C270 (HK BIODIESEL PLANT) Safety Report
C270 Monthly Safety Report – February 2013
![Page 2: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/2.jpg)
Safety :Contribution from All Level ( Top to Shop )
SAFETY STATISTICS
C270 Monthly Safety Report – February 2013
Jan 2013 Feb 2013
Accumulated Man-hour 445,951 517,794
Days worked from Commencement
449 477
Accumulated Man-day Lost 814 926
Cumulative Accident Frequency Rate
1.03 0.97
![Page 3: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/3.jpg)
SAFETY INSPECTION / MEETINGPhysical site safety walks
C270 Monthly Safety Report – February 2013
![Page 4: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/4.jpg)
SAFETY INSPECTION / MEETING
Weekly Safety Meetings with Safety Representatives of Subcontractors
C270 Monthly Safety Report – February 2013
![Page 5: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/5.jpg)
AREA NEED IMPROVEMENT
C270 Monthly Safety Report – February 2013
HOUSEKEEPINT – Safe AccessPlanning of storage of construction material in transit
PROMPT RECTIFICATION
Improvement – Construction material in transit removed to maintain safe access
![Page 6: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/6.jpg)
AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
HOUSEKEEPINT – Safe AccessPlanning of storage of construction material in transit
Improvement – Construction material in transit removed to maintain safe access
C270 Monthly Safety Report – February 2013
![Page 7: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/7.jpg)
AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
NOISE NUISANCEExcessive noise generated to employees working near by
Improvement – Provision of Acoustic Barrier to minimize noise nuisance to protect occupational health of employee
C270 Monthly Safety Report – February 2013
![Page 8: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/8.jpg)
POSITIVE SAFETY ATTITUDE
PRE-WORK MEETING
Installation of Pipe Bridge – Integration of safety consideration in both Planning Stage and Implementation Stage
C270 Monthly Safety Report – February 2013
![Page 9: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/9.jpg)
POSITIVE SAFETY ATTITUDE
PRE-WORK MEETING
Installation of Pipe Bridge – Integration of safety consideration in both Planning Stage and Implementation Stage
C270 Monthly Safety Report – February 2013
![Page 10: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/10.jpg)
POSITIVE SAFETY ATTITUDE
SITE SECURITY CONTROL
Security Guard Force + Electronic Recognition System + Managerial Regular Checking
C270 Monthly Safety Report – February 2013
![Page 11: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/11.jpg)
POSITIVE SAFETY ATTITUDE
OCCUPATIONAL HEALTH & SAFETY CONTROL
Regular Physical Checking to Individual’s Safety HelmetOccupational Health Advice
C270 Monthly Safety Report – February 2013
![Page 12: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/12.jpg)
POSITIVE SAFETY ATTITUDE
Regular Site Safety Inspection by Labour Department’s District Occupational Officer
QUALITY, SAFETY and ENVIRONMENT Inspection by Government Department
C270 Monthly Safety Report – February 2013
![Page 13: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/13.jpg)
SAFETY TRAINING
Site Specific Safety Induction
Current MonthAccumulate (Oct 2011 –
Feb 2013)
No. of class 17 335
No. of Attendee 62 1503
INDUCTIONTRAINING
C270 Monthly Safety Report – February 2013
![Page 14: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/14.jpg)
TOOL BOX TALKTRAININGSAFETY TRAINING
Topic No. of attendee
Safety Lifting Safety 76
Safety Before & After Long Holiday 77
Environmental Dust Control Management 62
Safety RA – Working on Jetty 16
Current Month Total 229 nos.
Accumulated Total : 5,294 nos.
C270 Monthly Safety Report – February 2013
![Page 15: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/15.jpg)
SAFETY Promotion
3 nos. Safety News / Alert Sharing
9 nos. Safety Reminder to Subcontractors
5 nos. General Safety Advice on Construction Safety
5 nos. Internal – BDI interface
1 no.Risk Assessment – Fabrication & Installation
of Pipe Bridge
1 no. Safety Promotional Article
Safety Circulation
C270 Monthly Safety Report – February 2013
![Page 16: Monthly safety report 2013 02](https://reader035.fdocuments.net/reader035/viewer/2022081720/558759b2d8b42a88718b4596/html5/thumbnails/16.jpg)
C270 Monthly Safety Report – February 2013