Transcript of Motorway Interchange Location Model (Three Minutes Presentation)
Optimum Location of Motorway Interchanges: Concessionaires’
Perspective
PhD student Hugo RepolhoUniversity of Coimbra PORTUGAL
Introduction (1)
Optim
um
Location o
f M
oto
rwa
y I
nte
rchanges:
Concessio
naires’ P
ers
pective
OBJECTIVE: develop an optimization model for assisting toll-motorway concessionaires inthe analysis of the most profitable solutions for Motorway Interchanges Location Problem.
The location of the interchanges strongly impacts the amount of traffic that the motorwaycan capture from the existing road network.
In Europe most motorways are owned by the State but operated by private concessionaires.
The concessionaires may define certain design details for the motorway, namely themotorway interchanges location (access and exit points).
Their profit comes from the application of a certain toll fee per mile to the motorway users.
Introduction (2)
Optim
um
Location o
f M
oto
rwa
y I
nte
rchanges:
Concessio
naires’ P
ers
pective
1 n m M
i
j
i
ASSUMPTIONS:
There are two types of routes to consider:
1. Routes through the existing road network (choice 1);2. Routes through a combination of existing roadway segments and new motorway
segments (choice 2).
• People will travel through the least cost route;
• The proportion of people using the motorway increases as the travel costs decrease;
Choice 1Choice 2
MILM: model’s objective function
Optim
um
Location o
f M
oto
rwa
y I
nte
rchanges:
Concessio
naires’ P
ers
pective
Mm
m
Ji jiJj Mm amnMn
ijmnmnijmn wfyxdqtaMaxijmn
ij
: 0 and :
02
OBJECTIVE FUNCTION: expresses the profit for the concessionaire, given as thedifference between total toll fee revenue and fixed charges for installing and operatingthe interchanges and constructing the motorway.
Total toll fee revenue Fixed charges
The MILM can be seen as a particular case of the p-hub median problem, which wasformulated by Campbell, 1994.
Portuguese case study
•Motorway A25 located in the center of Portugal•Dataset : 55 centers and 33 candidate motorway interchanges;
ArcMap 9.2 Image
Optim
um
Location o
f M
oto
rwa
y I
nte
rchanges:
Concessio
naires’ P
ers
pective
Portuguese case study - Results
ArcMap 9.2 Image
13
4
6 7
911
1318 2624
28
33
1014 15 17
29
22 31
18227
36404
45974
5314055109
49081
52703
5494253192
3656934342
32250
36910
30873 31369
2662425026
0
10000
20000
30000
40000
50000
60000
0.03 0.04 0.045 0.049 0.05 0.051 0.053 0.054 0.055 0.056 0.06 0.065 0.07 0.08 0.085 0.09 0.1
Pro
fit
(€/d
ay)
Toll fee (€/km)
Optim
um
Location o
f M
oto
rwa
y I
nte
rchanges:
Concessio
naires’ P
ers
pective
•The model was run for several Toll fee values.
Final Considerations
Optim
um
Location o
f M
oto
rwa
y I
nte
rchanges:
Concessio
naires’ P
ers
pectiveThe optimum location of motorway interchanges under the concessionaires’
perspective follows a previous work done under the users’ perspective, whichaimed to minimize travel costs.
We believe that the concessionaires’ perspective is the most relevant in real-world applications.
The models presented are useful in toll-motorway concessionaires’ cost-benefitanalysis.