    MRP I & II

  • 8/8/2019 mrp pres 2

    2/23

    TEAM MEMBERS

    y Anup Mulay 04

    y Kevin Dsilva 25

    y Melissa Nazareth 30

    y Stanley Thomas 53

  • 8/8/2019 mrp pres 2

    3/23

    INTRODUCTION

    y What is MRP I

    y What is MRP II

  • 8/8/2019 mrp pres 2

    4/23

    EVOLUTION

    y 1950 Manual Systems.

    y 1960 Inventory Management and Control.

    y 1970 Material Requirement Planning. ( Joseph Orlicky )

    y 1980 Manufacturing Resource Planning. (Oliver

    Wight and George Plossl )

    y 1990 Enterprise Resource Planning.

  • 8/8/2019 mrp pres 2

    5/23

    WHY??

    Manufacturing

    Efficiency and

    Cost

    Profits

    Competition

    Survive and

    Grow

  • 8/8/2019 mrp pres 2

    6/23

    MRP is a software based production,

    planning and inventory control systemused to manage the manufacturing

    process.

  • 8/8/2019 mrp pres 2

    7/23

    OVERVIEWOVERVIEW

    MRP by period report

    MRP by date report

    Planned orders report

    Purchase requirements

    Exception reports

    MRPPrograms

    Master ProductionSchedule

    BOM

    Lead Times(Item Master File)

    (Bill-of-Material)

    Inventory Data

    Purchasing data

  • 8/8/2019 mrp pres 2

    8/23

    Master Production Schedule.y Shows items to be produced

    y End item, customer order, moduley Derived from aggregate plan

    Bill of Materialsy

    complete product descriptiony materialsy partsy componentsy production sequencey modular BOM

    y subassemblies

    y planning BOMy fractional options

    Inventory recordy status according to time windows or bucketsy identify each parent item that created demand

  • 8/8/2019 mrp pres 2

    9/23

    Gross Requirements

    On-hand

    Net requirements

    Planned order receiptSafety stock

    Net requirements in period = Gross requirements in period Projected inventory in period +Safety stock

    Gross Requirements

    On-hand

    Net requirements

    Planned order receiptSafety stock

    Net requirements in period = Gross requirements in period Projected inventory in period +Safety stock

  • 8/8/2019 mrp pres 2

    10/23

    y Primaryy Planned orders - to release at a future time.y Order release notices - execute planned ordersy Changes in due dates of open orders due to reschedulingy Cancellations or suspensions of open orders due to

    cancellation or suspension in the MPS.y Stock status data

    y Secondaryy Planning reports e.g. forecasting inventory requirements over

    time.

    y Performance reports e.g. actual vs. planned usage and costs.y Exception reports e.g. serious discrepancies, late/overdue

    orders.

  • 8/8/2019 mrp pres 2

    11/23

    y Safety Stock.

    y Lot Sizing.

    y Lot-for-Lot Ordering.

    y EOQ Model.

    y Fixed Period Ordering.

  • 8/8/2019 mrp pres 2

    12/23

    y Lower levels of in process inventory.

    y The ability to keep track of material required.

    y The ability to evaluate capacity requirements generated by a

    master schedule.

    y A means of allocating production time.

  • 8/8/2019 mrp pres 2

    13/23

    In order to implement and operate an effective

    MRP system, it is necessary to have,

    y A computer and the necessary software programs to handlecomputation and maintain records.

    y Accurate up to date

    y Master Schedule.

    y Bills of Material.

    y Inventory Records.

    y Integrity of file data.

  • 8/8/2019 mrp pres 2

    14/23

    MRP 2

    y Manufacturing Resource Planning (MRP II) is

    defined by APICS as a method for the effective planning of all

    resources of a manufacturing company.

  • 8/8/2019 mrp pres 2

    15/23

    Key features

    y Master Production Schedule (MPS)

    y Item Master Data (Technical Data)

    y Bill of materials (BOM)(Technical Data)

    y Production Resources Data (Manufacturing Technical Data)y Inventories and Orders (Inventory Control)

    y Purchasing management

    y Material Requirements Planning (MRP)

  • 8/8/2019 mrp pres 2

    16/23

    y Shop Floor Control (SFC)

    y Capacity planning or Capacity Requirements Planning (CRP)

    y Standard Costing (Cost Control)

    y Cost Reporting / Management (Cost Control)

  • 8/8/2019 mrp pres 2

    17/23

    MPS

    y (MPS) is a plan for production, staffing, inventory, etc.[1] It is

    usually linked to manufacturing where the plan indicates

    when and how much of each product will be demanded.

  • 8/8/2019 mrp pres 2

    18/23

    An Example

  • 8/8/2019 mrp pres 2

    19/23

    BOM

    y A BOM can define products as they are designed

    (engineering bill of materials), as they are ordered (sales bill

    of materials), as they are built (manufacturing bill of

    materials), or as they are maintained (service bill of

    materials).

    y BOM Explosion and Implosion.

  • 8/8/2019 mrp pres 2

    20/23

    PurchasingManagement

    y Purchasing management is the management of

    purchasing process, and related aspects in an organization.

    Because of production companies purchase nowadays about

    70% of their turnover, and service companies purchase

    approximately 40% of their turnover [1], purchasing

    management is one of the most critical areas in the entire

    organization and needs intensive management.

  • 8/8/2019 mrp pres 2

    21/23

    Capacity PlanningorCRP

    y Capacity planning is the process of determining the

    production capacity needed by an organization to meet

    changing demands for its products.[1] In the context of

    capacity planning, "capacity" is the maximum amount of

    work that an organization is capable of completing in a given

    period of time.

    y For eg. Parle Hide N Seek.

  • 8/8/2019 mrp pres 2

    22/23

    Conclusion

    y MRP 1 and MRP 2 are the techniques important for

    companies seeking backward integration or following

    backward integration.

  • 8/8/2019 mrp pres 2

    23/23

    Thank You