Sr No. Chapter 01. Carriage ..….……………………………………………………………………………………………… 01 to 22 02. Loading, Unloading & Stacking ……………………………………………………………………… 23 to 25 03. Earthwork ( Excavation & Embankment) ……….…………………………………………………. 26 to 33 04. Dismentling (Demolition) ………………………..……………………………………………………. 34 to 38 05. Mortar ………………………………………….…………………………………………………………. 39 to 40 06. Concrete ………………………………………….…………….……….………………………………. 41 to 51 07. Brickwork ……………………………………...………………………………………………………… 52 to 58 08. Stone Masonary ………………………………………………………………………………………… 59 to 61 09. Roofing ……………………………………………………...…………………………………………… 62 to 67 10. Flooring ………………………………………………………………………………………………….. 68 to 73 11. Surface Rendering …………………………………...………………………………………………… 74 to 78 12. Wood Work ………………………………….…………………………………………………………… 79 to 89 13. Painting & Varnishing ………………………..……………………………………………………….. 90 to 96 14. Lining of Canals ……………………..…………………………………………………………………. 97 to 98 15. Sheet Piling ……………………………………………………………………………………………… 99 to 100 16. Protection & Diversion Work ………………..……………………………………………………….. 101 to 111 17. Outlets …………………………………………….……………………………………………………… 112 to 114 18. Road & Road Structure ………………………………………..……………………………………… 115 to 119 19. Plumbing, Sanitary Installation & Gas Fittings ………………….………………………………… 120 to 126 20. Surface Drainage …………………………………………………..………………………………….. 127 to 128 21. Sewerage ………………………………………………………………………………………………… 129 to 133 22. Sinking of Wells ………………………………………………………………………………………… 134 to 137 23. Tubewell & Water Supply …………………………..………………………………………………… 138 to 151 24. Electric Installation …………………………………………………………………………………….. 152 to 166 25. Iron Work ………………………………………………………………………………………………… 167 to 173 26. Miscellaneous ……………………………………………………...…………………………………… 174 to 177 TABLE OF CONTENTS Page Nos

Transcript of MRS Jan-Mar 09

Page 1: MRS Jan-Mar 09

Sr No. Chapter

01. Carriage ..….……………………………………………………………………………………………… 01 to 2202. Loading, Unloading & Stacking ……………………………………………………………………… 23 to 2503. Earthwork ( Excavation & Embankment) ……….…………………………………………………. 26 to 3304. Dismentling (Demolition) ………………………..……………………………………………………. 34 to 3805. Mortar ………………………………………….…………………………………………………………. 39 to 4006. Concrete ………………………………………….…………….……….………………………………. 41 to 5107. Brickwork ……………………………………...………………………………………………………… 52 to 5808. Stone Masonary ………………………………………………………………………………………… 59 to 6109. Roofing ……………………………………………………...…………………………………………… 62 to 6710. Flooring ………………………………………………………………………………………………….. 68 to 7311. Surface Rendering …………………………………...………………………………………………… 74 to 7812. Wood Work ………………………………….…………………………………………………………… 79 to 8913. Painting & Varnishing ………………………..……………………………………………………….. 90 to 9614. Lining of Canals ……………………..…………………………………………………………………. 97 to 9815. Sheet Piling ……………………………………………………………………………………………… 99 to 10016. Protection & Diversion Work ………………..……………………………………………………….. 101 to 11117. Outlets …………………………………………….……………………………………………………… 112 to 11418. Road & Road Structure ………………………………………..……………………………………… 115 to 11919. Plumbing, Sanitary Installation & Gas Fittings ………………….………………………………… 120 to 12620. Surface Drainage …………………………………………………..………………………………….. 127 to 12821. Sewerage ………………………………………………………………………………………………… 129 to 13322. Sinking of Wells ………………………………………………………………………………………… 134 to 13723. Tubewell & Water Supply …………………………..………………………………………………… 138 to 15124. Electric Installation …………………………………………………………………………………….. 152 to 16625. Iron Work ………………………………………………………………………………………………… 167 to 17326. Miscellaneous ……………………………………………………...…………………………………… 174 to 177

TABLE OF CONTENTS

Page Nos

Page 2: MRS Jan-Mar 09

CARRIAGENote: 1 The rates are applicable to carriage of material on pacca roads only.

For kacha roads an allowance of 25% extra shall be allowed for 2nd and subsequent mileage (Km) rates. Rateupto 1st mile (1st Km) is however common to both kacha and pacca roads.

Note: 2 For hilly areas 25% above the rates in the plain areas shall be allowed for total mileage (Km) covered.

Note: 3 In case of articles longer than 15 ft. (4.6 m) carried in trucks, the following rates shall be allowed:-

i) Above 15 ft. to 25 ft. (4.6 to 7.6 m) :- Total rates to be paid for 15 ft. to 25 ft. (4.6 to 7.6 m) length will be 1.5 times of the rate given in the Composite Schedule of Rates.

ii) Above 25 ft. (7.6 m) :- The total rate to be paid for above 25 ft. (7.6 m) length will be 2 times of the rate given in the Composite Schedule of Rates.

The length measured shall not be the actual length, but the length of the form of consignment as actuallyreceived.

Note: 4 The term 'mile' (Km) whenever used is to mean statute mile (Km).

Note: 5 The rates include loading and unloading of material from the conveyance and stacking as directed.

Note: 6 The rates for carriage by boat or steamer shall be the same as by any other mechanical means on lan

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

1 Carriage of 100 Cft. (2.83 cu.m) of all materials like stone 16.1aggregate, spawl, kankar lime (unslaked), surkhi, etc. or150 Cft. (4.25 cu.m) of timber, by truck or by any othermeans owned by the contractor.

1st chain (1st 30 m) Chain 64.05 30 64.052nd chain (2nd 30 m) " 11.60 Metre 11.603rd to 10th chain (60 to 300 m) " 7.55 " 7.551000 to 5000 ft. (300 to 1500 m) 1000 ft. 72.00 300 Metre 72.00

a) Upto 50 Kilometers Distance %cft / 50 KM 525 %cft / 50 KM 625

b) From 51 Kilometers to 100 kilometers distance %cft / KM 5.90 %cft / KM 7.00

c) From 101 Kilometers to 200 Kilometers Distance %cft / KM 5.30 %cft / KM 6.50

c) From 201 Kilometers to 300 Kilometers Distance %cft / KM 4.80 %cft / KM 5.75d)Beyond 300 kilometers %cft / KM 4.75

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

Chap-1 (Carriage) Page 1

Page 3: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

2 Carriage of 5 tons of all material like coal, stone lime 16.1 Cement carried in containers other(unslaked), etc. B.G. Rail fastenings, points and crossing, than bags will be paid according toBridge Girders, pipes, sheets, Rail, M.S. bars, etc. etc. this item. The word "pipes" coversby truck or any other means owned by the contractor. G.I,C.I,R.C.C. and P.C.C.

1st chain (1st 30 m) Chain 64.05 30 64.052nd chain (2nd 30 m) " 11.60 Metre 11.603rd to 10th chain (60 to 300 m) " 7.55 7.55

1000 to 5000 ft. (300 to 1500 m) 1000 Ft. 72.00 300 72.00Metre

1st Km Km 110.301st mile Mile 176.452nd Km " 25.452nd mile " 40.753rd Km Km 22.853rd mile Mile 36.554th Km " 20.654th mile " 33.005th Km " 18.955th mile " 30.306th Km " 17.406th mile " 27.857th Km and subsequent kilometres " 10.907th mile and subsequent miles " 17.40

3 Carriage of 100 maunds of fuel wood by truck 16.1or any other means owned by the contractor:

1st chain (1st 30 m) Chain 64.05 30 M 64.052nd chain (2nd 30 m) " 11.60 " 11.603rd to 10th chain (60 to 300 m) " 7.55 " 7.55

1000 to 5000 ft. (300 to 1500 m) 1000 ft 72.00 300 M 72.00

1st Km Km 110.301st mile Mile 176.452nd Km " 25.452nd mile " 40.753rd Km " 22.853rd mile " 36.554th Km " 20.65

Chap-1 (Carriage) Page 2

Page 4: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

4th mile " 33.005th Km " 18.955th mile " 30.306th Km " 17.406th mile " 27.857th Km and subsequent kilometres " 10.907th mile and subsequent miles " 17.40

4 Carriage of 1000 Nos. bricks 10"x5"x3" (250x125x75 mm) ditto Reduce the rate by 33% in case ofor 1000 Nos. tiles 12"x6"x2" (300x150x50 mm) by truck or carriage of 1000 Nos. tiles sizeany other means owned by the contractor :- 12"x6"x1¼" (300 x 150 x 30 mm).

1st chain (1st 30 m) Chain 64.05 30 M 64.052nd chain (2nd 30 m) " 11.60 " 11.603rd to 10th chain (60 to 300 m) " 7.55 " 7.55

1000 to 5000 ft. (300 to 1500 m) 1000 Ft 72.00 300 M 72.00

1st Km Km 110.301st mile Mile 176.452nd Km " 25.452nd mile " 40.753rd Km " 22.853rd mile " 36.554th Km " 20.654th mile " 33.005th Km " 18.955th mile " 30.306th Km " 17.406th mile " 27.857th Km and subsequent kilometres " 10.907th mile and subsequent miles " 17.40

5 Carriage of 100 cft. (2.83 cu.m) of all material like stone 16.1 Material trolly to be supplied by theaggregate, spawl, kankar lime(unslaked), surkhi, etc. o Government and maintained and run150 cft. (4.25 cu.m) of timber, by means of material trolly by the contractor.

1st chain (1st 30 m) Chain 64.05 30 M 64.052nd chain to 10th chain (2nd 30 m to 300 m) " 11.60 " 11.60

1000 to 5000 ft. (300 to 1500 m) 1000 Ft. 72.00 300 M 72.00

1st Km Km 90.451st mile Mile 144.702nd Km " 30.55

Chap-1 (Carriage) Page 3

Page 5: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

2nd mile " 48.903rd Km " 25.803rd mile " 41.304th Km 20.654th mile 33.005th Km 15.505th mile 30.306th Km 14.256th mile 27.857th Km and subsequent kilometres 8.957th mile and subsequent miles 17.40

6 Carriage of 5 tons of all material like coal, stone lim 16.1 Material trolly to be supplied by the(unslaked), etc. B.G. Rail fastening, points and crossing Government and maintained and runBridge girders, pipes, sheets, Rail, M.S. bars, etc. etc. b by the contractor.means of material trolly

1st chain (1st 30 m) Chain 64.05 30 M 64.052nd chain (2nd 30 m) " 11.60 " 11.60

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 72.00 300 M 72.00

1st Km Km 90.451st mile Mile 144.702nd Km " 30.552nd mile " 48.903rd Km " 25.803rd mile and subsequent miles " 41.34th Km 20.654th mile 33.005th Km 18.955th mile 30.306th Km 17.406th mile 27.857th Km and subsequent kilometres 10.907th mile and subsequent miles 17.40

7 Carriage of 100 maunds of fuel wood, by means o ditto Material trolly to be suppliedmaterial trolly. by the Government and

maintained and run by the1st chain (1st 30 m) Chain 64.05 30 M 64.05 contractor.2nd chain (2nd 30 m) " 11.6 " 11.6

1000 to 5000 ft. (300 to 1500 m) 1000 Ft 72.00 300 M 72.00

1st Km Km 90.451st mile Mile 144.702nd Km " 30.552nd mile " 48.90

Chap-1 (Carriage) Page 4

Page 6: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

3rd Km and subsequent kilometers " 25.803rd mile subsequent miles " 41.304th Km 20.654th mile 33.005th Km 18.955th mile 30.306th Km 17.406th mile 27.857th Km and subsequent kilometres 10.907th mile and subsequent miles 17.40

8 Carriage of 1000 Nos. tiles 12"x6"x2" (300x150x50 mm), ditto Material trolly to be supplied by theby means of material trolly. Government and maintained and run

by the contractor.1st chain (1st 30 m) Chain 64.05 30 M 64.052nd chain (2nd 30 m) " 11.60 " 11.60

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 72.00 300 M 72.00 16.1

1st Km Km 90.451st mile Mile 144.702nd Km " 30.552nd mile " 48.903rd Km and subsequent kilometers. " 25.803rd mile subsequent miles " 41.304th Km 20.654th mile 33.005th Km 18.955th mile 30.306th Km 17.406th mile 27.857th Km and subsequent kilometres 10.907th mile and subsequent miles 17.40

9 Carriage of 1000 No. bricks, 9"x4½"x3" ditto(225x113x75 mm) or 8"x4"x4" (200x100x100mm) (nominal)

1st chain (1st 30 m) Chain 52.48 30 M 6.352nd chain (2nd 30 m) " 10.15 3.853rd to 10th chain (60 to 300 m) " 6.20

36.851000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 58.95 300 M

1st Km Km 90.40

Chap-1 (Carriage) Page 5

Page 7: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

1st mile Mile 144.652nd Km " 20.902nd mile " 33.403rd Km " 19.303rd mile " 30.904th Km " 16.904th mile " 27.055th Km " 15.505th mile " 24.806th Km " 14.256th mile " 22.807th Km and subsequent kilometres " 8.957th mile and subsequent miles " 14.30

10 Carriage of 1000 No. tiles 9"x4½"x1½" 16.1(225x113x38 mm).

1st chain (1st 30 m) Chain 31.67 30 M 31.67 16.12nd chain (2nd 30 m) " 5.73 " 5.733rd to 10th chain (60 to 300 m) " 3.70 " 3.70

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 35.61 300 M 35.61

1st Km Km 54.551st mile Mile 87.302nd Km " 12.652nd mile " 20.203rd Km " 11.203rd mile " 17.954th Km " 10.204th mile " 16.355th Km " 9.405th mile " 15.006th Km " 8.656th mile " 13.807th Km and subsequent kilometres " 5.407th mile and subsequent miles " 8.60

11 Carriage of 1 Cwt. (50 Kg) cement in bags ditto

1st chain (1st 30 m) Chain 1.21 30 M 1.212nd chain (2nd 30 m) " 0.14 " 0.143rd to 10th chain (60 to 300 m) " 0.07 " 0.07

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 0.71 300 M 0.71

1st Km Km 1.401st mile Mile 2.20

Chap-1 (Carriage) Page 6

Page 8: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

2nd Km " 0.402nd mile " 0.653rd Km and subsequent kilometers " 0.203rd mile subsequent miles " 0.35

12 Carriage of 100 Nos. empty cement bags including 16.1bundling.

1st 1000 (300 m) ft. 0/00 Ft. 17.66 300 M 17.661000 to 5000 (300 to 1500 m) ft. " 2.20 " 2.20

1st Km Km 3.301st mile Mile 5.302nd Km to 6th Km Km 1.202nd mile to 6th mile Mile 1.957th Km and subsequent kilometres " 1.307th mile and subsequent miles " 2.10

13 Carriage of 100 (2.83 cu.m) cft. of Sarkanda or pilchi, frash ditto Previous lead of collection notor brushwood, by boat or road :- to be deducted from the next

lead of carriage.

1st chain (1st 30 m) Chain 26.20 30 M 26.202nd chain (2nd 30 m) " 11.60 " 11.603rd to 10th chain (60 to 300 m) " 3.70 " 3.70

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 29.58 300 M 29.58

1st Km Km 48.551st mile Mile 77.652nd Km " 35.62nd mile " 56.953rd Km " 29.703rd mile " 47.504th Km " 21.704th mile " 34.705th Km " 17.955th mile " 28.756th Km 14.256th mile 22.807th Km and subsequent kilometres 8.957th mile and subsequent miles 14.30

14 Carriage of light machinery weighing upto 3 tonne Ton Tonne dittoupto 1000 ft. (300 metre) 0/00 ft. 214.01 300 M 214.01

Chap-1 (Carriage) Page 7

Page 9: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

Execeeding 1000 to 5000 ft (300 to 1500metre) 1000 ft. 51.85 " 51.85

1st Km Km 108.501st mile Mile 173.602nd Km " 20.152nd mile " 32.203rd Km " 18.953rd mile " 30.354th Km " 15.204th mile " 24.305th Km " 15.405th mile " 24.656th Km " 11.806th mile " 18.907th Km and subsequent kilometres " 8.507th mile and subsequent miles " 13.60

15 Carriage of small consignments weighing upto 5 maunds 16.1 For consignment weighing 5 to 10(job rates) : maunds, rate be increased by 25%;

and for consignments weighing 10Consig- to 20 maunds, rate be increased by

Upto 1000 ft. (300 metre) ment/ 17.38 Consign- 17.38 100%.1000 ft. ment/

Exceeding 1000 to 5000 ft. (300 to 1500 1000 ft. 11.92 300 M 11.92metre)

1st Km Consign- 16.951st mile Consign- 27.15 ment/ Km2nd Km and subsequent kilometres ment/Mile 3.152nd mile and subsequent miles " 5.00 "

16 Carriage of consignments job.

i) Cooly load for distance:- Each Each

a) Upto 5 Km Consignment 33.75 Consignment 33.75b) Above 5 to 13 Km " 72.00 " 72.00

ii) Carriage of consignments odd jobs. Each Each a) Donkey load for distance upto 500 feet. Consignment 10.85 Consignment 10.85b) Upto 1000 feet. " 16.45 " 16.45c) Upto ½ Mile/ 0.8 Km " 20.80 " 20.80d) Upto one Mile/ 1.6 Km " 26.00 " 26.00e) Upto three Miles/ 4.8 Km " 45.95 " 45.95f) Exceeding 3 Miles/ 16 km " 82.25 " 82.25

Chap-1 (Carriage) Page 8

Page 10: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

Each Eachiii) Cart load for a distance :- Consign- Consig-

ment nment a) upto 4 Miles/ 6.4 Km " 89.85 " 89.85b) Exceeding 4 Miles(6.4 Km) to10 Miles(16 Km) " 163.55 " 163.55

iv) Camel load for a distance:-

a) upto 4 Miles/ 6.4 Km.) " 66.45 " 66.45b) exceeding 4 to 12 mills (6.4 Km to 19.2 Km) " 100.75 " 100.75

17 Hire charges of:- 1. This item will be allowed withprior concurrence of Superintending

i) truck (10 Ton Capacity) Per 2000.00 Per 2000.00 Engineer.day day 2. The rate includes pay of driver

ii) tractor with trolly " 6408.00 " 1000.00 and cleaner only. The repairs shallbe the responsibility of the owner

iii) tractor without trolly " 5504.00 " 800.00 and the cost of lubrication, fuel,loading and unloading shall be paidby the borrower.

18 Carriage of bitumen, tar or other lubricants, in drums: 16.1

1st Km Per 19.451st mile Per 28.95 Tonne2nd Km Ton " 4.502nd mile " 4.753rd Km " " 4.053rd mile 7.604th Km " 3.654th mile5th Km " 3.355th mile6th Km " 3.056th mile7th Km and subsequent kilometres " 2.707th mile and subsequent miles

19 Carriage of Asbestos cement pipes BSS Class 'B" withcomet joint and rubber ring, including loading, unloadingand stacking (rate per 100 Rft. (30 m pipes):-

i) 3" (75 mm) i/d pipes:-1st chain (1st 30 m) Chain 2.55 30 M 2.55

Chap-1 (Carriage) Page 9

Page 11: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

2nd chain (2nd 30 m) " 0.45 " 0.453rd to 10th chain (60 to 300 m) " 0.30 " 0.30

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 2.85 300 M 2.85

1st Km Km 4.351st mile Mile 6.952nd Km " 1.002nd mile " 1.603rd Km " 0.903rd mile " 1.454th Km " 0.804th mile " 1.305th Km " 0.755th mile " 1.206th Km " 0.706th mile " 1.107th Km and subsequent kilometres " 0.457th mile and subsequent miles " 0.70

ii) 4" (100 mm) i/d pipes:-

1st chain (1st 30 m) Chain 3.30 30 M 3.302nd chain (2nd 30 m) " 0.60 " 0.603rd to 10th chain (60 to 300 m) " 0.40 " 0.40

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 3.70 300 M 3.70

1st Km Km 5.701st mile Mile 9.102nd Km " 1.302nd mile " 2.103rd Km " 1.203rd mile " 1.904th Km " 1.054th mile " 1.705th Km " 0.955th mile " 1.556th Km " 0.906th mile " 1.457th Km and subsequent kilometres " 0.557th mile and subsequent miles " 0.90

iii) 6" (150 mm) i/d pipes:-

1st chain (1st 30 m) Chain 4.95 30 M 4.95

Chap-1 (Carriage) Page 10

Page 12: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

2nd chain (2nd 30 m) " 0.90 " 0.903rd to 10th chain (60 to 300 m) " 0.60 " 0.60

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 5.60 300 M 5.60

1st Km Km 8.551st mile Mile 13.702nd Km " 1.952nd mile " 3.153rd Km " 1.803rd mile " 2.854th Km " 1.604th mile " 2.555th Km " 1.455th mile " 2.356th Km " 1.356th mile " 2.157th Km and subsequent kilometres " 0.857th mile and subsequent miles " 1.35

iv) 8" (200 mm) i/d pipes:Chain 8.40

1st chain (1st 30 m) " 1.50 30 M 1.502nd chain (2nd 30 m) " 1.00 " 1.003rd to 10th chain (60 to 300 m) " 1.00

0/00 Ft. 9.451000 to 5000 ft. (300 to 1500 m) 300 M 9.45

1st Km Km 14.451st mile Mile 23.152nd Km " 3.352nd mile " 5.353rd Km " 3.003rd mile " 4.804th Km " 2.704th mile " 4.355th Km " 2.505th mile " 4.006th Km " 2.306th mile " 3.657th Km and subsequent kilometres " 1.457th mile and subsequent miles " 2.30

v) 10" (250 mm) i/d pipes:-

1st chain (1st 30 m) Chain 11.30 30 M 11.302nd chain (2nd 30 m) " 2.05 " 2.053rd to 10th chain (60 to 300 m) " 1.35 " 1.35

Chap-1 (Carriage) Page 11

Page 13: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 12.70 300 M 12.70

1st Km Km 19.451st mile Mile 31.102nd Km " 4.502nd mile " 7.203rd Km " 4.053rd mile " 6.454th Km Km 3.654th mile Mile 5.805th Km " 3.355th mile " 5.356th Km " 3.056th mile " 4.907th Km and subsequent kilometres " 1.907th mile and subsequent miles " 3.05

vi) 12" (300 mm) i/d pipes:

1st chain (1st 30 m) Chain 14.70 30 M 14.702nd chain (2nd 30 m) " 2.65 " 2.653rd to 10th chain (60 to 300 m) " 1.75 " 1.75

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 16.50 300 M 16.50

1st Km Km 25.301st mile Mile 40.452nd Km " 5.852nd mile " 9.353rd Km " 5.253rd mile " 8.404th Km " 4.704th mile " 7.555th Km " 4.355th mile " 6.956th Km " 4.006th mile " 6.407th Km and subsequent kilometres " 2.507th mile and subsequent miles " 4.00

vii) 16" (400 mm) i/d pipes:-

1st chain (1st 30 m) Chain 24.10 30 M 24.102nd chain (2nd 30 m) " 4.35 " 4.353rd to 10th chain (60 to 300 m) " 2.85 " 2.85

Chap-1 (Carriage) Page 12

Page 14: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 27.05 300 M 27.05

1st Km Km 41.451st mile Mile 66.352nd Km " 9.552nd mile " 15.303rd Km " 8.603rd mile " 13.754th Km " 7.754th mile " 12.405th Km " 7.155th mile " 11.406th Km " 6.556th mile " 10.507th Km and subsequent kilometres " 4.107th mile and subsequent miles " 6.55

viii) 18" (450 mm) i/d pipes:-

1st chain (1st 30 m) Chain 30.95 30 M 30.952nd chain (2nd 30 m) " 5.60 " 5.603rd to 10th chain (60 to 300 m) " 3.65 " 3.65

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 34.80 300 M 34.80

1st Km Km 53.301st mile Mile 85.252nd Km " 12.302nd mile " 19.703rd Km " 11.053rd mile " 17.654th Km " 9.954th mile " 15.955th Km " 9.155th mile " 14.656th Km " 8.406th mile " 13.457th Km and subsequent kilometres " 5.257th mile and subsequent miles " 8.40

ix) 20" (500 mm) i/d pipes:-

1st chain (1st 30 m) Chain 32.85 30 M 32.852nd chain (2nd 30 m) " 5.95 " 5.953rd to 10th chain (60 to 300 m) " 3.90 " 3.90

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 36.95 300 M 36.95

Chap-1 (Carriage) Page 13

Page 15: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

1st Km Km 56.551st mile Mile 90.502nd Km " 13.052nd mile " 20.903rd Km " 11.703rd mile " 18.754th Km " 10.604th mile " 16.955th Km " 9.705th mile " 15.556th Km " 8.956th mile " 14.307th Km and subsequent kilometres " 5.557th mile and subsequent miles " 8.90

x) 24" (600 mm) i/d pipes:-

1st chain (1st 30 m) Chain 36.40 30 M 36.402nd chain (2nd 30 m) " 6.60 " 6.603rd to 10th chain (60 to 300 m) " 4.30 " 4.30

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 40.90 300 M 40.90

1st Km Km 62.651st mile Mile 100.252nd Km " 14.452nd mile " 23.153rd Km " 12.953rd mile " 20.754th Km Km 11.704th mile Mile 18.755th Km " 10.805th mile " 17.256th Km " 9.906th mile " 15.857th Km and subsequent kilometres " 6.207th mile and subsequent miles " 9.90

20 Carriage of PVC pipes B.S.S. Class 'B' including loading,unloading and stacking (Rate per 1000 ft.) (300 metre) :-

i) 3" (75 mm) i/d pipes:-

1st chain (1st 30 m) Chain 4.95 30 M 4.95

Chap-1 (Carriage) Page 14

Page 16: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

2nd chain (2nd 30 m) " 0.90 " 0.903rd to 10th chain (60 to 300 m) " 0.60 " 0.60

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 5.55 300 M 5.55

1st Km Km 8.551st mile Mile 13.652nd Km " 1.952nd mile " 3.153rd Km " 1.803rd mile " 2.854th Km " 1.604th mile " 2.555th Km " 1.455th mile Mile 2.356th Km Km. 1.356th mile " 2.157th Km and subsequent kilometres " 0.857th mile and subsequent miles " 1.35

ii) 4" (100 mm) i/d pipes:-

1st chain (1st 30 m) Chain 7.65 30 M 7.652nd chain (2nd 30 m) " 1.40 " 1.403rd to 10th chain (60 to 300 m) " 0.90 " 0.90

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 8.60 300 M 8.60

1st Km Km 13.151st mile Mile 21.052nd Km " 3.052nd mile " 4.853rd Km " 2.703rd mile " 4.354th Km " 2.454th mile " 3.955th Km " 2.255th mile " 3.606th Km " 2.056th mile " 3.307th Km and subsequent kilometres " 1.307th mile and subsequent miles " 2.05

iii) 5" (125 mm) i/d pipes:-

Chap-1 (Carriage) Page 15

Page 17: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

1st chain (1st 30 m) Chain 10.40 30 M 10.402nd chain (2nd 30 m) " 1.90 " 1.903rd to 10th chain (60 to 300 m) " 1.25 " 1.25

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 11.70 300 M 11.70

1st Km Km 17.951st mile Mile 28.702nd Km " 4.152nd mile " 6.653rd Km " 3.703rd mile " 5.954th Km " 3.354th mile Mile 5.355th Km Km. 3.105th mile " 4.956th Km " 2.856th mile " 4.557th Km and subsequent kilometres " 1.807th mile and subsequent miles " 2.85

iv) 6" (150 mm) i/d pipes:

1st chain (1st 30 m) Chain 14.35 30 M 14.352nd chain (2nd 30 m) " 2.60 " 2.603rd to 10th chain (60 to 300 m) " 1.70 " 1.70

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 16.15 300 M 16.15

1st Km. Km. 24.701st mile Mile 39.55 2nd Km " 5.702nd mile " 9.153rd Km " 5.153rd mile " 8.204th Km " 4.654th mile " 7.405th Km " 4.255th mile " 6.806th Km " 3.906th mile " 6.257th Km and subsequent kilometres " 2.457th mile and subsequent miles " 3.90

v) 8" (200 mm) i/d pipes:-

Chap-1 (Carriage) Page 16

Page 18: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

1st chain (1st 30 m) Chain 25.20 30 M 25.202nd chain (2nd 30 m) " 4.55 " 4.553rd to 10th chain (60 to 300 m) " 2.95 " 2.95

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 28.30 300 M 28.30

1st Km Km 43.401st mile Mile 69.402nd Km " 10.002nd mile " 16.003rd Km " 8.953rd mile Mile 14.354th Km Km. 8.154th mile " 13.005th Km " 7.455th mile " 11.906th Km " 6.856th mile " 10.957th Km and subsequent kilometres " 4.307th mile and subsequent miles " 6.85

vi) 10" (250 mm) i/d pipes:-

1st chain (1st 30 m) Chain 39.05 30 M 39.052nd chain (2nd 30 m) " 7.05 " 7.053rd to 10th chain (60 to 300 m) " 4.60 " 4.60

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 43.90 300 M 43.90

1st Km Km 67.251st mile Mile 107.602nd Km " 15.552nd mile " 24.853rd Km " 13.953rd mile " 22.304th Km " 12.604th mile " 20.155th Km " 11.555th mile " 18.506th Km " 10.656th mile " 17.007th Km and subsequent kilometres " 6.657th mile and subsequent miles " 10.60

Chap-1 (Carriage) Page 17

Page 19: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

vii) 12" (300 mm) i/d pipes:-

1st chain (1st 30 m) Chain 55.00 30 M 55.002nd chain (2nd 30 m) " 9.95 " 9.953rd to 10th chain (60 to 300 m) " 6.50 " 6.50

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 61.80 300 M 61.80

1st Km Km 94.651st mile Mile 151.452nd Km Km 21.852nd mile Mile 34.953rd Km " 19.603rd mile " 31.354th Km " 17.704th mile " 28.355th Km " 16.255th mile " 26.006th Km " 14.956th mile " 23.907th Km and subsequent kilometres " 9.357th mile and subsequent miles " 14.95

viii) 14" (350 mm) i/d pipes:-

1st chain (1st 30 m) Chain 71.55 30 M 71.552nd chain (2nd 30 m) " 12.95 " 12.953rd to 10th chain (60 to 300 m) " 8.45 " 8.45

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 80.45 300 M 80.45

1st Km Km 123.201st mile Mile 197.152nd Km " 28.452nd mile " 45.503rd Km " 25.553rd mile " 40.854th Km Km 23.054th mile Mile 36.905th Km " 21.155th mile " 33.856th Km " 19.456th mile " 31.157th Km and subsequent kilometres " 12.157th mile and subsequent miles " 19.45

Chap-1 (Carriage) Page 18

Page 20: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

21 Carriage of PVC pipes B.S.S. Class 'D' including loading,unloading and stacking (Rates per 1000 ft.):-

i) 2" (50 mm) i/d pipes:-

1st chain (1st 30 m) Chain 3.60 30 M 3.602nd chain (2nd 30 m) " 0.65 " 0.653rd to 10th chain (60 to 300 m) " 0.45 " 0.45

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 4.05 300 M 4.05

1st Km Km 6.251st mile Mile 10.002nd Km " 1.452nd mile " 2.303rd Km " 1.303rd mile " 2.054th Km " 1.154th mile " 1.855th Km " 1.055th mile " 1.706th Km " 1.006th mile " 1.607th Km and subsequent kilometres " 0.657th mile and subsequent miles " 1.00

ii) 2½" (63 mm) i/d pipes:-

1st chain (1st 30 m) Chain 5.65 30 M 5.652nd chain (2nd 30 m) " 1.00 " 1.003rd to 10th chain (60 to 300 m) " 0.65 " 0.65

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 6.35 300 M 6.35

1st Km Km 9.701st mile Mile 15.552nd Km " 2.252nd mile " 3.603rd Km " 2.003rd mile " 3.204th Km " 1.804th mile " 2.905th Km " 1.655th mile " 2.65

Chap-1 (Carriage) Page 19

Page 21: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

6th Km " 1.556th mile " 2.457th Km and subsequent kilometres " 0.957th mile and subsequent miles " 1.55

iii) 3" (75 mm) i/d pipes:-

1st chain (1st 30 m) Chain 7.80 30 M 7.802nd chain (2nd 30 m) " 1.40 " 1.403rd to 10th chain (60 to 300 m) " 0.90 " 0.90

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 8.80 300 M 8.80

1st Km Km 13.451st mile Mile 21.502nd Km " 3.102nd mile " 4.953rd Km " 2.803rd mile " 4.454th Km " 2.554th mile " 4.055th Km Km 2.305th mile Mile 3.706th Km " 2.156th mile " 3.407th Km and subsequent kilometres " 1.307th mile and subsequent miles " 2.10

iv) 4" (100 mm) i/d pipes:-

1st chain (1st 30 m) Chain 12.95 30 M 12.952nd chain (2nd 30 m) " 2.35 " 2.353rd to 10th chain (60 to 300 m) " 1.55 " 1.55

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 14.55 300 M 14.55

1st Km Km 22.301st mile Mile 35.652nd Km " 5.152nd mile " 8.203rd Km " 4.653rd mile " 7.404th Km " 4.154th mile " 6.655th Km " 3.805th mile " 6.10

Chap-1 (Carriage) Page 20

Page 22: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

6th Km " 3.556th mile " 5.657th Km and subsequent kilometres " 2.207th mile and subsequent miles " 3.50

v) 5" (125 mm) i/d pipes:-

1st chain (1st 30 m) Chain 19.35 30 M 19.352nd chain (2nd 30 m) " 3.50 " 3.503rd to 10th chain (60 to 300 m) " 2.30 " 2.30

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 21.75 300 M 21.75

1st Km Km 33.301st mile Mile 53.252nd Km " 7.702nd mile " 12.303rd Km " 6.903rd mile " 11.054th Km " 6.204th mile " 9.955th Km " 5.705th mile " 9.156th Km " 5.256th mile " 8.407th Km and subsequent kilometres " 3.307th mile and subsequent miles " 5.25

vi) 6" (150 mm) i/d pipes:-

1st chain (1st 30 m) Chain 27.85 30 M 27.852nd chain (2nd 30 m) " 5.05 " 5.053rd to 10th chain (60 to 300 m) " 3.30 " 3.30

1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 31.30 300 M 31.30

1st Km Km 47.951st mile Mile 76.702nd Km " 11.052nd mile " 17.703rd Km " 9.953rd mile " 15.904th Km " 8.954th mile " 14.355th Km " 8.25

Chap-1 (Carriage) Page 21

Page 23: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

5th mile " 13.206th Km " 7.556th mile " 12.107th Km and subsequent kilometres " 4.707th mile and subsequent miles " 7.55

22 Hand shunting loaded Railway wagons ortrucks:-

a) upto ¼ mile / ¼ Km Each 161.20 Each 100.75b) upto ½ mile / ½ Km No 291.80 No 182.40c) upto ¾ mile / ¾ Km " 393.95 " 246.20d) upto 1 (1.6 Km) mile " 468.80 " 293.00e) 2nd mile and subsequent miles/ Each Each

2nd and subsequent kilometres No/Mile 272.20 No/Km 170.15

23 Hand shunting empty Railway wagons or trucks.

a) upto ¼ mile / ¼ Km Each 93.50 Each 58.45b) upto ½ mile / ½ Km No. 154.95 No. 96.85c) upto ¾ mile / ¾ Km " 204.30 " 127.70d) upto 1 mile / 1 Km " 245.25 " 153.30e) 2nd mile and subsequent miles/ Each Each

2nd and subsequent kilometres No/Mile 133.65 No/Km 83.55

Chap-1 (Carriage) Page 22

Page 24: MRS Jan-Mar 09

LOADING, UNLOADING & STACKING1 The rate for loading into and unloading from mobile trucks, trollies and boats, etc. will be the same as for Railway wagons.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Laoding or unloading into or from Railway wagons, lead 100 Cft. 290.40 cu.m 102.55 within one chain, (30m) shingle, sand, ballast, surkhi, ashes, kankar, brick bats, coal, lime or 1,000 Nos. tiles size12"x6"x2" (300x150x50 mm) or 9"x4½"x1½"(225x113x37mm) properly laid & stacked.

2 Loading or unloading bricks into or from Railway wagonslaid and stacked, lead within one chain:-

a) Bricks 10" (250 mm) size. 1000 Nos. 363.00 1000 Nos. 363.00

b) Bricks 9" (225 mm) or smaller size. ditto 290.40 ditto 290.40

3 Loading or unloading into or from Railway wagons cement 100 Bags 363.00 100 Bags 363.00in bags (from inside or outside the godown) and stackingwithin one chain (30 m)

4 Loading or unloading into or from Railway wagons empty 100 Nos. 34.85 100 Nos. 34.85cement bags (from inside or outside the godown) andstacking.

5 Loading or unloading into or from Railway wagons (from 100 Mds. 217.80 100 Kg 5.85inside or outside the godown) and stacking, white lime in bags.

6 Loading or unloading into or from Railway wagons Per 174.25 Per 171.50Structural Steel, R.S. joists, broad, narrow or meter gauge Tonne Tonnerail and rail fastenings, etc.

7 Loading or unloading 45 gallon (204.57 Litres) drums full Each 21.80 Each 21.80into or from Railway wagons, lead upto one chain.

8 Loading or unloading packages of all sorts, upto one Cwt Each 10.90 Each 10.90 Except cement in jute or(50 Kg). paper bags.

9 Loading or unloading sleepers other than wooden,including stacking lead within one chain:-

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPIND

Chap-2 (Loading/Unloading) Page 23

Page 25: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPIND

a) Broad gauge sleepers 100 Nos. 726.00 100 Nos. 726.00

b) Metre gauge and narrow gauge sleepers. ditto 363.00 ditto 363.00

10 Loading or unloading timber logs or timber for shuttering, Per 90.75 Per 89.30into or from Railway wagons of any gauge, including Ton Tonnestacking lead within one chain (30 m)

11 Loading or unloading bhoosa in Railway wagons lead upto 100 Mds. 871.20 100 Kg 23.35150 ft. (45 m)

12 Loading or unloading timber scrap or wooden plugs, into or Per 145.20 Per 142.90from Railway wagons, and stacking within one chain lead. Ton Tonne

13 Loading or unloading pitching stone or spawl from Railway 100 Cft. 107.45 cu.m 37.95wagons of any gauge (including clearing 5 ft. (1500 mm)away from the rail).

14 Loading or unloading building stone (including clearing 5 ft. 100 Cft. 139.40 cu.m 49.25(1.5 m) away from rails).

15 Unloading oil, bitumen tar, etc.

a) Crude oil (to be pumped from tank wagon into tank). 1000 363.00 100 8.00Gallon litres

b) Crude oil (drained by gravity). 1000 363.00 100 8.00Gallon litres

c) Crude oil materials from railway wagons. 100 Cft. 46.45 cu.m 16.40

d) Fuel oil from tank into empty drums, including Per 129.05 Per 127.05stacking within one chain (30 m). Ton Tonne

e) Petrol (2 gallon tin) 100 Nos. 182.95 100 Nos. 182.95 The rate includes checkingand weighing the tins.

f) Kerosine oil (4 gallon tin) 100 Nos. 363.00 100 Nos. 363.0016 Removing and stacking within one chain

(30 m) lead:

a) Stone, spawl, brick bats, shingle, sand, lime, 100 Cft. 145.20 cu.m 51.30surkhi, ashes, kankar and coat, etc

Chap-2 (Loading/Unloading) Page 24

Page 26: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPIND

b) Bricks. 1000 Nos. 387.20 1000 Nos. 387.20

c) Broad gauge wooden sleepers. 100 Nos. 232.3 100 Nos. 232.3

d) Metre gauge or narrow gauge wooden sleepers. 100 Nos. 138.30 100 Nos. 138.30

e) Rails girders, pipes, cement etc. Per 64.55 Per 63.50Ton Tonne

f) Bridge and crossing timbers, etc. 100 No. 774.40 100 No. 774.40

17 Loading into wagons girders, rails, permanent way Per 145.20 Per 142.90

material (except wooden sleepers) iron work, M.S. bars, Ton Tonnepipes, etc. including lead one chain (30 M) and stackinginside wagons.

18 Unloading from wagons girders, rails, permanent way Per 82.95 Per 81.65material (except wooden sleepers) iron work, M.S. bars, Ton Tonnepipes, etc. lead upto one chain (30 m) but excludingstacking.

19 Loading into wagons wooden broad gauge sleepers, 100 Nos. 580.80 100 Nos. 580.80including one chain (30 m) lead and stacking,.

20 Unloading wooden broad gauge sleepers from wagons, 100 Nos. 276.55 100 Nos. 276.55including one chain (30 m) lead and stacking.

21 Laoding metre gauge or narrow gauge wooden sleepers, 100 Nos. 290.40 100 Nos. 290.40including one chain (30 m) lead and stacking insidewagons.

22 Unloading metre gauge or narrow gauge wooden sleepers, 100 Nos. 152.85 100 Nos. 152.85including one chain (30 m) lead but excluding stacking.

23 Loading bridge and crossing timbers, including one chain 100 Nos. 1161.60 100 Nos. 1161.60(30 m) lead and stacking.

24 Unloading bridge and crossing timbers, including one 100 Nos. 580.80 100 Nos. 580.80chain (30 m) lead but excluding stacking.

25 Loading or unloading bitumen, asphalt or tar in drums, into Per 87.10 Per 85.75or from railway wagons, lead upto one chain (30 m). Ton Tonne

Chap-2 (Loading/Unloading) Page 25

Page 27: MRS Jan-Mar 09

EARTHWORK (EXCAVATION & EMBANKMENT)1 Special allowances for the hardness, wetness and slush:-

The grant of allowances for hard, very hard, wet and slush will be subject to Superinteding Engineer's approval. Specific instructions regarding grant of suchallowances may be issued by the various Administrative Departments and Statutory Bodies. The earth requiring repeated blows of Kassi to break it and ofwhich dry bulk density is not less than 1.5, will be treated as hard.

2 Deduction for shrinkage from bank measurements:-The following allowances should be provided for material which is not rammed, or equally consolidated:-a) Deduction for shrinkage from the bank measurements when the earthwork is done by manual labour.......... 10%b) Deduction for settlement from the bank measurement when the earthwork is done by machines................... 3 to 6%

Before the work is let out to be done by tractors, scrapers, etc. deduction ranging between 3% to 6% should be agreed to with the contractor

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

1 Earthwork excavation underessed lead upto a single throw 171 to 17.5of Kassi, phaorah or shovel:-

a) In ashes, sand, soft soil or silt clearance. 1000 Cft. 1,089.00 -- cu.m 38.45 --b) In ordinary soil. 1000 Cft. 1,306.80 -- cu.m 46.15 --

2 Earthwork excavation in ashes, sand and soft soil or silt 1000 Cft. 1,597.20 -- cu.m 56.40 -- ditto

clearance, undressed lead upto 50 ft (15 metre).

3 Bed clearance and dressing slopes of drains to required ditto The rate is applicable where the earthsections including the removal of weeds, roots, etc. of the bed to be removed is of thedisposal of excavated materials within 50 ft. (15 metre) lead. type of ordinary soil. When it is silt ora) Excavated material undressed. 1000 Cft. 2,032.80 -- cu.m 71.80 -- 1 or 2 above, whichever is applicable.b) Excavated material dressed in the specified manner. 1000 Cft. 2,137.35 -- cu.m 75.50 -- the drains of each category.

4 Borrowpit excavation undressed lead upto 100 ft (30 metre).

a) Ordinary soil 1000 Cft. 2,032.80 -- cu.m 71.80 --b) Hard soil 1000 Cft. 2,497.45 -- cu.m 88.20 --

5 Earthowrk in ordinary soil for embankments lead upto 100 *411-1 to The rate includes hire charges of

ft. (30 m), including ploughing and mixing with blade grade 411-13 and machinery, cost of fuel, lubricants, payor disc harrow or other suitable equipment, and 301-1 & of driver and cleaner. The rate alsocompaction by mechanical means at optimum moisture 202-3 includes clearing and grubbingcontent and dressing to designed section, complete in all where necessary.respects:- i) 95% to 100% maximum modified AASHO dry density. 1000 Cft. 2,162.70 2,757.45 cu.m 76.40 97.40ii) 90% maximum modified AASHO dry density. 1000 Cft. 2,162.70 2,677.40 cu.m 76.40 94.55iii) 85% maximum modified AASHO dry density 1000 Cft. 2,162.70 2,597.35 cu.m 76.40 91.75

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

Chap-3 (Earthwork) Page 26

Page 28: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

6 Regular excavation dressed. 1000 Cft. 1,438.60 -- cu.m 50.80 -- *411-2

7 Earthwork excavation in open cutting upto 5'-0" (1.5 m) 17.1 to depth for storm water channels, drains, sullage drains in 17.5open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works, shuttering and timbering the trenches, dressed to designed level and dimensions, trimming, removal of surface water from trenches, back filling and surplus excavated material disposed of and dressed within 50 ft. (15 m) lead:- i) ordinary 1000 Cft. 2,429.35 2,473.50 cu.m 85.80 87.35ii) hard 1000 Cft. 2,893.95 2,938.05 cu.m 102.20 103.75 iii) very hard 1000 Cft. 3,387.65 3,431.80 cu.m 119.65 121.20iv) gravel & shingle 1000 Cft. 5,668.60 5,712.75 cu.m 200.20 201.75

8 Earthwork excavation in open cutting 5.01 ft. (1.5 m) to ditto

10.0 ft. (3.0 mm) depth for storm water channels, drains, sullage drains in open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works, shuttering and timbering the trenches, dressed to designed level and dimensions, trimming, removal of surface water from trenches, back filling and surplus excavated material disposed of and dressed within 100 ft. (30 m) lead:- i) ordinary 1000 Cft. 2,658.50 2,746.30 cu.m 93.90 97.00ii) hard 1000 Cft. 3,123.10 3,210.95 cu.m 110.30 113.40iii) very hard 1000 Cft. 3,616.80 3,704.65 cu.m 127.75 130.85iv) gravel & shingle 1000 Cft. 6,188.15 6,276.00 cu.m 218.55 221.65

9 Excavation in shingle or gravel formation and rock, not 17.1 to 17.5

requiring blasting, undressed lead upto 100 ft (30 m). i) Dry 1000 Cft. 5,517.60 -- cu.m 194.90 --ii) Wet 1000 Cft. 6,388.80 -- cu.m 225.65 --iii) In flowing water 1000 Cft. 8,131.20 -- cu.m 287.20 --

10 Earthwork excavation in irrigation channels, drains, etc. to

designed section, grades and profiles, excavated material dittodisposed off and dressed within 50 ft. (15 m) lead:-

i) ordinary 1000 Cft. 2,222.90 -- cu.m 78.50 --ii) hard 1000 Cft. 2,687.50 -- cu.m 94.90 --iii) very hard 1000 Cft. 3,181.20 -- cu.m 112.35 --iv) gravel & shingle 1000 Cft. 5,607.35 -- cu.m 198.05 --

Chap-3 (Earthwork) Page 27

Page 29: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

11 Excavation in rock dressed to designed section, grades and profiles, excavated material disposed off within 100 ft. (30 m) 17.1 to 17.5 Tools and plants shall be the liabilityand lift upto 5'-0" (1.5 m). of the contractor.a) Soft rock, slate, shale, schist laterite work, with pick and 1000 Cft. 5,037.10 -- cu.m 177.90 --

crow bar. b) Medium hard rock, requiring occasional blasting. 1000 Cft. 8,308.30 8,884.30 cu.m 293.45 313.80

12 a) Excavation in hard rock requiring blasting and disposal

of excavated material (blasted material) upto 50 ft. (15 17.1 to 17.5 1) Tools and plants required shall bem) lead, (including dressing and levelling to designed the liability of the Contractorsection,e tc. complete).

2) Reduce the rate by 8% if thei) Grade I 1000 Cft. 3,903.25 4,479.25 cu.m 137.85 158.20 excavated section is not dressed orii) Grade II 1000 Cft. 5,097.85 6,057.85 cu.m 180.05 213.95 levelled to designed section.iii) Grade III 1000 Cft. 6,025.80 7,177.80 cu.m 212.75 253.50iv) Grade IV 1000 Cft. 6,610.55 7,954.55 cu.m 233.50 280.95v) Grade V 1000 Cft. 7,217.75 8,753.75 cu.m 254.95 309.20vi) Grade VI 1000 Cft. 7,657.30 9,385.30 cu.m 270.45 331.50

b) Excavation in hard rock requiring blasting, but blasting

prohibited, and disposal of excavated material within 50 17.1 to 17.5 1) Tools and plants required shall beft. (15 m) lead (including dressing and levelling to the liability of the contractor.designed section, etc. complete):-

2) Reduce the rate by 8% if thei) Grade I 1000 Cft. 7,806.45 8,958.45 cu.m 275.70 316.40 excavated section is not dressed orii) Grade II 1000 Cft. 10,195.70 12,115.70 cu.m 360.10 427.95 levelled to designed section.iii) Grade III 1000 Cft. 12,051.60 14,355.60 cu.m 425.65 507.05iv) Grade IV 1000 Cft. 13,221.10 15,909.10 cu.m 466.95 561.90v) Grade V 1000 Cft. 14,435.55 17,507.55 cu.m 509.85 618.35vi) Grade VI 1000 Cft. 15,314.65 18,770.65 cu.m 540.90 663.00

13 Rehandling of earthwork:

a) Lead upto a single throw of Kassi, phaorah or shovel 1000 Cft. 726.00 -- cu.m 25.65 -- dittob) Upto a lead of 50 ft. (15 m). 1000 Cft. 1,016.40 -- cu.m 35.90 --

14 Rehandling of gravel work or excavated rock, 1000 Cft. 2,904.00 -- cu.m 102.55 -- 17.1 to 17.5

lead upto 50 ft.( 15 m)

15 Filling, watering and ramming earth under floors:- ditto

i) with surplus earth from foundation, etc. 1000 Cft. 1,312.10 -- cu.m 46.35 --ii) with new earth excavated from outside, 1000 Cft. 2,325.30 -- cu.m 82.15 --

lead upto one chain (30 m).

Chap-3 (Earthwork) Page 28

Page 30: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

16 Extra for every 50 ft. (15 m) additional lead or part thereof :- This rate shall be applicable upto 1000 ft. total distance, including the

i) for earhtwork soft, ordinary, hard and very hard. 1000 Cft. 37.10 -- cu.m 1.30 -- lead covered in the item of earthworkii) for gravel, shingle or rock. 1000 Cft. 43.50 -- cu.m 1.55 --

17 Transportation of earth all types when the total distance, This rate will be paid inaddition to the

including the lead covered in the item of work, is more than rate of earthwork, without deducting1000 ft. (300 m) the lead covered in the item ofa) upto ¼ mile (400 m). 1000 Cft. 1,008.00 -- cu.m 35.60 -- earthworkb) for every 330 ft. (100 m) additional lead or part thereof,

beyond ¼ mile (400 m) upto one mile. (1.6 Km.) 1000 Cft. 63.05 -- cu.m 2.25 --c) for every ¼ mile (400 m) additional lead or part thereof,

beyond one mile (1.6 Km.) upto 5 mile (8 Km). 1000 Cft. 101.90 -- cu.m 3.60 --d) for every ½ mile (800 m) additional lead

or part thereof, beyond 5 miles (8 Km). 1000 Cft. 83.85 -- cu.m 2.95 --

18 Dressing and levelling of earhtwork to designed section, etc. 17.10 to 17.5complete:- a) Ashes, sand, silt or soft soil. 1000 Cft. 72.85 -- cu.m 2.55 --b) Ordinary or hard soil. 1000 Cft. 129.90 -- cu.m 4.60 --c) Gravel work or soft rock not requiring 1000 Cft. 314.15 -- cu.m 11.10 --

blasting.

19 Dowel dressing. Per 63.80 -- Metre 2.10 -- ditto This rate is in addition to payment forChain dressed earhtwork.

20 a) Dressing slopes of banks or ground surface. 100Sft. 27.70 -- sq.m 3.00 -- ditto To be paid only when exclusively

dressing is done and no earthwork is carried out in embankment or cutting.

b) Dressing of earthwork (done by machinery or otherwise 100Sft. 60.25 -- sq.m 6.50 -- i) The surface area dressed is to beand left undressed) to designed section. taken for measurement.

ii) The item is applicable where the dressing is done by the contractor other than the one who executed the

work.21 Excavation in foundation of building, bridges and other

structures, including dagbelling, dressing, refilling around 17.1 to 17.5structure with excavated earth, watering and rammiing lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) a) in sand, ashes or loose soil 1000 Cft. 2,513.30 -- cu.m 88.75 --b) in ordinary soil. 1000 Cft. 2,898.70 -- cu.m 102.40 --c) in hard soil or soft murum. 1000 Cft. 3,236.65 -- cu.m 114.30 --

Chap-3 (Earthwork) Page 29

Page 31: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

22 Cutting hard rock such as granite, ballast, hard lime stone or 1000 Cft. 18,110.40 20,593.60 cu.m 639.65 727.35 17.1 to 17.5 Tools and plants required shall be thesand stone, etc. with chisels and hammers, for small liability of the contractor.foundations.

23 Extra for excavation requiring shoring. 1000 Cft. 389.40 537.25 cu.m 13.75 19.00 17.1 to 17.5 Composite rate includes materials,

i.e. plank, etc.24 Compaction of earthwork (soft, ordinary or hard soil) :- ditto

a) Mixing, moistening earth to optimum moisture content 1000 Cft. 240.75 -- cu.m 8.50 --

in layers for compaction, etc. complete.

b) Compaction by rolling with animal driven roller/hand rammed:

i) soft or sandy soil 1000 Cft. 298.30 -- cu.m 10.55 --

1) The rate does not include hireii) ordinary soil 1000 Cft. 336.60 -- cu.m 11.90 -- charges of the roller.

2) Roller to be 'supplied by iii) hard soil 1000 Cft. 409.20 -- cu.m 14.45 -- Government

iv) admixture of shingle 1000 Cft. 447.50 -- cu.m 15.80 --

c) Ramming earthwork (all types of soil). 1000 Cft. 435.60 -- cu.m 15.40 --

d) Ramming earhtwork behind retaining walls. 1000 Cft. 580.80 -- cu.m 20.50 --

25 Compaction of earthwork with power road roller, including 17.1 (a)

ploughing, mixing, moistening earth to optimum moisture *411-5 and The rate also includes hire charges ofcontent in layers, etc. complete: 202-3 machinery, cost of fuel, lubricant, pay

of driver and cleaner, etc.i) 95% to 100% maximum modified AASHO dry density. 1000 Cft. -- 594.75 cu.m - 21.00

ii) 90% maximum modified AASHO dry density. 1000 Cft. -- 514.70 cu.m - 18.20

iiii) 85% maximum modified AASHO dry density. 1000 Cft. -- 434.65 cu.m - 15.35

26 Extra for wet earthwork. 1000 Cft. 1,016.40 -- cu.m 35.90 - 17.1 to 17.5 That will support a man's weight.

27 Extra for slush or Daldal including dewatering. 1000 Cft. 2,323.20 -- cu.m 82.05 - 17.1 to 17.5 That will not support a man's weight.

28 Extra for puddling. 1000 Cft. 1,696.20 -- cu.m 59.90 - ditto

29 Earthwork on small rain water drains, along canal banks, 100 Rft. 275.90 -- Metre 9.05 - ditto

roads and plantation drains, dressed, etc. complete

Chap-3 (Earthwork) Page 30

Page 32: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

30 Filling and compacting soil, earth and boulders behind 1000 Cft. 2,613.60 -- cu.m 92.30 -- 17.1 to 17.5

retaining walls (including excavation of soil and lead upto 50 ft.( 15 m).

31 Dag bailing 3" (75 mm) deep. Per mile 702.55 -- Per 436.65 -- ditto Dag bailing for layout of borrow pit, to

Km be done by contractors at their own cost.

32 Turfing slopes of banks or lawns with grass sods including 100Sft. 484.00 -- sq.m 52.10 -- dittoploughing, laying, setting and watering (Turf got from within a distance of 5 miles (8 Km.) and maintenance for 15 days).

33 Berm cutting:- 17.1 to 17.5

a) lead upto a single throw of Kassi, phaora or shovel 1000 Cft. 1,306.80 -- cu.m 46.15 --

(without dressing). b) upto 50 ft(15 m)lead (including dressing). 1000 Cft. 2,222.90 -- cu.m 78.50 --

34 Berm trimming both sides of channels:- 17.1 to 17.5

a) upto 3½ ft. (1.06 m) depth. Per Mile 3,220.80 -- Per Km. 2013.00 -- b) exceeding 3½ ft. to 5 ft. (1.06 to 1.5 m) depth. Per Mile 4,353.80 -- Per Km. 2721.15 --c) exceeding 5 ft. to 8 ft. (1.5 to 2.4 m) depth Per Mile 6,932.20 -- Per Km. 4332.65 --

35 Ploughing and levelling borrowpits. ditto Area ploughed to be measured.

i) upto 3 ft. (0.9 m) depth. Per Acre 633.60 -- Per Hect. 1565.65 --ii) above 3 ft. (0.9 m) depth. Per Acre 1,267.20 -- Per Hect. 3131.30 --

36 Making boundary or service roads, including dag-belling, ditto

levelling and dressing:

i) in unploughed land:

a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide. Per Chain 321.20 -- Metre 10.55 --b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide. Per Chain 400.40 -- Metre 13.15 --

ii) in ploughed land:

a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide. Per Chain 333.65 -- Metre 10.95 --b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide. Per Chain 410.95 -- Metre 13.50 --

Chap-3 (Earthwork) Page 31

Page 33: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

37 Earthwork by boats, including hire of boats:- 17.1 to 17.5 For ordinary soil.

i) Digging and loading into boats, upto 50 ft. (15 m) lead. 1000 Cft. 2,178.00 -- cu.m 76.95 --ii) Carriage by boats upto 10 chains (300 m). 1000 Cft. 350.00 -- cu.m 12.35 --iii) Extra for every additional one chain (30 m) or part 1000 Cft. 38.00 -- cu.m 1.35 --

thereof beyond 10 chains (300 m). iv) Unloading earth from boats. 1000 Cft. 1,016.40 -- cu.m 35.90 --

38 Unloading earth from B.G. trucks and clearing 5 ft. (1.5 m) 1000 Cft. 871.20 -- cu.m 30.75 -- 17.1 to 17.5

from rail.

39 Earthwork by tramway, digging and loading in trucks, upto 50 1000 Cft. 2,032.80 -- cu.m 71.80 -- 17.1 to 17.5ft. (15 m) lead.

40 Unloading earth from B.G. trucks and spreading upto 1000 Cft. 1,633.50 -- cu.m 57.70 -- ditto

15 ft. (4.5 m) from rail.

41 Supplying clean and screened river or pit sand within 5 100Cft. 268.70 288.70 cu.m 94.90 101.95 ditto The rate incudes:-chains (150 m). i) removal of top crust of earth

over burden ii) royalty to the government or cost to the private owner.

42 Earthwork excavation in open cutting for sewers and 17.1 to 17.5 The rate does not include back fillingmanholes as shown in drawings including shuttering and **13.1 &13.4 after laying of sewer, which is payabletimbering, dressing to correct section and dimensions separately.according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:-

If the timbering and shuttering is noti) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 1000 Cft. 2,128.30 2,200.45 cu.m 75.15 77.70 actually done at site, the compositeii) 7-01 ft. to 15.0 ft. (2.15 to 4.5 m) depth 1000 Cft. 3,775.30 4,098.95 cu.m 133.35 144.80 rate may be reduced by Rs. 72.15,iii) above 15.0 ft. (4.5 m) depth 1000 Cft. 4,936.90 5,260.55 cu.m 174.35 185.80 106.35 and 106.35 respectively.

43 Earthwork excavation of trenches in open cutting for sewers 17.1 to 17.5 The rate does not include back filling

and manhole chambers, etc. below sub-soil water level to **13.3 & after laying of sewer, which is payablecorrect section and dimensions according to templates and 13.5 separately.levels, including shoring, timbering and shuttering of M.S. sheets on both sides of the trenches:

i) 0 ft. to 4.0 ft. (0 to 1.20 m) depth below SSWL. 1000 Cft. 959.95 2,585.85 cu.m 33.90 91.35ii) 4.01 ft. to 8.0 ft. (1.22 to 2.4 m) depth below SSWL. 1000 Cft. 1,199.85 3,304.30 cu.m 42.40 116.70iii) Exceeding 8 ft. (2.4 m) depth below SSWL. 1000 Cft. 1,799.80 4,067.45 cu.m 63.55 143.65

Chap-3 (Earthwork) Page 32

Page 34: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

44 Excavation of trenches in all kinds of soil, except cutting 1000 Cft. 2,127.85 -- cu.m 75.15 -- 17.1 to 17.5 The rate does not include back fillingrock, for watersupply pipelines upto 5 ft. (1.5 m) depth **8.1 after laying of pipe line, which isfrom ground level, including trimming, dressing sides, payable separately.levelling the beds of trenches to correct grade and cutting pits for joints, etc. complete in all respects.

45 Cutting and removing trees within a distance of 100 ft. (30 m)

a) upto 2½ ft. (760 mm) girth. Each 437.25 -- Each 437.25 b) above 2½ ft. to 6 ft. (760 to 1800 mm) girth. Each 849.75 -- Each 849.75

46 Uprooting stump and removing within 100 ft. (30 m) from 2 ft. Each 544.50 -- Each 544.50

to 6 ft. (600 to 1800 mm) girth.

47 Jungle clearance and removing within 100 ft. (30 m).

a) light 1000 Sft. 72.60 -- sq.m 0.80 --b) thick 1000 Sft. 145.20 -- sq.m 1.55 --

48 Uprooting Sarkanda growth and disposal within 100 ft. (30 m) 100Sft. 34.85 -- sq.m 3.75 --

49 Ploughing 3 times. Per 155.50 -- Per Hect. 384.30 --

Acre

50 Levelling, dressing and making lawns. 100Sft. 145.20 -- sq.m 15.60 --

51 Turfing lawns (excluding cost of turf). 100Sft. 88.00 -- sq.m 9.45 --

52 Earthwork in excavation of drains, irrigation channels through excavator / drag lines in all kind of soil and conditions(dry,wetslush,daldal and under water) including its disposal.a) without path making 1000 Cft. -- 1266.00 cu.m -- 44.72b) with path making 1000 Cft. -- 1226.00 cu.m -- 43.31

53 Earthwork (other than excavation) in irrigation work, through earth moving machinery with following leads.

1) 2000 feet 1000 Cft. -- 2124.00 cu.m -- 75.012) 2500 feet 1000 Cft. -- 2297.00 cu.m -- 81.123) 3500 feet 1000 Cft. -- 2979.00 cu.m -- 105.224) 5000 feet 1000 Cft. -- 3597.00 cu.m -- 127.03

* Specification number correspond to Book of "Specification for Road & Bridge Construction, 1971".** Specification number correspond to Book of "Building & Roads Department Specification Vol. II, 1966 (Public Health Works).

Chap-3 (Earthwork) Page 33

Page 35: MRS Jan-Mar 09

DISMANTLING (DEMOLITION)1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

2 The rates for dismantling roofs or upper storey floor, include the dismantling of all materials, except roofsupports such as beams and trusses.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

Stone Work

1 Dismantling dry stone masonry. 100Cft. 246.85 cu.m 87.20 18.1

2 Dismantling stone masonry in mud mortar. 100Cft. 363.00 cu.m 128.20 ditto

3 Dismantling stone masonry in lime or cement mortar. 100Cft. 871.20 cu.m 307.70 ditto Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4thand subsequent floors respectively.

4 a) Dismantling dry stone or spawl pitching. 100Cft. 435.60 cu.m 153.85 ditto

b) Dismantling stone or spawl pitching (mud grouted). 100Cft. 551.75 cu.m 194.90 ditto

5 Dismantling stone or spawl pitching and apron in silted 100Cft. 726.00 cu.m 256.40 dittocondition.

6 Dismantling stone pitching, cement or lime grouted. 100Cft. 1,161.60 cu.m 410.30 ditto

7 Dismantling stone in crates:

a) wooden crates 100Cft. 580.80 cu.m 205.15

b) wire crates ditto 726.00 ditto 256.40

8 Dismantling stone ware drain including base concrete. 100Cft. 406.55 cu.m 143.60 ditto

Brick Work

9 Dismantling mud/pise walling. 100Cft. 145.20 cu.m 51.30 18.1

10 Dismantling sun dried brick masonry. 100Cft. 363.00 cu.m 128.20 ditto

11 Dismantling dry brick masonry. 100Cft. 246.85 cu.m 87.20 ditto

12 Dismantling brick work in mud mortar. 100Cft. 508.20 cu.m 179.50 18.1 Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4th

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

Chap-4 (Dismantling) Page 34

Page 36: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

13 Dismantling brick work in lime or cement mortar. 100Cft. 1,234.20 cu.m 435.90 ditto and subsequent floors respectivelyagainst item No. 12, 13, 14 & 15.

14 Dismantling cement block masonry. 100Cft. 1,089.00 cu.m 384.65 ditto

15 Dismantling Dhajji walling. 100Cft. 290.40 cu.m 102.55 ditto

Concrete

16 Dismantling mud concrete. 100Cft. 580.80 cu.m 205.15 ditto

17 Dismantling lime concrete. 100Cft. 798.60 cu.m 282.05 Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4th

18 Dismantling lime or cement concrete, under water. 100Cft. 3,049.20 cu.m 1077.00 and subsequent floors respectivelyagainst item No. 17, 19 & 20.

19 a) Dismantling cement concrete plain 100Cft. 1,597.20 cu.m 564.15 ditto1:4:8.

b) Dismantling cement concrete plain ditto 2,613.60 ditto 923.101:3:6.

c) Dismantling cement concrete 1:2:4 ditto 3,194.40 ditto 1128.25plain.

d) Dismantling cement concrete with brick ditto 871.20 ditto 307.70aggregate.

e) Dismantling D.P.C. of cement concrete ditto 435.60 ditto 153.851½" thick (40 mm) and clearing the site.

20 Dismantling cement concrete reinforced, 100Cft. 5,227.20 cu.m 1846.25 ditto

separating reinforcement from concrete,cleaning and straightening the same.

Roofing

21 Dismantling sirki sarkanda or thatched 100Sft. 174.25 sq.m 18.75 18.1roofing, supported on battens or ballies.

22 a) Dismantling 1st class tile roofing. 100Sft. 435.60 sq.m 46.85 Add extra 13%, 32 and 51% onlabour rate only for 2nd, 3rd, 4th

b) Dismantling 2nd class tile roofing. 100Sft. 363.00 sq.m 39.05 ditto and subsequent floors respectivelyagainst items No. 22, 25, 26 and28.

23 Dismantling from any height, asbestos sheets and ridge 100Sft. 224.40 sq.m 24.15 18.1coping.

Chap-4 (Dismantling) Page 35

Page 37: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

24 a) Dismantling roof of wooden planks and battens, from 100Sft. 195.35 sq.m 21 dittoany height.

b) Dismantling wooden ceiling above 20' (6.0 m) height 100Sft. 760.30 sq.m 81.80 dittoin difficult position, including lifting with care andspecial scaffolding along live electric wires and withmachines underneath.

25 Dismantling jack arch roofing, including removal of joists. 100Sft. 580.80 sq.m 62.50 ditto

26 Dismantling R.B. roof complete with mud and plaster, 100Sft. 726.00 sq.m 78.10 dittoincluding separating reinforcement, cleaning andstraightening the same.

27 a) Stripping and stacking slate or tiles from the truss 100Sft. 363.00 sq.m 39.05roofing.

b) Stripping and stacking C.I. sheet roof. ditto 328.40 ditto 35.35

c) Extra for dismantling C.I. sheet roof above 20 ft. (6m) ditto 468.60 ditto 50.40in difficult position, including lifting with specialscaffolding along live electric wire with machineunderneath.

28 Dismantling slates or tiles including battens, purlins and 100Sft. 580.80 sq.m 62.50 18.1planking.

Flooring

29 Dismantling brick or flagged flooring without 100Sft. 246.85 sq.m 26.55 18.1 Add extra 13%, 32% and 51% onconcrete foundation. labour rates only for 2nd, 3rd, 4th

and subsequent floors respectively30 Dismantling plank or wooden block flooring, 100Sft. 363.00 sq.m 39.05 ditto against items No. 29 and 30.

etc.

31 Disjoining R.C.C. pipes inside the trench and dismantling i) The rate does not include theand removing the pipes from the trench and stacking them cost of excavation and refilling ofoutside:- trench, or the demolition of any

masonry or brick work.a) 6" to 12" (150 to 300 mm) diameter Per Lft 11.10 Metre 36.40b) 13" to 24" (325 to 600 mm) diameter Per Lft 16.90 Metre 55.45 ii) Bends, elbows, sluice valves,c) 25" to 36" (625 to 900 mm) diameter ditto 19.90 ditto 65.25 etc. should not be paid for extra ifd) Above 36" (Above 900 mm) diameter ditto 28.15 ditto 92.35 fixed in the length of pipe line that

is being dismantled.

Chap-4 (Dismantling) Page 36

Page 38: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

WOOD WORK32 a) Removing door with chowkat. Per 145.20 Per 145.20 18.1 Add extra 13%, 32% and 51% on

No. No. labour rates only for 2nd, 3rd, 4thb) Removing windows and sky lights with chowkat. ditto 113.83 ditto 113.83 and subsequent floors respectively

against items No. 32, 33, 34, 35 &36.

33 Removing ventilators and wooden sunshade, etc. Per No. 61.06 Per No. 61.06 ditto

34 a) Dismantling wooden beams upto 12' (3.65m) Per No. 90.75 Per No. 90.75 dittolength.

b) Dismantling wooden beams from 12.1' to 23' ditto 145.20 ditto 145.20(3.65 to 7.0 m) length.

35 a) Dismantling wooden partition Jaffry work etc. 100Sft. 174.45 sq.m 18.75 ditto

b) Dismantling wooden trusses. 100Kg 517.10 %Kg 517.10

36 Dismantling wooden palisade fencing. Per Lft. 14.30 Metre 46.90 ditto

Iron work

37 Dismantling iron work of trusses, sheds, water tanks, etc. 100Kg 519.65 %Kg 519.65 18.1 Add extra 13%, 32% and 51% onexcluding cutting of rivets. labour rates only for 2nd, 3rd, 4th

and subsequent floors respectivelyagainst items No. 37 and 38.

38 Dismantling rolled steel beams or iron rails, etc. 100Kg 238.30 %Kg 238.30 ditto

39 Dismantling iron latrine. Per Unit/ 521.40 Per Unit/ 521.40 ditto2 Seats 2 Seats

40 Dismantling tees, bends or sluice valves upto 12" Each per 10.55 Each per 4.20 ditto(300 mm) bore. inch bore cm bore

41 a) Dismantling B.G. water column. Each 3,770.25 Each 3770.25 ditto

b) Dismantling M.G. or N.G. water column. Each 2,516.25 Each 2516.25 ditto

42 Dismantling all type of wire fencing, including rolling wire 100Lft. 246.85 Metre 8.10 18.1into bundles and collecting material.

Chap-4 (Dismantling) Page 37

Page 39: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

Miscellaneous

43 Dismantling wire netting of tennis courts and frame work. 100Sft. 116.15 sq.m 12.50 18.1

44 Dismantling cloth ceiling and supporting timber. 100Sft. 217.80 sq.m 23.45 ditto

45 Dismantling and removing road metalling. 100Cft. 580.80 cu.m 205.15 ditto

46 Dismantling and removing road pavement, etc., including 100Cft. 775.35 cu.m 273.85 dittoscreening and stacking of byproducts upto one chain lead(30 metre).

47 Removing mud plaster from walls. 100Sft. 60.50 sq.m 6.50 ditto Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4th

48 Removing cement or lime plaster. 100Sft. 121.00 sq.m 13.00 ditto and subsequent floors against itemNo. 47, 48, 49, & 50 respectively

49 Scraping:- 18.1

a) White wash or colour wash. 100Sft. 72.60 sq.m 7.80

b) Ordinary distemper, oil bound distemper, ditto 217.80 ditto 23.45or paint of wall.

50 Dismantling glazed or encaustic tiles, etc. 100Sft. 818.40 sq.m 88.05 18.1

51 Scraping boulders. 100Cft. 1,016.40 cu.m 359.00 18.1

52 Cleaning lime or cement mortar of old stones 100Cft. 508.20 cu.m 179.50 18.1to be used in masonry.

Electric Wiring

53 Dismantling light, fan and call bell point Per 22.55 22.85 Per 22.55 22.85including casing and capping/strip open type, point pointand making good damaged surface (buildingportion).

54 Dismantling plug point and making good Per 19.35 19.60 Per 19.35 19.60damaged surface (building portion). point point

55 Dismantling G.I./M.S. conduit/G.I. flexible/PVC pipes orconduit wiring, etc. of all sizes including making gooddamaged surface (building portion):-

i) on surface Per foot 4.15 4.20 P.Mtr 13.60 13.80ii) recessed in wall Per foot 8.70 8.80 P.Mtr 28.55 28.85

Chap-4 (Dismantling) Page 38

Page 40: MRS Jan-Mar 09

Dry Material Required for Dry Material Required for 100 Cft. Wet (Ready) Mortar One Cum Wet (Ready) Mortar

S. No. Ratio of Mortar Cement Lime Cement Lime Sand (50 Kg) Putty Sand (50 Kg.) Putty Cum.

Bag Cft. Cft. Bag. Cum1 2 3 4 5 6 7 81 Cement : Sand

1 : 2 33.48 82 11.83 0.821 : 3 23.11 85 8.16 0.851 : 4 18.37 90 6.49 0.901 : 5 14.70 90 5.19 0.901 : 6 13.61 100 4.81 1.001 : 7 11.68 100 4.12 1.001 : 8 10.21 100 3.61 1.00

2 Cement : Lime : Sand1 : 1 : 6 12.25 15.0 90 4.33 0.15 0.901 : 1 : 7 10.70 13.1 92 3.78 0.13 0.921 : 1 : 8 9.39 11.5 92 3.32 0.12 0.921 : 1 : 9 8.52 10.44 94 3.00 0.10 0.94

1 : 1 : 10 7.67 9.4 94 2.71 0.09 0.941 : 2 : 8 9.19 22.5 90 3.25 0.23 0.901 : 2 : 9 8.16 20.0 90 2.88 0.20 0.90

1 : 2 : 10 7.67 18.8 94 2.71 0.19 0.941 : 2 : 12 6.39 15.66 94 2.26 0.16 0.941 : 3 : 12 6.26 23.0 92 2.21 0.23 0.921 : 3 : 14 5.47 20.1 94 1.93 0.20 0.941 : 3 : 16 4.82 17.7 94 1.70 0.18 0.941 : ¼ : 3 23.11 7.0 85 8.16 0.07 0.85

3 Lime : Sand1 : 2 43 86 0.43 0.861 : 3 31 93 0.31 0.93

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

MORTAR

Chap-5 (Mortar) Page 39

Page 41: MRS Jan-Mar 09

MORTARDry Material Required for 100 Cft. Dry Material Required for

Wet (Ready) Mortar one M3 Wet (Ready) MortarS. Ratio of Mortar Clay Lime Sand Surkhi Cinder Clay Lime Sand Surkhi CinderNo. (Putty) (Putty)

Cft. Cft. Cft. Cft. Cft. M3 M3 M3 M3 M3

1 2 3 4 5 6 7 3 4 5 6 7

4 Mud 135 1.35

5 Lime : Surkhi2 : 3 49.00 - 73.5 - 0.49 - 0.74 -1 : 2 40.75 - 81.5 - 0.41 - 0.82 -1 : 3 30.30 - 91.0 - 0.30 - 0.91 -

6 Lime : Sand : Surkhi1 : 1 : 1 40.50 40.5 40.5 - 0.41 0.41 0.41

7 Lime : Cinder1 : 1 57.0 - 57.0 - 0.57 - - 0.57

Wet material required for 100 Cft. Wet material required for 1M³ (35.32 Cft) masonry (including wastage): masonry ( including wastage) :

1 Brick Masonry :a) Mud Mortar 35.00 Cft 0.35 M3

b) Cement, Sand 25.00 Cft 0.25 M3

c) Cement, Lime (Putty) Sand 25.00 Cft 0.25 M3

d) Lime (Putty) Sand 25.00 Cft 0.25 M3

2 Stone Masonry :a) Random rubble, uncoursed

i) Foundation and Plinth 45.00 Cft 0.45 M3

ii) Superstructure 40.00 Cft 0.40 M3

iii) Coursed 35.00 Cft 0.35 M3

b) Ashlar Block in course or Scabled masonry 30.00 Cft 0.30 M3

c) Ashlar fine masonry 20.00 Cft 0.20 M3

(1) Cement 1 Cft. = 40.8233 KgNotes : (2) Unslaked lime 1.7 Cft. = 37.3242 Kg

(3) Slaked lime 2.5 Cft. = 37.3242 Kg(4) Quick lime 40 Kg Will yield 2.6 Cft. lime putty.

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

Chap-5 (Mortar) Page 40

Page 42: MRS Jan-Mar 09

CONCRETENotes 1 Notes (1) Rates for all finished works include the removal of surplus debris, unused material and by products.

2 If concrete mixer or high frequency vibrator, etc. is supplied by the Government, all charges including depreciation will be recovered from the contractor.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Mud concrete in foundation including watering and ramming, 100Cft 1603.80 3463.80 cu.m 566.45 1223.40 The stone ballast, crushed bajri,

using brick or stone ballast 1½" (40 mm) gauge. round shingle from nallah, or brick

ballast may be used according to

2 Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 100Cft 1089.00 2805.00 cu.m 384.65 990.75 their comparative cheaper rates in

mm) gauge. various areas of the Province.

3 Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 20.1 -do-

50 mm) gauge, in foundation and plinth:-

(a) Ratio 1: 3: 6 100Cft 2112.00 9494.40 cu.m 745.95 3353.40

(b) Ratio 1: 4: 8 ditto 2112.00 8102.40 " 745.95 2861.75

(c) Ratio 1:5:10 ditto 2112.00 7363.20 " 745.95 2600.70

(d) Ratio 1: 6:12 ditto 2112.00 6801.55 " 745.95 2402.30

(e) Ratio 1: 6: 18 ditto 2112.00 6285.60 " 745.95 2220.05

(f) Ratio 1: 7:20 ditto 2112.00 6006.00 " 745.95 2121.30

4 Extra on item No. 3 above, for sedimentation tank or filter

beds of Public Health Engineering Works: The stone ballast, crushed bajri,

round shingle from nallah, or brick

(a) in bed 100Cft 785.40 - cu.m 277.40 - ballast may be used according to

their comparative cheaper rates in(b) on slope ditto 1194.60 - " 421.95 - various areas of the Province.

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

Chap-6 (Concrete) Page 41

Page 43: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

5 Cement concrete plain including placing, 20.1

compacting, finishing and curing

complete (including screening and

washing of stone aggregate):

(a) Ratio 1: 1:2 100Cft 2996.40 18429.60 cu.m 1058.35 6509.35

(b) Ratio 1: 1½: 1½ ditto 2996.40 18170.40 " 1058.35 6417.80

(c) Ratio 1: 1½: 3 ditto 2996.40 14682.00 " 1058.35 5185.70

(d) Ratio 1: 2: 3 ditto 2996.40 13987.20 " 1058.35 4940.30

(e) Ratio 1: 3: 3 ditto 2996.40 12381.60 " 1058.35 4373.20

(f) Ratio 1: 2: 4 100Cft 2996.40 12658.80 cu.m 1058.35 4471.10

(g) Ratio 1: 2: 6 ditto 2996.40 11179.20 " 1058.35 3948.50

(h) Ratio 1: 3: 6 ditto 2996.40 10765.20 " 1058.35 3802.25

(i) Ratio 1: 4: 8 ditto 2996.40 9390.00 " 1058.35 3316.55

6 Providing and laying reinforced cement concrete (including 20.4 1) The rate includes rendering floor

prestressed concrete), using coarse sand and screened surface smooth, and the plastering

graded and washed aggregate, in required shape and design, done for making up all surfaces

including forms, moulds, shuttering, lifting, compacting, after removing centring.

curing, rendering and finishing exposed surface, complete

(but excluding the cost of steel reinforcement, its fabrication 2) Plastering done under soffit of

and placing in position, etc.):- R.C.C. roof slab meant for human

habitation buildings shall be paid

(a) (i) Reinforced cement concrete in roof slab, beams, extra.

columns lintels, girders and other structural members laid in

situ or precast laid in position, or prestressed members cast 3) This item shall not be applicable

in situ, complete in all respects:- to factory made units.

(1) Type A (nominal mix 1:1:2) Per Cft 63.60 246.20 cu.m 2246.35 8695.80 4) Composite rate shall be reduced by

(2) Type B (nominal mix 1: 1½: 3) ditto 63.60 208.80 " 2246.35 7374.80 Rs:5/- P.Cft & Rs:7/- P.Cft if chenab sand (3) (c) Type C (nominal mix 1: 2: 4) ditto 63.6 188.6 " 2246.35 6661.35 and local sand respectively is used.

Chap-6 (Concrete) Page 42

Page 44: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

(a)(ii) Reinforced cement concrete in slab of rafts / strip

foundation, base slab of column and retaining walls; etc and

other structural members other than those mentioned in

5(a) (i) above not requiring form work (i.e. horizental

shuttering) complete in all respects:-

(1) Type A (nominal mix 1: 1: 2) Per Cft 38.55 201.85 cu.m 1361.60 7129.35

(2) Type B (nominal mix 1: 1½: 3) ditto 38.55 162.40 " 1361.60 5735.95

(3) Type C (nominal mix 1: 2: 4) ditto 38.55 142.20 " 1361.60 5022.50

(b) Precast reinforced cement concrete and prestressed

reinforced cement concrete in columns, beams, lintels, stair

cases, shelves, etc.

(1) Type A (nominal mix 1: 1: 2) Per Cft 50.90 227.75 cu.m 1797.80 8044.15

(2) Type B (nominal mix 1:1½: 3) ditto 50.90 190.10 " 1797.80 6714.35

(3) Type C (nominal mix 1: 2: 4) ditto 50.90 170.15 " 1797.80 6009.70

(c) Erecting and fixing in position, precast cement concrete

or stone slab in roofs or lintels, etc. lift unto 20 ft., (6m) Per Cft 24.75 31.80 cu.m 874.15 1123.20

including all charges.

(d) Add extra labour for R.C. concrete in Per Cft 10.90 -- cu.m 385.00 -

2nd and subsequent storeys.

7 Providing and casting in situ bored reinforced concrete piles *851-1 Composite rate shall be reduced bywith type C concrete (nominal mix 1: 2: 4 ) , using 10% extra to Rs:5/- P.Cft & Rs:7/- P.Cft if chenab sand cement in dry mix, and course sand, including all labour and 851-10 and local sand respectively is used.material (except the cost of steel reinforcement and itslabour for bending and laying in position, etc. which will bepaid separately, including, screening & washing of shingleand curing:-i) 18 " (450 mm) dia pile Per Rft 644.35 842.00 Metre 2113.45 2761.75ii) 20" (500 mm) dia pile Per Rft 714.55 958.40 Metre 2343.70 3143.55iii) 22" (550 mm) dia pile Per Rft 818.55 1106.25 Metre 2684.85 3628.50

Chap-6 (Concrete) Page 43

Page 45: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

iv) 24" (600 mm) dia pile Per Rft 949.70 1301.25 Metre 3115.00 4268.15

8 Fabrication of mild steel reinforcement bar cage for R.C.C. *851-5 The rate includes wastage, overlaps,

bored piles, including cutting, bending, laying in position, etc.

welding and fastening, including cost of binding wire and

labour charges for binding of steel reinforcement (also

includes removal of rust from the bars):-

(a) plain bars Per Cwt. 792.00 4025.80 100 kg 1559.05 7924.80

(b) deformed bars ditto 792.00 4300.60 " 1559.05 8465.75

9 Fabrication of mild steel reinforcement for cement concrete, *851.5 The rate includes wastage, overlaps

including cutting, bending, laying in position, making joints and chairs, etc.

and fastenings, including cost of binding wire and labour

charges for binding of steel reinforcement (also includes

removal of rust from bars):-

(a) plain bars Per Cwt. 214.50 3609.20 100 kg 422.25 7104.70

(b) deformed bars ditto 214.50 3906.20 " 422.25 7689.35

10 Precast cement concrete solid or face blocks (1:2:4), Per Cft 29.20 121.65 cu.m 1031.35 4296.70 20.2

including cost of templates.

11 Precast cement concrete hollow blocks (1: 2: 4) , including Per Cft 65.20 125.75 cu.m 2302.85 4441.50 20.2

cost of templates and constructing walls thereof.

12 Providing and fixing ornamental cement jali 2" (50 mm) thick Per Sft 20.45 36.30 sq.m 220.05 390.60 20.1 to

(1: 2: 4), without steel. 20.4

13 Extra labour for laying concrete plain or reinforced:

(a) above 20' (6 m) upto 40'(12 m) height 100Cft 1161.60 - cu.m 410.30 -

(b) for every additional 10'(3 m) height. 100Cft 726.00 - cu.m 256.40 -

Chap-6 (Concrete) Page 44

Page 46: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

14 Extra labour for work of weirs, rail or road bridges, syphons, and 100Cft 290.40 - cu.m 102.55 -

concreting in superstructure

15 Making reinforced cement concrete spout, including fixing in Each 255.75 348.45 Each 255.75 348.45 20.4

position (2½' x 6" x5") (760 mmx150 mm x 125 mm)

16 Making holes upto 3"(75 mm) dia 18"(450 mm) depth in cement Per hole 613.80 - Each 613.80 - 20.1

concrete or stone masonry walls and repairing.

17 Extra labour for skipping concrete in wells. 100Cft 1716.00 - cu.m 606.10 - 20.1

18 Nicking concrete surface:

(a) Cement concrete surface 100Sft 264.00 - sq.m 28.40 -

(b) Lime concrete surface ditto 87.10 - " 9.35 -

19 Preparing, watering and ramming surface for laying concrete

(for Headworks only):-

(a) Horizontal floor 100Sft 220.45 - sq.m 23.70 -

(b) Glacis and crest ditto 336.60 - " 36.20 -

(c) Inverted filters ditto 102.30 - " 11.00 -

20 Fabrication of high tensile steel prestressing cables for 100 Kg. 2567.80 28871.05 100 Kg. 2567.80 28871.05 *811-1 The rate includes wastage in

prestressed (post tensioned) concrete, including assembling by to cutting and breakage in stressing,drawing the H.T. wire through metal spacer plate, inserting in helix 811-11 etc.core and taping or tying, sheathing in longitudinally welded metalcorrugated sheath, positioning , anchorage with male and femaleset of anchorage cone, forming ducts for transverse cable,stressing cables with jack at both ends as per stressing schedule,maintaining stressing record and supply the same in the approvedproforma to the Engineer-in-charge, making loop at blind end,including all materials required for it, grouting the cable ducts withcement, cutting projected ends and making good recesses, etc.,complete in all respects.

Chap-6 (Concrete) Page 45

Page 47: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

21 Fabrication of High Tensile steel reinforcement for prestressed 100kg 1579.80 26977.50 %kg 1579.80 26977.50 1) The rate includes wastage in

(pretension) concrete work, including inserting wire in moulds, cutting and breakage in stressing,

providing M.S. shear bars, spacers and lift hooks, male and etc.

female anchorage, tie down, struts, stressing cables, maintaining 2) Quantity of H. T. wire will form

stress record and supply the same in approved proforma to the basis of payment.

Engineer-in-charge, cutting wires and projecting ends and making 3) This item shall not be applicable

good recesses, etc., complete in all respects. to factory made units.

22 Lifting, transporting and placing precast prestressed concrete *811-1

B eam, Girder and other members (excluding battens) etc. in to

Position on the bridge to correct alignment and level, etc. 811-11

complete

i) Beam upto 50 ft. (15 m) length 100Cft 1098.95 cu.m 388.15

ii) Beam above 50 ft. (15m) upto 75 ft. (22.5m) length 100Cft 1616.29 cu.m 570.85

iii) Beam above 75ft. (22.5m) upto 100ft. (30m) length 100Cft 2046.90 cu.m 722.95

iv) Beam above 100ft. (30m) upto 150ft.(45m) length 100Cft 2610.80 cu.m 922.15

v) Beam above 150ft. (45m) length 100Cft 3139.15 cu.m 1108.75

23 Providing and laying foam concrete 3 inch (75 mm) thick, Per Sft. 17.60 43.70 sq.m. 189.40 470.20

using cement sand in the ratio of 1:2 and aluminium powder

at the rate of 0.2% of the cement, sand mix,

24 Providing and fixing 6 in(150 mm). wide curved sheet of

required shape fixed on face of the construction joint with G.I.

screw,1.5 in (40 mm) long to cover construction joints

vertically:-

i) aluminium sheet 1/16 in(1.5 mm) thick Per Rft. 12.05 38.00 Metre 39.50 124.65

ii) G.I. sheet, 18 SWG Per Rft. 7.05 57.40 Metre 23.10 188.25

25 Providing and fixing 1/8" (3 mm) thick 3" (75 mm) wide aluminiumstrip on horizontal and vertical expansion joints in walls, columns,

Chap-6 (Concrete) Page 46

Page 48: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

ceilings and floors etc., including cost of clips/screws etc.,

complete in all respects:-

a) On interior surface (without mastic strip) Per Rft. 3.90 29.85 Metre 12.80 97.90

b) On exterior surface (with mastic strip) ditto 3.90 32.70 " 12.80 107.25

26 Providing and fixing 1/16" (1.5 mm) thick copper flashing on Per Sft. 7.35 77.65 Sq.m 79.10 835.50

expansion joints complete in all respects.

27 Providing and fixing 6 in (150 mm). wideG.I. sheet 18SWG. Per Rft. 3.90 50.85 Metre 12.80 166.80

stopper to expansion joint.

28 Providing embeding 10" (250 mm) wide ¼" (6 mm) thick Per Rft. 16.50 58.50 Metre 54.10 191.85

rubber water stopper in expansion joints of R.C.C. roof

slab complete in all respects.

29 Filling expansion joints with bitumen. sand & saw dust in Per Rft Per Metre/

ratio 1:2:2. per inch 1.80 5.10 Per 25 mm 5.90 16.75

width Width

30 Filling expansion joints with bitumen. Per Rft. 24.90 - Metre 81.65 -

31 Laying asphaltic mixture in expansion joints. Per Rft. 25.40 - Metre 83.30 - Material to be paid on actuals.

32 Providing and fixing theremopore (foamed polythene)

sheet in horizontal and vertical expansion joints:

a) 1" (25 mm) thick thermopore sheet Per Sft. 4.10 8.80 Sq.m 44.10 94.70

b) 1½" (40 mm) thick thermopore sheet ditto 4.10 12.90 " 44.10 138.80

33 Providing and laying damp proof course of cement concrete

1:2: 4(using cement, sand and shingle), including bitumencoating :-

Chap-6 (Concrete) Page 47

Page 49: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

(a) with one coat bitumen and one coat polythene sheet

500gauge

i) 1½" thick (40 mm) 100Sft 797.50 2789.75 sq.m 85.80 300.20

ii) 2" thick (50 mm) 100Sft 797.50 3136.60 sq.m 85.80 337.50

iii) 3" thick (75 mm) 100Sft 830.50 3940.25 sq.m 89.35 423.95

(b) with 2 coats of bitumen:

i) 1½" thick (40 mm) 100Sft 797.50 2946.05 sq.m 85.80 317.00

ii) 2" thick (50 mm) 100Sft 797.50 3292.50 sq.m 85.80 354.25

iii) 3" thick (75 mm) 100Sft 830.50 4096.15 sq.m 89.35 440.75

34 Providing and laying damp proof course with cement sand

plaster and bitumen coating:-

(a) with one coat of bitumen and one coat of polythene sheet

500 gauge :-

i) Ratio 1: 4

a) ½" thick (13 mm) 100Sft 748.00 1840.05 sq.m 80.50 198.00

b) ¾" thick (20 mm) 100Sft 748.00 2030.60 sq.m 80.50 218.50

ii) Ratio 1:3

a) ½ " thick (13 mm) 100Sft 748.00 1903.20 sq.m 80.50 204.80

b) ¾ " thick (20mm) 100Sft 748.00 2105.50 sq.m 80.50 226.55

iii) Ratio 1:2

a) ½ " thick (13 mm) 100Sft 748.00 1997.35 sq.m 80.50 214.90

b) ¾ " thick (20 mm) 100Sft 748.00 2286.80 sq.m 80.50 246.05

Chap-6 (Concrete) Page 48

Page 50: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

(b) with 2 coats of bitumen:-

i) Ratio 1: 4

a) ½" thick (13 mm) 100Sft 748.00 1903.70 sq.m 80.50 204.85

b) ¾" thick (20 mm) 100Sft 748.00 2094.45 sq.m 80.50 225.35

ii) Ratio 1:3

a) ½ " thick (13 mm) 100Sft 748.00 1967.60 sq.m 80.50 211.70

b) ¾ " thick (20 mm) 100Sft 748.00 2169.90 sq.m 80.50 233.50

iii) Ratio 1:2

a) ½ " thick (13 mm) 100Sft 748.00 2124.55 sq.m 80.50 228.60

b) ¾ " thick (20 mm) 100Sft 748.00 2428.40 sq.m 80.50 261.30

35 Providing and laying vertical damp proof course with cement

sand plaster and bitumen coating:-

(a) with one coat of bitumen and one coat of polythene sheet

500 gauge:

i) Ratio 1: 4

a) ½" thick (13 mm) 100Sft 748.00 1776.95 sq.m 80.50 191.20

b) ¾" thick (20 mm) 100Sft 748.00 1967.85 sq.m 80.50 211.75

ii) Ratio 1:3

a) ½ " thick (13 mm) 100Sft 748.00 1840.40 sq.m 80.50 198.05

b) ¾ " thick (20 mm) 100Sft 748.00 2042.75 sq.m 80.50 219.80

iii) Ratio 1:2

a) ½ " thick (13 mm) 100Sft 748.00 1997.35 sq.m 80.50 214.90

b) ¾ " thick (20 mm) 100Sft 748.00 2301.20 sq.m 80.50 247.60

Chap-6 (Concrete) Page 49

Page 51: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

(b) with 2 coats of bitumen:-

i) Ratio 1: 4

a) ½" thick (13 mm) 100Sft 748.00 1903.65 sq.m 80.50 204.85

b) ¾" thick (20 mm) 100Sft 748.00 2094.45 sq.m 80.50 225.35

ii) Ratio 1:3

a) ½ " thick (13 mm) 100Sft 748.00 1967.00 sq.m 80.50 211.65

b) ¾ " thick (20 mm) 100Sft 748.00 2169.30 sq.m 80.50 233.40

iii) Ratio 1:2

a) ½ " thick (13 mm) 100Sft 748.00 2123.95 sq.m 80.50 228.55

b) ¾ " thick (20 mm) 100Sft 748.00 2427.75 sq.m 80.50 261.20

36 Grouting concrete between, the grooves of gates, including 100Cft 3646.50 - cu.m. 1287.95 -

shuttering.

37 Chiesel dressing concrete surface on sides of grooves. 100Sft 145.20 - sq.m 15.60 -

38 Laying and ramming dry ballast or kankar. 100Cft 1179.75 - cu.m 416.70 -

39 Hoisting and placing in position R.C.C. shelves. per No. 43.30 - per No. 43.30 -

40 Breaking brick ballast, screening and stacking:-

(a) 2"(50 mm) ring 100Cft. 907.50 - cu.m 320.55 -

(b) 1½ "(40 mm) ring ditto 1016.40 - " 359.00 -

(c) 1" (25 mm) ring ditto 1179.75 - " 416.70 -

(d) Jhama ballast ¾"(20 mm) ring ditto 1361.25 - " 480.80 -

Chap-6 (Concrete) Page 50

Page 52: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

41 Supplying and fixing broken glasses on court yard walls, Per Rft 29.10 57.20 metre 95.45 187.60

including 1:3: 6 cement concrete coping.

42 Crushing stone ballast by machine. 100Cft 907.50 - cu.m. 320.55 - This does not include the charges

for working of crushers, but includes

manual labour for carriageof stone to

crusher within three chains (90 m)

and also stacking the product after

crushing within three chains (90 m).

43 Breaking stone ballast screened and stacked:-

(a) 2" ring (50 mm) 100Cft. 1016.40 - cu.m. 359.00 -

(b) 1½ " ring (40 mm) ditto 1179.75 - " 416.70 -

(c) 1" ring (25 mm) ditto 1361.25 - " 480.80 -

d) ½ " ring (13 mm) ditto 1815.00 - " 641.05 -

(e)1/8" to ¼" ring (3 mm to 6 mm) ditto 3085.50 - " 1089.80 -

44 Screening and stacking stone ballast shingle or bajri, etc. 100Cft. 290.40 - cu.m. 102.55 -

45 Washing ballast, bajri or shingle. 100Cft. 290.40 - cu.m. 102.55 -

46 Erecting and carting sun shades of precast R.C. concrete

upto 5' x 2½' (1.50 m x 0.76 m) Each 182.15 - Each 182.15 -

Specification numbers correspond to book of standard specification of Road and Bridge Construction, "1971"

Chap-6 (Concrete) Page 51

Page 53: MRS Jan-Mar 09

BRICK WORK1 Rates for all finsihed works include the removal of surplus debris, unused material and byproducts.2 The rates apply to all sizes of bricks, including the modular bricks of size 8"x4"x4" (200x100x100 mm) nominal.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Pacca brick work in mud mortar in buildings: 21.1 Masonry of boundary wall to beto considered as masonry other than

i) in foundation and plinth 100Cft. 1664.50 8354.50 cu.m 587.90 2950.80 21.4 building.ii) in ground floor ditto 2218.90 8908.90 ditto 783.70 3146.60

The composite rate is to bereduced by 7% and 14%, if 2nd or3rd class bricks are used.

2 Add extra labour on item No. 1 for brick work in:-

i) first floor 100Cft. 422.40 -- cu.m 149.20 -ii) second floor ditto 976.80 -- ditto 345.00 -iii) third floor ditto 1531.20 -- ditto 540.80 -iv) fourth & subsequent floors ditto 2494.80 -- ditto 881.15 -

3 Pacca brick work in mud mortar other than building:- 21.1 to Same remarks as against21.4 item No. 1 above

i) upto 20 ft. (6.1 m) height 100Cft. 2287.30 8977.30 cu.m 807.85 3170.80ii) extra labour for every 5 ft. (1.5 m) ditto 422.40 -- ditto 149.20 -

additional height, or part thereof.

4 Pacca brick work in foundation and plinth in:- ditto Same remarks as againstitem No. 1 above.

i) Cement, sand mortar:-

Ratio 1:2 100Cft. 2181.45 12261.45 cu.m 770.45 4330.75Ratio 1:3 ditto 2181.45 11415.45 ditto 770.45 4031.95Ratio 1:4 ditto 2181.45 10907.85 ditto 770.45 3852.65Ratio 1:5 ditto 2181.45 10569.45 ditto 770.45 3733.15Ratio 1:6 ditto 2181.45 10315.25 ditto 770.45 3643.35Ratio 1:7 ditto 2181.45 10148.25 ditto 770.45 3584.35Ratio 1:8 ditto 2181.45 10002.60 ditto 770.45 3532.90

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-7(Brickwork) Page 52

Page 54: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

ii) lime, cement sand mortar:- 21.1 The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Cft. 2181.45 10431.60 cu.m 770.45 3684.45Ratio 1:1:7 ditto 2181.45 10261.85 ditto 770.45 3624.50Ratio 1:1:8 ditto 2181.45 10123.70 ditto 770.45 3575.70Ratio 1:1:9 ditto 2181.45 10008.20 ditto 770.45 3534.90Ratio 1:1:10 ditto 2181.45 9921.65 ditto 770.45 3504.35

iii) lime, sand mortar 1:2 100Cft. 2181.45 9456.90 cu.m 770.45 3340.20 ditto ditto

5 Pacca brick work in ground floor:- ditto i) The composite rate is tobe reduced by 7% and 14%,

i) cement, sand mortar:- if 2nd or 3rd class bricks areused.

Ratio 1:2 100Cft. 2881.05 12961.05 cu.m 1017.60 4577.85 ii) Masonry of boundary wallRatio 1:3 ditto 2881.05 12115.05 ditto 1017.60 4279.05 to be considered as masonryRatio 1:4 ditto 2881.05 11607.45 ditto 1017.60 4099.75 other than building.Ratio 1:5 ditto 2881.05 11269.05 ditto 1017.60 3980.20Ratio 1:6 ditto 2881.05 11014.85 ditto 1017.60 3890.45Ratio 1:7 ditto 2881.05 10847.85 ditto 1017.60 3831.45Ratio 1:8 ditto 2881.05 10701.45 ditto 1017.60 3779.75

ii) lime, cement, sand mortar:- The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Cft. 2881.05 11131.20 cu.m 1017.60 3931.55Ratio 1:1:7 ditto 2881.05 10962.80 ditto 1017.60 3872.05Ratio 1:1:8 ditto 2881.05 10823.30 ditto 1017.60 3822.80Ratio 1:1:9 ditto 2881.05 10707.80 ditto 1017.60 3782.00Ratio 1:1:10 ditto 2881.05 10621.45 ditto 1017.60 3751.50

iii) lime, sand mortar 1:2 100Cft. 2881.05 10156.50 cu.m 1017.60 3587.30 The rate of lime mortar also

includes grinding of mortar.

6 Add extra labour on item No. 5 for brickworkin:-

i) first floor 100Cft. 422.40 -- cu.m 149.20 -ii) second floor ditto 976.80 -- ditto 345.00 -iii) third floor ditto 1531.20 -- ditto 540.80 -iv) fourth & subsequent floors ditto 2494.80 -- ditto 881.15 -

chapter-7(Brickwork) Page 53

Page 55: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

7 Pacca brick work other than building upto 10ft. (3 m) 21.1 i) The composite rate is to beheight. to reduced by 7% and 14%, if 2nd or

21.5 3rd class bricks are used.i) cement, sand mortar:-

ii) Workshops, godowns,, bins,Ratio 1:2 100Cft. 2587.20 12667.20 cu.m 913.80 4474.05 house type godowns, reservoirs,Ratio 1:3 ditto 2587.20 11821.20 ditto 913.80 4175.25 filter beds, storage tanks, wells,Ratio 1:4 ditto 2587.20 11313.60 ditto 913.80 3995.95 screening chambers, collectingRatio 1:5 ditto 2587.20 10975.20 ditto 913.80 3876.45 tanks, manholes etc. are to beRatio 1:6 ditto 2587.20 10721.05 ditto 913.80 3786.70 treated as masonry other thanRatio 1:7 ditto 2587.20 10554.00 ditto 913.80 3727.65 buildings.Ratio 1:8 ditto 2587.20 10408.35 ditto 913.80 3676.25

ii) lime, cement, sand mortar:- The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Cft. 2587.20 10837.40 cu.m 913.80 3827.75Ratio 1:1:7 ditto 2587.20 10667.60 ditto 913.80 3767.80Ratio 1:1:8 ditto 2587.20 10529.45 ditto 913.80 3719.00Ratio 1:1:9 ditto 2587.20 10413.90 ditto 913.80 3678.20Ratio 1:1:10 ditto 2587.20 10327.40 ditto 913.80 3647.65

iii) lime, sand mortar 1:2 100Cft. 2587.20 9862.65 cu.m 913.80 3483.50 ditto

8 Add extra labour on item No. 7, for every 10ft.(3 m) 100Cft. 422.40 -- cu.m 149.20 -additional height, or part thereof.

9 Extra labour for arch work in brick masonry, including 100Cft. 937.20 -- cu.m 331.00 - 21.5labour for centring and decentring.

10 Extra for pacca brick work in steining of wells or any other 100Cft. 660.00 1053.60 cu.m 233.10 372.15 21.1 The composite rate is to becircular masonry. to reduced by 7% and 14%, if 2nd or

21.4 3rd class bricks are used.

11 Extra labour for profile and flared walls. 100Cft. 227.05 -- cu.m 80.20 -

12 Extra labour for pacca brick work in piers and abutment:-

i) from 10ft. to 20ft. (3 m to 6 m) height 100Cft. 208.55 -- cu.m 73.65 -ii) above 20 ft. (6 m) height. 100Cft. 422.40 -- cu.m 149.20 -

13 Extra for face work (half brick thick) using special bricks 100Cft. 3157.05 cu.m 1115.05 This item is to be executed onlyinstead of first class bricks. under the written permission of

Superintending Engineer.

chapter-7(Brickwork) Page 54

Page 56: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

14 Reinforced brick work in lintel of openings, laid in 1:3 Per Cft. 72.20 171.25 cu.m 2549.30 6048.55cement mortar, including all labour, material, forms,moulds, lifting & shuttering, etc, (but excluding cost andlabour of steel reinforcement which shall be paid forseparately).

15 Extra for dressing or chamfering bricks for:-

a) special architectural bricks 100 Nos. 1682.75 - % Nos. 1682.75 -b) all other purposes ditto 841.35 - ditto 841.35 -

16 Perforated pacca brick walling half brick thick, in ground 21.1 The composite rate is to befloors:- to reduced by 7% and 14%, if 2nd or

21.4 3rd class bricks are used.i) mud mortar 100 Sft. 1108.00 2782.90 Sqm. 119.20 299.45

ii) cement, sand mortar:-

Ratio 1:2 100 Sft. 1443.00 3965.40 sq.m. 155.25 426.70Ratio 1:3 ditto 1443.00 3753.75 ditto 155.25 403.90Ratio 1:4 ditto 1443.00 3627.00 ditto 155.25 390.25Ratio 1:5 ditto 1443.00 3542.40 ditto 155.25 381.15Ratio 1:6 ditto 1443.00 3483.00 ditto 155.25 374.75Ratio 1:7 ditto 1443.00 3436.80 ditto 155.25 369.80Ratio 1:8 ditto 1443.00 3402.90 ditto 155.25 366.15

iii) lime, cement sand mortar The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Sft. 1443.00 3507.95 sq.m 155.25 377.45Ratio 1:1:7 100Sft. 1443.00 3464.65 sq.m 155.25 372.80Ratio 1:1:8 100Sft. 1443.00 3432.35 sq.m 155.25 369.30Ratio 1:1:9 100Sft. 1443.00 3401.75 sq.m 155.25 366.05Ratio 1:1:10 100Sft. 1443.00 3383.25 sq.m 155.25 364.05

iv) lime, sand mortar 1:2 100Sft. 1443.00 3262.80 sq.m 155.25 351.10 ditto

17 Add extra labour on item No. 16 for pacca brick work in:-

i) first floor 100Sft. 213.85 - sq.m 23.00 -ii) second floor ditto 485.75 - ditto 52.25 -iii) third floor ditto 768.25 - ditto 82.65 -iv) fourth & subsequent floors ditto 1207.00 - ditto 129.85 -

chapter-7(Brickwork) Page 55

Page 57: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

18 Perforated pacca brick walling one brick thick, in ground 21.1 The composite rate is to befloor: to reduced by 7% and 14%, if 2nd or

21.4 3rd class bricks are used.i) mud mortar 100Sft. 1532.50 4877.50 sq.m 164.90 524.80

ii) cement, sand mortar:-

Ratio 1:2 100 Sft. 2173.50 7213.50 sq.m 233.85 776.15Ratio 1:3 ditto 2173.50 6790.50 ditto 233.85 730.65Ratio 1:4 ditto 2173.50 6536.70 ditto 233.85 703.35Ratio 1:5 ditto 2173.50 6367.50 ditto 233.85 685.15Ratio 1:6 ditto 2173.50 6248.70 ditto 233.85 672.35Ratio 1:7 ditto 2173.50 6156.05 ditto 233.85 662.40Ratio 1:8 ditto 2173.50 6084.10 ditto 233.85 654.65

iii) lime, cement, sand mortar:- The rate of lime mortar alsoRatio 1:1:6 100Sft. 2173.50 6298.60 sq.m 233.85 677.75 includes grinding of mortarRatio 1:1:7 ditto 2173.50 6211.55 ditto 233.85 668.35Ratio 1:1:8 ditto 2173.50 6144.65 ditto 233.85 661.15Ratio 1:1:9 ditto 2173.50 6086.90 ditto 233.85 654.95Ratio 1:1:10 ditto 2173.50 6044.30 ditto 233.85 650.35

iv) lime, sand mortar 1:2 100Sft. 2173.50 5810.65 sq.m 233.85 625.25 ditto

19 Add extra labour on item No. 18 for perforated pacca brickwork in:-

i) first floor 100Sft. 316.80 -- sq.m 111.90 -ii) second floor ditto 732.60 -- ditto 258.75 -iii) third floor ditto 1148.40 -- ditto 405.60 -iv) fourth & subsequent floors ditto 1871.10 -- ditto 660.85 -

20 Fire brick masonry in fireclay mortar:- 21.1to

i) upto 20 ft. (6.10 m) height including all charges. Per Cft. 28.50 488.40 cu.m 1007.05 17251.15 21.2

ii) Extra for every 5 ft. (1.5 m) additional height, or part 100Cft. 422.40 -- ditto 149.20 - A&C No.I dated 2.9.1998thereof.

21 First class brick walling laid in 1:3 cement sand mortar,reinforced with 1" (25 mm) wide 18 gauge hoop iron:- 21.19

i) 4½" (113 mm) thick walling with hoop iron, bonding 6" 100Sft. 1254.00 5732.80 sq.m 134.95 616.85(150 mm) apart.

chapter-7(Brickwork) Page 56

Page 58: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

ii) 4½" (113 mm) thick walling with hoop iron, bonding 100Sft. 1138.50 5188.50 sq.m 122.50 558.3012" (300 mm) apart.

iii) 3" (75 mm) thick walling with hoop iron, bonding 6" ditto 985.05 4346.65 ditto 106.00 467.70(150 mm) apart.

iv) 3" (75 mm) thick walling with hoop iron, bonding 12" ditto 788.05 3673.40 ditto 84.80 395.25(300 mm) apart.

22 Ghilafi work (1½ brick thick wall) 100Cft. 2227.35 6325.35 cu.m 786.70 2234.10 21.18

23 Dry brick pitching 100Cft. 1386.00 7866.00 cu.m 489.55 2778.25 21.1

24 Sun dried bricks in mud mortar 100Cft. 1861.20 3367.20 cu.m 657.40 1189.30 21.16

25 Pise wall (mud walling) 100Cft. 847.45 -- cu.m 299.30 - 21.17

26 Eave brick moulded, weathered and throated with back 21.1 to 21.2brick or drip course cornice, in 1:3 cement mortar:-

i) 3" (75 mm) thick drip course cornice Rft. 14.85 39.15 Metre 48.70 128.40 correction vide A&C No.I dated 2.9.98ii) 4½" (113 mm) thick drip course cornice. ditto 16.90 58.15 ditto 55.45 190.75iii) 4½" (113 mm) thick eave brick with back brick. ditto 11.10 79.10 ditto 36.40 259.45

27 Laying dressed or moulded brick cornices in 1:6 cement 21.1 to 21.2mortar, plastering or painting complete:-

i) 1 brick Rft. 16.90 27.10 Metre 55.45 88.90ii) 2 bricks ditto 25.10 56.40 ditto 82.35 185.00iii) 3 bricks ditto 33.45 85.30 ditto 109.70 279.80iv) 4 bricks ditto 42.00 115.70 ditto 137.75 379.50

28 Cleaning bricks dismantled from kacha pacca masonry 1,000 508.20 -- 1,000 508.20 -Nos Nos

29 Scraping bricks dismantled from pacca masonry 1,000 958.30 -- 1,000 958.30 -Nos Nos

30 Supplying and filling sand under floor; or plugging in wells. 100Cft. 121.00 841.00 cu.m 42.75 297.05

31 Providing and laying 2" (50 mm) thick and 15" (375 mm) Rft. 63.95 103.45 Metre 209.75 339.30projected tile band, laid in 1:2 cement sand mortar, withhoop iron 1" (25 mm) wide 18 gauge flat iron sheet 9"apart.

chapter-7(Brickwork) Page 57

Page 59: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

32 First class brick tiles clad by laying tiles in stretcher This item is to be executed onlycourse in cement sand mortar reinforced with 18 SWG under the written permission of thehoop iron strips bonding placed at 2.0' (600 mm) apart Superintending Engineer.horizontally, and at 1.0' (300 mm) interval vertically.

i) 1:3 100Sft. 1138.50 6318.80 sq.m 122.50 679.90ii) 1:4 ditto 1138.50 6115.75 ditto 122.50 658.05

33 Chamfering sides of head regulators and masonry walls to Per Sft. 34.10 -- sq.m 366.90 -increase width.

34 Replacing kallar eaten bricks Each No. 28.05 32.10 Each 28.05 32.10

35 Repairing corners of bridges and other hydraulic masonry Each No. 170.50 190.50 Each 170.50 190.50works

36 Extra labour for drains of bath rooms, etc. Per Lft. 16.50 -- Metre 54.10

37 Maroo corners Each 105.60 -- Each 105.60 Payable in addition to brick workCorner Corner

chapter-7(Brickwork) Page 58

Page 60: MRS Jan-Mar 09

STONE MASONRY1 The composite rates do not include the carriage of stone or spawl which will be paid separately by road and/or rail whichever means of

transport is adopted. The supply and carriage to site of work of all other materials is included in the composite rates.

2 The payment of carriage of stone or spawl will be made on the basis of the actual stack measurement (without any reduction factor) of thestone or spawl carried.

3 Where the stone or spawl is issued from stock and the contractor is paid for its carriage and/or labour only; or where the stone or spawl issupplied, carried or handled by the contractor in which no laying is required, the actual stack measurement (without any reduction factor)shall form the basis of the payment of supply or carriage of stone or spawl. The quantity of finished and completed item of work shall formthe basis of laying.

4 Rates for all finished work include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Random, rubble masonry (uncoursed), in foundation and 22.10,plinth: 22.11

a) dry masonry 100 Cft. 2409.00 3159.00 cu.m 850.85 1115.75b) in mud mortar 100 Cft. 2986.50 4006.50 cu.m 1054.85 1415.10c) in lime, sand mortar 1:2 100 Cft. 4587.00 6359.40 cu.m 1620.15 2246.15d) in cement, sand mortar

i) ratio 1:3 100 Cft. 4587.00 9366.75 cu.m 1620.15 3308.35ii) ratio 1:4 100 Cft. 4587.00 8706.60 cu.m 1620.15 3075.15

iii) ratio 1:6 100 Cft. 4587.00 7835.20 cu.m 1620.15 2767.40iv) ratio 1:8 100 Cft. 4587.00 7353.00 cu.m 1620.15 2597.10

2 Coursed rubble masonry hammer dressed, in foundation 22.8and plinth:

a) dry masonry 100 Cft. 3069.00 3819.00 cu.m 1083.95 1348.85b) in mud mortar 100 Cft. 4224.00 5244.00 cu.m 1491.90 1852.20c) in lime, sand mortar 1:2 100 Cft. 5148.00 6806.40 cu.m 1818.25 2404.00d) in cement, sand mortar:

i) ratio 1:3 100 Cft. 5148.00 9840.00 cu.m 1818.25 3475.50ii) ratio 1:4 100 Cft. 5148.00 9163.20 cu.m 1818.25 3236.45

iii) ratio 1:6 100 Cft. 5148.00 8388.50 cu.m 1818.25 2962.80iv) ratio 1:8 100 Cft. 5148.00 7962.25 cu.m 1818.25 2812.25

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-8(Stone masonary) Page 59

Page 61: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

3 Random rubble masonry (uncoursed) in 22.10ground floor or 20 ft.(6 m) height, building/otherthan building.

a) dry masonry 100 Cft. 2739.00 3489.00 cu.m 967.40 1232.30b) in mud mortar 100 Cft. 3564.00 4584.00 cu.m 1258.80 1619.05c) in lime, sand mortar 1:2 100 Cft. 4983.00 6755.40 cu.m 1760.00 2386.00d) in cement, sand mortar:

i) ratio 1:3 100 Cft. 4983.00 9864.00 cu.m 1760.00 3483.95ii) ratio 1:4 100 Cft. 4983.00 9102.60 cu.m 1760.00 3215.05

iii) ratio 1:6 100 Cft. 4983.00 8231.20 cu.m 1760.00 2907.25iv) ratio 1:8 100 Cft. 4983.00 7749.00 cu.m 1760.00 2736.95

4 Coursed rubble masonry hammer dressed, in ground floor 22.8or 20 ft. (6 m) height, building/other than building.

a) dry masonry 100 Cft. 3580.50 4330.50 cu.m 1264.65 1529.55b) in mud mortar 100 Cft. 5247.00 6255.00 cu.m 1853.25 2209.25c) in lime, sand mortar 1:2 100 Cft. 5824.50 7482.95 cu.m 2057.20 2643.00d) in cement, sand mortar:

i) ratio 1:3 100 Cft. 5824.50 10516.50 cu.m 2057.20 3714.45ii) ratio 1:4 100 Cft. 5824.50 9839.70 cu.m 2057.20 3475.40

iii) ratio 1:6 100 Cft. 5824.50 9065.00 cu.m 2057.20 3201.75iv) ratio 1:8 100 Cft. 5824.50 8638.75 cu.m 2057.20 3051.20

5 Ashlar block in course or scabbled masonry (including 22.5dressing, etc.,) in ground floor or 20 ft. (6 m) height, &building/other than building. 22.6

a) in lime, sand mortar 1:2 100 Cft. 15846.60 17499.95 cu.m 5597.00 6181.00b) in cement, sand mortar:

i) ratio 1:3 100 Cft. 15846.60 19572.45 cu.m 5597.00 6913.00ii) ratio 1:4 100 Cft. 15846.60 19064.85 cu.m 5597.00 6733.70

iii) ratio 1:6 100 Cft. 15846.60 18489.60 cu.m 5597.00 6530.55

6 Ashlar fine masonry (including dressing, etc.) in ground 22.3floor or 20 ft. 6 m) height, building/other than building. (A) to

(C) &a) in lime, sand mortar 1:2 100 Cft. 30666.90 32318.50 cu.m 10831.55 11414.90 22.4b) in cement, sand mortar:

i) ratio 1:3 100 Cft. 30666.90 33354.75 cu.m 10831.55 11780.90ii) ratio 1:4 100 Cft. 30666.90 33100.65 cu.m 10831.55 11691.15

iii) ratio 1:6 100 Cft. 30666.90 32818.45 cu.m 10831.55 11591.50

chapter-8(Stone masonary) Page 60

Page 62: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

7 Extra labour on items 3, 4, 5 & 6 above for work in:-

i) first floor 100 Cft. 603.25 - cu.m 213.05 -ii) second floor 100 Cft. 1388.65 - cu.m 490.45 -iii) third floor 100 Cft. 2188.55 - cu.m 773.00 -iv) fourth floor 100 Cft. 3527.05 - cu.m 1245.75 -

8 Extra labour on items 3,4,5 & 6 above for every 5 ft.(1.5 m) 100 Cft. 554.40 - cu.m 195.80 -

additional height, other than building, or part thereof.

9 Extra labour for arch work in stone masonry, including 100 Cft. 1623.25 - cu.m 573.35 - 22.12centering and decentring, etc.

10 Extra labour for:- 22.7

a) coping and caps, etc. 100 Cft. 9504.00 - cu.m 3356.80 -b) cornice & string course 100 Rft. 9504.00 - Rm. 311.75 -

11 Dressing stones:- 22.2i) This rate of dressing shall be paid

a) hammer dressed 100 Sft. 3366.00 - sq.m 362.20 only when the supply of undressedb) rough tooled dressed 100 Sft. 6441.60 - sq.m 693.10 stone is made.c) chisel dressed 100 Sft. 7788.00 - sq.m 838.00 ii) In case of masonry, dressing isd) fine dressed 100 Sft. 16632.00 - sq.m 1789.60 already included and this rate shall

not be added thereto.iii) Only dressed surface of stoneshall be measured.

12 Dhajji walling 5"x5" (125 mmx125 mm) thick deodar 100 Sft. 6220.65 10125.40 sq.m 669.35 1089.50 22.13framing with stone laid in 1:6 cement sand mortar, and 1:4cement sand plaster on both sides.

13 Providing and fixing stone blocks from 2 Cft. Per Cft. 237.60 262.75 cu.m 8392.05 9280.35(0.6 cu.m) to 6 Cft (0.17 cu.m). eachincluding lift upto 20 ft. (6 m)

14 Providing and fixing stone blocks, under 2 Per Cft. 138.60 166.70 cu.m 4895.35 5887.85Cft. (06 cu.m) each including lift upto 20 ft.(6 m)

chapter-8(Stone masonary) Page 61

Page 63: MRS Jan-Mar 09

ROOFING

Rates for all finished works include the removal of surplus debris unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 First class tile roofing, consisting of 4" (100 mm) earth 100Sft. 3933.60 7448.30 sq.m 423.25 801.45 23.1 Add extra 13%, 32% & 51% onand 1" (25 mm) mud plaster with Gobri leeping over ½" (13 labour rates only or 6%, 15% & 23%mm) thick cement plaster 1:6 with 34 lbs. per %Sft or on composite rates for 2nd, 3rd, 4th1.72 Kg/sq.m hot bitumen coating sand blinded, provided & sub- sequent floors, respectively.over 2 layers of tiles 12"x6"x1¼" (300x150x30 mm) laid in1:6 cement mortar with ½" (13 mm) thick sand wichedlayer of 1:6 cement mortar, including 1:2 cement pointingunderside of tiles, complete, including curing, etc.

2 Second class tile roofing consisting of 4" (100 mm) earth 100Sft. 2983.20 5519.70 sq.m 321.00 593.90 23.2 dittoand 1" (25 mm) mud plaster with Gobri leeping over ½" (13mm) thick cement plaster 1:6 with 34 lbs. per %Sft or1.72 Kg/sq.m of hot bitumen coating sand blinded,provided over one layer of 12"x6"x2" (300x150x50 mm)tiles laid in 1:6 cement mortar, including 1:2 cementpointing underneath of tiles complete including curing, etc.

3 Covering mud roof with coal tar, and fine sand. 100Sft. 169.95 630.10 sq.m 18.30 67.80 23.1 to 23.2 ditto

4 Filling spaces in between:-

a) Wooden battens over beams, filled with 100Sft. 286.00 1317.00 sq.m 30.75 141.70 Add extra 13%, 32% & 51% ondeodar wood pieces (spacers). roof area labour rates only or 6%, 15% &

b) RCC battens, filled with CC block 1:3:6. -ditto- 566.05 808.55 60.90 87.00 23% on composite rates for 2nd,c) Spaces filled with bricks. -ditto- 160.25 468.05 17.25 50.35 3rd, 4th & sub- sequent floors,

respectively.

5 Single layer of tiles 9"x4½"x1½" (225x113x40 mm) laid 100Sft. 910.80 4094.65 sq.m 98.00 440.60 23.1 dittoover 4"(100 mm) earth and 1" (25 mm) mud plaster withoutBhoosa, grouted with cement sand 1:3 on top of RCC roofslab, provided with 34 lbs. per %Sft. or 1.72 Kg/Sq.mbitumen coating sand blinded.

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-9(Roofing) Page 62

Page 64: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

6 Jack arch roofing 4½" (113 mm) thick laid in 1:5 cement 23.3 to For steel part and its erection etc.mortar, including an average depth of 4" (100 mm) cement 23.5 items 10 & 14 under Chapter IRONconcrete in haunches and over crown, with 3" (75 mm) WORK be referred.earth and 1" (25 mm) plaster, soffits of arches cementplaster 1:6 and ½" (13 mm) thick. The rate also includes Add extra 13%, 32% & 51% onbitumen coating, centring, laying skew bricks in cement labour rates only or 6%, 15% & 23%mortar (1:3), and encasing exposed flanges of the joints on composite rates for 2nd, 3rd, 4thwith fine cement concrete 1:2:4 using stone aggregate:- & sub- sequent floors, respectively.

a) cement concrete in haunches 1:6:12. 100Sft. 4290.00 10887.60 sq.m 461.60 1171.50b) cement concrete in haunches 1:3:6. ditto 4290.00 11769.30 ditto 461.60 1266.40

7 Jack arch roofing 4½" (113 mm) thick laid in 1:5 cement 23.3 For steel part and its erection etc.mortar, including an average depth of 4" (100 mm) cement to items 10 & 14 under Chapter IRONconcrete in haunches and over crown, with ½" (13 mm) 23.5 WORK be referred.cement plaster 1:6 on top (except earth filling mud plasterand gobri) soffit of arches cement plastered. The rate also Add extra 13%, 32% & 51% onincludes bitumen coating, centring, laying skew bricks in labour rates only or 6%, 15% & 23%cement sand mortar (1:3), and encasing exposed flanges on composite rates for 2nd, 3rd, 4thof the joints with fine cement concrete 1:2:4 using stone & sub- sequent floors, respectively.aggregate:-

a) cement concrete in haunches 1:6:12. 100Sft. 3458.40 10295.15 sq.m 372.10 1107.75b) cement concrete in haunches 1:3:6. ditto 3458.40 10678.00 ditto 372.10 1148.95

8 Extra for vaulted jack arch roofing. 100Sft. 924.00 sq.m 99.40 - ditto

9 Jack arch roofing of shingle and cement concrete 1:3:6, 100Sft. 4356.00 9382.85 sq.m 468.70 1009.60 23.3 ditto

4½" (113 mm) thick at crown, with ½" (13 mm) cement toplaster including cost of supplying, erecting and 23.5dismantling centring.

10 Earth filling over roof including watering, ramming with 1" 23.1 Add extra 13%, 32% & 51% on(25 mm) mud plaster finished, with gobri leeping: to labour rates only or 6%, 15% & 23%

23.3 on composite rates for 2nd, 3rd, 4tha) 3" (75 mm) thick earth filling and 1" (25 mm) mud 100Sft. 379.10 666.50 sq.m 40.80 71.70 & sub- sequent floors, respectively.

plaster

b) 4" (100 mm) thick earth filling and 1" (25mm) 100Sft. 489.70 837.10 sq.m 52.70 90.05mud plaster

11 1/8" (3 mm) thick gobri leeping on roofs or floors. 100Sft. 63.35 76.85 sq.m 6.80 8.25 ditto ditto

chapter-9(Roofing) Page 63

Page 65: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

12 Two coats of bitumen laid hot using 34 lbs. per %Sft, or 100Sft. 290.40 1187.85 sq.m 31.25 127.80 23.11.72 Kg per square metre over roof and blinded with sandat one Cft. per %Sft. (0.003 cu.m per sq.m)

13 Providing & Fixing corrugated galvanized iron sheets with G.I. bolts, 23.7 Add extra 13%, 32% & 51% onnuts, limpet and bitumen washers, wind ties, complete in labour rates only or 6%, 15% & 23%all respects without valleys and ridges:- on composite rates for 2nd, 3rd, 4th

& sub- sequent floors, respectively,a) 20 BWG 100Sft. 572.00 11633.85 sq.m 61.55 1251.80 on items 13 to 18.b) 22 BWG 100Sft. 572.00 9831.80 sq.m 61.55 1057.90c) 24 BWG 100Sft. 572.00 7944.25 sq.m 61.55 854.80

14 Khassi parnalas in cement, sand mortar 1:2, 12" (300 Rft. 47.30 62.20 Metre 155.15 204.00 23.10mm) outside width finished smooth with a floating coat ofneat cement.

15 Khuras on roof 2'x2'x6" (600 x 600 x 150 mm) Each 174.25 289.35 Each Each 289.35 23.10

16 Bottom Khuras of brick masonry in cement mortar 1:6, Each 174.25 429.35 Each 174.25 429.35 23.104'x2'x4½" (1200x600x113 mm) over 3" (75 mm) cement concrete 1:4:8.

17 Plain galvanized iron sheets 22 SWG rain water down pipeincluding clamp and fixing in position.

a) 4" (100 mm) diameter down pipe Per Rft. 36.45 111.55 Metre 119.55 365.90b) 5" (125 mm) diameter down pipe Per Rft. 36.45 129.00 Metre 119.55 423.10

18 Plain galvanized iron sheet flashing, 22 gauge. Per Sft. 36.45 96.65 sq.m 392.20 1039.95 23.11

19 Providing and fixing 1/16" (1.5 mm) thick lead flashing over Per Sft. 7.80 69.25 Sq.m 83.95 745.15roof expansion joint complete in all respects.

20 Cast iron rain water downpipe fixed in position, excluding Add extra 13%, 32% & 51% onheads and shoes, but including painting and clamps, etc:- labour rates only or 6%, 15% & 23%

on composite rates for 2nd, 3rd, 4tha) 4" dia (100 mm) cast iron down pipe. Per Rft. 34.10 178.80 Metre 111.85 586.45 & sub- sequent floors, respectively,b) 3" (75 mm) cast iron down pipe. Per Rft. 34.10 154.25 Metre 111.85 505.95 on items 19 to 24

21 Rain water down pipe cast iron head fixed in place, Each 127.70 402.30 Each 127.70 402.30including cost of clamp holdfast and painting.

chapter-9(Roofing) Page 64

Page 66: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

22 Shoes, bends or offsets for cast iron rain water down pipe, Each 29.35 249.05 Each 29.35 249.05including fixing and painting.

23 Plain GI sheet iron spouts fixed in position, including Each 151.80 241.45 Each 151.80 241.45 23.10painting.

24 Laying ½" (13 mm) thick deodar ceiling complete, 100Sft. 3069.00 11274.25 sq.m 330.20 1213.10 26.1including sawing, planing and fixing.

25 Flat sheet roof with galvanized iron plain sheets, includingbattens, rolls, screws, clips etc. (Planking to be paid forseparately):-

a) 22 BWG sheets roofing 100Sft. 1811.70 10911.70 sq.m 194.95 1174.10 23.60b) 24 BWG sheets roofing 100Sft. 1811.70 9736.65 sq.m 194.95 1047.65

26 Asbestos cement corrugated sheet roofing including 100Sft. 1221.00 4789.80 sq.m 131.40 515.40 23.8

necessary overlaps, and GI hook bolts, nuts, screws,washers and bitumen washers, etc. (excluding valleys andridges, etc).

27 Extra labour for erection of GI sheets, flat sheet or 100Sft. 136.85 -- sq.m 14.75 - 23.6asbestos sheet roofing, above 20' (6.10 m) height indifficult position, including lifting with care and specialscaffolding along live electric wires.

28 Fixing asbestos cement sheet ridges and valleys ¼" Per Rft. 14.70 60.15 Metre 48.20 197.30 23.8(6 mm) thick.

29 Plain galvanized iron sheet ridging, including fixture, 23.6timber for ridge roll and ridge sheeting:-

a) 6" (150 mm) lap and 18" (450 mm) Per Rft. 40.60 247.05 Per Metre 133.15 810.30overall, of 22 gauge G.I sheet ridging.

b) 9" (225 mm) lap and 24" (600 mm) Per Rft. 51.50 246.20 Per Metre 168.90 807.55overall, of 24 gauge G.I sheet ridging.

c) 12" (300 mm) lap and 30" (750 mm) Per Rft. 51.50 296.75 Per Metre 168.90 973.35overall, of 22 gauge G.I sheet ridging.

30 Plain 22 gauge G.I sheet gutter semi circular Per Rft. 17.60 114.85 Per Metre 57.75 376.70 23.118" (200 mm) dia meter.

chapter-9(Roofing) Page 65

Page 67: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

31 Making masonry ventilators in cement, sand Each 682.00 1001.80 Each 682.00 1001.80mortar 1:4

32 Fixing water spouts or parnalas. Each 204.60 -- Each 204.60 - 23.10

33 Making drip course 2"x½" (50x13 mm) under RCC slab edges Per Rft. 7.30 8.20 Metre 23.95 26.90in outer opening, in cement, sand mortar 1:2.

34 Supplying and laying of twin G.I sheet 20 SWG duly Per Sft. 20.75 222.50 sq.m 223.25 2394.10painted with bitumen, with polythene film in between 300gauge, to provide a sliding joint under the bearing of thebeams, including 3" (75 mm) long, 3/8" (10 mm) dia bar toact as holdfast on wall and beam.

35 Providing and laying roof insulation, comprising of singlelayer of tiles 9"x4½"x1½" (225x113x40 mm) grouted withcement sand mortar 1:3 laid over 2" (50 mm) thick earth(including mud plaster) over thermopore sheet, overpolythene sheet 300 gauge over a layer of bitumen,complete in all respects:-

i) Thermopore sheet ½ " (13 mm) thick 100Sft. 1402.50 4644.60 sq.m 150.90 499.75ii) Thermopore sheet ¾ " (20 mm) thick 100Sft. 1402.50 4771.90 sq.m 150.90 513.45iii) Thermopore sheet 1" (25 mm) thick 100Sft. 1405.80 4899.90 sq.m 151.25 527.25

36 Providing and fixing AC rain water down pipe 4" (100 mm) Rft. 8.60 83.35 Metre 28.20 273.40dia, with shoe, T-bend, clamp, etc.

37 Making jharries in existing brick masonry for providing Rate will be increased by 1.5 timerecesses for bearing of RCC roof slab, including repairing for stone masonry or plain; concrete;the damaged face:- and 2 times for reinforced cement

concrete.i) for slabs upto 6" (150 mm) thick Rft. 13.20 14.50 Metre 43.30 47.55ii) for slabs exceeding 6" to 12" (150 to 300 mm) thick. Rft. 21.60 24.00 Metre 70.85 78.70

38 Making recess in existing brick masonry for bearing of Rates will be increased by 1.5 timesbeam, girder, R.S. Joist, etc. including repairing damaged for stone masonry and plainface:- cement concrete and two times

for reinforced cement concrete.i) upto 1.0' (300 mm) height of girder or beam. Each 55.00 59.35 Each 55.00 59.35

ii) for every 6" (150 mm) additional height or part thereof. Each 26.40 28.50 Each 26.40 28.50

chapter-9(Roofing) Page 66

Page 68: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

39 Hoisting RS. Beams and wooden beams and placing in Each 52.80 - Each 52.80 -position.

40 Hoisting and placing in position sahl ballies, over roof. Each 29.25 - Each 29.25 -

41 Hoisting precast R.C.C/prestressed concretebattens and placing in position.

a) 5' to 6' (1.50 to 1.83 m) long Each 25.00 - Each 25.00 -b) 6' to 7' (1.83 to 2.13 m) long Each 35.00 - Each 35.00 -c) 7' to 8' (2.13 to 2.44 m) long Each 43.75 - Each 43.75 -d) 8' to 9' (2.44 to 2.74 m) long Each 58.30 - Each 58.30 -e) above 9' (2.74 m) length Each 69.95 - Each 69.95 -

42 Hoisting and placing in position R.C. trough: Applicable only to roof trough(inverted tees & trough) for height of

a) upto 10' (3 m) in length Each 69.95 - Each 69.95 - 1st storey only.b) 10' to 11' (3 to 3.36 m) in length ditto 87.45 - ditto 87.45 -c) 11' to 12' (3.36 to 3.66 m) in length ditto 116.60 - ditto 116.60 -d) 12' to 13' (3.66 to 3.96 m) in length ditto 134.55 - ditto 134.55 -e) 13' to 14' (3.96 to 4.26 m) in length ditto 145.75 - ditto 145.75 -f) 14' to 15' (4.26 to 4.57 m) in length ditto 159.00 - ditto 159.00 -g) 15' to 16' (4.57 to 4.88 m) in length ditto 174.90 - ditto 174.90 -h) 16' to 17' (4.88 to 5.19 m) in length ditto 194.35 - ditto 194.35 -i) 17' to 18' (5.19 to 5.49 m) in length ditto 249.85 - ditto 249.85 -j) 18' to 19' (5.49 to 5.80 m) in length ditto 269.10 - ditto 269.10 -k) 19' to 20' (5.80 to 6.10 m) in length ditto 291.50 - ditto 291.50 -

43 Hoisting and placing in position R.C. inverted battens:-

i) upto 10' (3.05 m) span Each 52.80 - Each 52.80 -ii) from 10' to 12' (3.05 to 3.66 m) span ditto 117.35 - ditto 117.35 -iii) from 12' to 13' (3.66 to 3.96 m) span ditto 140.80 - ditto 140.80 -iv) from 13' to 14' (3.96 to 4.26 m) span ditto 176.00 - ditto 176.00 -v) from 14' to 15' (4.26 to 4.57 m) span ditto 192.00 - ditto 192.00 -vi) from 15' to 16' (4.57 to 4.88 m) span ditto 211.20 - ditto 211.20 -vii) from 16' to 18' (4.88 to 5.49 m) span ditto 264.00 - ditto 264.00 -viii) from 18' to 20' (5.49 to 6.10 m) span ditto 422.40 - ditto 422.40 -

44 Reinforced cement concrete spout, including fixing in Each 272.80 439.95 Each 272.80 439.95position, with top and bottom Khurras.

chapter-9(Roofing) Page 67

Page 69: MRS Jan-Mar 09

FLOORINGRates for all finished works include the removal of surplus debris, unused material and byproducts

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Laying Murum flooring, consisting of 1"(25 mm) layer of 100 Sft. 1551.00 2769.60 sq.m 166.90 298.00fine powdery or flakey variety of Murum, laid over 6"(150mm) good hard layer of Murum spreaded over 9"(225 mm)thick sub-base comprising of hand packed rubble orbroken bricks properly watered and rammed, provided overwell rammed earth.

2 Earth flooring, consisting of 6"(150 mm) thick consolidated 100 Sft. 511.50 811.50 sq.m 55.05 87.30 24.1layer of moistened earth, including ramming.

3 Providing, laying, watering and ramming brick ballast 1½" 100 Cft. 1151.70 2891.70 cum. 406.80 1021.35to 2"(40 mm to 50 mm) gauge mixed with 25% sand, forfloor foundation, complete in all respects.

4 Mud flooring, consisting of 6"(150 mm) thick consolidated 100 Sft. 957.00 1398.90 sq.m 102.95 150.50 24.2layer of moistened earth and finished off with 1"(25 mm)mud plaster and gobri leeping.

5 Dry brick paving laid flat, sand grouted, including 100 Sft. 564.95 2316.95 sq.m 60.80 249.30 24.12

preparation of bed by watering, ramming and bringing thesame to proper camber, by ½"(13 mm) thick mud plaster

6 Dry brick on edge paving, sand grouted, including 100 Sft. 1007.80 3607.00 sq.m 108.45 388.10 24.12preparation of bed by watering, ramming & bringing thesame to proper camber, by ½ "(13 mm) thick mud plaster

7 Grouting 4½"(113 mm) dry brick work with cement mortar 100 Sft. 514.80 849.60 sq.m 55.40 91.40ratio 1: 5

8 Flat brick flooring laid in 1:6 cement mortar, over a bed of 100 Sft. 937.20 3250.80 sq.m 100.85 349.80 24.43/4" (20 mm) thick cement mortar, 1:6.

9 Brick on edge flooring, laid in 1:6 cement mortar, over a 100 Sft. 1,214.40 4,575.35 sq.m 130.65 492.30 24.4bed of ¾" (20 mm) thick cement mortar 1:6.

10 Brick tiles (12"x6"x2") (300x150x50mm) laid in 1:6 100 Sft. 1,171.50 2,435.10 sq.m 126.05 262.00 dittocement mortar, over a bed of ¾" (20 mm) thick cementmortar 1:6.

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-10(Flooring) Page 68

Page 70: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

11 Brick ties (9"x4½"x1½")(225 mm x 113 mm x 40 mm) laid 100 Sft. 1,336.50 3,707.70 sq.m 143.80 398.95 24.4flat in 1:3 cement mortar, over a bed of 3/4"(20 mm) thickcement mortar 1:6.

12 Cement tiles (8"x8"x¾")(200 x 200 x 20 mm) laid flat in 100 Sft. 820.40 4,542.05 sq.m 88.30 488.75 24.71:2 cement mortar, over 3/4" (20 mm) thick bed of cementmortar 1:2.

13 Cement concrete tiles laid in 1:2 cement mortar, over 24.83/4" (20 mm) thick bed of cement mortar 1:2:-

(a) 12"x12"x1" (300 x 300 x 25 mm) 100 Sft. 820.40 3,165.20 sq.m 88.30 340.60 (b) 9"x9"x¾" (225 x 225 x 20 mm) ditto 820.40 4,112.70 ditto 88.30 442.55 (c) 6"x6"x¾"(150 x 150 x 20 mm) ditto 820.40 5,707.30 ditto 88.30 614.10

14 Coloured cement tiles (8"x8"x¾")(200 x 200 x 20 mm) of 100 Sft. 820.40 4,567.25 sq.m 88.30 491.45 24.7

approved dark shade laid flat in 1:2 cement mortar, over ¾" (20 mm) bedding mortar of 1:2.

15 Providing and laying topping of cement concrete 1:2:4, 24.9 If glass or marble strips are usedincluding surface finishing and dividing in panels:- for panelling, it will be paid extra as

per item No. 41 or 42. (a) 1"(25 mm) thick 100 Sft. 991.65 1,778.50 sq.m 106.70 191.35 (b) 1¼"(30 mm) thick ditto 991.65 1,953.45 ditto 106.70 210.20 (c) 1½"(40 mm) thick ditto 1,186.35 2,323.10 ditto 127.65 249.95 (d) 1¾"(45 mm) thick ditto 1,186.35 2,505.65 ditto 127.65 269.60 (e) 2"(50 mm) thick ditto 1,381.05 2,919.45 ditto 148.60 314.15 (f) 2¼"(56 mm) thick ditto 1,417.35 3,116.65 ditto 152.50 335.35 (g) 2½"(62 mm) thick ditto 1,575.75 3,406.30 ditto 169.55 366.50 (h)2¾"(70 mm) thick ditto 1,575.75 3,631.40 ditto 169.55 390.75 (i) 3"(75 mm) thick ditto 1,575.75 3,835.60 ditto 169.55 412.70

16 Providing and laying conglomerate flooring (two coat work) 24.10 If glass or marble strips are used

with top layer of ½"(13mm) thick wearing surface, for panelling, it will be paid extra asconsisting of one part of cement and 2 parts of stone per item No. 41 or 42.chips passing 3/16"(6 mm) sieve, over bottom layer ofcement concrete 1:3:6, including surface finishing anddividing in panels:-

(a) 1½"(40 mm) thick 100 Sft. 1,430.55 2,559.90 sq.m 153.95 275.45 (b) 1¾"(45 mm) thick ditto 1,430.55 2,682.55 ditto 153.95 288.65 (c) 2"(50 mm) thick ditto 1,782.00 3,199.55 ditto 191.75 344.25

chapter-10(Flooring) Page 69

Page 71: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

17 Add extra in cement concrete floor topping, if finished with 100 Sft. 112.20 514.85 sq.m 12.05 55.40pigment and polishing.

18 Extra labour for each storey above ground, for mosaic, 100 Sft 217.80 - sq.m 23.45 - On items 19-25 & 29-34conglomerate, tiles, stone and wooden floor.

19 Flag stone flooring in lime mortar 1:2, over ¾"(20 mm) 24.5bedding mortar, in platforms and floors, etc.

(a) 2"(50 mm) thick 100 Sft. 2,843.95 4,152.55 sq.m 306.00 446.80 (b) 3"(75 mm) thick ditto 2,843.95 4,462.70 ditto 306.00 480.20

20 Asphalt flooring , including preparation of proper base 24.10remelting, setting out, and finishing complete:-

(a) 1"(25 mm) thick topping 100 Sft. 1,014.75 9,741.60 sq.m 109.20 1048.20 (b) ½"(13 mm) thick topping ditto 800.25 5,253.55 ditto 86.10 565.30 (c) ¼"(6 mm) thick topping ditto 598.95 2,907.25 ditto 64.45 312.80

21 13/8"(35 mm) thick mosaic flooring, consisting of 3/8"(10 If glass or marble strips are usedmm) mosaic topping of one part of cement and marble for panelling, it will be paid extra aspowder in the ratio of 3:1 and two parts of marble chips, per item No. 41 or 42.laid over 1"(25 mm) thick flooring of 1:2:4 cement concreteincluding rubbing and polishing complete :-

(a) using grey cement 100 Sft. 3,637.95 5,234.80 sq.m 391.45 563.25 (b) using white cement ditto 3,637.90 5,347.65 ditto 391.45 575.40

22 1½"(40 mm) thick mosaic flooring, consisting of ½ "(13 If glass or marble strips are used

mm) mosaic topping of one part of cement and marble for panelling, it will be paid extra aspowder in the ratio of 3:1 and two parts of marble chips, per item No. 41 or 42.laid over 1"(25 mm) thick floor of 1:2:4 cement concrete,including rubbing and polishing complete with finishing :-

(a) using grey cement 100 Sft. 3,637.90 5,351.70 sq.m 391.45 575.85 (b) using white cement ditto 3,637.90 5,616.80 ditto 391.45 604.35

23 Providing and laying floor of mosaic marble chips tiles 100 Sft. 2,320.55 5,681.40 sq.m 249.70 611.30 24.81"(25 mm) thick of approved quality and shade, laid inwhite cement and pigment, over ¾"(20 mm) thick beddingof cement sand mortar 1:2, including finishing andpolishing, complete.

chapter-10(Flooring) Page 70

Page 72: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

24 Laying floor of approved white glazed tile ¼" (6 mm) thick 100 Sft. 2,904.00 7,457.75 sq.m 312.45 802.45 24.7in white cement 1:2 over ¾" (20mm) thick cement mortar1:2, complete.

25 Laying floor of approved coloured glazed tiles ¼ "(6 mm) 100 Sft. 2,904.00 7,747.55 sq.m 312.45 833.65 dittothick, laid in white cement and pigment on a bed of ¾"(20 mm) thick cement mortar 1:2.

26 Rubbing and polishing old grit/ mosaic floor, including 100 Sft. 649.45 756.95 sq.m 69.90 81.45 The composite rate will be reducedrepairing voids, uneven surface, complete in all respects. by Rs. 150.00 per % Sft or Rs.13.95 per

Sq. metre respectively, if nopolishing is done.

27 Rubbing and polishing grit floor, including repairing voids, 100 Sft. 681.10 801.70 sq.m 73.30 86.25 The composite rate will be reduceduneven surface, complete in all respects by Rs. 150.00 per % Sft or Rs.13.95 per

Sq. metre respectively, if nopolishing is done.

28 Cleaning and washing mosaic or marble floor with caustic 100 Sft. 119.00 160.70 sq.m 12.80 17.30 24.6soda mixture.

29 Shisham wood boarding or strip flooring 3/4" (20mm) thick 100 Sft. 2,288.00 22,815.90 sq.m 246.20 2455.00 24.13(sawn to required size) tongued and grooved or splayedrebated fixed with brass screws on deodar wood battens1½ "x2"(40 x 50 mm),size placed at 12"(300 mm) centreto centre, including two coats of bitumen laid hot on thebase.

30 Deodar wood boarding or strip flooring 3/4" (20 mm) thick 100 Sft. 2,574.00 24,495.60 sq.m 276.95 2635.75 ditto(sawn to required size) tongued and grooved or splayedrebated fixed with brass screws on deodar wood battens1½"x2"(40 x 50 mm) size , placed at 12"(300 mm) centre,to centre including two coats of bitumen laid hot on thebase.

31 Teak wood boarding or strip flooring ½" (13 mm) "thick 100 Sft. 2,255.00 34,146.20 sq.m 242.65 3674.15 ditto(sawn to required size) to tongued and grooved screwedon deodar wood battens 1½ " x2"(40 x 50 mm) size,placed at 12"(300 mm) centre to centre, including 2 coatsof bitumen laid hot on base.

chapter-10(Flooring) Page 71

Page 73: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

32 Shisham wood block flooring 1"(25 mm) thick cut to 100 Sft. 2,392.50 26,824.05 sq.m 257.45 2886.25 24.13required size, fixed on a layer of asphalt bitumen laid onbase.

33 Teak wood block 1"(25 mm) thick cut to required size, 100 Sft. 2,255.00 60,618.60 sq.m 242.65 6522.55 dittofixed on a layer of asphalt bitumen laid on base.

34 Laying wooden paving of hard wood on edge in coal tar dittoand asphalt:- 100 Sft. sq.m

Per Inch per cm (a) Shisham wood thickness 1,496.00 16,639.55 thickness 160.95 1790.40 (b) Kikar wood ditto 1,496.00 5,592.95 ditto 160.95 601.80

35 Tile skirting laid in 1:2 cement mortar, over ¾"(20 mm)thick cement mortar, 1:2 including cement washing andfilling joints complete:-

(a) cement tiles 100 Sft. 1,351.25 5,370.65 sq.m 145.40 577.90 (b) mosaic tiles ditto 2,293.50 7,547.95 ditto 246.80 812.15

36 Providing grey cement skirting or dado 3/8"(10 mm) thickincluding rounding of corner and straight ening of top edgeand finishing to smooth surface afterplastering :-

(a) 1:2 cement, sand mortar 100 Sft. 1,827.40 2,260.15 sq.m 196.65 243.20 (b) 1:3 cement, sand mortar ditto 1,827.40 2,130.90 ditto 196.65 229.30 (c) Extra if skirting or dado is finished ditto 90.75 319.25 ditto 9.75 34.35 with pigment of any colour.

37 White glazed tile (6"x6"x¼") (6 mm) thick dado jointed in white 100 Sft. 3,597.00 8,150.75 sq.m 387.05 877.00 24.7cement and laid over 1:2 cement sand mortar 3/4" (20mm)thick, including finishing.

38 Coloured glazed tile dado (6"x6"¼") (6mm) thick in pigment over 1:2 100 Sft. 3,597.00 8,426.50 sq.m 387.05 906.70 dittocement, sand mortar 3/4"(20mm) thick, including finishing.

39 Mosaic dado or skirting with one part of cement andmarble powder in the ratio of 3:1 and two parts of marblechips, laid over ½"(13 mm) thick cement plaster 1:3,including rubbing and polishing, complete with finishing:

(a) using grey cement: i) 3/8"(10 mm) thick 100 Sft. 4,224.00 5,022.05 sq.m 454.50 540.35 ii) ½"(13 mm) thick ditto 4,224.00 5,597.55 ditto 454.50 602.30

chapter-10(Flooring) Page 72

Page 74: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

(b) using white cement :

'i) 3/8"(10 mm) thick 100 Sft. 4,224.00 5,561.10 sq.m 454.50 598.35 ii) ½"(13 mm) thick ditto 4,224.00 5,749.95 ditto 454.50 618.70

40 Rubber flooring, consisting of 12"x12"x1/8" Per Sft. 12.05 69.05 sq.m 129.65 743.00 24.14 The cost of base for rubber flooring(300x300x3mm) rubber tiles, laid on firm foundation. is not included in the rate and is

payable separately.

41 Providing and fixing glass strip 5mm thick and 1½" Per Rft. - 3.95 Metre - 12.95 Labour for fixing already included in(40 mm) wide, for dividing the mosaic flooring into panels. items No. 15, 16, 21and 22 of this

Chapter.

42 Providing and fixing marble strip of any shade for dividingthe mosaic flooring into panels

a) sSize 1½" x 3/8" (40 x 10 mm) Per Rft. - 5.30 Metre - 17.40b) sSize 1½" x ¼" (40 x 6 mm) ditto - 3.70 ditto - 12.15

chapter-10(Flooring) Page 73

Page 75: MRS Jan-Mar 09

SURFACE RENDERING1 PLASTERING, POINTING, WHITE WASHING, COLOUR WASHING AND DISTEMPERING, ETC.2 Rates for all finished works include the removal of surplus debris, unused material and byproducts

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Mud plaster on walls (excluding Gobri leeping) upto 20' 25.7(6.00 m) height:-

a) ½" (13 mm) thick 100 Sft. 245.50 317.50 sq.m 26.40 34.15b) 1" (25 mm) thick ditto 338.20 482.20 ditto 36.40 51.90

2 Mud plaster on floor or roof (excluding Gobri leeping):- ditto Add extra 13%, 32% and 51% above

the labour rates only or 6%, 15% &a) ½" (13 mm) thick 100 Sft. 220.45 292.45 sq.m 23.70 31.45 23% on the composite rates for 2nd,

3rd, 4th and subsequenct floors,b) 1" (25 mm) thick ditto 220.45 364.45 ditto 23.70 39.20 respectively.

3 Cement lime plaster 1:7:12 (cement, lime and sand) upto 25.1 to 25.620' (6.00 m) height.

a) ¼" (6 mm) thick 100 Sft. 739.20 838.20 sq.m 79.55 90.20

b) ½" (13 mm) thick ditto 739.20 937.15 ditto 79.55 100.85

4 Cement Neru plaster 1:2 (cement and sand) upto 20' ditto(6.00 m) height:-

a) ¼" (6 mm) thick 100 Sft. 739.20 1060.25 sq.m 79.55 114.10b) ½" (13 mm) thick ditto 739.20 1256.75 ditto 79.55 135.25

5 2" (50 mm) stucco cement plaster 1:2:4 (cement, sand 100 Sft. 1752.95 3512.65 sq.m 188.60 377.95 ditto

and shingle) upto 20' (6.00 m) height.

6 Providing and laying machine sprayed plaster ½" (13 mm) dittothick, using cement and chips zero gauge, over theexisting plastered and roughened surface, upto 20' (6.00m) height:-

i) ratio 1:1 100 Sft. 710.15 1676.15 sq.m 76.40 180.35ii) ratio 1:1½ ditto 710.15 1560.95 ditto 76.40 167.95iii) ratio 1:2 ditto 710.15 1494.95 ditto 76.40 160.85

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-11(Surface Rendering) Page 74

Page 76: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

7 Cement plaster 1:2 upto 20' (6.00 m) height:- 25.1to

a) 3/8" (10 mm) thick 100 Sft. 739.20 1171.95 sq.m 79.55 126.10 25.6b) ½" (13 mm) thick ditto 739.20 1300.80 ditto 79.55 139.95c) ¾" (20 mm) thick ditto 943.80 1809.25 ditto 101.55 194.70

8 Cement plaster 1:3 upto 20' (6.00 m) height:- ditto

a) 3/8" (10 mm) thick 100 Sft. 739.20 1042.70 sq.m 79.55 112.20b) ½" (13 mm) thick ditto 739.20 1143.85 ditto 79.55 123.10c) ¾" (20 mm) thick ditto 943.80 1550.75 ditto 101.55 166.85

9 Cement plaster 1:4 upto 20' (6.00 m) height:- ditto

a) 3/8" (10 mm) thick 100 Sft. 739.20 1007.05 sq.m 79.55 108.35b) ½" (13 mm) thick ditto 739.20 1080.50 ditto 79.55 116.25c) ¾" (20 mm) thick ditto 943.80 1475.90 ditto 101.55 158.80

10 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. ditto i) This item shall be applicable toroof slabs only, upto 20' height. buildings meant for human

habitation only, such as buildingslike residences, offices,

a) 1:2 100 Sft. 871.20 1390.70 sq.m 93.75 149.65 educational institutions andb) 1:3 ditto 871.20 1261.10 ditto 93.75 135.70 hospitals, etc. It shall not bec) 1:4 ditto 871.20 1225.45 ditto 93.75 131.85 admissible on godowns; bins;

agriculture, poultry and animalsheds; cycle stands; garrages; etc.ii) The thickness of the plaster willnot be more than 3/8" (10 mm)thick.

11 Cement plaster 1:5 upto 20' (6.00 mm) height:- 25.1 to 25.6

a) 3/8" (10 mm) thick 100 Sft. 739.20 976.80 sq.m 79.55 105.10b) ½" (13 mm) thick ditto 739.20 1027.20 ditto 79.55 110.55c) ¾" (20 mm) thick ditto 943.80 1419.00 ditto 101.55 152.70

12 Cement plaster 1:6 upto 20' (6.00 mm) dittoheight:-a) 3/8" (10 mm) thick 100 Sft. 739.20 933.60 sq.m 79.55 100.45b) ½" (13 mm) thick ditto 739.20 996.95 ditto 79.55 107.25c) ¾" (20 mm) thick ditto 943.80 1332.60 ditto 101.55 143.40

chapter-11(Surface Rendering) Page 75

Page 77: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

13 Applying floating coat of cement 1/32" (0.8 mm) thick. 100 Sft. 489.70 662.50 sq.m 52.70 71.30 25.4 to 25.6

14 Lime pointing flush upto 20' (6.00 m) height including 100 Sft. 534.60 595.95 sq.m 57.50 64.10 25.8raking joints, in lime, sand mortar 1:2.

15 Lime pointing struck joints on walls, upto 20' (6.00 m) 100 Sft. 871.20 932.55 sq.m 93.75 100.35 dittoheight, including raking joints in lime sand mortar 1:2.

16 Cement pointing flush upto 20' (6.00 m) heihgt:- ditto

a) ratio 1:2 100 Sft. 739.20 1063.20 sq.m 79.55 114.40b) ratio 1:3 ditto 739.20 986.90 ditto 79.55 106.20

17 Cement pointing 1:2 flush on floor. 100 Sft. 534.60 858.60 sq.m 57.50 92.40 ditto

18 Cement pointing struck joints, on walls, upto20' (6.00 m) hiehgt:-

a) ratio 1:2 100 Sft. 871.20 1195.20 sq.m 93.75 128.60b) ratio 1:3 ditto 871.20 1118.90 ditto 93.75 120.40

19 Pointing flush on stone work, upto 20' (6.00 m) height. 25.8

a) in lime mortar 1:2 (lime, sand) 100 Sft. 726.00 807.60 sq.m 78.10 86.90b) in cement mortar 1:3 ditto 726.00 973.70 ditto 78.10 104.75c) on stone work raised:-

i) in lime mortar 1:2 100 Sft. 1399.20 1480.80 sq.m 150.55 159.35ii) in cement mortar 1:3 ditto 1399.20 1646.90 ditto 150.55 177.20

20 Raking and washing joints of stone masonry 100 Sft. 306.25 - sq.m 32.95 - ditto

(old work).

21 Raking and washing joints of brick masonry (old work). 100 Sft. 153.10 - sq.m 16.45 - ditto

22 Priming coat of chalk under distemper. 100 Sft. 81.85 87.30 sq.m 8.80 9.40 25.11

23 Distempering:- ditto

a) new surface:-i) one coat 100 Sft. 75.45 142.20 sq.m 8.10 15.30ii) two coats ditto 111.55 198.30 ditto 12.00 21.35iii) three coats ditto 147.60 254.35 ditto 15.90 27.35

chapter-11(Surface Rendering) Page 76

Page 78: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

b) old surface:- i) one coat 100 Sft. 68.85 115.65 sq.m 7.40 12.45ii) two coats ditto 111.55 158.30 ditto 12.00 17.05

24 Colour washing:- 25.10

a) new surface:- i) one coat 100 Sft. 54.15 76.40 sq.m 5.85 8.20ii) two coats ditto 81.25 113.45 ditto 8.75 12.20

b) old surface:-

i) one coat 100 Sft. 54.15 67.05 sq.m 5.85 7.20ii) two coats ditto 81.25 99.35 ditto 8.75 10.70

25 White washing:- 25.9

a) new surface:- i) one coat 100 Sft. 54.15 70.85 sq.m 5.85 7.60ii) two coats ditto 81.25 106.25 ditto 8.75 11.45iii) three coats ditto 105.30 138.55 ditto 11.35 14.90

b) old surface:-

i) one coat 100 Sft. 54.15 66.70 sq.m 5.85 7.20ii) two coats ditto 81.25 102.10 ditto 8.75 11.00

26 Gobri leeping:- 25.7

a) on walls 100 Sft. 91.85 95.75 sq.m 9.90 10.30b) over roofs ditto 76.05 79.95 ditto 8.20 8.60

27 Striking joints of burnt bricks in lime or cement mortar. 100 Sft. 132.00 - sq.m 14.20 - 25.8 Payable with fresh masonry, when

the face of the work is not to be plastered/pointed.

28 Extra for lime, mud or cement plaster and pointing from 100 Sft. 135.95 - sq.m 14.65 -20' (6.00 m) and above for each additional 10' (3.00 m) height or part thereof.

29 Caulking joints of sleeper wall, with sand and coaltar. 100 Sft. 298.30 567.75 sq.m 32.10 61.10

30 Caulking joints of sleepers, withmud and chopped straw. 100 Sft. 298.30 325.90 sq.m 32.10 35.05

31 Extra cost of labour and material for red oxide pigment in 100 Sft. 95.70 188.10 sq.m 10.30 20.25

cement pointing to match with the colour of bricks.

chapter-11(Surface Rendering) Page 77

Page 79: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

32 Providing grooved cement sand plaster 1:3 over existingplastered and roughened surface upto 20' (6.00 m) height.

i) 3/8" (10 mm) thick 100 Sft. 871.20 1174.70 sq.m 93.75 126.40ii) ½" (13 mm) thick ditto 871.20 1275.85 ditto 93.75 137.30

33 Providing and fitting expanded metal edge bead for Rft. 4.55 29.35 Metre 14.90 96.25corners, with nails on both sides of edges.

34 Petty repairs to fire place.

i) Single Each 143.20 178.75 Each 143.20 178.75ii) Double Each 286.45 357.55 Each 286.45 357.55

Area above 100 Sft (10.76 sq.m)35 Petty repair to main rooms. Each 288.40 383.10 Each 288.40 383.10

Area upto 100 Sft (10.76 sq.m)36 Petty repair to small rooms. Each 144.20 191.55 Each 144.20 191.55

37 Petty repair to verandah. Each 288.40 364.10 Each 288.40 364.10The height will be taken from the

38 Extra labour for white washing, colour washing, priming coat 100 Sft. 9.05 - sq.m 0.95 - floor, roof or ground uderneath asand distempering, etc. from 20' (6.00 m) height and above, Per Per the case may be on the siderequiring scaffolding, for every additional 10' (3.00m) height coat coat towards which the work is to beor part thereof. done.

chapter-11(Surface Rendering) Page 78

Page 80: MRS Jan-Mar 09

WOOD WORK1 No extra rate is to be paid for sawing as the rates are inclusive of these2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Plain wood work sawn, wrought, planed and fixed 26.1inposition, including cost of nails and screws etc.

a) Deodar wood Per Cft. 407.55 2268.85 cu.m 14394.65 80135.80b) Shisham wood ditto 457.60 2043.10 ditto 16162.45 72162.30

2 Plain wood work for regulation karries or needles, etc. 26.1including sawing, planning, wroughting wood and providingand fixing steel parts of karries i.e. end strip and rods, etc.

a) Deodar wood Per Cft. 254.10 2119.60 cu.m 8974.80 74864.25b) Shisham wood ditto 254.10 1850.80 ditto 8974.80 65370.25

3 First class teak wood wrought joinery in doors and 26.1windows, etc. panelled, panelled and glazed or fully toglazed and fixed in position, including chowkat, holdfast, 26.3tower bolt, chocks, rubber stop, cleats/G.I. clamps, &chords with hooks, nails, screws, etc. complete 26.7(excluding sliding bolt and lock):-

i) 2" (50 mm) thick Per Sft. 71.80 1112.40 sq.m 772.55 11969.40ii) 1¾" ( 45 mm) thick ditto 71.80 1037.80 ditto 772.55 11166.75iii) 1½" (40 mm) thick ditto 71.80 964.90 ditto 772.55 10382.30

4 First class teak wood wrought joinery in wire gauze doors 26.8 i) This also includes the cost ofand windows with frames 22 SWG galvanized iron wire to wood required for extra thickness ofgauze 12x12 meshes to square inch, (5x5 meshes in cm2) 26.10 chowkat.including brass fittings, sash bars, etc. complete:- ii) If 24 SWG wire gauge is used,

the composite rate shall bea) teak wood framing 1¾" (45 mm) thick with wire gauze reduced by Rs.4.70 per sft. and

fixed in position:- Rs.50.60 per sq.m.

i) without springs or spring hinges. Per Sft. 12.70 458.70 sq.m 136.65 4935.60

ii) with springs or spring hinges ditto 12.70 462.25 ditto 136.65 4973.80

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-12(Wood Work) Page 79

Page 81: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

b) teak wood framing 1½" (40 mm) thick, with wiregauze fixed in position:-i) without springs or spring hinges. Per Sft. 12.70 423.15 sq.m 136.65 4553.10ii) with springs or spring hinges. ditto 12.70 427.05 ditto 136.65 4595.05

c) G.I. wire gauze 22 SWG, 12x12 meshes per square Per Sft. 22.90 143.45 sq.m 246.40 1543.50

inch, (5x5 meshes per cm2) fixed to chowkat with ¾"(20 mm) teak wood strips and screws.

d) G.I. wire gauze 22 SWG, 12x12 meshes per square Per Sft. 21.45 446.60 sq.m 230.80 4805.40inch (5x5 meshes per cm2) fixed with ½" (13 mm) stripon separate frame of teak wood 2"x2" (50x50 mm),for windows, etc.

5 P/F expanded metal ½" to ¾" (13 to 20 mm) mesh, 16 Per Sft. 27.45 232.10 sq.m 295.35 2497.40Guage, fixed to chowkat with 1" (25 mm) teak wood coverstrips and screw etc., complete.

6 Providing and fixing expanded metal ½" (13 mm) to ¾" Per Sft. 28.60 325.55 sq.m 307.75 3502.9020 mm), 16 gauge, fixed to chowkat with 1" (25 mm)covermoulding and screws, including teak wood frame 2"x2" (50 mm x 50 mm)

7 First class deodar wood wrought joinery in doors and 26.1 towindows, etc. panelled, or panelled or glazed, or fully 26.3 & 26.7glazed, fixed in position, including chowkat, holdfast, hinges, tower bolts, chocks, rubber stop, cleats/G.I. clamps, handles and chord with hooks, etc. complete (excluding sliding bolt or lock):-

a) 2" thick (50 mm) Per Sft. 69.20 795.60 sq.m 744.60 8560.65b) 1¾" thick (45 mm) ditto 69.20 744.00 ditto 744.60 8005.55c) 1½" thick (40 mm) ditto 69.20 708.15 ditto 744.60 7619.70

8 Deodar wood framed, braced and battened doors and 26.1, 26.2windows, complete with iron fittings and fixed in position, & 26.4including chowkats:-

a) 2¼" (56 mm) thick, with 1¼" (30 mm) Per Sft. 77.15 411.75 sq.m 830.15 4430.45battens and 1" (25 mm) planks.

b) 1¾" (40 mm) thick with 1" (25 mm) ditto 70.40 359.45 ditto 757.50 3867.70battens and ¾" (20 mm) planks.

chapter-12(Wood Work) Page 80

Page 82: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

9 1" (25 mm) thick battneded doors and windows fitted in Per Sft. 90.70 243.05 sq.m 975.95 2615.20position, complete with iron fittings, without chowkats.

10 Deodar battened ledged and braced doors and windows 26.1, 26.22¼" (56 mm) thick (1¼" (30 mm) thick ledge braces and 26.4 to1" (25 mm) thick battens complete with iron fittings, Per Sft. 83.10 197.85 sq.m 894.15 2128.85 26.6chowkats and fixed in position.

11 a) Deodar wood framed with braces and 22 SWG G.I. 26.1, 26.2 If 24 gauge G.I. sheet is used, the

sheet facing, including holdfast, wooden beadings, & 26.4 composite rate will be reduced byhinges, and locking arrangements as directed by the Re.4.70 per Sft. (Rs. Per 50.60

Engineer incharge:- Sq.m) for G.I. facing on one sideand Rs.9.40 per Sft. (Rs.101.20

i) G.I. sheet facing on one side. Per Sft. 36.05 412.50 sq.m 387.90 4438.50 per Sq.m) for G.I. sheet facing onii) G.I. sheet facing on both sides. ditto 39.90 433.80 ditto 429.30 4667.70 both sides.

b) Partal wood framed with braces and 22 SWG G.I.sheet facing, including holdfast, wooden beadings, -ditto-hinges and locking arrangements, as directed by theEngineer-in-charge:-

i) G.I. sheet facing on one side. Per Sft. 36.05 136.90 sq.m 387.90 1473.05ii) G.I. sheet facing on both sides. ditto 39.90 158.15 ditto 429.30 1701.70

12 First class deodar wood wrought joinery work in wire 26.8 to i) This also includes the cost ofgauze doors and windows, with 22 SWG G.I. wire gauze, 26.10 wood required for extra thickness12x12 meshes per square inches (5x5 per cm2) including of chowkat.iron fittings etc. complete:-

ii) If 24 SWG wire gauze is useda) deodar wood framing 1¾" (45 mm) thick with wire the composite rate shall be

gauze fixed in position:- reduced by Rs.4.70 per sft orRs.50.60 per sq.m.

i) without springs or spring hinges. Per Sft. 38.15 345.45 sq.m 410.50 3717.05ii) with springs or spring hinges. ditto 38.15 349.35 ditto 410.50 3759.00

b) deodar wood framing 1½" (40 mm) thick, with wiregauze fixed in position:-i) without springs or spring hinges Per Sft. 38.15 321.45 sq.m 410.50 3458.80ii) with springs or spring hinges ditto 38.15 324.15 ditto 410.50 3487.85

c) G.I. wire gauze 22 SWG, 12x12 meshes per squareinch, (5x5 in cm2) fixed to chowkat, with ¾" Per Sft. 28.60 112.50 sq.m 307.75 1210.50('20 mm) thick deodar wood strip and screws.

chapter-12(Wood Work) Page 81

Page 83: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

d) G.I. wire gauze 22 SWG 12x12 meshes per squareinch, (5x5 meshes in cm2) fixed to chowkat, with ½" Per Sft. 42.90 305.40 sq.m 461.60 3286.10(13 mm) strip on separate frame of deodar wood 2" x2" (50 mm x 50 mm).

13 Making and fixing trellis doors and windows of deodar Per Sft. 62.50 278.05 sq.m 672.50 2991.80 26.1wood, complete. 26.2

14 Providing and fixing mild steel chowkat of doors, windows,C.window, etc. including holdfast, making and threadingholes for hinges, etc. complete:-

a) M.S. angle iron 1½"x 1½"x ¼" (40x40x6 mm) welded Per Sft. 16.95 107.30 sq.m 182.40 1154.55with M.S. flat 2"x ¼" (50 mm x 6 mm)

b) M.S. tee iron 1½"x 1½"x ¼" (40x40x6 mm) welded Per Sft. 16.95 81.65 sq.m 182.40 878.55with M.S. flat 2"x ¼" (50 mm x 6 mm)

15 Providing and fixing M.S. sheet hollow pressed frame ofdoors, windows, C. windows, etc. (chowkat only) of 20SWG welded with M.S. flat 6"x 1¼" x 1/8" (150mmx30mmx3mm) M.S. holdfast 9"x1"x1/8"(225mmx25mmx3mm) welded/screwed 4" (100 mm) longiron hinges, including filling chowkat with cement sandmortar 1:8 and embedding holdfast in cement concrete1:2:4, complete in all respects:

a) single rebate Per Sft. 22.15 93.35 sq.m 238.35 1004.45b) double rebate ditto 26.60 107.15 ditto 286.20 1152.95

16 Extra for providing and fixing iron double spring hinges, Per Sft. 2.10 30.15 sq.m 22.60 324.40 26.2with brass fittings (it shall include brass finger plate, 6" door area door area(150 mm) tower bolt).

17 Providing and fixing brass spring hinges to wire gauzed Each 43.90 163.90 Each 43.90 163.90doors.

18 Providing and fixing sliding bolt to doors:-

i) iron sliding bolt, 10" (250 mm) long Each 42.90 90.90 Each 42.90 90.90ii) iron sliding bolt, 12" (300 mm) long ditto 42.90 126.90 ditto 42.90 126.90iii) brass sliding bolt, 10" (250 mm) long ditto 42.90 132.90 ditto 42.90 132.90iv) brass sliding bolt, 12" (300 mm) long ditto 42.90 294.90 ditto 42.90 294.90

chapter-12(Wood Work) Page 82

Page 84: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

19 Extra for brass fittings to doors and windows, except forhinges, which shall be of iron:-

i) deodar wood panelled or panelled and Per Sft. 1.25 10.15 sq.m 13.45 109.20glazed or fully glazed.

ii) deodar wood wire gauzed shutters. ditto 1.25 8.30 ditto 13.45 89.30

20 Extra for providing and fixing approved quality rim lock Each 133.90 321.10 Each 133.90 321.10adjustable over the style surface.

21 Providing and fixing, approved quality mortice lock. Each 187.55 372.35 Each 187.55 372.35

22 Providing and fixing, expended metal ½" to ¾" (13 mm to20 mm) mesh 16 gauge.

a) fixed to chowkat with 1" (25 mm) thick deodar wood Per Sft. 27.45 186.55 sq.m 295.35 2007.30strip and screws, etc.

b) fixed with 1" (25 mm) cover moulding and screws, ditto 28.60 255.10 ditto 307.75 2744.90including deodar wood frame 2"x2" (50 x 50 mm)

23 a) Providing and fixing deodar wood almirah 9" to 12" For hollow frame shutter with(225 mm to 300 mm) depth, including boxing with Per Sft. 95.25 1129.70 sq.m 1025.00 12155.55 commercial ply on one side, theback, shelves, shutter and brass fittings, etc. composite rate shall be reduced bycomplete. Rs.54.00 per Sft;or Rs.580.00

per Sqm and for hollow frameshutter with commercial ply onboth sides, the composite rateshall be reduced by Rs.22.80 perSft. or Rs.245.00 per Sq. metre.

b) Providing and fixing deodar wood almirah 9" to 12"(225 mm to 300 mm)depth with shelves, shutters, Per Sft. 70.50 310.10 sq.m 758.70 3336.80brass fittings, etc., without boxing and back,complete.

24 Providing and fixng class room almirah consiting of 1" (25 Per Sft. 46.50 275.50 Sq.m 500.50 2964.35mm) thick solid flush shutter with deodar wood lipping ¼"(6 mm) thick all around (sterling made) fixed in deodarwood frame 3"x1" (75mm x 25mm) including full hinges C.P. fittings with RCC (1:1½:3) shelves 1½" (40 mm) thickincluding 3 coats of painting.

chapter-12(Wood Work) Page 83

Page 85: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

25 Providing and fixing wooden box type wardrobe 22" (550 If hollow flush door leaves 1" thickmm) deep including ¾" (20 mm) thick boxing and shelves, (25 mm) with commercial plyhanger rods, hard board back drawers, brass fittings, 3 ply) on both sides of deodarlocking arrangements, handles, internal bolts, shoe rods, wood frame and partal woodetc. including three coats of enamel paint:- bracing and deodar wood lipping is

used, the composite rate will bei) Partal wood boxing and deodar wood reduced by Rs.13.00 per Sft. or

shelves and leaves, etc. Per Sft. 105.60 398.00 sq.m 1136.25 4282.35 Rs.140.00 per Sq. metre.

ii) Deodar wood boxing, and deodar wood ditto 103.30 524.70 ditto 1111.40 5645.55shelves and leaves, etc.

26 Providing and fixing wardrobe 22" (550 mm) deepconsisting of RCC shelves 1½" (40 mm) thick including ½"thick vinboard boxing and back (one side ply) vinboard Per Sft. 38.30 354.95 Sq.m 411.90 3819.15shutter ¾" (20 mm) thick including deodar wood lipping ¼"(6 mm) on all edges, fixes including deodar wood frame3"x1" (75mm x 25mm) with hanger rod in centre positiondrawers at bottom and openable shutter on upper portionincluding full hinges C.P. fitting and painting 3 coatscomplete.

27 Providing and fixing chowkat for doors, windows and C.windows, including holdfast, etc.

a) Teak wood Per Sft. 19.90 379.20 Sq.m 214.35 4080.30b) Deodar wood ditto 12.70 262.45 ditto 136.75 2823.90c) Shisham wood ditto 14.85 118.65 ditto 159.65 1276.65

28 Making and fixing deodar wood planking in eave boards, 26.1etc. planed on both sides, rebated and fixed including 26.2nails and screws, bolts and brackets:-

a) 1" (25 mm) thick Sft. 23.65 172.10 sq.m 254.25 1851.95b) ¾" (20 mm) thick ditto 23.65 135.00 ditto 254.25 1452.45c) ½" (13 mm) thick ditto 23.65 98.00 ditto 254.25 1054.65

29 Making and fixing deodar wood shelves, including dittobrackets:-

i) 1" (25 mm) thick Sft. 23.65 172.10 sq.m 254.25 1851.95ii) 1½" (40 mm) thick ditto 23.65 246.20 ditto 254.25 2649.30iii) 2" (50 mm) thick ditto 23.65 320.30 ditto 254.25 3446.60

chapter-12(Wood Work) Page 84

Page 86: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

30 a) Making and fixing cleats for doors and windows, Each 27.45 89.30 Each 27.45 89.30 26.1 andincluding hinges and screws. 26.2

b) Making and fixing cleats with brass hooks for roof Each 35.10 56.05 Each 35.10 56.05ventilators.

c) Providing and fixing door stops of 1½" (40 mm) dia Each 4.15 51.95 Each 4.15 51.95rubber block.

d) Providing and fixing G.I. hook with clamps for doors. Each 1.30 6.40 Each 1.30 6.40

31 Hard wood railing of any shape and design, including dittobends and corners, fixed in position, including polishingcomplete as directed.

a) Shisham wood Per Rft. 102.30 205.50 Metre 335.55 674.05b) Teak wood ditto 76.55 513.60 ditto 251.15 1684.60

32 Deodar wood dado or picture rail 3"x1½" (75x40 mm) as Per Rft. 38.30 137.15 Metre 125.55 449.80 26.1per approved design including moulding and fixed in place, 26.2cost of screws, nails, plugs, and painting complete.

33 Sawing wood by hand:-

a) Soft wood (deodar, kail or chir). 100Sft. 389.40 - sq.m 41.90 -b) Hard wood (shisham, kikar, teak or ditto 519.20 - ditto 55.85 -

sahl).

34 Sawing wood by machine:

a) Soft wood 100Sft. 230.25 - sq.m 24.80 -b) Hard wood ditto 346.00 - ditto 37.25 -

35 Making and fixing sun-shade of deodar wood including Per Sft. 32.40 209.05 sq.m 348.70 2249.35 26.1fixing brackets.

36 Making and fixing 1" (25 mm) thick kail or chir wooden dittonotice board with frame. Per Sft. 36.60 92.30 sq.m 393.80 993.15

37 Making deodar punkha pole 10'x6"x6" Each 137.30 4066.10 Each 137.30 4066.10 ditto(3.0 m x 150 mm x 150 mm)

38 Dismantling and refixing eave boards. Per Rft. 9.80 -- Metre 32.15 --

chapter-12(Wood Work) Page 85

Page 87: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

39 Making wooden stair-cases complete 2' to 3' (600 to 900 Per Rft. 140.60 1296.05 Metre 461.10 4251.00 26.1mm) wide frame 1½" (40 mm) thick planks of deodarwood, including hand rails.

40 Providing and fixing partition, including frame work:-

a) Sheets on one side of framework:-

i) Hard board 100Sft. 685.80 6890.95 sq.m 73.80 741.45ii) Ply wood ¼" (6 mm) thick ditto 685.80 7772.95 ditto 73.80 836.35iii) Masonite ditto 262.95 8610.15 ditto 28.30 926.45

b) Sheets on both sides of frame work:-

i) Hard board 100Sft. 822.95 7669.95 sq.m 88.55 825.30ii) Ply wood ¼" (6 mm) thick ditto 822.95 15604.40 ditto 88.55 1679.05iii) Masonite ditto 822.95 11953.95 ditto 88.55 1286.25

41 Providing and fixing ceiling, including frame work:-

i) Hard board 100Sft. 1361.25 5137.25 sq.m 146.45 552.75ii) Chip board ditto 1361.25 6217.25 ditto 146.45 669.00iii) Ply wood ¼" (6 mm) thick ditto 1361.25 6097.25 ditto 146.45 656.05iv) Masonite ditto 1361.25 7417.25 ditto 146.45 798.10

42 Providing and fixing thermopore false ceiling, including In case of acousticwooden frame panelling, cost of M.S. clamps, making Thermopore sheet, theholes in walls and repairing damaged surface, complete in composite rate will beall respects:- increased by Rs.9.00 per Sft.

a) Deodar wood frame panelling:

i) ¾" (20 mm) thick 100Sft. 1545.75 5864.80 sq.m 166.30 631.05ii) 1" (25 mm) thick ditto 1545.75 5948.40 ditto 166.30 640.05

b) Partal wood frame panelling:

i) ¾" (20 mm) thick 100Sft. 1545.75 4086.50 sq.m 166.30 439.70ii) 1" (25 mm) thick ditto 1545.75 4205.80 ditto 166.30 452.55

43 a) Fixing door, including chowkats. Each 255.75 - Each 255.75 -

b) Fixing windows, including chowkats. ditto 127.90 - ditto 127.90 -

chapter-12(Wood Work) Page 86

Page 88: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

44 a) Glazing with panes (16 oz. to 18 oz.,) Per Sft. 13.90 34.75 sq.m 149.65 373.75 26.12including cost of putty

b) Glazing with panes (16 oz. to 18 oz.) Per Sft. 18.50 58.35 sq.m 199.10 627.95using deodar wooden fillets and putty

45 Glazing with panes (24 oz. to 26 oz.), using Per Sft. 27.15 64.85 sq.m 292.30 697.75 26.12putty and deodar wooden fillets

46 a) Cutting to required size and fixing glas Per Sft. 9.75 10.80 sq.m 105.00 116.05panes with putty

b) Cutting to required size and fixing glass panes with Per Sft. 15.20 25.85 sq.m 163.80 278.40wooden fillets and putty

47 Glazing with plate glass 1/4" (6 mm) thick including the coof deodar wood fillets and putty:-

a) Glazing upto 8 sft (0.75 sq.m) Per Sft. 23.15 76.90 sq.m 248.90 827.70

b) Glazing exceeding 8 Sft (0.75 sq.m) but not exceeding 24 sf Per Sft. 23.20 77.15 sq.m 249.60 830.30(2.25 sq.m).

48 Providing and fixing 1½" (40 mm) thick deodar woodpanelled or panelled and glazed, doors and windows, withmild steel chowkat (frame), etc. complete in all respect(excluding sliding bolt or lock) with:

i) M.S. angle iron 1½"x1½"x¼", welded Per Sft. 98.30 426.55 sq.m 1057.75 4589.60i) (40 mmx 40 mmx 6mm) with M.S. flat

2"x¼" (50 mm x 6 mm)ii) M.S. tee iron 1½"x1½"x¼", welded Per Sft. 98.30 390.80 sq.m 1057.75 4205.00

(40 mmx40 mmx 6mm) with M.S. flat½"x¼" (13 mm x 6 mm)

49 Providing and fixing 1½" (40 mm) thick hollow flush door Teak ply would be used under theand windows with commercial ply (3 ply) on both faces o written permission of thedeodar wood shutter frame 1¼" (30 mm) thick and partal superintending Engineer, and thewood braces at about 3" (75 mm) apart and deodar wood composite rate of using teak plylipping 1½"x3/8" (40 mmx10 mm) fixed with M.S. chowka will be increased by Rs.20.00 per(frame) including chromium plated fittings, etc. complet Sft. ( 216.00 per Sq.m)in all respects (without sliding bolt or lock)

i) M.S. angle iron 1½"x1½"x¼", welded Per Sft. 69.20 341.35 sq.m 744.35 3673.00(40 mmx40 mmx 6mm) with M.S. flat2"x¼" (50 mm x 6 mm)

chapter-12(Wood Work) Page 87

Page 89: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

ii) M.S. tee iron 1½"x1½"x¼", welded Per Sft. 69.20 315.25 sq.m 744.35 3391.95(40 mmx40 mmx 6mm) with M.S. flat½"x¼" (13 mm x 6 mm)

50 Providing and fixing 1½" (40mm) thick solid flush door It C.P. Finger plate and kick plateshutter sterling with commercial ply (5 mm thick) are not provided/fixed theon both sides double pressed and deodar wood lipping Per Sft. 35.85 216.70 sq.m 385.50 2331.80 composite rate will be reduced by1½"x3/8" (40mm x 10mm) around shutter including Rs.15.20 per Sft.chromium plated fitting, iron hinges with aluminium kick Reduce composite rate by Rs.13.00 plate 22 SWG on both sides & finger plate complete in all per. Sq/ft or Rs.140 per sq.meter ifrespect. 3-mm commmercial ply is used

51 Providing and fixing panelled door of M.S. sheet, with Per Sft. 68.65 259.25 sq.m 738.70 2789.45forged door leaves of M.S. sheet 22 SWG fitted in hollowframe chowkat 3"x4½" (75 mmx113 mm) made of M.S.sheet 18 SWG filled with plain cement concrete 1:3:6 etc.complete with all fittings and hammer painting, includingcarriage to site and fixing in position.

52 Providing and laying 24 SWG aluminum kick plate 4" (100 Per Rft. 14.85 22.40 Metre 48.70 73.50mm) high, fixed with screws 4" (100 mm) centre to centre,on bottom rail of flush doors only of commercial ply.

53 Providing and fitting curtain railing to doors and windows, Per Rft. 6.20 93.45 Metre 20.30 306.50comprising of TOSO-elite Japan made superior type ofrailing or equivalent, fixed over 4"x¾" (100mmx20mm)deodar wood strip, including painting.

54 Providing and fixing M.S. flat ½"x1/8" (13mm x 3mm) grill Per Sft. 38.40 141.85 sq.m 413.10 1526.40including ¾" x 1/8" (20 mmx3 mm) M.S. flat frame, inwindows of approved design, including painting threecoats, complete in all respects.

55 Providing and fixing G.I. wire gauze 22 SWG, 12x12 Per Sft. 11.80 41.00 sq.m 126.80 441.40 It 24 SWG wire gauze is used, themeshes per square inch, (5x5 meshes in cm2) fixed to composite rate shall be reduced bysteel window, complete with flat iron patti ½"x 1/8" (13 Rs.4.70 per Sft. or Rs.50.60 per squaremmx3 mm) and machine made screws. metre.

56 Providing and fixing wooden moulding stopper 2½"x5/8"(63 x 16 mm) on door frame fitted with ply of approvedquality complete in all respects.

a) Teak wood moulding Per Sft. 15.45 83.25 sq.m 166.45 895.55b) Deodar wood moulding ditto 15.45 39.15 ditto 166.45 421.30

chapter-12(Wood Work) Page 88

Page 90: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

57 Providing and fixing deodar wood dolly frame having Rate shall be paid as per surface area of1½"x1½" (40 x 40 mm) vertical and horizontal double post dolly frame e-g 0.75' x (3.5' + (2 x 7))with 1½"x1½" (40 x 40 mm) full width of james braces at12" (300 mm) including filling of the spaces in betweenbraces with 1:3:6 PCC fixing ply of approved qualityincluding holdfasts complete in all respects.

a) Teak wood ply Per Sft. 33.75 203.45 sq.m 363.25 2189.15b) With commercial ply ditto 33.75 175.70 ditto 363.25 1890.60

58 Providing and fixing ornamental wooden architrave 3" x (1½" tapered to ¼") all along the door frame complete in allrespect.

a) Teak wood architrave Per Sft. 6.65 51.95 sq.m 71.35 558.90b) Deodar wood architrave ditto 6.65 21.80 ditto 71.35 234.35

59 Providing and fixing Vin board cabinet 3/4" thick with

drawers 3"deep in 'Kitchen including termite proofing and polishing with synthetic enamel as specified, with handles hinges,screws etc., complete in all respects.

i) 1-1/2' deep,without back Per Sft 74.75 314.45 sq.m 804.50 3383.50ii) 1-1/2' deep,with back Per Sft 74.75 339.65 sq.m 804.50 3654.65iii) 2' deep,without back Per Sft 74.75 339.00 sq.m 804.50 3647.85iv) 2' deep,with back Per Sft 74.75 364.20 sq.m 804.50 3919.00

chapter-12(Wood Work) Page 89

Page 91: MRS Jan-Mar 09

PAINTING AND VARNISHING1 The rates include charges for scaffolding and other arrangements.

2 The rates for all finished works include the removal of surplus debris, unused material and by products

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 a) Cleaning painted wood work with oil and water. 100 Sft. 72.60 83.45 sq.m 7.80 9.00

b) Oiling woodwork with boiled linseed oil. 100 Sft. 48.40 88.00 sq.m 5.20 9.45 27.7

2 Brushing and scraping blisters of old paints from 100 Sft. 145.20 -- sq.m 15.60 - 27.3woodwork.

3 Scraping, brushing and removing old paint from metal 100 Sft. 580.80 -- sq.m 62.50 - 27.9surface.

4 Painting old surfaces:- 27.127.3 &

a) Painting corrugated surfaces, patent roofing, etc. with 27.9oil paint.

i) first coat 100 Sft. 181.50 317.10 sq.m 19.55 34.10ii) each subsequent coat ditto 137.50 207.10 ditto 14.80 22.30

b) Painting sashes, fanlights, glazed or gauzed doorsand windows:-

i) first coat 100 Sft. 110.00 183.20 sq.m 11.85 19.70ii) each subsequent coat ditto 93.50 153.50 ditto 10.05 16.50

c) Painting doors and windows, any type:

i) first coat 100 Sft. 181.50 320.70 sq.m 19.55 34.50ii) each subsequent coat ditto 137.50 243.70 ditto 14.80 26.20

d) Painting guard bars, gates of iron bars, gratings,railing (including standards, braces etc.) and similaropen work:-i) first coat 100 Sft. 110.00 183.20 sq.m 11.85 19.70ii) each subsequent coat ditto 93.50 153.50 ditto 10.05 16.50

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-13(Painting & Var) Page 90

Page 92: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

e) Painting fillets, framings, skirtings, pipes, gutters andsimilar linear work not exceeding 6" in girth:-

i) first coat 100 Lft. 93.50 166.70 Metre 3.05 5.45ii) each subsequent coat ditto 66.00 126.00 ditto 2.15 4.15

f) Painting small detached articles, not exceeding onesquare foot (Sq.m) of painted surface:-

i) first coat 100 Nos. 276.40 412.00 100 Nos. 276.40 412.00ii) each subsequent coat ditto 249.85 323.05 ditto 249.85 323.05

g) Painting small detached articles, exceeding onesquare foot (Sq.m) but not exceeding three squarefeet (Sq.m) of painted surface:-

i) first coat 100 Nos 631.70 1034.90 100 Nos 631.70 1034.90ii) each subsequent coat ditto 367.70 569.30 ditto 367.70 569.30

5 Painting new surface:- 27.127.2 &

a) Preparing surface and painting corrugated surface, 27.9patent roofing, etc.

i) priming coat. 100 Sft. 274.55 447.35 sq.m 29.55 48.15ii) each subsequent coat of paint. ditto 96.35 264.95 ditto 10.35 28.50

b) Preparing surface and painting sashes, fan light,glazed or gauzed doors and windows etc. any type(including edges):-

i) priming coat. 100 Sft. 115.65 238.35 sq.m 12.45 25.65ii) each subsequent coat of paint. ditto 79.20 175.20 ditto 8.50 18.85

c) Preparing surface and painting of doors and windowsany type (including edges):-

i) priming coat. 100 Sft. 274.55 443.75 sq.m 29.55 47.75ii) each subsequent coat of paint. ditto 96.35 264.95 ditto 10.35 28.50

d) Preparing surface and painting guard bars, gates ofiron bars, gratings, railing (including standards,braces, etc.) and in similar open work:-i) priming coat. 100 Sft. 177.20 281.00 sq.m 19.05 30.25ii) each subsequent coat of paint. ditto 79.20 175.20 ditto 8.50 18.85

chapter-13(Painting & Var) Page 91

Page 93: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

e) Preparing surface and painting of fillets, framing,skirtings, pipes, gutters, and similar linear work notexceeding 6" (150 mm) girth:-

i) priming coat. 100 Lft. 140.25 219.20 Metre 4.60 7.20ii) each subsequent coat of paint. ditto 52.80 132.60 ditto 1.75 4.35

f) Preparing surface and painting of small detachedarticles, not exceeding one sq. ft. (Sq.m) of paintedsurface:-

i) priming coat. 100 Nos. 412.50 832.20 100 Nos. 412.50 832.20ii) each subsequent coat of paint. ditto 203.05 536.65 ditto 203.05 536.65

g) Preparing surface and painting of small detachedarticles, exceeding one Sft. but not exceeding 3 Sft.(Sq.m) of painted surface:-

i) priming coat. 100 Nos. 1171.50 1841.10 100 Nos. 1171.50 1841.10ii) each subsequent coat of paint. ditto 352.00 949.60 ditto 352.00 949.60

h) Extra for knotting and stopping to 100 Sft. 18.50 30.35 sq.m 2.00 3.25priming coat on new surface of wood.

6 Applying Khanki Mixture hot to barrage 27.10gates:-

i) first coat 100 Sft. 137.50 193.35 sq.m 14.80 20.80ii) second coat ditto 109.80 148.50 ditto 11.80 16.00

7 French polishing complete:- 27.6

a) on new work 100 Sft. 1395.45 1446.80 sq.m 150.15 155.70b) on old work ditto 735.45 763.75 ditto 79.15 82.20

8 Varnishing wood work, including cleaning and preparingsurface.

a) first coat 100 Sft. 110.00 207.20 sq.m 11.85 22.30b) second coat ditto 41.25 115.05 ditto 4.45 12.40c) third coat ditto 41.25 99.45 ditto 4.45 10.70

chapter-13(Painting & Var) Page 92

Page 94: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

9 Bitumen coating to plastered or cement concrete surface:-

i) 20 lbs. per 100 Sft. (9.07 Kg per Sq.m) 100 Sft. 121.00 660.00 sq.m 13.00 71.00ii) 14 lbs. per 100 Sft. (6.35 Kg per Sq.m) ditto 116.15 392.75 ditto 12.50 42.25iii) 10 lbs. per 100 Sft. (4.54 Kg per Sq.m) ditto 95.85 372.45 ditto 10.30 40.05

10 Writing letters or figures, per letter, per inch (25 mm) Per No. 5.50 6.00 Per No. 5.50 6.00 27.1

height.

11 Writing letters or figures at any surface with reflective paint Per Letter 5.50 5.80 Per Letter 5.50 5.80 27.1of approved quality and colour per letter per inch height. per inch per 25 mm

height height

12 Writing letters of figures on any surface with reflective tape ditto 6.45 7.20 ditto 6.45 7.20 dittoof approved quality and colour per letter per inch (25 mm)height.

13 Coaltar painting: 27.8to

a) first coat, laid hot 100 Sft. 101.05 520.70 sq.m 10.85 56.05 27.11b) second coat, laid hot ditto 61.25 329.30 ditto 6.60 35.45

14 Solignum painting:- 27.8

a) one coat, applied hot 100 Sft. 101.65 124.45 sq.m 10.95 13.40b) two coats, applied hot ditto 154.00 190.10 ditto 16.55 20.45

15 Creosote painting:- ditto

a) one coat, applied hot 100 Sft. 121.95 225.15 sq.m 13.10 24.25b) two coats, applied hot ditto 184.80 357.60 ditto 19.90 38.50

16 Burning off or rubbing down with pumice stone, old paint 100 Sft. 378.85 393.25 sq.m 40.75 42.30 27.3from wood work.

17 Removing with caustic soda, old paint from wood work. 100 Sft. 145.20 152.40 sq.m 15.60 16.40 ditto

18 Painting distance marks for white ground and black Each 27.50 31.35 Each 27.50 31.35 27.1lettering on both sides.

19 Painting two feet wide gauges, reading to 10th of a foot Per Rft. 55.00 62.30 per Metre 180.40 204.40 ditto(metre).

chapter-13(Painting & Var) Page 93

Page 95: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

20 Painting sounding rods and other gauges, reading to 10th Per Lft. 27.50 29.85 per Metre 90.20 97.90 27.1of a foot (metre)

21 Painting leveling staves. Per Lft. 85.80 89.45 per Metre 281.40 293.45

22 a) Painting and lettering mile/Km stones, dittoon both sides:

i) one coat Each 23.10 49.80 Each 23.10 49.80ii) two coats ditto 103.15 143.95 ditto 103.15 143.95

b) Painting and lettering Furlong/½ Km 27.1stones, on both sides:-

i) one coat Each 3.10 6.10 Each 3.10 6.10ii) two coats ditto 13.75 19.15 ditto 13.75 19.15

c) Painting and lettering Sign posts:-

i) one coat Each 66.00 81.60 Each 66.00 81.60ii) two coats ditto 108.90 137.70 ditto 108.90 137.70

23 Removing paint or varnish from wall. 100 Sft. 290.40 - sq.m 31.25 - 27.12

24 Scraping from hydraulic gates:- 27.1

a) Khanki paint 100 Sft. 580.80 - sq.m 62.50 -b) Aluminium paint ditto 580.80 - ditto 62.50 -

25 Painting letters with shade. per letter 8.80 8.80 per letter 8.80 8.80 27.1per inch per 25 mmheight height

26 Scraping rust from old rail or girders. 100 Sft. 435.60 471.60 sq.m 46.85 50.75 27.927.10

27 Chiselling old paint from brick work. 100 Sft. 580.80 604.80 sq.m 62.50 65.10 27.12

28 Cleaning glasses with chalk and spirit, etc. 100 Sft. 484.00 494.00 sq.m 52.10 53.15

29 Cleaning and oiling rafter or rolled steel 100 Sft. 145.20 170.25 sq.m 15.60 18.30 27.9beams.

chapter-13(Painting & Var) Page 94

Page 96: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

30 Cleaning and painting punkha poles, including fixing Each 95.70 102.00 Each 95.70 102.00 27.3hooks.

31 Preparing surface and painting with emulsion paint:- 27.12

a) first coat 100 Sft. 139.40 263.35 sq.m 15.00 28.35b) 2nd and each subsequent coat ditto 106.90 205.90 ditto 11.50 22.15

32 Preparing surface and painting with water proof coloured 27.12cement finish, like duracem, buxcem or other finishes withsimilar specifications, on walls, etc.

a) new surface:

i) 1st coat 100 Sft. 139.40 205.10 sq.m 15.00 22.05ii) 2nd and subsequent coat ditto 106.95 164.85 ditto 11.50 17.75

b) old surface:

i) 1st coat 100 Sft. 139.40 167.60 sq.m 15.00 18.05ii) 2nd and subsequent coat ditto 106.95 134.45 ditto 11.50 14.45

32A Providing and applying weather shield paint of approvedquality on external surface of building including preparation ofsurface, application of primer complete in all respect:

a) new surface:

i) 1st coat %sft 475.20 770.75 sq.m 51.15 82.95ii) 2nd coat %sft 260.70 380.50 sq.m 28.05 40.95

b) old surface: %sft 260.70 380.50 sq.m 28.05 40.95

33 Painting traffic lane 5" (125 mm) wide, with road marking Per Rft. 0.85 1.50 Metre 2.70 5.00enamel.

34 Painting traffic lane 5" (125 mm) wide with reflective Per Rft. 1.00 7.55 Metre 3.25 24.75 AASHTO Rates shall be reduced by Rs.0.50clorinated rubber (CR) paint including glass beads comlpete M248-91 P.Rft or Rs.1.65 P.Mtr. If glass beads in all respect. (2000) are not used.

35 Repainting of ceiling fan (all sizes and types), including Per Job 33.00 60.00 Job 33.00 60.00painting of blades, canopy, suspension rod and regulator,with suitable enamel paint.

chapter-13(Painting & Var) Page 95

Page 97: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

36 Repainting of iron poles with cross arms, with bitumen or Per Job 77.00 170.00 Job 77.00 170.00 other approved paint.

37 Repainting of pipes and specials of G.I., M.S. or conduit,etc., fixed for on surface electric wiring, with approvedpaint:

i) upto 40 mm (1½") dia Per Rft. 0.70 2.30 Metre 2.30 5.40ii) above 40 mm (1½") to 50 mm (2") dia ditto 1.40 3.00 ditto 4.60 9.80iii) above 50 mm (2") to 100 mm (4") dia ditto 2.35 4.70 ditto 7.70 15.45

38 Repainting main switches and branch distribution boards Per Job 6.75 45.35 Job 6.75 45.35of all sizes and types, with approved paint (complete set).

39 Extra labour for painting, varnishing, etc. from 20' (6.10 m) 100 Sft. 46.45 - sq.m 5.00 - The height will be taken from theheight and above, for every additional 10' (3.05 m) height, per coat floor, roof or ground underneath, asor part thereof, requiring scaffolding. the case may be on the side

towards which the work is to bedone.

chapter-13(Painting & Var) Page 96

Page 98: MRS Jan-Mar 09

LINING OF CANALS1 Rates for all finished works include the removal of surplus debris, unused material and byproducts2 The rates also include curing for specified period wherever necessary.3 Nominal dimension of tile or brick shall be taken for the purpose of measurement and payment

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Formation, dressing and preparing sub-grade:- 28.1 to 28.3

a) in bed 100Sft. 286.35 - sq.m 30.80 -b) on slope ditto 385.45 - ditto 41.45 -

2 Stabilized layer of cement, sand ratio 1:30, 2" (50 mm) 100Sft. 805.20 1150.80 sq.m 86.65 123.85 dittothick on slope.

3 Cement plaster ½" (13 mm) thick ratio 1:10. ditto

a) in bed 100Sft. 570.25 747.35 sq.m 61.35 80.40b) on slope ditto 732.60 909.70 ditto 78.85 97.90

4 Cement plaster 3/8" (10 mm) thick ratio 1:3. ditto

a) in bed 100Sft. 570.25 890.65 sq.m 61.35 95.85b) on slope ditto 732.60 1053.00 ditto 78.85 113.30

5 Cement plaster 1½" (40 mm) thick ratio 1:6. ditto

a) in bed 100Sft. 732.60 1490.75 sq.m 78.85 160.40b) on slope ditto 937.20 1695.35 ditto 100.85 182.40

6 Tile lining 12"x6"x2" (300x 150x50 mm) in 1:6 cement, 28.2 to 28.3 The rates are only for laying tilessand mortar:- over 1/8" (3 mm) thick layer of 1:6

mortar. Items 1 to 5 above area) in bed 100Cft. 3663.00 9510.10 cu.m 1293.75 3358.95 payable separately.b) on slope ditto 4191.00 10038.10 ditto 1480.25 3545.45

7 Tile lining 12"x6"x2" (300x150x50 mm) in 28.2 to 28.3 The rates are only for laying tiles1:3 cement, sand mortar:- over 1/8" (3 mm) thick layer of 1:3

mortar. Items 1 to 5 above area) in bed 100Cft. 3663.00 10593.00 cu.m 1293.75 3741.45 payable separately.

b) on slope ditto 4191.00 11121.00 ditto 1480.25 3927.95

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-14(Lining of canal) Page 99

Page 99: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

8 Brick lining 9"x4½"x3" (225x113x75 mm) in 1:6 cement, 28.2 The rates are only for laying brickssand mortar:- over 1/8" (3 mm) thick layer of 1:6

mortar. Items 1 to 5 above area) in bed 100Cft. 3663.00 11814.10 cu.m 1293.75 4172.75 payable separately.b) on slope ditto 4191.00 12342.10 ditto 1480.25 4359.25

9 Brick lining 9"x4½"x3" (225x113x75 mm), in 1:3 cement, ditto The rates are only for layingsand mortar:- bricks over 1/8" (3 mm) thick

layer of 1:3 mortar. Items 1 toa) in bed 100Cft. 3663.00 12897.00 cu.m 1293.75 4555.20 5 above are payableb) on slope ditto 4191.00 13425.00 ditto 1480.25 4741.70 separately.

10 Cement concrete lining, using washed screened and 20.1, 28.1graded stone aggregate:- & 28.3

a) in bed:-

i) ratio 1:2:4 100Cft. 2996.40 12658.80 cu.m 1058.35 4471.10ii) ratio 1:3:6 ditto 2996.40 10765.20 ditto 1058.35 3802.25iii) ratio 1:4:8 ditto 2996.40 9390.00 ditto 1058.35 3316.55

b) on slope:-

i) ratio 1:2:4 100Cft. 3498.00 13160.40 cu.m 1235.50 4648.25 ii) ratio 1:3:6 ditto 3498.00 11266.80 ditto 1235.50 3979.45iii) ratio 1:4:8 ditto 3498.00 9891.60 ditto 1235.50 3493.70

chapter-14(Lining of canal) Page 100

Page 100: MRS Jan-Mar 09

SHEET PILINGRates for all finished works include the removal of surplus debris, unused material and by produc

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Cutting Ransome and Larson piles. Per 99.00 - Per 99.00 - 29.1-cut cut 29.3

2 Cutting universal piles. Per cut 146.50 - Per cut 146.50 - ditto

3 Driving steel piles, 25' to 30'. (7.5 to 9.0 m) 100Sft. 1882.30 - sq.m 202.55 - ditto 1) The rate includes laying andremoving of track and also carriageof piles to machine, averagedistance of 3 chains (90 metre).

2) The rates are for the tacklegangs only supplied by thecontractor, Mechanical staffon-machines will be supplied byGovernment.

3) T-piles and adjustable junctionpiles will be counted as two piles.

4 Driving steel piles,more than 15' (4.6 m) and less than 25' 100Sft. 1805.75 - sq.m 194.30 - ditto ditto(7.5 m).

5 Driving steel piles, 15' (4.5 m) and under. 100Sft. 1346.40 - sq.m 144.85 - ditto ditto

6 Dolleying piles. Each 119.35 - Each 119.35 - ditto Upto 5' (1.5 m) dolleying.

7 Drilling holes in piles by hand. Each 13.60 - Each 13.60 - ditto

8 Raising and lowering machine. Per Ft. 1768.80 - Metre 5801.65 - ditto

9 Turning Machine, 90o . Per 2687.50 - Per 2687.50 - 29.1 toJob Job 29.3

10 Turning Machine, 135o . Per 3300.00 - Per 3300.00 - dittoJob Job

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-15(Sheet piling) Page 101

Page 101: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

11 Turning Machine, 180o . Per 4493.30 - Per 4493.30 - 29.1 toJob Job 29.3

12 Travelling machine (light). Per 5314.30 - 30 M. 5314.30 - dittoChain

13 Loading and unloading piles. Ton 107.45 - Tonne 105.75 - ditto To be done by hand carts orramps, including cost of ropes.

14 Dismantling piling machine. Each 10905.40 - Each 10905.40 - ditto

15 Erecting piling machine. Each 12583.15 - Each 12583.15 - ditto

16 Carriage of piling machine under different conditions. per 2171.40 - 30 M 2171.40 - dittochain

chapter-15(Sheet piling) Page 102

Page 102: MRS Jan-Mar 09

PROTECTION & DIVERSION WORKS1 Rates for all finished works include the removal of surplus debris, unused material and byproducts2 The composite rates of the items in which stone, boulders, shingle spawl are used do not contain the carriage

of the these stone materials, which will be paid separately by road, and/or rail, whichever means of transport isadopted. The supply and carriage to site of work of all other material required in the item, is included in thecomposite rates.

3 The carriage of stone or spawl will be paid on the basis of actual stack measurement (without any reductionfactor) of the stone, boulders, shingle or spawl carried.

4 Where stone, boulder or spawl is issued from stock and contractor is paid for its carriage and/or labour only; or where such stone product is supplied, carried or handled by the contractor in which no laying is required,the actual stack measurement (without any reduction factor) shall from the basis of payment of supply orcarriage of the stone, boulder or spawl, etc. The quantity of finished and completed item of work shall form thebasis of laying.

5 In case of the items in which the rates include carriage of stakes, bushing, Pilchi, sarkanda or farash, etc. withinone mile (1.6 Km.)

i) the cost of the carriage within one mile (one Km) shall not be deducted from the carriage charges to follow thereafterfrom the point of supply.

ii) if the site of work happens to be within one mile (one Km.) of the source of supply, the materials will be collectedand measured at site of work and no extra carriage would be admissible in such cases.

iii) where the site of the work is situated at more than one mile (one Km.) distance from the source of supply, the pointof supply will be fixed carefully by the Engineer-in-charge in such a way that the carriage charges wouldbe arrived at, most economically. Extra carriage will be admissible from the place of supply of thematerial which will be considered its starting point. The demarcation of the place of supply will bepre-determined before calling the tenders.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Cutting pilchi frash or sarkanda inlcuidng carriage within 100Cft. 551.75 cu.m 194.85one mile.

2 Weaving matresses. 100Cft. 1045.45 cu.m 369.20

3 a) Supplying and filling jute bags 1.25 (o.o35 cum) Cft., Per 16.35 28.70 Per Baq 16.35 28.7 The rate does not include supply ofcapacity, with sand or earth, sewing and stacking, in Bag sand or earth for filling bags, whichdry. will be paid extra.

b) Supply and filling jute bags 1.25 (0.35 ccum) Cft. ditto 25.40 37.75 Per Baq 25.40 37.75 -ditto-capacity, with sand or earth, sewing and laying inposition, under water.

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-16(Protec & Div) Page 101

Page 103: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

4 a) Supplying and filling jute bags 4 to 5 cft Per 39.10 85.90 Per 39.10 85.90 The rate does not include supply of(0.11 to 0.14 cum) capacity, with sand or earth, Bag Bag sand or earth for filling bags, whichsewing and stacking, in dry. will be paid extra.

b) Supply and filling new jute bags 4 to 5 cft (0.11 to ditto 55.85 102.65 ditto 55.85 102.65 -ditto-0.14 cu.m) capacity, with sand or earth, sewing andlaying in position, under water.

5 Carriage of jute bags 1.25 Cft. (0.035 cu m) capacity, filledwith sand or earth:-

a) 1st chain (30 m) 100 Nos 145.20 % Nos 145.20

b) 2nd to 4th chain (30 m to 120 m) Per chain 52.25 Per 30 m 52.25per 100 Per 100 Nos/

Nos

c) 5th and subsequent chains ditto 20.35 ditto 20.35(150 m and subsequent every 30 m)

6 Carriage of new jute bags 4 to 5 Cft.(0.11 to 0.14 cu.m) capacity, filled with sand or earth:-

a) 1st chain (Ist 30 metre) 100 Nos 580.80 % Nos 580.80

b) 2nd to 4th chain (60 m to 120 m) per chain 203.30 Per 30 m 203.30per 100Nos per %Nos

c) 5th and subsequent chains (150 m and ditto 78.40 ditto 78.40subsequent every 30 m)

7 Rolling matresses to river edge and floating,after unroling:-

a) area of matress upto 2,000 Sft. 100Sft. 326.70 sq.m 35.15( 186 sq.m)

chapter-16(Protec & Div) Page 102

Page 104: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

b) area of matress 2,000 to 2,500 Sft. 100Sft. 544.50 sq.m 58.60

(186 sq.m to 232 sq.m)

c) area of matress over 2,500 Sft. ditto 635.25 ditto 68.35(232 sq.m)

8 Sewing empty cement bags in sheets. 100 Nos 508.20 536.20 % Nos 508.20 536.2

9 Making compact round pilchi, frash or sarkanda round 100Cft. 707.85 780.10 cu.m 250.00 275.55 Measured in the shape of compactbundles of specified size for the work. round bundles and of size specified

for the work, before filling at site.

10 Launching the above and placing in position. 100Cft. 348.50 cu.m 123.05

11 Supply within 5 chains (150 m):-

a) Boulders 9" (225 mm) and above 100Cft. 1051.25 cu.m 371.25

b) Over size shingle 3" to 9"(75 to 225 mm) ditto 702.75 ditto 248.20

c) Mixed graded shingle ditto 833.45 ditto 294.35

12 Supplying Munj or Patha Trungers 6" (150 mm) mesh to hold Each 45.40 76.80 Each 45.40 76.83 Cft. (0.085 cu.m)

13 Providing and weaving G.I. wire netting for wire crates, withG.I. wire of approved size (including siding and partition tomake crate):-

a) 6" (150 mm) mesh

i) 15 SWG wire 100Sft. 600.60 859.30 sq.m 64.65 92.45ii) 10 SWG wire ditto 643.50 1483.50 ditto 69.25 159.65iii) 8 SWG wire ditto 643.50 1960.60 ditto 69.25 210.95

b) 4" (100 mm) mesh

i) 15 SWG wire 100Sft. 772.20 1161.10 sq.m 83.10 124.95ii) 10 SWG wire ditto 858.00 2115.50 ditto 92.30 227.65iii) 8 SWG wire ditto 858.00 2829.50 ditto 92.30 304.45

14 Providing and laying shingle on top of bund, including 100Cft. 363.00 653.40 cu.m 128.20 230.75handling of materials within three chains.

chapter-16(Protec & Div) Page 103

Page 105: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

15 Supply and dumping at site, without boat, includinghandling of materials within three chains (90 m)

a) stone or boulder 100Cft. 635.25 1031.25 cu.m 224.35 364.2 The rate includes supply of brickb) shingle or spawl ditto 635.25 925.65 ditto 224.35 326.9 bats to site of work.c) brick bats ditto 490.05 1414.05 ditto 173.10 499.45

16 Supply and dumping by boat, including loading into boat The rate includes supply of brickwithin three chains (90 m) lead, and hire charges of boat and bats to site of work.boatman.

a) stone or boulder 100Cft. 937.20 1333.20 cu.m 331.00 470.9b) shingle or spawl ditto 937.20 1227.60 ditto 331.00 433.60c) brick bats ditto 792.00 1716.00 ditto 279.75 606.10

17 Providing and filling brick bats in crates 100Cft. 854.70 1778.70 cu.m 301.90 628.25 The rate includes supply of brick(excluding cost of crates). bats to site of work.

18 Supplying and filling bricks in crates and hand packing 100Cft. 1036.20 8236.20 cu.m 366.00 2909.05 The rate includes supply of bricks(excluding cost of crates). to site of work.

19 Supply and filling in wire crates, including sewing crates(excluding cost of crates):-

i) stone or boulder 100Cft. 1181.40 1577.40 cu.m 417.25 557.15ii) shingle or spawl ditto 1181.40 1471.80 ditto 417.25 519.85

20 Extra for anchoring boat, for dumping by boats or tipping 100Cft. 67.35 - cu.m 23.80 -crates.

21 Extra for tipping crates (in addition to anchoring boats). 100Cft. 638.90 - cu.m 225.65 -

22 Pilchi reventment, including carriage upto one mile 100Sft. 363.00 763.00 sq.m 39.05 82.1 30.1(1.6 km.)

23 Surface protection with pilchi matresses, carriage upto 100Sft. 907.50 947.50 sq.m 97.65 101.95 dittoone mile (1.6 Km).

24 Pilchi, sarkanda or frash pitching on slopes, including The cost of placing earth betweensupply of pilchi, sarkanda or frash within one mile, (1.6 km) 100Sft. 551.05 1482.00 sq.m 59.30 159.45 rolls shall be paid separately, asalso supply and driving of pegs 1½' (460 mm) long earthwork.sharpened at one end and, tying with wire or Munj Ban(excluding cost of placing earth between rolls).

chapter-16(Protec & Div) Page 104

Page 106: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

25 Constructing Groynes upto 5' (1.5 m) height, with single 100Sft. 688.40 749.85 sq.m 74.05 80.70 Measurement to be made of therow of wooden vertical stakes 7" to 12" (175 to 300 mm) area of elevation on one face only.dia, 1' (300 mm) apart, average lead one mile (1.6 km.)

26 Construction Groynes upto 10' (3.0 m) height, with double 100Sft. 1185.35 1258.75 sq.m 127.55 135.45row of wooden vertical stakes 7" to 12" (175 to 300 mm)dia, 2' (600 mm) apart, average lead one mile (1.6 Km).

27 Providing and laying stone pitching/filling, dry hand 100Cft. 745.80 1418.10 cu.m 263.40 500.85packed, as filling behind retaining walls or in pitching andaprons.

28 Providing and laying stone pitching with hammer dressed 100Cft. 2574.00 3171.60 cu.m 909.15 1120.2stones on surface, laid in courses.

29 Providing and laying stone pitching, for top layer only:-

a) one slope 100Cft. 2079.00 2676.60 cu.m 734.30 945.4b) on level ditto 1897.50 2495.10 ditto 670.20 881.25

30 Providing and laying stone or spawl filling:-

a) on level 100Cft. 528.00 792.00 cu.m 186.50 279.75

b) on slope ditto 679.80 943.80 ditto 240.10 333.35

31 Providing and laying stone pitching, hand packed, withsurface levelled off to the correct section and voids filled in1:8 cement, sand mortar, in floors of bridges along banksand in appons etc.

i) top layer on slope 100Cft. 2791.15 4745.20 cu.m 985.85 1676.00ii) top layer on level ditto 2609.65 4563.70 ditto 921.75 1611.90iii) stone pitching/filling on slope or on level ditto 1467.20 3495.95 ditto 518.20 1234.75

(other than top layer).

32 Grouting stone pitching or apron, etc. in:-

a) cement, sand mortar 1:3 100Sft. 882.40 3635.00 sq.m 94.95 391.1b) cement, sand mortar 1:8 ditto 759.00 1395.00 ditto 81.65 150.10

33 Sand grouting in stone apron, with high 100Sft. 86.50 279.50 sq.m 9.30 30.10pressure hose.

chapter-16(Protec & Div) Page 105

Page 107: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

34 Grouting stone filling or pitching, with bajri. 100Cft. 453.75 1029.75 cu.m 160.25 363.7

35 Removing stone and repitching hand packed, on slopes or 100Cft. 1910.05 - cu.m 674.65 -level after making good damaged slope/portion.

36 Collecting and stacking boulders from nullah beds or loose 100Cft. 580.80 - cu.m 205.15 -shale, or from any other site, within 3 chains (90 m) lead.

37 Levelling and dressing stone filling under blocks and 100Cft. 528.00 1104.00 cu.m 186.50 389.95grouting with shingle.

38 Grouting jharies between blocks with bajri. 100Cft. 528.00 912.00 cu.m 186.50 322.10

39 Breaking stone into spawls and stacking 100Cft. 435.60 - cu.m 153.85 -

Canal and Roads

40 Fixing floating spurs, with material from canal plantationwithin one mile (1.6 Km) lead:-

a) upto 2.0' (600 mm) F.S. depth Each 14.35 - Each 14.35 -

b) above 2.0' to 3.0' (600 to 900 mm) F.S. depth ditto 16.15 - ditto 16.15 -

c) above 3.0' to 4.0' F.S. (900 mm to 1200mm) depth Each 21.50 - ditto 21.50 -

d) above 4.0' (1200 mm) F.S. depth ditto 53.80 - ditto 53.80 -

41 Staking and bushing from canal plantation, royalty to bepaid to Forest Department or cost to private owner, if andwhen required:-

a) i) Cutting and supply unsharpened pegs 3.5' (1.07 100 Nos 726.00 754.00 % Nos 726.00 754.00m) long, 3" to 6" (75 to 150 mm) dia, within one mile(1.6 Km) lead.

ii) Sharpening one end of 3.5' (1.07 m) long pegs, 3" 100 Nos 343.20 - 100 Nos 343.20 -to 6" (75 to 150 mm) dia.

iii) Driving pegs 3.5' (1.07 m) long, 3" to 6" (75 to 150 100 Nos 428.75 - 100 Nos 428.75 -mm) dia (driven 1.0' (300 mm) below the available bedor ground (average).

chapter-16(Protec & Div) Page 106

Page 108: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

iv) Tying pegs with Munj, Patha ban (one line, Per Chain 36.30 58.15 Per 30 36.30 58.15incuding tying around the pegs). of One Metre

Row of one row

v) Cutting and supplying brush wood from canal ditto 556.50 706.90 ditto 556.50 706.90plantation or private owners, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

b) i) Cutting and supplying unsharpened pegs 4.0' 100 Nos 79.65 111.50 100 Nos 79.65 111.50(1.20 m) long, 3" to 6" (75 to 150 mm) dia, from canalplantation, lead within one mile (1.6 Km).

ii) Sharpening one end of 4' (1.20 M) long pegs, 3" 100 Nos 343.20 - 100 Nos 343.20 -to 6" (75 to 150 mm) dia.

iii) Driving pegs 4' (1.20 m) long, 3" to 6" (75 to 150 100 Nos 518.25 - 100 Nos 518.25 -mm) dia (driven 1.0' (300 mm) below the available bedor ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per 36.30 Per 36.30 incuding tying around the pegs). Chain of 30 M of

one row one row

v) Cutting and supplying brush wood from canal ditto 1290.30 ditto 1290.30 plantation or private source, lead within one mile(1.6 Km). and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

c) i) Cutting and supplying unsharpened pegs 5.0' (1.5 100 Nos 99.65 139.50 100 Nos 99.65 139.50m) long, 3" to 6" (75 to 150 mm) dia, from canalplantation, lead within one mile (1.6 Km).

ii) Sharpening one end of 5' (1.5 m) long pegs, 3" to 100 Nos 363.00 - 100 Nos 363.00 -6" (75 to 150 mm) dia.

iii) Driving pegs 5' (1.5 m) long, 3" to 6" (75 to 150 100 Nos 596.65 - 100 Nos 596.65 -mm) dia (driven 1.5' (450 mm) below the available bedor ground (average).

chapter-16(Protec & Div) Page 107

Page 109: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

iv) Tying pegs with Munj, Patha ban (one line, Per 36.30 58.15 Per 36.30 58.15incuding tying around the pegs). Chain of 30 M

one row of one row

v) Cutting and supplying brush wood from canal Per chain 574.20 784.60 Per 30 M 574.20 784.60plantation or private source, lead within one mile of one row of one row(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

d) i) Cutting and supplying unsharpened 100 Nos 1452.00 1499.85 100 Nos 1452.00 1499.85pegs 6.0' (1.8 m) long, 3" to 6" (75 to150 mm) dia, from canal plantation, leadwithin one mile (1.6 Km).

ii) Sharpening one end of 6' (1.8 m) long pegs, 3" to 100 Nos 431.65 - 100 Nos 431.65 -6" (75 to 150 mm) dia.

iii) Driving pegs 6' (1.8 m) long, 3" to 6" (75 to 150 100 Nos 715.95 - 100 Nos 715.95 -mm) dia (driven 1.75' (530 mm) below the availablebed or ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per Per Chainincuding tying around the pegs). Chain of 36.30 58.15 of one row 36.30 58.15

one row

v) Cutting and supplying brush wood from canal ditto 1471.80 1727.30 ditto 1471.80 1727.30plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

e) i) Cutting and supplying unsharpened pegs 6'-1" to 100 Nos 1089.00 1188.20 100 Nos 1089.00 1188.208.0' long (1.85 to 2.45 m), 4" to 8" (100 to 200 mm)dia, from canal plantation, lead within one mile (1.6 Km).

ii) Sharpening one end of 6'-1" to 8.0' (1.85 to 2.45m) 100 Nos 549.10 - 100 Nos 549.10 -long pegs, 4" to 8" (100 to 200 mm) dia.

chapter-16(Protec & Div) Page 108

Page 110: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

iii) Driving pegs 6'-1" to 8.0' (1.85 to 2.45 m) long, 3" 100 Nos 790.15 - 100 Nos 790.15 -to 6" (75 to 150 mm) dia driven 2' (600 mm) belowthe available bed or ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per chain 36.30 48.40 Per 30 M 36.30 48.4incuding tying around the pegs). of one row of one row

v) Cutting and supplying brush wood from canal Per 1663.20 1963.80 Per 30 M 1663.20 1963.80plantation or private source, lead within one mile Chain of of one row(1.6 Km) and wattling between stakes and intertwining one row(thickness of wattled brushwood 1.0' (300 mm)average).

42 Staking with Bamboo from market and bushing from canalplantation or private source (royalty of brushwood to bepaid to Forest Department or cost to private owner, if andwhen required):-

a) i) Supplying Bamboos 8'-1" to 10.0' (2.46 to 3.05 m) 100 Nos 6600.00 - 100 Nos 6600.00 -long, 2½" to 5" (63 m to 125 mm) dia.

ii) Sharpening one end of 8'-1" to 10.0' (2.46 to 30.5 100 Nos 480.50 - 100 Nos 480.50 -m) long Bomboos, 2½" to 5" (63 to 125 mm) dia.

iii) Driving Bamboos 8'-1" to 10.0' (2.46 to 3.05 m) 100 Nos 865.15 - 100 Nos 865.15 -long 2½" to 5" (63 to 125 mm) dia, driven 2.5' (750mm) below the available bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Per 30 MMunj, Patha Ban, two lines, including tying around Chain of 54.45 88.70 of one 54.45 88.70the Bamboos. one row Row

v) Cutting and supplying brushwood from canal ditto 2036.10 2426.50 ditto 2036.10 2426.50plantation or private source, lead within one mile(1.6 Km), and wattling between stakes andintertwining (thickness of wattled brushwood 1.0' (300 mm) average).

b) i) Supplying Bamboos 10'-1" to 12.0' (3.07 to 3.66 100 Nos - 10200.00 100 Nos - 10200m) long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 10'-1" to 12.0' 100 Nos 549.10 - 100 Nos 549.10 -(3.07 to 3.66 m) long Bamboos, 2½" to5" (63 to 125 mm) dia.

chapter-16(Protec & Div) Page 109

Page 111: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

iii) Driving Bamboos 10'-1" to 12.0' (3.07 to 3.66 m) 100 Nos 939.30 - 100 Nos 939.30 -long 2½" to 5" (63 to 125 mm) dia, driven 2.75' (840 mm) below the available bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one 181.50 792.20 of one Row 181.50 792.20the Bamboos and third tie around the top end only. row

v) Cutting and supplying brushwood from canal ditto 2494.80 2990.80 ditto 2494.80 2990.80plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' ( 300 mm)average).

c) i) Supplying Bamboos 12'-1" to 14.0' (3.68 to 4.27 100 Nos - 10800.00 100 Nos - 10800.00m) long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 12'-1" to 14.0' (3.68 to 4.27 100 Nos 617.75 - 100 Nos 617.75 -m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.

iii) Driving Bamboos 12'-1" to 14.0' (3.68 to 4.27 m) 100 Nos 1073.95 - 100 Nos 1073.95 -long 2½" to 5" dia, driven 3.5' (1.07 mm) below theavailable bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one row 181.50 792.20 of one row 181.50 792.20the Bamboos and third tie around the top end only.

v) Cutting and supplying brushwood from canal ditto 2953.50 3524.70 ditto 2953.50 3524.70plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

d) i) Supplying Bamboos 14'-1" to 16.0' (4.30 to 4.90 m) 100 Nos - 12000.00 100 Nos - 12000.00long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 14'-1" to 16.0' (4.30 to 100 Nos 686.40 - 100 Nos 686.40 -4.90 m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.

iii) Driving Bamboos 14'-1" to 16.0' long (4.30 to 4.90m) 100 Nos 1193.30 - 100 Nos 1193.30 -2½" to 5" (63 to 125 mm) dia, driven 4' (1.20 m)below the available bed or ground (average).

chapter-16(Protec & Div) Page 110

Page 112: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one 181.50 792.20 of one 181.50 792.20the Bamboos and third tie around the top end only. Row Row

v) Cutting and supplying brushwood from canal ditto 3399.00 4060.35 ditto 3399.00 4060.35plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

e) i) Supplying Bamboos 16'-1" to 20' (4.9 to 6.10 m) 100 Nos - 12600.00 100 Nos - 12600.00long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 16'-1" to 20' (4.9 to 100 Nos 823.70 - 100 Nos 823.70 -6.10 m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.

iii) Driving Bamboos 16'-1" to 20' long (4.9 to 6.10 m) 100 Nos 1431.95 - 100 Nos 1431.95 -2½" to 5" (63 to 125 mm) dia, driven 4' (1.20 m)below the available bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one 181.50 792.20 of one 181.50 792.20the Bamboos and third tie around the top end only. row row

v) Cutting and supplying brushwood from canal ditto 4253.70 5095.30 ditto 4253.70 5095.30plantation or private source, lead within one mile (1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm) average).

43 Cutting and supplying brushwood from canal plantation or 100Cft. 181.50 241.50 cu.m 64.10 85.30 Royalty to be paid to the Forestfrom any other source, within one mile (1.6 Km). Department or cost to the private

owner, if and when required.

44 Filling brush wood only, thoroughly packed. 100Cft. 145.20 - cu.m 51.30 - Measured in compacted andpacked shape before filling.

45 Covering road 10' to 12' (3.00 to 3.65 m) wide, with 3" Per 348.50 - Per 348.50 -(75 mm) sarkanda or jungle upto one chain lead (30 m). Chain 30 M

46 a) Gachi pitching 1' (300 mm) thick. 100Sft. 1887.60 - Sq.m 203.10 -b) Gachi pitching done with silt clearance 100Sft. 1597.20 - Sq.m 171.85 -

and berm dressing.

chapter-16(Protec & Div) Page 111

Page 113: MRS Jan-Mar 09

OUTLETSRates for all finished works include the removal of surplus debris, unused material and byproduc

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Earthwork for outlets, excavation refilling, ramming and 17.1 Includes consolidation of earth afterpuddling:- to refilling.

17.5a) channels, discharge upto 50 cusecs. Job 605.00 - Job 605.00 -

b) channels, discharge from 51 to 100 cusecs. Job 798.60 - Job 798.60 -

c) channels, discharge from 101 to 200 cusecs. Job 1210.00 - Job 1210.00 -

d) channels, discharge from 201 to 350 cusecs. Job 1633.50 - Job 1633.50 -

e) channels, discharge over 350 cusecs. Job 2420.00 - Job 2420.00 -

2 Dismantling outlets:- 18.1 These rates are for totaldismantlement and removal

a) old types, such as K.G.O's orifices, etc. Each 605.00 - Each 605.00 - of material. The rates do notinclude earth work for which

b) A.P.M. or O.F., "H" upto 2.0 ft. (600 mm) ditto 907.50 - ditto 907.50 - rates are given in item 1,above.

c) A.P.M. or O.F., "H" from 2.1 ft. to 3.0'. ditto 1210.00 - ditto 1210.00 -(630 mm to 900 mm)

d) A.P.M. or O.F., "H" above 3.0'. ditto 1512.50 - ditto 1512.50 -(900 mm)

e) Tail cluster bifurcation ditto 907.50 - ditto 907.50 -

f) Tail cluster trifurcation ditto 1210.00 - ditto 1210.00 -

g) Tail cluster quardification ditto 1512.50 - ditto 1512.50 -

3 Making temporary A.P.M. bricks block and fixing at site. Each 337.60 548.80 Each 337.60 548.80 21.1 & 21.2

4 Dismantling walls, taking out temporary Job 686.40 - Job 686.40 - 18.1, 21.1A.P.M. brick block, fixing iron block and & 21.2rebuilding dismantled walls

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-17(Outlet) Page 112

Page 114: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

5 Dismantling walls and fitting iron block of O.F. outlet. Each 686.40 - Each 686.40 - 18.1, 21.1

& 21.2

6 Constructing, watching and removing bund for outlet built 17.1in running water:- to

17.2a) upto 3.0' (0.300 m) depth Each 1452.00 - Each 1452.00 -b) above 3.0' (0.300 m) depth ditto 1960.20 - ditto 1960.20 -

7 Adjusting "B" of tail cluster by dismantling and rebuilding Each 357.50 645.50 Each 357.50 645.50 18.1, 21.1throat walls. & 21.2

8 Adjusting "Y" of an A.P.M. outlet, including dismantling Each 693.00 1163.40 Each 693.00 1163.40 ditto

and rebuilding.

9 Extra labour in fixing A.P.M. and O.F. outlet blocks, 21.1 & 21.2 Rates to be Rs. 4.00 less in caseincluding dressing of bricks:- of O.F. outlets, where there is no

O.F. iron block.a) for channel depth of 5.0'. (1.5 m) Each 818.40 912.00 Each 818.40 912.00b) for channel depth of 4.0'. (1.2 m) ditto 613.80 707.40 ditto 613.80 707.40c) for channel depth of 3.0'. (900 mm) ditto 491.05 584.65 ditto 491.05 584.65d) for channel depth of 2.0'. (600 mm) ditto 409.20 481.20 ditto 409.20 481.20e) for channel depth of less than 2.0'. (600 mm) ditto 327.35 377.75 ditto 327.35 377.75

10 Repairing damaged reducing collar of Hume pipe outlets. Each 337.60 472.60 Each 337.60 472.60

11 Laying iron pipes for outlets. Per Lft. 16.35 - Metre 53.70 - 21.1, 21.2& 17.1 to

17.5

12 Water allowance for constructing outlets or culverts, when Each 295.25 Each 295.25 At the discretion of thecanal water is not flowing. to to Engineer-in-charge depending upon

605.00 605.00 the distance and source of supply.

13 Hoisting and placing R.C. slab or stone in position on Each 245.30 - Each 245.30 -outlets or W.C. culverts.

14 Fixing pipe outlet, including back filling of earth and 17.1 to 17.5puddling:- & 21.1 to

21.2a) portion under bank. Rft. 59.40 65.65 Metre 194.90 215.35 b) portion under road, beyond bank. ditto 26.95 33.20 ditto 88.40 108.9

chapter-17(Outlet) Page 113

Page 115: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

15 Removing pipe outlet, refilling earth and puddling. 17.1to

a) portion under bank. Rft. 48.40 - Metre 158.80 - 17.5b) portion under road, beyond bank. ditto 18.15 - ditto 59.55 -

16 Changing pipe outlets by removing one pipe and replacinit at the same site with another pipe complete with eartand puddling.

a) portion under bank. Rft. 69.30 75.55 Metre 227.35 247.85b) portion under road, beyond bank ditto 34.65 40.90 ditto 113.70 134.15

chapter-17(Outlet) Page 114

Page 116: MRS Jan-Mar 09

ROAD & ROAD STRUCTURE

1 Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction 1971".2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.3 The rates include the provision and maintenance of field test laboratory, pay of laboratory staff, cost of material for testing, etc.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

Sub-base & base construction

1 Providing and laying sub-base course of brick on edge 100Cft. 2097.60 8976.00 cu.m 740.85 3170.30 521-1 The nominal thickness of bricks shall4½" (113 mm) thick, including compaction to required to be taken for the purpose ofcamber and grade. 521-6 measurement and payment.

2 Providing and laying sub-base course of brick aggregate, 100Cft. 1420.35 2398.35 cu.m 501.65 847.10 501-1 To be used only when brickincluding compaction of sub-base course material to to aggregate is cheaper than stonerequired depth, camber, grade & density. 501-6 aggregate.

3 a) Providing and laying sub-base course of stone product dittoof approved quality and grade, including placing, mixing,spreading and compaction of sub-base material torequired depth, camber, grade to achieve 100%maximum modified AASHO dry density, includingcarriage of all material to site of work except gravel and.aggregate.

i) Pit run or bed run gravel. 100Cft. 1420.35 1852.35 cu.m 501.65 654.25ii) Crushed stone aggregate. 100Cft. 1420.35 2212.35 cu.m 501.65 781.40

(b) Subsequent carriage of gravel and crushed stone 100Cft. of 1) The carriage of the whole distanceaggregate consoli- to the site of work shall be

dated calculated on the basis of the ratessub-base of the actual means of transport

used in carriage, i.e. road and/or rail,as the case may be.

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-18(R & Road Struc) Page 115

Page 117: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

2) It shall be payable from thenearest approved quarry.

4 a) Providing and laying base course of crushed stone 100Cft. 1611.75 3127.35 cu.m 569.25 1104.60 501-1aggregate of approved quality and grade, and supply and tospreading of stone screening, including placing, mixing, 501-6spreading and compaction of base course material torequired depth, camber and grade to achieve 100%maximum modified AASHO dry density, includingcarriage of all materials to site of work except gravel and.aggregate.

b) Subsequent carriage of crushed stone aggregate. 100Cft. of 1) The carriage for the wholeconsole- distance to the site of work shall bedated calculated on the basis of the ratesbase of the actual means of transport

used in carriage, i.e. road and/orrail, as the case may be.

2) It shall be payable from thenearest approved quarry.

5 Providing and laying road edging of 3" (75 mm) wide and Per Rft. 5.20 19.05 Metre 17.10 62.45 552-1 to9" (225 mm) deep brick on end, complete in all respects. 552-5

Bituminous Work & Resurfacing

6 Providing and laying bituminous priming coat, using 10 100Sft. 72.60 600.80 sq.m 7.80 64.65 601-1 tolbs. kerosene oil and 10 lbs. binder per 100 Sft. or 0.5 Kg 601-6kerosene and 0.5 Kg binder per square metre.

3) The quantity of pit run or bed run graveland crushed stone aggregate for payment ofcarriage shall be taken as per actual loosevolume but not more than 120 Cft.

3) The quantity of crushed stone aggregatefor payment of carriage shall be taken asper actual loose volume but not more than122 Cft.

chapter-18(R & Road Struc) Page 116

Page 118: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

7 Providing and laying bituminous tack coat, using 15 lbs. of 100Sft. 72.60 447.10 sq.m 7.80 48.10 611-1 tobitumen per 100 Sft (0.75 Kg of bitumen per sq.m.) 611-5

8 a) Providing surface treatment to roads, including supply 612-1 to

of bitumen and bajri/crushed stone aggregate of 612-6approved quality, including cleaning of road surface,heating and spraying bitumen, spreading bajri and rollingwith road roller (including its operation cost, fuel andhire charges, etc.) etc. complete including carriage of allmaterials to site of work except bajjri/crushed stone aggregate.

1) 1st coat:-

i) 40 lbs. bitumen, and 5.5 Cft. bajri of nominal size 1" (25 100Sft. 76.35 1360.30 Sq.m 8.20 146.35mm) per 100 sq. feet or 1.96 Kg bitumen and 0.017cu.metre bajri per square metre..

ii) 35 lbs. bitumen, and 4.0 Cft. bajri of nominal size ¾" 100Sft. 76.35 1190.40 Sq.m 8.20 128.10(20 mm) per %Sft. or 1.72 Kg bitumen and 0.013 cu.metrebajri per sq.metre.

2) 2nd coat:-

i) 25 lbs. bitumen, and 2.75 Cft. bajri of nominal size ½" 100Sft. 58.70 853.10 Sq.m 6.30 91.80(13 mm) per %sft or 1.23 Kg bitumen and 0.008 cu. metre bajri persq.metre.

ii) 18 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8" 100Sft. 58.70 631.00 Sq.m 6.30 67.90(10 mm) per %Sft. or 0.89 Kg bitumen and 0.006 cu.metrebajri per sq. metre.

3) 3rd coat:-

14 lbs. bitumen, and 1.5 Cft. bajri of nominal size ¼" (6 100Sft. 40.20 484.35 sq.m 4.30 52.10mm) per %sft or 0.69 Kg bitumen and 0.005 cubic metre bajjri per sq.metre.

chapter-18(R & Road Struc) Page 117

Page 119: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

b) Subsequent carriage of crushed stone aggregate/bajri, 100Cft. cu.m 1) The carriage for the wholedistance to the site of work shall becalculated on the basis of the ratesof the actual means of transportused in carriage, i.e. road and/or rail,as the case may be.

2) It shal be payable from thenearest approved quarry.

9 a) Resurfacing of road, including supply of bitumen and 612-1bajri/crushed stone aggregate of approved quality, toincluding cleaning of road surface, heating and spraying 612-6of bitumen, and spreading bajri/crushed stoneaggregate and rolling with road roller (including itsoperation cost, fuel and hire charges, etc.) complete,including carriage of all materials to site of work.

i) 22 lbs. bitumen, and 2.5 Cft. bajri of nominal size ½" 100Sft. 50.90 750.85 sq.m 5.50 80.80(13 mm) per %Sft. or 1.07 Kg bitumen and bajjri 0.007 cu.mper sq.m.

ii) 20 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8" 100Sft. 50.90 683.15 sq.m 5.50 73.50(10 mm) per % Sft. or 0.79 Kg bitumen and 0.006cu.metre bajri per sq.metre.

b) Subsequent carriage of crushed stone aggregate/bajri. 100Cft. cu.m Same remarks as againstitem 8(b) above.

10 Providing and laying plant premixed bituminous carpet, per inch per 25mm 641-1 toincluding compaction and finishing to required camber, grade thickness thickness 642-6and density. per 100Sft. per Sq.m (i) 3% Bitumen -do- 670.60 1815.35 -do- 72.15 195.40(ii) 3.5% Bitumen -do- 670.60 1968.75 -do- 72.15 211.90(iii) 4% Bitumen -do- 670.60 2122.15 -do- 72.15 228.45(iv) 4.5% Bitumen -do- 670.60 2275.55 -do- 72.15 244.95(v) 5% Bitumen -do- 670.60 2428.85 -do- 72.15 261.45(vi) 5.5% Bitumen -do- 670.60 2582.35 -do- 72.15 277.95(vii) 6% Bitumen -do- 670.60 2735.75 -do- 72.15 294.45

chapter-18(R & Road Struc) Page 118

Page 120: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

11 Scarifying old road surface including removal of debris within 100Sft. 32.65 - Sq.m 3.50 -1 chain (30 m).

Incidental Construction

12 Providing R.C.C. railing on bridges, as per standard drawing. Per Rft. 65.50 267.40 Metre 214.85 877.30 901-1 The rate includes cost of steel, itsto fabrication, laying in position and

901-4 fastening, including cost of bindingwire and removal of rust from thebars, etc.

13 Providing and fixing G.I. pipe railing, as per Per Rft. of 48.95 361.80 Metre 160.65 1187.05 dittostandard drawing. 3 rows of

Pipes

14 Providing and fixing steel bearings of standard quality and Each Set - 2184.00 Each set - 2184.00 911-1 totype at site of work. of one of one 911-6

end end

15 Providing and fixing rubber bearing pad at site Per - 15.60 cu.cm - 0.95 dittoof work. Cu. Inch

16 Providing and laying expansion joint of neoprine strip 4"x¼" Per Rft. 38.30 115.80 Metre 125.60 379.95 921-1 to(100 mmx 6 mm) and plastic bitumen. 921-4

17 Providing and fixing rain water outlet of A.C. pipe. Each 19.15 84.95 Each 19.15 84.95 931-1 to933-4

18 Providing and erection at site of work:- 941-1 to The rate is for complete item of941-5 work according to Standard design

i) R.C.C. mile/Km. stone Each 1284.60 2990.55 Each 1284.60 2990.55 including cement concreteii) R.C.C. furlong/½ Km. stone Each 62.70 133.75 Each 62.70 133.75 foundation block and paintingiii) R.C.C. boundary pillar. Each 112.35 344.45 Each 112.35 344.45 letters etc.iv) Sign post of M.S. plate 1/8" thick (3 mm)

a) Mandatory. Each 408.55 3672.75 Each 408.55 3672.75b) Warning/Direction/Informatory. Each 394.85 3431.50 Each 394.85 3431.50

19 Providing and laying dry brick pavement/soling in streets or 100Cft. 1505.15 8383.55 cu.m 531.60 2961.05 The nominal thickness of bricks (2-11/16")roads, etc. sand grounted, laid in proper camber, including shall be taken for the purpose ofpreparation, watering, compaction of bed to proper camber, measurement and payment.and sand cushion. ( 9" x 4-3/8"x 2-11/16")

chapter-18(R & Road Struc) Page 119

Page 121: MRS Jan-Mar 09

PLUMBING, SANITARY INSTALLATION & GAS FITTINGS1 Rates for all finished works include the removal of surplus debris, unused material & by products.2 The material used shall conform to Schedule of Rates, Vol. I, Part I, (Specifications for Materials of

Construction, 1964, and the work will be executed according to Buildings & Roads Department Specifications,Vol II, 1966 (Public Health Works).

3 The rates include cutting and making good of the surface of walls, roof, floor, etc. where necessary.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Providing and fitting glazed earthen ware water closetEuropean type, excluding seat and cover:-

i) white Each 219.45 1,425.05 Each 219.45 1,425.05 ii) coloured Each 219.45 1,980.65 Each 219.45 1,980.65

2 Providing and fixing, double seat and cover only.

i) bakelite Each 2.60 314.60 Each 2.60 314.60 ii) plastic Each 2.60 218.60 Each 2.60 218.60

3 Providing and fitting glazed earthen ware water closet,squatter type (Orisa pattern), combined with foot rest.

i) white Each 169.15 1,048.60 Each 169.15 1,048.60 ii) coloured Each 169.15 1,216.60 Each 169.15 1,216.60

4 Providing and fitting white glazed earthen ware water closet, Each 169.15 1,822.75 Each 169.15 1,822.75 squartter type, with separate foot rest.

5 Providing and fitting water closet, squatter type of terrazzo Each 169.15 478.60 Each 169.15 478.60 concrete.

6 Providing and fitting glazed earthen ware wash hand basin56x40 cm (22"x16") including bracket set, waste pipe andwaste coupling, etc.i) white, with pedestal Each 214.50 2,193.30 Each 214.50 2,193.30 ii) coloured, with pedestal Each 214.50 2,339.70 Each 214.50 2,339.70 iii) white, without pedestal Each 191.80 1,486.60 Each 191.80 1,486.60 iv) coloured, without pedestal Each 191.80 1,544.20 Each 191.80 1,544.20

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-19(PSI & GF) Page 120

Page 122: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

7 Providing and fixing stainless steel sink with drain board, size Each 191.80 4,041.30 Each 191.80 4,041.30 120x60 cm (48"x24") including bracket set, waste pipe andwaste coupling.

8 Providing and fitting terrazzo concrete sink 60x45 cm (24"x18") Each 191.80 993.15 Each 191.80 993.15 with drain board of mosaic, including bracket set, waste pipeand waste coupling.

9 Providing and fixing glazed earthen ware sink, includingbracket set, waste pipe and waste coupling:-

i) 60x45 cm (24"x18") Each 191.80 1,526.15 Each 191.80 1,526.15 ii) 37.5x45 cm (15"x18") Each 191.80 1,346.15 Each 191.80 1,346.15

10 Providing and fixing glazed earthen ware flat back urinal. Each 123.75 787.35 Each 123.75 787.35

11 Providing and fitting glazed earthen ware low down flushingcistern 13,63 litres (3 gallons) capacity, including bracketset, copper connection, etc.

i) white Each 191.80 1,134.75 Each 191.80 1,134.75 ii) coloured Each 191.80 1,215.15 Each 191.80 1,215.15

12 Providing and fitting plastic made low down flushing cistern1363 litre (3 gallons) capacity, including bracket set, copperconnection, etc. complete.

i) white Each 191.80 960.75 Each 191.80 960.75 If rubber connection is used, theii) coloured Each 191.80 960.75 Each 191.80 960.75 composite rate will be reduced by

Rs. 12.50

13 Providing and fixing white enameled cast iron low down flushing Each 191.80 1,137.30 Each 191.80 1,137.30 cistern 13.63 litres (3 gallons) capacity, including bracketset, copper connection, etc.

14 Providing and fixing cast iron high level flushing cisternincluding cost of bracket set, copper connection, etc.

i) 13.63 litres (3 gallons) capacity Each 204.20 2,217.65 Each 204.20 2,217.65 ii) 4.55 litres (1 gallon) capacity Each 204.20 1,437.65 Each 204.20 1,437.65

15 Providing and fixing, chromium plated soap dish. Each 12.40 176.00 Each 12.40 176.00

chapter-19(PSI & GF) Page 121

Page 123: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

16 Providing and fitting, glazed earthen ware soap dish.

i) white Each 12.40 440.00 Each 12.40 440.00 ii) coloured Each 12.40 218.00 Each 12.40 218.00

17 Providing and fixing, chromium plated toilet paper holder. Each 16.50 383.25 Each 16.50 383.25

18 Providing and fixing, chromium plated towel rail:-

i) 60 cm (24") long, and 2 cm (¾") dia. Each 16.50 324.50 Each 16.50 324.50 ii) 50 cm (20") long, and 1.5 cm (½") dia. Each 16.50 264.50 Each 16.50 264.50

19 Providing and fixing looking glass 55x40 cm (22"x16") size, Each 30.95 346.15 Each 30.95 346.15 and 5 mm thick, first quality.

20 Providing and fixing glass shelf 60x13 cm (24"x5"), with5mm thick glass:-

i) with chromium plated brackets and railing. Each 36.90 323.25 Each 36.90 323.25 ii) glass shelf only, without chromium plated brackets Each 24.75 70.35 Each 24.75 70.35

and railing.

21 Providing and fitting glazed earthen ware shelf 60x13 cm (24"x5"), with chromium plated bracket and railing:-

i) White Each 36.90 835.65 Each 36.90 835.65 ii) Coloured Each 36.90 955.65 Each 36.90 955.65

22 Providing and fitting:-

i) plastic soap dish Each 12.40 148.35 Each 12.40 148.35 ii) plastic toilet paper holder Each 16.50 218.45 Each 16.50 218.45 iii) plastic towel rail Each 16.50 236.45 Each 16.50 236.45 iv) plastic shelf 60x13 cm (24"x5") with bracket and railing. Each 16.50 418.35 Each 16.50 418.35

23 Providing and fixing chromium plated pillar-cock, heavy:-

i) 2 cm (¾") Each 16.50 496.50 Each 16.50 496.50 ii) 1.5 cm (½") Each 16.50 653.70 Each 16.50 653.70

24 Providing and fixing chromium plated stop cock, heavy:-

i) 2 cm (¾") Each 16.50 262.50 Each 16.50 262.50 ii) 1.5 cm (½") Each 16.50 176.10 Each 16.50 176.10

chapter-19(PSI & GF) Page 122

Page 124: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

25 Providing and fixing underground stop cock 13 mm (½"), Each 23.65 444.35 Each 23.65 444.35 with chromium plated cover.

26 Providing and fixing chromium plated bib cock:-i) 2 cm (¾") Each 16.50 328.50 Each 16.50 328.50 ii) 1.5 cm (½") Each 16.50 302.10 Each 16.50 302.10

27 Providing and fixing chromium plated tee stop cock Each 16.50 429.30 Each 16.50 429.30 15mm (½").

28 Providing and fixing chromium plated shower rose:-

i) 1.5x10 cm (½"x4") Each 16.50 315.30 Each 16.50 315.30 ii) 2x15 cm (¾"x6") Each 16.50 376.50 Each 16.50 376.50

29 Providing and fixing, chromium plated mixing valve, for wash Each 20.65 1,452.25 Each 20.65 1,452.25 hand basin, sink or shower.

30 Providing and fixing gun metal peet/gate valve (screwed):- For brass peet/gate valve (screwed),the composite rates of items (i) to (v)

i) 30 mm (1¼") dia Each 24.75 408.75 Each 24.75 408.75 will be reduced by Rs. 66, 77, 95, 107ii) 40 mm(1½") dia Each 24.75 564.75 Each 24.75 564.75 and 120 respectively.iii) 50 mm(2") dia Each 24.75 768.75 Each 24.75 768.75 iv) 65 mm(2½") dia Each 24.75 1,212.75 Each 24.75 1,212.75 v) 80 mm(3") dia Each 24.75 1,794.75 Each 24.75 1,794.75

31 Providing and fitting, chromium plated or brass oxidised,swan neck cock 15 mm (½") dia.

i) single way Each 16.50 352.50 Each 16.50 352.50 ii) two way Each 24.75 606.75 Each 24.75 606.75 iii) three way Each 33.00 735.00 Each 33.00 735.00

32 Providing and fixing, union brass cock.

i) 13 mm (½") dia Each 16.50 124.50 Each 16.50 124.50 ii) 20 mm (¾") dia Each 16.50 208.50 Each 16.50 208.50

33 Providing and fixing, floor trap of cast iron, including concrete

chamber all round, and C.I. grating:-

i) 10x5 cm (4"x2") Each 49.50 336.85 Each 49.50 336.85 ii) 10x7.5 cm (4"x3") Each 49.50 336.85 Each 49.50 336.85

chapter-19(PSI & GF) Page 123

Page 125: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

34 Providing and fitting "P" trap:-

i) 10 cm (4") of cast iron. Each 41.25 410.05 Each 41.25 410.05 ii) 10 cm (4") glazed. Each 41.25 104.05 Each 41.25 104.05

35 Providing and fitting 10 cm (4") gully trap, including cement Each 61.90 523.05 Each 61.90 523.05

concrete, cost of PVC grating 15x15 cm (6"x6") andmasonry chamber 30x30 cm (12"x12").

36 Providing and fitting, cast iron soil pipe with:-

i) lead caulked, yarn joint:-

a) 10 cm (4") i/d Per foot 18.60 186.70 Metre 61.05 612.35 b) 5 cm (2") i/d Per foot 7.45 94.05 Metre 24.40 308.50

ii) cement caulked joint:-

a) 10 cm (4") i/d Per foot 4.45 120.05 Metre 14.65 393.80 b) 5 cm (2") i/d Per foot 1.80 83.00 Metre 5.85 272.25

37 Providing and fitting, A.C. soil pipe with cement caulkedjoint, including all specials:-

i) 60 (2¼)" mm i/d Per foot 3.55 25.65 Metre 11.70 84.10 ii) 80 (3") mm i/d Per foot 3.95 62.25 Metre 13.00 204.20 iii) 100 (4") mm i/d Per foot 4.45 96.85 Metre 14.65 317.65 iv) 150 (6") mm i/d Per foot 5.95 121.55 Metre 19.55 398.70

38 Providing and fitting cast iron specials, such as tee bend, In case of plug type, the compositecollar, cross, etc. plain type:- rate shall be increased by Rs.2 per kg.

i) lead caulked joint Kg 15.50 135.15 Kg 15.50 135.15 ii) cement caulked joint Kg 9.55 101.15 Kg 9.55 101.15

39 Supply and fitting of cast iron manhole coverwith frame, etc. complete.

i) 30 cm (12") dia Each 24.75 167.55 Each 24.75 167.55 ii) 45 cm (18") dia Each 24.75 816.75 Each 24.75 816.75 iii) 60 cm (24") dia Each 39.05 1,371.05 Each 39.05 1,371.05

40 Providing and fitting R.C.C. pipe 10 cm (4") dia, including Per foot 9.30 33.30 Metre 30.55 109.25 laying and jointing in trenches.

chapter-19(PSI & GF) Page 124

Page 126: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

41 Providing and fitting chromium plated or oxidised, gas cock 6'mm (¼"):-

i) single way Each 16.50 182.10 Each 16.50 182.10 ii) two way Each 24.75 276.75 Each 24.75 276.75 iii) three way Each 33.00 471.00 Each 33.00 471.00

42 Providing and fitting nipple or bush, 6 mm to Each 12.40 24.40 Each 12.40 24.40 10 mm (¼" to 3/8") i/d.

43 Providing and fixing, brass gas cock:-

a) 15 mm (½") dia Each 2.60 74.60 Each 2.60 74.60 b) 20 mm (¾") dia Each 93.75 92.60 Each 93.75 92.60

44 Providing and fixing brass stop cock/bib cock:-

a) 15 mm (½") dia Each 4.15 73.75 Each 4.15 73.75 b) 20 mm (¾") dia Each 4.15 112.15 Each 4.15 112.15

45 Hoisting and placing in position, precast R.C. latrine seats. Each 205.45 - Each 205.45 -

Replacement

1 Providing and fixing, chromium plated waste coupling:-

i) 3 cm (1¼") Each 24.75 108.75 Each 24.75 108.75 ii) 4 cm (1½") Each 24.75 120.75 Each 24.75 120.75

2 Providing and fixing rubber plug with chain:-

i) 3 cm (1¼") Each 1.00 43.00 Each 1.00 43.00 ii) 4 cm (1½") Each 1.00 49.00 Each 1.00 49.00

3 Providing and fixing, waste pipe of PVC:-

i) 3 cm (1¼") Each 12.40 38.80 Each 12.40 38.80 ii) 4 cm (1½") Each 12.40 48.40 Each 12.40 48.40

4 Providing and fixing, flushing bend of PVC.

i) 3 cm (1¼") Each 11.00 41.00 Each 11.00 41.00 ii) 4 cm (1½") Each 11.00 47.00 Each 11.00 47.00

chapter-19(PSI & GF) Page 125

Page 127: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

5 Providing and fixing chromium plated bottle trap with wastepipe, etc. complete:-

i) 3 cm (1¼") i/d Each 24.75 528.75 Each 24.75 528.75 ii) 4 cm (1½") Each 24.75 624.75 Each 24.75 624.75

6 Providing and fixing, angle iron brackets for:-

i) wash hand basin and cistern Each 24.75 137.55 Each 24.75 137.55 ii) sinks Each 24.75 149.55 Each 24.75 149.55

7 Providing and fixing 1.5 cm (½") dia connection, includingcheck nuts, etc.:-

i) plastic rubber connection Each 9.90 45.90 Each 9.90 45.90 ii) copper connection Each 9.90 81.90 Each 9.90 81.90

8 Providing and fixing brass ball float valve:-

i) 1.5 cm (½") dia Each 20.65 206.65 Each 20.65 206.65 ii) 2.0 cm (¾") dia Each 20.65 272.65 Each 20.65 272.65 iii) 2.5 cm (1") dia Each 20.65 332.65 Each 20.65 332.65 iv) 3 cm (1¼") dia Each 20.65 350.65 Each 20.65 350.65 v) 4.0 cm (1½") dia Each 20.65 500.65 Each 20.65 500.65 vi) 5 cm (2") dia Each 20.65 848.65 Each 20.65 848.65

chapter-19(PSI & GF) Page 126

Page 128: MRS Jan-Mar 09

SURFACE DRAINAGE1. Specification No. correspond to Book of Specification (B & R Department ) Vol. 11, 1966 (public Health Works).

2. Rates for all finished works include the removal of surplus debris, unused material and by produc

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Tega formed of pacca bricks on end, laid in and over 17.1cement sand mortar projecting to a height of not morethan 6" (150 mm) top of drain along the property sidewhere required, laid to lines, grades, slopes and shapeaccording to the Engineer's drawing:-

a) 3" thick (75 mm)

i) ratio 1:3 100Rft 696.95 2,382.70 Metre 22.85 78.15 ii) ratio 1:5 ditto 696.95 2,250.25 ditto 22.85 73.80

B) 4½" thick (113 mm)

i) ratio 1:3 100Rft 1,043.85 3,463.30 ditto 34.25 113.60 ii) ratio 1:5 ditto 1,043.85 3,263.85 ditto 34.25 107.05

2 Pacca flat brick 3" (75 mm ) thick, laid in reimbursement, 17.1in cement, sand mortar, on sides of drains and in otherworks where required. All joints to be completely filledand struck flush:-

a) ratio 1:3 100Sft. 1,033.30 3,401.60 Sqm. 111.20 366.00 b) ratio 1:5 ditto 1,033.30 3,190.30 ditto 111.20 343.30 c) ratio 1:6 ditto 1,033.30 3,130.90 ditto 111.20 336.90

3 Pacca brick on edge, laid in reimbursement, in cement, 17.1sand mortar, on sides of drains and on other works whererequired. All joints to be completely filled and struckflush:-

a) ratio 1:3 100Sft. 1,478.40 5,053.55 Sqm. 159.10 543.75 b) ratio 1:5 ditto 1,478.40 4,714.80 ditto 159.10 507.30 c) ratio 1:6 ditto 1,478.40 4,630.40 ditto 159.10 498.25

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-20(Surface Drainage) Page 127

Page 129: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

4 Pacca flat brick, Herring bond pitching in cement, sand 17.2mortar, laid to lines, grades, shapes and slopes as perEngineer's drawing:-

a) ratio 1:3 100Sft. 937.20 3,305.50 Sqm. 100.85 355.65 b) ratio 1:5 ditto 937.20 3,094.20 ditto 100.85 332.95 c) ratio 1:6 ditto 937.20 3,034.80 ditto 100.85 326.55

5 Pacca brick on edge, Herring bond pitching in cement, 17.2sand mortar, laid to lines, grades, shapes and slopes asper Engineer's drawing:-

a) ratio 1:3 100Sft. 1,446.70 5,021.90 Sqm. 155.65 540.35 b) ratio 1:5 ditto 1,446.70 4,683.10 ditto 155.65 503.90 c) ratio 1:6 ditto 1,446.70 4,598.75 ditto 155.65 494.80

6 Constructing Punjab Standard Drains. of cement concrete1:2 ½ :5, with cement concrete bedding ratio 1:6:12, 17.1complete, laid to lines, grades, slopes and shapes,rendering exposed surface of concrete with 1:1 cement,sand mortar, ¼" (6 mm) thick, as per Engineer's drawing(excluding excavation):-

a) Type I Per Rft 22.75 61.40 Metre 74.70 201.45 b) Type II ditto 45.55 115.70 ditto 149.35 379.55 c) Type III ditto 57.90 149.20 ditto 189.85 489.35 d) Type IV ditto 68.80 177.90 ditto 225.65 583.50 e) Type V ditto 90.30 242.45 ditto 296.15 795.25 f) Type VI ditto 103.80 278.10 ditto 340.40 912.20 g) Type VII ditto 115.00 304.50 ditto 377.25 998.80 h) Type VIII ditto 128.45 345.70 ditto 421.40 1,133.90 i) Type IX ditto 170.45 485.65 ditto 559.00 1,592.95 j) Type X ditto 187.25 532.50 ditto 614.20 1,746.55 k) Type XI ditto 209.50 592.20 ditto 687.15 1,942.50 l) Type XII ditto 223.30 628.80 ditto 732.45 2,062.45

7 Laying R.C.C hume pipes in position, including jointing:-a) 6" to 12" (150 mm to 300 mm ) dia Per Lft. 42.25 44.55 Metre 138.55 146.20 b) 12" to 24" (300 mm to 600 mm) dia ditto 64.00 68.70 ditto 210.00 225.30 c) 24" to 36" (600 mm to 900 mm) dia ditto 84.50 91.50 ditto 277.10 300.10

chapter-20(Surface Drainage) Page 128

Page 130: MRS Jan-Mar 09

SEWERAGE1 Specification No. correspond to Book of Specification of B&R Department Vol. II, 1966 (Public Health Works).2 Rate for all finished works include the removal of surplus debris, unused material and byproducts

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Providing and laying R.C.C. pipe, moulded with cement Chapter - 8concrete 1:1½:3, with spigot socket or collar joint, etc.including cost of reinforcement, conforming to B.S. 5911:Part I: 1981, Class "L" including carriage of pipe fromfactory to site of work, lowering in trenches to correctalignment and grade, jointing, cutting pipes wherenecessary, finishing and testing, etc., complete.

i) 100 mm (4") i/d Rft. 10.95 63.40 Metre 35.90 207.95ii) 150 mm (6") i/d Rft. 13.35 101.20 Metre 43.80 331.95iii) 225 mm (9:) i/d Rft. 25.80 231.00 Metre 84.60 757.70

2 Providing and laying non-reinforced concrete pipe, dittomoulded with cement concrete 1:1½:3, conforming toASTM Specification C-14-73, Class 2, including carriageof pipe from factory to site of work, lowering in trenches tocorrect alignment and grade, jointing, cutting pipe wherenecessary, finishing and testing, etc. complete.i) 100 mm (4") i/d Rft. 8.25 31.45 Metre 27.05 103.15ii) 150 mm (6") i/d Rft. 10.00 45.40 Metre 32.80 148.90iii) 200 mm (8") i/d Rft. 16.00 62.40 Metre 52.50 204.70iv) 225 mm (9:) i/d wall thickness 1 inch (25 mm) Rft. 17.40 79.80 Metre 57.05 261.75v) 250 mm (10") i/d Rft. 17.75 88.70 Metre 58.20 290.95

3 Providing and laying R.C.C. pipe sewers, moulded with dittocement concrete 1:1½:3 conforming to ASTMSpecification C-76-79, Class II. Wall B, including carriageof pipe from factory to site of work, lowering in trenches tocorrect alignment and grade, jointing with rubber ring,cutting pipes where necessary, testing, etc., complete.

i) 310 mm (12") i/d Rft. 26.90 293.15 Metre 88.25 961.55ii) 380 mm (15") i/d Rft. 33.80 357.45 Metre 110.85 1172.45iii) 460 mm (18") i/d Rft. 40.80 432.85 Metre 133.80 1419.75iv) 530 mm (21":) i/d Rft. 51.15 552.00 Metre 167.75 1810.55v) 610 mm (24") i/d Rft. 59.15 665.10 Metre 194.00 2181.55vi) 690 mm (27") i/d Rft. 86.00 837.45 Metre 282.10 2746.85vii) 760 mm (30") i/d Rft. 103.10 963.35 Metre 338.15 3159.80viii) 840 mm (33") i/d Rft. 128.20 1125.40 Metre 420.50 3691.30

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-21(Sewerage) Page 129

Page 131: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

ix) 910 mm (36") i/d Rft. 158.00 1545.50 Metre 518.25 5069.25x) 1070 mm (42") i/d Rft. 205.35 2089.95 Metre 673.55 6855.05xi) 1220 mm (48") i/d Rft. 382.35 2660.55 Metre 1254.10 8726.60xii 1370 mm (54") i/d Rft. 524.35 3353.70 Metre 1719.85 11000.15xiii) 1520 mm (60") i/d Rft. 673.25 4192.35 Metre 2208.25 13750.90xiv) 1680 mm (66") i/d Rft. 1044.20 5423.60 Metre 3425.00 17789.40xv) 1830 mm (72") i/d Rft. 1291.15 6589.75 Metre 4234.95 21614.40

4 Providing and laying R.C.C. pipe sewers, moulded with Chapter-8cement concrete 1:1½:3 conforming to ASTM SpecificationC-76-79, Class III, Wall B, including carriage of pipes fromfactory to site of work, lowering in trenches to correctalignment and grade, jointing with rubber ring, cutting pipeswhere necessary, testing, etc. complete:-

i) 310 mm (12") i/d Rft. 26.85 349.45 Metre 88.15 1146.20ii) 380 mm (15") i/d Rft. 33.80 412.50 Metre 110.80 1353.00iii) 460 mm (18") i/d Rft. 40.80 512.40 Metre 133.85 1680.65iv) 530 mm (21":) i/d Rft. 51.15 682.95 Metre 167.85 2240.10v) 610 mm (24") i/d Rft. 59.10 802.15 Metre 193.90 2631.05vi) 690 mm (27") i/d Rft. 86.10 891.40 Metre 282.40 2923.80vii) 760 mm (30") i/d Rft. 103.20 1185.00 Metre 338.55 3886.80viii) 840 mm (33") i/d Rft. 128.35 1370.35 Metre 420.95 4494.75ix) 910 mm (36") i/d Rft. 157.95 1829.45 Metre 518.15 6000.60x) 1070 mm (42") i/d Rft. 205.55 2387.15 Metre 674.25 7829.85xi) 1220 mm (48") i/d Rft. 387.60 2767.20 Metre 1271.40 9076.40xii 1370 mm (54") i/d Rft. 531.75 3672.40 Metre 1744.10 12045.45xiii) 1520 mm (60") i/d Rft. 682.50 4590.30 Metre 2238.55 15056.20xiv) 1680 mm (66") i/d Rft. 1059.00 5813.50 Metre 3473.50 19068.30xv) 1830 mm (72") i/d Rft. 1309.60 7112.80 Metre 4295.50 23330.00

5 Providing and laying R.C.C. pipe sewers, moulded with Chapter - 8cement concrete 1:1½:3 conforming to ASTMSpecification C-76-79, Class IV, Wall B, including carriageof pipes from factory to site of work, lowering in trenchesto correct alignment and grade, jointing with rubber ring,cutting pipes where necessary, testing, etc. complete:-

i) 310 mm (12") i/d Rft. 26.90 298.05 Metre 88.15 977.55ii) 380 mm (15") i/d Rft. 33.80 357.40 Metre 110.80 1172.35iii) 460 mm (18") i/d Rft. 40.80 461.00 Metre 133.85 1512.10iv) 530 mm (21":) i/d Rft. 51.15 640.15 Metre 167.85 2099.65v) 610 mm (24") i/d Rft. 59.15 857.25 Metre 193.95 2811.75vi) 690 mm (27") i/d Rft. 86.00 1130.00 Metre 282.10 3706.40vii) 760 mm (30") i/d Rft. 103.10 1399.05 Metre 338.15 4589.05viii) 840 mm (33") i/d Rft. 128.20 1553.80 Metre 420.45 5096.40ix) 910 mm (36") i/d Rft. 157.80 2325.00 Metre 517.55 7625.95

chapter-21(Sewerage) Page 130

Page 132: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

x) 1070 mm (42") i/d Rft. 205.35 2662.35 Metre 673.45 8732.45xi) 1220 mm (48") i/d Rft. 387.65 3434.20 Metre 1271.20 11264.35xii) 1370 mm (54") i/d Rft. 531.80 4663.90 Metre 1744.40 15297.50xiii) 1520 mm (60") i/d Rft. 682.55 5863.30 Metre 2238.70 19231.60xiv) 1680 mm (66") i/d Rft. 1059.05 6933.55 Metre 3473.70 22741.95xv) 1830 mm (72") i/d Rft. 1309.70 8214.50 Metre 4295.80 26943.50

6 Lowering of sub-soil water table, by installation of tubewells 1) This rate shall be payable, inalong sewer line and pumping out water, for excavation in addition to the item of excavationopen cutting below sub-soil water level, concreting, curing, below SSWL for sewers andlaying and jointing pipes, filling haunches, etc. till the manholes under Chapter,completion of sewer line, including disposal of pumped out EARTHWORKwater:- 2) The grant of these rates shall be

Rft of Metre of subject to Superintending Engineer's1) 0-1 ft. (0 to 310 mm) below SSWL laid sewer - 158.65 laid sewer - 520.35 approval.2) 0-2 ft. (0 to 610 mm) below SSWL ditto - 307.50 ditto - 1008.553) 0-3 ft. (0 to 910 mm) below SSWL ditto - 518.60 ditto - 1701.00 3) The rate includes cost of4) 0-4 ft. (0 to 1220 mm) below SSWL ditto - 745.45 ditto - 2445.00 providing pumps, POL and all5) 0-5 ft. (0 to 1520 mm) below SSWL ditto - 1031.20 ditto - 3382.25 operation charges at the site6) 0-6 ft. (0 to 1830 mm) below SSWL ditto - 1276.35 ditto - 4186.45 of work, etc.7) 0-7 ft. (0 to 2170 mm) below SSWL ditto - 1523.65 ditto - 4997.558) 0-8 ft. (0 to 2480 mm) below SSWL ditto - 1749.75 ditto - 5739.259) 0-9 ft. (0 to 2790 mm) below SSWL ditto - 1899.95 ditto - 6231.8010) 0-10 ft. (0 to 3100 mm) below SSWL ditto - 2186.15 ditto - 7170.5511) 0-11 ft. (0 to 3410 mm) below SSWL ditto - 2428.10 ditto - 7964.1512) 0-12 ft. (0 to 3720 mm) below SSWL ditto - 2689.15 ditto - 8820.45

7 Constructing gully grating chamber, 12"x12", ( 300x300 16.2 Pipe connection to be paidmm) complete in all respects: separately.

a) with C.I. gully trap, weighing 81 lbs. (36.75 Kg.) frame Each 469.60 2041.65 Each 469.60 2041.65hinged safety type.

b) concrete Gully trap. ditto 469.60 1816.65 ditto 469.60 1816.65

8 Constructing standard gully grating chamber, 3'x2½' Each 1423.65 5385.65 Each 1423.65 5385.65 ditto Pipe connection to be paid(900x750 mm), with chinaware trap as per PHED Drawing separately.STD/PD No. 3 of 1977, complete in all respects.

9 Extra for making and finishing benching floor work in 100Sft. 648.10 1006.70 Sq.m 69.75 108.30 14.4manhole chamber, with 1/8" (3 mm) thick cement finish

10 Restoration of brick pavement on edge, over laid service 100Sft. 903.85 1864.10 Sq.m 97.25 200.60 13.1line, with 2" (50 mm) sand cushion under soling

chapter-21(Sewerage) Page 131

Page 133: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

11 Restoration of flat brick pavement sand grouted, over 2" 100Sft. 549.45 1231.30 Sq.m 59.10 132.50 13.1(50 mm) thick dry sand cushion, under soling on laidservice line.

12 Restoration of metalled road, on laid service line, including 13.1compaction:-

a) Carpetted road, with 2" (50 mm) carpet and 10" (250 100Sft. 1731.85 5060.45 Sq.m 186.35 544.50mm) depth of stone metal for sub-base and base

b) Carpeted road, with 1½" (38 mm) carpet and 6" (150 100Sft. 1243.10 3722.65 Sq.m 133.75 400.55mm) depth of stone metal, for sub-base and base

c) Black Topped Road with two coats of surfacing & 10" 100Sft. 529.60 2238.25 Sq.m 57.00 240.85(250 mm) depth of stone metal, for sub base & base

13 Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle 14.7iron step, in manhole chambers, including carriage and Each 42.20 159.15 Each 42.20 159.15setting the same in work to correct lines and levels.

14 Fixing manhole frame and cover in R.C.C. slab including Per 140.00 - Per 140.00 - dittocarriage to site. set set

15 Providing and fixing 3" (75 mm) thick R.C.C. manhole Per 100.50 2387.50 Per 100.50 2387.50 dittocover, 22" (550 mm) dia, with tee shaped C.I. frame of 20" set set(500 mm) clear i/d (frame weighing 37.324 Kg. or onemaund) as per Standard Drawing STD/PD No. 5, of 1977,complete in all respects.

15-A Providing and fixing 6" thick R.C.C. manhole Per 194.73 3294.61 Per 194.73 3294.61cover with tee shaped C.I. frame of 22" I/d (frame set setweighing 37.324 Kg. or one maund as per StandardDrawing STD/PD No. 6, of 1977, complete in all respect.

16 Providing and fixing, 6" (150 mm) thick R.C.C. manhole Per 175.25 1828.05 Per 175.25 1828.05 dittocover for 22" as per standard drawing STD/PD No. 6 of set set1977, complete in all respects.

17 Providing and fixing, 6" (150 mm) thick R.C.C. manhole Per 152.55 2917.15 Per 152.55 2917.15 dittocover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" set set(550 mm) i/d as per standard drawing STD/PD No. 7 of1977, complete in all respects.

18 Desilting of disposal work collecting tank, including 100Cft. 414.85 469.15 cum 146.55 165.70 16.2removal of sludge within 3 chains (90 metre).

chapter-21(Sewerage) Page 132

Page 134: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

19 Providing and installing, C.I. ventilating shaft painted with 14.6bituminous paint with foundation bolts, as per PHEDStandard Drawing STD/PD No. 4 of 1977, complete in allrespects (except concrete foundation block):-

a) 6" (150 mm) i/d shaft

i) 18 ft. (5.5 metre) long Per Cwt 115.50 2147.05 %kg 227.35 4226.50ii) 24 ft. (7.30 metre) long ditto 128.35 2165.50 ditto 252.65 4262.80iii) 30 ft. (9.15 metre) long ditto 138.60 2174.45 ditto 272.85 4280.35iv) 36 ft. (11 metre) long ditto 145.00 2181.15 ditto 285.50 4293.65

b) 9" (225 mm) i/d shaft

i) 18 ft. (5.5 metre) long Per Cwt 102.95 2130.80 %kg 202.70 4194.45ii) 24 ft. (7.30 metre) long ditto 110.95 2138.30 ditto 218.40 4209.20iii) 30 ft. (9.15 metre) long ditto 118.80 2146.60 ditto 233.85 4225.55iv) 36 ft. (11 metre) long ditto 143.00 2170.60 ditto 281.50 4272.90

c) 12" (300 mm) i/d shaft

i) 18 ft. (5.5 metre) long Per Cwt 91.65 2120.60 %kg 180.45 4174.45ii) 24 ft. (7.30 metre) long ditto 117.85 2144.15 ditto 232.00 4220.80iii) 30 ft. (9.15 metre) long ditto 137.50 2163.15 ditto 270.65 4258.15

20 Silt clearing 10' (3.00 m) dia wells, andremoval of slush outside the compound:-

a) upto 10' (3.00 m) depth of slush Per well 3183.85 - Per well 3183.85 -b) beyond 10' (3.00 m) depth of slush Per well 6336.00 - Per well 6336.00 -

chapter-21(Sewerage) Page 133

Page 135: MRS Jan-Mar 09

SINKING OF WELLS1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.2 Well curbs to be laid at spring level or as deep as possible.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Excavation of well in dry upto 20'(6 metre) below groundlevel, and disposal of soil within one chain (30 metre)

a) in ordinary soil or sand :- 1000 Cft. cu.m

i) from 0' to 5' (o to 1.5 m) depth ditto 2157.65 - ditto 76.20 -ii) from 5.1' to 10' (1.5 to 3.0 metre) depth ditto 2253.50 - ditto 79.60 -iii) from 10.1' to 15' (3.0 to 4.5 metre) depth ditto 2535.20 - ditto 89.55 -iv) from 15.1' to 20' (4.5 metre to 6.0 metre) depth ditto 2909.80 - ditto 102.75 -

b) in hard soil

i) from 0' to 5'(0 to 1.5 metre) depth 1000 Cft. 2628.10 - cu.m 92.85 -ii) from 5.1' to 10'(1.5 to 3.0 metre) depth ditto 2747.20 - ditto 97.05 -iii) from 10.1' to 15'(3.0 to 4.5 metre) depth ditto 3002.75 - ditto 106.05 -iv) from 15.1' to 20'(4.5 to 6.0 metre) depth ditto 3377.35 - ditto 119.30 -

c) in hard strata, such as shingle, gravel, etc.

i) from 0' to 5'(0 to 1.5 metre) depth 1000 Cft. 5668.60 - cu.m 200.20 -ii) from 5.1' to 10'(1.5 to 3.0 metre) depth ditto 5871.90 - ditto 207.40 -iii) from 10.1' to 15'(3.0 to 4.5 metre) depth ditto 6121.65 - ditto 216.20 -iv) from 15.1' to 20'(4.5 to 6.0 metre ) depth ditto 6571.75 - ditto 232.10 -

2 Dry sinking of well, including loading, and removingexcavated material within one chain (30 m):-

a) in ordinary soil :-

i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 11616.00 - cu.m 410.30ii) from 15.1' to 20'(4.5 to 6.0 m) depth ditto 14520.00 - ditto 512.85iii) from 20.1' to 25'(6.0 to 7.5 m) depth ditto 17424.00 - ditto 615.40iv) from 25.1' to 30'(7.5 to 9.0 m) depth ditto 20328.00 - ditto 718.00v) from 30.1' to 35'(9.0 to 10.5 m) depth ditto 23232.00 - ditto 820.55vi) from 35.1' to 40'(10.5 to 12.0 m) depth ditto 26136.00 - ditto 923.10vii) from 40.1'to 45'(12.0 to 13.5 m) depth ditto 29040.00 - ditto 1025.70viii) from 45'(13.5 Sm) to any depth ditto 31944.00 - ditto 1128.25

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-22(Sinking of Wells) Page 134

Page 136: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

b) in hard soil :-

i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 15972.00 - cu.m 564.15 -ii) from 15.1' to 20'(4.5 to 6.0 m) depth ditto 18876.00 - ditto 666.70 -iii) from 20.1' to 25'(6.0 to 7.5 m) depth ditto 21780.00 - ditto 769.25 -iv) from 25.1' to 30'(7.5 to 9.0 m) depth ditto 24684.00 - ditto 871.85 -v) from 30.1' to 35'(9.0 to 10.5 m) depth ditto 27588.00 - ditto 974.40 -vi) from 35.1' to 40'(10.5 to 12.0 m) depth ditto 30492.00 - ditto 1077.00 -vii) from 40.1' to 45'(12.0 to 13.5 m) depth ditto 33396.00 - ditto 1179.55 -viii) from 45'(13.5 m) to any depth ditto 36300.00 - ditto 1282.10 -

c) in hard strata, such as shingle, gravel, etc.

i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 21780.00 - cu.m 769.25 -ii) from 15.1' to 20'(4.5 to 6.0 m) depth ditto 24684.00 - ditto 871.85 -iii) from 20.1' to 25'(6.0 to 7.5 m) depth ditto 27588.00 - ditto 974.40 -iv) from 25.1' to 30'(7.5 to 9.0 m) depth ditto 27951.00 - ditto 987.25 -v) from 30.1' to 35'(9.0 to 10.5 m) depth ditto 33396.00 - ditto 1179.55 -vi) from 35.1' to 40'(10.5 to 12.0 m) depth ditto 36300.00 - ditto 1282.10 -vii)from 40.1' to 45'(12.0 to 13.5 m) depth ditto 39204.00 - ditto 1384.70 -viii) from 45'-1" (13.5 m) to any depth ditto 42108.00 - ditto 1487.25 -

3 Wet sinking of well in ordinary soil (value of C upto 5), for *841-1 The outer dimensions of the curbdepths below spring level, including charges of machinery, to shall form basis of payment.shoring, kentledge and removal of excavated spoil within 841-9one chain (30 m):-

i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. 10621.65 - cu.m 198.60 -ii) above 10' to 20'(3.0 to 6.0 m) depth ditto 37125.00 - ditto 1311.25 -iii) above 20' to 30'(6.0 to 9.0 m) depth ditto 45692.30 - ditto 1613.85 -iv) above 30' to 40'(9.0 to 12.0 m) depth ditto 59400.00 - ditto 2098.00 -v) above 40' to 50'(12.0 to 15.0 m) depth ditto 66000.00 - ditto 2331.10 -vi) above 50' to 60'(15.0 to 18.0 m) depth ditto 74250.00 - ditto 2622.50 -vii) above 60' to 70'(18.0 to 21.0 m) depth ditto 76153.85 - ditto 2689.75 -viii) above 70' to 80'(21.0 to 24.0 m) depth ditto 78157.90 - ditto 2760.55 -ix) above 80'(24.0 m) to any depth ditto 84857.15 - ditto 2997.15 -

chapter-22(Sinking of Wells) Page 135

Page 137: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

4 Wet sinking of well in cohesive soil (value of Cmore than *841-1 The outer dimensions of the curb5), for depths below spring level, including charges of to shall form basis of payment.machinery shoring, kentledge and removal of excavated 841-9spoil within one chain (30 m):-

i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. - 25090.45 cu.m - 886.20ii) above 10' to 20'(3.0 to 6.0 m) depth ditto - 31363.05 ditto - 1107.75iii) above 20' to 30'(6.0 to 9.0 m) depth ditto - 37635.70 ditto - 1329.30iv) above 30' to 40'(9.0 to 12.0 m) depth ditto - 50180.90 ditto - 1772.40v) above 40' to 50'(12.0 to 15.0 m) depth ditto - 57901.05 ditto - 2045.05vi) above 50' to 60'(15.0 to 18.0 m) depth ditto - 62726.15 ditto - 2215.50vii) above 60' to 70'(18.0 to 21.0 m) depth ditto - 68428.50 ditto - 2416.90viii) above 70' to 80'(21.0 to 24.0 m) depth ditto - 71010.70 ditto - 2508.10ix) above 80'(24.0 m) to any depth ditto - 75271.35 ditto - 2658.60

5 Wet sinking of well in shingle, or gravel, etc, for depths *841-1 The outer dimensions of the curbbelow spring level, including charges of machinery, to shall form basis of payment.shoring, kentledge and removal of excavated spoil within 841-9one chain (30 m) :-i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. - 34214.25 cu.m - 1208.45ii) above 10' to 20'(3.0 to 6.0 m) depth ditto - 41817.40 ditto - 1477.00iii) above 20' to 30'(6.0 to 9.0 m) depth ditto - 50180.90 ditto - 1772.40iv) above 30' to 40'(9.0 to 12.0 m) depth ditto - 68428.50 ditto - 2416.90v) above 40' to 50'(12.0 to 15.0 m) depth ditto - 75271.35 ditto - 2658.60vi) above 50' to 60'(15.0 to 18.0 m) depth ditto - 83634.85 ditto - 2954.00vii) above 60' to 70'(18.0 to 21.0 m) depth ditto - 87524.85 ditto - 3091.40viii) above 70' to 80'(21.0 to 24.0 m) depth ditto - 89608.75 ditto - 3165.00ix) above 80'(24.0 m) to any depth ditto - 99041.25 ditto - 3498.15

6 Making and fixing in position, kiker wood well curb. Per Cft. 513.20 1204.80 cu.m 18125.45 42553.70

7 Laying well curb in position only. Each 198.00 - Each 198.00 -

8 Providing, making and laying R.C.C. well curb in position, *841-1 1) If concrete mixer is supplied byusing coarse sand, including all kinds of form, moulds, to Government, all charges includingcuring, shuttering, rendering and finishing the exposed 841-9 depreciation will be recovered fromsurface, (including screening and washing of aggregate :- the contractor.

2) The rate does not include cost ofa) Ratio 1:1½:3 Per Cft. 124.40 252.55 cu.m 4394.15 8919.35 steel reinforcement and its labour forb) ratio 1:2:4 ditto 124.40 229.05 ditto 4394.15 8089.15 bending, which is payable, separately.

chapter-22(Sinking of Wells) Page 136

Page 138: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

9 Providing and fixing structural steel for cutting 100Kg 379.50 7908.85 100Kg 379.50 7908.85 841-1 toedge. 841-9

10 Making and removing false masonry on well. 100Cft. 3886.30 10673.45 cu.m 1372.65 3769.85 21.1 to The rate includes dismantling of false21.5 & 18.1 masonry, scraping bricks obtained

from dismantling and credit ofbyproducts.

* Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction, 1971".

chapter-22(Sinking of Wells) Page 137

Page 139: MRS Jan-Mar 09

TUBEWELL AND WATER SUPPLY1 Specification No. correspond to Book of "Specification for B&R Department, 1966, Vol. II (Public Health Works)".2 Rates for all finished works include the removal of surplus debris, unused material and byproduc

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Boring for tubewell in all types of soil except shingle and Chap. 2rock, from ground level to 100 ft. (30 m) depth, includingsinking and withdrawing of casing pipe, complete:-

a) 3" (75 mm) i/d Per Rft. 28.90 Per Metre 94.85b) 4" (100 mm) i/d of bore 40.50 of bore 132.75c) 5" (125 mm) i/d ditto 74.35 ditto 243.90d) 6" (150 mm) i/d ditto 113.35 ditto 371.75e) 8" (200 mm) i/d ditto 152.60 ditto 500.45f) 10" (250 mm) i/d ditto 190.95 ditto 626.35g) 12" (300 mm) i/d ditto 208.60 ditto 684.20h) 15" (375 mm) i/d ditto 308.85 ditto 1012.95i) 18" (450 mm) i/d ditto 329.00 ditto 1079.15

2 Boring for tubewell in all types of soil except shingle, dittogravel & rock, from a depth of 100.1 ft. to 200 ft.(30 to 60 m) below ground level, including sinking andwithdrawing of casing pipe, complete:-

a) 5" (125 mm) i/d Per Rft. 126.35 Per Metre 414.35b) 6" (150 mm) i/d of bore 177.10 of bore 580.90c) 8" (200 mm) i/d ditto 205.90 ditto 675.30d) 10" (250 mm) i/d ditto 233.70 ditto 766.50e) 12" (300 mm) i/d ditto 259.15 ditto 849.95f) 15" (375 mm) i/d ditto 362.15 ditto 1187.90g) 18" (450 mm) i/d ditto 382.35 ditto 1254.05

3 Boring for tubewell in all types of soil except shingle, dittogravel & rock, from a depth of 200.1 ft. to 300 ft. (60to 90 m) below ground level, including sinking andwithdrawing of casing pipe, complete:-a) 5" (125 mm) i/d Per Rft. 175.90 Per Metre 576.95b) 6" (150 mm) i/d of bore 226.65 of bore 743.50c) 8" (200 mm) i/d ditto 259.20 ditto 850.10d) 10" (250 mm) i/d ditto 289.85 ditto 950.75e) 12" (300 mm) i/d ditto 308.10 ditto 1010.60

f) 15" (375 mm) i/d ditto 397.70 ditto 1304.50g) 18" (450 mm) i/d ditto 419.10 ditto 1374.65

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-23(Tubewell) Page 138

Page 140: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

4 Boring for tubewell in all types of soil except shingle, Chap. 2gravel & rock, from a depth of 300.1 ft. to 400 ft.(90 to 120 m) below ground level, including sinking andwithdrawing of casing pipe, complete:-

a) 8" (200 mm) i/d Rft of bore 312.50 Per Metre 1024.95b) 10" (250 mm) i/d ditto 346.05 of bore 1135.00c) 12" (300 mm) i/d ditto 366.70 ditto 1202.70d) 15" (375 mm) i/d ditto 485.40 ditto 1592.15e) 18" (450 mm) i/d ditto 489.60 ditto 1605.90

5 Direct Rotary/Reverse Rotary drilling of bore for tubewells, dittoin all types of soil except shingle, gravel and rock:-

a) from ground level to 250 ft. (75 m) below ground level:-

Per Rft. Per Metrei) 15" to 18" (375 to 450 mm) i/d of bore 274.05 of bore 898.90 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 394.15 ditto 1292.80 Above 2 cusec discharge

b) exceeding 250 ft. (75 m) depth below ground level:-

Rft Per Metrei) 15" to 18" (375 to 450 mm) i/d of bore 274.05 of bore 898.90 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 394.15 ditto 1292.80 Above 2 cusec discharge

6 Boring for tubewell in shingle, gravel and rock, including ditto Location and depth of shingle,sinking and withdrawing of casing pipe:- gravel or rock is to be determined

from the bore log.a) from ground level to 200 ft. (60 m) below ground level:-

Per Rft. Per Metre

i) 12" to 18" (300 to 450 mm) i/d of bore 618.10 of bore 2027.30 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 835.95 ditto 2741.95 Above 2 cusec discharge

b) exceeding 200 ft. (60 m) depth belowground level:-

i) 12" to 18" (300 to 450 mm) i/d ditto 618.10 ditto 2027.30 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 835.95 ditto 2741.85 Above 2 cusec discharge

7 Providing strong substantially built box of deodar wood Job for 468.90 6537.30 Job for 468.90 6537.30 ditto4'x2½'x9" (1200x750x225 mm), with compartments, lock compl- compl-and locking arrangement, for preserving samples of strata ete bore ete borefrom bore hole.

chapter-23(Tubewell) Page 139

Page 141: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

8 Furnishing sample of water from bore hole. Per Set 108.00 156.00 Per Set 108.00 156.00 Chap. 2

of 2 of 2bottles bottles

9 Providing and installing, brass strainer in tubewell bore ditto Cost/labour of jointing both ends ishole, including sockets, special sockets, studs, etc. included in the rate.complete:-

a) 2" i/d, 5/32" (50 mm i/d 4 mm) thick Per Rft. 14.60 636.20 Per Metre 47.90 2086.75b) 3" i/d, 5/32" (75 mm i/d 4 mm) thick Per Rft. 14.60 970.10 Per Metre 47.90 3181.95c) 4" i/d, 3/16" (100 mm i/d 5 mm) thick Per Rft. 19.30 1111.30 Per Metre 63.25 3645.00d) 5" i/d, 3/16" (125 mm i/d 5 mm) thick Per Rft. 21.80 1386.80 Per Metre 71.45 4548.65e) 6" i/d, 3/16" (150 mm i/d 5 mm) thick Per Rft. 24.55 2019.55 Per Metre 80.50 6624.10f) 7" i/d, 3/16" (175 mm i/d 5 mm) thick Per Rft. 28.60 2076.10 Per Metre 93.85 6809.65g) 8" i/d, 3/16" (200 mm i/d 5 mm) thick Per Rft. 35.35 2712.85 Per Metre 115.85 8898.05h) 9" i/d, 3/16" (225 mm i/d 5 mm) thick Per Rft. 35.35 2628.85 Per Metre 115.85 8622.55i) 10" i/d, 3/16" (250 mm i/d 5 mm) thick Per Rft. 39.70 3189.70 Per Metre 130.15 10462.15j) 10" i/d, ¼" (250 mm i/d 6 mm) thick Per Rft. 39.70 3861.70 Per Metre 130.15 12666.35k) 12" i/d, ¼" (300 mm i/d 6 mm) thick Per Rft. 40.90 4083.40 Per Metre 134.10 13393.50l) 15" i/d, ¼" (375 mm i/d 6 mm) thick Per Rft. 46.70 4414.70 Per Metre 153.20 14480.20m) 18" i/d, ¼" (450 mm i/d 6 mm) thick Per Rft. 46.70 4755.95 Per Metre 153.20 15599.50n) 20" i/d, ¼" (500 mm i/d 6 mm) thick Per Rft. 54.85 5241.85 Per Metre 179.90 17193.25o) 22" i/d, ¼" (550 mm i/d 6 mm) thick Per Rft. 56.05 6062.05 Per Metre 183.80 19883.50

10 Providing and installing M.S. Bail plug in tubewell bore In the case of increase or decreasehole: in the length of Bail plug, the rates

will be increased or decreased asa) 2" i/d, 1.5 ft. (50 mm i/d 450 mm) long. Each 66.45 442.20 Each 66.45 442.20 per rates given in serial No. 14 ofb) 3" i/d, 1.5 ft. (75 mm i/d 450 mm) long. Each 66.45 600.50 Each 66.45 600.50 this chapter for the respectivec) 4" i/d, 2 ft. (100 mm i/d 600 mm) long. Each 110.95 1198.50 Each 110.95 1198.50 diameter.d) 5" i/d, 2 ft. (125 mm i/d 600 mm) long. Each 110.95 1528.75 Each 110.95 1528.75e) 6" i/d, 2 ft. (150 mm i/d 600 mm) long. Each 149.35 1930.85 Each 149.35 1930.85f) 7" i/d, 2 ft. (175 mm i/d 600 mm) long. Each 149.35 2236.75 Each 149.35 2236.75g) 8" i/d, 2 ft. (200 mm i/d 600 mm) long Each 184.60 2482.25 Each 184.60 2482.25h) 9" i/d, 2 ft. (225 mm i/d 600 mm) long Each 184.60 2766.35 Each 184.60 2766.35i) 10" i/d, 2 ft. (250 mm i/d 600 mm) long Each 184.60 3583.65 Each 184.60 3583.65j) 12" i/d, 2 ft. (300 mm i/d 600 mm) long Each 221.55 4309.80 Each 221.55 4309.80k) 15" i/d, 2 ft. (375 mm i/d 600 mm) long Each 221.55 5327.05 Each 221.55 5327.05l) 18" i/d, 2 ft. (450 mm i/d 600 mm) long Each 265.95 6062.15 Each 265.95 6062.15m) 20" i/d, 2 ft. (500 mm i/d 600 mm) long Each 289.50 6757.50 Each 289.50 6757.50n) 22" i/d, 2 ft. (550 mm i/d 600 mm) long Each 289.50 7437.10 Each 289.50 7437.10

chapter-23(Tubewell) Page 140

Page 142: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

11 Providing and installing, P.V.C. strainer B.S.S. Class 'B', Chap. 2in tubewell bore hole, including sockets and solvents, etc.complete:-

a) 3" i/d (75 mm) Per Rft. 10.95 86.40 Per Metre 35.85 283.45b) 4" i/d (100 mm) Per Rft. 12.45 127.70 Per Metre 40.85 418.90c) 5" i/d (125 mm) Per Rft. 13.20 170.30 Per Metre 43.30 558.55d) 6" i/d (150 mm) Per Rft. 15.70 238.05 Per Metre 51.50 780.85e) 8" i/d (200 mm) Per Rft. 21.60 642.80 Per Metre 70.90 2108.40f) 10" i/d (250 mm) Per Rft. 22.15 894.25 Per Metre 72.60 2933.05g) 12" i/d (300 mm) Per Rft. 22.15 1064.55 Per Metre 72.60 3491.80

12 Providing and installing P.V.C. strainer B.S.S. Class `D' ,in tubewell bore hole, including sockets and solvent, etc.complete:-

a) 1¼" i/d (30 mm) Per Rft. 7.10 34.60 Per Metre 23.20 113.55b) 1½" i/d (40 mm) Per Rft. 7.35 43.05 Per Metre 24.15 141.2c) 2" i/d (50 mm) Per Rft. 7.50 62.55 Per Metre 24.50 205.2d) 3" i/d (75 mm) Per Rft. 10.95 127.35 Per Metre 35.90 417.7e) 4" i/d (100 mm) Per Rft. 12.55 208.15 Per Metre 41.20 682.75f) 5" i/d (125 mm) Per Rft. 13.55 305.15 Per Metre 44.40 1000.85g) 6" i/d (150 mm) Per Rft. 33.25 456.85 Per Metre 109.00 1498.4

13 Providing and installing P.V.C. Bail/End plug, in tubewellbore hole:-

i) B.S.S. Class `B'

a) 3" i/d (75 mm) Each 5.80 53.80 Each 5.80 53.80b) 4" i/d (100 mm) Each 6.60 72.60 Each 6.60 72.60c) 5" i/d (125 mm) Each 7.40 110.60 Each 7.40 110.60d) 6" i/d (150 mm) Each 9.20 159.20 Each 9.20 159.20e) 8" i/d (200 mm) Each 11.35 311.35 Each 11.35 311.35f) 10" i/d (250 mm) Each 11.95 439.15 Each 11.95 439.15g) 12" i/d (300 mm) Each 13.70 589.70 Each 13.70 589.70h) 14" i/d (350 mm) Each 13.70 620.90 Each 13.70 620.90

ii) B.S.S. Class `D'

a) 1¼" i/d (30 mm) Each 3.80 27.80 Each 3.80 27.80b) 1½" i/d (40 mm) Each 4.10 40.10 Each 4.10 40.10c) 2" i/d (50 mm) Each 4.30 58.30 Each 4.30 58.30d) 3" i/d (75 mm) Each 5.80 77.80 Each 5.80 77.80

chapter-23(Tubewell) Page 141

Page 143: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

e) 4" i/d (100 mm) Each 6.65 102.65 Each 6.65 102.65f) 5" i/d (125 mm) Each 7.40 145.40 Each 7.40 145.40g) 6" i/d (150 mm) Each 9.2 189.2 Each 9.2 189.2

14 Providing and installing M.S. blind pipe socketed/welded Chap.joint, M.S. reducer (where necessary), in tubewell bore 2hole, including jointing/welding with strainer, etc.complete:-

a) 2" i/d, 1/8" (50 mm i/d 3 mm) thick Per Rft. 39.75 192.50 Per Metre 130.40 631.45b) 3" i/d, 1/8" (75 mm i/d 3 mm) thick Per Rft. 39.75 257.90 Per Metre 130.40 845.85c) 4" i/d, 1/8" (100 mm i/d 3 mm) thick Per Rft. 49.70 339.15 Per Metre 163.00 1112.35d) 5" i/d, 3/16" (125 mm i/d 5 mm) thick Per Rft. 49.70 626.05 Per Metre 163.00 2053.50e) 6" i/d, 3/16" (150 mm i/d 5 mm) thick Per Rft. 70.95 753.15 Per Metre 232.70 2470.25f) 7" i/d, 3/16" (175 mm i/d 5 mm) thick Per Rft. 70.95 866.80 Per Metre 232.70 2843.20g) 8" i/d, 3/16" (200 mm i/d 5 mm) thick Per Rft. 82.80 1006.80 Per Metre 271.60 3302.30h) 9" i/d, 3/16" (225 mm i/d 5 mm) thick Per Rft. 82.80 1122.30 Per Metre 271.60 3681.15i) 10" i/d, ¼" (250 mm i/d 6 mm) thick Per Rft. 82.80 1454.75 Per Metre 271.60 4771.65j) 12" i/d, ¼" (300 mm i/d 6 mm) thick Per Rft. 99.35 1745.70 Per Metre 325.85 5725.95k) 15" i/d, ¼" (375 mm i/d 6 mm) thick Per Rft. 99.35 2157.30 Per Metre 325.85 7075.95l) 18" i/d, ¼" (450 mm i/d 6 mm) thick Per Rft. 121.55 2713.80 Per Metre 398.70 8901.35m) 20" i/d, ¼" (500 mm i/d 6 mm) thick Per Rft. 131.05 3011.35 Per Metre 429.85 9877.25n) 22" i/d, ¼" (550 mm i/d 6 mm) thick Per Rft. 131.05 3299.40 Per Metre 429.85 10822.00

15 Providing and installing P.V.C. blind pipe, B.S.S. Class ditto`B', in tubewell bore hole, including sockets and solventsand jointing with strainer, etc. complete.

a) 3" i/d (75 mm) Per Rft. 14.25 89.65 Per Metre 46.80 294.10b) 4" i/d (100 mm) Per Rft. 16.15 130.20 Per Metre 52.95 427.00c) 5" i/d (125 mm) Per Rft. 16.90 180.60 Per Metre 55.45 592.30d) 6" i/d (150 mm) Per Rft. 20.75 240.40 Per Metre 66.50 786.95e) 8" i/d (200 mm) Per Rft. 27.55 376.00 Per Metre 90.30 1233.30f) 10" i/d (250 mm) Per Rft. 28.70 567.30 Per Metre 94.20 1860.65g) 12" i/d (300 mm) Per Rft. 34.10 796.55 Per Metre 111.90 2612.70h) 14" i/d (350 mm) Per Rft. 31.70 1058.65 Per Metre 104.05 3472.35

16 Providing and installing P.V.C. blind pipe, B.S.S. Class`D', in tubewell bore hole, including sockets and solventsand jointing with strainer, etc. complete.

a) 1¼" i/d (30 mm) Per Rft. 8.65 35.85 Per Metre 28.35 117.55b) 1½" i/d (40 mm) Per Rft. 8.90 42.90 Per Metre 29.20 140.75c) 2" i/d (50 mm) Per Rft. 9.50 62.95 Per Metre 31.15 206.45d) 3" i/d (75 mm) Per Rft. 12.35 130.65 Per Metre 40.55 428.45

chapter-23(Tubewell) Page 142

Page 144: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

e) 4" i/d (100 mm) Per Rft. 16.30 212.70 Per Metre 53.40 697.65f) 5" i/d (125 mm) Per Rft. 17.25 315.05 Per Metre 56.55 1033.30g) 6" i/d (150 mm) Per Rft. 20.75 448.45 Per Metre 68.10 1470.85

17 Testing and developing of tubewell of size 6" (150 mm)i/d and above continuously.

i) upto 1.5 cs. discharge Per 578.00 Per 578.00Hour Hour

ii) above 1.5 cs. discharge ditto 695.75 ditto 695.75

18 Shrouding with graded pea gravel 3/8" to 1/8" (10 to 3 Per Cft. 16.30 41.20 cu.m 575.70 1455.15 The rate includes wastage, etc.mm), around tubewell in bore hole.

19 Laying cutting, jointing, testing and disinfecting cast iron Chap. 1) Pipes to be supplied bypipe line in trenches, with spigot and socket caulked lead 2 Government.joints, including cost of materials, such as lead, yarn, etc. 2) Providing and installing specialscomplete in all respects:- and valves is not included in the

rate, which is payable separately.

a) 3" (75 mm) i/d Per Rft. 36.10 Per Metre 118.35b) 4" (100 mm) i/d Per Rft. 44.90 Per Metre 147.30c) 5" (125 mm) i/d Per Rft. 56.00 Per Metre 183.70d) 6" (150 mm) i/d Per Rft. 66.65 Per Metre 218.55e) 8" (200 mm) i/d Per Rft. 82.10 Per Metre 269.20f) 10" (250 mm) i/d Per Rft. 121.95 Per Metre 399.95g) 12" (300 mm) i/d Per Rft. 142.75 Per Metre 468.15h) 15" (375 mm) i/d Per Rft. 184.70 Per Metre 605.85i) 18" (450 mm) i/d Per Rft. 245.25 Per Metre 804.35

20 Laying, cutting, jointing, testing and disinfecting cast iron ditto 1) Pipes to be supplied bypipe line in trenches, with flanged and flanged joints, Government.complete in all respects:- 2) Providing and installing specials

and valves is not included in thea) 3" (75 mm) i/d Per Rft. 15.90 Per Metre 52.15 rate, which is payable separately.b) 4" (100 mm) i/d Per Rft. 17.65 Per Metre 57.95c) 5" (125 mm) i/d Per Rft. 26.85 Per Metre 88.05d) 6" (150 mm) i/d Per Rft. 29.35 Per Metre 96.35e) 8" (200 mm) i/d Per Rft. 34.45 Per Metre 113.05f) 10" (250 mm) i/d Per Rft. 48.55 Per Metre 159.20g) 12" (300 mm) i/d Per Rft. 56.45 Per Metre 185.15h) 15" (375 mm) i/d Per Rft. 76.95 Per Metre 252.25i) 18" (450 mm) i/d Per Rft. 95.50 Per Metre 313.15

chapter-23(Tubewell) Page 143

Page 145: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

21 Laying, cutting, jointing, testing and disinfecting cast iron Chap. 2 1) Pipes to be supplied bypipe line in trenches with Tyton joints, complete in all Government.respects:- 2) Providing and installing specials

and valves is not included in thea) 3" (75 mm) i/d Per Rft. 7.75 Per Metre 25.45 rate, which is payable separately.b) 4" (100 mm) i/d Per Rft. 9.00 Per Metre 29.55c) 5" (125 mm) i/d Per Rft. 11.60 Per Metre 38.00d) 6" (150 mm) i/d Per Rft. 13.10 Per Metre 42.90e) 8" (200 mm) i/d Per Rft. 17.75 Per Metre 58.15f) 10" (250 mm) i/d Per Rft. 22.55 Per Metre 73.95g) 12" (300 mm) i/d Per Rft. 27.05 Per Metre 88.65h) 15" (375 mm) i/d Per Rft. 41.40 Per Metre 135.70i) 18" (450 mm) i/d Per Rft. 49.60 Per Metre 162.70

22 Providing, laying, cutting, jointing, testing and disinfecting Chap. Cost of sockets, tees, elbows,G.I. pipeline in trenches, with socket joints, using G.I. 2 bends, valves, crosses, unions andpipes of B.S.S. 1387-1967 complete in all respects, with plugs, etc. is included in the rates.specials and valves.

i) Light Quality

a) ½" i/d (15 mm) 2mm thick Per Rft. 4.45 43.25 Per Metre 14.60 141.85b) ¾" i/d (20 mm) 2.35mm thick Per Rft. 5.00 60.50 Per Metre 16.35 198.50c) 1" i/d (25 mm) 2.65mm thick Per Rft. 5.85 83.55 Per Metre 19.25 274.00d) 1¼" i/d (32 mm) 2.65mm thick Per Rft. 5.55 105.05 Per Metre 18.25 344.50e) 1½" i/d (40 mm) 2.9mm thick Per Rft. 6.10 131.95 Per Metre 20.00 432.80f) 2" i/d (50 mm) 2.9mm thick Per Rft. 6.85 165.15 Per Metre 22.45 541.65g) 2"½ i/d (65 mm) 3.25mm thick Per Rft. 7.20 224.20 Per Metre 23.65 735.30h) 3" i/d (75 mm) 3.25mm thick Per Rft. 8.30 262.75 Per Metre 27.15 861.85i) 4" i/d (100 mm) 3.65mm thick Per Rft. 9.20 363.50 Per Metre 30.20 1192.25 ii) Medium Quality

a) ½" i/d (15 mm) 2.65mm thick Per Rft. 4.45 52.30 Per Metre 14.60 171.55b) ¾" i/d (20 mm) 2.65mm thick Per Rft. 5.00 66.15 Per Metre 16.35 216.95c) 1" i/d (25 mm) 3.25mm thick Per Rft. 5.85 97.25 Per Metre 19.25 319.00d) 1¼" i/d (32 mm) 3.25mm thick Per Rft. 5.55 122.95 Per Metre 18.25 403.20e) 1½" i/d (40 mm) 3.25mm thick Per Rft. 6.15 140.90 Per Metre 20.15 462.20f) 2" i/d (50 mm) 3.65mm thick Per Rft. 6.85 192.20 Per Metre 22.45 630.45g) 2"½ i/d (65 mm) 3.65mm thick Per Rft. 7.20 240.15 Per Metre 23.65 787.70h) 3" i/d (75 mm) 4.05mm thick Per Rft. 8.30 308.50 Per Metre 27.15 1011.80i) 4" i/d (100 mm) 4.5mm thick Per Rft. 9.20 434.80 Per Metre 30.20 1426.10j) 5" i/d (150 mm) 4.85mm thick Per Rft. 10.60 590.15 Per Metre 34.80 1935.70k) 6" i/d (200 mm) 4.85mm thick Per Rft. 10.90 695.55 Per Metre 35.75 2281.35

ii. For internal G.I piping (1"dia, 3/4"dia & 1/2"dia) Bath room(s)/

Levorotary of rate (composite) shall be reduced by 8% and specials mentioned

above may be paid at the rates placed onWebsite as per actual quantity used.

i. Cost of sockets, tees, elbow, bends, valves, crosses, unions and plugs etc isincluded in the rates except for internal G.I piping (1"dia, 3/4"dia & 1/2"dia)

for Bath rooms/ Levorotary.

chapter-23(Tubewell) Page 144

Page 146: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

iii) Heavy Quality

a) ½" i/d (15 mm) 3.25mm thick Per Rft. 4.45 67.70 Per Metre 14.60 222.05b) ¾" i/d (20 mm) 3.25mm thick Per Rft. 5.00 86.75 Per Metre 16.35 284.45c) 1" i/d (25 mm) 4.05mm thick Per Rft. 5.85 134.75 Per Metre 19.25 441.95d) 1¼" i/d (32 mm) 4.05mm thick Per Rft. 5.55 173.80 Per Metre 18.25 570.15e) 1½" i/d (40 mm) 4.05mm thick Per Rft. 6.15 199.45 Per Metre 20.15 654.25f) 2" i/d (50 mm) 4.5mm thick Per Rft. 6.85 277.75 Per Metre 22.45 910.95g) 2"½ i/d (65 mm) 4.5mm thick Per Rft. 7.20 354.45 Per Metre 23.65 1162.6h) 3" i/d (75 mm) 4.85mm thick Per Rft. 8.30 461.75 Per Metre 27.15 1514.5i) 4" i/d (100 mm) 5.4mm thick Per Rft. 9.20 646.40 Per Metre 30.20 2120.25j) 5" i/d (125 mm) 5.4mm thick Per Rft. 10.60 798.15 Per Metre 34.80 2618k) 6" i/d (150 mm) 5.4mm thick Per Rft. 10.90 948.80 Per Metre 35.75 3112.15

23 Providing, laying, cutting, jointing, testing and disinfectingAsbestos cement/Fibre Cement pipe line in trenches, with PS 428 & Providing and installing specialscomet joint and rubber ring, complete in all respects:- ISO 160 and valves is not included in the

rate, which is payable separately.B Class WOrking Pressure

a) 3" i/d (75 mm) Per Rft. 7.70 87.55 Per Metre 25.15 287.20b) 4" i/d (100 mm) Per Rft. 8.15 113.75 Per Metre 26.70 373.05c) 6" i/d (150 mm) Per Rft. 11.15 186.40 Per Metre 36.55 611.35d) 8" i/d (200 mm) Per Rft. 15.40 317.95 Per Metre 50.45 1042.85e) 10" i/d (250 mm) Per Rft. 19.85 460.95 Per Metre 65.15 1511.85f) 12" i/d (300 mm) Per Rft. 25.25 614.25 Per Metre 82.80 2014.75g) 14" i/d (350 mm) Per Rft. 28.90 799.10 Per Metre 94.85 2621.10h) 16" i/d (400 mm) Per Rft. 32.55 1117.85 Per Metre 106.70 3666.50i) 18" i/d (450 mm) Per Rft. 38.30 1399.10 Per Metre 125.60 4589.05j) 20" i/d (500 mm) Per Rft. 44.95 1677.95 Per Metre 147.50 5503.70k) 24" i/d (600 mm) Per Rft. 52.80 2308.75 Per Metre 173.20 7572.65

24 C Class Working Pressure PS 428 &a) 3" i/d (75 mm) Per Rft. 7.70 87.55 Per Metre 25.15 287.20 ISO 160b) 4" i/d (100 mm) Per Rft. 8.15 118.65 Per Metre 26.70 389.15c) 6" i/d (150 mm) Per Rft. 11.15 217.15 Per Metre 36.55 712.25d) 8" i/d (200 mm) Per Rft. 15.40 340.60 Per Metre 50.45 1117.25e) 10" i/d (250 mm) Per Rft. 19.85 508.05 Per Metre 65.15 1666.35f) 12" i/d (300 mm) Per Rft. 25.25 707.80 Per Metre 82.80 2321.65g) 14" i/d (350 mm) Per Rft. 28.90 1080.15 Per Metre 94.85 3542.90h) 16" i/d (400 mm) Per Rft. 32.55 1524.80 Per Metre 106.70 5001.35i) 18" i/d (450 mm) Per Rft. 38.30 1953.10 Per Metre 125.60 6406.10j) 20" i/d (500 mm) Per Rft. 44.95 2330.05 Per Metre 147.50 7642.50k) 24" i/d (600 mm) Per Rft. 53.60 3299.35 Per Metre 175.85 10821.85

chapter-23(Tubewell) Page 145

Page 147: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

25 D Class Working Pressure PS 428 &a) 3" i/d (75 mm) Per Rft. 7.70 87.55 Per Metre 25.15 287.20 ISO 160b) 4" i/d (100 mm) Per Rft. 8.15 133.95 Per Metre 26.70 439.35c) 6" i/d (150 mm) Per Rft. 11.15 263.05 Per Metre 36.55 862.85d) 8" i/d (200 mm) Per Rft. 15.40 466.05 Per Metre 50.45 1528.70e) 10" i/d (250 mm) Per Rft. 19.85 716.25 Per Metre 65.15 2349.35f) 12" i/d (300 mm) Per Rft. 25.25 1030.50 Per Metre 82.80 3380.00g) 14" i/d (350 mm) Per Rft. 28.90 1522.95 Per Metre 94.85 4995.25h) 16" i/d (400 mm) Per Rft. 32.55 2179.80 Per Metre 106.70 7149.75i) 18" i/d (450 mm) Per Rft. 38.30 2738.70 Per Metre 125.60 8982.90j) 20" i/d (500 mm) Per Rft. 44.95 3346.40 Per Metre 147.50 10976.20k) 24" i/d (600 mm)

26 Providing, laying, cutting, jointing, testing and disinfecting Chap Providing and installing specialsP.V.C. pipe line of B.S.S. with `B' Class working pressure 2 and valves is not included in thepipe, in trenches, complete in all respects:- rate, which is payable separately.

a) 3" i/d (75 mm) Per Rft. 2.50 79.40 Per Metre 8.25 260.50 b) 4" i/d (100 mm) Per Rft. 3.15 119.45 Per Metre 10.30 391.85 c) 5" i/d (125 mm) Per Rft. 3.90 170.85 Per Metre 12.70 560.30 d) 6" i/d (150 mm) Per Rft. 4.20 228.20 Per Metre 13.70 748.55e) 8" i/d (200 mm) Per Rft. 5.90 361.35 Per Metre 19.35 1185.20f) 10" i/d (250 mm) Per Rft. 7.60 556.95 Per Metre 25.00 1826.80h) 12" i/d (300 mm) Per Rft. 9.40 787.10 Per Metre 30.85 2581.65g) 14" i/d (350 mm) Per Rft. 11.95 1059.40 Per Metre 39.15 3474.85

27 Providing, laying, cutting, jointing, testing and disinfecting ditto Providing and installing specialspipe line in trenches with P.V.C. pipes of B.S.S. with `D' and valves is not included in theClass working pressure complete in all respects:- rate, which is payable separately.a) 2" i/d (50 mm) Per Rft. 2.10 56.60 Per Metre 6.85 185.60 b) 3" i/d (75 mm) Per Rft. 2.50 123.15 Per Metre 8.25 403.95 c) 4" i/d (100 mm) Per Rft. 3.15 203.50 Per Metre 10.30 667.45 d) 5" i/d (125 mm) Per Rft. 3.90 307.60 Per Metre 12.70 1009.00 e) 6" i/d (150 mm) Per Rft. 4.20 440.40 Per Metre 13.70 1444.55

28 Providing and fixing cast iron special of B.S.S. Class `B' 9.1 i) Labour rates include the cost of(such as bend, tee cross collar, reducer, tail piece, jointing material & labour.flanged spigot, cap, flanged socket, taper, angle branch,plug etc.) for cast iron pipe line , complete:- ii) The internal dia of the pipe, from

which the branch is taken out wila) C.I.S.S. Specials, with spigot. and be considered the internal dia for

socket joint:- the purpose of payments ofi) 3" to 6" (75 to 150 mm) i/d Per Kg. 15.50 93.45 Per Kg 15.50 93.45 specials.ii) 8" to 12" (200 to 300 mm) i/d Per Kg. 8.70 86.65 Per Kg 8.70 86.65iii) 15" to 18" (375 to 450 mm) i/d Per Kg. 5.25 83.20 Per Kg 5.25 83.20

chapter-23(Tubewell) Page 146

Page 148: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

b) C.I. flanged specials, with flanged andflanged joints:-

i) 3" to 6" (75 to 150 mm) i/d Per Kg 6.95 84.90 Per Kg 6.95 84.90ii) 8" to 12" (200 to 300 mm) i/d Per Kg 2.25 80.20 Per Kg 2.25 80.20iii) 15" to 18" (375 to 450 mm) i/d Per Kg 3.10 80.20 Per Kg 3.10 80.20

c) C.I. Specials, with tyton joints:-

i) 3" to 6" (75 to 150 mm) i/d Per Kg 7.75 85.70 Per Kg 7.75 85.70ii) 8" to 12" (200 to 300 mm) i/d Per Kg 7.75 85.70 Per Kg 7.75 85.70iii) 15" to 18" (375 to 450 mm) i/d Per Kg 7.75 85.70 Per Kg 7.75 85.70

29 Providing and fixing cast iron specials of B.S.S. Class 'B' 9.1 1) Labour rates include the cost of(such as bend, tee, cross collar, reducer, tail piece, jointing material and labour.flanged socket, flanged spigot, cap, taper, angle branch,plug, etc) for Asbestos cement pipe line, with comet joint 2) The internal dia of the pipe, fromand rubber ring, complete. which the branch is taken out, willi) 3" to 6" (75 to 150 mm) i/d Per Kg 10.60 88.55 Per Kg 10.60 88.55 be considered the internal dia forii) 8" to 18" (200 to 450 mm) i/d Per Kg 5.55 83.50 Per Kg 5.55 83.50 the purpose of payment.iii) 20" to 24" (500 to 600 mm) i/d Per Kg 4.45 82.40 Per Kg 4.45 82.40

30 Providing and fixing sluice valve of B.S.S. quality and 9.1 Labour rates include cost of jointingweight, Class `B', for cast iron pipe line, and Asbestos material and labour.cement pipe line (including cost of jointing material):-a) 3" i/d (75 mm) Each 428.60 4628.60 Each 428.60 4628.60b) 4" i/d (100 mm) Each 466.40 5866.40 Each 466.40 5866.40c) 5" i/d (125 mm) Each 839.55 8279.55 Each 839.55 8279.55d) 6" i/d (150 mm) Each 895.05 9295.05 Each 895.05 9295.05e) 8" i/d (200 mm) Each 1045.05 15445.05 Each 1045.05 15445.05f) 10" i/d (250 mm) Each 1766.10 20966.10 Each 1766.10 20966.10g) 12" i/d (300 mm) Each 1984.60 25984.60 Each 1984.60 25984.60h) 16" i/d (400 mm) Each 2632.25 44632.25 Each 2632.25 44632.25i) 18" i/d (450 mm) Each 3029.55 87029.55 Each 3029.55 87029.55

31 Providing and fixing, sluice valve of B.S.S. quality and Labour rates include cost of jointingweight, for Asbestos cement pipe line, with comet joint 9.1 material and labour.and rubber ring, complete (including cost of jointingmaterials):-a) 3" i/d (75 mm) Each 332.50 4532.50 Each 332.50 4532.50b) 4" i/d (100 mm) Each 410.60 5810.60 Each 410.60 5810.60c) 6" i/d (150 mm) Each 521.80 8921.80 Each 521.80 8921.80d) 8" i/d (200 mm) Each 870.35 15270.35 Each 870.35 15270.35e) 10" i/d (250 mm) Each 1113.60 20313.60 Each 1113.60 20313.60

chapter-23(Tubewell) Page 147

Page 149: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

f) 12" i/d (300 mm) Each 1286.65 25286.65 Each 1286.65 25286.65g) 16" i/d (400 mm) Each 1525.65 43525.65 Each 1525.65 43525.65h) 18" i/d (450 mm) Each 1843.70 85843.70 Each 1843.70 85843.70

32 Providing and fixing, fire hydrants B.S.S. quality and Each 50.75 1970.75 Each 50.75 1970.75 9.1 1) Labour rates include cost ofweight of 2½" (65 mm) dia (including cost of jointing jointing material and labour.material).

2) Connecting pipes and specials,if used, will be paid extra.

33 Providing and fixing, air valve 2½ (65mm) dia of B.S.S. dittoquality and weight (complete with jointing material).

a) single Each 102.45 3402.45 Each 102.45 3402.45

b) double Each 102.45 6102.45 Each 102.45 6102.45

34 Providing and fitting C.I. flanges on pipes, includingturning, threading, facing and fitting, etc. complete in all dittorespects:-

a) 3" to 6" (75 to 150 mm) i/d Per Kg 19.10 52.55 Per Kg 19.10 52.55

b) 8" to 12" (200 to 300 mm) i/d Per Kg 12.30 45.80 Per Kg 12.30 45.80

c) 15" to 18" (375 to 450 mm) i/d Per Kg 10.15 43.60 Per Kg 10.15 43.60

35 Cutting C.I. pipe, and welding spigot or socket, flanged ortyton end, after finishing ends of pipes:

Per Inch Per cm i/d a) 3" to 6" (75 to 150 mm) i/d i/d of pipe 39.15 of pipe 15.65b) 8" to 12" (200 to 300 mm) i/d ditto 48.10 ditto 19.25c) 15" to 18" (375 to 450 mm) i/d ditto 44.55 ditto 17.80

36 Providing, laying, cutting, jointing, testing and disinfecting Cost of sockets, tees, elbows,G.I. pipe line in trenches, with flanged joints, using G.I. bends, valves, crosses, unions andpipe of B.S.S. 1387-1967 complete in all respects, plugs, etc. is included in the rates.including specials and valves:-

i) G.I. flanged joints (Heavy Quality)

a) 1½" i/d (40 mm) Per Rft. 8.50 236.30 Per Metre 27.90 775.10b) 2" i/d (50 mm) Per Rft. 8.50 328.50 Per Metre 27.90 1077.55c) 2½" i/d (65 mm) Per Rft. 8.95 418.45 Per Metre 29.35 1372.55d) 3" i/d (75 mm) Per Rft. 9.05 544.65 Per Metre 29.65 1786.45

chapter-23(Tubewell) Page 148

Page 150: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

e) 4" i/d (100 mm) Per Rft. 10.70 771.40 Per Metre 35.10 2530.25f) 6" i/d (150 mm) Per Rft. 12.35 950.70 Per Metre 40.45 3118.25g) 8" i/d (200 mm) Per Rft. 12.35 1127.00 Per Metre 40.60 3696.55

ii) C.I. flanged joints (Medium Quality)

a) 1½" i/d (40 mm) Per Rft. 9.75 171.00 Per Metre 32.00 560.90b) 2" i/d (50 mm) Per Rft. 9.10 230.90 Per Metre 29.80 757.30c) 2½" i/d (65 mm) Per Rft. 10.20 288.90 Per Metre 33.40 947.50d) 3" i/d (75 mm) Per Rft. 10.25 369.35 Per Metre 33.65 1211.45e) 4" i/d (100 mm) Per Rft. 12.05 537.55 Per Metre 39.50 1763.15f) 6" i/d (150 mm) Per Rft. 13.75 729.80 Per Metre 45.15 2393.70g) 8" i/d (200 mm) Per Rft. 13.85 859.95 Per Metre 45.45 2820.55

37 Providing and installing P.V.C. bends, of B.S.S.

i) Class `B' working pressure:-a) 3" i/d (75 mm) Each 66.05 178.85 Each 66.05 178.85b) 4" i/d (100 mm) Each 77.55 318.75 Each 77.55 318.75c) 5" i/d (125 mm) Each 96.95 566.15 Each 96.95 566.15d) 6" i/d (150 mm) Each 100.65 793.05 Each 100.65 793.05

ii) Class `D' working pressure:-a) 1¼" i/d (30 mm) Each 41.50 71.50 Each 41.50 71.50b) 1½" i/d (40 mm) Each 45.40 77.80 Each 45.40 77.80c) 2" i/d (50 mm) Each 49.85 113.45 Each 49.85 113.45d) 3" i/d (75 mm) Each 66.05 234.05 Each 66.05 234.05e) 4" i/d (100 mm) Each 77.55 472.35 Each 77.55 472.35f) 5" i/d (125 mm) Each 96.95 1008.95 Each 96.95 1008.95g) 6" i/d (150 mm) Each 100.65 1381.05 Each 100.65 1381.05

38 Providing and installing P.V.C. tees, of B.S.S.

i) Class `B' working pressure:-

a) 3" i/d (80 mm) Each 99.05 515.45 Each 99.05 515.45b) 4" i/d (100 mm) Each 118.05 961.65 Each 118.05 961.65c) 5" i/d (125 mm) Each 142.90 1831.30 Each 142.90 1831.30d) 6" i/d (150 mm) Each 150.95 1890.95 Each 150.95 1890.95

ii) Class `D' working pressure:-

a) 1¼" i/d (30 mm) Each 63.65 178.85 Each 63.65 178.85b) 1½" i/d (40 mm) Each 68.35 209.95 Each 68.35 209.95c) 2" i/d (50 mm) Each 74.35 262.75 Each 74.35 262.75

chapter-23(Tubewell) Page 149

Page 151: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

d) 3" i/d (75 mm) Each 99.05 515.45 Each 99.05 515.45e) 4" i/d (100 mm) Each 118.05 961.65 Each 118.05 961.65f) 5" i/d (125 mm) Each 142.90 1831.30 Each 142.90 1831.30g) 6" i/d (150 mm) Each 150.95 1890.95 Each 150.95 1890.95

39 Providing and installing P.V.C. sockets, B.S.S.

i) Class `B' working pressure:-

a) 3" i/d (75 mm) Each 49.45 101.05 Each 49.45 101.05b) 4" i/d (100 mm) Each 61.00 153.40 Each 61.00 153.40c) 5" i/d (125 mm) Each 76.20 193.80 Each 76.20 193.80d) 6" i/d (150 mm) Each 79.90 253.90 Each 79.90 253.90e) 8" i/d (200 mm) Each 116.45 524.45 Each 116.45 524.45f) 10" i/d (250 mm) Each 138.65 1291.85 Each 138.65 1291.85g) 12" i/d (300 mm) Each 160.00 2986.00 Each 160.00 2986.00h) 14" i/d (350 mm) Each 181.15 3061.15 Each 181.15 3061.15

ii) Class `D' working pressure:-a) 1¼" i/d (30 mm) Each 27.70 42.10 Each 27.70 42.10b) 1½" i/d (40 mm) Each 31.60 50.80 Each 31.60 50.80c) 2" i/d (50 mm) Each 36.00 67.20 Each 36.00 67.20d) 3" i/d (75 mm) Each 49.45 153.85 Each 49.45 153.85e) 4" i/d (100 mm) Each 61.00 244.60 Each 61.00 244.60f) 5" i/d (125 mm) Each 76.20 408.60 Each 76.20 408.60g) 6" i/d (150 mm) Each 79.90 666.70 Each 79.90 666.70

40 Providing and installing P.V.C. Tapered core, B.S.S.

i) Class `B' working pressure:-

a) 3" i/d (75 mm) Each 66.05 102.05 Each 66.05 102.05b) 4" i/d (100 mm) Each 77.55 125.55 Each 77.55 125.55c) 5" i/d (125 mm) Each 65.00 125.00 Each 65.00 125.00d) 6" i/d (150 mm) Each 100.65 172.65 Each 100.65 172.65e) 8" i/d (200 mm) Each 144.05 264.05 Each 144.05 264.05f) 10" i/d (250 mm) Each 166.25 322.25 Each 166.25 322.25g) 12" i/d (300 mm) Each 193.20 385.20 Each 193.20 385.20h) 14" i/d (350 mm) Each 214.30 454.30 Each 214.30 454.30

ii) Class `D' working pressure:-a) 1¼" i/d (30 mm) Each 41.50 59.50 Each 41.50 59.50b) 1½" i/d (40 mm) Each 45.40 69.40 Each 45.40 69.40c) 2" i/d (50 mm) Each 49.85 79.85 Each 49.85 79.85

chapter-23(Tubewell) Page 150

Page 152: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

41 Making connection for new watersupply lines with the The rate includes the component ofrunning main, including excavation of trench and refilling, bailing out water from the trenchcomplete, but excluding cost of pipe and specials, etc. and cutting of existing pipe line.

Diameter of running main:Per Per

i) upto 6" i/d (150 mm) Connection 849.75 Connection 849.75ii) upto 8" i/d (200 mm) ditto 1067.55 ditto 1067.55iii) upto 10" i/d (250 mm) ction 1382.70 ction 1382.70iv) upto 12" i/d (300 mm) ditto 1927.20 ditto 1927.20v) upto 16" i/d (400 mm) ditto 2337.25 ditto 2337.25vi) upto 20" i/d (500 mm) ditto 3072.30 ditto 3072.30vii) upto 24" i/d (600 mm) ditto 3672.90 ditto 3672.90

chapter-23(Tubewell) Page 151

Page 153: MRS Jan-Mar 09

ELECTRIC INSTALLATIONRates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Supply and erection of G.I. pipes for wiring purposes, includingpull boxes, inspection boxes, bends, tees, etc. complete withall specials.

a) on surface, including clamps, etc. 38.4

i) 15 mm i/d Per Rft. 10.70 46.65 Per Metre 35.10 153.05 ii) 20 mm i/d Per Rft. 10.70 59.35 Per Metre 35.10 194.70 iii) 25 mm i/d Per Rft. 10.70 77.90 Per Metre 35.10 255.60 iv) 32 mm i/d Per Rft. 13.05 97.65 Per Metre 42.75 320.30 v) 40 mm i/d Per Rft. 13.05 119.40 Per Metre 42.75 391.65 vi) 50 mm i/d Per Rft. 15.50 148.35 Per Metre 50.90 486.65 vii) 80 mm i/d Per Rft. 19.75 235.00 Per Metre 64.80 770.75

b) recessed in walls, including hooks, cutting jharries andrepairing surface: 38.3

i) 15 mm i/d Per Rft. 15.35 50.65 Per Metre 50.40 166.15 ii) 20 mm i/d Per Rft. 15.35 64.35 Per Metre 50.40 211.00 iii) 25 mm i/d Per Rft. 16.00 83.80 Per Metre 52.55 274.90 iv) 32 mm i/d Per Rft. 16.00 101.60 Per Metre 52.55 333.30 v) 40 mm i/d Per Rft. 17.45 124.60 Per Metre 57.30 408.70 vi) 50 mm i/d Per Rft. 24.00 157.65 Per Metre 78.80 517.00 vii) 80 mm i/d Per Rft. 38.45 255.25 Per Metre 126.05 837.25

2 Supply and erection of M.S. conduit pipes for wiring, including 38.4 & 38.6pull boxes, inspection boxes, bends, tees, etc. complete with all specials.

a) on surface, including clamps, etc.

i) 16 mm i/d Per Rft. 7.45 24.45 Per Metre 24.40 80.15 ii) 20 mm i/d Per Rft. 7.45 29.35 Per Metre 24.40 96.25 iii) 25 mm i/d Per Rft. 7.45 35.60 Per Metre 24.40 116.85 iv) 32 mm i/d Per Rft. 7.45 39.00 Per Metre 24.40 127.95 v) 40 mm i/d Per Rft. 8.35 50.25 Per Metre 27.45 164.80 vi) 50 mm i/d Per Rft. 10.30 61.70 Per Metre 33.75 202.30

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-24(Electric Installation) Page 152

Page 154: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

b) recessed in walls, including cutting jharries, cost of 38.3 &hooks and repairing surface etc. 38.7

i) 16 mm i/d Per Rft. 13.75 32.55 Per Metre 45.00 106.75 ii) 20 mm i/d Per Rft. 13.75 37.20 Per Metre 45.00 121.95 iii) 25 mm i/d Per Rft. 15.35 44.65 Per Metre 50.40 146.35 iv) 32 mm i/d Per Rft. 16.00 49.15 Per Metre 52.55 161.15 v) 40 mm i/d Per Rft. 16.70 59.30 Per Metre 54.80 194.50 vi) 50 mm i/d Per Rft. 17.45 71.35 Per Metre 57.30 234.00

3 Supply and erection of PVC pipe for wiring recessed in walls, 38.3 &including inspection boxes, pull boxes, hooks, cutting jharries, 38.5and repairing surface, etc., complete with all specials.

i) 12 mm i/d Per Rft. 12.40 21.00 Per Metre 40.65 68.90 ii) 20 mm i/d Per Rft. 12.80 23.90 Per Metre 42.00 78.35 iii) 25 mm i/d Per Rft. 14.25 28.95 Per Metre 46.70 94.90 iv) 32 mm i/d Per Rft. 15.35 34.30 Per Metre 50.40 112.55 v) 40 mm i/d Per Rft. 16.00 41.50 Per Metre 52.55 136.15 vi) 50 mm i/d Per Rft. 16.70 52.20 Per Metre 54.80 171.20

4 Supply and erection of PVC pipe for wiring on surfaceincluding clamps inspection boxes, pull boxes, bends, tees, repairing surface, etc., complete with all specials:-

i) 12 mm i/d Per Rft. 3.35 11.55 Per Metre 10.95 37.85 ii) 20 mm i/d Per Rft. 3.35 13.85 Per Metre 10.95 45.50 iii) 25 mm i/d Per Rft. 3.35 18.20 Per Metre 10.95 59.70 iv) 32 mm i/d Per Rft. 3.80 23.30 Per Metre 12.55 76.40 v) 40 mm i/d Per Rft. 3.80 30.80 Per Metre 12.55 101.00 vi) 50 mm i/d Per Rft. 4.60 44.70 Per Metre 15.15 146.60

5 Supply and erection of G.I. flexible pipe for wiring, including 38.4welding of sockets, nipples and check nuts, etc. complete:-

i) 12 mm i/d Per Rft. 8.80 35.15 Per Metre 28.90 115.30 ii) 20 mm i/d Per Rft. 9.40 43.80 Per Metre 30.80 143.60 iii) 25 mm i/d Per Rft. 9.70 58.00 Per Metre 31.90 190.30 iv) 32 mm i/d Per Rft. 11.75 76.85 Per Metre 38.50 252.10 v) 40 mm i/d Per Rft. 12.80 94.75 Per Metre 42.00 310.80 vi) 50 mm i/d Per Rft. 14.10 130.05 Per Metre 46.20 426.60 vii) 80 mm i/d Per Rft. 18.80 286.60 Per Metre 61.65 940.05

chapter-24(Electric Installation) Page 153

Page 155: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

6 Supply and erection PVC pipe for recessed wiring (main and 38.2 &sub-main) purpose, including bends, specials, etc. in floor, 38.3wall or trenches:-

i) 50 mm i/d Per Rft. 16.70 53.65 Per Metre 54.80 175.95 ii) 80 mm i/d Per Rft. 19.20 68.70 Per Metre 63.05 225.35 iii) 100 mm i/d Per Rft. 19.20 89.25 Per Metre 63.05 292.75

7 Supply and erection of PVC pipe for surface wiring (main andsub-main) including clamps, inspection boxes, pull boxesbends etc., complete with all specials:-

i) 50 mm i/d Per Rft. 4.60 41.05 Per Metre 15.15 134.65 ii) 80 mm i/d Per Rft. 6.70 68.30 Per Metre 21.95 224.00 iii) 100 mm i/d Per Rft. 7.65 84.70 Per Metre 25.10 277.80

8 Supply and erection of wooden strip batten for wiring Per Rft. 1.35 2.90 Per Metre 4.40 9.55 38.8 Additional width required to

purposes, including clips, insulation cleats, etc. accommodate wires will be providedby erection of additional strips.

9 Supply and erection of Sahl wood casing and capping for Per Rft. 1.35 10.90 Per Metre 4.40 35.70 38.8wiring purposes, including insulation cleats, screws, etc. complete.

10 Supply and erection of single core PVC insulated copper 38.1conductor cables, in prelaid PVC pipe/M.S. conduit/G.Ipipe/wooden strip batten/wooden casing an capping/G.I.wire/trenches (rate for cables only):-

a) 250/440 volts, PVC insulated:

i) 3/0.74 mm (3/0.029") Per Rft. 2.70 6.80 Per Metre 8.80 22.35 ii) 3/0.91 mm (3/0.036") Per Rft. 2.70 8.70 Per Metre 8.80 28.55 iii) 7/0.74 mm (7/0.029") Per Rft. 2.70 11.70 Per Metre 8.80 38.45 iv) 7/0.91 mm (7/0.036") Per Rft. 2.95 16.90 Per Metre 9.75 55.50 v) 7/1.12 mm (7/0.044") Per Rft. 3.35 23.70 Per Metre 10.95 77.70 vi) 7/1.63 mm (7/0.064") Per Rft. 4.10 46.30 Per Metre 13.50 151.95 vii) 19/1.32 mm (19/0.052") Per Rft. 9.30 85.05 Per Metre 30.55 279.00 viii) 19/1.63 mm (19/0.064") Per Rft. 10.85 115.35 Per Metre 35.65 378.35

chapter-24(Electric Installation) Page 154

Page 156: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

b) 250/440 volts, PVC insulated cotton braided andcompounded cables:-

i) 3/0.74 mm (3/0.029") Per Rft. 2.95 6.20 Per Metre 9.75 20.25 ii) 3/0.91 mm (3/0.036") Per Rft. 2.95 6.45 Per Metre 9.75 21.20 iii) 7/0.74 mm (7/0.029") Per Rft. 2.95 7.85 Per Metre 9.75 25.80 iv) 7/0.91 mm (7/0.036") Per Rft. 3.15 9.55 Per Metre 10.35 31.35 v) 7/1.12 mm (7/0.044") Per Rft. 3.50 12.20 Per Metre 11.55 40.00 vi) 7/1.63 mm (7/0.064") Per Rft. 4.05 24.80 Per Metre 13.30 81.30

11 Supply and erection of single core PVC insulated, PVCsheathed copper conductor, 250/440 volts grade cable(BSS-2004), in prelaid PVC pipes/M.S. conduit/G.I.pipe/wooden strip batten/wooden casing andcapping/trenches, etc. (rate for cable only):-

i) 3/0.74 mm (3/0.029") Per Rft. 2.70 8.15 Per Metre 8.80 26.70 ii) 3/0.91 mm (3/0.036") Per Rft. 2.70 10.95 Per Metre 8.80 35.95 iii) 7/0.74 mm (7/0.029") Per Rft. 2.70 14.35 Per Metre 8.80 47.10 iv) 7/0.91 mm (7/0.036") Per Rft. 2.95 21.25 Per Metre 9.75 69.70 v) 7/1.12 mm (7/0.044") Per Rft. 3.35 28.95 Per Metre 10.95 95.00 vi) 7/1.63 mm (7/0.064") Per Rft. 4.10 58.75 Per Metre 13.50 192.75

12 Supply and erection of single core PVC insulated, PVCsheathed copper conductor, 660/1100 volts grade cable, in 38.1 toprelaid G.I. pipe/M.S. conduits/PVC pipe/G.I. wire/trenches, 38.7etc (rate for cable only):-

i) 7/1.63 mm (7/0.064") Per Rft. 4.05 63.75 Per Metre 13.30 209.15 ii) 19/1.32 mm (19/0.052") Per Rft. 4.45 69.40 Per Metre 14.65 227.60 iii) 19/1.63 mm (19/0.064") Per Rft. 4.85 93.70 Per Metre 15.95 307.25 iv) 19/2.11 mm (19/0.083") Per Rft. 5.35 178.50 Per Metre 17.55 585.50 v) 37//1.83 mm (37/0.072") Per Rft. 9.25 247.30 Per Metre 30.25 811.20 vi) 37/2.11 mm (37/0.083") Per Rft. 11.15 310.05 Per Metre 36.60 1,017.00 vii) 37/2.62 mm (37/0.103") Per Rft. 15.75 475.50 Per Metre 51.65 1,559.60

13 Supply and erection of copper conductor cables for service dittoconnection, in prelaid pipe/G.I. wire/trenches, etc. (rate forcable only):-

a) PVC insulated, PVC sheathed twin core, 250/440 volts.

i) 3/0.74 mm (3/0.029") Per Rft. 2.95 7.55 Per Metre 9.75 24.70 ii) 3/0.91 mm (3/0.036") Per Rft. 2.95 20.30 Per Metre 9.75 66.60 iii) 7/0.74 mm (7/0.029") Per Rft. 2.95 27.45 Per Metre 9.75 90.10

chapter-24(Electric Installation) Page 155

Page 157: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

iv) 7/0.91 mm (7/0.036") Per Rft. 3.15 40.10 Per Metre 10.35 131.45 v) 7/1.12 mm (7/0.044") Per Rft. 3.50 57.80 Per Metre 11.55 189.55 vi) 7/1.63 mm (7/0.064") Per Rft. 4.05 104.05 Per Metre 13.30 341.35

b) PVC insulated, PVC sheathed 3 core,660/1100 volt cable:-

i) 3/0.74 mm (3/0.029") Per Rft. 3.15 21.60 Per Metre 10.35 70.90 ii) 3/0.91 mm (3/0.036") Per Rft. 3.15 31.05 Per Metre 10.35 101.80 iii) 7/0.74 mm (7/0.029") Per Rft. 3.15 41.95 Per Metre 10.35 137.65 iv) 7/0.91 mm (7/0.036") Per Rft. 3.50 55.40 Per Metre 11.55 181.70 v) 7/1.12 mm (7/0.044") Per Rft. 3.70 81.70 Per Metre 12.20 268.00 vi) 7/1.63 mm (7/0.064") Per Rft. 4.25 162.85 Per Metre 13.95 534.15

c) PVC insulated, PVC sheathed 4 core,660/1100 volt non armoured cable:-

i) 3/0.74 mm (3/0.029") Per Rft. 3.35 27.85 Per Metre 10.95 91.30 ii) 3/0.91 mm (3/0.036") Per Rft. 3.35 39.15 Per Metre 10.95 128.40 iii) 7/0.74 mm (7/0.029") Per Rft. 3.50 50.55 Per Metre 11.55 165.75 iv) 7/0.91 mm (7/0.036") Per Rft. 3.50 75.15 Per Metre 11.55 246.55 v) 7/1.12 mm (7/0.044") Per Rft. 3.70 107.85 Per Metre 12.20 353.70 vi) 7/1.63 mm (7/0.064") Per Rft. 4.25 212.10 Per Metre 13.95 695.70 vii) 19/1.32 mm (19/0.052") Per Rft. 5.95 268.65 Per Metre 19.50 881.20

d) PVC insulated, PVC sheathed 4 core 660/1100 volt grade cable, Cost of trenches where necessaryarmoured with G.I. wire 16 SWG. is included in the rates.i) 19/1.32 mm (19/0.052") Per Rft. 5.95 295.90 Per Metre 19.50 970.55 ii) 19/1.63 mm (19/0.064") Per Rft. 6.35 396.70 Per Metre 20.90 1,301.20 iii) 19/1.83 mm (19/0.072") Per Rft. 6.70 537.35 Per Metre 21.95 1,762.45 iv) 19/2.11 mm (19/0.083") Per Rft. 7.25 754.70 Per Metre 23.70 2,475.40 v) 37//1.83 mm (37/0.072") Per Rft. 7.45 1,297.10 Per Metre 24.40 4,254.55 vi) 37/2.11 mm (37/0.083") Per Rft. 8.90 1,442.25 Per Metre 29.25 4,730.65 vii) 37/2.36 mm (37/0.093") Per Rft. 10.70 1,584.35 Per Metre 35.10 5,196.70 viii) 37/2.62 mm (37/0.103") Per Rft. 13.40 2,690.15 Per Metre 43.90 8,823.65

14 Supply and erection of M.S. sheet box of 16 SWG, 10 cm (4") 38.1deep, with 4.75 mm thick (3/16") bakelite sheet top, for torecessed wiring, including making holes for regulators, 38.7switches, plugs, etc.

i) 10 x 10 cm (4"x4") Each 43.90 95.55 Each 43.90 95.55 ii) 17.5 x 10 cm (7"x4") Each 54.85 132.75 Each 54.85 132.75 iii) 22.5 x 10 cm (9"x4") Each 73.15 165.55 Each 73.15 165.55

chapter-24(Electric Installation) Page 156

Page 158: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

iv) 20 x 25 cm (8"x10") Each 87.80 248.40 Each 87.80 248.40 v) 25 x 30 cm (10"x12") Each 109.75 335.15 Each 109.75 335.15 vi) 30 x 35 cm (12"x14") Each 146.30 440.05 Each 146.30 440.05

15 Supply and erection of round block of Sahl wood, 10x4 cm Each 12.55 26.45 Each 12.55 26.45 38.1(4"x1½") thick.

16 Supply and erection of teak wood board, 4.5 cm (1¾") thick. 38.1

i) 17.5 x 10 cm (7"x4") Each 17.55 69.15 Each 17.55 69.15 ii) 22.5 x 10 cm (9"x4") Each 17.55 81.15 Each 17.55 81.15 iii) 20 x 25 cm (8"x10") Each 19.50 95.10 Each 19.50 95.10 iv) 25 x 30 cm (10"x12") Each 21.95 127.55 Each 21.95 127.55 v) 30 x 35 cm (12"x14") Each 25.10 178.70 Each 25.10 178.70

17 Supply and erection of Sahl wood board, 4.5 cm (1¾") thick.

i) 17.5 x 10 cm (7"x4") Each 17.55 48.75 Each 17.55 48.75 ii) 22.5 x 10 cm (9"x4") Each 17.55 65.55 Each 17.55 65.55 iii) 20 x 25 cm (8"x10") Each 19.50 80.70 Each 19.50 80.70 iv) 25 x 30 cm (10"x12") Each 21.95 97.55 Each 21.95 97.55 v) 30 x 35 cm (12"x14") Each 25.10 113.90 Each 25.10 113.90

18 Supply and erection of iron/aluminum clad, 500 volts main 38.1 When the base frame is alreadyswitches with kitkat fuses, on angle iron board with 3 mm installed, the labour and composite(1/8") thick M.S. sheet covering, including bonding to earth rates will be reduced as follows:- For with necessary flexible pipe and thimbles, etc. 15 to 35 Amps. by Rs. 21.20 and Rs.

145.50. For 60 to 65 Amps. by Rs.a) double pole: 38.80 and Rs. 252.60. For 100 Amps.

by Rs. 38.80 and Rs. 350.80.i) 15/20 Amp. Each 292.60 1,093.00 Each 292.60 1,093.00 ii) 30/35 Amp. Each 292.60 1,357.00 Each 292.60 1,357.00 iii) 60/65 Amp. Each 438.90 1,821.30 Each 438.90 1,821.30 iv) 100 Amp. Each 438.90 2,392.50 Each 438.90 2,392.50

b) triple pole:i) 15/20 Amp. Each 438.90 1,540.50 Each 438.90 1,540.50 ii) 30/35 Amp. Each 292.60 1,771.00 Each 292.60 1,771.00

c) triple pole with neutral link:

i) 30/35 Amp. Each 292.60 1,891.00 Each 292.60 1,891.00 ii) 60/65 Amp. Each 438.90 2,415.05 Each 438.90 2,415.05 iii) 100 Amp. Each 557.55 3,037.75 Each 557.55 3,037.75

chapter-24(Electric Installation) Page 157

Page 159: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

19 Supply and erection of iron/aluminum clad, 500 volts main When the base frame is alreadyswitches with triple pole and neutral link and HRC fuses, on 38.1 installed, the labour & compositeangle iron board with 3 mm (1/8") thick M.S. sheet covering, rates will be reduced as follows:-including bonding to earth with necessary flexible pipe andthimbles. i) For 60/65 Amp. by Rs. 21.20 and

Rs. 145.50.60/65 Amp Each 438.90 2,483.70 Each 438.90 2,483.70 ii) For 100 to 300 Amp. by Rs. 21.20100 Amp Each 557.55 3,551.60 Each 557.55 3,551.60 and Rs. 350.80150 Amp Each 557.55 4,991.55 Each 557.55 4,991.55 iii) For 400 to 500 Amp. by Rs. 42.20200 Amp Each 1,260.60 7,905.00 Each 1,260.60 7,905.00 and Rs. 526.20300 Amp Each 1,260.60 9,157.80 Each 1,260.60 9,157.80 400 Amp Each 1,767.15 12,272.55 Each 1,767.15 12,272.55 500 Amp Each 1,890.90 15,653.70 Each 1,890.90 15,653.70

20 Supply and erection of iron/aluminum clad, branch ditto When the base frame is alreadydistribution board, 250 volt, on angle iron frame of suitable installed the labour and compositesize with 3 mm (1/8") M.S. sheet covering: rates will be reduced by Rs. 19.50 &

Rs. 152.20 respectively.i) 2 way, 15 Amp per way Each 146.30 466.70 Each 146.30 466.70 ii) 3 way, 15 Amp per way Each 146.30 466.70 Each 146.30 466.70 iii) 4 way, 15 Amp per way Each 146.30 532.70 Each 146.30 532.70 iv) 5 way, 15 Amp per way Each 146.30 586.70 Each 146.30 586.70 v) 6 way, 15 Amp per way Each 146.30 628.70 Each 146.30 628.70 vi) 7 way, 15 Amp per way Each 146.30 676.70 Each 146.30 676.70 vii) 8 way, 15 Amp per way Each 146.30 724.70 Each 146.30 724.70 viii) 9 way, 15 Amp per way Each 146.30 772.70 Each 146.30 772.70 ix) 10 way, 15 Amp per way Each 146.30 844.70 Each 146.30 844.70 x) 11 way, 15 Amp per way Each 146.30 892.70 Each 146.30 892.70 xi) 12 way, 15 Amp per way Each 146.30 946.70 Each 146.30 946.70 xii) 2 way, 30 Amp per way Each 219.45 539.85 Each 219.45 539.85 xiii) 3 way, 30 Amp per way Each 219.45 545.85 Each 219.45 545.85 xiv) 4 way, 30 Amp per way Each 219.45 599.85 Each 219.45 599.85 xv) 5 way, 30 Amp per way Each 219.45 659.85 Each 219.45 659.85 xvi) 6 way, 30 Amp per way Each 219.45 701.85 Each 219.45 701.85 xvii) 7 way, 30 Amp per way Each 219.45 761.85 Each 219.45 761.85 xviii)8 way, 30 Amp per way Each 219.45 809.85 Each 219.45 809.85 xix) 9 way, 30 Amp per way Each 219.45 857.85 Each 219.45 857.85 xx) 10 way, 30 Amp per way Each 219.45 929.85 Each 219.45 929.85

chapter-24(Electric Installation) Page 158

Page 160: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

21 Supply and erection of bus bars, for 500 volts 3 phase A.C. When the base frame is alreadysupply with four copper bars, including glazed porcelain 38.1 installed the labour and compositebridges, on angle iron board, fixed with rag bolts and M.S. rates will be reduced by Rs. 21.20 andsheet box 1.5 mm thick, etc. complete:- Rs. 145.50 respectively.

i) 60 Amp. with 4 copper bars Each 552.75 2,369.25 Each 552.75 2,369.25 size 1½"x1/8" (40 x 3 mm)

ii) 100 Amp. with 4 copper bars Each 552.75 2,369.25 Each 552.75 2,369.25 size 1½"x1/8" (40 x 3 mm)

iii) 200 Amp with 4 copper bars Each 858.00 2,794.50 Each 858.00 2,794.50 size 2"x1/8" (50x 3 mm)

iv) 300 Amp with 4 copper bars Each 1,001.55 2,938.05 Each 1,001.55 2,938.05 size 2"x3/16" (50x 5 mm)

v) 500 Amp with 4 copper Each 676.50 3,126.50 Each 676.50 3,126.50 size 2"x1/4" (50x 6 mm)

22 i) Supply and erection of plain pendent lamp holder, Each 10.30 43.90 Each 10.30 43.90 38.1complete with bakelite lamp holder and flexible twin wire23/0.0076" upto 2 metre length (without bulb and shade).

ii) Extra for additional length of flexible wire, beyond Per Rft. -- 1.65 Per Metre -- 5.45 2 metres.

23 Supply and erection of counter weight pedent with porcelain Each 20.65 138.25 Each 20.65 138.25 38.1

counter weight, and fitting on bakelite lamp holder, withflexible twin wire 23/0.0076" complete (without bulb andshade).

24 Supply and erection of stiff pedent with brass/metal pipe 6.3 Each 28.60 214.60 Each 28.60 214.60 dittocm (2.5") long, and 15 mm (½") dia brass oxidised or painted,along with brass lamp holder with VIR/PVC cable 3/0.74 mm(3/0.029").

25 Supply and erection of 22.5 cm (9") long swan neck plain Each 29.60 66.80 Each 29.60 66.80 dittobrass/steel brass oxidised bracket lamp holder, complete.

26 Supply and erection of wall type/pole type bracket, with double Each 40.85 346.85 Each 40.85 346.85 dittocover water tight reflector, flexible wire and brass bolder.

27 Supply and erection of bakelite button holder shade, large Each 6.75 25.60 Each 6.75 25.60 dittosize.

28 Supply and erection of call bell 220/250 volts, fixed on teak Each 28.60 183.05 Each 28.60 183.05 38.1wood board 17.5x10 cm (7"x4").

chapter-24(Electric Installation) Page 159

Page 161: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

29 Supply and erection of bell push or bed switch, with 5 metres Each 6.20 75.80 Each 6.20 75.80 38.1twin flexible wire 23/0.0076".

30 Supply and erection of ceiling rose, bakelite. Each 10.30 20.20 Each 10.30 20.20 ditto

31 Supply and erection of switches 5 Amp.

i) open type Each 9.90 22.20 Each 9.90 22.20 dittoii) piano type Each 9.90 21.00 Each 9.90 21.00 iii) ring type, recessed Each 9.90 17.10 Each 9.90 17.10 iv) plate type, recessed Each 9.90 41.40 Each 9.90 41.40 v) double control, open type Each 13.30 30.50 Each 13.30 30.50 vi) double control, ring type recessed Each 13.30 31.70 Each 13.30 31.70 vii) double control, piano type Each 13.30 27.95 Each 13.30 27.95

32 Supply and erection of switches 10/15 Amp. ditto

i) open type Each 9.90 31.90 Each 9.90 31.90 ii) recessed type Each 9.90 40.30 Each 9.90 40.30

33 Supply and erection of wall socket with 3 pin 5 Amp, shoe. Each 9.90 61.90 Each 9.90 61.90 ditto

34 Supply and erection of 3 pin. 5 Amp wall socket. Each 9.90 46.30 Each 9.90 46.30 ditto

35 Supply and erection of 3 pin, 10/15 Amp. wall socket. ditto

i) open type Each 9.90 40.30 Each 9.90 40.30 ii) recessed type Each 9.90 76.30 Each 9.90 76.30

36 Supply and erection of 3 pin switch and plug combined, dittorecessed type.

i) 5 Amp Each 9.90 58.70 Each 9.90 58.70 ii) 10/15 Amp Each 9.90 82.90 Each 9.90 82.90

37 Supply and erection of 3 pin 10/15 Amp. wall socket with shoe, Each 9.90 119.50 Each 9.90 119.50 dittoopen type.

38 Supply and erection of cut out, bakelite. ditto

i) open type Each 5.50 23.90 Each 5.50 23.90 ii) recessed type Each 5.50 29.90 Each 5.50 29.90

chapter-24(Electric Installation) Page 160

Page 162: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

39 Supply and erection of button holder. 38.1

i) bakelite large size Each 6.20 13.85 Each 6.20 13.85 ii) brass Each 6.20 21.00 Each 6.20 21.00

40 Supply and erection of brass bracket with holder. Each 8.25 23.05 Each 8.25 23.05 ditto

41 Supply and erection of bell push open/recessed type Each 5.50 15.50 Each 5.50 15.50 ditto(without flexible wire).

42 Supply and erection of kitkat, 500 volt: ditto

i) 15/20 Amp Each 9.75 34.95 Each 9.75 34.95 ii) 30/35 Amp Each 10.65 35.85 Each 10.65 35.85 iii) 60/65 Amp Each 16.25 56.45 Each 16.25 56.45 iv) 100 Amp Each 18.30 92.10 Each 18.30 92.10 v) 200 Amp Each 20.90 133.10 Each 20.90 133.10 vi) 300 Amp Each 20.90 280.70 Each 20.90 280.70 vii) 400 Amp Each 27.05 351.65 Each 27.05 351.65 viii) 500 Amp Each 27.05 501.05 Each 27.05 501.05

43 Supply and erection of tube light, including rod, choke, starter 38.1with frame, flexible wire, including connection from ceilingrose, etc., complete.

i) double rod (80 watts) with two chokes and 2 starters. Per set 169.15 963.55 Per set 169.15 963.55

ii) single rod (40 watts) with one choke and one starter. ditto 135.30 491.70 ditto 135.30 491.70

iii) round tube, 32 watt, with one choke and one starter, Each 135.30 554.10 Each 135.30 554.10 without cover.

iv) round tube, 32 watt with one chock and one starter, with ditto 112.75 651.55 ditto 112.75 651.55 cover.

44 Providing and fixing M.S. iron box for housing main switches, dittomade of 1.5 mm (1/16") thick M.S. sheet, with lockingarrangement, including painting:-i) 60x35x15 cm (24"x14"x6") Each 131.95 1,449.15 Each 131.95 1,449.15 ii) 95x40x20 cm (38"x16"x8") Each 511.50 2,078.30 Each 511.50 2,078.30 iii) 105x52.5x22.5 cm (42"x21"x9") Each 777.65 2,865.75 Each 777.65 2,865.75 iv) 135x70x27.5 cm (54"x28"x11") Each 858.00 4,119.70 Each 858.00 4,119.70

chapter-24(Electric Installation) Page 161

Page 163: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

45 Supply and erection of girder clamp hook, 16 mm (5/8") with Each 22.55 128.15 Each 22.55 128.15 38.1M.S. plate 25x6 mm (1"x¼"), with bolts and nuts for hanging &ceiling fans. 38.10

46 Supply and erection of girder strut, of M.S. tee section Each 28.60 706.20 Each 28.60 706.20 ditto40x40x6 mm (1½"1½"x ¼"), complete with clamp, bolts andnuts, etc., including fixing with cement concrete 1:3:6.

47 Supply and erection of roof suspension hook, 16 mm (5/8") Each 30.65 1,160.90 Each 30.65 1,160.90 38.1dia rod with 75x40x3 mm (3"x1½"x1/8") M.S. steel channel, with clamp, bolts and nuts, etc., including fixing with cementconcrete 1:3:6.

48 Supply and erection of roof suspension hook of M.S plate Each 40.85 457.05 Each 40.85 457.05 75x40x12.7mm (3"x1½"x½") with 16 mm (5/8") hook completewith bolts, nuts and fixing with cement concrete 1:3:6

49 Supply and erection of 3/8" (10 mm) dia M.S. bar fan hook, Each 12.70 27.10 Each 12.70 27.10 dittoplaced at the time of casting of slab.

50 Erection of circular L.T. pole in cement concrete 1:3:6 one Each 314.10 886.20 Each 314.10 886.20 38.12metre below ground level (excluding the cost of pole),including cement concrete collar (1:2:4) excavation offoundation, and finishing surface.

51 Supply and erection of bracket of M.S. channel 75x40x6 mm (3"x1½"x¼") section:-i) 0.60 metre (2') long for 2 lines. Each 88.40 519.65 Each 88.40 519.65 ii) 1.200 metre (4') long for 4 lines. Each 103.15 1,046.15 Each 103.15 1,046.15

52 Supply and erection of anchor rod Henley type for pole, Per Rft. 5.30 17.10 Per Metre 17.45 56.05 38.14including necessary clamps and 7/12" stay wire, strainingscrews, etc., erected in cement concrete 1:3:6 and collar ofcement concrete.

43 Supply and erection of stay for house service pipe, erected Per Rft. 7.65 26.30 Per Metre 25.10 86.30 dittowith straining screws and 7/14" stay wire, complete.

54 Supply and erection of house service pipe Henley (G.I. pipe Per Rft. 32.05 93.55 Per Metre 105.05 306.90 water quality) or pole type, 50 mm (2") dia, erected to instalinsulated overhead line,include shackle insulator for holdinginsulated wire and straining devices for bearer wire and otheraccessories etc., complete.

chapter-24(Electric Installation) Page 162

Page 164: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

55 Supply and erection of house service pipe 50 mm (2") dia G.I. Per Rft. 31.00 194.80 Per Metre 101.75 639.00 pipe Henley or pole type for bare copper wire overhead line,including shackle insulator, straining devices and otheraccessories etc.

56 Supply and erection of lightning arrestor horn type, complete. Each 171.60 2,091.60 Each 171.60 2,091.60

57 Supply and erection of shackle insulator, medium size. Each 23.35 173.35 Each 23.35 173.35 38.12

58 Supply and erection of pin insulator, green medium size. Each 23.35 65.35 Each 23.35 65.35 ditto

59 Supply and erection of bare copper conductor wire No. 2 to Per Kg 12.15 494.95 Per Kg 12.15 494.95 38.1No. 10 SWG, including binding wire No. 16 SWG.

60 Supply and erection of G.I. wire of all sizes, including binding Per Kg 12.15 98.95 Per Kg 12.15 98.95 dittowire No. 16 SWG for support of rubber wire or earthing wire,pole to pole etc.

61 Wiring overhead line in 2 single core, PVC/weather proof 38.12cable, on G.I. wire No. 8 SWG bearer wire and in house service pipe, including connection through joint box.

i) 3/0.74 mm (3/0.029") Per Rft. 2.90 4.75 Per Metre 9.55 15.50 ii) 7/0.74 mm (7/0.029") ditto 2.90 10.60 ditto 9.55 34.75 iii) 7/0.91 mm (7/0.036") ditto 2.90 13.15 ditto 9.55 43.15 iv) 7/1.12 mm (7/0.044") ditto 2.90 10.45 ditto 9.55 34.30

62 Supply and erection of all aluminum stranded hard drawn bare Per Rft. 5.80 17.50 Per Metre 19.05 57.45 38.1conductor, of size 7/3.099 mm (7/0.122").

63 Supply and erection of street light pole bracket 30 mm (1¼") Each 143.00 743.10 Each 143.00 743.10 G.I. pipe 2 metre long, complete with 2 No. pole clamp.

64 Supply and erection of pole mounted street light, holders, shade and glass, etc., for fitting 125/250 watts mercury vapourlamp (excluding cost of lamps):

i) G.E.C. design Each 286.00 2,530.00 Each 286.00 2,530.00 ii) Philips design ditto 286.00 2,956.00 ditto 286.00 2,956.00

65 Supply and fitting of mercury vapour lamp, complete with

choke set.i) 125 watt lamp Each 112.75 952.75 Each 112.75 952.75 ii) 250 watt lamp ditto 135.30 1,755.30 ditto 135.30 1,755.30

chapter-24(Electric Installation) Page 163

Page 165: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

66 Manufacture and erection of angle iron lattice steel structure Each 5,153.55 17,255.25 Each 5,153.55 17,255.25 38.13 The composite rate will be reducedpole (36.0') 10,923 mm long 9348 mm (30.5') above ground or increased by Rs. 36.50 for eachlevel) 355 mm (14") square at base and 204 mm (8") square at (100 mm) of reduction or addition intop for electric distribution line, using 1¼"x1¼"x3/16" (30x30x5 the height of the pole above groundmm) angle iron legs and ¾"x¾"1/8" (20x20x3 mm) angle iron level.bracing 420 mm (17") long fixed between legs on all the foursides in diagonal position, and 1¾"x1¾"x3/16"(45x45x5 mm)angle iron on top and 4 bands of M.S. flat iron 2"x¼" (50x6 mm)305 mm (12") centre to centre, as per standard drawingincluding silver painting of pole 3 coats, excavation and refillingof foundation cement concrete 1:2:4. 6'-0"x1'-8"x1'-8"(1807x500x500 mm) for foundation, etc, complete in allrespects.

67 Manufacture and erection of galvanized angle iron lattice steel Each 1,801.85 23,476.90 Each 1,801.85 23,476.90 38.13 The composite rate will be reducedstructure pole 37 ft. (11.25 m) long 30 ft. (9 m) above ground or increased by Rs. 237.00 for eachlevel), 34" square (850 mm) at base, 13.75" (35 mm) square at foot (300 mm) of reduction ortop, for electric distribution line, using 2"x2"x5/32" addition in the height of the pole(50x50x4mm) high tensile steel angle iron legs, and 1-3/8"x above ground level.1-3/8"x1/8" (35x35x3 mm) M.S. angle iron bracings fixedbetween legs on all the four sides in diagonal position as perstandard drawing including silver painting of pole, excavationand refilling of foundation, one ft. (300 mm) thick cementconcrete 1:3:6 foundation of outer size 8'x3½'x3½'(2400x1050x1050 mm), etc. complete in all respects.

68 Earthing of iron clad/aluminum switches, etc. with G.I. wire No. Job 610.50 2,846.40 Job 610.50 2,846.40 8 SWG in G.I. pipe 15 mm (½") dia, recessed or on surface ofwall and floor, complete with 1.5 metre long G.I. pipe, 50 mm(2") dia with reducing socket 4 to 5 metre below ground level,and 2 metre away from building plinth.

69 Earthing of Metallic cases, etc. with G.I. wire No. 8 SWG, in 38.1115 mm (½") dia G.I. pipe, best quality:-i) on surface, including clamps, etc. Per Rft. 6.55 44.45 Per Metre 21.45 145.85 ii) recessed in wall, including hooks, ditto 14.90 52.05 ditto 48.85 170.65

jharries and making good surface.

70 Bonding to earth with wire on surface, including cost of wire, dittoclamps, thimbles, etc.

a) G.I. wire:i) 8 SWG Per Rft. 3.00 8.00 Per Metre 9.90 26.25 ii) 16 SWG ditto 3.00 4.35 ditto 9.90 14.25

chapter-24(Electric Installation) Page 164

Page 166: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

b) Copper wire:

i) 16 SWG Per Rft. 3.00 6.75 Per Metre 9.90 22.10 ii) 20 SWG ditto 3.00 4.60 ditto 9.90 15.05

71 Erection only, of lightning conductor of copper tape, including Per Rft. 10.45 14.00 Per Metre 34.30 45.95 38.11 Rate includes all materials requiredsupply of copper staple and copper nails and cement, sand in erection (excluding copper tapemortar. lightning conductor).

72 Supply and erection of 600x600x3 mm (2'x2'x1/8") copper Each 407.00 3,716.85 Each 407.00 3,716.85 dittoplate, including revitting to copper tape and placing in mixtureof salt and charcoal, etc.

73 Supply and erection of copper tape, including copper staple copper nails, cement, sand, etc.

i) tape 40x3 mm (1½"x1/8") Per Rft. 14.90 109.45 Per Metre 48.85 359.05 ii) tape 50x3 mm (2"x1/8") ditto 14.90 127.75 ditto 48.85 419.05

74 Supply and erection of 25 mm (1") dia and one metre long Job 286.00 2,176.00 Job 286.00 2,176.00 lightning conductor copper rod with 5 spikes on ball and base,etc. complete.

75 Supply and erection of electric energy meter, including meter 38.1testing fee, etc.

a) single phase:

i) 1x10 Amp, 250 volts Each 123.75 1,887.75 Each 123.75 1,887.75 ii) 1x30 Amp, 250 volts ditto 123.75 1,887.75 ditto 123.75 1,887.75

b) three phase, 4 wires:

i) 3x15 Amp, 400 volts Each 247.50 5,365.50 Each 247.50 5,365.50 ii) 3x50 Amp, 400 volts ditto 338.25 5,456.25 ditto 338.25 5,456.25 iii) 3x80 Amp, 400 volts ditto 338.25 5,456.25 ditto 338.25 5,456.25

76 Rewinding of A.C. ceiling fan, capacitor type, including cost of The credit of out turn of dismantledwire, leatheride paper cotton tape, soldering, etc. material has been accounted for in

the rate.i) 1200 mm (48") sweep, 275-300 RPM. Each 231.00 670.50 Each 231.00 670.50 ii) 1400 mm (56") sweep, 250-275 RPM. ditto 253.70 662.25 ditto 253.70 662.25

chapter-24(Electric Installation) Page 165

Page 167: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

77 Rewinding of A.C. exhaust fan, including cost of wire, The credit of out turn of dismantledleatheride paper, cotton tape, soldering, etc. material has been accounted for in

the rate.i) 375 mm (15") sweep, and 1300-1500 RPM Each 165.00 432.05 Each 165.00 432.05 ii) 450 mm (18") sweep, and 1300-1500 RPM ditto 165.00 468.80 ditto 165.00 468.80

78 Rewinding of pedestal fan 600 mm (24") sweep, and 900-950 Each 198.00 536.65 Each 198.00 536.65 The credit of out turn of dismantledRPM, including wire, leatheride paper, cotton, tape, etc. material has been accounted for in

the rate.79 Supply and fitting of regulator knob with shaft Each 30.95 90.95 Each 30.95 90.95 38.1

and plate of electric fan regulator.

80 Supply and fitting of capacitor 2.2 uF, for ceiling fans. Each 24.75 60.75 Each 24.75 60.75 ditto

81 Supply and fitting of ball bearing of size Each 30.95 138.95 Each 30.95 138.95 ditto6201, 6202 or 6203 for ceiling fans.

82 Rewinding regulator of ceiling fan 48"/56" (1200/1400 mm) Each 61.90 126.15 Each 61.90 126.15 The credit out turn of dismantledsweep, to control 3/4 speeds. material has been accounted for in

the rate.83 Erection of ceiling fan alongwith regulator (all sizes), including Each 112.05 125.65 Each 112.05 125.65

carriage from local Railway Station/Store to site of work,electric wire/cable for suspension rod and board connection,and cutting, threading on the rod, where necessary.

chapter-24(Electric Installation) Page 166

Page 168: MRS Jan-Mar 09

IRON WORKThe Rates for all finished works include the removal of surplus debris, unused material and byproduct

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

Railway Track, etc.

1 Laying, linking and packing tramway line. 100Lft. 890.05 Metre 29.20

2 Dismantling tramway track. 100Lft. 300.30 Metre 9.85

3 Laying, linking of B.G. track, including packing, 100Lft. 2293.50 Metre 75.25straightening and leveling.

4 Linking points and crossings, complete with fastenings. Each 2283.60 Each 2283.60

5 Bending or strainghtening B.G. rail with Jim Each 280.50 Each 280.50Crow. Point Point

6 Fixing street lamp posts. Each 308.55 Each 308.55

7 Binding ends of sleepers and timber of all sizes and kinds, 100 Nos 2776.95 100 Nos 2776.95including spreading and restacking.

8 Opening stacks of sleepers and timber of all kinds and 100 Nos 351.55 100 Nos 351.55sizes, including spreading for inspection and restackingwithin one chain lead.

IRON WORK

9 Small iron work, such as gusset plates, knees, bends, Per Cwt 1650.00 5649.85 100 Kg 3248.05 11121.75stirrups, straps, rings, etc. including cutting, drilling,riveting, handling, assembling and fixing; but excludingerection in position.

10 Fabrication of heavy steel work, with angle, tees, flat iron Per Cwt 437.60 4241.95 100 Kg 861.40 8350.30round iron and sheet iron for making trusses, girders,tanks, etc., including cutting, drilling, revitting, handling,assembling and fixing, but excluding erection in position.

11 Erection and fitting in position iron trusses, staging of Per Cwt 168.65 100 Kg 332.00water tanks, etc.

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-25(Iron work) Page 167

Page 169: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

12 Fixing corrugated iron sheet, including revitting, etc. 100 Sft. 686.40 sq.m 73.85

13 Erecting corrugated iron sheet tanks, upto 20' Per Cwt 311.45 100 Kg 613.15(6 m) height.

14 Erecting rolled steel beams or old rails, in roofs, etc., Per Cwt 183.70 100 Kg 361.60erection and fixing in position.

15 Erecting rolled steel beams or rails, erection for posts etc. Per Cwt 89.95 100 Kg 177.00(other than in roofs).

16 Making bolts and nuts of iron rods. Per Cwt 1173.15 5642.40 100 Kg 2309.35 11107.10

17 Cutting rails, rolled steel joists and beams, with hacksaw:-

a) upto 6" size (150 mm) Per Cut 113.85 Per Cut 113.85b) above 6" size (150 mm) Per Cut 167.65 Per Cut 167.65

18 Cutting rails or rolled steel beams of size below 6" Per 54.20 Per Cwt 54.20(150 mm), with jim. Cut Cut

19 Bending rolled steel beams or rails. Per 52.95 254.50 Per 52.95 254.50Bend Bend

20 Drilling holes, in plates upto ½" (13 mm) thick, per inch Per 23.10 Per 23.10dia, (25mm) or part thereof. Hole Hole

21 Extra for drilling holes in plates over ½" (13 mm) thick, per Per 12.95 Per 12.95inch dia, (25 mm) or part thereof. Hole Hole

22 Rivetting 1/8" dia (3 mm). 100 Nos 231.00 100 Nos 231.00

23 Cutting out Rivets, all sizes. 100 Nos 759.00 100 Nos 759.00

24 Fitting and erection of gutters of sheet iron. Per Lft. 40.75 Metre 133.65

25 Cutting and fixing iron bars, for barred windows. Per bar 23.10 Per bar 23.10

26 Cutting G.I. sheets. Each 9.35 Each 9.35Cut Cut

27 Notching web or foot of rail posts, for housing rail beams Per 235.40 369.80 Per 235.40 369.80Notch Notch

chapter-25(Iron work) Page 168

Page 170: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

28 Hoop iron netted trellis work fixed with nails Per Sft. 15.20 sq.m 163.35

29 Fixing zinc iron or G.I. sheet on table tops Per Sft. 10.10 sq.m 108.60

30 Making and fixing steel grated doors, complete wit Per Sft. 74.95 489.80 sq.m 806.55 5270.30locking arrangement, angle iron frame 2"x2"x3/8(50x50x10 mm) and ¾" (20 mm) square bars 4" (100 mm)centre to centre.

31 Making and fixing steel grated door with 1/16" thic Per Sft. 79.40 582.85 sq.m 854.10 6271.40(1.5mm) sheeting, including angle iron frame 2"x2"x3/8(50x50x10 mm) and ¾" (20 mm) square bars 4" (100 mm)centre to centre, with locking arrangement

32 Making and fixing grating in opening, including fixing Per Sft. 31.00 243.50 sq.m 333.35 2619.90site with flat iron 2"x3/8" (50x10 mm) and ¾" (19 mm)square bars, at 4" (100 mm) centre to centre.

33 Providing and fixing stair railing (all types and designs) o Per Rft. 228.85 611.10 Metre 750.75 2004.90 The composite rate shall behard wood, including bends and corners, screwed to reduced or increased by Rs. 31.905/8"x5/8" (16x16 mm) M.S. square bars 2.75 ft. (838 mm) for each foot of reduction orhigh, at 5.5 inch (137 mm) inch centre to centre, fixed in addition in the height of the squaresteps of stairs, M.S. flat 1"x1/8" (25x3 mm) welded to bars.bars, painting/polishing 3 coats, etc. complete

34 Providing/fixing stair railing consisting of M.S. Box sectio Per Rft. 114.65 294.55 Metre 376.20 966.35size 1-1/2"x3" of 16 SWG welded with M.S. flat 1"x1/8"continuously and welded over M.S. square bars 5/8"x5/8"punched in M.S. flat 2 ¾' high @ 5½" c/c fixed in steps ofstair I/C painting 3 coats complete

35 Providing and fixing terrace railing of 2" (50 mm) i/ Per Rft. 83.30 438.55 Metre 273.29 1438.81 -do-conduit pipe 16 SWG, welded with 5/8"x5/8" (16x16 mm)square bar 2.75 ft. (838 mm) high fixed at 5" (125 mm)centre to centre, in reinforced cement concrete slab withsuitable arrangement, complete in all respects, as pedesign and drawing

36 Providing and fixing collapsible gate made of 2"x2"x"¼ Per Sft. 143.60 483.30 sq.m 1544.95 5200.30(50x50x6 mm) tee iron at top and bottom, channel ironverticals ¾"x¼"x¼"x1/8" (20x6x6x3 mm) at 3" (75 mm) to5" (125 mm) centre to centre (approximate) and flat ironcrosses 3"x3/16" (75x5 mm), and best quality rollers abottom of 3" (75 mm) diameter including holdfastshandles 12" (300 mm) long of ¾"x¼"x¼"x1/8" (20x6x6x3mm) channel iron, locking arrangement inside andoutside, painting 3 coats of black Japan enameledcomplete in working order

chapter-25(Iron work) Page 169

Page 171: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

37 Providing and fixing 24 SWG G.I. sheet rolling shutter, Per Sft. 34.80 183.95 sq.m 374.30 1979.40consisting of steel frame of M.S. channel 2"x1¼"x1/8"(50x30x3 mm), angle iron 1½"x1½"x1/8" (40x40x3 mm),M.S. plate 1'x1'x1/8" (300x300x3 mm), G.I. pipe 1½" (37mm) dia, springs 2' (600 mm) centre to centre, rollers, 24SWG G.I. covering 1 ft. x 1 ft. (300x300 mm), handles,holdfast, and painting three coats, complete in allrespects.

38 Providing and fixing M.S. angle iron 1½"x1½"x¼" Per Rft. 17.45 102.50 Metre 57.30 336.20(40x40x6 mm) edge protector nozing of steps of stairs,having holdfast or 3/8" (10 mm) dia M.S. bars 8" (200 mm)long welded at 2' (600 mm) centre to centre andembedded in cement concrete on steps, complete in allrespects.

39 Providing and fixing stair railing of 2½" (63 mm) i/d G.I. Per Rft. 101.30 433.80 Metre 332.30 1423.30 The composite rate shall bepipe, welded with 5/8"x5/8" (16x16 mm) square M.S. bars reduced or increased by Rs. 31.902'-9" (838 mm) high, fixed in each step, complete in all for each foot of reduction orrespects, including painting, polishing three coats. addition in the height of the square

bars.40 Providing and fixing G.I. wire gauze 24 SWG, 12x12 Per Sft. 16.50 51.55 sq.m 177.55 554.90

meshes per square inch, fixed to steel windows or doors,etc., complete in all respects.

41 Providing and fixing steel windows with openable glazedpanels, using beam section for frame 1½"x1"x5/8"x1/8" For fixed pannels, the composite(40x25x16x3 mm), Z-section for leaves ¾"x1"x¾"x1/8" rate will be reduced by Rs.30.00(20x25x20x3 mm), T-section sashes 1"x1"x1/8" (25x25x3 per Sft. or Rs. 305.00 per Sq. mm), glass panes, wooden screed for glazing embedded metre.over a thin layer of putty duly screwed with leaves, brassfittings, holdfast, duly painted, complete in all respects,including all cost of material and labour, etc. as perapproved design and as directed by theEngineer-in-charge:-

a) without wire gauze:

i) glass pane 2 mm thick Per Sft. 42.50 121.20 sq.m 457.45 1304.20ii) glass pane 2.5 mm thick ditto 42.50 218.35 ditto 457.45 2349.35iii) glass pane 3 mm thick ditto 42.50 223.15 ditto 457.45 2401.00iv) glass pane 4 mm thick ditto 42.50 225.55 ditto 457.45 2426.80v) glass pane 5 mm thick ditto 42.50 227.95 ditto 457.45 2452.65

chapter-25(Iron work) Page 170

Page 172: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

b) fixed with wire gauze, 22 SWG

i) glass pane 2 mm thick Per Sft. 56.20 254.90 sq.m 604.85 2742.95ii) glass pane 2.5 mm thick ditto 56.20 257.30 ditto 604.85 2768.75iii) glass pane 3 mm thick ditto 56.20 262.10 ditto 604.85 2820.40iv) glass pane 4 mm thick ditto 56.20 264.50 ditto 604.85 2846.25v) glass pane 5 mm thick ditto 56.20 266.90 ditto 604.85 2872.05

42 Providing and fixing steel windows using M.S. sheet (16SWG) moulded tubular pipe 1½"x1½" (40x40mm) forframe and 1¼"x1¼" (30x30mm) for leaves including M.S.square bars ¼"x¼" (6x6 mm) welded around each panelof frame, 5 mm thick glass panes fixed with double M.S.square tubular pipe 3/8"x3/8" (10x10mm) (22 SWG)beading with U' shaped rubber lining, brass fitting,holdfast, including painting three coats complete in allrespects.a) For openable panels fixed with wire Per Sft. 30.20 217.65 Sq.m 325.10 2342.10

gauze 24 SWG, 12x12 mesh and glasspanes ¼" (6 mm) thick.

b) For fixed panels without wire gauze. ditto 29.05 116.25 ditto 312.65 1250.85

43 Providing and fixing windows consisting of M.S. box Per Sft. 41.90 302.10 Sq.m 451.00 3250.35section frame 2"x1½" (50x40mm), leaves frame 1-½"x1"(40x25mm) box section frame for glazing 3/8"x3/8"(10x10mm) using 16 SWG sheet 'U' shaped rubbersupported with 1"x1/8" (25x3mm) M.S. flat for fixing 3/16"(5 mm) thick glass panes M.S. box section ½"x½"(13x13mm) of 16 SWG for fixing 24 SWG wire gauze onouter side by means of ¾"x1/8" (20x3mm) M.S. flat andscrews I/C all C.P. fitting and painting 3 coats complete inall respect.

44 Providing and fixing windows consisting of M.S. box Per Sft. 51.65 354.85 Per Sft. 555.85 3817.95section frame 2"x1½", (50x40mm) leaves frame 1½"x1"(40x25mm) box section frame for glazing 3/8"x3/8"(10x10mm) using 16 SWG sheet 'U' shaped rubbersupported with 1"x1/8" (25x3mm) M.S. flat for fixing 3/16"(5 mm) thick glass panes M.S. box section ½"x½"(13x13mm) of 16 SWG for fixing 24 SWG wire gauze onouter side by means of ¾"x1/8" (20x3mm) M.S. flat andscrews including grill of M.S. flat ½"x1/8" (13x3mm) or¼"x¼" (6x6mm) square bar with independent frame of½"x½" (13x13mm) box section of 16 SWG i/c all C.P.fitting and painting 3 coats complete in all respect.

chapter-25(Iron work) Page 171

Page 173: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

45 Flapping G.I. pipes for bath room drains. Each 297.00 330.60 Each 297.00 330.60

46 Supply and fixing iron grating for fire place. Per Sft. 84.15 180.15 sq.m 905.45 1938.40

47 Fixing copper flashing, including cutting of sheets, Per Lft. 28.60 Metre 93.80grooving and rivetting.

48 Providing and fixing angle iron railing, using 2½"x2½"x3/8" Per Rft. 43.40 580.50 Metre 142.35 1904.45(63x63x10 mm) angle iron post 4½" (113 mm) long, 5' to6' (1500 to 1800 mm) apart, with 2½"x2½"x3/8" (63x63x10mm) angle iron top rail, and two rows of M.S. flat 2½"x¼"(63x6 mm) including fixing to side of Bridge/structure withU.bolt 1½' (450 mm) long ¾" (20 mm) dia, painting posts,etc. complete in all respects.

49 Providing and fixing barbed wire fencing on compound 100Rft. 1029.40 6860.60 Metre 33.75 225.10wall, consisting of 1½"x1½"x3/16" (40x40x5 mm), angleiron post 3¼ ft. (990 mm) long, 5 to 6 ft. (1500 to 1800mm) centre to centre, embedded in cement concrete1:4:8, base of size 9"x9"x12" (225x225x300 mm), andthree rows of barbed wire, painting posts, etc. complete inall respects.

50 Providing and fixing barbed wire fencing on compound 100Rft. 1728.75 8674.50 Metre 56.70 284.60wall, consisting of 1½"x1½"x3/16" (40x40x5mm) angleiron post 3' (900 mm) long, 4' (1200 mm) apart embeddedin cement concrete 1:4:8 base of size 6"x6"x9"(150x150x225 mm) and 4 rows of barbed wire, includingbinding wire, painting posts, etc. complete in all respects.

51 Providing and fixing all types of partly fixed and partly (1) Increase rate by Rs. 30.00 per openable glazed anodised bronze colour aluminium Sft or Rs.322.80 per Sq-metre ifdoors, using delux section of M/s Al-Cop or Pakistan sections thickness is 2 mm.Cables, having chowkat frame of size 40 x 100 mm (1½" x (2) Reduce rate by Rs.20.00 per Sft4") and leaf frame of 60x40mm (2½"x1½") wide sections or Rs.215.20 per Sq-metre ifincluding the cost of ¼" (5 mm) thick imported tinted sections are of dull aluminimumglass with aluminium triangular gola and rubber gasket to Per Sft 54.30 336.30 sq. m 584.25 3618.60 shade.support the glass and leaf edging, using approved (3) Reduce rate by Rs.20.00 perstandard fittings, locks, 3" (75 mm) wide long handles Sft or Rs.215.20 per Sq-metre ifetc., and hardware any required as approved by the local glass is used.engineer in-charge.

chapter-25(Iron work) Page 172

Page 174: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

52 Providing and fitting all types of glazed aluminium Per Sft 73.62 292.47 sq. m 792.10 3146.95 (1) Reduce rate by Rs.20.00 per Sftwindows of anodised bronze colour partly fixed and partly or Rs.215.20 per Sq-metre ifsliding using delux sections of M/s Al-Cop or Pakistan section thickness is 1.2 mm.Cables having frame size of 100 x 20 mm (4"x¾") andleaf frame sections of 50 x 20 mm (2"x¾"), all of 1.6mm (2) Reduce rate by Rs.20.00 per Sftthickness including 5 mm thick imported tinted glass with or Rs.215.20 per Sq-metre ifrubber gasket using approved standard latches, hardware sections are of dull aluminiumetc., as approved by the Engineer in-charge. shade.

(3) Reduce rate by Rs.20.00 per Sftor Rs.215.20 per sq-metre if localglass is used.

chapter-25(Iron work) Page 173

Page 175: MRS Jan-Mar 09

MISCELLANEOUSRates for all finished works include the removal of surplus debris, unused material and byproduc

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Notice board made of cement, sand mortar 1:3. Per Sft. 42.90 49.80 Per 461.60 536.00 The board is to be of cementsq.m plaster ½" (13 mm) thick, with 2"

(50 mm) wide and 1" (25 mm) thick beading.

2 Fixing handles to iron hammers. Each 51.55 - Each 51.55 -

3 Providing and fixing barbed wire fencing, with 4 horizontal 100Lft. 3,718.45 15,895.50 L.m. 122.00 521.50 Vertical bars in straining andand 2 number cross wires fixed with posts of R.C.C., 1:2:4 stiffening posts to be 4 No. each by(straining posts 7'x9"x9" (2.13 mx225x225 mm) at 100' ½" (13 mm) dia and for(30 m) centre to centre, stiffening posts 7'x6"x6" (2.13 intermediate posts to be 4 No. ofmx150x150 mm) at 50 ft. (15 m) interval and intermediate 3/8" (10 mm) dia Stirrups for allpost 7'x5"x5" (2.13 mx125x125 mm) at 8 ft.(2.4 m) centre posts to be ¼" (6 mm) dia. at 12"to centre), including cost of steel, its fabrication and (300 mm) centre to centre.placing of steel reinforcement, eye bolts, washers, etc.complete.

Surveying

4 Supplying Bamboo Jhandies 10' to 12' (3.00 to 3.65 m) with Each 27.70 120.10 Each 27.70 120.10 iron shoes, and flags 15" (375mm) square.

5 Supplying wooden pegs for levelling, 1½" (40 mm) dia, 6" 100Nos. 82.50 98.10 100Nos. 82.50 98.10 (150mm) long.

6 Supplying wooden pegs for alignment, 2" to 3" dia (50 to 100Nos. 198.00 378.00 100Nos. 198.00 378.00 75 mm), 9" (225 mm) long.

7 Fixing enamalled iron gauges flush with masonry, including Per Lft. 51.15 58.35 Per 167.80 191.45 cost of hooks. L.M.

8 Placing boundary pillars in position, including digging pits. Each 34.10 - Each 34.10 -

9 Fixing main line type distance mark in position, including Each 138.60 247.95 Each 138.60 247.95 Composite rate does not includemaking 1:3:6 cement concrete base block, size cost of iron distance marks.14"x10"x15" (350x250x375 mm).

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

chapter-26( Misc) Page 174

Page 176: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

Hand Pumps & Pressure Pipes

10 Cutting pipes, upto 2" (50 mm) dia. Per cut 28.60 - Per cut 28.60 -

11 Cutting pipe, above 2" (50 mm) dia. Per cut 52.80 - Per cut 52.80 -

12 Threading pipe ends, 1½" (40 mm) to 4" (100 mm) dia. Each 36.85 - Each 36.85 - End End

13 Assembling 1½" (40 mm) dia pressure pipe. 100Lft. 117.55 - Per Metre 3.85 -

14 Boring and fixing 1½" (40 mm) dia pressure pipe:

a) in ordinary soil Per Lft. 41.65 - Per Metre 136.70 - b) in clay Per Lft. 25.40 - Per Metre 83.35 - c) in shingle Per Lft. 36.55 - Per Metre 119.90 -

15 Repairs to hand pump, pulling out and refitting. Per Lft. 19.45 - Per Metre 63.90 -

16 Fixing hand pump (Machine only) Each 99.00 - Each 99.00 -

Rest House Furniture & Fuel, etc.

17 Washing Niwar of bed. Per bed 272.25 292.40 Per bed 272.25 292.40

18 Washing Durries. 100Sft. 363.00 411.00 sq.m 39.05 44.25

19 Recaning chairs:

i) office chairs, single caning seat only. Each 138.60 169.20 Each 138.60 169.20 ii) office chairs, double canning seat only. Each 178.20 221.40 Each 178.20 221.40 iii) office chairs, single caning back only. Each 99.00 100.95 Each 99.00 100.95 iv) office chairs, double caning back only. Each 158.40 174.95 Each 158.40 174.95 v) easy chairs, single caning seat only. Each 99.00 140.05 Each 99.00 140.05 vi) easy chairs, double caning seat only. Each 277.20 338.40 Each 277.20 338.40 vii) easy chairs, single caning only, back and seat in one Each 396.00 648.00 Each 396.00 648.00

piece.viii) easy chairs, double caning back & seat in one piece Each 594.00 1,206.00 Each 594.00 1,206.00

or couches with caned area about 16 Sft (1.5 Sqm).

20 Making and fixing Hat pegs ordinary. Each 89.10 177.90 Each 89.10 177.90

21 Weaving charpoy. Each 248.80 - Each 248.80 -

chapter-26( Misc) Page 175

Page 177: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

22 Sweeping chimney Each 60.50 61.70 Each 60.50 61.70

23 Picture railing, including making, fixing and painting Per Lft. 25.45 65.70 Per LM 83.45 215.55

24 Cutting fuel wood, from plantation 100Kg 81.05 - 100Kg 81.05 -

25 Splitting fuel wood 100Kg 169.70 - 100Kg 169.70 -

26 Burning charcoal, including loading, unloading and 100Kg of 274.80 - 100Kg of 274.80 - repairing kilns. Char- Char-

coal coal

27 Filling cement bags with coal and sewing (including cos 100Cft. 744.15 747.05 cu.m 262.85 263.85 of strings).

28 Supplying manure. Cart 47.85 167.85 Cart 47.85 167.85 Capacity of cart, 20 Cft. (0.57Load Load cu.m).

29 Washing punkha frills. Each 76.55 - Each 76.55 -

30 Washing:-

a) table cloth Each 19.15 - Each 19.15 - b) napkins, dusters, etc Each 12.75 - Each 12.75 -

31 Hoisting and placing sleepers for centring, includin Each 35.50 - Each 35.50 - carriage within one chain No. No.

32 Dismantling sleepers from centring, including stackin Each 36.55 - Each 36.55 - within one chain No. No.

33 Dredging Sumps. Per 1,361.25 - Per 1,361.25 - Not less than five gangmen to beShift Shift employed for each shift to ensur

effective dredging

34 Fixing `U' bolt in masonry or concrete, including levellin Each 126.50 - Each 126.50 - and tying for fixing angle iron post

35 Bailing out water:-

a) by hand 1000 Cft. 1,089.00 - cu.m 38.45 - Rate includes cost of providingb) by pump 1000 Cft. 118.60 210.25 ditto 4.20 7.45 pump, POL and operation charges

etc.

36 Drilling holes in R.C. Trough Per Nos. 71.50 - Per Nos. 71.50 -

chapter-26( Misc) Page 176

Page 178: MRS Jan-Mar 09

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st QUARTER OF 2009 (January to March) DISTRICT RAWALPINDI

37 Supplying and laying polythene sheet over D.P.C. unde The rate includes overlapsfloors and on roofs, etc

i) 300 gauge (.003" thick) Per Sft. 0.55 1.20 sq.m 6.20 13.05 ii) 500 gauge (.005" thick) Per Sft. 1.15 2.10 sq.m 12.35 22.45

38 Laying 2" (50 mm) thick sand and bitumen carpet, on top 100Sft. 837.05 3,795.50 sq.m 90.05 408.40 of foundation of oil tank.

39 Cutting hole 4"x6" (100x150 mm) in stone masonry or Per 146.15 - Per 146.15 - Same rate to be paid for other typebrick wall with chisel, repairing masonry and removing Hole Hole of masonry and R.C.C. work.debris within one chain lead.

40 Making 1½"x1½" (40x40 mm) groove in wall of stone or Per 127.90 - Per 127.90 - brick masonry in cement for fixing planks upto 9" (225 Plank Plankmm) deep.

41 Drilling holes in stone or brick masonry upto 2" (50 mm) Per hole 36.30 Per hole 14.50 dia, per inch (25 mm) depth. per inch per c.m

depth depth

42 Spraying anti-termite liquid mixed with water in the ratio of 100Sft. of 11.20 142.00 sq.m of 1.20 15.30 1:40. each each

spray spray

43 Providing and fixing barbed wire fencing, with 4 horizontaland two cross wires, with R.C.C. 1:2:4 posts, 5.5'x6"x9"(1.68mx150mmx225 mm) at 8 ft. (2.45 m) centre tocentre, reinforced with 4 No. 3/8" (10 mm) dia vertical barsand 1/8" (3 mm) dia stirrups 12" (300 mm) centre tocentre, complete in all respects.

i) without cement concrete base. 100Rft. 4,285.85 15,633.30 Per Metre 140.60 512.75 ii) in cement concrete 1:4:8 base of size 12"x12"x21" 100Rft. 4,706.25 17,245.10 Per Metre 154.35 565.65

(300x300x525 mm).

chapter-26( Misc) Page 177