Status from 28.12.11 to 10.01.2012 Boiler Erection work Bunker Fabrication Bunker Erection progress CHP Gallery Status Condenser Condenser Tubes ESP ESP 1ST FIELD COLLECTING PLATES

description

Erection Sequence of Power Plant

Transcript of Month Wise Erection Photos

Page 1: Month Wise Erection Photos

Status from 28.12.11 to 10.01.2012

Boiler Erection work Bunker Fabrication Bunker Erection progress CHP Gallery Status

Condenser Condenser Tubes ESP ESP 1ST FIELD COLLECTING PLATES

HP Heaters SA & PA FAN FOUNDATION TRANSFER TOWER COLUMNS GROUND PRE ASSY DECK SLEEVES ERECTION

Page 2: Month Wise Erection Photos

Status from 12.01.12 to 22.01.2012

Boiler Structure Coal Bunker ESP Bottom Hopper Pre Assembly ESP Collecting Electrodes Erection

PA & SA Fan Foundations Primary Crusher House Cum Foundations Deaerator Platform Cooling Tower

TG Building Structure Stator Generator Transformer STG Deck Reinforcement

Page 3: Month Wise Erection Photos

Status as on 31.01.2012

Boiler Structure CHP Control Room Ground Hopper Screen House & Conveyor Trench Foundations

Coal Bunker Canopy Structure Coal Bunker Erection Cooling Tower ESP Collecting Electrode Erection

Excavation For ID Fan Foundation STG Deck TG Building Staircase Generator Transformer

Page 4: Month Wise Erection Photos

Status from 04.02.12 to 19.02.12

Water Wall Panel Erection BFP Suction Line CHP Conveyor Trestles & Gallery Erection Coal Bunker Hopper Plate Erection

Cyclone Top & Bottom Cones Pre Assembly Cyclone Pre Assembly ESP Control Room Foundations CEP Base Frames Grouting

PA & SA Fan Foundations ID Fan & Duct Supporting Foundations STG Deck TG Building Brick Work Towards North

Page 5: Month Wise Erection Photos

Status from 20.02.12 to 29.02.12

Water Wall Panels Pre Assembly RHS Water Wall Panels Coal Bunker Structure, Bunker & Canopy ESP Hopper Top Part Erection For Stream 1

Erection of ESP Collecting Electrodes For Stream 1 Blue Matching For CEP & DTP-1 Refractory Anchors Welding For Cyclone Oil Purifier Foundations

Cribs Dismantling For STG Deck TG Integral Non IBR Piping TG Building Sheeting Generator Packer Plates

Page 6: Month Wise Erection Photos

Status from 03.03.12 to 11.03.12

Boiler Steam Drum Boiler Refractory Ground Hopper Coal Bunker & Canopy Structure Secondary Crusher

Economizer Coils Pre Assembly ESP Control Room & Compressor ESP Stream -2 Bottom Hopper Erection Condenser LP Heater 7 CEP Pump Base Frame Erection Foundations

Piping ID Fan & Duct Supporting Trestle -16 Erection Turbine 2nd Bearing pedestal TG Building South Side wall Column Foundations Packer Plates Grouting & Side Sheeting

Page 7: Month Wise Erection Photos

Status from 12.03.12 to 18.03.12

Boiler Boiler 1st Pass Boiler 3rd Pass BFP Suction Piping DTP & CEP Pump Assembly

ESP Assay 1 ESP Assay 2 ESP Out Let Duct Deaerator Level Stand Pipe HP Heaters in 6 Mtrs

MOT Erected Generator Cooling Chamber RCC Started Stator Assy Making Ready for Lifting Stator Lifting to its Position TG Building Towards North Side

Page 8: Month Wise Erection Photos

Status from 22.03.12 to 10.04.12

Boiler Drum Lifting Boiler Down Comers & Water Wall Panels Coal Feeders CEP & DTP Motors Erection ESP Roof Insulation

Ducting GSC Piping Cooling Tower Sleeves Erection PA & SA Fan Foundation ID Fan Foundations

Oil Cooler Cooling water Piping Stator Lifting @9.2 Mtrs Turbine 1st Bearing Pedestals Erection Switch Yard Towers Auxiliary Foundations Transfer Tower Columns Erection

Page 9: Month Wise Erection Photos

Status from 12.04.12 to 22.04.12

Cage Wall Front Panel Coal Bunker Canopy Side Sheeting Down Comer Lifting HP Feed Water Line High Temperature Super Heater Coils Pre Assembly

Piping Pre Assembly COT & DOT Tanks ESP Control Room & Compressor Drain Flash Tank Main Folder Line DM Plant & DW Water Storage Tank Foundations Foundations

ID Fan & ESP Outlet Duct Supporting ID Fan2 Foundations PA & SA Fan Foundations Stator Alignment Switch Yard Columns Foundations

Page 10: Month Wise Erection Photos

Status from 23.04.12 TO 30.04.12

Plant View West Side Boiler Canopy Structure Front Cage Wall Panel ESP Control Room Foundations

Insulation & Cladding for ESP Casing DM Plant & DM Water Storage Foundations ID Fan1 & Duct Supporting Column Foundations ID Fan 2 Foundations

Cable Trench Cable Tray Support at TG Cellar Excavation for UAT Foundations LP Casing Base Frames

Page 11: Month Wise Erection Photos

Status from 02.05.12 TO 13.05.12

Plant Overview Coal Conveyor Gallery Cage Water Wall Panels Plenum Platen Tubes Pre Assembly

BFP-B Motor Blue Matching ESP Control Room & Compressor Foundations ESP Casing Insulation & Sheeting ID Fan1 & Duct Supporting Column Foundations

DM Water Storage Tank SA Fan Erection LP Outer Casing UAT Foundations

Page 12: Month Wise Erection Photos

Status from 15.05.12 to 22.05.12