Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Transcript of Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with...

Page 1: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Moving the Needle:How to Move Forward with Pre-Fabrication

UNECE/ COFFI

November 7, 2018

Page 2: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Who is Metric Modular?

• One of North America’s

largest wood only volumetric

modular builders

• In business for over 40 years

• In business to de-risk

construction projects

Page 3: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

We specialize in

Offices/Commercial

Education

Multifamily Housing

Affordable Housing

High Performance

Buildings

Hospitality

Trinity Western University – 5 storey dormitory (2018)

Page 4: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Manufacturing CapacityOver 207,000 sq. ft. of

manufacturing capacity

Production up to 4 mods per day

Two manufacturing facilities:

Agassiz

Penticton

Page 5: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Barriers Toward Acceptance

Of Pre-Fabrication

Page 6: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018
Page 7: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018
Page 8: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Resistance to Innovation

Page 9: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Acceptance of Perceived Risk

Page 10: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Lack of attention toward being environmentally responsible

Page 11: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Recommendations:

Moving Forward with Pre-Fabrication

Page 12: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Leadership and Culture

Page 13: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Remove Traditional Approaches to Construction

Page 14: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Socially Conscious

Page 15: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Case Study

Bella Bella Passive House

Page 16: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Bella Bella• A remote

community• Fly in and water

access only• Home of the

Heiltsuk First Nation

Page 17: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018
Page 18: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Six two-

bedroom units

Certified

Passive House

Seven-month

delivery

Page 19: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018
Page 20: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018
Page 21: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018
Page 22: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018
Page 23: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018
Page 24: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018
Page 25: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018
Page 26: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018
Page 27: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018
Page 28: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Bella Bella

Passive House

• Uses 75% less energy

• Up to 80% lower GHGs

• Better Indoor Air Quality

• Cost less than site-built

Page 29: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

On the coldest night of the year,

each unit in the Bella Bella Passive House

will require a heat load equal to

just six 100-watt lightbulbs

Page 30: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Lessons Learned

• Leadership by the owner

• Collaboration = Lower Risk

• Sustainable

• Culture of Learning & New

Business Stream

• Showed what was possible with

Pre-Fabrication

Page 31: Moving the Needle - UNECE Homepage · 2018-11-13 · Moving the Needle: How to Move Forward with Pre-Fabrication UNECE/ COFFI November 7, 2018

Let’s Talk!