
Phast Risk allows you to combine the flammable and toxic consequences from each
scenario in your QRA model with their likelihood to quantify the risk of fatalities. Phast Risk
allows you to take account of local population distribution, sources of ignition, land usage
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-22
and local prevailing weather conditions. It is designed to perform all the analysis, data
handling and results presentation elements of a QRA within a structured framework.
Phast Risk allows you to quickly identify major risk contributors so that time and efforts can
be directed to mitigating these highest risk activities. Based on effects calculations and
population vulnerabilities, Phast Risk can integrate over all scenarios and weather
conditions to estimate the total risk. The established individual and societal risk indicators
are predicted by Phast Risk across your facility and surrounding area using the classical QRA
methodology. Risk ranking reports can be produced at points of strategic importance to
show the relative influence of the various failure scenarios and their contribution to both
the individual and societal risk metrics.
A key benefit of Phast Risk is the ability to identify major risk contributors and differentiate
these from incidents with worst case consequences which might otherwise dominate the
safety reviews. Whilst medium scale incidents have lesser consequences, they may have a
higher frequency, which, when combined with their hazardous effects, generate a higher
level of risk. Time and effort directed to mitigating high consequence but often low
frequency events may not be well spent. Phast Risk helps you direct this effort more
effectively. Phast Risk also provides facilities to help you manage large quantities of input
data, including scenarios, parameters, wind roses, ignition and population, and combine
these in many ways. This is critical when looking at sensitivity analyses and assessing the
merits of a range of risk reduction measures.
Benefits
• Facilitates cost reduction in terms of losses and insurance
• Allows optimization of plant and process design
• Assist in compliance with safety regulators
• Enables quicker response to hazardous incidents
• Improve engineer’s understanding of potential hazards
• Regular software upgrades incorporate industry experience and expertise, and
advances in consequence modeling technology
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-23
6.1.5.2.3 SCENARIOS
TABLE – 6.4
POSSIBLE ACCIDENT SCENARIOS
Scenario MCL Scenario Pressure & Temp. Quantity (MT)
1 Release of Acetic Acid NTP 150
2 Release of Acetic Anhydride NTP 200
3 Drum Storage Area NTP 200 Kg
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-24
Scenario-1 Release of Acetic Acid
Basis: Catastrophic Rupture of bottom nozzle (4”) of Styrene storage tank Resultant Pool Fire due to static charge.
Basic Input Data
Stored quantity 150 MT
Wind speed 1.40 m/s
Temperature Room Temperature
Pressure Atmospheric Pressure
Results:-
• Maximum Pool Radius is 3.024 m
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-25
Cloud Footprint
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-26
Maximum Concentration
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-27
Scenario-2 Release of Acetic Anhydride
Basic Input Data
Stored quantity 200 MT
Wind speed 1.40 m/s
Temperature Room Temperature
Pressure Atmospheric Pressure
Radiation Effects
Radiation Level
(KW/m2)
Distance (meter)
(Category 1.5/F)
Effect if IHR at Height of simulation
4 188.518 This level is sufficient to cause personnel if unable to reach cover within 20s;
however blistering of the skin (second degree burn) is likely; 0: lethality
12.5 110.027 This level will cause extreme pain within 20 seconds and movement to a safer
place is instinctive. This level indicates around 6% fatality for 20 seconds
exposure.
37.5 NR This level of radiation is assumed to give 100% fatality as outlined above.
Results:-
• Maximum Pool Radius is 108.085 m.
NR – Not Reached
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-28
Cloud Footprint
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-29
Maximum Concentration
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-30
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-31
Intensity Radiation for Pool Fire
Green – 4 KW/m2
Yellow – 12.5 KW/m2
Red – 37.5 KW/m2
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-32
Scenario -3 Unconfined Pool Fire Simulations for Drum Storage Area
Catastrophic Rupture
Input Data
Stored quantity - 200 Kg
Wind speed – 1.40 m/s
Results indicate
Pool Fire Scenario
Radiation Level
(KW/m2)
Distance in meter
Effect if IHR at Height of simulation
4 50.5 This level is sufficient to cause personnel if unable to reach cover within 20s;
however blistering of the skin (second degree burn) is likely; 0: lethality
12.5 37.6 This level will cause extreme pain within 20 seconds and movement to a safer
place is instinctive. This level indicates around 6% fatality for 20 seconds
exposure.
37.5 19.80 This level of radiation is assumed to give 100% fatality as outlined above.
Fire Ball Scenario
Radiation Level
(KW/m2)
Distance in meter Injury Type
4 65.0 Pain after 20secs.
12.5 42.5 1st
degree Burn
37.50 25.0 100% Fatal
BLEVE simulation for Drums Storage
BLEVE simulation for Drums Storage
Scenario : FIRE BALL/ BLEVE
In put Data Results of Computations
Stored quantity 200 Kg Fire Ball radius 11.17 meter
Wind speed 1.40 m/s Fire ball Intensity of Heat
radiation
186.59 KW /m 2
Fire ball duration 4.56 sec.
Incident Intensity of
Heat Radiation ( IHR)
at ground level
KW /m 2
IHR- Isopleth
Distance
( Meters )
Damage effects
37.5 25 100 % Fatal. Min. to ignite wood (without flame contact)
25.0 30 Min. to ignite wood (without flame contact). Significant injury.
12.5 42.5 Min. to ignite wood (with flame contact). 1 st deg. burn.
4.0 76 Pain after 20 secs. Blistering unlikely.
1.6 120 No discomfort even on long exposure.
Results
♦ In the 25 meter radius area is considered as 100% fatality in 1 min.
♦ In 42.5 meter radius area is considered as 1st
deg. Burn in 10 sec. and 1 % fatal in 1 minute.
♦ In the 76 meter radius area will give pain after 20 seconds. Blistering unlikely.
♦ In the 120 meter radius area is considered as safe area and no discomfiture even on long exposure.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-33
Intensity Radiation for Pool Fire
Intensity Radiation for Fire Ball
Green – 4 KW/m2
Yellow – 12.5 KW/m2
Red – 37.5 KW/m2
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-34
BLEVE
Green – 4 KW/m2
Yellow – 12.5 KW/m2
Red – 37.5 KW/m2
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-35
6.1.6 RISK ASSESSMENT SUMMARY
• From the Risk Assessment studies conducted, it would be observed that by and large,
the risks are confined within the factory boundary walls.
• Based on these studies company has been proposed to plan its facility sitting as well as
location of operator cabin, open area, etc.
• Company has to increase awareness programme in the surrounding vicinity and educate
people for safe evacuation at the time of toxic release.
• A HAZOP study to be carried out for all product plant and storage facilities.
• Induction safety course to be prepared and trained all new employees before starting
duties in plant.
6.1.6.1 PROCESS SAFETY
• Safety measures will be adopted from the design stage.
• Safety Valve and pressure gauge will be provided on reactor and its jacket (if jacket is
provided).
• Utility like Chilling, cooling, vacuum, steaming and its alternative will be provided to
control reaction parameters in a safe manner.
• Free Fall of any flammable material in the vessel will be avoided.
• Static earthing provision will be made at design stage to all solvent handling
equipments, reactors, vessels & powder handling equipments.
• Any reaction upsets will be confined to the reaction vessel itself.
• All emergency valves and switches and emergency handling facilities will be easily
assessable.
• Further all the vessels will be examined periodically by a recognized competent person
under the Gujarat Factory Rules.
• All the vessels and equipments will be earthed appropriately and protected against
Static Electricity. Also for draining in drums proper earthing facilities will be provided.
• Materials will be transferred by pumping through pipeline or by vacuum from drums.
• All solvents and flammable material storage tanks will be stored away from the process
plant and required quantity of material will be charge in reactor by pump.
• Jumpers will be provided on all solvent handling pipeline flanges.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-36
• Caution note, safety posters, stickers, periodic training & Updation in safety and
emergency preparedness plan will be displayed and conducted.
• Flame proof light fittings will be installed in the plant.
• All the Plant Personnel will be provided with Personal Protection
• Equipments to protect against any adverse health effect during operations, leakage,
spillages or splash. PPE like Helmets, Safety Shoes, Safety
• Glasses, Acid-Alkali Proof Gloves etc. will be provided to the employees.
• All employees will be given and updated in Safety aspects through periodic training in
safety.
• Material Safety Data Sheets of Raw Materials & Products will be readily available that
the shop floor.
6.1.6.2 FOR HAZARDOUS STORAGE TANK FARM
• Tank farm will be constructed as per explosive department requirement and separation
distance will be maintained.
• Tanks shall be located and marked in designated area of hazardous chemical storage.
• Static earthing provision will be made for road tanker as well as storage tank.
• Tanks of proper MOC will be selected.
• Flame arrestor with breather valve will be provided on vent line.
• Road tanker unloading procedure will be prepared and implemented.
• Fire load calculation will be done and as per fire load Hydrant System will be provided as
per NFPA std. and Fire extinguishers will be provided as per fire load calculation.
• Spark arrestor will be provided to all vehicles in side premises.
• Flame proof type equipments and lighting will be provided.
• Lightening arrestor will be provided on the top of chimney.
• Trained and experience operator will be employed for tank farm area.
• NFPA label (hazard identification) capacity and content will be displayed on storage
tank.
• Solvents will be transferred by pump only in plant area and day tank will be provided.
Overflow line will be return to the storage tank or Pump On-Off switch will be provided
near day tank in plant.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-37
• Jumpers will be provided on solvent handling pipe line flanges.
• Flexible SS hose will be used for road tanker unloading purpose and other temperature
connection.
• All tanks shall be uniformly tagged.
• Level indicator shall be provided in tanks.
• Dyke will be provided.
• Industrial type electric fittings shall be provided.
• Adequate fire fighting equipments will be provided.
• Anti corrosive paint shall be done.
• Safety instruction board will be displayed.
6.1.6.2 FOR DRUM/CARBOY STORAGE AREA
Some chemicals will be received at plant in drums/Carboys by road truck and stored in a
drum/Carboy storage area.
• FLP type light fittings will be provided.
• Proper ventilation will be provided in godown.
• Proper label and identification board /stickers will be provided in the storage area.
• Conductive drum pallets will be provided.
• Drum handling trolley / stackers/fork lift will be used for drum handling.
• Separate dispensing room with local exhaust and static earthing provision will be made.
• Materials will be stored as per its compatibility study and separate area will be made for
flammable, corrosive and toxic chemical drums storage.
• Smoking and other spark, flame generating item will be banned from the Gate.
6.1.6.3 TRANSPORTATION
• Road tanker unloading procedure will be in place and will be implemented for safe
unloading of road tanker.
• Static earthing provision will be made for tanker unloading.
• Earthed Flexible Steel hose will be used for solvent unloading from the road tanker.
• Fixed pipelines with pumps will be provided for solvent transfer up to Day
tanks/reactors.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-38
• Double mechanical seal type pumps will be installed.
• NRV provision will be made on all pump discharge line.
6.1.7 OTHER RISK REDUCTION OPPORTUNITIES
The following opportunities shall be considered as a potential means of reducing identified
risks during the detailed design phase:
• Buildings and plants structures shall be designed for cyclone floods and seismic events
to prevent structural collapse and integrity of weather (water) proofing for storage of
goods;
• Provision for adequate water capacity to supply fire protection systems and critical
process water;
• Isolate people from load carrying/mechanical handling systems, vehicle traffic and
storage and stacks locations;
6.1.8 RECOMMENDATIONS FOR ALARP
The following actions are particularly recommended to be implemented in order to ensure
ALARP (As Low As reasonably practical) performance in the operation: Maintain and ensure
effectiveness of all the safety measures, among others through the following actions:
Raw Material Storage Area
- The raw material storage area should be declared as a prohibited area and should be
provided having at least two exits, “No Smoking” and “Prohibited Area” display
boards, as applicable should be provided at site.
- Regular inspection of tanks/drums/carboys containing raw material to be done to
take care.
- Periodic site inspection should be carried out to ensure that there is no leakage from
any of the drums in the ware house.
- Fire hydrant system needs to be provided in storage area as per TAC standards.
- Smoke detector and fire alarm systems need to be provided.
- Provision of fire doors in ware house area.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-39
Fire access for Tank Farm area and Ware Houses
- Fire access roads should be provided to storage area. The storage tanks/area should
have suitable fire protection and fire fighting facility.
The following features are also important for the project by taking the layout into
consideration:-
• Hinged doors swing outward in an explosion.
• Window panes (if installed) are shatterproof or plastic in frame.
• Floors, walls and ceilings are designed and installed to limit the generation and
accumulation of static electricity.
• All doors must be fire resistant. Floors, walls and ceilings are designed for at least 2 h of
fire resistance.
• Walls or partitions are continuous from floor to ceiling, and securely anchored.
• Integrity of the wall should be ensured i.e. blast wall not to be broken or drilled as that
can leads to weak spots.
• The building is constructed of non-combustible materials, on a substantial frame.
• Restrained deflagration vent panels are present.
• There is adequate ventilation, and any heating in rooms is limited to steam, hot water, or
other indirect means.
Electrical Safety for Whole Facility
• Electrical Safety: All cables and electric fittings shall be constructed, installed, protected,
operated and maintained in such a manner so as to prevent risk of open sparking.
6.1.9 FIRE FIGHTING SYSTEM
M/s. Gujarat Dyestuff Industries management will take into consideration fire prevention
measures at the project planning and during plant commissioning stage to avoid any
outbreak of fire. But looking to the hazardous nature of process and the chemicals that are
handled and processed, the chances of outbreak of fire cannot be totally ignored. Hence to
tackle such a situation a good well laid fire protection system will be provided in the factory.
Details of fire fighting are given in Table 6.5.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-40
TABLE 6.5
FACILITIES TO BE MAINTAINED FOR FIRE FIGHTING:
Sr. No. Type Capacity Total Quantity
10 Kg 30#
1 Dry Chemical Powder 5 Kg 50#
2 Kg
2 Carbon Dioxide 4.5 Kg 60#
9 Kg 50#
3 Form Type 50 Kg 10#
Other fire fighting facilities proposed to be installed at site:
� Fire load calculation will be carried out and Fire Extinguishers at different locations will
be provided (as mentioned in above table) as per the TAC guidelines.
� Working staff will be given training to operate DCP and CO2 extinguishers.
� Fire Hydrant Network will be installed as per the calculated requirement for fire fighting.
� A main fire pump with a capacity of 50 M3/Hr @ 10 Bar/cm2 will be installed.
� A stand-by diesel pump with equal capacity (50 M3/Hr @ 10 Bar/cm2) will be installed.
This pump will be used for fire fighting in case of power failure.
� A fire water reservoir with holding capacity of 300 m3 of water shall be provided.
� First Aid Training will be imparted to employees by designated first aid trainers.
6.2 DISASTER MANAGEMENT PLAN
M/s. Gujarat Dyestuff Industries shall develop the emergency management system to tackle
the emergency situation, apart from its emergency management system. The detail of
disaster management system is discussed in the following section.
6.2.1 DEFINING THE NATURE OF EMERGENCY
6.2.1.1 LEVEL OF EMERGENCY CAN BE CLASSIFIED IN THREE CATEGORIES.
LEVEL - 1:
The leakage or emergency, which is confinable within the plant, premises. It may be due to -
a) Small fire in the plant
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-41
b) Low toxic gas release for short duration.
c) Collapsing of equipment that do not affect out side premises.
LEVEL - 2:
The emergency, which is confinable within the factory premises. It may arise due to -
a) Major fire inside the factory premises.
b) Medium scale explosion confined to the factory premises.
c) Heavy toxic / flammable gas leakage for short duration.
LEVEL - 3:
The emergency, which is not confinable within the factory premises and general public in
the vicinity likely to be affected. It may arise due to -
a) Explosion of high magnitude affecting the adjacent area
b) Heavy / Profuse leakage of toxic / flammable gases for a long duration.
6.2.2 OBJECTIVES OF EMERGENCY MANAGEMENT SYSTEM
The objectives of the emergency management system are summarized as under.
• To identify and assess types of emergencies due to different types of hazards.
• To work out plan with all provisions to handle emergencies and safeguard employees and
people in the vicinity of the factory.
• To provide for emergency preparedness and the periodical rehearsal of the plan.
• To plan mode of proper communication and actions to be followed in the event of
emergency.
• To keep all necessary information with respect to hazard/accident control and
emergency contacts in one document for easy and speedy reference.
• To inform employees, general public and the authorities about the hazards/risk if any
and the role to be played by them in the event of emergency.
• To control and contain the accident.
• To effect rescue and treatment of casualties.
• To inform and help relatives of casualties.
• To secure rehabilitation of affected area and restore normalcy.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-42
• To provide information to media and government agencies.
• To preserve record, equipment etc. for investigating cause of emergency.
• To be ready for “mutual aid” if need arises to help neighboring units.
6.2.3 STRUCTURE OF EMERGENCY MANAGEMENT SYSTEM
M/s. Gujarat Dyestuff Industries shall develop an emergency management team. The
management structure includes the following personnel’s;
• Chief Emergency Controller
• Incident Controllers and Deputy Incident Controllers
• Site Main Controllers
• Key Personnel’s
• Essential Workers
• Assembly points
• Emergency control center
• Fire control arrangements
• Medical arrangements
• Other arrangements
6.2.3.1 CHIEF EMERGENCY CONTROLLER
He will be Chief Manager in his absence, the Plant Supervisor will be the Chief Controller till
any one of the designated Manager arrives at Site and assumes overall charge of the
situation. His task will be to co-ordinate all internal and external activities from the
Emergency Control Centre at Main Security Gate from where all operations will be directed.
He shall:
1. Immediately on being informed of the emergency and its location, will arrive at the scene
& handle the situation.
2. Relieve the Incident Controller from responsible of the Main Controller.
3. Co-ordinate to avail services from external agencies like fire brigade, hospitals etc, if
called for, following the declaration of major emergency. If necessary, major installations
in the vicinity may also be informed of the situation.
4. Exercise direct operational control of the unaffected section of the plant.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-43
5. In consultation with the advisory team, expedite the shutting down of loading /
unloading operations of tankers and if necessary, instruct the supervisor / security
personnel to evacuate tankers.
6. Ensure that all employees are evacuated from the affected area and the casualties, if
any, are given necessary medical attention. Instruct P & A Assistant / Security for rushing
casualties to hospitals if required.
7. Liaise with fire and police officials, pollution control board officials and other statutory
bodies and advise them of all possible consequence effects outside the premises.
8. Arrange for relief of personnel when emergency is prolonged.
9. Issue authorized statement or press release to the news – media.
10. Ensure preservation of evidence for enquiries to be conducted by statutory
authorities.
11. Authorize the sounding of “All Clear” and “Evacuation Siren”.
12. Arrange for obtaining the head – count of all personnel within the premises and
cross-checking with the data from records available for no. of persons within the
premises.
13. Nominate a person from advisory team, to maintain chronological log of event
during the entire period of emergency.
6.2.3.2 INCIDENT CONTROLLER AND DEPUTY INCIDENT CONTROLLER
His primary duties are to take charge at the scene of the incident. In the initial stage he may
be required to take decisions involving the operation of the other plants or to stop or
continue any process and to take technical decisions to control the incident. The deputy
incident controller should take the charge of incident controller, if he is not available due to
any reason. As our factory is running 24 hrs, so each plants shift in charge are being
nominated as I.C (after 'G' Shift) and they will be always available in the shift and can take
charge till the arrival of IC.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-44
Responsibilities/Duties of Incident Controller and Deputy Incident Controller:
• He shall take charge at the scene of incident.
• He may be required to take decisions whether to stop or continue any Process and take a
control the incident or to isolate affected area of the plant and simultaneously inform /
consult senior officers as per requirement.
• He shall immediately assess the gravity of risk and alert panel and field operators to start
controlling their respective section.
• After assessing the level of emergency likely to exist, he shall ad emergency. As per the
assessment of risk, if necessary inform concerned Senior Officer to declare major
emergency and active on-site/off site emergency plan accordingly. As Per the situation
ensure that Site Main Controller (SMC) will be informed.
• He will work under the direction of the SMC, but till his arrival he may have to execute
following responsibilities.
• Ensure that all the Key Personnel are called.
• Direct for evacuation of plant and areas likely to be affected by the emergency.
• He shall communicate to the SMC the type of outside help needed.
• He shall direct all emergency operations within the affected area with the following
priorities.
• Personnel safety, including of surrounding community.
• Minimum damage to Plant, Property and Environment.
• Appropriate actions to minimize loss of Production and Material.
• Give information to the head of fire fighting and rescue team and other emergency
services.
• Depending on the incident, instruct partial or total shut down, isolations,
depressurization, Nitrogen purging, fire fighting, rescue operations.
• Instruct upstream/down stream units to take emergency shut down /cutting off supply
and other appropriate actions and emergency evacuation help etc.
• Direct for search of casualties.
• Evacuate non-essential workers/visitors/contractors to safe assembly points.
• Brief site main controller and keep him informed about the developments.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-45
• Pressure evidences. This will be necessary for investigation for cause and concluding
preventive measures.
• Send runners, if telephones are out of order.
6.2.3.3 SITE MAIN CONTROLLER
He will have an overall responsibility for directing operations & calling outside help from
Emergency Control Centers. He is required to take decisions after consultation with the
Senior Manager available at site.
The Shift Engineer of non-affected Plant will act as SMC till arrival of the designated SMC at
Emergency Control Centre (ECC). Until the arrival of SMC, he may have to execute following
responsibilities.
• As soon as he received the information or comes to know about the incident, he shall
proceed to Emergency Control Room (Control Room) and shall take charge of the
incident. If Control Room gets affected due to unfavorable wind direction, Fire Control
Room shall be used as alternate Emergency Control Room.
• He has overall responsibility for directing emergency action, operation and calling
outside help.
• He shall ensure that all the Key Personnel are called.
• He shall assess the gravity of situation with the help of Incident Controller (IC), Plant
Manager and Key Personnel and after quickly assess the situation, shall find out the of
emergency from Incident Controller (l C), and declare the emergency.
• Level-l: Emergency - may be handled within the plant premises.
• Level-2: Emergency - On Site Emergency plant shag be activated.
• Level-3: Emergency - Action to be taken to operate Off-Site Emergency Plan.
• He shed direct all emergency operations within the affected area with the following
priorities.
• Personnel safety, including of surrounding community.
• Minimum damage to Plant, Property and Environment.
• Appropriate actions to minimize loss of Production and Material.
• He shall direct for evacuation of plant and areas likely to be affected by the emergency.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-46
• He shall continuously review and assess possible developments to determine most
probable course of events and actions.
• He shall assess the situation and ensure that whatever resources needed is made
available and utilized in a co-ordinate manner.
• He shall direct the safe shut down of plants in construction with incident controller and
Key Personnel, if necessary.
• He shall check that all non-essential workers, visitors, contractors are evacuated to safe
assembly points and head count is completed.
• He shall give instructions to the Incident controllers, Fire fighting and Rescue teams.
• He shall, if necessary arrange for evacuation of neighboring population.
• He shall ensure that search for casualties, within the affected area has been carried out
and arrange for hospitalization of victims and additional medical help, if required.
• He shall ensure that liaison will be made with outside agencies such as Police Services,
Fire Services, Expert on Health and Safety, Meteorological Office, District Emergency
Authorities, Collector and Senior Inspector of Factories. Provide advice on possible
effects to areas outside the factory.
• He shall arrange for up to date records of emergencies.
• He shall advice not to re-start the plants unless it is declared safe to start by competent
authorities.
6.2.3.4 KEY PERSONNELS
Key Personnel are required to provide and to implement the decisions made by the SMC in
the light of information received on the developing situation at the time of emergency. As
necessary, they will decide the actions needed to shutdown plants, evacuate personnel,
carryout emergency engineering work, arrange for supplies of equipments, utilities, carryout
environment monitoring, provide catering facilities, liaise with police, fire brigade and other
local authorities, relative of casualties, hospital, press & neighboring industries. Action at
assembly points, outside shelters and mutual aid center under the direction of the SMC. All
the key personnel and other called in so to assist shall report to the ECC. They shall be
available at any time on duty or on call or on duty or holiday.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-47
6.2.3.5 ESSENTIAL WORKERS
A task force of essential trained workers (expert’s team) is available to get the work done by
the Incident Controller and the Site Main Controller. Such work will include:
1) Fire fighting and spill control till a Fire Brigade takes the charge.
2) To help the Fire Brigade and mutual aid teams, if it is so required.
3) Shutting down plant and making it safe.
4) Emergency engineering work e.g. isolating equipment, material process, providing
temporary by-pass lines, safe transfer of materials, urgent repairing or replacement,
electrical work, etc.
5) Provision of emergency power, water, lighting, instruments, equipments, materials, etc.
6) Movement of equipment, special vehicle and transport to or from the scene of the
accident.
7) Search, evacuation, rescue and welfare.
8) The injured is given First Aid.
9) Moving tankers or other vehicles from area of risk.
10) Carrying out atmospheric test and pollution control.
11) Manning of assembly points to record the arrival of evacuated personnel. Manning for
outside shelters and welfare of evacuated persons there.
12) Assistance at causalities reception areas to record details of causalities.
13) Assistance at communication centers to handle out going and in coming calls and to act
as messengers if necessary.
14) Manning of works entrances in liaison with the police to direct emergency vehicles
entering the work, to control traffic leaving the works and to turn away or make
alternative safe arrangements for visitors, contractors and other traffic arriving at the
works.
15) Informing surrounding factories and the public as well as directed by the Site Main
Controller.
16) Any special help required.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-48
6.2.3.6 ASSEMABLY POINT
In affected & vulnerable plants, all nonessential workers (who are not assigned any
emergency duty) are evacuating the area & report to a specified Assembly Points. Each
assembly Point will be clearly marked by a Conspicuous notices & provided with an
identification numbers e.g. Assembly Point No. 1, 2 and so on. Assembly Points are located
at a safe place, well away from area of risk and least affected by the down wind direction.
To ensure that workers do not have to approach the affected area to reach the Assembly
Point proper location and numbers have been marked at Assembly Points. Each Assembly
Point in manned by a nominated person to record the names and dept. Further telephone
to communicated SMC has been provided at each assembly Points. At each Assembly Point
duties of Assembly Point In-charge has been also displayed in brief Before reaching an
Assembly Point or subsequently, if it is required to pass through an affected area or due to
presence of toxic substances. Suitable PPE's including respirators, helmet etc., are issued &
made available with workers.
6.2.3.7 EMERGENCY CONTROL CENTER
The Emergency Control Center is the place or room from where the operations to handle
the emergency are directed and coordinated. Main Control Room will be
earmarked/identified as the Emergency Control Room. Fire Control Room shall be
earmarked/identified as the alternative Emergency Control Room to be operated in case of
unfavorable wind direction. Adequate Telecommunication System will be available in the
Emergency Control Room i.e. Hot Lines, Intercom Walkie-Talkies & External Phones.
The ECC center shall be equipper with the following facilities.
1. Internal and external telephone including STD facility
2. Telephone directory
3. Telephone nos. of mutual aid centers
4. Factory layout plan
5. Map of the area
6. Employee blood group and their address
7. Messengers / Runners for sending messages
8. Adequate numbers of PPE'S
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-49
6.2.3.8 FIRE CONTROL ARRANGEMENTS
6.2.3.8.1 FIRE FIGHTING, GAS LEAK CONTROL AND RESCUE OPERATION
A) Role of Manager (Fire and Safety) / Shift In-Charge (Fire & Safety)
1. Incident Controller will be the only person to direct the fire fighting and Emergency
operation.
2. Keep the constant touch with the SMC / In charge - EHS.
3. Direct the crew members to the scene of emergency and arrange replenishment of
Manpower / equipment / extinguishing media etc.
B) Role of EHS Representative:
1. On being notified about the location of fire/ gas leakage immediately proceed to the help.
2. Decide his line of action in consultation with Incident controller and take appropriate
measures to handle the emergency.
3. Assessing the severity of the incident immediately report to emergency controller about
the gravity of the situation.
4. He will assess the extra requirement required if any from the neighboring industry.
C) Fire crew members
1. On hearing fire alarm, emergency siren they shall immediately report to control room
and proceed to the scene of emergency and work under the direction of IC/ Dy IC.
2. The personal availability at the scene of incident to be made optimize.
6.2.3.9 MEDICAL SERVICES
The roles of Medical officers are as follows;
(a) He will contact immediately to the SMC/IC.
(b) He will render necessary treatment, at Occupational Health Center.
(c) He will arrange for Hospitalization and Treatment at outside hospitals, if required.
(d) He will mobilize in getting the services of External medical agencies, other Para –
medical services etc. and transportation services etc.
(e) He will arrange for extra medical assistance/antidotes, from out, if required.
(f) He will arrange for first-aid trained volunteers for necessary help.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-50
(g) He will liaise with the Government Health Authorities for treatment of the affected
persons nearby.
6.2.3.10 OTHER ARRANGEMENTS
Other arrangements include external transport, cranes, generator sets to supply emergency
power, environment monitoring equipment, rescue items etc. when available resources do
not meet the requirement.
STANDARD OPERATING PROCEDURE (EMERGENCY)
• As soon as emergency alarm is heard, all essential workers shall report to IC or SMC.
• They shall carefully listen to the instructions given by IC or SMC
• According to the type of emergency/accident, they shall get equipped with PPE/Fire
fighting equipment and devices.
• The runner among the workers shall inform SMC/IC and key personnel if they are not at
site.
• The messenger amongst the workers shall deliver messages to nearby units as per the
instructions of SMC/IC.
• The in-charge of medical arrangements shall prepare first-aid and other required
facilities for the injured.
• The other essential workers shall try to control the emergency as per the instructions
given to IC.
• IC would keep SMC informed about the status of control measures being taken at the
site and ask for other requirements e.g. Mutual aid, equipment etc., if he find necessary.
• SMC would co-ordinate with outside agencies regarding control measures being taken,
need for external help, evacuation, medical treatment etc.
6.3 COMMMUNICATION SYSTEM
After the assessment of risk & their possible environmental impact and after making an
organization for the preparedness to control the emergency, the next most essential step is to
make us ready for Communication at the time of emergency. Communication System is a
Crucial Factor while handling emergency.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-51
Company will have quick & effective Communication System through which, any situation,
which can lead to emergency, can be informed or known to.
i. All working inside the plant.
ii. Key Personnel outside during normal working hours & during off-duty hours.
iii. Outside emergency services, Statutory and Local Authorities and
iv. Neighboring facilities and public leaving in vicinity.
Each and every section, Plant & Department of the Factory shall be connected by internal
telephones. External Phone at Office and Residence and Mobile shall be also available with
Key Personnel and top executive of the factory. Hot lines shall be provided with mutual aid
Partner through the Emergency Control Center. The Communication System begins with
raising the alarm declaring the emergency, Telephone messages and Procedure to
communicate the emergency to other persons & General Public.
6.3.1 RAISING THE ALARM
As soon as incident takes place inside the factory and is noticed by someone, the first step is
to raise the nearest manual emergency bell to alert the nearby people. Next, he/she
informs the security persons to raise the emergency siren located at the factory gate. The
security personnel sound the siren, raising and lowering the sound three times in a 10
second “ON”, 5 second “OFF” sequence. All the security employees shall be trained for
operating the siren to announcing the emergency. In case of power failure, manual bell
shall be also provided.
The alarm sound informs the I.C and the S.M.C that an emergency has been created and
emergency organization is to be activated. The I.C. rushes to the site and takes charge of
the scene.
6.3.2 DECLARING THE MAJOR EMERGENCY
Major emergency has to be declared after sufficient and through check because the
declaration of major emergency puts many agencies on action and it may disturb the
running system, which may be Costly at, time or its Consequence may be Serious. Therefore
major emergency must not be decided on whims or immature judgment or without proper
thought. Looking to all the above, we will have taken care to nominate the persons who can
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-52
declare the emergency; we will have selected them on the basis of their knowledge &
experience. These persons will be technically qualified and experienced. They shall advice
the Incident Controller or Site Main Controller regarding the type of emergency. On being
convinced, the Site Main Controller or Incident Controller shall declare an ON-SITE
emergency. The decision about major emergency shall be taken as early as possible and
without wasting time so that control action can be started immediately.
6.3.3 TELEPHONE MESSAGES
After hearing the emergency alarm and during emergency or even while just receiving the
emergency message on phone, Telephone operator should be precise, sharp, attentive and
quick in receiving and noting the message and subsequently effective in further
Communication A form to record emergency telephone calls shall be available with
telephone operator or Person available in Emergency Control Center, who has to record
such calls during emergency. Telephonic messages shall be given out by the telephone
operator to Site main Controller and key personnel as per the instructions of the Incident
Controller. Telephonic messages shall also be given to authorities and external agencies to
describe the type of emergency. All details of emergency shall be collected/delivered
according to this format shall available with the telephone operator.
6.3.4 COMMUNICATION OF EMERGENCY & STATUTORY INFORMATION
6.3.4.1 COMMUNICATION OF EMERGENCY
An effective system to communicate emergency shall be available.
• Inside the factory i.e. workers including key personnel and essential workers, on duty &
inside during normal working hours.
• To key personnel and essential workers not on duty and outside during normal working
hours.
• To the outside emergency services and the Government authorities.
• To the neighboring factory & the General Public in the vicinity.
a) Information to Workers
All personnel inside the factory shall be informed by the sounding of the siren or in case of
electricity by ringing the bell.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-53
b) To key personnel outside during normal working hours
The key personnel outside the factory premises shall be informed as per the need by
external telephones or runners.
c) To the outside Emergency Services and the Authorities
Once the emergency is declared, it is essential that the outside emergency services should
be informed in the shortest possible time. Responsibilities shall be fixed as per the
Incident/Emergency Command structure/plan to contact outside agencies for help and to
communicate to the all the Government and other Authorities such as Fire Brigade, Police,
District Emergency Authorities, Factory Inspectorate & Hospital etc. In case of major
emergency, outside agencies like mutual aid, hospitals, policies, Factory Inspector, Collector,
Fire-brigade etc. shall be informed by telephone or by sending special messenger from
emergency control center.
d) To neighboring factories and the General Public
A major emergency will affect areas outside the works and it is essential that neighboring
factory and General Public, should be informed to enable them to take prompt action to
protect their own workers and to take whatever measures may be possible to prevent
further escalation of the emergency due to effects on their own installations, at the same
time, they may be able to provide assistance as part of a prearranged mutual aid plan.
Further responsibilities shall be fixed to inform the neighboring factories and the General
Public leaving in the vicinity. The neighboring units shall be informed about an emergency
through external telephones or runners. The general public shall be informed about an
emergency using loudspeaker on scooter or rickshaw or car. Help from police shall be
sought if required.
6.3.4.2 STATUTORY INFORMATION
a) Information to Workers
Set of Statutory information regarding types of hazards and their prevention and control as
directed in the Factories Act shall be prepared by the unit. This information shall be printed
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-54
in the local language and given in the form of booklet to all workers including contract
workers.
b) To the outside emergency services and authorities
Statutory information in the form of booklet shall be given to outside emergency services
and authorities.
c) To neighboring firms and the general public
Statutory information in the form of booklet will be given to neighboring units and the
general public of the villages in the vicinity of the unit.
6.4 ACTION ON SITE
The activities related to emergency time activities shall be divided into two parts. These are
• Pre-emergency activities
• Post-emergency Activities
6.4.1 PRE-EMERGENCY ACTIVITIES
6.4.1.1 INTERNAL SAFETY SURVEY
A safety committee shall be constituted as per Factories Act. The nominated members of
the committee shall be assigned the responsibility to conduct safety survey once in a month
before safety meeting. The internal safety survey includes –
• Identify various hazards in the factory
• Check whether protective equipments are in sound working condition
• Check various safety installations located at various plants for proper working
• Check sprinklers, showers, etc. in all plants
• Suggest extra modifications/ requirements to make systems more reliable
• Check presence of toxic gases by the help of dragger tube
Frequency of Internal Safety Survey: Once in a month
6.4.1.2 THIRD PARTY SURVEY
A safety survey shall be carried out once in a year by an external agency. It shall include –
• Inspection of building, structures for strength and stability
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-55
• Identify and study the hazards inside individual plants and within the factory premises.
• Check safety system for its adequacy.
• Suggest modifications or additions in the operating practices and safety system, if
necessary.
Frequency of Third Party Safety Survey: Once in a year
6.4.1.3 PRESSURE VESSEL TESTING/ EXAMINATION
• To prepare list of pressure vessels in the plant with details of operating conditions and
manufacturing details.
• To carry out preventive maintenance of valves & fittings on all pressure vessels (valves,
pipelines, pressure gauge, temperature recorders and emergency vent lines)
• To arrange for testing and examination of all pressure vessels as per the rules of Factories
Act by govt. certified competent person on due date.
• To maintain record of testing and certificates issued by competent person and make
them available to Factory Inspector at the time of inspection.
Frequency of Pressure Vessel Testing / Examination: Twice in a year
6.4.1.4 NON-DESTRUCTIVE TESTING (NDT)
• To prepare list of equipment and pipelines in the plant which require NDT as per the
rules of Factories Act.
• To arrange for Non-Destructive Testing (NDT) as per the rules under Factories Act by
govt. certified competent person on due dates.
• To maintain record of testing and certificates issued by competent person and make
them available to Factory Inspector at the time of inspection.
Frequency of Non-Destructive Testing : Once in a year
6.4.1.5 SAFETY RELIEF VALVES TESTING
• To prepare list of Safety Relief Valves installed on various equipment and pipelines in the
unit alongwith detailed specifications.
• To prepare schedule for testing and calibration as per the rules under Factories Act by
govt. certified agencies on due dates.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-56
• To maintain record of testing and certificates and mark dates of testing and calibration
on the valves.
• To carry out repairs/replacement as suggesting by the testing authority.
Frequency : Twice in a year
6.4.1.6 FIRE SYSTEM TESTING
• To prepare list of various fire-fighting equipment (Fire Extinguishers, etc.) installed at
various locations in the unit along with detailed specifications.
• To prepare schedule for testing of all these equipment and check operability
• To maintain record of testing and mark dates of testing on the equipment.
• To carry out repairs/replacement of defective equipment
Frequency: Once in a month
6.4.1.7 MUTUAL AID SCHEME
• To prepare Mutual Aid Scheme and enter into agreement with the neighboring units for
getting or extending help during emergency
• To appoint coordinator for follow-up under mutual Aid Scheme
• To review the scheme once in a year with coordinators of neighboring units w.r.t. scope
of help, type of aid, contact persons, etc.
• To include the scheme in mock drills
6.4.1.8 MOCK-DRILLS
• To conduct minor mock drills to train employees about their role / duties during
emergency
• To refresh training to the employees for fire fighting, spill control, use of personal
protective equipments etc.
• To check whether various members of emergency control committee remember their
role / duties properly and to find out the faults and points of improvement in their
performance.
• To check whether the various equipment for emergency control are operating
satisfactorily and find and rectify the draw-backs if any.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-57
• To conduct major mock-drills with permission from the authorities
Mock drills shall be regularly conducted in our unit by our Emergency Control Organization
and the findings are compiled to analyze whether employees are familiarized with the
emergency control procedures and what sort of training is required to be given.
6.4.1.9 SAFETY TRAINING
To organize regular training for the employees for handling of safety equipment, use of
personal protective equipment, first-aid, etc. by internal/external faculty, as well as by
sending persons outside to attend safety programs etc. The topics covered in safety
training will be –
• Training on fire fighting
• Training on spill control
• Training on toxic release control
• Training on good housekeeping
• Training on use of PPE
The records of the training programs shall be maintained by the Safety Committee. New
topics will be included in the safety training programs year by year to upgrade safety
knowledge among the workers.
Frequency: Once in a year
6.4.1.10 PERSONAL PROTECTIVE EQUIPMENT
• To procure adequate number of personal protective equipment (aprons, hand gloves,
safety goggles, helmets, nose masks, safety belts, gas cartridges, self-breathing
apparatus, safety shoes etc.) suitable for plant operations and maintain records of use.
• To have proper system for issuing the PPE and disposal of used PPE
• To train the workers about proper use of PPE.
• To check the fresh air blowers provided at confined spaces for fresh air to workers.
6.4.1.11 COMMUNICATION
• To maintain internal/external telephones in working order
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-58
• To check alarms / siren / loudspeakers for workability
• To provide manual emergency bells at various location for use during power failure
• To periodically check wind cock for wind direction
• To check lightning arrestors installed at different locations for physical condition and
proper earthing connection.
6.4.1.12 EMERGENCY LIGHTS
• To keep sufficient number of emergency torch/ batteries in ECC as well as at the
production site
• To maintain the three DG sets available in the factory as stand-by for power failure. The
D.G. sets are set to start functioning within two minutes of failure of electricity.
6.4.1.13 EMERGENCY CONTROL ROOM
It is necessary to maintain the Emergency Control Room and keep it equipped with all
necessary items, documents, telecommunication systems, PPE etc. required in case of an
emergency.
6.4.1.14 ASSEMBLY POINTS
• To fix assembly points in the factory for non-essential workers
• To fix assembly points for plant emergency staff and coordinators
• To maintain record of no. of workers gathered at the assembly points at the time of
emergency. The Safety Committee shall nominate a person for this duty.
6.4.1.15 LIAISON WITH STATE AUTHORITIES
• To liaison with civil authorities, local hospitals, Fire-Brigade, Collector, factories
Inspector, Police, etc regarding emergency activities and need for external aid.
• To keep the details regarding name, address & telephone numbers of various govt.
authorities and neighboring units available and update the details from time to time.
• To inform about Mock-drill in advance and if required conduct mock-drill in presence of
any of these authorities.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-59
• To submit report of Mock-drill conducted and the out comings with photograph to
Factories Inspector.
6.4.1.16 HOSPITAL FACILITIES
• To equip Occupational Health Centre with First-Aid and medicines
• To keep Health records (esp. blood-group records) of all employees
• To liaison with hospitals in the area of the unit
• To keep list of blood donors ready for reference
• To update arrangements with neighboring units for emergency first aid.
6.4.1.17 OUTSIDE SHELTER
• To reserve space in nearby schools/hospitals/buildings for temporary shelter during
emergency
• To arrange for clothing, food, medicine in temporary shelter
6.4.1.18 STATUTORY INFORMATION
Statutory Information about chemicals handled in the unit, manufacturing process, the
hazards in the unit, methods of prevention and control, first aid measures etc. shall be given
to
- Workers
- Public and Neighboring units
- Government authorities & outside emergency services
6.4.1.19 PROTECTIVE DEVICES & ENGINEERING MAINTENANCE
• Installation of safety valve and pressure gauges on vessels used for high pressure
operations.
• Installation of temperature indicators on reactors, temperature switch or alarm at critical
reactors
• Maintenance of cooling water systems and pumps. To keep standby pump at cooling
tower.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-60
• Installation of overhead water tank for emergency. To keep it filled and regular cleaning
of the same
• Periodic cleaning of heat transfer surfaces (jacket, reactors, shell & tube heat exchangers,
boilers)
• To keep minimum inventory of hazardous materials with records
• To maintain good housekeeping and ensure safety compliance
6.4.1.20 LIST OF SUPPLIERS OF SAFETY EQUIPMENT
• To prepare and preserve list of suppliers of safety equipment e.g. first aid box, medicines,
fire extinguishers, PPE, communication, self breathing apparatus, chlorine kit, etc.
• To check all supplies every three months
• To update the list and keep it ready-to-refer location in the plant as well as at ECC
6.4.1.21 FIRE PREVENTION PLAN
• List of major work-place fire hazards
• Potential ignition sources
• Sparks from electrical fitting / motors
• Sparks from welding operations
• Ignition system of boiler house
• Sparks from static electricity
• Fire prevention & control measures
• Use of flameproof electrical fittings and electric motors wherever necessary
• No welding shall be done anywhere in the plant without prior permission from safety
officer and necessary precautions from in charge of the area.
• Ignition system of boiler should be provided with guard
• All vessels and pipeline should be properly earthed to prevent static electricity
• The vent lines of all vessels and tanks holding flammable materials should be provided
with flame arrestors
• Fire extinguishers shall be provided at all critical locations in the unit
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-61
6.4.2 POST EMERGENCY ACTIVITIES
These activities are to be carried out after an emergency is over so as to establish the cause
of the emergency and decide the measures to be taken to prevent its re-occurrence. These
activities are –
1. Collection of records of accident, injury, damage to property, buildings, equipment,
material and loss of production
2. Conducting enquiries and concluding preventive measures
3. Making insurance claim for the materialistic loss / damage
4. Implementation of enquiry report’s recommendations
5. Rehabilitation of affected persons within and outside the plant
6. Restarting the plant and normalizing the operations.
6.4.3 EMERGENCY TIME ACTIVITIES
The probable emergency situation that can arise in the unit and the corresponding control
actions are describes below.
6.4.3.1 FLAMMABLE RELEASES
Source / Incident – Fire involving spilled combustible material near or in flammable storage
areas
Control action –
1. Any one who notices fire shall sound emergency alarm.
2. SMC/IC who is at site, shall immediately rush to the scene and assess the situation.
For fire due to spillage of combustible material, he activates the on-site plan as -
• He cuts off electric supply to that area and evacuates all the persons to safe
assembly points.
• He calls in DIC (if DIC is not present there) and asks essential workers to fight fire
with dry chemical / CO2 fire extinguisher or sand.
• He inform fire brigade telling them in briefly about kind of fire and type of
extinguishers required
• He informs mutual aid teams and asks for necessary help.
• He arranges first-aid / hospitalization for the affected persons.
• Fire officer on reaching the site, takes charge of the fire-fighting operations
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-62
• Mutual aid teams shall be asked for help in the form of first-aid, transport etc.
• If fire is growing, fire officer informs IC who alerts neighboring units and through
SMC gets more fire-fighting help.
• Fire fighting shall be continued till fire is fully overcome
• After extinguishing fire, fire officer cools the entire area with water spray and checks
that no re-ignition shall be likely. After that, he declares the area safe.
• IC tells essential workers to sound all clear
• The incident shall be recorded
• SMC arranges to inform families / relatives of injured / dead.
• SMC issues authorized statement to press / media.
• SMC informs Factories Inspector about the incident and related information
6.4.3.2 TOXIC RELEASES
Source / Incident – Pressure release due to failure of
- Stuffing box gland packing
- Pressure release valve
- Vessel / pipeline failure
Control action –
1. Any one who notices the release shall sound emergency alarm.
2. SMC/IC who is at site, shall immediately rush to the scene and assess the situation.
For toxic release from a reactor, he activates the on-site plan as -
• He evacuates all the persons to safe assembly point.
• He calls in DIC (if DIC is not present there) and asks essential workers to wear self-
breathing apparatus and if the reaction is exothermic, start cooling water flow in the
reactor jacket and cool the reactor as soon as possible.
• The essential workers stop all the charging pumps of that reactor and the nearby
reactors.
• He informs mutual aid teams and asks for necessary help.
• He arranges first-aid / hospitalization for the affected persons.
• Mutual aid teams shall be asked for help in the form of first-aid, transport etc.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-63
• When the leak stops and the air shall clear of toxic release, IC tells essential workers
to sound all clear.
• The vessel / rupture disc/gland packing will be attended by maintenance
department.
• The incident shall be recorded
• SMC arranges to inform families / relatives of injured / dead.
• SMC issues authorized statement to press / media.
• SMC informs Factories Inspector about the incident and related information
6.4.3.3 CHEMICAL SPILL
Most of the storage tanks shall be located in Storage Tank Yards. Dyke walls of sufficient size
will be connected around the tank yard. Neutralizing material shall be kept nearby. For
dilution, water connection will be provided on all sides of tank farms. Sand buckets shall be
provided for covering spillage of flammable / corrosive materials.
6.4.4 EVACUATION & TRANSPORTATION
All non-essential workers shall be evacuated from incident area and adjacent areas to safe
assembly points. Assembly points shall be clearly marked and assembly point in-charge will
also be designated. The assembly point in-charge will be a well-trained supervisor who shall
keep record of persons arriving at the assembly point and direct them for proper gathering.
He shall also inform the ECC about the persons gathered at the assembly point. Those in
need of medical treatment shall be transported to first-aid center / hospital as the case may
be. In case of major emergency all non-essential workers shall be transported to temporary
shelter.
6.4.5 SAFE CLOSE-DOWN
As per the instructions from IC or SMC, some parts or full of the plant shall be closed down
by the essential workers. The procedure for safe shut-down and start-up will be given in
safety manual given to all workers.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-64
6.4.6 USE OF MUTUAL AID
Mutual aid from neighboring units shall be called up as and when required. The aid shall be
taken under the supervision of SMC.
6.4.7 HELP OF EXTERNAL AUTHORIES
Outside authorities such as Police, District Emergency Authority (DEA), Factory Inspector,
Disaster Management Centre, GIDC officer, Industries Association, Regional Pollution
Control Board, nearby hospitals etc. shall be informed of the on-site and off-site emergency
plans and called in as per need.
6.4.8 MEDICAL TREATMENT
Injured workers shall be located and given prompt first-aid by essential workers and key
personnel. Those requiring medical treatment shall be taken to the hospital / outside
medical center.
6.4.9 ACCOUNTING FOR PERSONNEL
Through daily muster rolls and with the help of shift-in-charge the head count shall be
undertaken to find out whether persons are missing and if so immediate search shall be
carried out to locate them. The list shall include company employees, contract workers as
well as visitors. Help from local authority or fire-brigade shall be taken if required. This list
shall be kept with time keeper / security officer at any time and shall be used to account for
personnel. Injured shall be taken to hospitals and their families/relatives shall be informed
Casualties would be identified, their families and local authority shall be informed.
6.4.10 ACCESS TO RECORDS
In order to inform families/relatives of injured/dead, a up-to-date list of names and
addresses of all the workers is maintained in addition to the muster roll where shift-wise
attendance is marked. Such list includes health records. This list will be available at the ECC
and one such copy shall be available at our head office.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-65
6.4.11 PUBLIC RELATIONS
Our General Manager shall be the only nominated person to issue administrative statement
about the accident or emergency to news/media. No other person shall divulge any
information to any news / media person.
6.4.12 REHABILITATION
In case of Toxic release or chemical spillage, Senior Fire Brigade Officer would ensure that
the incident area shall be safe and cleaned up of all mess. Then only, he would allow people
to re-enter the location. In case of fire, the Senior Fire-Brigade Officer shall ensure that the
area is cooled down and there are no chances of re-ignition. IC shall arrange for clean-up of
the area and then only people shall be allowed to re-enter the area for work.
Even when all clear has been given, great care shall be taken when re-entering affected
areas and no work in connection with the salvage, collection of evidence or start up shall be
taken up until a thorough examination of the area has been carried out. The statutory
powers of the Factory Inspector shall be kept in mind before any evidence is disturbed.
Particular care shall be taken to avoid the introduction of possible sources of ignition, such
as diesel engines, hand or power operated tools, flame cutting equipment, etc. until it has
been established that no flammable materials are present where they could be ignited.
6.5 OFF – SITE EMERGENCY PLAN
6.5.1 NEED OF THE OFF – SITE EMERGENCY PLAN
An off-site emergency plan is prepared to deal with those incidents which have the potential
to harm persons or the environment outside the boundary of the factory premises. A major
accident, major emergency and disaster may affect areas outside the plant. An explosion
can scatter debris over wide areas and its effects of blasts can cover considerable distances.
Wind can spread burning fumes of toxic gases. Thus the events like these described above
can affect outside areas and combating them needs an Off-site Emergency plan.
Envisaging such a rare incident, an off-site emergency plan should be drawn up for the
following purpose.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-66
1. To provide basic information about the risk and environmental impact assessment
related to the unit to local / district authorities, police, fire-brigade, surrounding
units, and the general public. To appraise them of consequences and the protection
/ prevention measures and control actions and to seek their help to communicate
with public in case of a major emergency. The information from all industries shall
enable district authorities to educate public about what could go wrong, and to train
them of measures to be taken as an individual.
2. To enable district authorities to prepare the off-site emergency plan (contingency)
for the district or particular area and to organize rehearsals and initiate actions
learnt from these incidents.
Our Emergency Plan shall be made after considering the all possible effects of incidents on
the neighboring population and the remedial measures will be devised in consultation with
the local authorities and emergency services.
6.5.2 STRUCTURE OF THE OFF-SITE EMERGENCY PLAN
IC District Authorities Mutual Aid teams, outside
SMC (Collector, Factory services, voluntary
Essential Workers Inspector, Police) organizations
(Implementing Information, Evacuation (Fire-fighting, Gas leak
Action plan, control, First-aid, Shelter,
Informing nearby Hospitalization,
Public) Transportation)
6.5.3 ROLE OF FACTORY MANAGEMENT
The Off-Site emergency Plans are dovetail so that the emergency services shall be
summoned at the appropriate time and shall be provided with accurate information and a
correct assessment of the situation. The responsibility for this is with the Site Main
Controller. The Site Main Controller shall provide a copy of our On-Site and Off-Site
Emergency Plan to the District authorities, the Factories Inspectorate and the Emergency
Services, so that on the basis of information and such authorities can make their emergency
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-67
preparedness plan to formulate and execute the District / Area off Site Emergency Plan.
Further on the advice of the authorities we can also modify our plan to make our plan more
effective and perfect.
6.5.4 ROLE OF EMERGENCY CO-ORDINATION OFFICER (ECO)
The various emergency services will be co-ordinated by the Emergency Co-ordination officer
(ECO), who will likely to be a Collector. The ECO will liaise closely with the Site Main
Controller. The Emergency Control Centre of the factory can be utilized by the ECO to keep
liaison with the Site Main Controller.
6.5.5 ROLE OF THE FIRE AUTHORITIES
The control of fire is normally the responsibility of the senior fire officer who would take
over the handling of fire from the IC on arrival at the site.
• The senior fire brigade officer may also have similar responsibility for other events such
as explosion and toxic releases. Fire authority having major hazard units in the area
shall- Familiarize themselves with the location and site of all stages of flammable
materials, water and foam supply points, fire fighting equipment.
• Act as observer of an on-site exercise involving only site personnel
6.5.6 ROLE OF THE HEALTH AUTHORITIES
Health authorities, including Doctors, Surgeons, Hospitals, and Ambulances so on, have a
vital part to play following a Major Accident and they should form an integral part of any
emergency plan. In case of major fires, injuries will be the result of the effects of thermal
radiation to a varying degree, and the knowledge and experience to handle this type of
injuries cases may be generally available in most of the hospitals. But in case of major toxic
releases, the effects vary according to the chemical, which has leaked, and it is important for
health authorities that might be involved in dealing with the aftermath of a toxic release to
be familiar with the treatment appropriate to such casualties. Major Off-Site incidents are
likely to require medical equipment and facilities additional to those available locally and a
Medical 'Mutual Aid' scheme should exist to enable the assistance of neighboring
authorities to be obtained in the event of an emergency.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-68
6.5.7 ROLE OF TELEPHONE DEPARTMENT
The communication system between the factory and the various above role-playing
authorities must be effective. The ineffective public telephone system will not be useful in
emergency. Therefore, telephone department should maintain the phones and if required
temporary telephone connection may be provided to various above authorities to deal the
emergency.
6.5.8 ROLE OF POLICE AND EVACUATION AUTHORITIES
• To protect life and property
• To control traffic movement
• To inform people to remain indoors or evacuate
• To carry-out evacuation
• To identify dead, deal with casualties and inform relatives of dead or injured.
For evacuation, the following criteria are useful:
a) In case of major fire, only houses close to fire and in the direction of smoke need
evacuation
b) If fire is escalating and in turn threatening a store of hazardous material, it is
necessary to evacuate people nearby if time is available; otherwise they should be
informed to keep themselves indoor and shield from the fire.
c) For release of toxic gases, limited evacuation may be appropriate in downwind
direction with windows closed and provides good protection. Toxic gases which are
hazardous down to much lower concentration cover a long distance. This factor
must be considered while deciding upon the need and extent of evacuation.
6.5.9 ROLE OF THE MUTUAL-AID AGENCIES
Mutual-aid arrangements shall be made in areas of fire & toxicity control, medical and
transport & evacuation. All partners of mutual-aid shall extend all possible help in these
areas.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-69
6.6 OCCUPATIONAL HEALTH AND SAFETY
For large industries, where multifarious activities are involved during construction, erection,
testing, commissioning, operation and maintenance; the men, materials and machines are
the basic inputs. Along with the boons, industrialization generally brings several problems
like occupational health and safety.
The industrial planner, therefore, has to properly plan and take steps to minimize the
impacts of industrialization and to ensure appropriate occupational health and safety
including fire plans. All these activities again may be classified under construction and
erection, and operation and maintenance.
6.6.1 OCCUPATIONAL HEALTH
Occupational health needs attention both during construction & erection and operation &
maintenance phases. However, the problem varies both in magnitude and variety in the
above phases.
6.6.1.1 CONSTRUCTION AND ERECTION
The occupational health problems envisaged at this stage can mainly be due to
constructional accident and noise. To overcome these hazards, in addition to arrangements
to reduce it within TLV's, necessary protective equipments shall be supplied to workers.
6.6.1.2 OPERATION AND MAINTENANCE
The problem of occupational health, in the operation and maintenance phase is primarily
due to noise which could affect consultation. The necessary personal protective equipments
will be given to all the workers. The working personnel shall be given the following
appropriate personnel protective equipments.
• Industrial Safety Helmet;
• Face shield
• Zero power plain goggles with cut type filters on both ends;
• Zero power goggles with cut type filters on both sides and blue color glasses;
• Welders equipment for eye and face protection;
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-70
• Cylindrical type earplug;
• Ear muffs;
• Canister Gas mask;
• Self contained breathing apparatus;
• Leather apron;
• Aluminized fiber glass fix proximity suit with hood and gloves;
• Boiler suit;
• Safety belt/line man's safety belt;
• Leather hand gloves;
• Asbestos hand gloves;
• Acid/Alkali proof rubberized hand gloves;
• Canvas cum leather hand gloves with leather palm;
• Lead hand glove;
• Electrically tested electrical resistance hand gloves; and
• Industrial safety shoes with steel toe.
6.6.1.3 HOSPITAL FACILITIES
It is proposed that client will make formal agreements with nearby hospital having facilities
to attend fire and toxic effect cases for attending the affected persons in the emergency
arising out of accidents, if any.
6.6.1.4 FACTORY MEDICAL OFFICER
A qualified doctor will be appointed as FMO on retainer ship basis. Apart from him,
Paramedical Staff will be employed.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-71
6.6.1.5 PROPOSED FACILITY TO BE MADE AVAILABLE AT OHC
One Room is proposed to be provided to be operated as OHC. The centre will be equipped
with following medical equipments:—
1. Examination Table
2 Dressing Tables For performing Dressing
3. Glucometer For measurement of Blood Sugar
4 Vision chart To evaluate vision acuity
5. Nebuliser For relieving coughs & Breathing Difficulty
6. Infra red light for relieving muscular pain
7. Suction machine For cleaning airway
8. Autoclave machine For sterilizing cotton &dressing material
9. Weighing Machine For measuring body weight
10. Medical Oxygen Cylinder kit
11. Sphygmomanometer To measure blood pressure
12. Refrigerator To preserve medicines
13. Thermometer
6.6.1.6 AMBULANCE VAN
An ambulance van is proposed to be made available 24 hours at Fire Station.
6.6.1.6 FIRST AID BOX
First Aid Boxes are proposed to be made available at the different location in the plant,
Training to be given to employees for First Aid.
6.6.1.7 PERIODIC MEDICAL EXAMINATION
It is proposed that client will ensure that…
(1) Workers employed shall be medically examined by a qualified medical practitioner/
Factory Medical Officer, in the following manner:
(a) Once in a period of 6 months, to ascertain physical fitness of the person to do the
particular job;
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-72
(b) Once in a period of 6 months, to ascertain the health status of all the workers in respect
of occupational health hazards to which they are exposed and in cases where in the opinion
of the Factory Medical Officer it is necessary to do so at a shorter interval in respect of any
workers;
© In periodic and pre-medical examinations, various parameters will be checked. Viz., LIVER
FUNCRION TESTS, Chest X-rays, Audiometry, Spirometry, Vision testing (Far & Near vision,
color vision and any other ocular defect) ECG and other parameters as will be found
necessary as per the opinion of Factory Medical officer.
(2) No person shall be employed for the first time without a certificate of granted by the
Factory Medical Officer.
6.6.1.8 EMP FOR THE OCCUPATIONAL SAFETY & HEALTH HAZARDS SO THAT SUCH
EXPOSURE CAN BE KEPT WITHIN PERMISSIBLE EXPOSURE LEVEL (PEL)/THRESHOLD
LEVEL VALUE (TLV) SO AS TO PROTECT HEALTH OF WORKERS
1. It is proposed to formulate and implement an EMP for Occupational Safety and Health
with following aims…
• To keep air-borne concentration of toxic and hazardous chemicals below PEL and TLV.
• Protect general health of workers likely to be exposed to such chemicals
• Providing training, guidelines, resources and facilities to concerned department for
occupational health hazards.
• Permanent changes to workplace procedures or work location to be done if it is found
necessary on the basis of findings from workplace Monitoring Plan.
2. It is proposed that this EMP be formulated on the guidelines issued by Bureau of Indian
Standards on OH&S Management Systems: IS 18001:2000 Occupational Health and
Safety Management Systems
3. Proposed EMP will be incorporated in Standard Operating Procedure also.
4. The proposed EMP will also include measure to keep air-born concentration of toxic
and hazardous chemicals below its PEL and TLV, like…
a. Leak Surveys
b. Separate storage for toxic chemicals
c. Exhaust Ventilation
d. Proper illumination
e. On-line detectors toxic chemicals like Chlorine and Bromine
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-73
f. Close processes to avoid spills and exposures
g. Atomization of process operations to hazards of manual handling of chemicals
h. Supply of proper PPEs like Air mask, Berating canisters, SCBA sets, On-line breathing
apparatus at the places where there is possibility of presence of toxic chemicals
i. Decontamination procedure for empty drums and carboys.
j. Regular maintenance program for pumps, equipment, instruments handling toxic and
corrosive chemicals
k. Display of warning boards
l. Training to persons handling toxic and corrosive chemicals
5. Workplace Monitoring Plan
• It is proposed that a Workplace Monitoring Plan to be prepared & implemented in
consultation with FMO and industrial hygienists.
• Each workplace must be evaluated to identify potential hazards from toxic substances
or harmful physical agents. Air-borne concentration of toxic chemicals will be measured
and record will be kept.
• The current state-of-the-art exposure measurement model is as follows: For purposes of
measuring worker exposure across a single shift it is sufficient t o place a reasonably
accurate exposure measuring device on the worker , within t he worker ’s breathing
zone, and have it operate for nearly the full shift. Client has been proposed to study the
exposure data when the plant is operative.
6. Health Evaluation of Workers
1. It is proposed that management will device a plan to check and evaluate the exposure
specific health status evaluation of workers
2. Workers will be checked for physical fitness with special reference to the possible health
hazards likely to be present where he/she is being expected to work before being
employed for that purpose. Basic examinations like Liver Function tests, chest x ray,
Audiometry, Spirometry Vision testing (Far & Near vision, color vision and any other
ocular defect) ECG, etc. will be carried out. However, the parameters and frequency of
such examination will be decided in consultation with Factory Medical Officer and
Industrial Hygienists.
3. While in work, all the workers will be periodically examined for the health with specific
reference to the hazards which they are likely to be exposed to during work. Health
evaluation will be carried out considering the bodily functions likely to be affected
during work. The parameters and frequency of such examination will be decided in
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-74
consultation with Factory Medical Officer and Industrial Hygienists. Plan of monthly and
yearly report of the health status of workers with special reference to Occupational
Health and Safety.
6.6.1.9 MEDICAL SURVEILLANCE PROGRAM
Pre-employment Medical Check Up
1. Chest X-ray
2. Cardiogram
3. Audiometry
4. Hematological Examination:- CBC, SGOT, SGPT, Cholesterol, Blood Sugar etc
5. Urine Examination
6. Vision test
7. Colour blindness test
8. Lung function test- Spirometry
Periodical Medical Check up
1. Lung Function test
2. Cardiogram
3. Audiometry
4. Hematological Examination
5. Urine examination
6. Vision test
7. Colour blindness test
8. Biomarker in Blood & Urine
6.6.2 SAFETY PLAN
Safety of both men and materials during construction and operation phases is of concern.
Safety plan shall be prepared and implemented in the proposed project activity. The
preparedness of an industry for the occurrence of possible disasters is known as emergency
plan. The disaster in the plant is possible due to collapse of structures and fire/explosion etc.
• The proposed expansion project would formulate safety policy keeping in view the safety
requirement during construction, operation, maintenance phases, with the following
regulations:
• To allocate sufficient resources to maintain safe and healthy conditions of work;
• To take steps to ensure that all known safety factors are taken into account in the design,
construction, operation and maintenance of plants, machinery and equipment;
• To ensure that adequate safety instructions are given to all employees;
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-75
• To provide wherever necessary protective equipment, safety appliances and clothing and
to ensure their proper use;
• To inform employees about materials, equipment or processes used in their work which
are known to be potentially hazardous to health or safety;
• To keep all operations and methods of work under regular review for making necessary
changes from the point of view of safety in the light of experience and up to date
knowledge;
• To provide appropriate facilities for first aid and prompt treatment of injuries and illness
at work;
• To provide appropriate instruction, training, retraining and supervision to employees in
health and safety, first aid and to ensure that adequate publicity is given to these
matters;
• To ensure proper implementation of fire prevention methods and an appropriate fire
fighting service together with training facilities for personnel involved in this service;
• To organize collection, analysis and presentation of data on accident, sickness and
incident involving people injury or injury to health with a view to taking corrective,
remedial and preventive action;
• To promote through the established machinery, joint consultation in health and safety
matters to ensure effective participation by all employees;
• To publish/notify regulations, instructions and notices in the common language of
employees;
• To prepare separate safety rules for each type of occupation/processes involved in a
plant; and
• To ensure regular safety inspection by a competent person at suitable intervals of all
buildings, equipments, work places and operations.
6.6.3 SAFETY ORGANIZATION
Construction and Erection Phase
A qualified and experienced safety officer shall be appointed. The responsibilities of the
safety officer include identification of the hazardous conditions and unsafe acts of workers
and advice on corrective actions, conduct safety audit, organize training programs and
provide professional expert advice on various issues related to occupational safety and
health. He is also responsible to ensure compliance of Safety Rules/ Statutory Provisions.
Operation and Maintenance Phase
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-76
When the construction is completed the posting of safety officers shall be in accordance
with the requirement of Factories Act and their duties and responsibilities shall be as
defined there of.
6.6.4 SAFETY CIRCLE
In order to fully develop the capabilities of the employees in identification of hazardous
processes and improving safety and health, safety circles would be constituted in each area
of work. The circle would consist of about five to six employees from that area. The circle
normally shall meet for about an hour every week.
6.6.5 SAFETY TRAINING
Safety training shall be provided by the Safety Officers with the assistance of faculty
members called from Professional Safety Institutions and Universities. In addition to regular
employees, limited contractor labors shall also be provided safety training. To create safety
awareness safety films shall be shown to workers and leaflets shall be distributed.
Some precautions and remedial measures proposed to be adopted to prevent fires are:
• Compartmentalization of cable galleries, use of proper sealing techniques of cable
passages and crevices in all directions would help in localizing and identifying the area of
occurrence of fire as well as ensure effective automatic and manual fire fighting
operations;
• Spread of fire in horizontal direction would be checked by providing fire stops for cable
shafts;
• Reliable and dependable type of fire detection system with proper zoning and interlocks
for alarms are effective protection methods for conveyor galleries;
• Housekeeping of high standard helps in eliminating the causes of fire and regular fire
watching system strengthens fire prevention and fire fighting; and
• Proper fire watching by all concerned would be ensured.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-77
6.6.6 HEALTH AND SAFETY MONITORING PLAN
The health of all employees shall be periodically monitored for early detection of any
ailment due to exposure to heat and noise.
6.7 TRAINING, REHERASAL & RECORDS
6.7.1 NEED OF TRAINNING & REHEARASAL
Training is important in order to –
• Teach worker’s how to handle chemicals safely, how to act as a runner/messenger, how
to use PPE, how to start and shut down the plant, how to carry out emergency repairs
etc.
• Teach one to be a safe and alert worker.
Rehearsal is essential for -
• Explaining and making key personnel and essential workers aware of their role in case of
an emergency.
• Testing the emergency procedure, emergency arrangements and ability of all involved
with it to grasp the procedure and implement the same.
• Testing the effectiveness of communication system including the alternative
arrangement in case of failure.
• Testing the speed of mobilization of resources, search, rescue and treatment of
casualties, emergency isolation and shut down.
• Detecting the shortcomings in the emergency plan and incorporating remedial measures.
• Allowing professional emergency services to test their parts of the plan and testing co-
ordination.
• Building confidence in workers which is helpful in facing real situations.
Training shall be given to regular employees and contract personnel also. Effective and
latest teaching aids will be used to train workers and supervisory staff. Such training courses
shall be conducted once in a year and co-ordination with offsite personnel shall be sought
during such training. Records will be maintained for training.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-78
6.7.2 SOME CHECK POINTS
Following points can be checked at the time of training/assessing the adequacy of the
Emergency Plan.
� Does the plan cover the range of incidents that can realistically be anticipated?
� Have the consequences of the various incidents considered been adequately assessed?
� Are there sufficient resources in terms of personnel and equipment on the site to carry
out the Emergency Plan for the various incidents in conjunction with the public
emergency services?
� Have the time scales been assesses correctly?
� Is there a logical sequence of actions for each person given a role in the plan? Whether
key personnel, especially the nominated incident controllers, consulted in the
preparation of the plan?
� Is there 24 hours cover, to take account of absences due to sickness and holidays,
minimum shift manning, operator only periods, silent hours, shutdown periods, only
security personnel being present, or for unmanned sites etc.?
� Is there satisfactory co-operation with the local emergency services and district
emergency planning officers?
� At sites where an off-site plan to protect people and the environment outside the site in
the event of an incident is appropriate what is the procedure for initiating the off-site
plan and is this satisfactory?
6.7.3 RECORDS AND UPDATING THE PLAN
All records of On-Site and Off-Site Emergency Plan and modifications by experience and
suggestion, the rehearsals and conclusions of such plans and the enquiries shall be well
maintained and preserved. The necessary data bank shall be also maintained for the utility
of industries and others. New information and the deficiencies identified during the
rehearsal is reviewed and incorporated in the document for continual up dating of the plan
and such information shall be communicated to the concerned authorities.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-79
6.8 HAZOP STUDY
6.8.1 OBJECTIVE
For identifying cause and the consequences of perceived mal operations of equipment and
associated operator interfaces in the context of the complete system. It accommodates the
status of recognized design standards and codes of practice but rightly questions the
relevance of these in specific circumstances where hazards may remain undetected.
6.8.2 PURPOSE OF HAZOP
It emphasizes upon the operating integrity of a system, thereby leading methodically to
most potential and detectable deviations which could conceivably arise in the course of
normal operating routine
- including "start-up” and "shut-down" procedures
- as well as steady-state operations.
It is important to remember at all times that HAZOP is an identifying technique and not
intended as a means of solving problems nor is the method intended to be used solely as an
undisciplined means of searching for hazardous scenarios.
6.8.3 FEATURES OF HAZOP STUDY
Subsystems of interest line and valve, etc
Equipment, Vessels
Modes of operation Normal operation
Start -up mode
Shutdown mode
Maintenance /construction / inspection mode
Trigger events Human failure
Equipment /instrument/component failure
Supply failure
Emergency environment event
Other causes of abnormal operation, including
instrument disturbance
Effects within plant Changes in chemical conditions
Changes in inventory
Change in chemical physical conditions
Hazardous conditions Release of material
Changes in material hazard characteristics
Operating limit reached
Energy source exposed etc.
Corrective actions Change of process design
Change of operating limits
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-80
Change of system reliability
Improvement of material containment
Change control system
Add/remove materials
How would hazardous During normal operation
Conditions detected? Upon human failure
Upon component failure
In other circumstances
Contingency actions Improve isolation
Improve protection
6.8.4 HAZOP STUDY PROCEDURE
• Procedure in HAZOP study consists of examining the process and instrumentation (P&I)
line diagram, process line by process line.
• A list of guide words is used to generate deviations from normal operation
corresponding to all conceivable possibilities.
• Guide words covering every parameter relevant to the system under review i.e. flow
rate and quality, pressure, temperature, viscosity, components etc.
• Flowchart for application of HAZOP is shown in figure.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-81
HAZOP STUDY FLOW CHART
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-82
GUIDE WORDS
NONE No forward flow when there should be
MORE More of any parameter than there should be, e.g. more
flow, more pressure, more temperature, etc.
LESS As above, but "less of" in each instance
PART System composition difference from what it should be
MORE THAN More "components" present than there should be for
example, extra phase, impurities
OTHER What needs to happen other than normal operation, e.g.
start up, shutdown, maintenance?
NONE e.g., NO FLOW caused by blockage; pump failure; valve
closed or jammed: leak: valve open; suction vessel empty;
delivery side over - pressurized: vapor lock; control failure
REVERSE e.g., REVERSE FLOW caused by pump failure: NRV failure or
wrongly inserted; wrong routing; delivery over pressured;
back- siphoning; pump reversed
MORE OF e.g., MORE FLOW caused by reduced delivery head ; surging
; suction pressurized ; controller failure ; valve stuck open
leak ; incorrect instrument reading.
MORE OF MORE TEMPERATURE, pressure caused by external fires;
blockage ; shot spots; loss of control ; foaming; gas release;
reaction; explosion; valve closed; loss of level in heater; sun.
LESS OF e.g., LESS FLOW caused by pump failure; leak; scale in
delivery; partial blockage ; sediments ; poor suction head;
process turndown.
LESS e.g., low temperature, pressure caused by Heat loss;
vaporization; ambient conditions; rain; imbalance of input
and output; sealing; blocked vent.
PART OF Change in composition high or low concentration of mixture;
additional reactions in reactor or other location; feed
change.
MORE THAN Impurities or extra phase Ingress of contaminants such as
air, water, lube oils; corrosion products; presence of other
process materials due to internal leakage ; failure of
isolation ; start-up features.
OTHER Activities other than normal operation start-up and
shutdown of plant ; testing and inspection ; sampling ;
maintenance; activating catalyst; removing blockage or scale
; corrosion; process emergency ; safety procedures activated
; failure of power, fuel, steam , air, water or inert gas;
emissions and lack of compatibility with other emission and
effluents.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-83
6.8.5 PROCESS HAZARD AND ITS CONTROL
Parameter Guide
Word
Name of
hazardous
process
and
operation
Possible causes Possible
consequences
Measures
safeguard
Action Require
Distillation
More Good Heating 1. No process hazards.
It is part of the
requirement.
2. It will accelerate
the distillation
process.
Temp.
Less Poor Heating No distillation will
take place. Process
delayed.
More Not Possible -- Pressure
Less Not Possible --
More Not Possible --
1. Temperature
gauge &
pressure
gauge
provided.
2. Sight glass
provided.
3. Safety valve
provided .
4. Cooling &
chilling
arrangement
with
alternative
provided.
1. Non return Valve to be provided.
2. Arrow indicator to be provided on
pipeline.
3. Stand by pump to be provided.
4. Pump, storage tank & pipe line
identification to be done.
5. Color code to be provided.
6. Periodic checking of the condenser
to be followed.
Flow
Power
Failure
Distillation
No GEB Supply Distillation will not
achieve.
D.G.Set
provided.
Raw material to the storage tank ( Day Tank ) - Transferring
No 1. No material
in the
storage tank.
2. Pump
tripped.
3. Pump
discharge
valve closed.
4. Heavy
leakage in
pipe line or
chocking the
pipeline.
No material to service
tank.
Pressure gauge
provided on the
pump discharge
valve.
pipeline
arrangement
with alternative
provided.
1. Non-returnable Valve to be
provided.
2. Arrow indicator to be provided on
pipeline.
3. Stand by pump to be provided.
4. Pump, storage tank & pipe line
identification to be done.
5. Color code to be provided.
6. Work permit procedure to be
followed for handling of
hazardous chemicals.
7. PPE compliance to be followed
during handling of acid.
More 1. Valve
opened
more than
set value
2. Human
Error.
More material to the
service tank.
Reverse Not possible
Flow
Pressure
Less
Transferrin
g of Raw
material to
the Storage
Tank
SOP to be prepared.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-84
Transferring of Raw material from storage tank to Process vessel
More 1. Seasonal effect
2. Poor insulation
of pipeline.
3. Falling of hot
water on
uninsulated
line.
4. Incoming
material from
storage tank
itself has high
temperature.
1. More pressure in the
pipeline may give rise
to leakage.
2. From poor flange
joints, valve. Fire &
health hazards.
Insulation on
pipeline &
batch tank
provided.
1. Considering this
sufficient quantity of
water shall be ensured.
2. All flange joints shall be
checked regularly.
Temp.
Less 1. Seasonal effect
2. Leakage of
chilled water
from tank.
No workplace Hazards. Safety valve
provided on
batch tank.
More 1. N2 pressures
more.
2. Valve failure
3. FIC mal
function.
4. Human error.
1. Pressure rise in batch
tank.
2. Leakage in flange joint.
3. Safety valve of batch
tank may popup.
4. Tank filling operation
completed in less
time.
Pressure gauge shall be
provided on batch tank.
Pressure
Less 1. Low pressure of
N2 itself.
No safety hazards but it will
take more time for filling
operation.
More Same as
Pressure
Same as Pressure Same as Pressure
Less 1. Choking in the
excess flow
valve. (Holes are
choked.)
2. Low pressure of
N2 itself.
3. Valve choked.
No safety hazards but it will
take more time for filling
operation.
Flow
Reverse
Transferri
ng of Raw
material
from the
Storage
Tank to
Process
Vessel
No chances 1. NRV
provided.
2. Auto shut
off valve
provided.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-85
Transferring of Raw material from storage tank to Process vessel
More 5. Seasonal
effect
6. Poor
insulation of
pipeline.
7. Falling of hot
water on
uninsulated
line.
8. Incoming
material
from storage
tank itself
has high
temperature
.
3. More pressure in
the pipeline may
give rise to
leakage.
4. From poor flange
joints, valve. Fire
& health
hazards.
Insulation on
pipeline & batch
tank provided.
3. Considering this sufficient
quantity of water shall be
ensured.
4. All flange joints shall be checked
regularly.
Temp.
Less 3. Seasonal
effect
4. Leakage of
chilled water
from tank.
No workplace
Hazards.
Safety valve
provided on
batch tank.
More 5. N2 pressures
more.
6. Valve failure
7. FIC mal
function.
8. Human
error.
5. Pressure rise in
batch tank.
6. Leakage in flange
joint.
7. Safety valve of
batch tank may
popup.
8. Tank filling
operation
completed in less
time.
Pressure gauge shall be provided on
batch tank.
Pressure
Less 2. Low
pressure of
N2 itself.
No safety hazards but
it will take more time
for filling operation.
More Same as
Pressure
Same as Pressure Same as Pressure
Less 4. Choking in
the excess
flow valve.
(Holes are
choked.)
5. Low
pressure of
N2 itself.
6. Valve
choked.
No safety hazards but
it will take more time
for filling operation.
Flow
Reverse
Transferri
ng of Raw
material
from the
Storage
Tank to
Process
Vessel
No chances 3. NRV
provided.
4. Auto shut off
valve
provided.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 6-86
6.8.6 PLANNING FOR HAZOP
• Safety procedures documents
• Relief/venting philosophy
• Chemical involved
• Piping specifications
• Carry out the study
• Record the results
• Follow-up of actions noted
1. Final report contains resolution of all recommended actions.
2. Must appoint someone as leader to check progress of action.
3. Team may meet again if answers to questions do not simply lead to an action.
Team may meet again if significant design changes in interim report.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 1
CHAPTER - 7
ENVIRONMENTAL MANAGEMENT PLAN
7.1 BACKGROUND
The industry shall adopt a comprehensive Environmental Management Plan (EMP) which
will cover several environmental protection measures, not only for abatement of
environmental pollution resulting from the project, but also for the improvement in the
ambient environment. The various components of the EMP are outlined in subsequent
sections. An EMP is a site-specific plan developed to ensure that all necessary measures are
identified and implemented in order to protect the environment and comply with
environmental legislation.
7.2 OBJECTIVES OF ENVIRONMENTAL MANAGEMENT PLAN
The Environment Management area will be handled by a Qualified Manager with adequate
training and experience in operation of ETP and management of other pollution control
measures. He will be assisted by a Qualified Executive and one operator (in each shift) to run
ETP and other pollution control system.
All the necessary controls w.r.t. management of Liquid / Hazardous / Gaseous pollutants will
be exercised.
For all liquid effluents, full fledged effluent treatment plant consisting of primary, secondary
and tertiary treatment will be installed to ensure adequate treatment prior to discharge.
Process stacks will be equipped at safe height with scrubbers where required to ensure
emissions within prescribed limits.
To handle hazardous waste as per Hazardous & Other Wastes (Management and
Transboundary Movement) Rules, 2016 of Environment Protection Act, 1986.
Hazardous waste will be disposed off at the common Incinerator / secured land fill facility
available in the nearby vicinity.
• Fixed gas detection system will be installed in the workplace area.
• Work place monitoring will be carried out regularly through continuous monitoring
systems and periodic checking.
• Ambient air quality will be monitored regularly.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 2
• Good green belt will be maintained inside and outside the premises by planting
trees, developing lawns.
• To work in R&D for continuous improvement in process to reduce Pollution Load &
moving towards adopting cleaner production technology.
7.3 ENVIRONMENTAL MANAGEMENT CELL
Apart from having an environmental management plan, it is also necessary to have a
permanent organizational set up charged with the task of ensuring effective
implementation. In this effect, M/s. Gujarat Dyestuff Industries will assign responsibilities to
officers from various disciplines to co-ordinate the activities concerned with management
and implementation of environment control measures.
An organogram of Environment management cell is shown in Figure 7.1. This department
shall undertake the monitoring of environment pollution level by measuring stack emissions,
Ambient air quality, water and effluent quality, Noise level, etc. either departmentally or by
appointing external agency whenever necessary. M/s. Gujarat Dyestuff Industries shall have
its own laboratory equipped with different equipment for environmental monitoring. M/s.
Gujarat Dyestuff Industries shall carry out the regular monitoring in future as well as ensure
that pollution is limited below prescribed limits and shall take corrective action by providing
new pollution control equipment if required. In case the monitored results of environment
pollution are found to exceed the prescribed limits, remedial actions are taken through the
concerned plant authorities. The actual operation and maintenance of pollution control
equipment of each department is under respective department heads.
The environmental department shall also look after preparation and submission of Water
Cess Return, Environmental statement and Consolidated Consent & Authorization
application/ renewal under water (Prevention and Control of Pollution) Act, 1974, Air
(Prevention and Control of Pollution) Act, 1981, Ambient Air Quality as per NAAQS
Standards, 2009 and Hazardous Waste (Management, Handling and Transboundary) Third
Amended Rules, 2010 under Environment Protection Act, 1986.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 3
FIGURE - 7.1
ORGANOGRAM OF ENVIRONMENT MANAGEMENT CELL
DIRECTOR / CEO
GENERAL MANAGER
MANAGER / ASST. MANAGER
EXECTUTIVES / OFFICERS
OPERATORS
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 4
7.3.1 ENVIRONMENT POLICY
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 5
Monitoring points /locations and components
Environmental monitoring plan shall be decided considered the environmental impact likely
to occur due to operation of the project as the main scope of monitoring program is to track
timely and regularly change in the environmental condition and to take timely action to
protect the environment
Sr. No.
Components Environmental Monitoring Points/Location
1. Ambient Air Ambient air quality at minimum 3
Location, including the plant premises
2. Water & Waste water • Intake Raw Water Quality
• Wastewater from all Source
• Wastewater at different stages of Effluent
Treatment Plant
3 Noise
•At all source and outside the Plant Area.
• At least 5 points near/around the plant
4. Greenbelt/Vegetation Cover Greenbelt Area at Boundary & Reserved Area
5. Solid Waste • Process Dust generated & Collected from All Dust
Collection Systems as Solid wastes
• Other solid waste
6. Soil At least two Locations from Area near the company.
ENVIRONMENT MANAGEMENT CELL:
To facilitate the Environment Management System, one of the most important aspects is
the organization and personnel. The unit will form an Environment Management Cell for
achievement of the following:
• Collect information from regular monitoring and create a database.
• Analyze the data and decide the critical areas for immediate attention and corrective
actions. Work out action plan for implementation of the recommendations made
under Environment Management Plan.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 6
• Prepare budget for environment management program and proper allocation of the
funds for the same.
• Qualified and experienced person in the field of Environment either environmental
engineer or environmental scientist will be appointed for overall responsibility for
the management of all the issues related to Environment, Health and Safety within
the plant. In consultation with in-charge of the plant, he will directly report to the
Senior Management (Director / Executive Director) of the company for Issues related
to the Environment Management System of the unit.
7.3.2 CORPORATE ENVIRONMENT RESPONSIBILITY
• To develop & to promote the technology having minimum pollution of Air, Water &
Land.
• Educating & promoting staff & workers for creating safe working atmosphere.
• More & more tree plantation in the surrounding open area within site.
7.3.3 MANAGEMENT RESPONSIBILITY
• Director/CEO is overall responsible for effective implementation of Occupational
Health, Safety & Environment Management System (HSEMS)
• Core Committee conducts management review every Six months to assess the
effectiveness of HSE Management System. If necessary the committee allocates
resources for taking Corrective and Preventive action on Non-Conformance.
• The Core Committee advises and monitors the establishment and implementation of
HSEMS
• HODs, Dept. in-charges, Supervisors, are responsible for implementing HSE
Management Programs. Safety Officer to lead the programme. All the employees are
responsible for implementing and maintaining HSE Management System.
• HODs are responsible to define and monitor the key characteristics for measure of
performance in HSE. HODs are responsible for control of all the documents and data
as per the requirement of ISO-14001 and OHSAS 18001
• Verification activities, including internal HSE Audits, are carried out at the direction of
Core committee and team of Internal Auditors.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 7
The organization structure of M/s. Gujarat Dyestuff Industries at Plot No. Z- 25, 26, 27, 28,
SEZ Dahej, Vill: Dahej, Tehsil: Vagra, Dist: Bharuch (Guj.) will be as per Organization Chart.
The Roles, responsibilities, accountabilities and authorities of key personnel have been
defined in the following paragraphs:
ROLE – 1: GENERAL MANAGER (OPERATION HEAD)
RESPONSIBILITIES:
• He is responsible for entire activities of Unit.
• He is responsible to define HSE policy and ensure that this policy is understood,
implemented and maintained at all levels in the organization.
• He is also responsible to provide adequate resources for achieving improved
Occupational Health Safety and environmental performance
• He is responsible for setting organizational HSE objectives and targets.
• He is also responsible to review HSE management system at appropriate intervals, to
ensure its continuing and effectiveness. Monitoring of effectiveness of the system shall
be done through Management Reviews
• He is also responsible to appoint Management Representative and extend support and
resources in implementing HSE management system.
• He is responsible for procurement of raw material (Indigenous & Imported) and
engineering goods as per the specifications.
• He is overall responsible to ensure that legal requirements are met as per the legal
register.
• Review the implementation of HSE Management System and its effectiveness, at
appropriate intervals, to ensure continual improvement of the organization’s overall
performance.
• In absence of General Manager, other unit’s Operations Head oversees his functions.
CEO also may look into the delegation of authority, during his absence.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 8
ACCOUNTABILITY
He is accountable for all operations being carried out in the organization. His scope of
accountability in terms of HSE is as follows
1. Establishment, operation and maintenance of ISO 14001 and OHSAS 18001 systems
in all spheres of manufacturing site.
2. Review of performance and progress of the management systems by periodic
review through Management review.
3. To ensure availability of resources essential to establish, implement, maintain and
improve the HSE management system.
MRM INCLUDES
1. The MRM shall obtain the findings of statutory inspection and testing reports from
concerned departments and present in the management review meeting for
discussion and action.
2. The minutes of the Management Review Meeting are recorded and circulated to all
members of the HSE Apex Committee.
Assistant MR shall prepare minutes of meeting within two days after the meeting. He shall
ensure that the review outputs are recorded in the “Action decided” column of format of
Minutes of Management review meeting.
7.4 ENVIRONMENT MANAGEMENT PLAN
The Environment Management plan is meant for mitigation/ management of the adverse
impacts and the strengthening positive impacts during proposed expansion project.
Environment Management Plan is tabulated in Table:-7.1
7.4.1 CONSTRUCTION PHASE
During Construction Phase sanitation facilities are required. Temporary facilities shall be
made available to construction personnel. Necessary PPEs shall also be provided.
• Sanitation
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 9
The site should be provided with adequate and suitable sanitary facilities to maintain proper
standard of hygiene for construction workers. These facilities should include water supply,
sanitary toilets, rest room, etc.
• Noise Environment
Noise effect on the nearly habitation during construction activities will be negligible as the
nearest habitat is more than 3 km from the plant. However, construction labor would be
provided with noise protection devises like ear muffs and occupational safety ware, as per
requirement. And noise generating equipment shall be stopped during night hours.
• Construction Equipment & Waste
The waste oil generated by construction equipment, if any, would be disposed through
authorized recyclers and unauthorized dumping of waste oil shall be avoided. Other wastes
shall be disposed-off by adopting environmentally compatible methodology.
• Storage of Hazardous Materials
The hazardous material such as lubricating oils, compressed gases (for welding), paints,
varnishes, etc. are required to be stored at the site during construction phase. Since, these
materials are hazardous in nature; they shall be stored as per the prescribed / accepted
safety norms.
• Solid / Hazardous Waste Disposal
The hazardous materials used during the construction may include petrol, diesel, welding
gas and paints. These materials would be stored and handled according to the guidelines
specified under Hazardous Waste (Management, Handling & Trans-boundary Movement)
Third Amendment Rules, 2010 by MoEF. Some of the precautions of storage and handling of
the hazardous materials and waste includes the following:
� Dyke enclosures would be provided where-ever necessary for storage of hazardous
materials.
� Diesel and other fuels would be stored in separate dyke enclosures.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 10
� Separate storage for waste paints and thinners, contaminated rags and brushes to
facilitate recycling and reuse. Rags could be laundered for reuse.
� Vehicle maintenance area to be selected properly, to prevent contamination of soil
and ground water by accidental spillage of oil, and other wastes
TABLE:-7.1
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT
ISSUE/COMPONENT
REMEDIAL MEASURES
Hazardous waste generation &
disposal
Proper collection, Safe Handling, Storage within premises and
disposal of waste at approved TSDF, incineration facility, re-
cyclers, re-processors.
Effluent generation and
treatment
New Effluent treatment plant will be provided for treatment of
wastewater generated from new project.
Emission from stack Adequate pollution control system will be provided for control of
gaseous emission.
• Adequate stack height for better dispersion of pollutants
• Scrubbers at Process Vents
Noise Acoustic enclosure on DG sets, engineering control at high noise
level areas like compressors etc, wherever feasible, proper oiling,
lubrication and maintenance of equipment, development of
greenbelt around plant boundary and inside plant
Greenbelt 33.9% of the plant area will be developed as greenbelt.
Rainwater harvesting Rainwater harvesting will be done for this project.
Information and awareness about
hazardous chemicals plant
Awareness and information will be provided within 5 km of the
study area about the hazardous situations.
Preparedness to handle onsite &
offsite emergency
Onsite & Offsite Emergency Management Plan will be prepared
Monitoring of Environmental
parameters
Regular monitoring of various environmental parameters will be
carried out to check the effectiveness of the control system.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 11
7.4.2 WATER ENVIRONMENT
Water requirement shall be met through GIDC Water supply. However, record of water
consumption for different usages should be maintained.
Water Pollution and Its Mitigation Plan
Total water requirement is 34.5 KL/day [24 Fresh + 10.5 Reuse] which is met through GIDC
water supply. The wastewater generation is 14.5 KL/day in which the industrial 10.5 KL/Day
(processing 8.5 KL/Day is treated from inter reaction of RM, reused in cooling and 2.0
KL/Day is cooling bleed off and utilized in greenbelt). So, there will be no industrial waste
water generation and Domestic Waste water generation 4 KL/Day is disposed in septic
tank/soak pit.
Construction Phase
• The drinking water and sanitation facilities at the project site are available to the
construction work force. This is necessary to reduce pollution of any receiving water
body and also to prevent hazards due to water borne vectors.
Operation Phase
• Annual environmental audit will be carried out every year from recognized Schedule-I
environmental auditor.
• Records of analysis results of treated and untreated wastewater along with MLVSS in
aeration tanks should also be maintained.
• Adequate spares for effluent collection, handling, treatment and disposal system should
be maintained.
• Proper housekeeping should be adopted to prevent spillages and contaminated surface
runoff going to storm water drains.
• The following measures would be taken to minimize the water usage in the operational
phase:
� Endeavor to reduce the actual process water consumption by way of improvement
in operation of processing units.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 12
� Water saving by shower head flow controls, spray taps and faucet aerators and
photo-sensitive taps.
� Exploring other options of reusing the treated effluent besides fire water make up or
for horticulture development.
7.4.2.1 INFORMATION FOR RAIN WATER HARVESTING
Rain water harvesting refers to the collection and storage of rain water and also other
activities aimed at harvesting surface and ground water, prevention of losses through
evaporation and seepage and all other hydrological studies and engineering interventions,
aimed at conservation and efficient utilization of the limited water endowment of
physiographic unit such as a watershed. The total amount of water that is received in the
form of rainfall over an area is called the rainwater endowment of that area. Out of this, the
amount that can be effectively harvested is called the water harvesting potential.
Rain Water can be harvested for two purposes:
• Stored for ready use in containers above ground or below ground
• Charged into soil for withdrawal later i.e. ground water recharging
The main elements of rain water harvesting systems are:
• Catchments
• Conduits
• Storage facility
• Transferring facility
The proposed expansion project will have rain water harvesting system with reuse of
collected rain water by transferring rain water in to main water reservoir. Various kinds of
recharge structures are possible which can ensure that rainwater percolates in the ground
instead of draining away from the surface. All process and non process building terrace are
provided with proper drain and rain water collected in common storage tank from where
rain water is transferred to main water storage reservoir.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 13
Maintenance of the storage and transferring system:
Periodic maintenance required for reliable and higher quality water supply. During raining
season the entire system to be checked before and after rains and cleaned after every dry
period. Before first shower storage tanks should be cleaned and flushed of all sediments and
debris. Rain Water harvesting method shall be adopted by Industry by developing various
rain water harvesting system within premises. A dedicated Storm water gutter are provided
throughout the site and divert all rain water to water harvesting ponds without any
contamination.
7.4.3 AIR ENVIRONMENT
M/s. Gujarat Dyestuff Industries proposes expansion (product change) to produce Acetic
Anhydride at Plot No. Z- 25, 26, 27, 28, SEZ Dahej, Vill: Dahej, Tehsil: Vagra, Dist: Bharuch
(Guj.). There shall be 4 types of source of air pollution in proposed expansion scenario at
M/s. Gujarat Dyestuff Industries i.e. stack attached to Thermic Fluid Heater (2 Nos.), Furnace
(2 Nos.), DG Set (1 No.) & Incinerator (1 No.). Air Pre Heater, Multi Cyclone, Bag Filter,
Caustic Scrubber, Ventury Scrubber, Packed Bed Scrubber and Drop back Scrubber will be
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 14
installed to prevent air pollution. The baseline ambient air quality monitoring is carried out
during study period (October’ 16 to December’ 16) around Project site (within the study
area), clearly reveals that the concentrations of PM10, PM2.5, SO2, NOX, O3, Pb, CO, NH3, C6H6,
Benzo (a) Pyrene (BaP), Arsenic (As), Nickel (Ni), HC & VOCs are well within the prescribed
limits as per the National Ambient Air Quality Standards for residential & Industrial.
• The major sources of air emission from the proposed project are:
1. Non point sources emissions
2. Point source emissions
3. Fugitive emissions
7.4.3.1 ACTION PLAN TO CONTROL AMBIENT AIR QUALITY AS PER NAAQES STANDARDS:
Control Measures:
The design stage endeavors to mitigate the problems related to environment and health at
the process technology/ source level itself. Besides standards, emphasis would be given to
comply with all design standards/ regulatory norms as specified by CPCB/MoEF/GPCB etc.
Following measures would be taken right from the design stage to ensure compliance with
applicable regulatory standards:
• Under normal circumstances, there will be no continuous release of volatile hydrocarbon
streams. However, if during start-up/ shut down or an emergency situation any hydrocarbon
stream is released, the same will be directed to an elevated flare for complete combustion.
This will eliminate the possibility of forming an explosive mixture due to sudden release of
un-burnt hydrocarbons to the atmosphere.
Construction Phase (Non point sources emissions)
Generation of suspended particulate matter is a common phenomenon due to
transportation of constructions materials. This would be mitigated by allowing the vehicles
entering the premises under cover. Emission of fugitive dust due to movement of heavy
vehicles etc. shall be controlled by spraying water in the affected zone. Hosing down the
wheels of the vehicles with water and providing washing troughs for them would further
mitigate the amount of dust generated. In addition, emission of other pollutants from
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 15
construction machinery using diesel driven prime movers, will be controlled by proper
maintenance.
Operation Phase (Point sources emissions)
In-plant Control Measures: Some of the mitigation measures, which can reduce the impact
on air environment, are as follows:
• Ensuring the operations of various process units as per specified operating guidelines/
operating manuals.
• Strict adherence to maintenance schedule including lubrication for various machinery/
equipment.
• Emission at M/s. Gujarat Dyestuff Industries will be in the form of the gas emission from
Thermic Fluid Heater (2 Nos.), Furnace (2 Nos.), DG Set (1 No.) & Incinerator (1 No.).
Moreover, regular monitoring of stacks shall be carried out to check the emissions.
Record should be maintained for changing of scrubbing media on printed logbook In
case emissions exceed, the corrective measures should immediately be taken and
records of the same should be maintained.
• Regular ambient air quality monitoring shall be carried out within premises and should
also be carried out in the nearby area for PM10, PM2.5, SO2, NOx & VOCs.
• A greenbelt around the factory will be developed for reducing the air pollution and
attenuation of noise.
• Adoption of good house-keeping.
7.4.3.2 INFORMATION FOR CONTROL OF FUGITIVE EMISSIONS
The emissions are normally defined as emissions to the atmosphere resulting from leaking
piping sources and equipments such as valves, flanges, pump seals, connections, and
compressor seals open end lines and pressure relief valves. The emissions are not visually
observed but can be measured in relatively low concentration at each area of source.
Fugitive emissions are expected to be generated during construction and operation stages
of the proposed project. During construction stage, main source of fugitive emission is dust
which is expected mainly due to movement of vehicles carrying construction material and
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 16
vehicles used for construction. During operation stage, leakage through valves, pumps,
emission from open drum containing chemicals, open feeding; storage tanks, etc. are the
major sources of fugitive emissions of organic chemicals and VOCs. Excess use of solvent
may also results fugitive emission from the process vessels.
The above will be controlled by having proper scrubbing system with a provision of primary
and secondary scrubbers, boiler stacks will be provided with bag filters to take care of
particulate matter, Condenser to trap VOC, solid raw material charging will be done through
closed system. Proper maintenance schedule will be adhered to avoid emissions through
flange joints, pump seals etc. Proper gland packing is always maintained for pumps and
valves and to the extent possible pumps will be with mechanical seal.
M/s. Gujarat Dyestuff Industries shall have fully closed system. Adequate dust collector will
be installed for control of fugitive emission during loading of raw material and product.
Condenser will be provided to trap VOC. All the Flange joints of the pipe lines which carry
solvents will be covered with flange guards. All the rotating equipments like pumps will be
installed with Mechanical Seals to arrest any sort of emissions. VOC detectors will be
installed at various places to identify any fugitive emissions. A regular preventive
maintenance schedule will be in place to replace or rectify all gaskets and joints etc as a part
of ISO systems to ensure no fugitive emissions shall take place. Following measures will be
adopted to prevent and control fugitive emissions:
1. Airborne dust at all transfers operations/ points will be controlled either by spraying
water or providing enclosures.
2. Care will be taken to store construction material properly to prevent fugitive
emissions, if any.
3. Adequate ventilation will be provided.
4. Regular maintenance of valves, pumps, flanges, joints and other equipment will be
done to prevent leakages and thus minimizing the fugitive emissions of VOCs.
5. Entire process will be carried out in the closed reactors with proper maintenance of
pressure and temperature.
6. Periodic monitoring of work area will be carried out to check the fugitive emission.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 17
7. Breather valves will be provided on solvent tanks.
8. Solvent tank vents will be connected to vent chillers.
9. To eliminate chances of leakages from glands of pumps, mechanical seal will be
provided at all solvent pumps.
10. Stand by pumps will be provided on all scrubbers. Besides, scrubbers will be
equipped with on-line pH meter with hooter system for better operational control.
11. Close feeding system will be provided for centrifuges. Centrifuge and filtrate tank
vents will be connected to vent chillers.
12. Minimum number of flanges, joints and valves in pipelines.
13. Regular inspection of floating roof seals and proper preventive maintenance of roofs
and seals for tanks
14. Fugitive emission over reactors, formulation areas, centrifuges, chemical loading,
transfer area, are collected through hoods and ducts by induced draft and
controlled by scrubber/ dust collector.
15. Dedicated scrubbers will be provided to control fugitive emissions.
16. For dust emissions, cyclones / bag filter provided.
17. Emphasis has been given to solvent management / solvent loss prevention as
shown in the solvent management plan.
18. Enclosures to chemical storage area, collection of emission from loading of raw
materials in particular solvents through hoods and ducts by induced draft, and
control by scrubber / dust collector to be ensured.
19. Nitrogen blanketing, provided, besides special care needs to be taken for control
in respect of odorous chemicals.
7.4.4 NOISE ENVIRONMENT
The sound pressure level generated by a noise source decreases with increasing distance
from the source due to wave divergence. The propagation and attenuation of noise pressure
wave is dependent on many parameters amongst which, the medium of travel and the
ambient conditions are the most significant parameters. In order to minimize adverse
impact on the noise environment, due attention shall be given for implementing noise
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 18
control measures. Comprehensive measures shall be taken at design stage for noise from
proposed unit. The measures are as under:
• The noise level at the plant boundary shall be restricted to 75 dB(A) during day time and
70 dB(A) during night time.
• Noise level shall be specified for various rotating equipment as per Occupational Safety
and Health Association (OSHA) standards.
• Equipment lay-out shall be done considering segregation of high noise generating
sources.
• Erection of suitable enclosure, if required, to minimize the impact of high noise
generating sources.
• There may be small addition to the ambient noise level, due to the increased
transportation activities. This creates a slight adverse impact on the sound environment.
• Regular oiling, lubrication and maintenance of the equipment shall be carried out to
minimize noise generation.
During Construction Phase
Following measures shall be taken for abatement of noise during construction phase:
• Noise emissions from construction equipment will be kept to a minimum by regular
maintenance.
• Heavy and noisy construction jobs shall be avoided during night hours.
Following measures shall be adopted for abatement of noise during operation phase:
• Acoustic laggings, enclosures and silencers shall be provided wherever necessary for
high noise generating equipment.
• Sound proof glass paneling shall be provided for all operating stations / control rooms as
well as for shift rooms at critical places.
• Strict implementation/ compliance of all statutory norms w.r.t. noise generation,
occupational exposure shall be done.
• Use of personal protective devices such as ear-muffs and ear-plugs shall be strictly
enforced.
• Acoustic barriers / shelter shall be developed in noisy workplaces.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 19
• Noise generating sources in the plant areas shall be monitored regularly. Monitoring of
ambient noise levels should also be carried out regularly both inside the premises as well
as outside the greenbelt.
During Operation Phase
However, due to the attenuation of noise level within the factory and due to the fact that
the project site is situated in a well developed industrial estate and not in the immediate
vicinity of human settlement, significant impact is not expected in the nearest present
human settlement. The volume of transport vehicles to be handled is very low. The
company shall develop a green belt around the periphery of the premises, which shall act as
a barrier to the propagation of noise from the factory premises. This shall further reduce the
noise levels appreciably.
• It is recommended to measure and maintain records of noise level at various places
within and outside factory premises.
• Manufacturers/ suppliers of major noise generating equipment/ machines like
compressors, turbines, generators should be asked to take required measures for
minimizing the noise levels generated by machines by using noise absorbing material
for various enclosures or using appropriate design/ technology for fabricating/
assembling the machines.
• Audiometric tests should be conducted periodically for the employees working close
to the high noise sources.
• High noise generating machines and processes required for proposed project will be
enclosed and insulated.
• Insulation of ventilation pipes and use of dampers will be made at all possible places.
• Implementation of management control on site for limiting transportation timing by
adopting mechanical and technological ideas.
• Preventive maintenance schedule will be followed for all instruments and
machineries to maintain good working condition.
• Enclosures and barriers will be provided to pumps and machineries producing high
noise levels, required for proposed project.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 20
• There will be periodical noise level measurements for verifying compliance with
relevant laws.
• Workers exposed to high noise generating operations will be provided with suitable
ear protection devices.
• Green belt development will act as a medium for noise absorbance.
7.4.5 LAND ENVIRONMENT
7.4.5.1 HAZARDOUS WASTE MANAGEMENT
Four categories of hazardous wastes will be generated from the Proposed Expansion
Project. Treatment, Storage & Disposal mode for the same will be followed as per Hazardous
Waste (Storage, Handling & Trans-boundary Movement) Third Amendment Rules, 2010.
Record of hazardous waste generation and disposal shall be maintained on printed logbook.
All necessary precautions shall be taken during handling, loading and unloading of
hazardous wastes.
Storage of Hazardous Waste:
• Hazardous waste shall not be stored for a period more than 90 days. And shall maintain
records and make them available for inspection.
• Store at a designated Onsite-secured area with impervious floor that affords protection
from sun & rain fall, spreading of leachate, mixing of wastes etc.
Transportation of Hazardous Waste:
• Properly packed & labeled waste transport through dedicated vehicle to a captive
facility/ authorized TSDF facility.
Disposal of Hazardous Waste:
Used Oil @ 25 Lit/Month or 0.3 KL/Annum, ETP Sludge @ 50 Kg/Month, Bags & Containers
@ Nil and Incineration Ash @ 1.25 MT/Month. Used Oil will be given to authorized recyclers.
ETP Sludge & Incineration Ash will be sent to TSDF facility i.e. NECL for land filling.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 21
7.4.5.2 IDENTIFICATION OF RECYCLE/REUSE, CLEANER PRODUCTION AND CO-PROCESSING
OPTION OF HAZARDOUS WASTE
• It is recommended to analyze each hazardous waste periodically and maintain records.
• Check the calorific value of the ETP Sludge and then explore possibilities of Co-
Processing in Cement Industry as Primary fuel. Waste materials used for co-processing
are referred to as alternative fuels and raw materials (AFR).
1. Reduction of waste by in house solvent recovery plant from waste.
2. All the non-biodegradable effluents generated from plant will be converted into
biodegradable effluents followed by conventional treatment in wastewater
treatment plant. Treated effluent will discharge to deep sea as per GPCB norm.
3. Second wash of plant/ equipment will be re-used as first wash in the same equipment/
reactor to reduce fresh water consumption.
4. 5S implementation considered in the plant
Solid Waste Contaminated with
Hazardous Material:
Use Proper Decontamination
Process treatment separately and
recycle/reuse/sell only
Decontaminated Wastes
(Ash, 25% NH3 Solution and NH4Cl
Solution)
Hazardous Wastes (HWs) generated from the Premises
Properly Segregate, Label and store in Roofed
Designated secured storage area with impervious
Flooring & Leachate Management System as per
the Guidelines
Leachate to ETP for
further treatment
Use proper safety and
personal protective
equipment while
handling HWs
Disposable HWs of
Secured TSDF:
ETP Sludge, Chemical
containing residue, Sludge
from treatment of waste
water arising out of
cleaning/disposal of
barrels/containers
Incinerable HWs:
Process Waste, Distillation
Residues, Date expired or
discarded product, off-
specification products
Reusable,
Recyclable,
Recoverable HWs:
Used Oil, Discarded
drum/ Containers of
PP/HDPE bags/Liners
TSDF Site
Common Incinerator
Site or co-processing in Reuse/recycle within the plant premises offer necessary
treatment (if required)
OR
Sell to the authorized reprocessor/ recyclers/ end users
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 22
7.5 GREEN BELT DEVELOPMENT
Tree plantation is known for improving the aesthetic and climatological environment of an
area and properly designed green belt can help in ameliorating air pollution to a very
significant degree. It should be borne in mind that the green belt will be most effective as a
sink for particulate matter and gaseous emissions from ground level sources, such as,
fugitive emissions. Effectiveness of green belt for the elevated sources is rather limited but
its action as a green lung greatly helps in improving the air quality of the area. However,
considerable scope exists for strengthening the existing green belt and developing the same
in future.
BREAK UP OF DIFFERENT LAND USE OF FACTORY
Total Plot Area is of 74,123.01 m2 out of which 25,129.51 m
2 (approx. 33.9%) of land shall be
utilized for the green belt area.
Good greenery shall be maintained in and around the site by planting various types of tress
and maintaining lawns. 25,129.51 m2 area (approx.) shall be utilized for tree plantation /
development of lawns. A green belt with width of min. 1 meter shall be developed within
the site boundary and across the premises inside roads. Trees like Asopalav, Neem,
Gulmohar, Champa, Gauva, Babul, Palm Trees, Nariyal, Ghaneri, Shevga, Jangli badam, Sag,
Jamun, Mango, Rain tree etc. shall be planted in and around the site.
Green Belt to Trap and Absorb Pollutants
A green belt traps and absorbs pollutants without altering the biogeochemical cycle of
water and nutrients. Absorption and trapping capacity of trees depend on height of plant,
canopy structure, physiognomy and morphological character of leaf. Once fully developed,
such tree plantations can serve as buffer and shock absorber against transient and
accidental release of pollutants caused by power, equipment and human failures. Green belt
is usually designed in such a way that the first few rows in a green belt have a shorter height
and dense canopy. Plants native to an area are generally used to suit the prevailing
ecosystem and biogeochemical cycle. Native plants are more tolerant to disease, grow at a
faster rate and result in better attenuation of pollutants.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 23
Plantation Design
In view of the different functional requirements of the plant in an industrial area, the
pattern of plantation within plant is discussed as below:
A. Curtain Plantation
To help in restrict the movement of pollutants from inside to outside and from outside to
inside, a thick green belt shall be developed at the peripheral limits of the plant along the
boundary walls whenever feasible. The curtain will be an effective buffer against gases, dust
and noise.
B. Avenue Plantation
Linear plantations along road-sides help reduce air and noise pollution from automobiles as
well as general emissions from the industrial units. To combine bio-aesthetic and pollution
abatement needs, parallel rows of trees (inner and outer rows) shall be planted on the roads
and boundary.
C. Field Plantation
Plantation on the open stretches of land helps improve the general ecological conditions of
the habitat by adding greenery to the landscape and by providing a vast canopy of foliage
for sink of pollutants generated in the area. The open land spaces, not used for industrial
purposes, shall be filled with plant species.
D. Ornamental Plantation
The immediate area of each building shall be arranged into a lawn, fringed by flower beds.
In some strategic corners flowering climbers been used to highlight the visual effect.
Plantation Details
Actual Status of Plantation/Green Belt
Trees species to be planted at plant are in line with trees species recommended in CPCB’s
guidelines for developing Greenbelts. For plantation at the plant in future, it is suggested
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 24
that these guidelines should also be followed for selecting pollutants tolerant and absorbent
species.
(a.) Species of tree planted
Green Belt Avenue Trees Shrubs
Above 3m height Below 3m height
Jamun Alstonia Bamboo Pentas var.
Gulmohar Pinkcaassia Bahunia Galphemia
Peltophorum Spethodia Large stomia Miniature bamboo
Kasid Paras, papal Cordia Jestropha
Gultora Pendula Karen Hibiscus var.
Karen Gulmohar Gulltora Braya
Kapop Jackranda Tecoma var. Palmbago capensis
Neem Bignonia Tagari Acalypha var.
Arjun Largestomia Russolia
Sisoo Cadamba Duranta var.
Australian babul Lantana var.
Babul Cassia biflora
Pangara Ixora var.
Cassia fistula Cana
(b.) Co-relation of Trees with pollution control
Trees Air pollution Dust Noise Salt
Trees Pangara Karen Pendula Neem Neem
Babool Pendulla Bahunia Peltophorum Gulmohar
Cadamba Neem Paras pipal Jamun
Tecoma var. Bogunvelia Cassia fistula Pendula
Alstonia Spethodia
Jackranda Gulmohar
Places: Green-Belt Plant Area Plant Area Plant Area
And green
belt
Plant Area
GREEN BELT DEVELOPMENT PROGRAMME
YEAR NO. OF TREES/PLANTS TO BE
PLANTED IN PLANT AREA
2017-2018 400
2018-2019 300
2019-2020 300
2020-2021 200
2021-2022 200
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 25
7.6 OCCUPTIONAL HEALTH AND SAFETY
Health hazards associated with the occupation are called occupational hazards. In chemical
industry due to handling of toxic and hazardous chemicals there are possibilities of
developing occupational diseases. M/s. Gujarat Dyestuff Industries shall carry out the
following checks to curb the problem:
i) Pre - employment medical check up at the time of employment.
ii) Annual medical check up shall be done for all employees.
iii) First aid training shall be given to the employees.
iv) Monitoring of occupational hazards like noise, ventilation, chemical exposure shall
be carried out at frequent intervals, the records of which shall be documented.
OHC Room will be provided at Security building. Professional doctor will be called every
week at factory. And routine checkup of all employees will be carried out annually for all
standard tests needed as per Factory Inspector Office. Employees will be trained frequently
through special master faculties on various points related to occupational health to create
more awareness on the subject. All precautions shall be taken to avoid foreseeable
accidents like spillage, fire and explosion hazards and to minimize the effect of any such
accident and to combat any emergency at site level. Some of the preventive safety
measures shall be taken to minimize the risk of accident with respect to Technical Safety,
Organizational Safety and Personal Safety are listed below:
• Company shall take all reasonably practicable measures to minimize the risk of such
accident in compliance with the legal obligation under the relevant safety.
• All building plans and installations shall be as per relevant acts and duly approved by
competent government authorities.
• Process and Equipment shall be designed by qualified and experienced professionals
and fabricated to applicable national / international codes with stage wise
inspection.
• Pressure Relief Valves and rupture disks shall be installed on the reactor and jackets
wherever required.
• Hazardous processes shall be operated by trained workers and shall be looked after
by qualified & experienced supervisors.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 26
• Safety features such as fire extinguishers, fire hydrant system and suitable Personal
Protective Equipment (PPE) shall be provided. Regular operations and testing of fire
hydrant system and fire extinguishers shall be carried out.
• Suitable provisions for control of critical process / storage parameters within
specified safe limits (use of pressure relief valves, rupture discs, safety valves, trip
circuits, wherever necessary) shall be done.
• Use of flameproof electrical equipment, flame arresters and breather valves shall be
done.
• Provision of Earthing and lighting arrestor to prevent electrical fires and explosions in
flammable / explosive chemicals storage / processing areas shall be done.
• Tanks storing hazardous liquid chemicals shall be provided with dyke wall to confine
any spillage and facilitate easy collection. Necessary separation distance shall be
maintained.
Personal Protective Equipment (PPE) like goggles, safety shoes, helmet, apron, earplugs,
facemask & clothing shall be provided to employees as per the job requirements. The
company shall prepare a comprehensive on-site emergency plan with well-defined
responsibilities to face any eventuality caused under adverse circumstances and unforeseen
reason.
Health & Safety:
M/s. Gujarat Dyestuff Industries is committed towards the Health and Safety of workers and
will provide a facility of pre medical and regular medical check-up of employees for
detecting any kind of adverse effect on the health of employee due to the chemical or work
place condition and will provide opportunity to improve the working condition.
The workers exposed to fugitive emission will be provided with some protective devices like
dust mask to prevent respiratory disorders. The workers exposed to higher noise level will
be provided with ear muffs/ ear plugs. The protective devices will be provided to the
employees who are exposed to any kind of hazard. Proper handling of the materials and the
maintenance of Material Safety Data Sheet (MSDS) will be followed to ensure safety within
the plant area.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 27
A regular monitoring of the Occupational Health and Safety will reduce the chances of
accidents hence all the records of job related accidents and illness shall be maintained as
per the requirements of factory act.
The following occupational measures will be adopted:
• The workers will be provided with personal protective equipments such as gloves,
goggles, safety shoes, helmets and masks.
• Periodic medical checkup of the workers for audiometric, blood tests, physical
examination, etc as per applicable rules.
• First aid medical facility will be made available at the site at strategic location and
plant personnel will be trained for first aid medical treatment.
• Dispensary and medical facility available in the nearby area will be utilized in the
case of emergency.
For large industries, where multifarious activities are involved during construction, erection,
testing, commissioning, operation and maintenance; the men, materials and machines are
the basic inputs. Along with the boons, industrialization generally brings several problems like
occupational health and safety. The industrial planner, therefore, has to properly plan and
take steps to minimize the impacts of industrialization and to ensure appropriate
occupational health and safety including fire plans. All these activities again may be classified
under construction and erection, and operation and maintenance.
OCCUPATIONAL HEALTH
Occupational health needs attention both during construction & erection and operation &
maintenance phases. However, the problem varies both in magnitude and variety in the
above phases.
Construction and Erection
The occupational health problems envisaged at this stage can mainly be due to
constructional accident and noise. To overcome these hazards, in addition to arrangements
to reduce it within Threshold Limit Value (TLV), necessary protective equipments shall be
supplied to workers.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 28
• All reasonably practical measures will be adopted by the unit to minimize the risk of
accidents within a chemical manufacturing unit.
• All building plans and installations will be as per relevant laws and will be approved
by competent authority.
• Trained workers will be employed for all the hazardous process operations within
the plant and will be supervised by experienced supervisors.
• Safety features such as fire extinguishers at strategic locations and suitable personal
protective equipments will be provided.
• Flame-proof electrical fittings, flame arrestors etc., will be installed.
• All the raw materials & solvents will be stored in designated storage area equipped
with necessary safety features.
• Periodic inspection & testing of pressure vessels, equipments, and machineries will
be done.
• Good house-keeping will be ensured within the factory premises.
• Training will be provided to the designated staff & workers for firefighting, work
permit system, first aid & safe handling of hazardous chemicals.
• Incident / accident reporting system will be developed and all the employees will be
made aware for the same.
• Suitable notices / boards will be displayed at designated locations indicating
appropriate hazard warnings.
• Antidotes as well as MSDS for all the chemicals will be made available within the
factory premises
Personnel Protective Equipment:
Personnel protective equipment is devices that are fitted and issued to each worker
personally for his or her exclusive use. They are intended for temporary use and emergency
response action only. If a worker must enter a contaminated area, he must wear adequate
protective equipment. Employees should be taught when and how to use respiratory
apparatus provided, and how to recognize defects in the equipment. Full dress escape drills
should be conducted at least once a year. If such safety equipment is not available, entry
into the contaminated area should not be attempted.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 29
• Keep personnel protective equipment where it can be accessed quickly, outside the
hazardous material storage area and away from areas of likely contamination.
• Each employee should maintain his / her personnel protective equipment in clean,
working condition at all times.
• All equipment should be used and maintained in accordance with the
manufacturer’s instructions.
Handling of Hazards:
• Personnel protective equipment used by the person during handling of hazardous
chemicals should be replaced after certain time.
• If any spillage of hazardous chemicals, it should be cleaned and disposed as per
standard practiced.
• Personnel engaged in handling of hazardous chemicals should be made aware of
properties of hazardous chemicals.
General Working Conditions:
(a) House Keeping:
• All the passages, floors and stairways should be maintained in good condition. The
system should be available to deal with any spillage of dry or liquid chemical at the
plant.
• Walkways should be clearly marked and free from obstructions.
• In the plant, precaution and instructions should be displayed at strategic locations.
• All pits, sumps should be properly covered or securely fenced.
• Roads/walkway within the plant should be maintained neat and clean.
(b) Ventilation:
• Adequate ventilation should be provided in the work floor environment.
• The work environment should be assessed and monitored regularly.
• Local ventilation is most effective method for controlling dust and gaseous emissions
at work floor.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 30
Safe Operating Procedures:
• Safe operating procedures should be available for mostly all operations and
equipment.
• The workers should be informed of the consequences of failure to observe the safe
operating procedures.
Work Permit System:
Work permit system should be followed at the plant. Hazardous work permit should be used
for hot work, electrical works, etc.
Fire Protection:
• Adequate firefighting facilities should be available at the plant.
• The fire fighting system and equipment should be tested and maintained as per
relevant standards.
• The fire drills should be conducted once in six months.
Emergency Preparedness
On-site emergency plan should be prepared and readily available for an unlikely event of
emergency.
Emergency telephone numbers should be available and display properly strategic locations.
Communication System
• Adequate communication facilities should be available at the plant and supported
with uninterrupted power supply.
• Communication facilities should be checked periodically for its proper functioning.
Safety Inspections:
The system should be initiated for checklist based routine safety inspection and internal
audit of the plant periodically. Safety inspection team should be formed from various
disciplines.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 31
Accident Reporting, Investigation and Analysis:
A system should be initiated for accident and near miss reporting, investigation and analysis.
To motivate and awareness among the personnel at the plant about safety, total accident
(lost time injury) free days can be displayed on the board prominently at strategic location.
Mock Drill Exercises:
Mock drills should be conducted once in six months. Exercises or Drills have two basic
functions, namely training and testing of systems. While exercises do provide an effective
means of training in response procedures, their primary purpose is to test the adequacy of
the emergency management system and to ensure that all response elements are fully
capable of managing an emergency situation.
Mock drills are best means of accomplishing the following goals and objectives:
1. To reveal weaknesses in the plans and procedures before emergencies occur.
2. To identify deficiencies in resources (both in manpower and equipment).
3. To improve the level of co-ordination among various response personnel, departments
and agencies.
4. To clarify each individual’s role and areas of responsibility
7.7 MEASURES FOR CONSERVATION OF ENERGY
M/s. Gujarat Dyestuff Industries shall adopt various measures for energy conservation:
• Energy efficient machineries will be used during operation phase.
• Installation of economizer & high efficiency burner on steam boilers.
• Company shall try to utilize renewable sources of energy for conservation of non-
renewable sources of energy.
• Enough care will be taken to prevent/minimize energy losses at each stage.
• Energy audit will be used as a tool for monitoring purpose.
• External lights will be controlled through timers for auto on/off function based on
timings.
• The cable size will be selected so as to minimize the power losses.
• The power factor improvement capacitors will be provided individually for AC loads.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 32
• Using water cooled chillers, variable frequency drives for secondary pumps and
public area and building management system for HVAC equipments with non-CFC
and non-HCFC based refrigerants.
• Use of VFDs for various utilities in variable load application to optimize pump and air
handling unit performance, wherever required.
• Automated day light control.
• Efficient lamps and ballasts.
• Automated control for external lighting (Astronomical/Sensor)
• Occupancy Sensors.
• Phase-wise implementation of Advance Process Control (APC) in the process plants
• Replacement of conventional lighting fixture by more energy efficient fittings.
• Installation of improved insulation over the High Pressure (HP) steam line to reduce
the heat loss.
• Use of FRP blade on Cooling Tower
Company shall explore possibility of use of solar energy for various infrastructure
operations. Also use of Energy Efficient Lighting, Transformers, HVAC system, Use of Energy
Efficient Motors, electrical appliances to minimize the energy consumption in addition to
Process Planning.
7.8 NATURAL RESOURCES CONSERVATION
The substances that are found in nature and are used by the man for his welfare directly or
indirectly are called as natural resources. Sun, wind, soil, fossil fuels, wood, forest, flora and
fauna are some of the examples of natural resources. The judicious or wise use of natural
resources in such a way that the present generations make use of natural resources without
compromising the needs of the natural resources for the future generation is called
as conservation of natural resources.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 33
Conservation of Natural Resources
As natural resources are beneficial to human beings, maintain ecological balance and at the
same time are in a threat of getting depleted due to its indiscriminate over exploitation,
there is an urgent need for conservation of natural resources. This can be accomplished by
the following ways:
• Alternative forms of energy such as solar energy etc. shall use more in comparison to
fossil fuels. Alternative forms of energy are eco-friendly, do not cause pollution and are
renewable.
• Avoid using plastics, synthetic materials etc as these materials cause damage to the soil.
• Water is precious natural resources and hence avoids wasting water. Taps shall be
closed when not in use.
• Natural gas shall be used as a source of fuel in Boiler.
• Adopt 3 R's for conservation viz, Re-use, Reduce and Re-cycle.
• Trees shall be planted along roadsides, railway tracks and waste lands and deforestation
should be avoided.
• Don't waste electricity. Fans and lights shall be switched off when not in use.
7.9 SKILLED AND TRAINED MANPOWER
Employment would be as per prevailing norms of state government for skilled and trained
people for the proposed project. The company has sufficient skilled manpower for the
existing project and our technical, administration and other staff are sufficient to take care
of the proposed plant. M/s. Gujarat Dyestuff Industries will give employment to about 40
employees (Including Contract workers) (Existing – 20 + Additional – 20).
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 34
7.10 SOCIO-ECONOMIC DEVELOPMENTAL ACTIVITIES
Apart from business, M/s. Gujarat Dyestuff Industries shall be devoted to social
commitments and will continue to do the same as per the needs of nearby village people.
For Corporate Social Responsibility, Various Programs/ Projects related to Social & Economic
development of surrounded area has been planned, which are as follows, Planned for
providing Water purifier for Village people, conducting medical camps for Cataract
operation, pregnant women check up & Senior Citizen Check-up, deputing teacher for
literacy development to Senior Citizens. Other such activities as stated as below:
A) Natural Resource Management – The main focus of this program will be to maximize the
yield returns of the farmers through efficient management of existing resources & extension
of new agricultural practices.
1) Integrated Agricultural Growth Project – For improvement and use of the modern
techniques and thereby would certainly contribute to prosperity in the agriculture
sector and reduce the rural poverty by programs like Farmers Training, Nursery
Growing Trainings, Modern agriculture equipment distribution programs etc.
2) Animal Husbandry Projects – Various programs like health checkups & treatment,
vaccination program, Anti sterility camps, breed improvement etc. will be carried
out.
B) Income Generation Program -
1) Establishment of Self help groups
2) Rural Entrepreneurship Development Program
3) Handcrafts Development Program
4) Vocational Training
5) Business process outsourcing
C) Health, Education & Infrastructure
1) Aids Awareness Program
2) General Health Camps
3) Innovative Teaching Methods
4) Adult Education
5) Sanitation
6) Infrastructure Development Projects
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 35
For the upcoming expansion at Dahej, SEZ, Gujarat Dyestuff Industries will work closely with
local communities for CSR initiatives–The budgetary provision is as below:
Budgetary Provisions for the next five years (Every Year)
(A part of common contribution with Association)
ACTIVITIES BUDGETARY PROVISION
(LAKH)
Drinking Water facility provide to nearby village 4.5
Educational Facility 3.25
Capacity Building Programs 6.0
Health & Medical Facility 7.75
Employment opportunity, contribution to ITI like institute 2.5
Total 24.0
In addition to above, unit will arrange separately or jointly health check up Programme in
surrounding area and medical / commercial assistant to surrounding people for further
medical treatment, if required.
7.11 METHODOLOGY OF DE-CONTAMINATION AND DISPOSAL OF DISCARDED
CONTAINERS AND ITS RECORD KEEPING
Decontamination & Disposal of Discarded Containers: The proper disposal of empty
chemical containers is more important for hazardous chemicals as it can contain residual
amounts of chemicals. There can be no more than 1 inch of material left in the container not
more than 3% by weight of the containers capacity. In an effort to ensure that this residue is
handled properly and to be able to recycle or properly dispose of these containers, the
following procedure is to be followed. The below guidelines are useful for non hazardous
chemicals also.
Rinse Procedure: An empty chemical container that contains hazardous chemicals (liquid or
solid), must be rinsed 3 times with water (or appropriate rinsing agent) before being
discarded. The first rinse should be collected as chemical waste, it can be put into any waste
container of compatible chemicals, the second & third rinses can then go down to drain. If
the chemical is on the list of acutely hazardous waste, then all three rinses must be
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 36
collected. For solvents or other volatile liquids like benzene, toluene, xylene etc. (not in the
list of acutely hazardous waste) should not be rinsed with water. They are to be placed into
an operating fume hood overnight without the cap to allow the vapors to disperse. After the
containers are rinsed, they can be discarded appropriately as described below. All caps
should be let off of the discarded containers. Containers should be labeled with “Empty”
labels and the chemical name should be crossed or blacked out prior to being discarded.
Caps may be discarded to regular trash.
Reuse /Recycle/ Disposal of cleaned containers:
• All chemicals must follow the above rinse except the volatile Solvents & before being
discarded in any form.
• Metal containers or any plastic containers, plastic tubing or plastic beakers that do not
meet the recycling criteria can be discarded into regular trash.
• Glass containers, glass tubing that do not meet the recycling criteria should be placed into
trash can for disposal.
• Plastic & glass containers that meet the recycling criteria must be placed in appropriate
recycling containers.
• Empty compressed gas cylinders should be returned to vendor.
7.12 ACTION PLAN FOR TRANSPORTATION OF RAW MATERIALS AND PRODUCTS
1. Every material (FG and or Raw material) container should be with TREM CARD, Material
Safety Data Sheet.
2. Container should be marked with Emergency Information Panel (includes Correct
Technical Name, Class Label, UN NO, HAZCHEM, Emergency Dial, Specialist advice etc).
3. Container or Tank should be thoroughly hydraulically tested and test certificate should
be available with driver.
4. Only trained driver having valid driving license are allowed to carry out transportation
of material.
5. Driver should be allowed with attendant to enter inside or going outside from the
company.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 7- 37
6. Driver and attendant well trained on Driving rules, Chemical Properties, Emergency
Preparedness ( Communication, Leakage spillage handling, Use of PPE, First-aid, Fire
fighting measures, Toxic release measures).
7. Container should be certified for road worthiness, PUC certificate.
8. Vehicle should be equipped with fire fighting equipment, first aid box, Toolbox,
Antidotes, PPEs and Emergency Exit.
9. Conditions of Valves and fittings should be checked at security gate and proper
corrective action will be taken in case of any abnormality.
Transportation of all the raw material and products shall primarily by road only. The raw
material and products shall be received delivered in Tanks, MS/HDPE/FIBRE drums, Carboys
and cylinders as well as through tankers & containers and stores at ambient temperature.
All the storage tanks of hazardous flammable substance will be located within premises in
separate storage area i.e. solvent farm area at ambient temperature. Solvents shall be
stored in cool and dry place with all precautionary process instrumentation and safety
appliance.
Large area shall be covered by well-designed warehouse, which is containing store office,
raw material store, finished product stores etc. In case of any abnormality reported to site
regarding road accident, our emergency response team will reach at the site and take
proper corrective action and information of such incident will be provided to local police
station and other government authority as per situation.
7.13 CAPITAL COST FOR ENVIRONMENTAL MANGEMENT
Total Project Cost for proposed project activity is Rs. 1500 Lakhs. Capital cost of air & water
pollution control system and environmental monitoring equipments will be Rs. 121 Lakhs.
Annual recurring cost towards the environmental protection measures will be Rs. 25 Lakhs.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 8- 1
CHAPTER - 8
EXECUTIVE SUMMARY & CONCLUSION
of
PROPOSED EXPANSION (PRODUCT CHANGE) TO
MANUFACTURE ACETIC ANHYDRIDE AT DAHEJ SEZ
of
M/s. GUJARAT DYESTUFF INDUSTRIES
PLOT NO. Z/25-28, DAHEJ SEZ, VILL: DAHEJ,
TEHSIL: VAGRA, DIST: BHARUCH
GUJARAT
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 8- 2
8.1. Project Description
M/s. Gujarat Dyestuff Industries proposes expansion (product change) to produce
Acetic Anhydride at Plot No. Z- 25, 26, 27, 28, SEZ Dahej, Vill: Dahej, Tehsil: Vagra, Dist:
Bharuch (Guj.). The total area of the premises is 76,689.32 m2. Total cost of the
expansion project will be Rs. 15 Crores.
Product and Capacity
LIST OF PRODUCTS ALONG WITH THEIR PRODUCTION CAPACITY
QUANTITY
(MT/MONTH)
SR.
NO.
PRODUCT NAME
EXISTING ADDITIONAL
PROPOSED
TOTAL
CAS Nos. LD50
1
Vinyl Sulphone
(From Condensed VS as
Raw Material)
430 -430 0 77-77-0 32 mg/kg
2 Acetic Acid -92 % 100 -100 0 64-19-7 3310 mg/kg
3 Acetic Anhydride 0 1200 1200 108-24-7 1780 mg/kg
Total 530 1200 1200
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 8- 3
8.2. Description of the Environment
BASELINE ENVIRONMENTAL STATUS
AIR ENVIRONMENT
The dispersion of pollutants in the atmosphere is a function of several meteorological
parameters viz. temperature, wind speed and direction, mixing depths, inversion level,
etc. The ambient air samples were collected and analyzed for Particulate Matter (PM10),
Particulate Matter (PM2.5), Sulphur Dioxide (SO2), Oxides of Nitrogen (NOx), Ozone (O3),
Lead (Pb), Carbon Monoxide (CO), Ammonia (NH3), Benzene (C6H6), Benzo (a) Pyrene
(BaP), Arsenic (AS), Nickel (Ni), HCl, Cl & VOCs were monitored at site and nearby
villages for identification, prediction, evaluation and assessment of potential impact on
ambient air environment.
The arithmetic mean and 98th
percentile values of PM10 at all the locations in
residential/rural areas ranged between 72-81 µg/m3 and 77.16-84 µg/m
3 respectively in
post-monsoon season. Similarly, the arithmetic mean and 98th
percentile values of PM2.5
varied in the range of 42-48 µg/m3 and 44-49.54 µg/m
3, respectively. The PM10 and
PM2.5 concentrations at all the AAQM locations were primarily caused by local
phenomena including vehicular activities and natural dust getting air borne due to
manmade activities and blowing wind.
The arithmetic mean and 98th
percentile values of NOx at all the locations in
residential/rural areas were observed to be in the range of 14-20 µg/m3 and 16-22
µg/m3 respectively. The arithmetic mean and 98
th percentile values of SO2 at all the
locations in residential/rural areas ranged between 11.5-18 µg/m3 and 15-19 µg/m
3
respectively. The arithmetic mean and 98th
percentile values of O3 at all the locations in
residential/rural areas ranged between 10-11 µg/m3 and 13.54-14.54 µg/m
3
respectively. At all the air quality monitoring locations in residential/rural areas, the 98th
percentile values of NOx, SO2 & O3 were observed to be within limits. The values of
VOCs at all the locations in residential/rural areas ranged between 0.3-0.8 ppm
respectively.
The values of Pb at all the locations in residential/rural areas were observed to be in the
range of BDL-0.92 µg/m3
. The values of NH3 at all the locations in residential/rural areas
were observed to be in the range of BDL-1.75 µg/m3
. The values of CO at all the
locations in residential/rural areas were observed to be in the range of 1.20-1.28 mg/m3
.
The values of Ni at all the locations in residential/rural areas were observed to be in the
range of 10.44-10.86 ng/m3
. At all the AAQM locations (Industrial as well as residential)
C6H6, BaP, As, HC values were below detectable limit.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 8- 4
WATER ENVIRONMENT
BASELINE GROUND WATER QUALITY
pH of ground water samples varies from 7.02 – 8.09. Turbidity, Total Dissolved Solids
and Total Suspended Solids varies in the range of 0.1 – 0.6 NTU, 206 - 3236 mg/L and 2 -
46 mg/L respectively. DO is found in range of 5.98 – 7.52 mg/L. COD, BOD are found in
the range of 9.28 – 19.52 mg/L and <0.1 mg/L respectively. Total hardness (as CaCO3)
varies from 112.9 – 1108.8 mg/L. Calcium hardness (as CaCO3) varies from 67.42 – 100.5
mg/L. Total Alkalinity varied from 84.15 – 237.6 mg/L. Chloride and Sulfates are found in
the range of 62.18 – 1080.2 mg/L and 9.75 – 204.4 mg/L. Copper is not found in any
sample. Sodium, Potassium is found in the ranges 10.76 – 608.6 mg/L, 1.4 – 213.8 mg/L
respectively. Nickel is not found in any sample.
BASELINE SURFACE WATER QUALITY
pH of surface water sample varies from 7.47 – 7.77. Turbidity, Total Dissolved Solids and
Total Suspended Solids varies in the range of 0.4 – 0.5 NTU, 480 - 1200 mg/L and 2 - 18
mg/L respectively. DO and COD are found in range of 5.64 – 6.0 mg/L and 39.04 – 48.84
mg/L respectively. BOD and Total hardness (as CaCO3) varies from 1.68 – 5.64 mg/L and
116.9 – 231.8 mg/L respectively. Calcium hardness (as CaCO3) varies from 76.62 – 195.6
mg/L. Total Alkalinity varies from 138.6 – 420.8 mg/L. Chloride and Sulfates are found in
the range of 68.43 – 340 mg/L and 15.64 – 48.39 mg/L. Copper & Nickel is not found in
the sample. Sodium, Potassium is found in the ranges 28.51 – 57.6 mg/L, 6.3 – 10.4
mg/L respectively.
NOISE ENVIRONMENT
The objective of the noise pollution survey around the project site was to identify
existing noise sources and to measure background noise levels. The study was carried
out in the following steps:
Reconnaissance
• Identification of noise sources and measurement of noise levels
• Measurement of noise levels due to transportation
• Community noise levels
LAND ENVIRONMENT
Soil quality monitoring has been carried during post-monsoon season at nine locations.
BASELINE STATUS
pH varies from 7.02 – 7.79. Water Holding Capacity (WHC) varies from 54.7% - 96.53%.
Bulk Density varies from 1.18 – 1.37 g/cm3. Sulphate and Chloride are found in the
range 8.7 – 668.4 mg/kg and 54.20 – 3178 mg/Kg respectively. Total Hardness varies
from 78.62 – 1048.3 mg/kg. Calcium and Sodium are found in the range of 16.96 –
298.9 mg/kg and 438 - 956 mg/kg respectively. Iron varies from 8.7 – 429.5 mg/kg.
Potassium and Lead is found in the ranges 332 – 925 mg/kg, BDL – 2.24 mg/kg
respectively. Copper is not found in any sample.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 8- 5
8.3. Anticipated Environmental impacts and mitigation measures
Water Requirement, Waste Water Generation and Treatment:
Total water requirement is 34.5 KL/day [24 Fresh + 10.5 Reuse] which is met through
GIDC water supply. The wastewater generation is 14.5 KL/day in which the industrial
10.5 KL/Day (processing 8.5 KL/Day is treated from inter reaction of RM, reused in
cooling and 2.0 KL/Day is cooling bleed off and utilized in greenbelt). So, there will be no
industrial waste water generation and Domestic Waste water generation 4 KL/Day is
disposed in septic tank/soak pit.
Air Pollution Source and Control Management:
There will be four types of flue gas which are the main emission source from the plant
under the Air Pollution Control Act, 1981. Proper Stack height will be provided in order
to achieve norms prescribed by statutory authority. The details of stacks are given
below
Sr.
No.
Stack attached to Fuel
Type
Stack Height/
dia in m
APC measures Probable emission
� Existing Flue gas Stacks
1. Thermic Fluid Heater
(6 Lacs kcal/hr)
LDO/NG 20 -
2. D.G. Set (380 KVA) HSD 11 -
PM<150 mg/Nm3
SO2 <100 ppm
NOX <50 ppm
Existing Flue gas stack will be replaced after proposed expansion with following new stacks
1. Thermic Fluid Heater
(20 Lakh kcal/hrs) –
2 Nos.
Coal 30 Air Pre heater
Multi cyclone
Bag filter
2. Furnace - 2 Nos. FO 30 Air Pre heater
Heat recovery unit
Caustic Scrubber
PM<150 mg/Nm3
SO2 <100 ppm
NOX <50 ppm
3. DG set ( stand by) HSD 11 _
4. Incinerator FO 30 Ventury scrubber
Packed bed
scrubber
Drop back
scrubber
PM<150 mg/Nm3
SO2 <100 ppm
NOX <50 ppm
HCl <50 mg/Nm3
CO <50 mg/Nm3
TOC<20 mg/Nm3
� Process Gas Stack : no Process Gas Stack
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 8- 6
Hazardous Waste:
Four Categories of Hazardous/Solid Wastes is generated from this Unit. Hazardous
waste generation after proposed expansion will be Used Oil @ 25 Lit/Month or 0.3
KL/Annum, ETP Sludge @ 50 Kg/Month, Bags & Containers @ Nil and Incineration Ash
@ 1.25 MT/Month. Used Oil will be given to authorized recyclers. ETP Sludge &
Incineration Ash will be sent to TSDF facility i.e. BEIL for land filling.
Sr.
No
Waste
details
Category Existing
Quantity
Total
Proposed
MT/Month
Mode of Disposal
1. ETP Sludge 35.3 50
Kg/Month
50 Kg/Month Collection, storage, transportation and
disposal at TSDF.
2. Incineration Ash 37.2 - 1.25
MT/Month
Collection, storage, transportation and
disposal at TSDF.
3. Used Oil 5.1 25
Lit/Month
25 Lit/Month
Or
0.3
KL/Annum
Collection, storage, transportation and
selling to authorized recyclers.
4. Bags and
Containers
33.1 100
Nos.
/Month
Nil Collection, storage, transportation and
selling to authorized recyclers.
Green Belt:
Total 74,123.01 sq. meter land area is available at site; out of this area about 25,129.51
sq. meter (approx. 33.9%) area are covered as greenbelt and other forms of greenery.
Power Requirements:
Estimated power requirement is 1200 KW. Power will be taken from Torrent Power.
Stand by DG set, 1 No. (1200 KVA each) will be used as emergency power back up.
Fuel requirement
Sr.
No.
Fuel Requirement
1 Coal 20.16 TPD
2 FO (Furnace Oil) 4.64 KL/day
Capital and recurring cost earmarked for environmental protection measures:
Total Project Cost for proposed project activity is Rs. 15 Crores. Out of this around Rs.
121 Lakhs will be invested for pollution control measures.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 8- 7
CUMULATIVE IMPACT CHART
ENVIRONMENTAL
PARAMETER
TOTAL CUMULATIVE
SCORE
Air Quality 14
Noise and Odour 11
Water Quality 7
Land Requirement 8
Infrastructure 11
Service 12
Environmental Hazards 10
Terrestrial Ecology/ Land use 2
Socio Economic Status 11
Aquatic Ecology 7
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 8- 8
8.4. Environmental Monitoring Programme
Environmental
Component
Parameters Standards Frequency
Air Environment
AAQM at plant site As prescribed by GPCB
including PM2.5, PM10, SO2,
NOx, Cl2, HC & VOCs
Prescribed by
CPCB
Quarterly in upwind and
downwind direction
Stack emission
monitoring of
emissions sources
Parameters prescribed by
GPCB
In stack
Prescribed by
GPCB
Quarterly
Fugitive emissions/
work place monitoring
within the plant side
VOC Prescribed by
GPCB
Quarterly
Water Environment
Analysis of treated
effluent
Parameters prescribed by
GPCB
Prescribed by
GPCB
Once a day by Company,
Once in a Quarter by third
party
Ground water quality Colour, pH, TDS, TSS,
Sulphates, Chlorides, BOD3,
COD, oil and grease, etc.
Water quality
Standards
Once a Season
Noise Environment
Ambient Noise at plant
site
Noise level in dB(A) As per National
Noise Standards
Once in quarter
Soil Environment
At plant site Analysis of pH,
conductivity, Sulphates,
calcium, magnesium, Cl-
-- Pre and post monsoon
season by Company
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 8- 9
8.5. Additional Studies
Storage details of Hazardous Chemicals
Sr.
No.
Name of the chemicals Max.
quantity
Stored in MT
No. of
Tanks/Drums
Type of
Storage
Phase
of
chemical
Storage
Condition
Hazards
Involved
1 Acetic Acid 150 2 Tank Liquid Above ground /
NTP
Flammable
2 Tri Ethyl Phosphate 0.2 12 Drums Liquid Above ground /
NTP
Corrosive
3 Acetic Anhydride 200 2 Tank Liquid Above ground /
NTP
Flammable
4 Dil. Acetic Acid 100 1 Tank Liquid Above ground /
NTP
Flammable
8.6. Project Benefits
It can be seen that the expansion project is beneficial in the interest of common man,
the society, the state and as the country as a whole. The benefits can be summarized as
below:
� The expansion project will provide quality product at lower cost to the users.
� There should be positive impact on the socio-economic condition of the area in
terms of direct and indirect employment due to the proposed expansion project.
� Numbers of local trained persons are likely to find jobs.
� Country will save valuable foreign exchange as import of these products will
reduce by corresponding amount.
� These products also have export potential. Hence, possibility of earning foreign
exchange.
Adequate pollution control measures will be taken to check any kind of contamination
or pollution from the company. Due to coming up of project many changes are expected
to occur in the socio – economic setup of the surrounding region. The socio- economic
changes may be beneficial or detrimental. General trend of socio – economic
environment due to the project industry is that it increases the population density
within the area and in a few of the surrounding villages. This can be attributed to more
job opportunities, direct and indirect, provided by the industry. Considering the
pollution control measures taken by the company environment management system
adopted there is no significant adverse impact on environment.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 8- 10
8.7. Environment Management Plan
ENVIRONMENT
ISSUE/COMPONENT
REMEDIAL MEASURES
Hazardous waste generation &
disposal
Proper collection, Safe Handling, Storage within premises and
disposal of waste at approved TSDF, incineration facility, re-cyclers,
re-processors.
Effluent generation and
treatment
New Effluent treatment plant will be provided for treatment of
wastewater generated from proposed expansion project.
Emission from stack Adequate pollution control system will be provided for control of
gaseous emission.
• Adequate stack height for better dispersion of pollutants
Noise Acoustic enclosure on DG sets, engineering control at high noise level
areas like compressors etc, wherever feasible, proper oiling,
lubrication and maintenance of equipment, development of
greenbelt around plant boundary and inside plant
Greenbelt 33.9% of the plant area will be developed as greenbelt.
Rainwater harvesting Rainwater harvesting will be provided in non-plant area.
Information and awareness about
hazardous chemicals plant
Awareness and information will be provided within 10 km of the
study area about the hazardous situations.
Preparedness to handle onsite &
offsite emergency
Onsite & Offsite Emergency Management Plan will be prepared
Monitoring of Environmental
parameters
Regular monitoring of various environmental parameters will be
carried out to check the effectiveness of the control system.
M/s. GUJARAT DYESTUFF INDUSTRIES ENVIRONMENT IMPACT ASSESSMENT REPORT
Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 8- 11
8.8 Conclusion
The EIA study of M/s. Gujarat Dyestuff Industries has been carried out with respect to
the TORs awarded by SEAC, Gandhinagar. All the impacts likely to have an effect on the
environment have been identified and efficient/adequate mitigation measures have
been proposed for the same.
Considering the probability of likely impacts, M/s. Gujarat Dyestuff Industries has
planned adequate mitigation measures and EMP. Further, M/s. Gujarat Dyestuff
Industries shall also undertake CSR activities which shall have beneficial impacts on the
socio-economic environment. Measures like energy conservation and greenbelt
development are also noteworthy. Looking to the overall project scenario, employment
potential and allied development plans; it has been noticed that the proposed
expansion project would significantly help in the improvement of the society and nation
at large. M/s. Gujarat Dyestuff Industries has committed to implement all the pollution
control measures to protect surrounding environment. Also this project can definitely
improve the regional, state and national economy. Industrial growth is an indication of
socio economic development. The implementation of this project will definitely improve
the physical and social infrastructure of the area.
All the relevant safety norms with latest technology have been incorporated in the
proposed project. Hazards and associated risks, safety and security provision associated
with the project activities appear to be acceptable. Hence the project in totality may be
considered environmentally safe. In general, from all the discussion undertaken above
and the Environmental Impact Assessment study carried out in the pre-monsoon season
regarding the project, it can be concluded that there will not be any significant negative
impact on environment by M/s. Gujarat Dyestuff Industries. However, the same will be
well within the statutory norms.
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD.
403, CENTER POINT, NR. KADIWALA SCHOOL,
RING ROAD, SURAT – 395002 (GUJARAT)
TEL: +91 (261) 2460854/2461241/3987173/3048586
TELEFAX: +91 (261) 2707273/3987273
EMAIL: [email protected]
WEBSITE: WWW.AQUA-AIR.CO.IN
1
CHAPTER - 9
DISCLOSURE OF CONSULTANTS ENGAGED
Aqua-Air Environmental Engineers Pvt. Ltd.
Environmental Management Consultants & Equipments Supplier
ISO 9001:2008 Certified Company
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD.
403, CENTER POINT, NR. KADIWALA SCHOOL,
RING ROAD, SURAT – 395002 (GUJARAT)
TEL: +91 (261) 2460854/2461241/3987173/3048586
TELEFAX: +91 (261) 2707273/3987273
EMAIL: [email protected]
WEBSITE: WWW.AQUA-AIR.CO.IN
2
COMPANY PROFILE
Aqua-Air Environmental Engineers Pvt. Ltd. is a Surat based company; one of the leading and
multidiscipline Environmental Management Consulting firms of the region.
Aqua-Air Environmental Engineers Pvt. Ltd. was founded by Mr. Jayesh S. Patel & Mrs. Archana J. Patel
on May 7, 2008 and Aqua-Air Environmental Engineers Pvt. Ltd. was registered under the companies
Act on May 7, 2008.
Office having 6,756 Sq. Ft. of area covering EC/EIA Department, R & D Centre (Environmental
Laboratory), Consent (NOC/CC&A) Department, ETP/Civil Department and Account Department,
Library, Conference room and Administration Department, etc. with experienced and qualified staff to
render services in the field of Environmental Management of various types of industries.
Aqua-Air Environmental Engineers Pvt. Ltd. has a well-established track record in monitoring legislation
and developing and implementing strategies for organizations that enable them to manage the impact
of environmental issues on their business.
The company has built a reputation for delivering innovative and practical solutions to environment
related business issues. These solutions help our clients to achieve successful business outcomes and
make sustainable environment serving improvements within their business operations.
Aqua-Air Environmental Engineers Pvt. Ltd. started the process for ISO/IEC 17025:2005 Accrediation by
NABL, New Delhi for the Competence Testing & Calibration Laboratories on June 24, 2008 and
submitted the application (Version No. 10) to NABL, New Delhi for ISO/IEC 17025:2005 registration on
October 7, 2008. After final assessment and Non-Conformances resolved and corrective actions taken
against the Non-Conformances, Laboratory Department - Aqua-Air Environmental Engineers Pvt. Ltd.
was accredited with the certification of ISO/IEC 17025:2005 on October 19, 2010.
Aqua-Air Environmental Engineers Pvt. Ltd. started the process for ISO 9001:2008 registration for
Quality Management System on December 1, 2009 and submitted the application for ISO 9001:2008
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD.
403, CENTER POINT, NR. KADIWALA SCHOOL,
RING ROAD, SURAT – 395002 (GUJARAT)
TEL: +91 (261) 2460854/2461241/3987173/3048586
TELEFAX: +91 (261) 2707273/3987273
EMAIL: [email protected]
WEBSITE: WWW.AQUA-AIR.CO.IN
3
registration on March 4, 2010. After final assessment, Aqua-Air Environmental Engineers Pvt. Ltd. was
certified from ANAB by M/s. Intertek System Certification on May 4, 2010.
Aqua-Air Environmental Engineers Pvt. Ltd. started the process for “EIA Consultant Organization”
accreditation under National Accreditation Board for Education And Training (NABET)/Quality Council
of India (QCI), New Delhi on January 7, 2010 and submitted the application (Rev. 06) for “EIA
Consultant Organization” accreditation under NABET, New Delhi on April 8, 2010. Office assessment
was done by external NABET/QCI auditors [Dr. L. Ramakrishnan & Mr. A. K. Gupta (B.Sc. Mechanical
Engg.)] on Feb. 3 & 4, 2011. NABET/QCI closed the application of Aqua-Air Environmental Engineers
Pvt. Ltd. on March 15, 2011. Aqua-Air Environmental Engineers Pvt. Ltd. filed SCA in Hon’ble High Court
of Gujarat against MoEF, QCI & NABET, New Delhi on April 13, 2012. Hon’ble High Court of Gujarat
issued stay order against operation of all OMs (related to NABET/QCI Scheme) of MoEF, New Delhi for
the company on Jan. 24, 2013. MoEFCC, New Delhi published Notification regarding mandatory
implementation accreditation scheme of NABET/QCI on March 3, 2016. Aqua-Air Environmental
Engineers P. Ltd. along with 11 EIA Consultants of Gujarat filed SCA No. 5312of 2016 in Hon'ble High
Court of Gujarat. Hon'ble High Court of Gujarat gave Stay Order on Apr. 5, 2016 against
implementation of Notification dated March 3, 2016 of MoEFCC, New Delhi till further orders.
Aqua-Air Environmental Engineers Pvt. Ltd. received the Certificate of Registration of Trade Mark,
Section 23 (2), Rule 62 (1) from Trade Marks Registry, Govt. of India on January 18, 2011.
The company’s work is spread all over Gujarat in India & Oman. Company have already prepared 267
Form-1, 178 EIA & EMP reports, 160 Risk Assessment & DMP reports, conducted 80 Public Hearings
and obtained 195 Environmental Clearances so far that includes Water related Projects / Pesticide
Industry Projects / Textile Industry Projects / Sugar Industry Projects / Chemical Industries / Specialty
Chemical Industry Projects / Bulk Drug (API) Industry Projects / Chemical Fertilizer Industry Projects /
Cement Plants / Thermal Power Plants / Mining Projects / Infrastructure Projects / Construction
Projects / Distilleries / Petrochemical Industry Projects/ SEZ Projects/ CRZ Projects, etc.
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD.
403, CENTER POINT, NR. KADIWALA SCHOOL,
RING ROAD, SURAT – 395002 (GUJARAT)
TEL: +91 (261) 2460854/2461241/3987173/3048586
TELEFAX: +91 (261) 2707273/3987273
EMAIL: [email protected]
WEBSITE: WWW.AQUA-AIR.CO.IN
4
Company's NABL Accredited Testing Laboratory has conducted Environmental Monitoring & Analysis
with Environmental Institute and Gujarat Pollution Control Board in Industrial Estates of Ankleshwar,
Panoli & Jhagadia. Company is also doing Turnkey/Consulting Projects for M/s. BASF (Detail
Engineering for Effluent Treatment Plant) & M/s. Reva Proteins Ltd. (Design of Effluent Treatment
Plant, supply of mechanical items, Commissioning and operation of Effluent Treatment Plant).
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD.
403, CENTER POINT, NR. KADIWALA SCHOOL,
RING ROAD, SURAT – 395002 (GUJARAT)
TEL: +91 (261) 2460854/2461241/3987173/3048586
TELEFAX: +91 (261) 2707273/3987273
EMAIL: [email protected]
WEBSITE: WWW.AQUA-AIR.CO.IN
5
2. ABOUT US
Aqua-Air Environmental Engineers Pvt. Ltd. has registered office in one of the top five fastest growing
cities of India – Surat. We are one of the most trusted and reliable environmental and engineering
consultancy service providers. With complete hold in the related domain and proficiency, we execute
our work all over Gujarat region.
In addition to engineering consultancy, we also execute turnkey projects for effluent treatment plants
at the client's site.
Aqua-Air Environmental Engineers Pvt. Ltd is:
• One of the leading companies in the region providing high quality services in environmental
engineering to the best of client's satisfaction.
• Posses a well - developed design office with Computer Center and Laboratory -cum- R&D Center to
carry out designing and analysis in the field of environmental engineering.
• Recognized as Schedule-II Environmental Auditor under the Environment Audit Scheme proposed
by the Hon'ble High Court of Gujarat.
• Listed with Gujarat Pollution Control Board as Consultants and proposing to get enlisted with GPCB
as Pollution Control Equipment Suppliers.
• Going to become a member of Consulting Engineers Association of India.
• Having well-developed library to render services in the field of environmental auditing, consulting,
monitoring and analysis.
3. ACHIEVEMENTS
1. Registered under the companies Act on May 7, 2008.
2. Gujarat Pollution Control Board Recognized Schedule – II Environmental Auditor on Dec. 24,
2008.
3. Certificate of ISO 9001:2008 received on May 4, 2010.
4. Import Export Licence received from Government of India on May 31, 2010.
5. Solvency Certificate of Rs. 1,40,00,000/- received from Bank of India, Gopipura branch, Surat on
Sept. 3, 2010.
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD.
403, CENTER POINT, NR. KADIWALA SCHOOL,
RING ROAD, SURAT – 395002 (GUJARAT)
TEL: +91 (261) 2460854/2461241/3987173/3048586
TELEFAX: +91 (261) 2707273/3987273
EMAIL: [email protected]
WEBSITE: WWW.AQUA-AIR.CO.IN
6
6. Certificate of National Accreditation Board for Testing and Calibration Laboratories (NABL)
received on Oct. 15, 2010.
7. Certificate of Registration of Trade Mark, Section 23 (2), Rule 62 (1) from Trade Marks Registry,
Govt. of India on Jan. 18, 2011.
8. Certificate of Authorization as dealer in India received from Spectrum Technologies, Inc., USA
on May 1, 2011.
9. Gujarat Pollution Control Board Recognized Schedule – II Environmental Auditor on May 6,
2011.
4. SERVICE PROVIDE
M/s. AQUA-AIR ENVIRONMENTAL ENGINEERS PVT. LTD. offers following specialized services in
Environmental Engineering, Water Supply Engineering and Civil Engineering.
4.1 TURN KEY/BOOT/BOO PROJECTS
4.1.1 ENVIRONMENTAL ENGINEERING
Detailed design Water Treatment Plants (WTPs)
Construction Common Effluent Treatment Plants (CETPs)
Fabrication Recycling Plants (RPs)
Piping Zero Discharge Plants (ZDPs)
Electrification Incineration System Plants (ISPs)
Supply Hazardous waste Storage areas (HWSAs)
Erection Secured/ Sanitary Landfill Facilities
Testing and Commissioning of Effluent
Treatment Plants (ETPs)
Bio–Medical Waste (BMW) Treatment Facilities on
a turnkey or BOOT/BOO basis.
Sewage Treatment Plants (STPs)
4.1.2 CIVIL ENGINEERING
Construction of
Water Treatment Plan Elevated Service Reservoirs (ESRs)
Sewage Treatment plant Underground Reservoirs (UGRs)
Industrial Wastewater Treatment plant Sewage Pumping Stations, etc.
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD.
403, CENTER POINT, NR. KADIWALA SCHOOL,
RING ROAD, SURAT – 395002 (GUJARAT)
TEL: +91 (261) 2460854/2461241/3987173/3048586
TELEFAX: +91 (261) 2707273/3987273
EMAIL: [email protected]
WEBSITE: WWW.AQUA-AIR.CO.IN
7
4.2 CONSULTING
4.2.1 ENVIRONMENTAL ENGINEERING
1. Complete study of the Pollution Problem in industries from wastes generation to disposal and
providing necessary technical knowledge like–
How including design Zero Discharge Plants (ZDPs)
Basic engineering, detailed engineering
Water Treatment Plants (WTPs)
Recycling plants (RPs) for reuse of water upto
maximum extent
Tender preparation for Effluent Treatment
Plants (ETPs) for industrial wastewater
Incineration System Plants (ISPs) for various non-
biodegradable or toxic industrial wastes on
Consulting basis
Sewage Treatment Plants (STPs) for residential
wastewater
Design of Hazardous waste Storage area and
Consultancy Services for Secured/ Sanitary Landfill
Facilities
Common Effluent Treatment Plants (CETPs) for
more than two industries
Design and Consultancy Services for Bio – Medical
Waste Treatment Facilities.
2. Water Supply Distribution System
Analysis Tender preparation
Design
3. Laboratory Analysis of
Air Waste Water
Water Industrial Effluent
Sewage Industrial Sludge
4. Process Study
Reduce the pollution at source Reuse / Recycle effluent
5. Pollution Control Facility
Performance study of existing Suggesting scheme for the optimization of the
facility
6. Environment Management
Environmental Clearance from Environmental Impact Assessment Studies (EIAs)
• MoEF • Short term (Rapid)
• New Delhi or DoEF • Long term (Comprehensive)
• Gandhinagar
Environmental statements Environmental Auditing
7. Statutory Requirements under Factory Act
Safety Audit
On-site / Off-site Emergency Plan
HAZOP study
8. For Various Energy Conservation Schemes
Energy Audit Design
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD.
403, CENTER POINT, NR. KADIWALA SCHOOL,
RING ROAD, SURAT – 395002 (GUJARAT)
TEL: +91 (261) 2460854/2461241/3987173/3048586
TELEFAX: +91 (261) 2707273/3987273
EMAIL: [email protected]
WEBSITE: WWW.AQUA-AIR.CO.IN
8
9. Environmental Management System
Preparing Adequacy Report Preparing Efficacy Report
10. Operation and Maintenance (O & M)
Effluent Treatment Plants (ETPs) Water Treatment Plants (WTPs)
Sewage Treatment Plants (STPs)
11. Air Monitoring
Ambient Air Stack
Vent
12. Design of Pollution Control Equipment
Cyclone Flash mixers
Scrubbers Reaction Vessels
Bag Filters, fume extraction systems Clariflocculators
Blowers Scrapper Mechanisms
Aerators Incinerators
Agitators Scrubbers, etc.
13. Pollution Control
Effluent Survey Feasibility Studies
Laboratory bench scale Treatability studies Environmental review of Pollution control
equipment and systems Pilot Plant studies etc.
14. Consulting Service
NOC Air Consent
Water Consent Hazardous Waste Authorization Application, etc.
15. As per requirements under Factory Act-1948 and Gujarat Factory Rules
Monitoring filling up Form-37
Analysis of Work Area Environment
16. Technical Consultation & assistance to ensure and assure compete Environ-Legal compliance
Clearance Liaison with statutory bodies in order to get the
required permits Consents
4.3 EQUIPMENT MFG. /TRADING
4.3.1 ENVIRONMENTAL ENGINEERING
1. Manufacture and supply of Pollution Control Equipment such as
Incinerators With scrubbers Dissolved Air Flotation (DAF) units
Autoclaves Cyclone
Hydro-claves Scrubbers
Fixed Aerators Bag Filters
Floating Aerators Oil Skimmers
Submersible Aerators (EOLO2) Deoiler Pipes
Submersible Mixers (RIO or BRIO) API separators
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD.
403, CENTER POINT, NR. KADIWALA SCHOOL,
RING ROAD, SURAT – 395002 (GUJARAT)
TEL: +91 (261) 2460854/2461241/3987173/3048586
TELEFAX: +91 (261) 2707273/3987273
EMAIL: [email protected]
WEBSITE: WWW.AQUA-AIR.CO.IN
9
Cascade Aerators Vacuum Drum filters
Clarifier mechanisms Solid bowl centrifuges
Agitators Filter presses
Clariflocculator Belt filters
Clariflocculator mechanism Reaction vessels
Flash mixes Reverse Osmosis, etc.
Oil skimmers
A- 1
LIST OF ANNEXURES
ANNEXURE
NO.
TITLE
1 National ambient air quality monitoring standards
2 Damage risk criteria for hearing loss occupational safety & health administration (OSHA)
3 CPCB recommendations for community noise exposure
4 CPCB standards classification of inland surface water
5 Indian standards specifications for drinking water
6 Indian standards for industrial and sewage effluents discharge
7 Copy of Plot Possession Certificate obtained from SEZ-Dahej
8 Permission obtained from the GIDC for supply of raw water & to take additional effluent load in
GIDC drainage
9 Membership of Common Environmental Infrastructure including CETP, TSDF / Common
Incineration Facility, if any
10 Copy of Existing EC & its Compliance
11 Copy of Existing CCA & its Compliance
12 Do’s & Don’ts
13 Copy of Typical Material Safety Data Sheets
14 Copy of Hon ‘able High Court’s Stay Order & Extensions
A- 2
ANNEXURE - 1
NATIONAL AMBIENT AIR QUALITY STANDARDS (NAAQS) (2009)
Concentration in Ambient Air Sr.
No.
Pollutant Time
Weighted
Average
Industrial
Residential,
Rural and
Other Area
Ecologically
Sensitive Area
(notified by
Central
Government)
Methods of
Measurement
(1) (2) (3) (4) (5) (6)
1 Sulphur Dioxide
(SO2), µg/m3
Annual*
24 Hours**
50
80
20
80
• Improved West and
Geake
• Ultraviolet
fluorescence
2 Nitrogen Dioxide
(NOx), µg/m3
Annual*
24 Hours**
40
80
30
80
• Modified Jacob &
Hochheiser (Na-
Aresenite)
• Chemiluminescence
3 Particular Matter
(size less than 10
µm) or PM10 µg/m3
Annual*
24 Hours**
60
100
60
100
• Gravimetric
• TOEM
• Beta attenuation
4 Particular Matter
(size less than 2.5
µm) or PM2.5 µg/m3
Annual*
24 Hours**
40
60
40
60
• Gravimetric
• TOEM
• Beta attenuation
5 Ozone (O2) µg/m3 8 Hours**
1 Hour**
100
180
100
180
• UV photometric
• Chemiluminescence
• Chemical Method
6 Lead (Pb) µg/m3 Annual*
24 Hours**
0.50
1.0
0.50
1.0
• AAS/ICP method
after sampling on
EPM 2000 or
equivalent filter
paper
• ED-XRF using Teflon
filter
7 Carbon Monoxide
(CO) mg/m3
8 Hours**
1 Hour**
02
04
02
04
• Non Dispersive Infra
Red (NDIR)
Spectrology
8 Ammonia (NH3)
µg/m3
Annual*
24 Hours**
100
400
100
400
• Chemiluminescence
• Indophenol blue
method
A- 3
* Annual arithmetic mean of minimum 104 measurements in a year at a particular site taken twice a
week 24 hours at uniform intervals
** 24 hourly or 08 hourly or 01 hourly monitored values, as applicable, shall be complied with 98%
of the time in a year. 2% of the time, they may exceed he limits but not on two consecutive days
of monitoring.
Note: Whenever and wherever monitoring results on two consecutive days of monitoring exceed the
limits specified above for the respective category, it shall be considered adequate reason to
institute regular or continuous monitoring and further investigation.
Concentration in Ambient Air Sr.
No.
Pollutant Time
Weighted
Average
Industrial
Residential,
Rural and
Other Area
Ecologically
Sensitive Area
(notified by
Central
Government)
Methods of
Measurement
(1) (2) (3) (4) (5) (6)
9 Benzene (C6H6)
µg/m3
Annual* 05 05 • Gas chromatography
based continuous
analyzer
• Absorption and
Desorption followed
by GC analysis
10 Benzo (a) Pyrene
(BaP) particulate
phase only, mg/m3
Annual* 01 01 • Solvent extraction
followed by HPCL/GC
analysis
11 Arsenic (AS),
mg/m3
Annual* 06 06 • AAS/ICP method
after sampling on
EPM 2000 or
equivalent filter
paper
12 Nickel (Ni), mg/m3 Annual* 20 20 • AAS/ICP method
after sampling on
EPM 2000 or
equivalent filter
paper
A- 4
ANNEXURE - 2
________________________________________________________________________
DAMAGE RISK CRITERIA FOR HEARING LOSS
OCCUPATIONAL SAFETY& HEALTH ADMINISTRATION (OSHA)
MAXIMUM ALLOWABLE
DURATION PER DAY
(HOURS)
NOISE LEVEL
(SLOW RESPONSE)
dB(A)
8 90
6 92
4 95
3 97
2 100
1.5 102
1 105
0.5 110
0.25 or Less 115
A- 5
ANNEXURE - 3
________________________________________________________________________
CPCB RECOMMENDATIONS FOR COMMUNITY NOISE EXPOSURE (1989)
CATEGORY
OF AREA
Leq (dBA)
(DAYTIME)
(06:00 TO 21:00 HRS)
Ldn (dBA)
(NIGHT TIME)
(21:00 TO 06:00 HRS)
Industrial Area 75 70
Commercial Area 65 55
Residential Area 55 45
Silence Zone 50 40
Note:
1. Day time shall mean from 6.00 a.m. to 10.00 p.m.
2. Night time shall mean from 10.00 p.m. to 6.00 a.m.
3. Silence zone is an area comprising not less than 100 meters around hospitals, educational
institutions, courts, religious places or any other area which is declared as such by
competent authority.
4. Mixed categories of areas may be declared as one of the four above mentioned
categories by the competent authority.
*dB(A) Leq denotes the time weighted average of the level of sound in decibels on scale A
which is relatable to human hearing.
A "decibel" is a unit in which noise is measured.
"A", in dB(A) Leq, denotes the frequency weighting in the measurement of noise and
corresponds to frequency response characteristics of the human ear.
Leq: It is energy mean of the noise level, over a specified period.
A- 6
ANNEXURE - 4 __________________________________________________________________________________________
CLASSIFICATION OF INLAND SURFACE WATER (CPCB STANDARDS)
SR
NO.
CHARACTERISTICS A@ B@ C@ D@ E@
1 Dissolved Oxygen
(mg/L), Min
6 5 4 4 -
2 Biochemical Oxygen
Demand (mg/L), Min
2 3 3 - -
3 Total Coliform
Organisms,
MPN/100 ml, Max.
50 500 5000 - -
4 Total Dissolved Solids
(mg/L), Max
500 - 1500 - 2100
5 Chlorides (as Cl-), mg/L,
Max.
250 - 600 - 600
6 Colour,
Hazen units, Max
10 300 300 - -
7 Sodium absorption
ratio, Max
- - - - 26
8 Boron (as B), mg/L, Max - - - - 2
9 Sulphates (as SO4-2
),
mg/L, Max.
400 - 400 - 1000
10 Nitrates (as NO3-), mg/L,
Max
20 - 50 - -
11 Free Ammonia
(as N), mg/L, Max
- - - 1.2 -
12 Conductivity at 25°C,
micromhos/cm, Max
- - - 1.0 2.25
13 pH value
6.5-8.5 6.5-8.5 6.5-8.5 6.5-8.5 6.0-8.0
14. Arsenic (as As), mg/L,
Max
0.05 0.2 0.2 - -
15 Iron (as Fe), mg/L, Max 0.3 - 50 - -
16 Fluorides (as F), mg/L,
Max
1.5 1.5 1.5 - -
17 Lead (as Pb), mg/L,
Max
0.1 - 0.1 - -
18 Copper (as Cu), mg/L,
Max
1.5 - 1.5 - -
19 Zinc (as Zn), mg/L,
Max
15 - 15 - -
*: If the Coliform count is found to be more than the prescribed tolerance limits, the criteria
for coliforms shall be satisfied if not more than 20 percent of samples show more than the
tolerance limits specified, and not more than 5 percent of samples show values more than 4
times the tolerance limit. Further, the feacal coliform should not be more than 20 percent of
the coliform.
A- 7
ANNEXURE - 5
___________________________________________________________________________
INDIAN STANDARDS/SPECIFICATIONS FOR DRIINKING WATER IS: 10500-1991
SR
NO.
SUBSTANCES OR
CHARCTER-
ISTICS
MAX
REQUIREME-
NT
(DESIRABLE
LIMIT)
UNDESIRABLE
EFFECTS OUT-SIDE
THE DESIRABLE
LIMIT
PERMISSIBLE
LIMIT IN
ABSENCE OF
ALTERNATE
SOURCE
METHOD
OF TEST
CI REF OF
IS: 3025
REMARKS
ESSENTIAL CHARACTERISTICS
1 Colour, Hazen
unit
5 Above this,
consumer
acceptance
decreases
25 4 of 3025,
1983
Extended upto 25
only if toxic
substances are not
suspected in
absence of
alternate
Source.
2 Odour Unobjectionable - 5 of
3025,198
3
a. Test cold and
when heated
b. Test at several
dilutions
3 Taste Agreeable - - Test to be
conducted only
after safety has
been established
4 Turbidity, NTU 5 Above this,
consumer
acceptance
decreases
10 8 Test to be
conducted only
after safety has
been established
5 pH Value 6.5-8.5 Beyond this range
the water will affect
the mucous
membrane and/or
water supply
system
No relaxation 8 -
6 Total Hardness
mg/L (as CaCO3)
300 Encrustation on
water supply
structure and
adverse effects on
domestic use
600 - -
7 Iron (as Fe), mg/L 0.3 Beyond this limit,,
taste/appearance
are affected has
adverse effect on
domestic uses and
water supply
structures &
promotes iron
bacteria
1.0 32 of
3025,
1964
-
8 Chlorides
(as Cl-) mg/L
250 Beyond this limit
taste, corrosion and
palatability are
affected
1000 32 of
3025
-
9 Residual free
chlorine, mg/L
0.2 - - 26 of
3025,
1986
To be applicable
only when water is
chlorinated tested
at consumer end,
when protection
against viral
infection is required
it should be min 0.5
mg/L
A- 8
ANNEXURE – 5 (Contd.)
DESIRABLE CHARACTERISTICS
10 Dissolved Solids,
mg/L
500 Beyond this
palatability
decrease and may
cause
gastrointestinal
irritation
2000 16 of
3025
11 Calcium (as Ca)
mg/L
75 - 200 40 of
3025,
1984
12 Copper (as Cu),
mg/L
0.05 Astringent, taste
discoloration of
pipes, fittings and
utensils will be
caused beyond this
1.5 36 of
3025,
1964
13 Manganese (as
Mn), mg/L
0.1 Astringent, taste
discoloration of
pipes, fittings and
utensils will be
caused beyond this
0.3 35 of
3025,196
4
14 Sulphate (as SO4-
2), mg/L
200 Beyond this causes
gastrointestinal
irritation when
magnesium or
sodium are present
400 24 of
3025,
1986
May be
extended upto
400 provided
(as Mg) does
not exceed 30
mg/l
15 Nitrate (as NO3-),
mg/L
45 Beyond this
methaemoglo-
binemia
100 - -
16 Fluoride (as F-),
mg/L
1.0 Fluoride may be
kept as low as
possible. High
fluoride may cause
fluorosis
1. 5 23 of
3025,
1964
-
17 Phenolic
substances mg/L
(as C6H5OH)
0.001 Beyond this, it may
cause objectionable
taste and odour
0.002 54 of
3025
18 Mercury (as Hg),
mg/L
0.01 Beyond this, the
water becomes
toxic
No relaxation See note
mercury
ion
analyzer
To be tested
when pollution
is suspected
19 Cadmium (as Cd),
mg/L
0.01 Beyond this the
water becomes
toxic
No relaxation See note
mercury
ion
analyser
To be tested
when pollution
is suspected
20 Selenium (as Se)
mg/L
0.01 Beyond this the
water becomes
toxic
No relaxation 28 of
3025,
1964
To be tested
when pollution
is suspected
21 Arsenic (As),
mg/L
0.05 Beyond this the
water becomes
toxic
No relaxation 37 of
3025,
1988
To be tested
when pollution
is suspected
22 Cyanide (CN-),
mg/L
0.05 Beyond this the
water becomes
toxic
No relaxation 27 of
3025,
1986
To be tested
when pollution
is suspected
23 Lead (Pb), mg/L 0.05 Beyond this the
water becomes
toxic
No relaxation See note
86
To be tested
when pollution
plumb
solvency is
suspected
A- 9
ANNEXURE – 5 (Contd.)
24 Zinc (as Zn), mg/L 5 Beyond this limit it
can cause
astringent taste and
an opalescence in
water
15 39 of
3025,196
4
To be
tested
when
pollution
is
suspected
25 Anionic
detergents mg/L
(as MBAS)
0.2 Beyond this limit
undesirable taste
and odour after
Chlorination takes
place
1.0 Methylen
e blue
extraction
method
To be
tested
when
pollution
is
suspected
26 Chromium (as
Cr+6
), mg/L
0.01 May be
carcinogenic above
this limit
0.05 28 0f
3025
To be
tested
when
pollution
is
suspected
27 Polynuclear
aromatic
hydrocarbons,
mg/L
- May be
carcinogenic
- 28 of
3025,196
4
To be
tested
when
pollution
is
suspected
28 Mineral Oil, mg/L 0.01 Beyond this limit
undesirable taste
and odour after
Chlorination takes
place
0.03 Gas
chromato
graphic
method
To be
tested
when
pollution
is
suspected
29 Pesticides
mg/L
Absent Toxic 0.001 58 of
3025,
1964
-
30 Radioactive
materials
a. Alpha emitters
Bq/L
b. Beta emitters
pci/L
-
-
-
-
0.1
1.0
-
-
-
-
31 Alkalinity (as
CaCO3), mg/L
200 Beyond this limit
taste becomes
unpleasant
600 13 of
3025,196
4
-
32 Aluminum (as Al),
mg/L
0.03 Cumulative effect is
reported to cause
dementia
0.2 31 0f
3025,196
4
-
33 Boron (as B),
mg/L
1 - 5 29 of
3025,196
4
-
Note: Atomic absorption spectrophotometric method may be used.
A- 10
ANNEXURE - 6
________________________________________________________________________
INDIAN STANDARDS FOR INDUSTRIAL AND SEWAGE EFFLUENTS DISCHARGE IS: 2490-1982
INDUSTRIAL EFFLUENT SR
NO.
PARAMETERS
INTO INLAND
SURFACE
WATER
ON LAND FOR
IRRIGATION
INTO
MARINE
COASTAL
AREA
INTO PUBLIC
SEWERS
1 Colour / odour - - - -
2 Suspended Solids
(mg/L)
100 200 100(for
Process
Waste)
600
3 Particle Size
Suspended Solids
Shall pass
850 micron IS
sieve
- Floatable
Solids Max 3
mm
Settable
Solids
Max 850
micron
-
4 Dissolved Solids
(Inorganic),
mg/L
2100 2100 - 2100
5 pH Value 5.5-9.0 5.5-9.0 5.5-9.0 5.5-9.0
6 Temperature °C Shall not
exceed 40 in
any section
of the stream
within 15
mts. down
stream from
the effluent
outlet
- 45 at the
point of
discharge
-
7 Oil & Grease, mg/L,
Max.
10 10 20 20
8 Total Residual
Chlorine, mg/L, Max
1 - 1 -
9 Ammonical
Nitrogen (as N) mg/L
max
50 - 50 50
10 Total Kjeldahl
Nitrogen (as N), mg/L,
Max
100 - 100 -
11 Free Ammonia (as
NH3) mg/L, Max.
5 - 5 -
12 Biochemical Oxygen
Demand,
5 Days at 20 ° C
30 100 100 350
13 Chemical Oxygen
Demand, mg/L, Max.
250 - 250 -
14 Arsenic (as As), mg/L,
Max.
0.2 0.2 0.2 0.2
A- 11
ANNEXURE – 6 (Contd.)
15 Mercury (as Hg)
mg/L
0.01 - 0.01 0.01
16 Lead (as Pb), mg/L,
Max
0.1 - 1.0 1.0
17 Cadmium (as Cd),
mg/L, Max
2 - 2 1
18 Hexavalent Chromium
(As Cr+6
), mg/L, Max.
0.1 - 1 2
19 Total Chromium (as
Cr) mg/L, Max
2 - 2 2
20 Copper (as Cu), mg/L,
Max
3 - 3 3
21 Zinc (as Zn), mg/L,
Max.
5 - 15 15
22 Selenium (as Se),
mg/L, Max
0.05 - 0.05 0.05
23 Nickel (as Ni), mg/L,
Max
3 - 5 3
24 Boron (as B), mg/L,
Max
2 2 - 2
25 Percent Sodium, Max - 60 60 -
26 Residual Sodium
Carbonate, mg/L,
Max
- 50 - -
27 Cyanide (as CN-),
mg/L, Max
0.2 0.2 0.2 0.2
28 Chloride (as Cl-), mg/L,
Max
1000 600 - 1000
29 Fluoride (as F-) mg/L,
Max
2 - 15 15
30 Dissolved Phosphate
(as P), mg/L, Max
5 - - -
31 Sulphate (as SO4-2
)
mg/L, Max
1000 1000 - 1000
32 Sulphide (as S-2
) mg/l,
Max
2 - 5 -
33 Phenolic Compounds
(as C6H5OH) Max
1 - 5 6
34 Radioactive materials
a.) Alpha emitters
µc/mL, Max
b.) Beta emitters
µc/mL, Max
10-7
10-6
10-8
10-7
10-7
10-6
10-7
10-6
35 Manganese (as Mn),
mg/L
2 2 - 2
36 Iron (as Fe), mg/L 3 3 - 3
37 Vanadium (as V), mg/L 0.2 - 0.2 0.2
38 Nitrate Nitrogen, mg/L 18 20 - 0.2
A- 12
ANNEXURE – 7
COPY OF PLOT POSSESSION CERTIFICATE OBTAINED FROM SEZ-DAHEJ
A- 13
A- 14
A- 15
A- 16
A- 17
A- 18
A- 19
A- 20
A- 21
A- 22
A- 23
ANNEXURE – 8
PERMISSION OBTAINED FROM THE GIDC FOR SUPPLY OF RAW WATER & TO TAKE
ADDITIONAL EFFLUENT LOAD IN GIDC DRAINAGE
A- 24
A- 25
A- 26
ANNEXURE – 9
MEMBERSHIP OF COMMON ENVIRONMENTAL INFRASTRUCTURE INCLUDING CETP, TSDF /
COMMON INCINERATION FACILITY, IF ANY
A- 27
ANNEXURE – 10
COPY OF EXISTING EC AND ITS COMPLIANCE
A- 28
A- 29
A- 30
A- 31
GUJARAT DYESTUFF INDUSTRIES
PLOT NO.: Z/25-28, DAHEJ SEZ, VILL: DAHEJ
TEHSIL: VAGRA, DIST.: BHARUCH (GUJ)
EC COMPLIANCE REPORT
Sr.
No. Compliance Condition
Status of
Compliance
A. 1 CONDITIONS:
A.1.1 SPECIFIC CONDITIONS:
1. Vinyl Sulphone shall be manufactured from the condensed Vinyl Sulphone as raw
material. In other words, the unit shall carry out only last step of Vinyl Sulphone
manufacturing (i.e. esterification of condensed Vinyl Sulphone).
Complied.
2. Condensed Vinyl Sulphone shall be purchased only from the unit having valid
consent and authorization of the Gujarat Pollution Control Board. Records shall be
maintained and submitted to the GPCB at regular intervals.
Complied.
A.1.2 WATER
3. Fresh water requirement for proposed project shall not exceed 21 kl/day and it
shall be met only with water supply system managed by Dahej SEZ Authority. The
water meter shall be installed and records of daily and monthly water
consumption shall be maintained. No ground water shall be tapped for the project
requirements in any case.
Complied.
4. Industrial effluent generation from cooling bleed off and washing activity shall not
exceed 1.60 Kl/day. There shall be no waste water generation from manufacturing
process.
Complied.
5. Industrial waste water shall be treated in the proposed ETP and treated effluent
conforming to the GPCB norms shall be utilizing in gardening and plantation within
the premises.
Complied.
6. You shall have to install treated water sump having capacity of 10 Kl for interim
storage (@6 days) of wastewater during high rainy days.
Complied.
7. Domestic wastewater generation shall not exceed 4Kl/day and it shall be disposed
off through septic tank – soak pit.
Complied.
8. The unit shall provide metering facility at the inlet and outlet of the ETP and
maintain the record of the same.
Agreed to the
condition.
9. A proper log book of the ETP operation, effluent discharge quality and quantity,
power consumption, chemical consumption etc. shall be maintained and shall be
furnished to the GPCB from time to time.
Agreed to the
condition.
10. The unit shall join and participate finically and technically for any common
environmental facility/ infrastructure as and when the same is taken up either by
the SEZ Authority/ GIDC/ GPCB or any such authority created for this purpose by
the Government/ SEZ Authority/ GIDC.
Complied.
A.1.3 AIR:
11. LDO (70 Litre / Hour) or Natural Gas (50 m3/Hour) shall be used as fuel in
proposed Thermic Fluid Heater having capacity of 6 Lacs Kcal/ Hour with 20 meter
stack height and high speed diesel shall be used in D.G. Set having capacity of 380
KVA with 11 meter stack height.
Complied.
12. There will be no process gas emission from manufacturing activity and other
ancillary operation.
Complied.
13. Flue gas emission shall conform to the standards prescribed by the GPCB. At no
time, the emission levels shall go beyond the stipulated standards.
Complied.
14. All the vessels used in the manufacturing process shall be close to reduce the Complied.
A- 32
fugitive emission.
15. The fugitive emission in the work zone environment shall be monitored. The
emission shall strictly conform to the standards prescribed by the concerned
authorities from time to time (e.g. Directors of Industrial Safety & Health).
Complied.
16. Regular monitoring of ground level concentration of SO2, NOx, PM10 and PM 2.5
shall be carried out in the impact zone and its records shall be maintained.
Ambient air quality levels shall not exceed the standards stipulated by the GPCB. If
at any stage these levels are found to exceed the prescribed limits, necessary
additional control measures shall be taken immediately. The location of the
stations and frequency of monitoring shall be decided in consultation with the
GPCB.
Agreed to the
condition.
A.1.4 SOLID/HAZARDOUS WASTE:
17. The company must strictly comply with the rules and regulations with regards to
handling and disposal of Hazardous waste in accordance with the Hazardous
Waste (Management, Handling and Trans boundary Movement) Rules, 2008 as
may be amended from time to time. Authorization from the GPCB must be
obtained for collection / treatment/ storage/ disposal of hazardous wastes.
Complied.
18. The hazardous wastes shall be dried, packed and stored in separate designated
hazardous waste storage facility with impervious bottom and leachate collection
facility before its disposal.
Complied.
19. ETP sludge shall be disposed at the nearest common TSDF Site. Complied.
20. Used Oil shall be sold to the approved registered recyclers. Complied.
21. Discarded containers and plastic liners shall be sold to the authorized vendors
after its decontamination.
Complied.
A1.5 SAFETY:
22. Necessary permission from various statutory authorities like Factory Inspectorate
and other shall be obtained prior to commissioning of the project.
Complied.
23. All necessary precautionary measures shall be taken to avoid any kind of accident
during storage and handling of hazardous chemicals.
Complied.
24. Storage and use of hazardous chemicals shall be minimized to the extent possible
and all necessary precautions shall be taken to mitigate the risk generated out of
it.
Complied.
25. During material transfer, spillages shall be avoided and garland drain be
constructed to avoid mixing of accidental spillages with domestic waste water or
storm water.
Complied.
26. Storage of hazardous chemical shall be in multiple small capacity tanks/ containers
instead of one single large capacity tanks for safety purpose.
Complied.
27. All the storage tanks shall be fitted with appropriate controls to avoid any
leakages,. Bund/ dyke walls shall be provided for storage tanks for hazardous
chemicals. Close handling system for chemicals shall be provided.
Complied.
28. Tie up shall be done with nearby health care unit/ doctor for seeking immediate
medical attention in the case of emergency, regular medical check up of the
workers and keeping its record etc.
Agreed to the
condition.
29. Personal Protective Equipments shall be provided to workers and its usage shall be
ensured and supervised.
Complied.
30. First Aid Box and required Antidotes for the chemicals used in the unit shall be
made readily available in adequate quantity.
Complied.
31. Training shall be imported to all the workers on safety and health aspects of
chemicals handling.
Agreed to the
condition.
32. Occupational health surveillance of the workers shall be done and its records shall
be maintained. Pre-employment and periodical medical examination for all the
Agreed to the
condition.
A- 33
workers shall be undertaken as per the Factories Act and Rules.
33. Handling and charging of the chemicals shall be done in such manner that minimal
human exposure occurs.
Agreed to the
condition.
34. Transportation of hazardous chemicals shall be done as per the provisions of the
Motor Vehicle Act & Rules.
Agreed to the
condition.
A1.6 NOISE:
35. The overall noise level in and around the plant area shall be kept well within the
standards by providing noise control measures including engineering controls like
acoustic insulation hoods, silencers, enclosures etc. on all sources of noise
generation. The ambient noise shall level shall confirm to the standards prescribed
under the Environment (Protection) Act, 1986 & Rules.
Agreed to the
condition.
A1.7 CLEANER PRODUCTION AND WASTE MINIMSATION:
36. The unit shall also undertake following waste minimization measures:
a). Metering and control of quantities of active ingredient to minimize waste.
b). Use of automated and enclosed filling to minimize spillage.
c). Reuse of by-products from process as raw materials or raw materials
substitutes in other process.
d). Venting equipment through vapour recovery system.
e). Use of high pressure hoses for equipment cleaning to reduce wastewater
generation.
f). Use of close feed system into batch reactors.
Agreed to the
condition.
A.1.8 GREEN BELT AND OTHER PLANTATION:
37. The unit shall develop and maintain green belt within premises as per the CPCB
guidelines. In addition to this, the unit shall also take up adequate plantation at
the suitable open land on road sides and other open areas within the Industrial
Area or in nearby locality or schools in consultation with the GIDC/ Gram
Panchayat/ GPCB and submit an action plan of plantation for next three years to
the GPCB.
Complied.
B. OTHER CONDITIONS:
38. In the event of failure of any pollution control system adopted by the unit, the unit
shall be safely closed down and shall not be restarted unit the desired efficiency of
the control equipment has been achieved.
Complied.
39. Pucca flooring/ impervious layer shall be provided in the work areas, chemical
storage areas and chemical handling areas to minimize soil contamination.
Complied.
40. Leakages from the pipes, pumps shall be minimal and if occurs, shall be arrested
promptly.
Complied.
41. During material transfer, spillages shall be avoided and garland drain be
constructed to avoid mixing of accidental spillages with domestic wastewater or
storm water.
Agreed to the
condition.
42. The company shall undertake socio-economic developmental / community
welfare activities in consultation with the District Development Officer/ District
Collector.
Agreed to the
condition.
43. Concealing factual data or submission of false/fabricated data and failure to
comply with any of the conditions mentioned above may result in withdrawal of
this clearance and attract action under the provisions Environment (Protection)
Act,1986.
Agreed to the
condition.
44. The project authorities shall also adhere to the stipulations made by the Gujarat
Pollution Control Board.
Agreed to the
condition.
45. It shall be mandatory for the project management to submit half-yearly
compliance report in respect of the stipulated prior environmental clearance
terms and conditions in hard and soft copies to the regulatory authority
Agreed to the
condition.
A- 34
concerned on 1st
June and 1st December of each calendar year.
46. The SEIAA may revoke or suspend the clearance, if implementation of any of the
above conditions is not found satisfactory.
Agreed to the
condition.
47. The company in a time bound banner shall implement these conditions. The SEIAA
reserves the right to stipulate additional conditions, if the same is found
necessary.
Agreed to the
condition.
48. No further expansion or modifications in the plant likely to cause environmental
impacts shall be carried out without obtaining prior Environmental Clearance from
the concerned authority.
Agreed to the
condition.
49. The project authorities shall earmark adequate funds to implement the conditions
stipulated by SEIAA as well as GPCB along with the implementation schedule for
all the conditions stipulated herein. The funds so provided shall not be diverted for
any other purpose.
Agreed to the
condition.
50. The applicant shall inform the public that the project has been accorded
environmental clearance by the SEIAA and that the copies of the clearance letter
are available with the GPCB and may also be seen at the Website of
SEIAA/SEAC/GPCB. This shall be advertised within seven days from the date of the
clearance letter in at least two local newspapers that are widely circulated in the
region, one of which shall be in the Gujarati language and the other in English. A
copy each of the same shall be forwarded to the concerned Regional Office of the
ministry.
Agreed to the
condition.
51. It shall be mandatory for the project management to submit half yearly
compliance report in respect of the stipulated prior environmental clearance
terms and conditions in hard and soft copies to the regulatory authority
concerned, on 1st June and 1
st December of each calendar year.
Agreed to the
condition.
52. The project authorities shall also adhere to the stipulation made by the Gujarat
Pollution Control Board.
Agreed to the
condition.
53. The project authorities shall inform the GPCB, Regional Office of MoEF and SEIAA
about the date of financial closure and final approvals of the project by the
concerned authorities and the date of start of the project.
Agreed to the
condition.
54. The SEIAA may revoke or suspend the clearance, if implementation of any of the
above conditions is not found satisfactory.
Agreed to the
condition.
55. The company in a time bound manner shall implement these conditions. The
SEIAA reserves the right to stipulate additional conditions, if the same is found
necessary. The above conditions will be enforced, inter-alia under the provision of
the Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control
of Pollution) Act, 1981, the Environment (Protection) Act, 1986, Hazardous Waste
(Management, Handling and Transboundary Movement) Rules,2008 and the
Public Liability Insurance Act, 1991 along with their amendments and rules.
Agreed to the
condition.
56. This environmental clearance is valid for five years from the date of issue. Agreed to the
condition.
57. Any appeal against this environmental clearance shall lie with the National Green
Tribunal, if preferred, within a period of 30 days as prescribed under Section 16 of
the National Green Tribunal Act, 2010.
Agreed to the
condition.
A- 35
ANNEXURE – 11
COPY OF EXISTING CCA & ITS COMPLIANCE
A- 36
A- 37
A- 38
A- 39
A- 40
A- 41
A- 42
GUJARAT DYESTUFF INDUSTRIES
PLOT NO.: Z/25-28, DAHEJ SEZ, VILL: DAHEJ
TEHSIL: VAGRA, DIST.: BHARUCH (GUJ)
CCA COMPLIANCE REPORT
Sr.
No. Compliance Condition
Status of
Compliance
1. Consent Order No.: AWH – 68556. Complied.
2. The consent under Water Act – 1974 shall be valid upto 15/10/2019. The consent
under Air Act -1981 and authorization under Environment (Protection) Act, 1986
shall be valid up to 15/10/2019 to operate industrial plant for manufacture of the
following products;
SR. NO. NAME OF THE PRODUCT QTY. (MT/MONTH)
1. Vinyl Sulphone
(From Condensed VS as raw
Material)
430
2. Acetic Acid – 92% 100
Complied.
3. SUBJECT TO THE FOLLOWING SPECIFIC CONDITIONS:
3.1 Applicant shall strictly comply/fulfil the given conditions of EC of Dahej Sez, issued
vide no.- 21-1084/2007-1A, III dated17/03/2010.
Agreed to the
condition.
3.2 The applicant shall not produce any product as well as not carry out any activities
for products/ process listed in the EIA Notification dated 14/09/2006 as amended
from time to time, requiring prior Environmental Clearance from competent
authority.
Complied.
3.3 Applicant shall strictly comply/fulfil with all the conditions stipulated by
competent authority in the order of Environmental Clearance issued vide letter
no: SEIAA/GUJ/EC/5(f)/147/2014/dated 08/09/2014.
Complied.
3.4 The concentrated/ high TDS waste water stream from manufacturing process if
any shall be segregated & treated in evaporation system. Condensate water shall
be reused to process/ scrubber. The generating solids after settlers, nutches filters
and centrifuges shall be disposed at nearest TSDF site.
Agreed to the
condition.
3.5 The effluent shall be stripped off, of VOC’s in a closed system before further
treatment into ETP.
Agreed to the
condition.
3.6 Unit shall provide treated effluent holding facility for at least 48 hrs. Having
vertical tank design.
Agreed to the
condition.
3.7 Applicant shall carry out Bio assay and toxicity test for the treated waste water
and same shall be submitted to the GPCB.
Agreed to the
condition.
3.8 Applicant shall have to comply with provision of Hazardous Waste (Management,
Handling & Transboundary Movement) Rule -2008, for all the types /categories of
the generating hazardous waste, including by products/ additional wastes.
Agreed to the
condition.
3.9 Unit shall install continuous monitoring as well as alarm system for parameters of
treated effluent, such as pH meter, TOC analyzer, magnetic flow meter along with
totalizer and recorder at the final outlet/pipe of ETP. Records of the same shall be
maintained invariably by the unit and shall be submitted to GPCB every month.
Agreed to the
condition.
3.10 Total control of odour nuisance from the plant premises shall be achieved &
maintained by the applicant continuously, if it is not achieved then the company
has to stop the use of such chemicals.
Complied.
3.11 The unit shall affix of water meters as per Section 4 (I) of the water ( prevention
and control of pollution) Cess Act – 1977 for the purpose of measuring and
recording the quantity of water consumed at such places as may be required,
Agreed to the
condition.
A- 43
within 15 days and it shall be presumed that the quantity indicated by the meter
has been consumed by the industry until the contrary is proved.
3.12 Applicant shall have to use only pure (fresh) raw materials in their production &
shall not use any type of hazardous waste, as a raw material in the products.
Complied.
3.13 Applicant shall ensured & undertake on Rs. 100 stamp paper that it has no outlet
in GIDC U/G drain.
Agreed to the
condition.
3.14 Process waste water & process gas shall not generate / emit from the
manufacturing process of the products.
Complied.
3.15 In any case, unit shall not carry out backward integration of the product (i.e. Vinyl
Sulphone). Only manufacturing process mentioned in the application shall be
carried out.
Complied.
3.16 You shall follow all conditions mentioned in the CTE no: 58651 dated 06/11/2014
issued to you.
Agreed to the
condition.
4. CONDITIONS UNDER WATER ACT:
4.1 The quantity of total water consumption shall not exceed 21 Kl/day. (Break up as
below)
a) Domestic – 5 Kl/day
b) Industrial – 11 Kl/day
c) Gardening – 5 Kl/day
Complied.
4.2 The quantity of total waste water generation shall not exceed 5.6 Kl/day. (break
up as below)
a) Domestic – 4 Kl/day
b) Industrial – 1.6 Kl/day
Complied.
4.3 The quantity of the industrial effluent from the manufacturing process and other
ancillary industrial operations shall not exceed 1.6 Kl/day and the quantity of
domestic waste water (sewage) shall not exceed 4.0 Kl/day.
Complied.
4.4 The quantity of treated effluent shall conform to the following standards prior to
utilized on land for gardening purpose within premises
PARAMETERS PERMISSIBLE LIMIT
pH 6.5 to 8.5
Temperature 400 C
Colour 100 units
Total suspended Solids 100 mg/l
Total Dissolved Solids 2100 mg/l
BOD (3 days at 270 C) 30 mg/l
COD 100 mg/l
Oil & Grease 10 mg/l
Phenolic Compounds 1 mg/l
Sulphides 0.5 mg/l
Ammonical Nitrogen 50 mg/l
Chlorides 600 mg/l
Sulphates 1000 mg/l
Percent Sodium 60%
SAR 26
Complied.
4.5 Sewage shall be treated separately to conform to the following standards, shall be
disposed into septic tank/soak pit system exclusively within the premises.
BOD Less than 20 mg/l
Suspended Solids Less than 30 mg/l
Residual Chlorine Minimum 0.5 ppm
Complied.
A- 44
4.6 The unit shall affix of water meters as per section 4 (1) of the water (protection
and control of pollution) Cess Act – 1977 for the purpose of measuring and
recording the quantity of water consumed at such places as may be required,
within 15 days and it shall be permitted that the quantity indicated by the meters
has been consumed by the industry unit the contrary is proved.
Complied.
5. CONDITIONS UNDER AIR ACT:
5.1 Electricity shall be used as fuel. Complied.
5.2 There shall be no flue gas emission from the manufacturing process as well as any
other ancillary operation.
Complied.
5.3 The applicant shall install and operate a comprehensive adequate air pollution
control measures in order to achieve prescribed standards.
Complied.
5.4 There shall be no process emission from the manufacturing process as well as any
other ancillary operation.
Complied.
5.5 Ambient air quality within the premises of the industry shall conform to the
following standards:
PARAMETER PERMISSIBLE LIMIT
Suspended Particulate Matter ( size
less than 10 um) or PM 10 ug/m3**
100 microgram per cubic meter
Suspended Particulate Matter ( size
less than 2.5um) or PM 2.5 ug/m3**
60 microgram per cubic meter
Oxides of Sulphur** 80 microgram per cubic meter
Oxides of Nitrogen** 80 microgram per cubic meter
Complied.
5.6 The applicant shall operate industrial plant/ air pollution control equipments very
efficiently and continuously so that the gaseous emission always conforms to the
standards specified in condition no. 5.2,5.4 & 5.5 above.
Complied.
5.7 The consent to operate the industrial plant shall lapse if at any time the
parameters of the gaseous emission are not within the tolerance limits specified in
the condition no 5.2,5.4 & 5.5 above.
Complied.
5.8 The applicant shall provide portholes, ladder, platform etc at chimney(s) for
monitoring the air emissions and the same shall be open for inspection to/ and for
use of Board’s staff. the chimney(s) vents attached to various sources of emission
shall be designed by numbers such as S-1, S-2 etc. and these shall be painted
/displayed to facilitate identification.
Complied.
5.9 The industry shall take adequate measures for control of noise levels from its own
sources within the premises so as to maintain ambient air quality standards in
respect of noise to less than 75 dB 9(a) during day time and 10 p.m. and night time
is reckoned between 10 p.m. and 6 a.m.
Complied.
5.10 The applicant shall install continuous / online monitoring system on the stacks for
the parameters such as PM10, SO2, NOx and PM 2.5.
Complied.
6 GENERAL CONDITIONS:
6.1 Any changes in personnel, equipment or working conditions as mentioned in the
consents form/order should immediately bye intimated to this board.
Complied.
6.2 Applicant shall also comply with the general conditions given in Annexure I. Agreed to the
condition.
6.3 Industry shall have to display the relevant information with regard to hazardous
wastes as indicated in the Court’s order in W.P. No. 657 of 1995 dated 14th
October 2003.
Agreed to the
condition.
6.4 Industry shall have to display on –line data outside the main factory gate ith
regard to quantity and nature of hazardous chemicals being handled in the plant,
Agreed to the
condition.
A- 45
including waste water and air emissions and solid hazardous waste generated
within the factory premises.
7. AUTHORIZATION FOR THE MANAGEMENT & HANDLING OF HAZARDOUS WASTES
Form-2 ( See rule 3 (c) & 5 (5))
7.1 Number of authorization: AWH – 68556. Complied.
7.2 M/S. GUJARAT DYESTUFF INDUSTRIES is herby granted an authorization to operate
facility for following hazardous wastes on the premises situated at PLOT NO: Z –
25,26,27, 28, SEZ DAHEJ-, DAHEJ – 392130, TAL: VAGRA, DIST: BHARUCH.
Sr.
No.
Type of Waste Quantity Category Disposal
1. ETP Sludge 0.05 MT/
Month
34.3 Collection, Storage,
Transportation and disposal at
TSDF, NECL, Nandesari.
2. Used Oil 0.025
MT/
Month
5.1 Collection, Storage,
Transportation, selling to
Register Re- Processors.
3. Bag and
Containers
100
Nos./
month
31.3 Collection, Storage,
Transportation, selling to
Authorized Recyclers.
Complied.
7.3 The authorization is granted to operate a facility for collection, storage,
incineration of Hazardous wastes at factory premises transportation and disposal
to TSDF by M/s. NECL, Nandesari.
Complied.
7.4 The authorization shall be force for a period up to 15/10/2019. Complied.
7.5 The authorization is subject to the conditions stated below and such other
conditions as may be specified in the rules from time to time under the
Environment (Protection) Act – 1986.
Agreed to the
condition.
7.6 The industry shall have to comply with the specific condition of the terms and
condition of Hazardous waste (M.H. & TM ) Rules, 2008 given in Annexure- A
attached herewith (No- 1to 9).
Agreed to the
condition.
7.7 The authorization shall be produced for inspection at the request of an officer
Authorized by the Gujarat Pollution Control Board.
Complied.
7.8 The persons authorized shall not rent, lend, sell and transfer of otherwise
transport the Hazardous waste without obtaining prior permission of the Gujarat
Pollution Control Board.
Agreed to the
condition.
7.9 Any unauthorized change in personnel, equipment or working conditions as
mentioned in the authorization order by the persons authorized shall constitute a
breach of this Authorization.
Agreed to the
condition.
7.10 It is the duty of the authorized person to take prior permission of the Gujarat
Pollution Control Board to close down the facility.
Agreed to the
condition.
7.11 An application for the renewal of an authorization shall be made as laid down in
rule 5 (6) (ii).
Agreed to the
condition.
7.12 Industry shall submit annual report within 15 days and sub squinty by 31st January
every year.
Agreed to the
condition.
7.13 Industry shall have to display the relevant information with regard to hazardous
waste as indicated in the Court’s order in W.P. No. 657 of 1995 dated 14th
October
2003.
Agreed to the
condition.
7.14 Industry shall have to display on-line data outside the main factory gate with
regard to and nature of hazardous chemicals being handled in the plant, including
waste water and air emission and hazardous waste generated within the factory
premises.
Agreed to the
condition.
8. GENERAL CONDITION:
A- 46
8.1 Any changes in personnel, equipment or working conditions as mentioned in the
consents Form/order should immediately be intimated to this board.
Agreed to the
condition.
8.2 Applicant shall also comply with the general conditions given in annexure I
attached herewith (NO: 1 to 38).
Agreed to the
condition.
8.3 The applicant shall not carry out any activities for which required clearances are
not obtained.
Complied.
8.4 If it is established by any competent authority that the damages caused due to
their industrial activities to any person or his property, in that case they are
obliged to pay the compensation as Determined by competent authority.
Agreed to the
condition.
8.5 Regular maintenance of the pipeline shall be carried out to avoid any spillage or
leakage during conveyance of the effluent.
Complied.
8.6 In case of power failure, separate stand by D.G. Set having power generation
capacity equivalent to the requirement of power to run the APCM system shall be
installed, so that it shall always be operated round the clock even in case of power
failure also. The unit shall not keep any bypass line or system for stack emission.
Complied.
8.7 The company shall make the arrangement for protection of possible fire hazard
during manufacturing process in material handling. Required fire fighting system
shall be provided.
Complied.
8.8 Training shall be imparted to all employees on safety and health aspect of
chemical handling. Pre-employment and routine periodical medical examinations
for all employees shall be undertaken on regular basis. Training to all employees
on handling of chemicals shall be imparted.
Agreed to the
condition.
8.9 Usage of Personnel Protection equipments (PPEs) by all employees/workers shall
be ensured.
Agreed to the
condition.
8.10 The applicant shall have to submit the returns in prescribed form regarding water
consumption and shall have to make payment for water cess to the board under
the water Cess Act- 1977
Agreed to the
condition.
8.11 The industry shall strictly comply with the rules and guideline under Manufacture,
Storage and Import of Hazardous chemicals shall be as per the Motor Vehicle Act
(MCA), 1989
Agreed to the
condition.
8.12 The company shall have to undertake and implement following measures:-
• Water conservation measures to minimize the fresh water consumption.
Metering system for water consumption.
• Cleaner production options.
• Reuse/ recycle of trade waste, ground (rain) water recharging, electricity
conservation.
• Use of solar or wind energy for lighting / heating purpose.
• Control of odour nuisance from the plant premises.
Agreed to the
condition.
8.13 The company shall have to keep baseline quality data of land, water and air shall
be required to submit GPCB with CTE/ CCA application.
Complied.
8.14 The company shall carry out regular monitoring of ground water quality within the
premises as well as around the impervious guard ponds. Separate logbook shall be
maintained. The data shall be submitted for each month to GPCB on or before 7th
day of succeeding month, and shall also comply with the instruction of GPCB in
case of deterioration if applicable.
Agreed to the
condition.
8.15 Handling, manufactured, storage and transport of hazardous chemicals shall be in
accordance with the Manufactured, storage and Import of Hazardous Chemicals
Rules, 1989.
Agreed to the
condition.
8.16 Transportation of effluent, solid waste or any other goods pertaining to treatment
activities, shall be carried out as per Central Motor Vehicle Rule – 1989 &
Hazardous Waste (Management and Handling & Trans Boundary Movement) –
Agreed to the
condition.
A- 47
Rule 2008.
8.17 The hazardous waste shall be handled as per the Hazardous Waste (Management
& Handling) Rules of the Environment (Protection) Act, 1986.
Agreed to the
condition.
8.18 On site and off site emergency plan as required under the Rules 13 & 14 of
Handling, manufacturing, storage and import of Hazardous chemical rules, 1989
shall be prepared and approval from Board shall be obtained.
Agreed to the
condition.
8.19 Periodic medical check-up of the workers shall be done and records maintained as
a measure to provide occupational health protection of the workers.
Agreed to the
condition.
8.20 Unit shall provide state of the art composite sampler and set up testing laboratory
facilities for collection, analysis of samples under the supervision of competent
technical personnel.
Agreed to the
condition.
8.21 The Environmental Unit/Cell shall be setup to ensure implementation and
monitoring of environment safe guards and other conditions stipulated by
statutory authorities. The Environmental Management Unit/Cell shall directly
report to the chief executive of the organization and shall works as a focal point
for internalizing environmental issues. These Cells/Units shall also coordinate the
exercise of the environmental audit and preparation of the environmental
statements.
Agreed to the
condition.
8.22 The environmental audit shall be carried out yearly and the environmental
statements pertaining to the previous year shall be submitted GPCB latest by 30th
September every year.
Agreed to the
condition.
8.23 Storm water shall not be mixed with the industrial effluent. Disposal system for
storm water shall provide separately.
Complied.
8.24 Good housekeeping shall be maintained within the premises. All pipes, valves and
drains shall be leak proof.
Complied.
8.25 The entire pipeline shall be protected from external corrosion/ damage. Complied.
8.26 Necessary clearance for the adequacy & safety measures shall be obtained from
the concerned authority.
Agreed to the
condition.
8.27 Unit shall comply with the provision of all the laws of land including safety,
disaster management prevention of contamination.
Complied.
8.28 The applicant shall have to submit the returns in prescribed form regarding water
consumption and shall have to make payment of water cess to the board under
the Water Cess Act -1977.
Agreed to the
condition.
8.29 In case of change of ownership/ management the name and address of the new
owners/ partners/ directors/ proprietor shall immediately be intimated to the
board.
Agreed to the
condition.
8.30 Adequate plantation shall be carried out all along the periphery of the industrial
premises in such a way that the density of plantation is at least 1000 tress per
acres and a green belt of 10 meters width is developed.
Complied.
8.31 The applicant shall however, not without the prior consent of the board bring into
use any new or altered outlet for the discharge of effluent or gaseous emission or
sewage waste from the proposed industrial plant. The applicant is required to
make applications to this board for this purpose in the prescribed forms under the
provisions of the Water Act – 1974, the Air Act – 1981 and the Environment
(Protection) Act – 1986.
Agreed to the
condition.
A- 48
ANNEXURE – 12
DO's & DON’Ts
DO’s and DON’Ts for Safer Operation
Do’s:
• Store used oil at proper place as per plant guidelines.
• Use lubricating oil carefully to avoid spillage on ground.
• Use lubricating oil as per requirement.
• Use minimum amount of water wherever it is required as per plant guidelines.
• Waste disposal system for all plants should be separate.
• Avoid spillage of liquid, hand gloves, cotton waste on road, which will cause
pollution. Recycle or dispose that material.
• Use cleaning equipment carefully. (i.e. cotton waste, oil & chemicals)
• Place all the equipments (i.e. Fire Hose, Rubber Pipe and Chisel) at proper place.
• Handling of chemicals should be as per plant guidelines to avoid undesired chemical
reaction.
• Safety training and correct use of PPE’s must for all the employees.
• Environment guidelines should follow during cleaning of vessels, Tank, channels etc.
• Follow shift in charge’s instructions during loading or unloading of chemicals.
• In case of fire or any accident, immediately inform responsible person,
• In case of emergency, inform operator as well as control room.
• Area of work during excavation, radiography, sand blasting shall be cordoned with
warning tags of "work in progress”, “no entry”, “radiography” in progress' etc.
• Switch off lights and computers when not in use.
• Shut the water cock properly when not in use.
• Always follow safety rule during the plant operation.
Do’s during shut down:
• All equipment, vessels, lines where hot work is envisaged shall be purged, flushed
thoroughly and positively isolated. Similar precautions should be taken for vessel
entry also.
• Back flow of materials from sewers, drains should be avoided by proper isolations.
• In case of confined space entry and other cleaning jobs etc. which are to be carried
out by the process department, vessel entry permit should be issued to immediate
supervising officer/operator by shift in charge. This permit should be renewed by
incoming shift in charge during every shift.
• Hoist, Platform, cages used for lifting persons or to send persons inside vessels by
such means must be of sound construction with wire ropes slings, etc. to avoid
failure.
• All steam, condensate, hot water connections should be made tight with clamps.
• Nitrogen hazard should be kept in mind. All nitrogen sources should be positively
isolated from vessels/confined spaces to avoid oxygen deficiency where vessel entry
is required.
A- 49
• All nitrogen hoses used for purging before vessel entry should be removed from
source/utility point.
• All underground sewers shall be flushed, protected from sparks.
• Full PPEs like PVC suits, gum boots, face shield & other required shall be used while
draining, flushing and other reclaiming activities to avoid burn, poisoning etc.
• Wet asbestos cloth/metallic plate should be used to collect flying sparks.
• Water, steam flushing, nitrogen blanketing shall be continued where spontaneous
combustion takes place. Precautions should be taken for pyrophoric nature of
material.
• Temporary electrical connections, cords, boards and other electrical fixtures should
be of sound material to prevent electrical shock.
• Oil spillage in the pit of oil slope tank should be cleaned with water/sand.
• Proper approach like aluminum ladder should be provided to reach to the platforms
of scaffolding and ladder must be tied.
• All clumps of scaffolding should be tightened properly and planks should be tied at
both ends and supported at proper distances along span to avoid sagging and failure.
• Always use safety belt while working at height of more than 2 meters and ensure
tieing the life line of safety belt with firm support.
• Ensure area cordoning for hot work, X-ray, excavation, hazard material temporary
storage.
• Ensure proper tagging of valves, switches etc to prevent its use.
• Ensure proper guidance to workman and make him aware about local area hazards
before start of the job.
• All welding machines should be provided with power isolation switch of suitable
rating.
• Portable electrical appliances/tools earthing should be in good working condition.
Insulation portion should be free from damages.
• All electrical cables should be joints free and connection taken by using three pin
plugs.
• While inserting fuse all care should be taken so that no one touches conductor to
avoid the shock to the persons.
• During hydro jetting work workers should wear hand gloves, safety helmet goggles
and PVC suit.
Don’ts:
• Do not use fire hydrant water for washing/bath purpose.
• Do not use water for cleaning purpose, use broomstick if possible.
• Do not wash or clean trolley, tractor or trucks which are used for chemical/fertilizer’s
transportation. Wash them at proper place.
• Smoking & carrying matchbox, cigarettes, lighter, bidis etc. are prohibited.
• Photography & carrying cameras/Mobile phones are strictly prohibited in all areas.
• Do not spill liquid or chemicals in open atmosphere.
• The use of Radio Active Source within the plant shall not be allowed without obtaining valid
permission/work permit and intimation in the form of a circular to all plant persons shall be
given in advance.
A- 50
• Unauthorized entry into any battery limit of plant is strictly prohibited.
• Sitting or walking on rail tracks, crossing between wagons, taking rest under stabled
wagons, crossing the rail through the openings underneath the stationary wagons
are strictly prohibited.
Don’ts during shut down:
• Do not use gasket or other blinds as it can fail during job. All blinds should be
metallic.
• No toxic/corrosive/irritating materials should remain plants or sections where hot
work is to be carried out.
• No hot work should be permitted in battery limits near sewers till areas have been
cleaned flushed properly.
• No hot work irrespective of place of area shall be done without valid permit.
• No combustible material shall be there in flare line for taking up of flare line job. Isolations
shall be ensured.
A- 51
ANNEXURE – 13
COPY OF TYPICAL MATERIAL SAFETY DATA SHEETS
Material Safety Data Sheet Acetic acid MSDS Section 1: Chemical Product and Company Identification Product Name: Acetic acid Catalog Codes: SLA3784, SLA1438, SLA2101, SLA3604,
SLA1258 CAS#: 64-19-7 RTECS: AF1225000 TSCA: TSCA 8(b) inventory: Acetic acid CI#: Not applicable. Synonym: Acetic acid; glacial acetic acid Chemical Name: Acetic Acid, Glacial Chemical Formula: C2-H4-O2 Contact Information: Sciencelab.com, Inc. 14025 Smith Rd. Houston, Texas 77396 US Sales: 1-800-901-7247 International Sales: 1-281-441-4400 Order Online: ScienceLab.com CHEMTREC (24HR Emergency Telephone), call: 1-800-424-9300 International CHEMTREC, call: 1-703-527-3887 For non-emergency assistance, call: 1-281-441-4400
Section 2: Composition and Information on Ingredients Composition: Name CAS # % by Weight Acetic acid 64-19-7 100 Toxicological Data on Ingredients: Acetic acid: ORAL (LD50): Acute: 3310 mg/kg [Rat]. 4960 mg/kg [Mouse]. 3530 mg/kg [Rat]. DERMAL (LD50): Acute: 1060 mg/kg [Rabbit]. VAPOR (LC50): Acute: 5620 ppm 1 hours [Mouse].
Section 3: Hazards Identification Potential Acute Health Effects: Very hazardous in case of skin contact (irritant), of eye contact (irritant), of ingestion, of inhalation. Hazardous in case of skin contact (corrosive, permeator), of eye contact (corrosive). Liquid or spray mist may produce tissue damage particularly on mucous membranes of eyes, mouth and respiratory tract. Skin contact may produce burns. Inhalation of the spray mist may produce severe irritation of respiratory tract, characterized by coughing, choking, or shortness of breath. Inflammation of the eye is characterized by redness, watering, and itching. Skin inflammation is characterized by itching, scaling, reddening, or, occasionally, blistering. Potential Chronic Health Effects: Hazardous in case of skin contact (irritant), of ingestion, of inhalation. CARCINOGENIC EFFECTS: Not available. MUTAGENIC EFFECTS: Mutagenic for mammalian somatic cells. Mutagenic for bacteria and/or yeast. TERATOGENIC EFFECTS: Not available. DEVELOPMENTAL TOXICITY: Not available. The substance may be toxic to kidneys, mucous membranes, skin, teeth. Repeated or prolonged exposure to the substance can produce target organs damage. Repeated
A- 52
or prolonged contact with spray mist may produce chronic eye irritation and severe skin irritation. Repeated or prolonged exposure to spray mist may produce respiratory tract irritation leading to frequent attacks of bronchial infection.
Section 4: First Aid Measures Eye Contact: Check for and remove any contact lenses. In case of contact, immediately flush eyes with plenty of water for at least 15 minutes. Cold water may be used. Get medical attention immediately. Skin Contact: In case of contact, immediately flush skin with plenty of water for at least 15 minutes while removing contaminated clothing and shoes. Cover the irritated skin with an emollient. Cold water may be used.Wash clothing before reuse. Thoroughly clean shoes before reuse. Get medical attention immediately. Serious Skin Contact: Wash with a disinfectant soap and cover the contaminated skin with an anti-bacterial cream. Seek immediate medical attention. Inhalation:
If inhaled, remove to fresh air. If not breathing, give artificial respiration. If breathing is difficult, give oxygen. Get medical attention immediately. Serious Inhalation: Evacuate the victim to a safe area as soon as possible. Loosen tight clothing such as a collar, tie, belt or waistband. If breathing is difficult, administer oxygen. If the victim is not breathing, perform mouth-to-mouth resuscitation. WARNING: It may be hazardous to the person providing aid to give mouth-to-mouth resuscitation when the inhaled material is toxic, infectious or corrosive. Seek immediate medical attention. Ingestion:
Do NOT induce vomiting unless directed to do so by medical personnel. Never give anything by mouth to an unconscious person. Loosen tight clothing such as a collar, tie, belt or waistband. Get medical attention if symptoms appear. Serious Ingestion: Not available.
Section 5: Fire and Explosion Data Flammability of the Product: Flammable. Auto-Ignition Temperature: 463°C (865.4°F) Flash Points: CLOSED CUP: 39°C (102.2°F). OPEN CUP: 43°C (109.4°F). Flammable Limits: LOWER: 4% UPPER: 19.9% Products of Combustion: These products are carbon oxides (CO, CO2). Fire Hazards in Presence of Various Substances: Flammable in presence of open flames and sparks, of heat. Slightly flammable to flammable in presence of oxidizing materials, of metals. Explosion Hazards in Presence of Various Substances: Risks of explosion of the product in presence of mechanical impact: Not available. Risks of explosion of the product in presence of static discharge: Not available. Slightly explosive in presence of oxidizing materials. Fire Fighting Media and Instructions:
Flammable liquid, soluble or dispersed in water. SMALL FIRE: Use DRY chemical powder. LARGE FIRE: Use alcohol foam, water spray or fog. Cool containing vessels with water jet in order to prevent pressure build-up, autoignition or explosion. Special Remarks on Fire Hazards: Reacts with metals to produces flammable hydrogen gas. It will ignite on contact with potassium-tert-butoxide. A mixture of ammonium nitrate and acetic acid ignites when warmed, especially if warmed.
A- 53
Special Remarks on Explosion Hazards: Acetic acid vapors may form explosive mixtures with air. Reactions between acetic acid and the following materials are potentially explosive: 5-azidotetrazole, bromine pentafluoride, chromium trioxide, hydrogen peroxide, potassium permanganate, sodium peroxide, and phorphorus trichloride. Dilute acetic acid and dilute hydrogen can undergo an exothermic reaction if heated, forming peracetic acid which is explosive at 110 degrees C. Reaction between chlorine trifluoride and acetic acid is very violent, sometimes explosive.
Section 6: Accidental Release Measures Small Spill: Dilute with water and mop up, or absorb with an inert dry material and place in an appropriate waste disposal container. If necessary: Neutralize the residue with a dilute solution of sodium carbonate. Large Spill: Flammable liquid. Corrosive liquid. Keep away from heat. Keep away from sources of ignition. Stop leak if without risk. If the product is in its solid form: Use a shovel to put the material into a convenient waste disposal container. If the product is in its liquid form: Absorb with DRY earth, sand or other non-combustible material. Do not get water inside container. Absorb with an inert material and put the spilled material in an appropriate waste disposal. Do not touch spilled material. Use water spray curtain to divert vapor drift. Prevent entry into sewers, basements or confined areas; dike if needed. Call for assistance on disposal. Neutralize the residue with a dilute solution of sodium carbonate. Be careful that the product is not present at a concentration level above TLV. Check TLV on the MSDS and with local authorities.
Section 7: Handling and Storage Precautions: \Keep away from heat. Keep away from sources of ignition. Ground all equipment containing material. Do not ingest. Do not breathe gas/fumes/ vapor/spray. Never add water to this product. In case of insufficient ventilation, wear suitable respiratory equipment. If ingested, seek medical advice immediately and show the container or the label. Avoid contact with skin and eyes. Keep away from incompatibles such as oxidizing agents, reducing agents, metals, acids, alkalis. Storage: Store in a segregated and approved area. Keep container in a cool, well-ventilated area. Keep container tightly closed and sealed until ready for use. Avoid all possible sources of ignition (spark or flame).
Section 8: Exposure Controls/Personal Protection Engineering Controls: Provide exhaust ventilation or other engineering controls to keep the airborne concentrations of vapors below their respective threshold limit value. Ensure that eyewash stations and safety showers are proximal to the work-station location. Personal Protection: Splash goggles. Synthetic apron. Vapor respirator. Be sure to use an approved/certified respirator or equivalent. Gloves (impervious). Personal Protection in Case of a Large Spill: Splash goggles. Full suit. Vapor respirator. Boots. Gloves. A self contained breathing apparatus should be used to avoid inhalation of the product. Suggested protective clothing might not be sufficient; consult a specialist BEFORE handling this product. Exposure Limits:
A- 54
TWA: 10 STEL: 15 (ppm) [Australia] TWA: 25 STEL: 27 (mg/m3) [Australia] TWA: 10 STEL: 15 (ppm) from NIOSH TWA: 25 STEL: 37 (mg/m3) from NIOSH TWA: 10 STEL: 15 (ppm) [Canada] TWA: 26 STEL: 39 (mg/m3) [Canada] TWA: 25 STEL: 37 (mg/m3) TWA: 10 STEL: 15 (ppm) from ACGIH (TLV) [United States] [1999] TWA: 10 (ppm) from OSHA (PEL) [United States] TWA: 25 (mg/m3) from OSHA (PEL) [United States]Consult local authorities for acceptable exposure limits.
Section 9: Physical and Chemical Properties Physical state and appearance: Liquid. Odor: Pungent, vinegar-like, sour (Strong.) Taste: Vinegar, sour (Strong.) Molecular Weight: 60.05 g/mole Color: Colorless. Clear (Light.) pH (1% soln/water): 2 [Acidic.] Boiling Point: 118.1°C (244.6°F) Melting Point: 16.6°C (61.9°F) Critical Temperature: 321.67°C (611°F) Specific Gravity: 1.049 (Water = 1) Vapor Pressure: 1.5 kPa (@ 20°C) Vapor Density: 2.07 (Air = 1) Volatility: Not available. Odor Threshold: 0.48 ppm Water/Oil Dist. Coeff.: The product is more soluble in water; log(oil/water) = -0.2 Ionicity (in Water): Not available. Dispersion Properties: See solubility in water, diethyl ether, acetone. Solubility: Easily soluble in cold water, hot water. Soluble in diethyl ether, acetone. Miscible with Glycerol, alcohol, Benzene, Carbon Tetrachloride. Practically insoluble in Carbon Disulfide.
Section 10: Stability and Reactivity Data Stability: The product is stable. Instability Temperature: Not available. Conditions of Instability: Heat, ignition sources, incompatible materials Incompatibility with various substances: Reactive with oxidizing agents, reducing agents, metals,
acids, alkalis. Corrosivity: Highly corrosive in presence of stainless steel(304). Slightly corrosive in presence of aluminum, of copper. Non-corrosive in presence of stainless steel(316). Special Remarks on Reactivity: Reacts violently with strong oxidizing agents, acetaldehyde, and acetic anhydride. Material can react with metals, strong bases, amines, carbonates, hydroxides, phosphates, many oxides,cyanides, sulfides, chromic acid, nitric acid, hydrogen peroxide, carbonates. ammonium nitrate, ammonium thiosulfate, chlorine trifluoride, chlorosulfonic acid, perchloric acid, permanganates, xylene, oleum, potassium hydroxide, sodium hydroxide, phosphorus isocyanate, ethylenediamine, ethylene imine. Special Remarks on Corrosivity: Moderate corrosive effect on bronze. No corrosion data on brass Polymerization: Will not occur.
Section 11: Toxicological Information Routes of Entry: Absorbed through skin. Dermal contact. Eye contact. Inhalation. Ingestion. Toxicity to Animals:
WARNING: THE LC50 VALUES HEREUNDER ARE ESTIMATED ON THE BASIS OF A 4-HOUR EXPOSURE. Acute oral toxicity (LD50): 3310 mg/kg [Rat]. Acute dermal toxicity (LD50): 1060 mg/kg [Rabbit]. Acute toxicity of the vapor (LC50): 5620 1 hours [Mouse].
A- 55
Chronic Effects on Humans: MUTAGENIC EFFECTS: Mutagenic for mammalian somatic cells. Mutagenic for bacteria and/or yeast. May cause damage to the following organs: kidneys, mucous membranes, skin, teeth. Other Toxic Effects on Humans:
Extremely hazardous in case of inhalation (lung corrosive). Very hazardous in case of skin contact (irritant), of ingestion, . Hazardous in case of skin contact (corrosive, permeator), of eye contact (corrosive). Special Remarks on Toxicity to Animals: Not available. Special Remarks on Chronic Effects on Humans: May affect genetic material and may cause
reproductive effects based on animal data. No human data found. Special Remarks on other Toxic Effects on Humans: Acute Potential Health Effects: Skin: Extremely irritating and corrosive. Causes skin irritation (reddening and itching, inflammation). May cause blistering , tissue damage and burns. Eyes: Extremely irritating and corrosive. Causes eye irritation, lacrimation, redness, and pain. May cause burns, blurred vision, conjunctivitis, conjunctival and corneal destruction and permanent injury. Inhalation: Causes severe respiratory tract irritation. Affects the sense organs (nose, ear, eye, taste), and blood. May cause chemical pneumonitis, bronchitis, and pulmonary edema. Severe exposure may result in lung tissue damage and corrosion (ulceration) of the mucous membranes. Inhalation may also cause rhinitis, sneezing, coughing, oppressive feeling in the chest or chest pain, dyspnea, wheezing, tachypnea, cyanosis, salivation, nausea, giddiness, muscular weakness. Ingestion: Moderately toxic. Corrosive. Causes gastrointestinal tract irritation (burning and pain of the mouth, throat, and abdomen, coughing, ulceration, bleeding, nausea, abdomial spasms, vomiting, hematemesis, diarrhea. May Also affect the liver (impaired liver function), behavior (convulsions, giddines, muscular weakness), and the urinary system - kidneys (Hematuria, Albuminuria, Nephrosis, acute renal failure, acute tubular necrosis). May also cause dyspnea or asphyxia. May also lead to shock, coma and death. Chronic Potential Health Effects: Chronic exposure via ingestion may cause blackening or erosion of the teeth and jaw necrosis, pharyngitis, and gastritis. It may also behavior (similar to acute ingestion), and metabolism (weight loss). Chronic exposure via inhalation may cause asthma and/or bronchitis with cough, phlegm, and/or shortness of breath . It may also affect the blood (decreased leukocyte count), and urinary system (kidneys). Repeated or prolonged skin contact may cause thickening, blackening, and cracking of the skin.
Section 12: Ecological Information Ecotoxicity: Ecotoxicity in water (LC50): 423 mg/l 24 hours [Fish (Goldfish)]. 88 ppm 96 hours [Fish (fathead minnow)]. 75 ppm 96 hours [Fish (bluegill sunfish)]. >100 ppm 96 hours [Daphnia]. BOD5 and COD: BOD-5: 0.34-0.88 g oxygen/g Products of Biodegradation: Possibly hazardous short term degradation products are not likely. However, long term degradation products may arise. Toxicity of the Products of Biodegradation: The products of degradation are less toxic than the
product itself. Special Remarks on the Products of Biodegradation: Not available.
Section 13: Disposal Considerations Waste Disposal: Waste must be disposed of in accordance with federal, state and local environmental control regulations.
A- 56
Section 14: Transport Information DOT Classification: CLASS 3: Flammable liquid. Class 8: Corrosive material Identification: : Acetic Acid, Glacial UNNA: 2789 PG: II Special Provisions for Transport: Not available.
Section 15: Other Regulatory Information Federal and State Regulations: New York release reporting list: Acetic acid Rhode Island RTK hazardous substances: Acetic acid Pennsylvania RTK: Acetic acid Florida: Acetic acid Minnesota: Acetic acid Massachusetts RTK: Acetic acid New Jersey: Acetic acid California Director's List of Hazardous Subtances (8 CCR 339): Acetic acid TSCA 8(b) inventory: Acetic acid CERCLA: Hazardous substances.: Acetic acid: 5000 lbs. (2268 kg) Other Regulations: OSHA: Hazardous by definition of Hazard Communication Standard (29 CFR 1910.1200). EINECS: This product is on the European Inventory of Existing Commercial Chemical Substances. Other Classifications: WHMIS (Canada): CLASS B-3: Combustible liquid with a flash point between 37.8°C (100°F) and 93.3°C (200°F). CLASS E: Corrosive liquid. DSCL (EEC):
R10- Flammable. R35- Causes severe burns. S23- Do not breathe gas/fumes/vapour/spray [***] S26- In case of contact with eyes, rinse immediately with plenty of water and seek medical advice. S45- In case of accident or if you feel unwell, seek medical advice immediately (show the label where possible). HMIS (U.S.A.): Health Hazard: 3 Fire Hazard: 2 Reactivity: 0 Personal Protection: H National Fire Protection Association (U.S.A.): Health: 3 Flammability: 2 Reactivity: 0 Specific hazard: Protective Equipment: Gloves (impervious). Synthetic apron. Vapor respirator. Be sure to use an approved/certified respirator or equivalent. Wear appropriate respirator when ventilation is inadequate. Splash goggles.
Section 16: Other Information References: Not available. Other Special Considerations: Not available. Created: 10/09/2005 03:35 PM Last Updated: 05/21/2013 12:00 PM The information above is believed to be accurate and represents the best information currently available to us. However, we make no warranty of merchantability or any other warranty, express or implied, with respect to such information, and we assume no liability resulting from its use. Users should make their own investigations to determine the suitability of the information for their particular purposes. In no event shall ScienceLab.com be liable for any claims, losses, or damages of any third party or for lost profits or any special, indirect, incidental, consequential or exemplary damages, howsoever arising, even if ScienceLab.com has been advised of the possibility of such damages.
A- 57
Material Safety Data Sheet Acetic anhydride MSDS Section 1: Chemical Product and Company Identification Product Name: Acetic anhydride Catalog Codes: SLA1693 CAS#: 108-24-7 RTECS: AK1925000 TSCA: TSCA 8(b) inventory: Acetic anhydride CI#: Not available. Synonym: Chemical Formula: (CH3CO)2) Contact Information: Sciencelab.com, Inc. 14025 Smith Rd. Houston, Texas 77396 US Sales: 1-800-901-7247 International Sales: 1-281-441-4400 Order Online: ScienceLab.com CHEMTREC (24HR Emergency Telephone), call: 1-800-424-9300 International CHEMTREC, call: 1-703-527-3887 For non-emergency assistance, call: 1-281-441-4400
Section 2: Composition and Information on Ingredients Composition: Name CAS # % by Weight
Acetic anhydride 108-24-7 100 Toxicological Data on Ingredients: Acetic anhydride: ORAL (LD50): Acute: 1780 mg/kg [Rat].
DERMAL (LD50): Acute: 4000 mg/kg [Rabbit].
Section 3: Hazards Identification Potential Acute Health Effects: Extremely hazardous in case of skin contact (irritant), of eye contact (irritant), of ingestion, of inhalation. Very hazardous in case of skin contact (corrosive). Hazardous in case of skin contact (permeator). Liquid or spray mist may produce tissue damage particularly on mucous membranes of eyes, mouth and respiratory tract. Skin contact may produce burns. Inhalation of the spray mist may produce severe irritation of respiratory tract, characterized by coughing, choking, or shortness of breath. Inflammation of the eye is characterized by redness, watering, and itching. Skin inflammation is characterized by itching, scaling, reddening, or, occasionally, blistering. Potential Chronic Health Effects: CARCINOGENIC EFFECTS: Not available. MUTAGENIC EFFECTS: Not available. TERATOGENIC EFFECTS: Not available. DEVELOPMENTAL TOXICITY: Not available. The substance is toxic to lungs, mucous membranes. Repeated or prolonged exposure to the substance can produce target organs damage. Repeated or prolonged contact with spray mist may produce chronic eye irritation and severe skin irritation. Repeated or prolonged exposure to spray mist may produce respiratory tract irritation leading to frequent attacks of bronchial infection.
Section 4: First Aid Measures Eye Contact: Check for and remove any contact lenses. In case of contact, immediately flush eyes with plenty of water for at least 15 minutes. Get medical attention immediately. Skin Contact:
A- 58
In case of contact, immediately flush skin with plenty of water for at least 15 minutes while removing contaminated clothing and shoes. Cover the irritated skin with an emollient. Wash clothing before reuse. Thoroughly clean shoes before reuse. Get medical attention immediately. Serious Skin Contact: Wash with a disinfectant soap and cover the contaminated skin with an anti-bacterial cream. Seek immediate medical attention. Inhalation:
If inhaled, remove to fresh air. If not breathing, give artificial respiration. If breathing is difficult, give oxygen. Get medical attention immediately. Serious Inhalation: Evacuate the victim to a safe area as soon as possible. Loosen tight clothing such as a collar, tie, belt or waistband. If breathing is difficult, administer oxygen. If the victim is not breathing, perform mouth-to-mouth resuscitation. WARNING: It may be hazardous to the person providing aid to give mouth-to-mouth resuscitation when the inhaled material is toxic, infectious or corrosive. Seek immediate medical attention. Ingestion:
Do NOT induce vomiting unless directed to do so by medical personnel. Never give anything by mouth to an unconscious person. If large quantities of this material are swallowed, call a physician immediately. Loosen tight clothing such as a collar, tie, belt or waistband. Serious Ingestion: Not available.
Section 5: Fire and Explosion Data Flammability of the Product: Flammable. Auto-Ignition Temperature: 316°C (600.8°F) Flash Points: CLOSED CUP: 49°C (120.2°F). OPEN CUP: 51°C (123.8°F). Flammable Limits: LOWER: 2.7% UPPER: 10.3% Products of Combustion: These products are carbon oxides (CO, CO2). Fire Hazards in Presence of Various Substances: Flammable in presence of heat. Explosion Hazards in Presence of Various Substances: Risks of explosion of the product in presence of mechanical impact: Not available. Risks of explosion of the product in presence of static discharge: Not available. Fire Fighting Media and Instructions:
Flammable liquid. SMALL FIRE: Use DRY chemical powder. LARGE FIRE: Use alcohol foam, water spray or fog. Cool containing vessels with water jet in order to prevent pressure build-up, autoignition or explosion. Special Remarks on Fire Hazards: Not available. Special Remarks on Explosion Hazards: Not available.
Section 6: Accidental Release Measures Small Spill: Absorb with an inert material and put the spilled material in an appropriate waste
disposal. Large Spill: Flammable liquid. Corrosive liquid. Keep away from heat. Keep away from sources of ignition. Stop leak if without risk. Absorb with DRY earth, sand or other non-combustible material. Do not get water inside container. Do not touch spilled material. Use water spray curtain to divert vapor drift. Prevent entry into sewers, basements or confined areas; dike if needed. Call for assistance on disposal. Be careful that the product is not present at a concentration level above TLV. Check TLV on the MSDS and with local authorities.
Section 7: Handling and Storage Precautions:
A- 59
Keep container dry. Keep away from heat. Keep away from sources of ignition. Ground all equipment containing material. Do not ingest. Do not breathe gas/fumes/ vapor/spray. Never add water to this product. In case of insufficient ventilation, wear suitable respiratory equipment. If ingested, seek medical advice immediately and show the container or the label. Avoid contact with skin and eyes. Storage:
Store in a segregated and approved area. Keep container in a cool, well-ventilated area. Keep container tightly closed and sealed until ready for use. Avoid all possible sources of ignition (spark or flame).
Section 8: Exposure Controls/Personal Protection Engineering Controls:
Provide exhaust ventilation or other engineering controls to keep the airborne concentrations of vapors below their respective threshold limit value. Ensure that eyewash stations and safety showers are proximal to the work-station location. Personal Protection:
Face shield. Full suit. Vapor respirator. Be sure to use an approved/certified respirator or equivalent. Gloves. Boots. Personal Protection in Case of a Large Spill: Splash goggles. Full suit. Vapor respirator. Boots. Gloves. A self contained breathing apparatus should be used to avoid inhalation of the product. Suggested protective clothing might not be sufficient; consult a specialist BEFORE handling this product. Exposure Limits: TWA: 5 TWA: 20 Consult local authorities for acceptable exposure limits.
Section 9: Physical and Chemical Properties Physical state and appearance: Liquid. Odor: Strong. Taste: Strong. Molecular Weight: 102.09 g/mole Color: Light. pH (1% soln/water): Not available. Boiling Point: 139.9°C (283.8°F) Melting Point: -73.1 (-99.6°F) Critical Temperature: Not available. Specific Gravity: 1.08 (Water = 1) Vapor Pressure: 0.5 kPa (@ 20°C) Vapor Density: 3.52 (Air = 1) Volatility: Not available. Odor Threshold: 0.1 ppm Water/Oil Dist. Coeff.: Not available. Ionicity (in Water): Not available. Dispersion Properties: Not available. Solubility: Not available.
Section 10: Stability and Reactivity Data Stability: The product is stable. Instability Temperature: Not available. Conditions of Instability: Not available. Incompatibility with various substances: Not available. Corrosivity: Not available. Special Remarks on Reactivity: Not available. Special Remarks on Corrosivity: Not available. Polymerization: Will not occur.
Section 11: Toxicological Information Routes of Entry: Dermal contact. Eye contact. Inhalation. Ingestion. Toxicity to Animals:
A- 60
WARNING: THE LC50 VALUES HEREUNDER ARE ESTIMATED ON THE BASIS OF A 4-HOUR EXPOSURE. Acute oral toxicity (LD50): 1780 mg/kg [Rat]. Acute dermal toxicity (LD50): 4000 mg/kg [Rabbit]. Acute toxicity of the vapor (LC50): 1000 4 hours [Rat]. Chronic Effects on Humans: Causes damage to the following organs: lungs, mucous membranes. Other Toxic Effects on Humans: Extremely hazardous in case of skin contact (irritant), of ingestion, . Very hazardous in case of skin contact (corrosive). Hazardous in case of skin contact (permeator), of eye contact (corrosive), of inhalation (lung corrosive). Special Remarks on Toxicity to Animals: Not available. Special Remarks on Chronic Effects on Humans: Not available. Special Remarks on other Toxic Effects on Humans: Not available.
Section 12: Ecological Information Ecotoxicity: Not available. BOD5 and COD: Not available. Products of Biodegradation:
Possibly hazardous short term degradation products are not likely. However, long term degradation products may arise. Toxicity of the Products of Biodegradation: The products of degradation are less toxic than the product itself. Special Remarks on the Products of Biodegradation: Not available.
Section 13: Disposal Considerations Waste Disposal:
Section 14: Transport Information DOT Classification: Class 8: Corrosive material Identification: : Acetic Anhydride UNNA: UN1715 PG: II Special Provisions for Transport: Not available.
Section 15: Other Regulatory Information Federal and State Regulations:
Pennsylvania RTK: Acetic anhydride Massachusetts RTK: Acetic anhydride TSCA 8(b) inventory: Acetic anhydride CERCLA: Hazardous substances.: Acetic anhydride Other Regulations: OSHA: Hazardous by definition of Hazard Communication Standard (29 CFR 1910.1200). Other Classifications: WHMIS (Canada):
CLASS B-3: Combustible liquid with a flash point between 37.8°C (100°F) and 93.3°C (200°F). CLASS E: Corrosive liquid. DSCL (EEC): R10- Flammable. R20/22- Harmful by inhalation and if swallowed. R34- Causes burns. HMIS (U.S.A.): Health Hazard: 3 Fire Hazard: 2 Reactivity: 0 Personal Protection: National Fire Protection Association (U.S.A.): Health: 3 Flammability: 2 Reactivity: 1 Specific hazard: Protective Equipment: Gloves. Full suit. Vapor respirator. Be sure to use an approved/certified respirator or equivalent. Wear appropriate respirator when ventilation is inadequate. Face shield.
Section 16: Other Information References: Not available. Other Special Considerations: Not available.
A- 61
Created: 10/10/2005 08:13 PM Last Updated: 05/21/2013 12:00 PM The information above is believed to be accurate and represents the best information currently available to us. However, we make no warranty of merchantability or any other warranty, express or implied, with respect to such information, and we assume no liability resulting from its use. Users should make their own investigations to determine the suitability of the information for their particular purposes. In no event shall ScienceLab.com be liable for any claims, losses, or damages of any third party or for lost profits or any special, indirect, incidental, consequential or exemplary damages, howsoever arising, even if ScienceLab.com has been advised of the possibility of such damages.
A- 62
Material Safety Data Sheet Triethyl phosphate MSDS Section 1: Chemical Product and Company Identification Product Name: Triethyl phosphate Catalog Codes: SLT1570 CAS#: 78-40-0 RTECS: TC7900000 TSCA: TSCA 8(b) inventory: No products were found. CI#: Not available. Synonym: Chemical Name: Not available. Chemical Formula: C6H15O4P Contact Information: Sciencelab.com, Inc. 14025 Smith Rd. Houston, Texas 77396 US Sales: 1-800-901-7247 International Sales: 1-281-441-4400 Order Online: ScienceLab.com CHEMTREC (24HR Emergency Telephone), call:
1-800-424-9300 International CHEMTREC, call: 1-703-527-3887 For non-emergency assistance, call: 1-281-441-4400
Section 2: Composition and Information on Ingredients Composition: Name CAS # % by Weight Triethyl phosphate 78-40-0 100 Toxicological Data on Ingredients: Triethyl phosphate: ORAL (LD50): Acute: 1500 mg/kg [Mouse]. 1600 mg/kg [Rat].
Section 3: Hazards Identification Potential Acute Health Effects: Hazardous in case of skin contact (irritant), of eye contact (irritant), of ingestion, of inhalation (lung irritant). Slightly hazardous in case of skin contact (permeator), . Potential Chronic Health Effects:
CARCINOGENIC EFFECTS: Not available. MUTAGENIC EFFECTS: Not available. TERATOGENIC EFFECTS: Not available. DEVELOPMENTAL TOXICITY: Not available. Repeated or prolonged exposure is not known to aggravate medical condition.
Section 4: First Aid Measures Eye Contact: Check for and remove any contact lenses. Do not use an eye ointment. Seek medical attention. Skin Contact: After contact with skin, wash immediately with plenty of water. Gently and thoroughly wash the contaminated skin with running water and non-abrasive soap. Be particularly careful to clean folds, crevices, creases and groin. Cover the irritated skin with an emollient. If irritation persists, seek medical attention. Wash contaminated clothing before reusing. Serious Skin Contact: Wash with a disinfectant soap and cover the contaminated skin with an anti-bacterial cream. Seek immediate medical attention. Inhalation: Allow the victim to rest in a well ventilated area. Seek immediate medical attention. Serious Inhalation: Not available. Ingestion:
Do not induce vomiting. Examine the lips and mouth to ascertain whether the tissues are damaged, a possible indication that
A- 63
the toxic material was ingested; the absence of such signs, however, is not conclusive. Loosen tight clothing such as a collar, tie, belt or waistband. If the victim is not breathing, perform mouth-to-mouth resuscitation. Seek immediate medical attention. Serious Ingestion: Not available.
Section 5: Fire and Explosion Data Flammability of the Product: May be combustible at high temperature. Auto-Ignition Temperature: 480°C (896°F) Flash Points: OPEN CUP: 130°C (266°F). Flammable Limits: LOWER: 1.2% UPPER: 10% Products of Combustion: These products are carbon oxides (CO, CO2). Fire Hazards in Presence of Various Substances: Not available. Explosion Hazards in Presence of Various Substances:
Risks of explosion of the product in presence of mechanical impact: Not available. Risks of explosion of the product in presence of static discharge: Not available. Fire Fighting Media and Instructions: SMALL FIRE: Use DRY chemical powder. LARGE FIRE: Use water spray, fog or foam. Do not use water jet. Special Remarks on Fire Hazards: Not available. Special Remarks on Explosion Hazards: Not available.
Section 6: Accidental Release Measures Small Spill: Absorb with an inert material and put the spilled material in an appropriate waste
disposal. Large Spill:
Absorb with an inert material and put the spilled material in an appropriate waste disposal. Finish cleaning by spreading water on the contaminated surface and allow to evacuate through the sanitary system.
Section 7: Handling and Storage Precautions:
Keep away from heat. Keep away from sources of ignition. Empty containers pose a fire risk, evaporate the residue under a fume hood. Ground all equipment containing material. Do not ingest. Do not breathe gas/fumes/ vapour/spray. Wear suitable protective clothing If ingested, seek medical advice immediately and show the container or the label. Avoid contact with skin and eyes Storage:
Keep container dry. Keep in a cool place. Ground all equipment containing material. Keep container tightly closed. Keep in a cool, well-ventilated place. Combustible materials should be stored away from extreme heat and away from strong oxidizing agents.
Section 8: Exposure Controls/Personal Protection Engineering Controls:
Provide exhaust ventilation or other engineering controls to keep the airborne concentrations of vapors below their respective threshold limit value. Ensure that eyewash stations and safety showers are proximal to the work-station location. Personal Protection:
Splash goggles. Lab coat. Vapor respirator. Be sure to use an approved/certified respirator or equivalent. Gloves. Personal Protection in Case of a Large Spill: Splash goggles. Full suit. Vapor respirator. Boots. Gloves. A self contained breathing apparatus should be used to avoid inhalation of the product. Suggested protective clothing might not be sufficient; consult a specialist BEFORE handling this product. Exposure Limits: Not available.
A- 64
Section 9: Physical and Chemical Properties Physical state and appearance: Liquid. Odor: Pleasant ester-like. Taste: Not available. Molecular Weight: 182.16 g/mole Color: Not available. pH (1% soln/water): Not available. Boiling Point: 215°C (419°F) Melting Point: -56°C (-68.8°F) Critical Temperature: Not available. Specific Gravity: 1.072 (Water = 1) Vapor Pressure: Not available. Vapor Density: 6.28 (Air = 1) Volatility: Not available. Odor Threshold: Not available. Water/Oil Dist. Coeff.: Not available. Ionicity (in Water): Not available. Dispersion Properties: Not available. Solubility: Not available.
Section 10: Stability and Reactivity Data Stability: The product is stable. Instability Temperature: Not available. Conditions of Instability: Not available. Incompatibility with various substances: Not available. Corrosivity: Non-corrosive in presence of glass. Special Remarks on Reactivity: Not available. Special Remarks on Corrosivity: Not available. Polymerization: No.
Section 11: Toxicological Information Routes of Entry: Eye contact. Ingestion. Toxicity to Animals: Acute oral toxicity (LD50): 1500 mg/kg [Mouse]. Chronic Effects on Humans: Not available. Other Toxic Effects on Humans:
Hazardous in case of skin contact (irritant), of ingestion, of inhalation (lung irritant). Slightly hazardous in case of skin contact (permeator), . Special Remarks on Toxicity to Animals: Not available. Special Remarks on Chronic Effects on Humans: Not available. Special Remarks on other Toxic Effects on Humans: Not available.
Section 12: Ecological Information Ecotoxicity: Not available. BOD5 and COD: Not available. Products of Biodegradation:
Possibly hazardous short term degradation products are not likely. However, long term degradation products may arise. Toxicity of the Products of Biodegradation: The products of degradation are more toxic. Special Remarks on the Products of Biodegradation: Not available.
Section 13: Disposal Considerations Waste Disposal:
Section 14: Transport Information DOT Classification: Not a DOT controlled material (United States). Identification: Not applicable. Special Provisions for Transport: Not applicable.
Section 15: Other Regulatory Information Federal and State Regulations: Connecticut carcinogen reporting list.: Triethyl phosphate TSCA 8(b) inventory: No products were found. Other Regulations: EINECS: This product is on the European Inventory of Existing Commercial
Chemical Substances.
A- 65
Other Classifications: WHMIS (Canada): Not controlled under WHMIS (Canada). DSCL (EEC): R22- Harmful if swallowed. R36/37/38- Irritating to eyes, respiratory system and skin. HMIS (U.S.A.): Health Hazard: 2 Fire Hazard: 1 Reactivity: 0 Personal Protection: h National Fire Protection Association (U.S.A.): Health: 2 Flammability: 1 Reactivity: 0 Specific hazard: Protective Equipment: Gloves. Lab coat. Vapor respirator. Be sure to use an approved/certified respirator or equivalent. Splash goggles.
Section 16: Other Information References: Not available. Other Special Considerations: Not available. Created: 10/10/2005 12:08 AM Last Updated: 05/21/2013 12:00 PM The information above is believed to be accurate and represents the best information currently available to us. However, we make no warranty of merchantability or any other warranty, express or implied, with respect to such information, and we assume no liability resulting from its use. Users should make their own investigations to determine the suitability of the information for their particular purposes. In no event shall ScienceLab.com be liable for any claims, losses, or damages of any third party or for lost profits or any special, indirect, incidental, consequential or exemplary damages, howsoever arising, even if ScienceLab.com has been advised of the possibility of such damages.
A- 66
ANNEXURE – 14
COPY OF HON ‘ABLE HIGH COURT STAY ORDER & EXTENSIONS
A- 67
A- 68
A- 69
A- 70