Polly C. Paulson, MPH, MA, MCHES Student H ealth & Counseling Services
MPH Global Services
-
Upload
prasad-uchil -
Category
Sports
-
view
983 -
download
1
description
Transcript of MPH Global Services
Our Market
International projects of Operators, Industrial and Engineering
companies in the following sectors :
• Oil & Gas (TOTAL)
• Power Plants and Solar Plants ENERGY
• Water/ wastes/ Mines/ Roads/ Buildings
• Telecoms Lafarge, Vinci INFRASTRUCTURE
• Auto/ Transport Tramway
• Sidérurgie/ Pharma
• Développement
INDUSTRY
3
MPH – Delivering Solutions
Solutions:
Technical Assistance in Personnel
MPH LOGISTICS
• Fully managed logistics service for mobilized candidates. Medical; Healthcare; insurance; Meet and greet; Work permit and visa; Flights and travel; In country security; Accommodation; Demobilization
MPH
PROJECTS
• Engineering Studies
• Construction
• Project Management
• Commissioning
• Start up
• Operations
• Maintenance
MPH SEARCH AND SELECT
• Executive and Confidential mandates. Research, Market mapping, Direct and Confidential approach. Source candidates not available on any database.
• Sourcing suitable candidates for our client requirements on a direct hire, contingent basis.
MPH TRAINING
• Delivery of technical training in line with project requirements and training needs analysis conducted in conjunction with our clients
3
Direct Hire
Service +
Why MPH Solutions
4
4
FLEXIBILITY
(Contract)
LOCALLY BASED OFFICE
(Project)
CLOSE TO CLIENTS
AND CONSULTANTS
(Sites)
72H TURN AROUND CV
PRESENTATION
(Fast Delivery)
5
Facts and Figures
5
FIRST MIDDLE EAST
OFFICE OPENED IN 2001
LARGEST SUPPLIER
GLOBALLY TO TOTAL SA
900 CONSULTANTS
CURRENTLY MOBILIZED IN
OUR PAYROLL
OFFICES IN 3 CONTINENTS
EUROPE
AFRICA / MIDDLE EAST
ASIA
STATE OF THE ART
SHARED SERVICE CENTER
IN DUBAI
6
Opening Office
• DUBAI 2001
• ABU DHABI
• QATAR 2003
• NIGERIA 2004
• YEMEN 2007
• HOUSTON
• KAZAKHSTAN 2008
• SAUDI ARABIA 2010
6
UAE Qatar Saudi Arabia Bahrain Kuwait Iraq Yemen Oman Libya Egypt Algeria Thailand Malaysia Australia United Kingdom France Nigeria
7
The MPH Group has offices strategically placed all around the world. We are a global business, providing manpower and logistics support to an international community. Our network of offices and partners gives us a local presence and knowledge to ensure we consistently deliver results. From Advertising, Searching and Selecting right through to Mobilization, MPH can help
Where We Operate
Implantations
Parternship
7
MPH Database
• Web based, multi country system
• Over 30,000 LIVE industry specific CV’s
• All CV’s are vetted before inclusion in the database
Industry Job Boards
• Multiple online job board registrations
• International coverage
• Oil & Gas Job search
• Rigzone
• Monster Gulf
• Naukri Gulf
MPH Website
• Free advertising for all client jobs
• Global reach through our network of offices
• First stop for candidates looking for their next opportunity
Global Networks
• Middle East network established over 10 years
• Referral network gives us access to a unique extended database of CV’s
8
Support Systems
8
Client Requirement
Received
Recruitment Team
Briefed
CV’s Sourced
Candidates Screened
CV Shortlist prepared
CV’s e-mailed to
Client
Interviews arranged
Feedback exchanged
Candidate Offered
Contract finalized
Candidate Mobilized
MPH Follow Up
9
Process
Fast, Efficient, Accurate. We deliver high quality
Candidate Profiles, on time and on budget.
9
Organisation Charts - Global
Philippe PALOMBA
Chief Operating Officer
Linh de LAVIGNE
HR Manager
Philippe LEFEBVRE
General Manager
SALES
Commercial Director
DUBAI / GULF
TBA
BD Associates
DUBAI / GULF
Prasad UCHIL
Business Development
QATAR
Abel MISSENER
Business Development Manager
SAUDI ARABIA/BAHRAIN
Enrico STRADA
Business Development Manager
NIGERIA / WEST AFRICA
Jean Philippe CAILLAUD
Operations Manager
YEMEN
Sabri QABBAN
Business Development Manager
KAZAKHSTAN
TBA
RECRUITMENT
TEAM TOTAL GROUP TEAM OTHER ACCOUNTS
Talent Acquisition Manager
Mihaela BANDUR
Talent Acquisition Manager
Nazneen ISHACK
Talent Acquisition Director
Olivier REGNAULT
Sr. Talent Consultant
Francois ETCHEVERS
Talent Consultant
Maria JOSEPH
Talent Consultant
Ziny DAYO
Talent Consultant
Abhilash JAGADISH
Talent Consultant
Jane BANCORO
Jr. Talent Consultant
May CONSULAR
Talent Consultant Manager
Cindy AZA
Talent Officer
Bhima CHAMILLAL
Talent Officer
Kajal MOHUN
Talent Officer
Estelle CHAN
Talent Officer
Anissah TOORABALLY
Frederic SARRAILH – TFSI/MPH I
General Manager Europe / Russia
DEFENSE
Gilles TABOUREL
INFRASTRUCTURE
Jean ROUZAUD
INDUSTRY
Jean Raymond LAYREAU
Stéphane AUBARBIER
President
SALES
Business Development
DUBAI / GULF
Francois TARTARIN
Business Development
DUBAI / GULF
Jaechun LEE
TELECOM / HIGH TECH
Marlene DOS SANTOS
Caroline GASC
Chief Financial Officer
AEROSPACE
Franceline GAUCHET Talent Consultant
Stephanie DELARBRE
Deputy Talent Acquisition Manager
Thierry Marie ANAIS
Sr. Talent Consultant
Nadia POPESCU
Talent Consultant
Sophie MARQUES
Talent Consultant
Anthony BAILLET
Talent Consultant
Jihane GHANNOUCHI
Talent Consultant
Magali TARES
Talent Consultant
Christian RIGOLLET
Business Development Manager
SINGAPOUR / INDONESIA
Guillaume PREVOT
INDUSTRY
Anael BEBEL
11
Clients
11
Synopsis:
Discovered in 2000, the Akpo gas and condensate field is located around 200 kilometers offshore Port Harcourt in
water depths ranging from 1,100 to 1,700 meters. The field development plan required 22 producing wells, 20
water injection wells and 2 gas injection wells, tied back to a floating production, storage and offloading (FPSO)
vessel with a storage capacity of 2 million barrels.
Number of Consultants:
28 MPH specialists (both in Nigeria and South Korea
for the FPSO construction):
Site Welding
Contracts
Stock
UFR construction
Engineering
Drilling
FPSO specialists
Client : TOTAL AKPO (Nigeria)
12
Client: Yemen LNG Company Ltd
Project: YLNG Project
The Company:
As the country’s largest-ever industrial investment (budgeted around US$ 4 billion), the decision to launch the
Yemen LNG project iwas an important milestone for both the Government of Yemen and the Yemen LNG
shareholders (TOTAL, Hunt, Yemen Gas Company, SK Corporation, KOGAS, Hyundai Corporation and GASSP).
Synopsis:
320 km pipeline complete from the Marib gas field to the liquefaction plant
MPH Project Value: USD 1.6 M
Number of Consultants: 78
• Civil / Construction
• Pipeline
• HSE / Environment
• Administration - Logistics
• QA/QC
• Instrumentation
• Mechanics
• Document control
• Metallurgy welding
• Operations
Work location:
the Yemen LNG chain comprises new and existing upstream gas processing facilities including a 25 km, 20-inch
transfer line linking the two gas processing units in the gas fields of block 18 in Marib; a 320km, 38-inch new main pipeline,
which will connect the gas processing facilities to the new liquefaction facilities in Balhaf,and a spur line to transport
domestic gas to the Ma’bar area in central Yemen.
13
Client: Total E&P Iran, South Pars
Project Phase I & II
The Company: As part of a multiphase development process, the Iranian authorities awarded Phases 2 & 3 to Total South Pars, a Total subsidiary and two partners, Gazprom and Petronas. Four-and-a-half years later, Phases 2 & 3 were the first of the planned 14 development phases to come on stream. Synopsis: For this development, TOTAL chose to tie the production platforms into onshore installations using large-diameter, 105
KM long multiphase pipelines, a bold move that had never been attempted over such a long distance and that demanded exceptional proficiency in multiphase transportation. This technology significantly scaled back the offshore installations required and enhanced the project’s economic feasibility. MPH Contract Value: USD 1.5 M Number of Consultants: 63 MPH Project Participation: The provision of 63 multi-discipline Engineers and Technicians dedicated to the following activities: Supervisory role during FEED; Basic & Detailed engineering; Supervisory role for Piping, Mechanical, Electrical & Instrumentation; Project Management; Site Procurement/Logistics; Maintenance activities; Commissioning; HSE; Production. Work location: The Iranian South Pars field is the northern extension of Qatar's giant North Field. It covers an area of 500 square miles and is located 3,000m below the seabed at a water depth of 65m. The Iranian side accounts for 10% of the world's and 60% of Iran's total gas reserves. Iran's portion of the field contains an estimated 436 trillion cubic feet.
14
The Company: The three Dolphin Energy Limited shareholders are Mubadala Development Company with 51 % Total 24.5 % and Occidental
Petroleum with 24.5%. Mubadala Development Company is wholly owned by the Government of Abu Dhabi. Synopsis: A 48-inch Export Pipeline will run over 370 kms from Ras Laffan to the UAE, where gas receiving facilities are being constructed
to facilitate local distribution; and another 24-inch pipeline crosses 182 kilometers of desert and mountain between the UAE-Oman border at
Al Ain and Fujairah. Number of Consultants: 60 MPH specialists, onshore and offshore including:
» Contract » Project » Planning » Cost » Mechanical / Rotating » Piping » Inspection » Civil/ Structural
Client: Dolphin Energy Qatar,
Export Pipeline
15
16
Client: Alstom Transport
Project: Al Sufouh Tramway
The company
A promoter of sustainable mobility, Alstom Transport develops and
markets the most complete range of systems, equipment and
services in the railway sector. Alstom Transport manages entire
transport systems, taking in rolling stock, signaling and
infrastructure, and offers “turnkey” solutions.
The company is no. 1 in the high and very high speed train sector
and keeps investing in high end segments, while developing
products suited to the specific needs of the emerging markets.
Alstom Transport is present in over 60 countries and employs
some 27,000 people.
The project
Al Sufouh Tramway is a tramway being built in Al Sufouh, Dubai. It
will run 14.5 kilometers (9.0 mi) along Al Sufouh Road from Dubai
Marina to the Burj Al Arab and the Mall of the Emirates.
The Al Sufouh Tram will use 11 of Alstom's Citadis 402 trams for
Phase 1.[3] The trams will be 44 m (144 ft.) long, with a capacity of
300 passengers and a maximum speed of 50 km/h (31 mph),
giving an average commercial speed of 20 km/h (12 mph).
These trams will use the "Alimentation par Sol" (APS) ground-level
power supply, and so will not need overhead cables.[4] This
method was first used in Bordeaux, France
The project is expected to be completed in 2014
Client: BESIX [SIX CONSTRUCT UAE]
The Company:
• BESIX Group, Belgium's leading multi-disciplinary group of building companies. Founded in 1909, engaged & active in construction contracting for Building works/ Marine works/Infrastructure/ Environment/Industrial projects, Property Development , Concessions & Assets across Europe, North and Central Africa, the Middle East and beyond.
• BESIX Group employs about 17,000 people in 16 countries on four continents with a turnover of 1.8 billion euros in 2010.
Synopsis of the Projects in UAE:
Das Island Offshore Project –
To provide an extension to the existing gas liquefying plant completed in 2009. Six Construct was awarded the Civil works (Onshore & Offshore) part of the Das Island Offshore project. The offshore part consists of
Yas Mall Project -
Client : Aldar Properties PJSC
Total value EUR:€ 421.162.000,00
Specialists provided by MPH includes
• HSE & Safety Engineers [Civil & Marine]
• Marine Surveyors
• Project Engineers
• Architect Engineers
17
The Company:
• Rio Tinto Alcan is one of five product groups operated by Rio Tinto, a leading international mining group. The company is the global leader in the aluminium business and one of the world's largest producers of bauxite, alumina and aluminium. Their leadership is reinforced by extensive project pipeline, benchmark smelting technology, enviable hydropower position.
MPH Projects Participation:
• EMAL (Phase 1&2) – Abu Dhabi, U.A.E
• VEDANTA / NALCO – Orissa, India
• BALCO – Korba, India
• BALCO – Madhya Pradesh, India
• RICHARDS BAY – South Africa
Number of Consultants: 23
Specialists provided by MPH includes:
• HSE Engineering
• Mechanical Engineering
• Civil Engineering
• AUTOCAD Operators
• Procurement Engineering
Client: Rio Tinto Alcan
18
The Company:
• Shams solar power station is a concentrating solar power station under construction near Madinat Zayed, Abu Dhabi, the
United Arab Emirates. The solar power station is located approximately 120 kilometres (75 mi) southwest of Abu Dhabi and 6
kilometres (4 mi) from Madinat Zayed on the road from Tarif to the Liwa Oasis. The first part, Shams 1, uses parabolic trough
technology and will have a capacity of 100 megawatts(MW), which makes it among the largest parabolic trough power
stations in the world.
Synopsis of the Project in Qatar
• The construction cost of Shams 1 is about US$600 million.
Number of Consultants: 20
• Mechanical Engineers
• Electrical Engineers
• Welders
• HSE disciplines
Shams 1 will be one of the largest concentrated solar power plants in the world,
extending over an area of 2.5 km², with a capacity of approximately 100 MW
and a solar field consisting of 768 parabolic trough collectors.
Client :
Masdar (60%)/Total (20%)/Abengoa (20%)
Project : Shams Project
19
SINCE 2008
SAUDI ARABIA
OWNER ENGINEERING SUPPORT
TO SATORP FOR THE JUBAIL REFINERY
PROJECT
Construction SINCE 2010
Madinat Zayed, Abu Dhabi
Construction cost : $ 600 million
Client : Siemens
Project : Algiers Metro
Context :
A consortium of three European companies, led by the group Siemens,
signed, at the beginning of 2006, a contract for the realization of the first line
of the Algiers Metro. This transport project was designed to address the
need for mass transport caused by the city's growth.
Requirements :
A supervisor responsible for the realization , with a team of two persons, of
the contradictory measures of length of settled cables.
• Establish the assessment of the settled cables, of the
remaining cables and the missing cables
MPHI capability :
MPHI has a solid experience of transport project and railway systems.
MPHI maintains a long term relationship with the project managers at the Clients
MPHI can Identify and mobilize and retain the right competencies
MPHI Commitments :
- Strict respect of methodology, security and safety.
- A single dedicated point of contact
The Project includes :
Endowed with a 380 million euro budget, Siemens Transportation Systems
France will supply the signalization, the automatisms, the telecoms, the
electrification and the computer ticketing.
20
Client : Alstom
Project : Maritza Project- Bulgaria
Context :
ALSTOM built a coal power plant of 670MW in Bulgaria
Requirements :
Provision of a team of operators for the commissioning of the power plant
TFSI capability :
TFSI with his subsidiary in Romania provide an important part of the team 7
Romanian specialists during all the commissioning
TFSI Commitments :
- The TFSI team is qualified for the provision of resources for the news
projects.
MARITZA PROJECT- BULGARIA
TECHNICAL ASSISTANCE AND COMMISSIONING
21
Client : Entraco
Project : RN1 Libreville
Context:
ENTRACO was awarded, in 2010, the total rehabilitation of the RN 1
road from Libreville (km 0) to Bifoun (km 170)
The project includes:
- The creation of a dual carriageway road between Libreville (km 0)
and N’Toum (km 50 ) and the widening and resurfacing of the section
from N’Toum to Bifoun
- A second step consisting in the creation of a new dual carriageway
ring road bypassing Libreville by the east, between PK 15 and
Owendo port zone (18 km)
MPHI capability:
MPHI has a strong experience in the construction industry in Gabon
MPHI has a long term relationship with the Client ownership
MPHI can easily identify and mobilize the required talents
MPHI Commitments:
- Commitment to competence, construction rules and regulations,
general behavior and respect of local rules and traditions, safety and
security
- A single dedicated contact point.
RN 1 Project
Requirements:
A team consisting of 20 to 30 road construction professionals was
required from site supervisor to construction site manager, heavy
duty equipment maintenance team , quarry management and
maintenance experts
22
23
Client : Entraco
Project : RN1 Libreville
Client : Alcatel Lucent
Project : Submarine Fiber Optic Atlantic
Context :
Alcatel ASN works on various projects on laying Fiber optic
submarine cables.
ACE / ATLANTIC 1 / SMW 4 / EASSY …
Requirements :
Provision of a team of 30 Technician on site for installation &
commissioning of Telecom equipment ,
Connecting in optical fiber of the first ground sites worldwide
(strong presence in Africa, in Latin America and in Asia).
Submarine installation of cables on boat
TFSI capability :
TFSI has a solid experience of Telecom projects in the world
TFSI maintains a long term relationship with the project managers
at the Clients
TFSI can Identify and mobilize and retain the right competencies
TFSI Commitments :
- Strict respect of methodology, security and safety.
- A single dedicated point of contact
- TFSI is qualified for the provision of resources on the extension life
24
25
Client : Alcatel Lucent
Project : Submarine Fiber Optic Atlantic
Saudi Aramco Total Refining and Petrochemical Company (SATORP) is
building a refinery in Jubail, Saudi Arabia.
Project
• Planned production: 400,000 barrels per day.
• Budget: $12 billion.
Assystem Responsibilities
Owner engineering support for various packages (Distillation &
Hydrotreating, Conversion, Aromatics, Coker, Utilities, Interconnection, etc.),
interfacing with the EPC contractors in charge of execution.
• Disciplines currently covered in FEED phase: Cost Controller, Engineering
Manager, Construction Manager, Specialties.
• Specialties: Construction, civil engineering, electricity, instrumentation,
welding, rotating machinery, processes, gas treatment, etc.
• Approximately 20 people assigned full-time.
• Depending on the phase, teams work in South Korea, Japan, Singapore,
Italy, Spain or Saudi Arabia, as determined by the location of the EPC
contractors and their suppliers.
SINCE 2008
SAUDI ARABIA
OWNER ENGINEERING SUPPORT
TO SATORP FOR THE JUBAIL REFINERY
PROJECT
Main case studies
26
Supporting the Usan project, an offshore development
about 100 kilometers off Nigeria.
Assystem responsibilities via MPH
Owner engineering support for various packages:
• FPSO under construction by Hyundai in South Korea.
• SURF (Subsea/Umbilicals/Risers/Flowlines), Saipem, France and Nigeria.
• Disciplines covered in the design and construction phase: Quality, QA/QC,
Piping, Procurement, Contracts, Document Control, Flowline Installation,
HSE.
• Participation of the teams during the towing and hook-up phases.
• 30 people assigned full-time.
SINCE 2007, ONGOING
OWNER ENGINEERING SUPPORT
FOR THE USAN PROJECT
Project to build an FPSO
• Water depth: 750 to 850 meters.
• Production: 180,000 barrels per day.
• Storage capacity: 2 million barrels.
• Budget: US$6 billion.
Main case studies
27
2010-2014
ENGINEERING FRAMEWORK
CONTRACT
FOR UNDERGROUND GAS
STORAGE FACILITIES IN EUROPE
28
Main case studies