MRP I & II
-
8/8/2019 mrp pres 2
2/23
TEAM MEMBERS
y Anup Mulay 04
y Kevin Dsilva 25
y Melissa Nazareth 30
y Stanley Thomas 53
-
8/8/2019 mrp pres 2
3/23
INTRODUCTION
y What is MRP I
y What is MRP II
-
8/8/2019 mrp pres 2
4/23
EVOLUTION
y 1950 Manual Systems.
y 1960 Inventory Management and Control.
y 1970 Material Requirement Planning. ( Joseph Orlicky )
y 1980 Manufacturing Resource Planning. (Oliver
Wight and George Plossl )
y 1990 Enterprise Resource Planning.
-
8/8/2019 mrp pres 2
5/23
WHY??
Manufacturing
Efficiency and
Cost
Profits
Competition
Survive and
Grow
-
8/8/2019 mrp pres 2
6/23
MRP is a software based production,
planning and inventory control systemused to manage the manufacturing
process.
-
8/8/2019 mrp pres 2
7/23
OVERVIEWOVERVIEW
MRP by period report
MRP by date report
Planned orders report
Purchase requirements
Exception reports
MRPPrograms
Master ProductionSchedule
BOM
Lead Times(Item Master File)
(Bill-of-Material)
Inventory Data
Purchasing data
-
8/8/2019 mrp pres 2
8/23
Master Production Schedule.y Shows items to be produced
y End item, customer order, moduley Derived from aggregate plan
Bill of Materialsy
complete product descriptiony materialsy partsy componentsy production sequencey modular BOM
y subassemblies
y planning BOMy fractional options
Inventory recordy status according to time windows or bucketsy identify each parent item that created demand
-
8/8/2019 mrp pres 2
9/23
Gross Requirements
On-hand
Net requirements
Planned order receiptSafety stock
Net requirements in period = Gross requirements in period Projected inventory in period +Safety stock
Gross Requirements
On-hand
Net requirements
Planned order receiptSafety stock
Net requirements in period = Gross requirements in period Projected inventory in period +Safety stock
-
8/8/2019 mrp pres 2
10/23
y Primaryy Planned orders - to release at a future time.y Order release notices - execute planned ordersy Changes in due dates of open orders due to reschedulingy Cancellations or suspensions of open orders due to
cancellation or suspension in the MPS.y Stock status data
y Secondaryy Planning reports e.g. forecasting inventory requirements over
time.
y Performance reports e.g. actual vs. planned usage and costs.y Exception reports e.g. serious discrepancies, late/overdue
orders.
-
8/8/2019 mrp pres 2
11/23
y Safety Stock.
y Lot Sizing.
y Lot-for-Lot Ordering.
y EOQ Model.
y Fixed Period Ordering.
-
8/8/2019 mrp pres 2
12/23
y Lower levels of in process inventory.
y The ability to keep track of material required.
y The ability to evaluate capacity requirements generated by a
master schedule.
y A means of allocating production time.
-
8/8/2019 mrp pres 2
13/23
In order to implement and operate an effective
MRP system, it is necessary to have,
y A computer and the necessary software programs to handlecomputation and maintain records.
y Accurate up to date
y Master Schedule.
y Bills of Material.
y Inventory Records.
y Integrity of file data.
-
8/8/2019 mrp pres 2
14/23
MRP 2
y Manufacturing Resource Planning (MRP II) is
defined by APICS as a method for the effective planning of all
resources of a manufacturing company.
-
8/8/2019 mrp pres 2
15/23
Key features
y Master Production Schedule (MPS)
y Item Master Data (Technical Data)
y Bill of materials (BOM)(Technical Data)
y Production Resources Data (Manufacturing Technical Data)y Inventories and Orders (Inventory Control)
y Purchasing management
y Material Requirements Planning (MRP)
-
8/8/2019 mrp pres 2
16/23
y Shop Floor Control (SFC)
y Capacity planning or Capacity Requirements Planning (CRP)
y Standard Costing (Cost Control)
y Cost Reporting / Management (Cost Control)
-
8/8/2019 mrp pres 2
17/23
MPS
y (MPS) is a plan for production, staffing, inventory, etc.[1] It is
usually linked to manufacturing where the plan indicates
when and how much of each product will be demanded.
-
8/8/2019 mrp pres 2
18/23
An Example
-
8/8/2019 mrp pres 2
19/23
BOM
y A BOM can define products as they are designed
(engineering bill of materials), as they are ordered (sales bill
of materials), as they are built (manufacturing bill of
materials), or as they are maintained (service bill of
materials).
y BOM Explosion and Implosion.
-
8/8/2019 mrp pres 2
20/23
PurchasingManagement
y Purchasing management is the management of
purchasing process, and related aspects in an organization.
Because of production companies purchase nowadays about
70% of their turnover, and service companies purchase
approximately 40% of their turnover [1], purchasing
management is one of the most critical areas in the entire
organization and needs intensive management.
-
8/8/2019 mrp pres 2
21/23
Capacity PlanningorCRP
y Capacity planning is the process of determining the
production capacity needed by an organization to meet
changing demands for its products.[1] In the context of
capacity planning, "capacity" is the maximum amount of
work that an organization is capable of completing in a given
period of time.
y For eg. Parle Hide N Seek.
-
8/8/2019 mrp pres 2
22/23
Conclusion
y MRP 1 and MRP 2 are the techniques important for
companies seeking backward integration or following
backward integration.
-