03/08/2017 C163 SCHEDULE 1 TO THE DEVELOPMENT CONTRIBUTIONS PLAN OVERLAY Shown on the planning scheme map as DCPO1. MORELAND DEVELOPMENT CONTRIBUTIONS PLAN OVERLAY 1.0 10/09/2015 C133 Area covered by the development contributions plan overlay This development contributions plan applies to the area within the red line shown in Figure 1 below. This is all land within the City of Moreland. FIGURE 1 – DCP Area and Charging Areas 2.0 10/09/2015 C133 Summary of costs A summary of all costs and incomes is shown in Table 1 below. Table 1 – summary of dcp costs Proportion of cost attributable to development % Actual cost contribution attributable to development $ (real terms) Time of provision Total cost $ Facility 7.68% $3,148,365 2012-2023 $40,985,000 CI Community Infrastructure MORELAND PLANNING SCHEME Page 1 of 6

Transcript of more - Moreland - Planning Schemes...

03/08/2017C163

SCHEDULE 1 TO THE DEVELOPMENT CONTRIBUTIONS PLAN OVERLAYShown on the planning scheme map as DCPO1.

MORELAND DEVELOPMENT CONTRIBUTIONS PLAN OVERLAY

1.010/09/2015C133

Area covered by the development contributions plan overlayThis development contributions plan applies to the area within the red line shown in Figure 1below. This is all land within the City of Moreland.

FIGURE 1 – DCP Area and Charging Areas

2.010/09/2015C133

Summary of costsA summary of all costs and incomes is shown in Table 1 below.

Table 1 – summary of dcp costs

Proportion of costattributable todevelopment %

Actual costcontributionattributable todevelopment $ (realterms)

Time ofprovision

Total cost $Facility

7.68%$3,148,3652012-2023$40,985,000CI CommunityInfrastructure

MORELAND PLANNING SCHEME

Page 1 of 6

Proportion of costattributable todevelopment %

Actual costcontributionattributable todevelopment $ (realterms)

Time ofprovision

Total cost $Facility

8.56%$703,1532012-2023$8,215,550DI CommunityInfrastructure

15.49%$9,581,1252012-2023$61,856,992DI Roads

13.48%$504,0362012-2020$3,738,000DI Drainage

16.56%$20,8642012-2013$126,000DI Planning

12.15%$13,957,544$114,921,542TOTAL

3.010/09/2015C133

Summary of contributionsThe development contributions that apply to each charging area in the DCP Area are shown inTable 2 for Residential Development, Table 3 for Industrial Development and Table 4 forCommercial Development.

Development contribution amounts are current as at 01 July 2012. They must be adjusted annuallyon July 1 each year in accordance with the methodology set out in the Moreland DevelopmentContributions Plan (incorporated document).

Notes:

Residential development is subject to the Development Infrastructure and Community InfrastructureLevy.

Industrial or Commercial development is required to pay a Development Infrastructure Levy butis not required to pay a Community Infrastructure Levy.

MORELAND PLANNING SCHEME

Page 2 of 6

Table 2 - Levies payable for residential development per dwelling

Revised Residential

Community InfrastructureDevelopment Infrastructure

TotalInfrastructure

Charge

TotalCommunityInfrastructure

ChargeCommunityFacility

TotalDevelopmentInfrastructure

ChargeCommunityFacilityPlanningRoadDrainageSuburbArea

Per DwellingPer DwellingPer DwellingPer DwellingPer DwellingPer DwellingPer DwellingPer Dwelling

$323.64$205.64$205.64$118.00$0.00$1.50$99.28$17.22Brunswick East/NorthFitzroy

1

$539.36$253.50$253.50$285.86$28.24$1.50$193.79$62.33Brunswick2

$345.53$65.04$65.04$280.49$104.71$1.50$174.28$0.00Brunswick West3

$1,459.98$177.13$177.13$1,282.86$163.93$1.50$1,073.46$43.97Coburg4

$731.75$231.27$231.27$500.47$88.65$1.50$410.32$0.00Pascoe Vale South5

$1,150.31$421.54$421.54$728.77$141.95$1.50$567.09$18.23Coburg North6

$1,309.65$609.86$609.86$699.79$0.00$1.50$571.26$127.03Pascoe Vale7

$637.76$391.46$391.46$246.31$0.00$1.50$201.15$43.65Oak Park8

$1,062.24$586.77$586.77$475.47$0.00$1.50$473.97$0.00Fawkner9

$645.64$203.90$203.90$441.73$50.88$1.50$369.47$19.88Hadfield10

$726.80$407.48$407.48$319.32$58.82$1.50$259.00$0.00Glenroy11

$458.81$168.80$168.80$290.01$0.00$1.50$288.51$0.00Gowanbrae/Tullamarine12

MORELAND PLANNING SCHEME

Page 3 of 6

Table 3 - Levies payable for industrial development per 100 square metres of leasable floorspace

Revised Industrial

Community InfrastructureDevelopment Infrastructure

TotalInfratructure

Charge

TotalCommunityInfrastructure

ChargeCommunityFacility

TotalDevelopmentInfrastructure

ChargeCommunityFacilityPlanningRoadDrainageSuburbArea

Per 100 sqmFloorspace

Per 100 sqmFloorspace

Per 100 sqmFloorspace

Per 100 sqmFloorspace

Per 100 sqmFloorspace

Per 100 sqmFloorspace

Per 100 sqmFloorspace

Per 100 sqmFloorspace

$84.89$0.00$0.00$84.89$0.00$0.30$75.21$9.38Brunswick East/NorthFitzroy

1

$181.06$0.00$0.00$181.06$0.00$0.30$146.81$33.95Brunswick2

$132.33$0.00$0.00$132.33$0.00$0.30$132.03$0.00Brunswick West3

$837.47$0.00$0.00$837.47$0.00$0.30$813.22$23.95Coburg4

$311.15$0.00$0.00$311.15$0.00$0.30$310.85$0.00Pascoe Vale South5

$439.84$0.00$0.00$439.84$0.00$0.30$429.61$9.93Coburg North6

$502.26$0.00$0.00$502.26$0.00$0.30$432.77$69.19Pascoe Vale7

$176.46$0.00$0.00$176.46$0.00$0.30$152.39$23.78Oak Park8

$359.37$0.00$0.00$359.37$0.00$0.30$359.07$0.00Fawkner9

$291.03$0.00$0.00$291.03$0.00$0.30$279.90$10.83Hadfield10

$196.51$0.00$0.00$196.51$0.00$0.30$196.21$0.00Glenroy11

$218.87$0.00$0.00$218.87$0.00$0.30$218.57$0.00Gowanbrae/Tullamarine12

MORELAND PLANNING SCHEME

Page 4 of 6

Table 4 - Levies payable for commercial development per 100 square metres of leasable floorspace

Revised Commercial

Community InfrastructureDevelopment Infrastructure

TotalInfratructure

Charge

TotalCommunityInfrastructure

ChargeCommunityFacility

TotalDevelopmentInfrastructure

ChargeCommunityFacilityPlanningRoadDrainageSuburbArea

Per 100 sqmFloorspace

Per 100 sqmFloorspace

Per 100 sqmFloorspace

Per 100 sqmFloorspace

Per 100 sqmFloorspace

Per 100 sqmFloorspace

Per 100 sqmFloorspace

Per 100 sqmFloorspace

$401.69$0.00$0.00$401.69$0.00$1.23$389.34$11.12Brunswick East/NorthFitzroy

1

$801.45$0.00$0.00$801.45$0.00$1.23$759.95$40.27Brunswick2

$684.69$0.00$0.00$684.69$0.00$1.23$683.46$0.00Brunswick West3

$4,239.26$0.00$0.00$4,239.26$0.00$1.23$4,209.63$28.40Coburg4

$1,610.34$0.00$0.00$1,610.34$0.00$1.23$1,609.11$0.00Pascoe Vale South5

$2,236.89$0.00$0.00$2,236.89$0.00$1.23$2,223.88$11.78Coburg North6

$2,323.53$0.00$0.00$2,323.53$0.00$1.23$2,240.24$82.06Pascoe Vale7

$818.26$0.00$0.00$818.26$0.00$1.23$788.83$28.20Oak Park8

$1,859.94$0.00$0.00$1,859.94$0.00$1.23$1,858.71$0.00Fawkner9

$1,462.98$0.00$0.00$1,462.98$0.00$1.23$1,448.91$12.84Hadfield10

$1,016.93$0.00$0.00$1,016.93$0.00$1.23$1,015.70$0.00Glenroy11

$1,132.63$0.00$0.00$1,132.63$0.00$1.23$1,131.40$0.00Gowanbrae/Tullamarine12

MORELAND PLANNING SCHEME

Page 5 of 6

4.003/08/2017C163

Land or development excluded from the development contributions planThe following land or development is exempt from the requirement to pay development contributionunder theMoreland Development Contributions Plan - January 2015:

Land developed for a non-government school as defined in Part 3 of the Ministerial Directionon Development Contributions Plans of 25 January 2012;

Land located at 173 – 199 Elizabeth Street, Coburg being the land more particularly describedas Lot D and LL on PS 646672U being the whole of the land contained in Certificates of TitleVolume 11309 Folio 031 and Volume 11309 Folio 032. (the former Kodak site)

A development that comprises:

– renovations or alterations to an existing dwelling;

– demolition of a dwelling followed by construction of a replacement dwelling on the sameland. The exemption applies to a single dwelling but not to a second or subsequent dwellingson the same land;

– outbuildings normal to an existing dwelling and fences; and

– reinstatement of a building which has been unintentionally damaged or destroyed providedthat for a building other than a dwelling, the exemption relates only to the extent that thefloor area of the new building is not greater than the damaged or destroyed building.

This schedule sets out a summary of the costs and contributions prescribed in the Moreland DevelopmentContributions Plan. Refer to the incorporated Moreland Development Contributions Plan – January 2015for full details.