Mortenson Construction - Bluebeam IRC 2013

31
Case Study: Exempla Saint Joseph Heritage Project Nick Pfenning | Mortenson Construction Presenter: “Collaborating in the Field on the Fast Track”

description

 

Transcript of Mortenson Construction - Bluebeam IRC 2013

Page 1: Mortenson Construction - Bluebeam IRC 2013

Case Study: Exempla Saint Joseph Heritage Project

Nick Pfenning | Mortenson Construction

Presenter:

“Collaborating in the Field on the Fast Track”

Page 2: Mortenson Construction - Bluebeam IRC 2013

Outline

Personal BackgroundMortenson BackgroundPast ProjectsProject Case Study: SJHP• Challenges

Extremely Fast Schedule Extensive Design Changes Mobility of Digital Documents

• Solutions Leveraging Bluebeam Revu Project Tracking with Studio

Page 3: Mortenson Construction - Bluebeam IRC 2013

Personal Background

Employment History• Great Grandfather was

born in Sweden, 1895 - Traveled to the United States at age 11

• Started as a Laborer with Mortenson, 2007

• Graduated from Colorado State University, 2009

• Promoted to Assistant Superintendent, 2013

Page 4: Mortenson Construction - Bluebeam IRC 2013

Mortenson Background

Company History• Founded in Minnesota in 1954

• Established in Colorado in 1981

• Average Annual Revenue Exceeding $2.5 billion

• 200 Salaried Team Members / 300+ Craft Workers

• Self Performed Work Includes: Concrete, Masonry, Doors / Frames /

Hardware, Equipment, & Accessories

Page 5: Mortenson Construction - Bluebeam IRC 2013

Mortenson Background

Corporate Offices

Page 6: Mortenson Construction - Bluebeam IRC 2013

Mortenson Background

Industry Groups

Minneapolis

Milwaukee

Denver

Seattle

Chicago

Phoenix

Portland

Canada

China

GEOGRAPHIC FOCUS

Federal Contracting Group

Renewable Energy Group

National Projects Group

INDUSTRY FOCUS

EXTENDED SERVICES

Mortenson Development, Inc.

Mortenson Infrastructure, Inc.

FS Squared (Full Service Facility Solutions)

Page 7: Mortenson Construction - Bluebeam IRC 2013

Exempla Lutheran Medical CenterWheat Ridge, Colorado

Past Projects

• 376,000 Square Feet

• $150 Million Construction Cost

• 30 Month Schedule(Mar. 2008 thru Sept. 2010)

• Building Services

12 Room Surgical Suite

72 Bed Patient Tower

Private Women & Infant Birthing Center

Page 8: Mortenson Construction - Bluebeam IRC 2013

Exempla Lutheran Medical Center

Past Projects

• Phased Turn-over

• Paper Contract Drawings

Page 9: Mortenson Construction - Bluebeam IRC 2013

Ralph L. Carr Colorado Judicial CenterDenver, Colorado

Past Projects

Home to the Supreme Court, Court of Appeals, & Attorney General Office

Page 10: Mortenson Construction - Bluebeam IRC 2013

Past Projects

• 695,000 Square Feet

• $200 Million Construction Cost

• 27 Month Schedule(Aug. 2010 thru Nov. 2012)

• LEED Gold

Ralph L. Carr Colorado Judicial Center

Page 11: Mortenson Construction - Bluebeam IRC 2013

Ralph L. Carr Colorado Judicial Center

Past Projects

First Project to use Bluebeam in the Denver Operating Group

Digital Documentation

Drawing Mark-up & Phase Plans

In-wall / Above Ceiling / Punchlist Inspections

Door, Frame, & Hardware Tracking

Page 12: Mortenson Construction - Bluebeam IRC 2013

Ralph L. Carr Colorado Judicial Center

Past Projects

Project Metrics

Page 13: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage ProjectDenver, Colorado

Case Study

• 831,127 Square Foot Replacement Hospital

• $367 Million Construction Cost

• 31 Month Construction Schedule (Jan. 2012 thru July 2014)

Page 14: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage Project

Case Study

Page 15: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage Project

Case Study

• Challenge: Fast Schedule

• Solutions

Work Smarter not Harder on Inspection Process & Documentation $1 Million of work being installed every day, no single person can be

responsible for inspecting everything – share the responsibility Put all information into a collaborative cloud based solution

(Bluebeam Studio)

Pre-fabrication – Shift Labor Resources to an Off-site Facility Reduce trade stacking on site Better Safety, Higher Quality, Faster Production Track production across town or across the country (Bluebeam

Studio)

Page 16: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage ProjectWorking Smarter on In-wall / Above Ceiling / Punchlist Inspections

Case Study

TRADITIONAL INSPECTION PROCESS

Page 17: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage ProjectWorking Smarter on In-wall / Above Ceiling / Punchlist Inspections

Case Study

CLOUD BASED

COLLABORATION

Page 18: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage ProjectPre-fabrication – Shifting resources to produce more work in a shorter time frame

Case Study

Exterior Wall Panels

Page 19: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage ProjectPre-fabrication – Shifting resources to produce more work in a shorter time frame

Case Study

Bathroom PODs

Page 20: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage ProjectPre-fabrication – Shifting resources to produce more work in a shorter time frame

Case Study

Multi-trade MEP Racks

Page 21: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage ProjectPre-fabrication – Shifting resources to produce more work in a shorter time frame

Case Study

Headwalls

Page 22: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage ProjectPre-fabrication – Shifting resources to produce more work in a shorter time frame

Case Study

Headwalls

Page 23: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage Project

Case Study

• Challenge: Design Changes

• Solutions

Get accurate information to the field Collaborative Design Scrub Process with all Project

Stakeholders Using Sync/ Overlay functions to coordinate across disciplines

Distribute information in a timely manner Real time updates with cloud based files Hyperlinking between drawing sets

Page 24: Mortenson Construction - Bluebeam IRC 2013

Case Study

Exempla Saint Joseph Heritage ProjectDesign Collaboration in Real Time

Page 25: Mortenson Construction - Bluebeam IRC 2013

Case Study

Exempla Saint Joseph Heritage ProjectDesign Collaboration in Real Time

Page 26: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage ProjectGetting Accurate Information to the Field

Case Study

Page 27: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage ProjectGetting Accurate Information to the Field

Case Study

Page 28: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage Project

Case Study

• Challenge: Mobility

Now that everything is in the cloud, how do we access information with no internet connection?

• Solutions

Local Sync Local Sync on a desktop PC at a Plan Room Computer Local Sync on a mobile device with a Tablet PC or an iPad

Page 29: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage ProjectWorking Offline in an Online World

Case Study

Page 30: Mortenson Construction - Bluebeam IRC 2013

Exempla Saint Joseph Heritage ProjectWorking Offline in an Online World

Case Study

Page 31: Mortenson Construction - Bluebeam IRC 2013

Questions? (frågor)