Mr. Lonnie Stewart General Manager Bee Groundwater ... Run 16... · Jaime Burke, AECOM, Inc. ... To...

36
Texas Water Development Board PC. Box 13231, 1700 N. Congress Ave. Austin, TX 78711-3231 www.twdb.texas.gov Phone (512) 463-7847, Fax (512) 475-2053 March 22, 2017 Mr. Lonnie Stewart General Manager Bee Groundwater Conservation District P.O. Box 682 Beeville, TX 78104 Dear Mr. Stewart: Texas Water Code, Section 36.1084, Subsection (b) states that the Texas Water Development Board’s (TWDB] Executive Administrator shall provide each groundwater conservation district and regional water planning group located wholly or partly in the groundwater management area with the modeled available groundwater in the management area based upon the desired future conditions adopted by the districts. This letter and the attached report (GAM Run 16-025 MAG) are in response to this directive. Groundwater Management Area 15 adopted desired future conditions for the Gulf Coast Aquifer System on April 29, 2016, as noted in the letter from Tim Andruss, Groundwater Management Area 15 Chair received by the TWDB on June 27, 2016. Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1, Subsection (25), as “the amount ofwater that the executive administrator determines may be produced on an average annual basis to achieve a desired future condition established under Section 36.108.” Modeled available groundwater estimates are reported by aquifer, groundwater conservation district, county, regional water planning area, and river basin for use by groundwater conservation districts and for use in the regional water planning process. We encourage open communication and coordination between groundwater conservation districts, regional water planning groups, and the TWDB to ensure that the modeled available groundwater reported in regional water plans and groundwater management plans are not in conflict. The estimates of modeled available groundwater are the pumping volumes that would have to occur to achieve the desired future conditions using the best available scientific tools. However, these estimates are based on assumptions of the magnitude and distribution ofprojected pumping in the aquifer. It is, therefore, important for groundwater conservation districts to monitor whether their management of pumping is achieving their desired future conditions. Districts are encouraged to continue to work Our Mission Board Members To provide leadership, information, education, and : Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Member support for planning, financial assistance, and outreach for the conservation and responsible development of water for Texas : Jeff Walker, Executive Administrator

Transcript of Mr. Lonnie Stewart General Manager Bee Groundwater ... Run 16... · Jaime Burke, AECOM, Inc. ... To...

Texas WaterDevelopment Board

PC. Box 13231, 1700 N. Congress Ave.Austin, TX 78711-3231 www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Mr. Lonnie StewartGeneral ManagerBee Groundwater Conservation DistrictP.O. Box 682Beeville, TX 78104

Dear Mr. Stewart:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDB] Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG) are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter from Tim Andruss, GroundwaterManagement Area 15 Chair received by the TWDB on June 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25), as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution ofprojected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumpingis achieving their desired future conditions. Districts are encouraged to continue to work

Our Mission Board Members

To provide leadership, information, education, and : Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Membersupport for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

Lonnie Stewart, General ManagerMarch 22, 2017Page 2

with the TWDB to better define available groundwater as additional information may helpbetter assess responses ofthe aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

ectfully,

jeffvaerExecutWe Administrator

Attachment: GAM Run 16-025 MAG

C w/att. : David Wheelock, Lower Colorado River AuthoritySteven I. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box 13231, 1700 N. Congress Ave.Austin, TX 7871 1-3231 , www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Mr. Tim AndrussGeneral ManagerCalhoun County Groundwater Conservation DistrictP.O. Box 1395Port Lavaca, TX 77979

Dear Mr. Andruss:

Texas Water Code, Section 36.1084, Subsection (b] states that the Texas WaterDevelopment Board’s (TWDB) Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG] are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter you sent, received by the TWDB onJune 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25), as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution ofprojected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumpingis achieving their desired future conditions. Districts are encouraged to continue to work

Our Mission Board MembersTo provide leadership, information, education, and : Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Member

support for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

Tim Andruss, General ManagerMarch 22, 2017Page 2

with the TWDB to better define available groundwater as additional information may helpbetter assess responses ofthe aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

Re p ctfully,

Jeff 1lèrExecutive Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven 1. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box 1 3231 1 700 N. Congress Ave.Austin, TX 78711-3231 www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Mr. Neil HudginsGeneral ManagerCoastal Bend Groundwater Conservation DistrictP.O. Box 341Wharton, TX 77488

Dear Mr. Hudgins:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDB] Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG) are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter from Tim Andruss, GroundwaterManagement Area 15 Chair received by the TWDB on June 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25), as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution of projected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumpingis achieving their desired future conditions. Districts are encouraged to continue to work

Our Mission Board Members

To provide leadership, information, education, and Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Membersupport for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

Neil Hudgins, General ManagerMarch 22, 2017Page 2

with the TWDB to better define available groundwater as additional information may helpbetter assess responses ofthe aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

Jeff erExecutive Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven J. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box 13231, 1700 N. Congress Ave.Austin, TX 7871 1 -3231 , www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Mr. Neil HudginsGeneral ManagerCoastal Plains Groundwater Conservation District2200 7th StreetBay City, TX 77414

Dear Mr. Hudgins:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDB) Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG) are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter from Tim Andruss, GroundwaterManagement Area 15 Chair received by the TWDB on June 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25), as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution ofprojected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumpingis achieving their desired future conditions. Districts are encouraged to continue to work

Our Mission Board Members

To provide leadership, information, education, and : Bech Bruun, Chairman Kathleen Jackson, Board Member f Peter Lake, Board Membersupport for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

Neil Hudgins, General ManagerMarch 22, 2017Page 2

with the TWDB to better define available groundwater as additional information may helpbetter assess responses of the aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

ectfully,

Jeff 1 erExec ye Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven 1. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box 13231, 1700 N. Congress Ave.Austin, TX 78711-3231, www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Mr. James BrasherGeneral ManagerColorado County Groundwater Conservation DistrictP.O. Box 667Columbus, TX 78934

Dear Mr. Brasher:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDB) Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG] are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter from Tim Andruss, GroundwaterManagement Area 15 Chair received by the TWDB on June 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25], as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution of projected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumpingis achieving their desired future conditions. Districts are encouraged to continue to work

Our Mission Board MembersTo provide leadership, information, education, and Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Member

support for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

James Brasher, General ManagerMarch 22, 2017Page 2

with the TWDB to better define available groundwater as additional information may helpbetter assess responses of the aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or ifyou have any questions or need anyfurther information.

R p ctfully,

//Jeff erExecut e Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven 1. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box I 3231 1 700 N. Congress Ave.Austin, TX 7871 1 -3231 , www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Mr. Larijai FrancisCity Project Manager-Water ResourcesCorpus Christi Aquifer Storage and Recovery Conservation DistrictP.O. Box 9277Corpus Christi, TX 78469

Dear Mr. Fancis:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDB) Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG] are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter from Tim Andruss, GroundwaterManagement Area 15 Chair received by the TWDB on June 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25), as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution of projected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumpingis achieving their desired future conditions. Districts are encouraged to continue to work

Our Mission Board MembersTo provide leadership, information, education, and : Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Member

support for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

Larijai Francis, City Project Manager-Water ResourcesMarch 22, 2017Page 2

with the TWDB to better define available groundwater as additional information may helpbetter assess responses of the aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

Jeff erExecutive Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven J. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box 13231, 1700 N. Congress Ave.Austin, TX 7871 1-3231, www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Mr. Russell LabusGeneral ManagerEvergreen Underground Water Conservation District110 Wyoming Blvd.Pleasanton, TX 78064

Dear Mr. Labus:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDB) Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG) are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter from Tim Andruss, GroundwaterManagement Area 15 Chair received by the TWDB on June 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25), as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution ofprojected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumpingis achieving their desired future conditions. Districts are encouraged to continue to work

Our Mission Board MembersTo provide leadership, information, education, and Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Member

support for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

Russell Labus, General ManagerMarch 22, 2017Page 2

with the TWDB to better define available groundwater as additional information may helpbetter assess responses ofthe aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

Res ectfully,

Jeff Va1lrExecutive Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven I. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office of Water, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box 13231, 1700 N. Congress Ave.Austin, TX 78711-3231, www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Mr. David Van DresarGeneral ManagerFayette County Groundwater Conservation District255 Svoboda Ln., Rm. 115La Grange, TX 78945

Dear Mr. Van Dresar:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDBJ Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG) are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter from Tim Andruss, GroundwaterManagement Area 15 Chair received by the TWDB on June 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25), as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution of projected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumpingis achieving their desired future conditions. Districts are encouraged to continue to work

Our Mission Board Members

To provide leadership, information, education, and : Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Membersupport for planning, financial assistance, andoutreach for the conservation and responsible

development ofwater for Texas 2 JeffWalker, Executive Administrator

David Van Dresar, General ManagerMarch 22, 2017Page 2

with the TWDB to better define available groundwater as additional information may helpbetter assess responses of the aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

Res tfully,

Jeff erExecutive Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : ‘ David Wheelock, Lower Colorado River AuthoritySteven 1. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P0. Box I 3231 , I 700 N. Congress Ave.Austin, TX 78711-3231 , www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Ms. Barbara SmithGeneral ManagerGoliad County Groundwater Conservation DistrictRO. Box 562Goliad, TX 77963

Dear Ms. Smith:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDB) Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG) are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter from Tim Andruss, GroundwaterManagement Area 15 Chair received by the TWDB on June 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25), as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution ofprojected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumpingis achieving their desired future conditions. Districts are encouraged to continue to work

Our Mission Board MembersTo provide leadership, information, education, and Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Member

support for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

Barbara Smith, General ManagerMarch 22, 2017Page 2

with the TWDB to better define available groundwater as additional information may helpbetter assess responses ofthe aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

Res tfully,

Jeff a(cJrExecutive Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven J. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box 13231, 1700 N. Congress Ave.Austin, TX 78711-3231, www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Ms. Charlotte KrauseGeneral ManagerPecan Valley Groundwater Conservation District107 N. GonzalesCuero, TX 77954

Dear Ms. Krause:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDB) Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG) are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter from Tim Andruss, GroundwaterManagement Area 15 Chair received by the TWDB on June 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25), as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution of projected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumpingis achieving their desired future conditions. Districts are encouraged to continue to work

Our Mission Board Members

To provide leadership, information, education, and : Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Membersupport for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas Jeff Walker, Executive Administrator

Charlotte Krause, General ManagerMarch 22, 2017Page 2

with the TWDB to better define available groundwater as additional information may helpbetter assess responses ofthe aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

Resp?ully,

Jeff WaJkExecutive Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven J. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box I 3231 , 1 700 N. Congress Ave.Austin, TX 7871 1-3231 , www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Mr. Tim AndrussGeneral ManagerRefugio Groundwater Conservation DistrictP.O. Box 116Refugio, TX 78377

Dear Mr. Andruss:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDB) Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG) are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter you sent, received by the TWDB onJune 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25], as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution ofprojected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumpingis achieving their desired future conditions. Districts are encouraged to continue to work

Our Mission Board MembersTo provide leadership, information, education, and : Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Member

support for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

Tim Andruss, General ManagerMarch 22, 2017Page 2

with the TWDB to better define available groundwater as additional information may helpbetter assess responses of the aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

Executive Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven J. Raabe, P.E., San Antonio River AuthorityRocky freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box 13231, 1700 N. Congress Ave.Austin, TX 7871 1-3231 , www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Mr. Tim AndrussGeneralManager

Texana Groundwater Conservation DistrictP.O. Box 109$Edna, TX 77957

Dear Mr. Andruss:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDB) Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG) are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter you sent, received by the TWDB onJune 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25], as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution ofprojected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumpingis achieving their desired future conditions. Districts are encouraged to continue to work

Our Mission Board MembersTo provide leadership, information, education, and : Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Member

support for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

Tim Andruss, General ManagerMarch 22, 2017Page 2

with the TWDB to better define available groundwater as additional information may helpbetter assess responses of the aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

espe tfl%

Jef erExec ye Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven 1. Raabe, P.E., San Antonio River AuthorityRocky freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

PC. Box 13231, 1700 N. Congress Ave.Austin, TX 7871 1 -3231 , www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Mr. Tim AndrussGeneral ManagerVictoria County Groundwater Conservation District2805 N. Navarro St., Ste. 210Victoria, TX 77901

Dear Mr. Andruss:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDB) Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG) are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter you sent, received by the TWDB onJune 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25), as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution of projected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumpingis achieving their desired future conditions. Districts are encouraged to continue to work

Our Mission Board MembersTo provide leadership, information, education, and : Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Member

support for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

Tim Andruss, General ManagerMarch 22, 2017Page 2

with the TWDB to better define available groundwater as additional information may helpbetter assess responses ofthe aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

R pe tfull

Jeff erExedite Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven 1. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box 13231, 1700 N. Congress Ave.Austin, TX 7871 1 -3231 , www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Mr. John E. BurkeChairLower Colorado Regional Water Planning Groupdo John Burke & Associates496 Shiloh Rd.Bastrop, TX 78602

Dear Mr. Burke:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDB] Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG) are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter from Tim Andruss, GroundwaterManagement Area 15 Chair received by the TWDB on June 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25), as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution ofprojected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumping

Our Mission Board MembersTo provide leadership, information, education, and Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Member

support for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

John F. Burke, ChairMarch22,2017Page 2

is achieving their desired future conditions. Districts are encouraged to continue to workwith the TWDB to better define available groundwater as additional information may helpbetter assess responses ofthe aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

Resp fully,

JeffW l1Exec tive Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven J. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box 13231, 1700 N. Congress Ave.Austin, TX 7871 1-3231 , www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March22,2017

Scott Bledsoe, IIICo-ChairCoastal Bend Regional Water Planning Groupc/o Live Oak Underground Water Conservation DistrictP,O Box 3Oakville, TX 78060

Dear Mr. Bledsoe:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDB) Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG] are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter from Tim Andruss, GroundwaterManagement Area 15 Chair received by the TWDB on June 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25), as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution of projected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumping

Our Mission Board MembersTo provide leadership, information, education, and : Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Member

support for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

Scott Bledsoe, III, Co-ChairMarch 22, 2017Page 2

is achieving their desired future conditions. Districts are encouraged to continue to workwith the TWDB to better define available groundwater as additional information may helpbetter assess responses ofthe aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

sp ctfullj

Jeff erExcci1ti4ie Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven 1. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box 13231, 1700 N. Congress Ave.Austin, TX 7871 1-3231 , www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Ms. Suzanne B. ScottChairSouth Central Texas Regional Water Planning Groupc/o San Antonio River Authority100 East Guenther St.San Antonio, TX 78283

Dear Ms. Scott:

Texas Water Code, Section 36.1084, Subsection (b] states that the Texas WaterDevelopment Board’s (TWDB) Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG) are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter from Tim Andruss, GroundwaterManagement Area 15 Chair received by the TWDB on June 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25), as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution ofprojected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumping

Our Mission Board Members

To provide leadership, information, education, and Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Membersupport for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

Suzanne B. Scott, ChairMarch 22, 2017Page 2

is achieving their desired future conditions. Districts are encouraged to continue to workwith the TWDB to better define available groundwater as additional information may helpbetter assess responses ofthe aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

Resp ully

JeffW 1kExec tive Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven J. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box 13231, 1700 N. Congress Ave.Austin, TX 7871 1-3231 , www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

The Honorable Harrison Stafford, IIChairLavaca Regional Water Planning Groupdo former Jackson County Judge508 South Gilbert St.Edna, TX 77957

Dear Judge Stafford:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDB) Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG) are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter from Tim Andruss, GroundwaterManagement Area 15 Chair received by the TWDB on June 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25], as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution ofprojected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumping

Our Mission Board Members

To provide leadership, information, education, and : Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Membersupport for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

The Honorable Harrison Stafford, II, ChairMarch 22, 2017Page 2

is achieving their desired future conditions. Districts are encouraged to continue to workwith the TWDB to better define available groundwater as additional information may helpbetter assess responses ofthe aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

Res e fully

JeffW 1Executive Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven 1. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning

Texas WaterDevelopment Board

P.O. Box 13231, 1700 N. Congress Ave.Austin, TX 7871 1-3231 , www.twdb.texas.govPhone (512) 463-7847, Fax (512) 475-2053

March 22, 2017

Ms. Carola SerratoCo-ChairCoastal Bend Regional Water Planning Groupc/o South Texas Water AuthorityP.O. Box 1701Kingsville, TX 78364

Dear Ms. Serrato:

Texas Water Code, Section 36.1084, Subsection (b) states that the Texas WaterDevelopment Board’s (TWDBJ Executive Administrator shall provide each groundwaterconservation district and regional water planning group located wholly or partly in thegroundwater management area with the modeled available groundwater in themanagement area based upon the desired future conditions adopted by the districts. Thisletter and the attached report (GAM Run 16-025 MAG) are in response to this directive.

Groundwater Management Area 15 adopted desired future conditions for the Gulf CoastAquifer System on April 29, 2016, as noted in the letter from Tim Andruss, GroundwaterManagement Area 15 Chair received by the TWDB on June 27, 2016.

Modeled available groundwater is defined in the Texas Water Code, Section 36.00 1,Subsection (25), as “the amount ofwater that the executive administrator determines maybe produced on an average annual basis to achieve a desired future condition establishedunder Section 36.108.” Modeled available groundwater estimates are reported by aquifer,groundwater conservation district, county, regional water planning area, and river basinfor use by groundwater conservation districts and for use in the regional water planningprocess.

We encourage open communication and coordination between groundwater conservationdistricts, regional water planning groups, and the TWDB to ensure that the modeledavailable groundwater reported in regional water plans and groundwater managementplans are not in conflict. The estimates of modeled available groundwater are the pumpingvolumes that would have to occur to achieve the desired future conditions using the bestavailable scientific tools. However, these estimates are based on assumptions of themagnitude and distribution ofprojected pumping in the aquifer. It is, therefore, importantfor groundwater conservation districts to monitor whether their management of pumping

Our Mission Board Members

To provide leadership, information, education, and : Bech Bruun, Chairman Kathleen Jackson, Board Member Peter Lake, Board Membersupport for planning, financial assistance, andoutreach for the conservation and responsible

development of water for Texas : Jeff Walker, Executive Administrator

Carola Serrato, Co-ChairMarch 22, 2017Page 2

is achieving their desired future conditions. Districts are encouraged to continue to workwith the TWDB to better define available groundwater as additional information may helpbetter assess responses of the aquifer to pumping and its distribution now and in thefuture.

Please contact Dr. Rima Petrossian ofour Groundwater Technical Assistance staffat 512-936-2420 or [email protected] ifyou have any questions or need anyfurther information.

Res. t,2

i,,)Jeff al eExecutive Administrator

Attachment: GAM Run 16-025 MAG

c w/att. : David Wheelock, Lower Colorado River AuthoritySteven I. Raabe, P.E., San Antonio River AuthorityRocky Freund, Nueces River AuthorityKaren Gregory, Lavaca-Navidad River AuthorityJaime Burke, AECOM, Inc.Brian Perkins, Black & Veatch Corp.Kristi Shaw, HDR, Inc.L’Oreal Stepney, Deputy Director, Office ofWater, Texas Commission ofEnvironmental QualityKim Wilson, Texas Commission of Environmental QualityKelly Mills, Texas Commission of Environmental QualityRobert Mace, Deputy Executive Administrator, Water Science andConservationLarry French, Groundwater DivisionTemple McKinnon, Water Use, Projections, & PlanningSarah Backhouse, Water Use, Projections, & PlanningSabrina Anderson, Water Use, Projections, & Planning