MotorWave Group Job Reference2010 - 2015
-
Macau Project –IACM Education Centre
澳門民政總署環境衛生處May 2010
-
Macau Project –IACM Education Centre
澳門民政總署環境衛生處
Macau IACM 澳門民政總署環境衛生處
Installed in March 2010 contains 120 turbines
-
Fu Hong Society -Aberdeen 扶康會 – 香港仔Consists 2 x 120 micro turbinesInstalled in August 2010
-
Project funded by WaiYin Association項目由慧妍雅集贊助
-
CLP Sheung Shui DepotInstalled in September 2011Consists 60 micro turbines
-
Macau Environmental Protection Bureau澳門環保署270 微型風車 (Jan 2011)270 micro turbines
-
“Wind Tree” – ASD Project-Horticultural Expo 2011 Xian
『風能樹』-建築署項目-西安2011國際園藝展
-
• Wanchai Highway PRE site office• Built in December 2011 consists 60 microturbines
-
NAAC – Installed in January 2012Consists of 120 microturbine And 2 x 120W PV panelsto power 5 LED lightings
-
City Hall wanchai – Installed in Febr 2012120 microturbines
-
CLP Tsuen Wan – Installed in June 201260 microturbines + 2 BIPV panels
-
YY3 Tseung Kwan O - Installed in Feb 2013120 microturbines + Weather station
-
Australian international School- Kowloon Tong - Installed in April 2013
-
VRC Deep water bay - Installed in May 20136 kW water heater + 500W PV water heater +1.4 kW Solar accumulator
-
VRC Deep water bay - Installed in May 20136 kW water heater + 500W PV water heater +1.4 kW Solar accumulator
-
Wing Yan school Yuen Long - Installed in June 2013120 microturbines + Weather station +monitoring system
-
Zero Carbon Building Kowloon Bay - Installed in June 20142 MotorGym 30 W Cardio bike + monitoring race simulation system
-
Zero Carbon Building Kowloon Bay - Installed in June 20142 MotorGym 30 W Cardio bike + monitoring race simulation system
-
Zero Carbon Building Kowloon Bay - Installed in June 20142 MotorGym 30 W Cardio bike + monitoring race simulation system
-
OCEAN Park Aberdeen - Installed in July 201411x MotorGym 30 W bike energy transformer + battery storage and inverter
for application
-
Hong Kong university - Installed in March 2015120 microturbines + LED spotlight stand alone system
-