MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

44
MINISTRY OF NIGER DELTA AFFAIRS (MNDA) 1 2013 MINISTERIAL PLATFORM TO COMMEMORATE THE MID-TERM ANNIVERSARY OF PRESIDENT GOODLUCK EBELE JONATHAN’S ADMINISTRATION by THE HONOURABLE MINISTER, ELDER GODSDAY P. ORUBEBE, CON at THE NATIONAL PRESS CENTRE, RADIO HOUSE, ABUJA JUNE 6, 2013

description

Presented by The Honourable Minister, Elder Godsday P. Orubebe, CON

Transcript of MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Page 1: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

MINISTRY OF NIGER DELTA AFFAIRS (MNDA)

1

2013 MINISTERIAL PLATFORM TO COMMEMORATE THE MID-TERM ANNIVERSARY OF

PRESIDENT GOODLUCK EBELE JONATHAN’S ADMINISTRATION

by

THE HONOURABLE MINISTER, ELDER GODSDAY P. ORUBEBE, CON

atTHE NATIONAL PRESS CENTRE, RADIO HOUSE, ABUJA JUNE

6, 2013

Page 2: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

I am delighted to present the achievements,accomplishments and challenges of the MNDAat this year’s Ministerial Platform tocommemorate the mid-term Anniversary ofPresident Goodluck Jonathan’s Administration.

Let me express appreciation to the HonMinister of Information, Mr. Labaran Maku forproviding the opportunity for this presentation.

2

Page 3: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

As you are all aware, the Niger Delta region whichprovides over 80% of the country’s total revenueand 95% of its total export earnings suffers fromenvironmental degradation and pollution caused byoil spills, gas leaks and flares.

The region has high unemployment rate among theyouths and women, poor infrastructural facilitiesand high prevalence of diseases. The regiontherefore, illustrates a development paradoxcharacterised by endemic poverty in the midst ofabundant human and rich natural resources.

3

Page 4: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

The thrusts of the projects and programmes ofthe Ministry for the transformation of theregion are to achieve infrastructuraldevelopment, environmental sustainability,peace & stability and socio-economicdevelopment in the Niger Delta.

4

Page 5: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

The key targets for the region in consonance with the Transformation Agenda of the present Administration include:

Increased access to physical and social infrastructure (Roads, Water, Electricity, Housing, Health care and School facilities);

Preservation and conservation of the environment through remediation, rehabilitation and restoration of degraded and polluted ecosystem;

Elimination of militancy through consolidation of post –amnesty projects and programmes;

Reduction of oil-related conflicts in the region;

Reduction in the high incidence of poverty caused by oil extraction activities in the areas;

Reduction in the rate of unemployment.

Reduction in inter and intra ethnic/communal conflicts; 5

Page 6: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Peace and Security

The Ministry intervenedsignificantly throughroutinely organized securityand consultative meetingsto sustain the peace andsecurity in the region. Thishas resulted in an increase inoil production from pre-Amnesty level of about700,000 bpd to the currentlevel of about 2.5m bpd.

6

Hon. Minister’s dialogue and consultative meeting with HOSTCOM Leader to resolve issues

Page 7: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

7

Hon. Minister’s dialogue and consultative meetings with the Youths to resolve issues

Page 8: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

8

Hon. Minister’s dialogue and consultative meetings with the Community Leaders to resolve issues

Page 9: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Skills Acquisition

The Ministry has trained over 706 non-militantyouths across the 9 Niger Delta States toacquire skills in various sectors of the economy.Some of the trainees are now gainfullyemployed.

9

Page 10: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

10

Graduation Ceremony of 40 Non-Militant Youths Trained in Oil & Gas at the Azimarine and General Services Centre, Ibeno, Akwa Ibom State

Page 11: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

11

Pre-departure Ceremony for 106 Non-Militant Youths going to India for Oil & Gas Training

Page 12: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

East – West Road

The Dualization of the East-West Road whichcommenced in 2006 and was taken over by theMinistry at 10% completion in 2010, has nowreached over 52% completion. With the level ofcommitment by this administration, the Road willbe completed by the end of December, 2014.

Some sections of the Road have been completedand are due for handing over by the contractors.

12

Page 13: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Component of the East-West Road completed (Section I-IV), Reconstruction of Benin-Abraka Road and Reconstruction of Owerri-Elele Road

A. Dualization of East-West Road; Warri-Oron (Delta, Bayelsa, Rivers & AkwaIbom States) – 338km

i. 150km to Binder course;

ii. 95km to wearing course;

iii. 740 Nos of the 1007 nos culverts completed; and

iv. 35 nos of the 41 nos bridges substantially completed.

B. Reconstruction of Owerri-Elele Road, Imo/Rivers State (35.15km)

i. 18km to Binder course;

ii. 14km to wearing course; and

iii. 20 nos of the 28 nos culverts completed

C. Reconstruction of Benin Abraka Road, Edo/Delta State (25km)

i. 15km to Binder course;

ii. 15km to wearing course; and

iii. 2 nos of the 10 nos culverts completed

13

Page 14: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Other Roads

The Ministry is also constructing 12 other roads spread across the 9 States. The roads which are at various levels of completion are:

1. Owerri – Omerelu Road, 34.14km in Imo/Rivers States 48.10%,

2. Port Harcourt/Aba Expressway – Obehia – Azumini – UkanafunRoad, 50Km in Abia/ Akwa Ibom States, Sections I &II - 34.98%

3. Construction of 35Km Okputuite-Mbato Junction - Orie Market -Lomara (Igwebuike) Road in Abia State – 14.48%;

4. Construction of 18km Ogriagbene-Torugbene Road in Delta State(Phase 1 & II) 26.03%;

5. Re-construction of 25km Benin – Abraka Road in Edo State, Phase I – 46.09%;

6. Construction of 18.5km Orhorho Junction – Odurobu – Kpakiama -Bomadi Road in Delta State, Phase I – 29.40%;

14

Page 15: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Other Roads Cont’d

7. Construction of 6.1km Omelema - Agada II Road in Rivers State, Phase I – 8.20%;

8. Rehabilitation of 17.475km Okpuala-Igwurunta Road, Phase I – 39.99%;

9. Construction of 31km Alode-Onne (Oil & Gas Free Zone) – Afam-Oyigbo-Imo River Bridge (Aba-Port Harcourt Expressway) – 9.44%;

10. Construction of 1.819km Emakalakala – Akipelai Road in Bayelsa State 12.77%;

11. Construction of 18km Gbaregolor-Ogriagbene Road, Delta State – 32.82%; and

12. Construction of 12km Sagbemi-Kirigbo-Rulewo Road - 6.0%

13. Construction of Mbak Atai – Ikot Ntu-Mkpeti-Okuiboku Road Project, Akwa Ibom State –0.00%

14. Construction of Mbak Atai - Itu –Okotia – Arochukwu Road Project, Akwa Ibom/Abia States –0.00%

15. Construction of Calabar – Oban-Nsan-Okoroba-Ajassor Road in Cross River State – 0.00%

16. Construction of Mbaise Ring Road intersecting Owerri – Umuahia Road with drainage – 0.00%

15

(Project No. 13 – 16 above are Newly awarded, mobilization fee paid, Contractor about to mobilize to site)

Page 16: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Completed Imo River Bridge

16

Page 17: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

COMPLETED FORMWORK FOR PILE CAP IN WATER @ PATANI BRIDGE ASPHALTIC CONCRETE WEARING COURSE @ CH 4 + 450

SUB-BASE (SAND CEMENT STABILIZATION) @ CH 39 + 275

17

Page 18: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Skills Acquisition Centres

The Ministry is building 9 Skills Acquisition Centres,one in each state of the region. The Skills AcquisitionCentres are designed to train youths to acquire skillsto enable them work in various sectors of theeconomy, in particular Oil and Gas, Commerce,Tourism, Agriculture, ICT, Construction and Maritime.Four of the Centres will be completed to commenceoperation this year.

18

Page 19: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

19

CAFETARIA

STAFF QUARTERS

Skill Acquisition Centre in Uwoachang Ibeno, Ibeno LGA, Bayelsa State

Page 20: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

View of the Workshop

20

Admin BuildingHostel

Conference Centre

Skill Acquisition Centre in Otuoke, Ogbia LGA, Bayelsa State

Page 21: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Housing Scheme

The construction of 360 Units of Housing, of 40units of 2 and 3 bedroom Bungalows in each ofthe 9 states has reached about 65%completion. Some of the housing units will becommissioned and allocated to thebeneficiaries before the end of this year.

21

Page 22: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

22

Housing Scheme in Abia State

Page 23: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

23

2 Bedroom Bungalows 3 Bedroom Bungalows

Housing Scheme in Bayelsa State

Page 24: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Environmental SustainabilityAs a result of years of oil exploration and

exploitation by the oil companies in the NigerDelta, the region has suffered a high degree ofenvironmental degradation which has seriouslyaffected the livelihood of the people. To addressthis challenge, the Ministry has embarked onvarious programmes of environmental remediation,reclamation and rehabilitation in some of theaffected communities in the region. Some of thereclaimed, remediated and rehabilitated areasinclude:

24

Page 25: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

25

A Canalization Projects

1 Canalization / River Training of Foupolo-Bulou NdoroCreek, Burutu LGA, Delta State - 40%

2 Canalization of Odoubou – Boloutou Creek, Ogbobagbene Burutu LGA, Delta State - 65%

3 Canalization at Baternren – Tselu – Utanoyibo Creek, Warri South West LGA, Delta State - 25%

B Shoreline Protection and Land Reclamation Projects

1 Land Reclamation and Shoreline Protection in kurutie, Gbaramatu Clan, Delta State - 91%

2 Land Reclamation/Shoreline Protection at Ogbobagbene, Burutu LGA, Delta State - 18%

Environmental Sustainability

Page 26: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

26

C Erosion Control Land and Reclamation Projects

1. Land Reclamation / Erosion Control at Igbontor / Ibanke & Oyomo/Okhelen - Awo Road. Uromi, Edo State. - 100%

2. Land Reclamation and Erosion Control at Ibakang Nsit-IkotEkpo-Unyehe Road, Nsit Attai LGA, Akwa Ibom State. - 75%Land Reclamation / Erosion Control at Essien Town –Ekorinim Community, Cross River State - 40%Idumuje – Unor Erosion Control Aniocha LGA, Delta State - 77%Land Reclamation/ Erosion Control at OguduAsa,Isukwuato LGA, Abia State - 13%

B Remediation and Rehabilitation of Oil Impacted Sites Projects

1 Remediation, Rehabilitation and Restoration of Oil Impacted Site at Stubbs Creek,Eket,Akwa-Ibom State - 26%

Environmental Sustainability

Page 27: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

PRE- CONSTRUCTION PHOTO 1: MID SECTIOON OF FOUPOLO BULOU NDORO CREEK

PRE- CONSTRUCTION PHOTO 2: FOUPOLO CREEK THE ENTRANCE FROM OSUOPELE ZION NEAR BOLOU-NDORO

PROJECT DELIVERABLES

Designed length of Canal - 6.3km

Designed Width of Canal - 40m/50m (Bottom/Top)

Designed Depth of Canal - 3.0m at Low Low Water (LLW)

PROJECT STATUS

Length of Canal Dredged - 2.55km

27

Canalization / River Training of Foupolo-BulouNdoroCreek, Burutu LGA, Delta State

Page 28: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Current Status Photo 1: 2550 Metres Near Ogogoro Creek

Current Status Photo 2: 700 Metres from the Mouth of the Foupolo Creek from Bulou Ndoro

WORK IN PROGRESS PHOTO NO 2: NEAR IBARE – OUT CAMP 1700 METRES FROM THE ENTRANCE OF THE FOUPOLO CREEK

WORK IN PROGRESS PHOTO NO 1: 430 METRES FROM BOLOU NDORO END OF THE FOUPOLO CREEK

28

Canalization / River Training of Foupolo-BulouNdoro Creek, Burutu LGA, Delta State

Page 29: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

PRE- PROJECT CONDITIONS

Eroded land to be reclaimed - 4.2ha

Shoreline to be protected - 1.0km

PROJECT STATUS

Eroded land reclaimed - 4.2ha

Shoreline Protected - 0.55km

Preconstruction Photo 1: Eroded Shoreline At Kurutie Requiring Protection

Preconstruction Photo 2: Flooded Land To Be Reclaimed For Development At Kurutie

29

Land Reclamation and Shoreline Protection in Kurutie, Gbaramatu Clan, Delta State

Page 30: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Work In Progress Photo 1:Dredging Operation to Reclaim Eroded Land At Kurutie

Work In Progress Photo 2 Stacked Sheet Pile Walls

Current Status Photo 1 : Concrete Sheet Pile Installed At Kurutie Current Status Photo 2: Reclaimed Land At Kurutie

30

•Land Reclamation and Shoreline Protection in

Kurutie, Gbaramatu Clan, Delta State

Page 31: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Land Reclamation and Erosion Controlat Ibakang Nsit-Ikot Ekpo-UnyeheRoad, Nsit Attai LGA, Akwa Ibom State.

PRE- PROJECT CONDITIONSEroded land to be reclaimed - 6Ha Drains to be constructed - 9km

PROJECT STATUSEroded land reclaimed - 6Ha Drains constructed - 5.5km

Pre- Construction Photo 1: Gully Along Ibakang Road Nsit Atai

Pre- Construction Photo 2: Gully Along Ikot Ekpo Road Nsit Atai

31

Page 32: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Work In Progress Photo No 2: Construction Of 3 Cell CulvertWork In Progress Photo No 1 : Reclamation Of Gully On The Road Way

Current Status Photo 1: Completed Road Side Drain Current Status Photo 2: Completed Culvert And Drains At Ikot Ekpo Road

32

Land Reclamation and Erosion Control at Ibakang Nsit-Ikot Ekpo-UnyeheRoad, Nsit Attai LGA, Akwa Ibom State

Page 33: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

PRE- PROJECT CONDITIONS

2,775m3 of Swampy Land/Soil Heavily Polluted By Oil

PROJECT DELIVERABLES

To Remediate and Rehabilitate the Oil Impacted Site to Improve Quality Of Life in The Region

Pilot Test: Application Of Molecular Potential Chain Disintegrator (MPCD) Nutrient Amendment as Stubbs Creek, Eket, Akwa Ibom State Pilot Project Site

Construction of Engineered Bio-Cell at Stubbs Creek, Eket, Akwa Ibom State

33

Remediation, Rehabilitation and Restoration of Oil Impacted Site at Stubbs Creek, Eket, Akwa-Ibom State

Page 34: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

The Ministry is embarking on the establishment ofIndustrial Parks in the Niger Delta region. The IndustrialParks which will consist of 5,000 Small and MeduimEnterprises (SMEs) to manufacture and produce goodsand services in over 100 different sectors/areas of theeconomy will be a replica of the model in Ankara, Turkey.

The Ministry has signed a Memorandum ofUnderstanding (MoU) with Ostim of Turkey for theestablishment of Industrial Parks in the Niger Deltaregion.

The technical work on the project has commenced andsome States in the region have indicated interest.

This model is to be replicated in the 9 States of the Niger Delta.

Industrial Park in Ankara, Turkey

34

Page 35: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

35

Page 36: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Job Creation

It should be noted that the work on theDualization of the East-West Road;Remediation, Reclamation and Rehabilitationwork; Construction of Skills AcquisitionCentres; and Building of Housing Units by theMinistry in the 9 States of the Niger Delta havecreated jobs for over 9,000 people in theregion.

36

Page 37: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

COLLABORATIVE DEVELOPMENT PROGRAMMES: Niger Delta Action Plan

In realization of the fact that Government alone(Federal, State and Local governments) cannotprovide the huge financial resources required toaddress the developmental challenges of the region,the Ministry in collaboration with developmentpartners has produced a development blue printcalled the Niger Delta Action Plan with focus onthree pillars:

37

Page 38: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Infrastructure Investment Programme:

Emphasizing investment in large-scale infrastructure development such as urbanand new town development, coastal and inland water ways construction, watertransportation; dredging and environmental remediation.

Social Sector Investment programme:

Focusing on community-based programmes with emphasis onagriculture, health and sanitation, education, employment creation, smalland medium enterprises and skills training, conflict resolution andcommunity security stabilization measures; and

Institutional Capacity Development and Multi-Stakeholder Trust Fund:

Support capacity development for project implementation and resourcemobilization.

Establishment of a Multi-Stakeholder Trust Fund which defines thegovernance structure for development partnership and the financialmechanism/resource mobilization for Programme implementation.

38

Page 39: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

Establishment of National Council on Niger Delta

National Council on Niger Delta has been established and was inaugurated by Mr. President on the 26th of April, 2013

The inaugural meeting of the National Council on Niger Delta was preceded by the Stakeholders’ Conference which endorsed the Niger Delta Action plan for the consideration and approval of the Council.

The Council subsequently approved the Action Plan for implementation.

The process for the implementation of the Action Plan has commenced.

39

Page 40: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

40

Page 41: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

i. The Ministry is faced with budgetary constraints inthe implementation of its projects andprogrammes.

ii. The terrain in most parts of the region makesinfrastructural development a difficult task. Highcosts of projects and technology required forinfrastructure projects as a result of the terrainconstitute a serious challenge.

41

Page 42: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

iii Even though youthrestiveness and insecurity inthe region have abated,intermittent disruption ofprojects by the youths andexcessive demands oncontractors by communities/individuals and incidences ofkidnapping still constituteserious problems. Thissituation has often times ledto work stoppages.

42

Hon. Minister’s dialogue and consultative meeting with the youths to resolve issues

Page 43: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

It is pertinent to note that the National Council on Niger Deltahas approved the Niger Delta Action Plan as a framework for thedevelopment of the region.

The Ministry has commenced the implementation/operationalisation of the Action Plan.

The National Council on Niger Delta and the Niger Delta ActionPlan are fundamental tools for the Ministry in coordinatingdevelopmental projects and programmes for the transformationof the region.

The MNDA is pursuing a number of alternative means of fundingits projects and programmes to address the current budgetaryconstraints

43

Page 44: MP2013: Presentation by the Federal Ministry of Niger Delta Affairs

44

Ministry’s Contact/Web AddressMinistry of Niger Delta Affairs

Federal Secretariat Complex, Phase IWebsite: www.nigerdelta.gov.ng

www.mnda.gov.ng