F-GS VER-MR Monitoring report form (Version 03.2) Monitoring report Title of the project activity Energy Efficiency measures in DMRC Phase II Stations Reference number of the project activity 103000000001684 Version number of the monitoring report 01 Completion date of the monitoring report 27/08/2014 Registration date of the project activity 20/12/2013 Monitoring period number and duration of this monitoring period I st Monitoring Period Duration 2 years (01/01/2012 31/12/2013) Project participant(s) Delhi Metro Rail Corporation (DMRC) Ltd. Host Party(ies) India Sectoral scope(s) and applied methodology(ies) AMS-II.E; Energy efficiency and fuel switching measures for buildingsEstimated amount of GHG emission reductions or net anthropogenic GHG removals by sinks for this monitoring period in the registered PDD 01/01/2012-31/12/2012 7071 tCO 2 e 01/01/2013-31/12/2013 7071 tCO 2 e Total 14142 tCO 2 e Actual GHG emission reductions or net anthropogenic GHG removals by sinks achieved in this monitoring period 01/01/2012-31/12/2012 6152 tCO 2 e 01/01/2013-31/12/2013 6043 tCO 2 e Total 12195 tCO 2 e

Transcript of Monitoring report form (Version 03.2)

Page 1: Monitoring report form (Version 03.2)

F-GS VER-MR

Monitoring report form

(Version 03.2)

Monitoring report

Title of the project activity Energy Efficiency measures in DMRC Phase II Stations

Reference number of the project activity 103000000001684

Version number of the monitoring report 01

Completion date of the monitoring report 27/08/2014

Registration date of the project activity 20/12/2013

Monitoring period number and duration of this

monitoring period

Ist Monitoring Period

Duration – 2 years (01/01/2012 – 31/12/2013)

Project participant(s) Delhi Metro Rail Corporation (DMRC) Ltd.

Host Party(ies) India

Sectoral scope(s) and applied methodology(ies) AMS-II.E; “Energy efficiency and fuel switching

measures for buildings”

Estimated amount of GHG emission reductions

or net anthropogenic GHG removals by sinks

for this monitoring period in the registered PDD

01/01/2012-31/12/2012 – 7071 tCO2e

01/01/2013-31/12/2013 – 7071 tCO2e

Total – 14142 tCO2e

Actual GHG emission reductions or net

anthropogenic GHG removals by sinks achieved

in this monitoring period

01/01/2012-31/12/2012 – 6152 tCO2e

01/01/2013-31/12/2013 – 6043 tCO2e

Total – 12195 tCO2e

Page 2: Monitoring report form (Version 03.2)

F-GS VER-MR

SECTION A. Description of project activity

A.1. Purpose and general description of project activity

>>

Energy Efficiency measures at DMRC Phase II stations (hereafter referred to as the “Project”) developed by

Delhi Metro Rail Corporation Ltd. (hereafter referred to as the DMRC) is located in state of Delhi, India. The

project involves implementation of energy efficiency measures in selected stations of Phase II of Delhi Metro

managed by DMRC as listed in section A.3.1.4 of PDD.

The energy efficiency measures have been undertaken primarily in the Heating, Venting and Air Conditioning

(HVAC) system, lighting system and other energy efficient measures of station buildings. The measures

adopted in the HVAC system result in reduction in electrical energy consumption, in comparison to that for a

station building forming a part of Phase I of Delhi Metro with similar size (in terms of floor area) and

architectural perspectives. Energy efficient measures adopted by DMRC in its Phase II stations are as follows:

1. T-8 tube lights with 67 lumen/w efficacy have been provided on Elevated stations and no incandescent

lamps have been used for lighting

2. Variable Voltage Variable Frequency (VVVF) control drive system in Lifts & Escalators, which matches

the power requirements with actual load. The Escalators have been provided with idling speed of 0.2m/sec

against the normal operating speed of 0.5m/sec or 0.65m/sec. This has resulted in estimated energy saving

of 1%.

The baseline scenario identified in registered PDD is the same as the scenario existing prior to the start of

implementation of the project activity i.e. Phase II stations implemented using similar technologies as Phase I

with no energy efficiency measures.

A.2. Location of project activity

>>

The project activity includes 37 over-ground (elevated) metro station buildings forming a part of Phase II of

Delhi Metro detailed below. The geographical coordinates for all the stations have been given below:

S No. Station Name Station Code Latitude Longitude

1 Adarsh Nagar AHNR 28°42’59.63” 77°10’13.80”

2 Anand Vihar AVIT 28°38’48.30” 77°18’57.54”

3 Arjangarh ARJ 28°29’25.42” 77°07’33.57”

4 Azadpur AZU 28°42’25.26” 77°10’50.23”

5 Botanical Garden BCGN 28°33’50.07” 77°20’04.08”

6 Dwarka Sector - 8 DSET 28°33’56.24” 77°04’00.94”

7 Ghittorni GHTI 28°29’37.82” 77°08’59.89”

8 Golf Course GEC 28°34’01.34” 77°20’45.81”

9 Govindpuri GDPI 28°32’54.46” 77°15’32.80”

10 Guru Dronacharya GE 28°29’41.56” 77°06’00.93”

11 Huda City Centre HCC 28°27’32.97” 77°04’21.26”

12 Iffco Chowk IFFCO 28°28’19.06” 77°04’21.21”

13 Jasola Apollo JLA 28°32’18.07” 77°16’59.25”

14 Jhilmil JLML 28°40’32.94” 77°18’44.71”

Page 3: Monitoring report form (Version 03.2)

F-GS VER-MR

15 Kalkaji Mandir KJMD 28°32’58.10” 77°15’32.80”

16 Karkardooma KKDA 28°38’53.59” 77°18’18.58”

17 Lajpat Nagar LJPN 28°34’13.90” 77°14’10.85”

18 Mansarovar Park MPK 28°40’31.25” 77°18’05.88”

19 Mayur Vihar Extension MVPE 28°35’42.00” 77°17’39.59”

20 Mayur Vihar Phase 1 MVP1 28°36’15.34” 77°17’22.35”

21 MG Road MGRO 28°28’46.60” 77°04’48.27”

22 Model Town MDTW 28°42’09.82” 77°11’38.22”

23 Mohan Estate METE 28°31’10.23” 77°17’40.39”

24 Moolchand MLCD 28°33’50.37” 77°14’02.94”

25 Nehru Place NP 28°33’05.54” 77°15’06.98”

26 Noida City Centre NCC 28°34’32.11” 77°21’20.53”

27 Noida Sector - 18 NSET 28°34’14.79” 77°19’34.23”

28 Noida Sector - 15 NSFT 28°35’06.07” 77°18’41.99”

29 Noida Sector - 16 NSST 28°34’42.34” 77°19’03.05”

30 Qutab Minar QM 28°31’17.21” 77°11’12.05”

31 Sarita Vihar STVR 28°31’44.04” 77°17’17.63”

32 Satguru Ramsingh Marg SRSM 28°39’43.51” 77°09’26.96”

33 Shivaji Park SHVP 28°40’29.81” 77°07’49.32”

34 Sikanderpur SKRP 28°29’10.11” 77°05’31.89”

35 Sultanpur SLTP 28°29’56.89” 77°09’41.52”

36 Tughlakabad TKBD 28°30’08.61” 77°17’57.61”

37 Yamuna Bank YB 28°40’33.14” 77°16’04.50”

Page 4: Monitoring report form (Version 03.2)

F-GS VER-MR

Figure: World Map showing India within which Delhi is shown with Metro lines

Page 5: Monitoring report form (Version 03.2)

F-GS VER-MR

Figure: Project boundary

A.3. Parties and project participant(s)

Party involved

((host) indicates

a host Party)

Private and/or public entity(ies)

project participants

(as applicable)

Indicate if the Party involved

wishes to be considered as

project participant

(Yes/No)

India Delhi Metro Rail Corporation Ltd. No

A.4. Reference of applied methodology

>>

Main Category: Type II – Energy efficiency improvement project

Page 6: Monitoring report form (Version 03.2)

F-GS VER-MR

AMS-II.E; “Energy efficiency and fuel switching measures for buildings”

Version 10, CDM EB35

A.5. Crediting period of project activity

>>

10 years; 01/01/2012 – 31/12/2021

SECTION B. Implementation of project activity

B.1. Description of implemented registered project activity

>>

The start date of the construction of the project activity is January 2006 when the first contract for construction

oh Phase II stations was given through civil contract for Adarsh Nagar, Azadpur and Model Town stations while

the start date of operation of project activity is 2011.

The start date of the operation of individual the stations of phase II are provided below:

Sl.no. Name of station Station code Start date

1 Adarsh Nagar AHNR Feb-09

2 Anand Vihar ISBT AVIT Jan-10

3 Arjangarh ARJ Jun-10

4 Azadpur AZU Feb-09

5 Botanical Gardn BCGN Nov-09

6 Dwarka Sector 8 DSET Oct-10

7 Ghittorni GHTI Jun-10

8 Golf Course GEC Nov-09

9 Govindpuri GDPI Oct-10

10 Guru Dronacharya GE Jun-10

11 Huda City Centre HCC Jun-10

12 Iffco Chowk IFFCO Jun-10

13 Jasola JLA Oct-10

14 Jhilmil JLML Jun-08

15 Kalkaji Mandir KJMD Oct-10

16 Karkardooma KKDA Jan-10

17 Lajpat Nagar LJPN Oct-10

18 Mansoravar MPK Jun-08

19 Mayur Vihar Extension MVPE Nov-09

20 Mayur Vihar Phase I MVP1 Nov-09

21 MG Road MGRO Jun-10

22 Model Town MDTW Feb-09

Page 7: Monitoring report form (Version 03.2)

F-GS VER-MR

23 Mohan Estate METE Jan-11

24 Moolchand MLCD Oct-10

25 Nehru Place NP Oct-10

26 Noida City Centre NCC Nov-09

27 Noida Sector Eighteen NSET Nov-09

28 Noida Sector Fiftn NSFT Nov-09

29 Noida Sector Sixteen NSST Nov-09

30 Qutub Minar QM Jun-10

31 Sarita Vihar STVR Oct-10

32 Satguru Ramsingh Marg SRSM Aug -11

33 Shivaji Park SHVP Jan-10

34 Sikanderpur SKRP Jun-10

35 Sultanpur SLTP Jun-10

36 Tughlakabad TKBD Jan-10

37 Yamuna Bank YB May-09

B.2. Post registration changes

B.2.1. Temporary deviations from registered monitoring plan or applied methodology

>>

NA

B.2.2. Corrections

>>

NA

B.2.3. Permanent changes from registered monitoring plan or applied methodology

>>

NA

B.2.4. Changes to project design of registered project activity

>>

NA

B.2.5. Changes to start date of crediting period

>>

NA

Page 8: Monitoring report form (Version 03.2)

F-GS VER-MR

B.2.6. Types of changes specific to afforestation or reforestation project activity

>>

NA

SECTION C. Description of monitoring system

>>

DMRC has implemented following structure for data monitoring, collection, data archiving and calibration of

equipments for this project activity. DMRC is the responsible entity for all monitoring procedures verifying the

VERs generated by the power project annually.

Monitoring Plan Objective and Organization

DMRC monitors the electricity consumed in all the station buildings forming the part of project activity. The

data is archived electronically and will be stored for 2 years after the end of the crediting period.

To ensure that the data is reliable and transparent, the project entity has established Quality Assurance and

Quality Control (QA&QC) measures to effectively control and manage data reading, recording, auditing as well

as archiving data and all relevant documents. The data is monitored on a monthly basis and submitted to

Quality Assurance team of project proponent.

Quality Assurance and Quality Control

QA&QC procedures for recording, maintaining and archiving data have been implemented as part of this Gold

Standard project activity.

QA&QC measures have been implemented to ensure the accuracy of metering and safety aspects of the project

operation. The metering devices are inspected properly and periodically, according to state electricity board’s

specifications and requirements to ensure accuracy in the readings. In addition to that, regular station meter

calibrations for both the project and baseline stations are being carried out.

Training and maintenance procedures: Carbon credit Quality Advisor ensured training to on-site staff with

respect to adherence to the Monitoring Plan of the project activity.

Internal audit of all the records of the plant will be carried out twice a year. During these audits all the data and

parameters that need to be monitored as per the monitoring plan would be checked and shortcomings if any will

be reported and addresses.

Data Storage and Archiving

In order to facilitate auditors’ reference and for any future requirement, relevant literature relating to the project

such as the project material and monitoring results are indexed. All the data items monitored under the

monitoring plan will be kept for 2 years after the end of crediting period or till the last issuance of VERs for this

project activity, whichever occurs later. The data will be maintained in both electronic and paper formats. The

data will be stored in following manner:

A copy of data will be maintained in electronic and paper format on-site for anytime reference and validation.

The energy consumption per station data and calibration certificates of all stations will be maintained in the

E&M Division of DMRC, Metro Bhawan. The operational area for each station is stored in the Civil Division

of DMRC, Metro Bhawan.

A copy of data will be stored in paper format by project operator in their branch office in safe storage.

SECTION D. Sustainability Monitoring Plan

>>

According to GS toolkit, the sustainability monitoring plan is required for each non-neutral indicator according

to GS Annex I. The indicators directly impacting sustainability are positive in nature and hence do not require

mitigation measures. However the main parameter for the project activity which is energy conservation by the

Phase II metro stations has been monitored during the entire crediting period. The energy conservation by

Page 9: Monitoring report form (Version 03.2)

F-GS VER-MR

Phase II stations is calculated on the basis of energy consumption data by each station of the project activity.

Since it is a neutral parameter, hence a mitigation measure is not applicable to this parameter. The project as a

whole contributes to sustainability as evident from the sustainable matrix described below. Thus the table for

the non-neutral parameters is not applicable to the project activity. However, to have a better assessment for the

impact of the project activity on the sustainable development, the major parameter of the project which is

energy consumption by metro stations has been monitored quantitatively and qualitatively during the crediting

period.

No 1

Indicator Energy Consumption for all the stations included in project

activity

Mitigation measure NA

Chosen parameter Energy Consumption for all the stations included in project

activity

Current situation of parameter By implementation of various energy efficiency measures in the

project stations a total of 13228 MWh of electrical energy has

been saved by Delhi Metro within the monitoring period. This has

henceforth resulted in reduction in GHG emissions and

contributed to sustainability of the project activity.

Estimation of baseline situation of

parameter

The baseline situation is the energy consumption by the Phase I

stations of Delhi metro which are energy intensive.

Future target for parameter The data will be measured continuously and will be recorded

every month for all the station buildings using electricity meter

Way of monitoring How The data is taken from site records (log books) maintained by

DMRC on electricity consumption for all the stations covered by

the project activity and are part of Phase II of Delhi Metro

When Monthly

By who Project proponent

No 2

Indicator Access to affordable and clean energy services

Mitigation measure NA

Chosen parameter SP8/Safe and Healthy work environment

Current situation of parameter DMRC was awarded with OHSAS 18001:2007 certification1 for a

period valid from 26 March, 2013 to 25 March, 2016. The scope

of certification includes operation and maintenance of Delhi

Metro line-2 covering 34 stations from Jahangir Puri to HUDA

City Centre and Khyber Pass and Sultanpur Depots.

Estimation of baseline situation of

parameter

DMRC is accredited to OHSAS 18001 standard. It has developed

a QEHS policy (Quality Environment Health and Safety) policy

which is followed strictly. All tenders for construction built-in

clauses for maintaining safety health and environment.

Future target for parameter Continued compliance to OHSAS standard

Way of monitoring How Checking compliance to health and safety management plan,

training session, health and safety programmes

When Annual

By who Project proponent

No 3

Indicator Human and institutional capacity Mitigation measure NA

1 OHSAS 18001:2007 Certificate dated 26/03/2013

Page 10: Monitoring report form (Version 03.2)

F-GS VER-MR

Chosen parameter SP9/ Safeguarding environment

Current situation of parameter DMRC was awarded with OHSAS 14001:2004 certification2 for a

period valid from 26 March, 2013 to 25 March, 2016. The scope

of certification includes operation and maintenance of Delhi

Metro line-2 covering 34 stations from Jahangir Puri to HUDA

City Centre and Khyber Pass and Sultanpur Depots.

Estimation of baseline situation of

parameter

DMRC has been awarded with ISO 14001 certificate and

complies with its Environmental Policy

Future target for parameter Continued compliance with ISO 14001 standard

Way of monitoring How Checking compliance to Environmental Management Plan

When Annual

By who Project proponent

No 4

Indicator Balance of payments and investment

Mitigation measure NA

Chosen parameter SP11/Anti-corruption policy

Current situation of parameter DMRC observes Vigilance Awareness Week on an annual basis

with a unique theme every year. In 2012, vigilance week was

observed from 29th

October 2012 to 3rd

November 2012 with the

theme being ‘Transparency in Public Procurement. While in

2013, it was observed from 28th

October to 2nd

November 2013

and the theme of the occasion was “Promoting Good

Governance – Positive Contribution of Vigilance”.

The weekly event involves hosting a variety of activities

including training, presentations, quiz, stage shows, slogan

writing etc. The main objective of the event is to sensitize the

employees about the importance of transparency and being

vigilant in day-to-day working.

Estimation of baseline situation of

parameter

DMRC has anti-corruption policy at place

Future target for parameter Continued compliance to anti-corruption policy

Way of monitoring How Vigilance checks

When Annually

By who Project proponent

No 5

Indicator Air quality

Mitigation measure NA

Chosen parameter SI1/Air Quality

Current situation of parameter Metro directly does not generate any air pollution as it runs on

electricity. However, ambient air quality monitoring and analysis

was carried out for the following stations of phase II of the Delhi

Metro:

1. Nehru Place

2. Jasola

3. Tughlakabad

4. Arjangarh

5. HUDA City Centre

6. Noida City Centre

This is a component of a 3 year Environmental Monitoring Plan

2 OHSAS 14001:2004 Certificate dated 26/03/2013

Page 11: Monitoring report form (Version 03.2)

F-GS VER-MR

(which includes Noise Monitoring, Vibration Monitoring,

Ground Water Analysis, Wastewater Analysis & Solid Waste

Testing) that began in April 2013, conducted monthly and shall

end by March 2016.This process involves the monitoring and

analysis of Particulate Matter PM10 content in air, which is a

respirable particulate matter primarily responsible for respiratory

problems.

Estimation of baseline situation of

parameter

As discussed in the sustainable development criteria, the project

activity includes energy efficient measures which do not have

any adverse effect on air quality. However as a mitigation

measure to control air pollution from other operational activities

in DMRC stations, DMRC is carrying out air quality (particulate

matter) monitoring inside its stations

Future target for parameter Prevention of air pollution in stations

Way of monitoring How PM monitoring equipment

When Monthly

By who Project proponent

No 6

Indicator Water quality and quantity

Mitigation measure NA

Chosen parameter SI2/ Water Quality

Current situation of parameter Ground Water & Waste Water Monitoring and analysis was

carried out for the following three depots of phase II of the Delhi

Metro:

1. Sultanpur

2.Yamuna Bank

3. Sarita Vihar

This is a component of a 3 year Environmental Monitoring Plan

(which includes Ambient Air Monitoring, Noise Monitoring,

Vibration Monitoring & Solid Waste Testing) that began in April

2013.

This process involves the monitoring and analysis of Ground

Water samples & Waste Water samples emanating from Effluent

Treatment Plants installed at various DMRC depots. The

following parameters were to be monitored

pH

Chemical Oxygen Demand

Biochemical Oxygen Demand

Total Suspended Solids

Oil & Grease

After the analysis of these samples it was found that almost all

parameters were falling within the Range of Prescribed Limits

by Central Pollution Control Board (CPCB).

The overall performance of Effluent Treatment Plants (ETPs)

installed at Yamuna Bank, Sarita Vihar and Sultanpur Depot was

very good since the content of all the parameters in the ETP Inlet

Sample was found to be less by a significant extent in ETP

outlet.

The pH content was within the safe limits.

TSS (Total Suspended Solids) values along with the other

parameters were also within the prescribed limits at all locations

indicating that the ground water is good and safe for Domestic

purpose.

Page 12: Monitoring report form (Version 03.2)

F-GS VER-MR

Estimation of baseline situation of

parameter

DMRC has effluent treatment plants at its depot. No water from

the depots is released into environment without prior treatment

Future target for parameter The water quality released from should be within national

standard

Way of monitoring How Water quality monitoring equipment

When Annually

By who Project proponent

No 7

Indicator Other Pollutants

Mitigation measure NA

Chosen parameter SI4/Other pollutants; Noise Pollution

Current situation of parameter Noise barriers are provided at sensitive locations such as

congested/residential areas.

Noise Monitoring and analysis was carried out near the

following stations of phase II of the Delhi Metro:

1. Near Karkardooma Flyover

2. DMRC Sarita Vihar Staff Quarters

3. DMRC Yamuna Bank Staff Quarters

This is a component of a 3 year Environmental Monitoring Plan

(which includes Ambient Air Monitoring, Ground Water

Analysis, Wastewater Analysis, Vibration Monitoring & Solid

Waste Testing) that began in April 2013.

This process involves measuring Ambient Noise near and around

selected metro stations and other DMRC establishments.

Estimation of baseline situation of

parameter

Noise monitoring has been done before construction of Phase II

stations of DMRC

Future target for parameter The noise generated by the equipments used in the project

activity will be monitored at the periphery of the equipment.

Point source of noise generation will be considered.

Way of monitoring How Noise

When Annually

By who Project proponent

No 8

Indicator Quality of employment

Mitigation measure NA

Chosen parameter SI6/Quality of employment

Current situation of parameter DMRC was awarded with OHSAS 18001:2007 certification for a

period valid from 26 March, 2013 to 25 March, 2016. The scope

of certification includes operation and maintenance of Delhi

Metro line-2 covering 34 stations from Jahangir Puri to HUDA

City Centre and Khyber Pass and Sultanpur Depots.

Estimation of baseline situation of

parameter

As discussed in Section F of the validity report, sustainable

development criteria, the project activity provides a good quality

of employment. DMRC complies with OHSAS 18001 for

occupational health and safety. DMRC also complies with its

policy of Quality Environment, Health and Safety

Future target for parameter Continue to provide quality employment in all operation and

maintenance activity for the project

Way of monitoring How Environmental Health and Safety compliance report

When Annual

By who Project proponent

Page 13: Monitoring report form (Version 03.2)

F-GS VER-MR

No 9

Indicator Livelihood of the poor

Mitigation measure NA

Chosen parameter SI7/Livelihood of the poor

Current situation of parameter Delhi Metro Rail Corporation Ltd., being a socially responsible

organization, accords high priority to social issues. Various

awareness programmes have been conducted by DMRC from

time to time to educate its stakeholder. Some of the activities

undertaken by DMRC are mentioned hereunder3:

1. For creating knowledge about HIV/AIDS/STI among labour

engaged in the construction work of Delhi Mass Rapid

Transit System, awareness programmes have continually

been conducted from time to time near Anand Vihar station.

The medium used to spread awareness include banners,

posters, street plays, songs, group discussions, counseling

and magic shows.

2. DMRC is providing medical facilities and education

services to its labourers and their children.

3. A Children’s Home, to accommodate 125 children, at Tis

Hazari having 5 dormitories, two classrooms, a playground,

an amphitheatre, a library and a mess has been constructed

by DMRC. The children home is provided with all

necessary furniture and is managed by Salaam Balak Trust.

4. Opening a ‘Winter Age Home’ in Kalkaji near Govindpuri

Metro Station, New Delhi and it is being run from

November to March every year since 2011 in collaboration

with the NGO ‘Help Age India’ for the welfare of Senior

Citizens.

Estimation of baseline situation of

parameter

As discussed in section F of the validity report, sustainable

Development indicator, revenue from the DMRC is utilized for

betterment of the livelihood of poor

Future target for parameter Children dormitory, classroom and playground for

homeless children

Develop and implement schemes for easy movement of

cycle rickshaws from and to metro stations

Old age home for helpless, homeless elders

Way of monitoring How Annual Report of DMRC

When Annual

By who Project proponent

No 10

Indicator Access to affordable and clean energy services

Mitigation measure NA

Chosen parameter SI8/Access to affordable and clean energy services

Current situation of parameter Positive

3 DMRC CSR Policy Document and Annual report 2012-13

Page 14: Monitoring report form (Version 03.2)

F-GS VER-MR

Estimation of baseline situation of

parameter

As discussed in section F of the validation report, stakeholders

have access to better services at affordable price. Reduction in

units of energy consumed contributes towards improvement in the

power scenario of Delhi

Future target for parameter Replication of energy efficient technologies to all future lines of

Delhi metro

Way of monitoring How Annual report of DMRC: for technology transfer and innovation

information

Monthly logbooks: for information on reduction in electrical units

consumed

When Annual

By who Project proponent

No 11

Indicator Human and institutional capacity

Mitigation measure NA

Chosen parameter SI9/Human and institutional capacity

Current situation of parameter

DMRC has been actively4 involved in strengthening human and

institutional capacity of society at large in the form of the

following initiatives:

1. Creating knowledge about HIV/AIDS/STI among labour

engaged in the construction work of Delhi Mass Rapid

Transit System, awareness programmes have continually

been conducted from time to time near Anand Vihar station.

The medium used to spread awareness include banners,

posters, street plays, songs, group discussions, counseling

and magic shows.

2. Opening a ‘Winter Age Home’ in Kalkaji near Govindpuri

Metro Station, New Delhi and it is being run from

November to March every year since 2011 in collaboration

with the NGO ‘Help Age India’ for the welfare of Senior

Citizens.

3. Conducting Community Interaction Programmes from time

to time to consult local residents, Resident Welfare

Associations and Project Affected Persons.

Estimation of baseline situation of

parameter

DMRC is already taking up activities to enhance human and

institutional capacity. Similarly, the carbon revenue obtained

from the project activity will be partly utilized for enhancing

human and institutional capacity in dealing with sustainability

issues.

Future target for parameter Work with NGOs and conduct environmental

awareness program

Work with schools to raise awareness on conservation

of resources

Raise awareness on female literacy and the role of

female in mitigating environmental issues

Way of monitoring How Annual reports of DMRC

When Annually

By who Project Proponent

4 DMRC CSR Policy Document and Annual report 2012-13

Page 15: Monitoring report form (Version 03.2)

F-GS VER-MR

No 12

Indicator Quantitative employment and income generation

Mitigation measure NA

Chosen parameter SI10/Quantitative employment and income generation

Current situation of parameter DMRC has a team of around 7035 employees5 with further

recruitment on a regular basis. With each phase of operation the

scope of work increases demanding more manpower. As of

March 2013, the total expenditure on employee remuneration

and related expenses was around ₨ 36,541 lakhs.

Estimation of baseline situation of

parameter

Employment generation is during installation of the equipment.

Future target for parameter Operation and maintenance of the equipment leading to

employment generation

Way of monitoring How Annual report

When Annual

By who Project proponent

No 13

Indicator Technology transfer and technological self-reliance

Mitigation measure NA

Chosen parameter SI12/Technology transfer and technological self-reliance

Current situation of parameter Positive

Estimation of baseline situation of

parameter

The energy efficient technologies of the project activity have

been utilized for the first time in DMRC and found to be

successful in reduction of energy consumed

Future target for parameter The success of the Phase II has led DMRC to implement all the

energy efficient measures of the project activity and more in

Phase III as well

Way of monitoring How Information from operations department of DMRC

When Annual

By who Project Proponent

SECTION E. Data and parameters

E.1. Data and parameters fixed ex ante or at renewal of crediting period

(Copy this table for each piece of data and parameter.)

Data / Parameter: EFy

Unit: tCO2/MWh

Description: CO2 emission factor for the NEWNE grid

Source of data: CEA published grid emission factors

Value(s) applied): 0.9219 tCO2/MWh

Purpose of data: To calculate baseline emissions

Additional comment: http://www.cea.nic.in/reports/planning/cdm_co2/cdm_co2.htm

Data / Parameter: ECBL,m

Unit: kWh

5 DMRC Annual Report 2012-13

Page 16: Monitoring report form (Version 03.2)

F-GS VER-MR

Description: Energy Consumption in the baseline stations in a given month

Source of data: Existing records for Delhi Metro Phase I provided by DMRC

Value(s) applied): Detailed in Annex

Purpose of data: To calculate baseline emissions

Additional comment:

Data / Parameter: ABL

Unit: Sq.m

Description: Area of all stations included in baseline stations in a given month

Source of data: Delhi Metro Phase I records provided by DMRC

Value(s) applied): Detailed in Annex

Purpose of data: To calculate baseline emissions

Additional comment: The area of the stations has been taken from the records maintained by

DMRC Limited.

Data / Parameter: AST

Unit: Sq.m

Description: Area of all stations included in the project activity

Source of data: Delhi Metro Phase II records provided by DMRC Limited

Value(s) applied): Detailed in Annex

Purpose of data: To calculate baseline emissions

Additional comment:

Data / Parameter: ηBL,m

Unit: kWh/sqm

Description: Per sqm Energy Consumption factor for the Baseline Stations in the

given month

Source of data: Calculated

Page 17: Monitoring report form (Version 03.2)

F-GS VER-MR

Value(s) applied):

Month Energy Consumption Factor

for the baseline

(in kWh/sqm)

January 5.04

February 4.81

March 5.46

April 6.00

May 6.35

June 6.34

July 6.27

August 6.03

September 5.78

October 6.22

November 5.09

December 4.95

Purpose of data: To calculate baseline emissions

Additional comment:

E.2. Data and parameters monitored

(Copy this table for each piece of data and parameter.)

Data / Parameter: ECPJ,m

Unit: kWh

Description: Energy Consumption for all the stations included in project activity

Measured/

Calculated /

Default:

Measured

Source of data: Site Records maintained by DMRC on electricity consumption for all the

stations covered by the project activity and are part of Phase II of Delhi

Metro.

Value(s) of monitored

parameter:

For 2012 – 16485.4 MWh

For 2013 – 16604.6 MWh

Total – 33090 MWh

Monitoring

equipment:

Measuring/

Reading/

Recording frequency:

The data will be measured continuously and will be recorded every

month for all the station buildings using electricity meter in log books.

Calculation method

(if applicable):

NA

QA/QC procedures: The electricity would be maintained in line with the state electricity

board’s requirement

Purpose of data:

Additional comment: The data archived will be maintained for crediting period +2 years. The

data archiving will be done on both paper and electronically.

E.3. Implementation of sampling plan

Page 18: Monitoring report form (Version 03.2)

F-GS VER-MR

>>

NA

SECTION F. Calculation of emission reductions or GHG removals by sinks

F.1. Calculation of baseline emissions or baseline net GHG removals by sinks

>>

Baseline emissions have been computed by multiplying the energy savings achieved and the emission

coefficient for NEWNE grid.

BEy = ESy * EFy .............(1)

Where:

BEy = Baseline Emissions in year y (in tCO2e)

ESy = Total Energy savings the given year y (in MWh)

EFy = Emission Coefficient for the NEWNE grid (in tCO2/MWh)

Step 1: Estimation of Energy Savings in the given year y

Where:

ESy = Total Energy savings the given year y (in MWh)

m = Month in the year y

ESm = Total Energy Savings in a given month m (in MWh)

Step 2: Estimation of Energy Savings in the given month m

(∑

)

Where:

ESm = Total Energy Savings in a given month m (in MWh)

ESST = Energy Savings for a given station in a given month m (in kWh)

ST = Station included in the project activity

Page 19: Monitoring report form (Version 03.2)

F-GS VER-MR

Step 3: Estimation of Energy Savings for a station in a given month

Where:

ESST = Energy Savings for a given station in a given month m (in kWh)

ηf = Per square meter savings in the given month

AST,m = Operational area for a given station in a month m (in sq.m)

Step 4: Estimation of Per Unit Energy Efficiency Factor

Where:

ηf,m = Per sqm Energy savings of the project station

ηBL,m = Average per sqm Energy Consumption factor for the Baseline Stations in the given

month m for the year 2010. 2011 and 2012

ηPJ,m = Average per sqm Energy Consumption factor for the Project Activity in the given

month m for the year 2010, 2011 and 2012

Step 5: Estimation of Per Unit Energy Efficiency Factor for Baseline Stations

( ∑

) ( ∑

)

Where:

ηBL,m = Average per Unit Energy Consumption factor for the Baseline Stations for a

given month m of year 2010, 2011 and 2012

ST = Station included in the baseline

ECBL,m = Energy Consumption for all the stations included in baseline stations of Phase I (in kWh)

ABL = Area of all the stations included in baseline stations of Phase I (in sq.m)

Step 6: Estimation of Per Unit Energy Efficiency Factor for Project Stations

∑ ( )

Where:

ηPJ,m = Per Unit Energy Consumption factor for the Project Stations for a given month m

ST = Station included in the project activity

ECPJ,m = Energy Consumption for active stations included in project activity (in kWh)

AST,m = Area of operational stations included in project activity (in sq.m)

Page 20: Monitoring report form (Version 03.2)

F-GS VER-MR

Total Energy Savings (MWh)

2012 2013

6674 6554

EFy = 0.9219

Baseline Emissions (tonne CO2)

2012 2013

6152 6043

Detailed calculations have been provided in Annexure I and excel sheet submitted along with the Monitoring Report.

F.2. Calculation of project emissions or actual net GHG removals by sinks

>>

For the project activity under consideration, the emission reductions will be computed on the basis of the net

amount of electrical energy consumption reduction w.r.t the baseline scenario. Therefore, there will be no

project emissions arising out of additional electricity consumption under the project activity. So, project

emissions (PEy) = 0

F.3. Calculation of leakage

>>

There are no leakage emissions from the project activity

F.4. Summary of calculation of emission reductions or net anthropogenic GHG removals by sinks

Item

Baseline

emissions or

baseline net

GHG removals

by sinks

(t CO2e)

Project

emissions or

actual net GHG

removals by

sinks

(t CO2e)

Leakage

(t CO2e)

Emission

reductions or

net

anthropogenic

GHG removals

by sinks

(t CO2e)

Total 12195 0 0 12195

F.5. Comparison of actual emission reductions or net anthropogenic GHG removals by sinks with estimates in

registered PDD

Item Values estimated in ex-ante

calculation of registered PDD

Actual values achieved during

this monitoring period

Emission

reductions or

GHG removals

by sinks

(t CO2e)

14142 12195

F.6. Remarks on difference from estimated value in registered PDD

Page 21: Monitoring report form (Version 03.2)

F-GS VER-MR

>>

The actual emission reductions for the monitoring period (01/01/2012 – 31/01/2013) are 12,195 tCO2e which is 13.77%

less than the estimated emission reductions in registered PDD (14142 tCO2e) for the same period. This reduction can be

attributed to fluctuations in energy consumption for the stations included in the project activity.

- - - - -

Page 22: Monitoring report form (Version 03.2)

F-GS VER-MR

ANNEXURE I: VER Sheet

Page 23: Monitoring report form (Version 03.2)

F-GS VER-MR

Phase II Energy Consumption Data

2012

STATION NAME STATION CODE AREA (sqm) Janaury February March April May June July August September October November December

1 Adarsh Nagar AHNR 7187 29605 27691 27877 30477 37781 36052 37902 36210 35218 35356 29641 29287

2 Anand Vihar ISBT AVIT 9880 65747 58797 66623 69120 74071 74539 70012 67673 64429 59981 58219 60580

3 Arjangarh ARJ 10974 18900 21106 25428 26378 28384 27461 25272 15982 37007 36550 33543 33751

4 Azadpur AZU 8421 34303 32229 34520 37178 41572 43496 40008 38407 36920 34012 32672 32886

5 Botanical Garden BCGN 6815 43782 30469 27774 29389 39478 45287 32891 40095 38674 40122 32751 36692

6 Dwarka Sec-8 DEST 5133 30000 23170 25990 28870 32460 37370 28020 32240 31660 30270 26840 28934

7 Ghitorni GHTI 10961 34219 32400 34923 37706 41281 38943 38414 35699 37451 37407 36695 36938

8 Golf Course GEC 7044 17747 16746 20727 21796 25418 38578 35133 32888 32771 31915 26442 27597

9 Govindpuri GDPI 8015 35535 35507 36458 41136 42011 40446 38731 37338 38029 34732 32957 31253

10 Guru Dronacharya GE 11198 46345 43114 48234 51038 56407 54811 51799 52116 50549 50882 47473 46183

11 HUDA City Centre HCC 10689 26678 27684 31287 36313 42780 42974 41410 32483 52867 53625 47838 46565

12 IFFCO Chowk IFFCO 11145 35025 33928 36969 37799 39108 38428 39400 35382 26495 38973 36448 37562

13 Jasola Apollo JLA 12863 35329 30663 34655 39525 42394 42666 43161 37116 36457 33217 28829 32876

14 Jhilmil JLML 8148 35025 30870 34488 37470 43526 47090 45319 39476 39351 35826 30850 27582

15 Kalkaji KJMD 9165 30581 28581 32051 34777 36586 35991 34799 33354 36330 31965 26335 30026

16 Karkardooma KKDA 14346 41022 36107 36846 47571 68076 79497 56055 55906 60892 63892 53937 48926

17 Lajpat Nagar LJPN 9218 37115 36292 37043 40461 43309 44946 47064 42679 46502 42894 40696 38528

18 Mansarovar Park MPK 8149 30212 26471 30344 30409 35276 35775 35298 36780 34003 38705 34538 31854

19 Mayur Vihar Extension MVPE 8485 27359 27650 27733 27081 21800 18594 27357 30133 29405 28173 25629 26417

20 Mayur Vihar Phase-I MVP1 8485 26845 27397 26942 33408 30340 32380 34518 28796 29085 30151 27783 28063

21 MG Road MGRO 12157 36827 36624 42678 43008 45474 45547 43817 43207 40579 41233 39385 39306

22 Model Town MDTW 7187 20022 16012 17624 24074 26618 28853 25286 26724 23549 25299 39107 38038

23 Mohan Estate METE 8256 29414 30891 31674 33207 35212 37472 34201 33088 32267 32817 28467 28015

24 Moolchand MLCD 9128 33455 30477 33096 35929 37940 38341 37670 43408 36107 34460 32978 33152

25 Nehru Place NP 9884 41227 39157 38749 43869 45166 46431 46157 46608 53523 40538 28851 31035

26 Noida City Centre NCC 6230 25364 24936 23967 25825 30180 32510 30838 43840 42889 44033 38512 39374

27 Noida Sec-18 NSET 6121 20466 18298 21319 20150 23926 30720 23149 35533 36748 40540 31492 29525

28 Noida Sec-15 NSFT 6272 19828 18598 21655 25092 16262 26920 22684 24322 22901 37098 34439 30572

29 Noida Sec-16 NSST 6256 38046 33984 39379 42063 46760 54154 44896 45798 44060 45240 36532 36461

30 Qutab Minar QM 10139 46317 42434 46784 50374 56710 55789 55110 52312 52391 47345 42241 44499

31 Sarita Vihar STVR 7612 37192 31269 34639 37795 41891 44125 42650 36192 34332 35272 32265 33736

32 Satguru Ramsingh Marg SRSM 5228 21710 20670 22400 24330 26760 28390 27430 27750 25794 25630 22864 22704

33 Shivaji Park SHVP 9005 35425 32116 33475 35163 40215 40906 36737 34334 33912 32699 30948 30538

34 Sikanderpur SKRP 11215 37236 37884 42031 42675 44702 41492 41516 41415 40617 40064 37254 37665

35 Sultanpur SLTP 14936 49530 50831 57444 61371 65475 60603 62161 58912 59318 59008 52318 49754

36 Tughlakabad TKBD 12933 28647 27236 31537 32043 37058 40016 41750 36031 34721 35806 32852 30490

37 Yamuna Bank YB 10000 42978 43589 37990 49811 41432 44746 47688 34501 49354 44319 44623 43440

Page 24: Monitoring report form (Version 03.2)

F-GS VER-MR

Phase II Energy Consumption Data

2013

STATION NAME

STATION CODE

AREA (sqm) January February March April May June July August September October November December

1 Adarsh Nagar AHNR 7187 28601 25306 30966 34854 36899 36489 37601 36157 36944 36771 32652 32022

2 Anand Vihar ISBT AVIT 9880 61513 53452 52542 53604 64796 61793 67896 57776 55685 55554 47710 61576

3 Arjangarh ARJ 10974 35145 32643 35245 36346 38565 36382 38404 38943 38143 37548 34175 35781

4 Azadpur AZU 8421 31377 28537 33778 35378 40255 39900 39073 39030 38423 39052 37061 37261

5 Botanical Garden BCGN 6815 37376 33835 39052 38501 40154 37996 37859 39572 40683 38870 34699 35670

6 Dwarka Sec-8 DEST 5133 29216 25320 28340 28070 30400 26700 26670 27300 26300 27510 22380 22108

7 Ghitorni GHTI 10961 37020 34346 38018 36679 37089 34149 34403 34038 33252 34740 32711 32372

8 Golf Course GEC 7044 26926 24458 32045 32645 33678 30996 33167 31888 33368 29035 20761 13912

9 Govindpuri GDPI 8015 32215 30606 31045 29162 39235 41044 38486 40938 39939 36153 34383 33057

10 Guru Dronacharya GE 11198 46516 42492 48722 48443 53274 46777 48052 51253 49005 48677 44678 45458

11 HUDA City Centre HCC 10689 48041 43914 51664 53903 62103 60906 61429 60293 60075 60413 55403 53925

12 IFFCO Chowk IFFCO 11145 37597 34490 37251 40889 45198 42022 38547 41626 40063 37630 39958 40321

13 Jasola Apollo JLA 12863 30597 28706 31725 32921 36936 38805 41980 36343 37807 33743 29066 31046

14 Jhilmil JLML 8148 30216 25379 33329 34424 34701 37532 34629 39435 34327 34711 30114 29053

15 Kalkaji KJMD 9165 30431 29995 31127 31592 31732 37069 34246 34079 36005 33480 26599 30251

16 Karkardooma KKDA 14346 49626 47467 36422 54738 53622 48270 51601 51331 49996 53883 50293 52326

17 Lajpat Nagar LJPN 9218 37115 34335 35631 40720 43697 46969 47893 44783 47106 41544 36793 34165

18 Mansarovar Park MPK 8149 29403 25474 29290 30416 36131 35327 32745 33892 31876 31112 29312 27885

19 Mayur Vihar Extension MVPE 8485 19243 22740 27401 25231 26906 25997 25010 25256 26129 27139 25917 26859

20 Mayur Vihar Phase-I MVP1 8485 26017 24925 31382 31618 32610 30534 30079 31473 30761 32280 30175 31433

21 MG Road MGRO 12157 39192 36590 40836 42748 49010 44119 42531 42288 43475 43342 40455 36826

22 Model Town MDTW 7187 33678 27027 24838 33422 38778 47343 31696 30321 44796 31542 27202 40941

23 Mohan Estate METE 8256 27799 26904 28236 28384 30844 35895 33065 32169 31634 32134 28017 28363

24 Moolchand MLCD 9128 33509 29409 30894 34997 37308 37696 38919 43132 36488 35614 33865 32807

25 Nehru Place NP 9884 30123 31570 31280 34561 45998 46994 46195 46707 47501 41089 28893 31666

26 Noida City Centre NCC 6230 37316 34724 41765 43603 48082 44057 44993 44719 46244 37933 44920 38896

27 Noida Sec-18 NSET 6121 29461 25772 32713 38530 43289 34181 36036 36134 36758 36354 33527 30608

28 Noida Sec-15 NSFT 6272 31657 28853 39407 41381 40658 38528 33504 38983 35070 33960 30878 30589

29 Noida Sec-16 NSST 6256 36156 32635 39200 39221 44519 40924 39605 39455 42843 41886 36720 35767

30 Qutab Minar QM 10139 45355 40608 43089 45706 49953 47430 46910 47963 46746 44827 40756 39936

31 Sarita Vihar STVR 7612 33162 31493 34978 37776 41503 43274 42565 36586 36005 35613 32202 33458

32 Satguru Ramsingh Marg SRSM 5228 22372 18770 22037 21994 26564 26319 25438 25373 24537 22909 20617 21031

33 Shivaji Park SHVP 9005 30424 26714 28920 29550 36036 31750 31940 30597 31406 29205 27461 27174

34 Sikanderpur SKRP 11215 37419 33775 40447 40253 47269 40930 39895 38052 40262 42290 39177 39456

35 Sultanpur SLTP 14936 48132 46001 54789 54344 54589 51165 51651 50434 50535 50637 49001 48005

36 Tughlakabad TKBD 12933 28809 27636 29939 31036 36388 38302 41492 35471 34763 34771 30812 29948

37 Yamuna Bank YB 10000 46870 38574 43937 44236 48353 44937 49076 43936 47315 47324 42813 42033

Page 25: Monitoring report form (Version 03.2)

F-GS VER-MR

Step 6:

Estimation of Energy Consumption per sqm for the month η_PJ

2012

STATION NAME STATION CODE AREA (sqm) Janaury February March April May June July August September October November December

1 Adarsh Nagar AHNR 7187 4.12 3.85 3.88 4.24 5.26 5.02 5.27 5.04 4.90 4.92 4.12 4.07

2 Anand Vihar ISBT AVIT 9880 6.65 5.95 6.74 7.00 7.50 7.54 7.09 6.85 6.52 6.07 5.89 6.13

3 Arjangarh ARJ 10974 1.72 1.92 2.32 2.40 2.59 2.50 2.30 1.46 3.37 3.33 3.06 3.08

4 Azadpur AZU 8421 4.07 3.83 4.10 4.41 4.94 5.17 4.75 4.56 4.38 4.04 3.88 3.91

5 Botanical Garden BCGN 6815 6.42 4.47 4.08 4.31 5.79 6.65 4.83 5.88 5.67 5.89 4.81 5.38

6 Dwarka Sec-8 DEST 5133 5.84 4.51 5.06 5.62 6.32 7.28 5.46 6.28 6.17 5.90 5.23 5.64

7 Ghitorni GHTI 10961 3.12 2.96 3.19 3.44 3.77 3.55 3.50 3.26 3.42 3.41 3.35 3.37

8 Golf Course GEC 7044 2.52 2.38 2.94 3.09 3.61 5.48 4.99 4.67 4.65 4.53 3.75 3.92

9 Govindpuri GDPI 8015 4.43 4.43 4.55 5.13 5.24 5.05 4.83 4.66 4.74 4.33 4.11 3.90

10 Guru Dronacharya GE 11198 4.14 3.85 4.31 4.56 5.04 4.89 4.63 4.65 4.51 4.54 4.24 4.12

11 HUDA City Centre HCC 10689 2.50 2.59 2.93 3.40 4.00 4.02 3.87 3.04 4.95 5.02 4.48 4.36

12 IFFCO Chowk IFFCO 11145 3.14 3.04 3.32 3.39 3.51 3.45 3.54 3.17 2.38 3.50 3.27 3.37

13 Jasola Apollo JLA 12863 2.75 2.38 2.69 3.07 3.30 3.32 3.36 2.89 2.83 2.58 2.24 2.56

14 Jhilmil JLML 8148 4.30 3.79 4.23 4.60 5.34 5.78 5.56 4.84 4.83 4.40 3.79 3.39

15 Kalkaji KJMD 9165 3.34 3.12 3.50 3.79 3.99 3.93 3.80 3.64 3.96 3.49 2.87 3.28

16 Karkardooma KKDA 14346 2.86 2.52 2.57 3.32 4.75 5.54 3.91 3.90 4.24 4.45 3.76 3.41

17 Lajpat Nagar LJPN 9218 4.03 3.94 4.02 4.39 4.70 4.88 5.11 4.63 5.04 4.65 4.41 4.18

18 Mansarovar Park MPK 8149 3.71 3.25 3.72 3.73 4.33 4.39 4.33 4.51 4.17 4.75 4.24 3.91

19 Mayur Vihar Extension MVPE 8485 3.22 3.26 3.27 3.19 2.57 2.19 3.22 3.55 3.47 3.32 3.02 3.11

20 Mayur Vihar Phase-I MVP1 8485 3.16 3.23 3.18 3.94 3.58 3.82 4.07 3.39 3.43 3.55 3.27 3.31

21 MG Road MGRO 12157 3.03 3.01 3.51 3.54 3.74 3.75 3.60 3.55 3.34 3.39 3.24 3.23

22 Model Town MDTW 7187 2.79 2.23 2.45 3.35 3.70 4.01 3.52 3.72 3.28 3.52 5.44 5.29

23 Mohan Estate METE 8256 3.56 3.74 3.84 4.02 4.27 4.54 4.14 4.01 3.91 3.97 3.45 3.39

24 Moolchand MLCD 9128 3.67 3.34 3.63 3.94 4.16 4.20 4.13 4.76 3.96 3.78 3.61 3.63

25 Nehru Place NP 9884 4.17 3.96 3.92 4.44 4.57 4.70 4.67 4.72 5.42 4.10 2.92 3.14

26 Noida City Centre NCC 6230 4.07 4.00 3.85 4.15 4.84 5.22 4.95 7.04 6.88 7.07 6.18 6.32

27 Noida Sec-18 NSET 6121 3.34 2.99 3.48 3.29 3.91 5.02 3.78 5.81 6.00 6.62 5.14 4.82

28 Noida Sec-15 NSFT 6272 3.16 2.97 3.45 4.00 2.59 4.29 3.62 3.88 3.65 5.91 5.49 4.87

29 Noida Sec-16 NSST 6256 6.08 5.43 6.29 6.72 7.47 8.66 7.18 7.32 7.04 7.23 5.84 5.83

30 Qutab Minar QM 10139 4.57 4.19 4.61 4.97 5.59 5.50 5.44 5.16 5.17 4.67 4.17 4.39

31 Sarita Vihar STVR 7612 4.89 4.11 4.55 4.97 5.50 5.80 5.60 4.75 4.51 4.63 4.24 4.43

32 Satguru Ramsingh Marg SRSM 5228 4.15 3.95 4.28 4.65 5.12 5.43 5.25 5.31 4.93 4.90 4.37 4.34

33 Shivaji Park SHVP 9005 3.93 3.57 3.72 3.90 4.47 4.54 4.08 3.81 3.77 3.63 3.44 3.39

34 Sikanderpur SKRP 11215 3.32 3.38 3.75 3.81 3.99 3.70 3.70 3.69 3.62 3.57 3.32 3.36

35 Sultanpur SLTP 14936 3.32 3.40 3.85 4.11 4.38 4.06 4.16 3.94 3.97 3.95 3.50 3.33

36 Tughlakabad TKBD 12933 2.22 2.11 2.44 2.48 2.87 3.09 3.23 2.79 2.68 2.77 2.54 2.36

37 Yamuna Bank YB 10000 4.30 4.36 3.80 4.98 4.14 4.47 4.77 3.45 4.94 4.43 4.46 4.34

Page 26: Monitoring report form (Version 03.2)

F-GS VER-MR

Estimation of Energy Consumption per sqm for the month η_PJ 2013

STATION NAME

STATION CODE

AREA (sqm) January February March April May June July August September October November December

1 Adarsh Nagar AHNR 7187 3.98 3.52 4.31 4.85 5.13 5.08 5.23 5.03 5.14 5.12 4.54 4.46

2 Anand Vihar ISBT AVIT 9880 6.23 5.41 5.32 5.43 6.56 6.25 6.87 5.85 5.64 5.62 4.83 6.23

3 Arjangarh ARJ 10974 3.20 2.97 3.21 3.31 3.51 3.32 3.50 3.55 3.48 3.42 3.11 3.26

4 Azadpur AZU 8421 3.73 3.39 4.01 4.20 4.78 4.74 4.64 4.63 4.56 4.64 4.40 4.42

5 Botanical Garden BCGN 6815 5.48 4.96 5.73 5.65 5.89 5.58 5.56 5.81 5.97 5.70 5.09 5.23

6 Dwarka Sec-8 DEST 5133 5.69 4.93 5.52 5.47 5.92 5.20 5.20 5.32 5.12 5.36 4.36 4.31

7 Ghitorni GHTI 10961 3.38 3.13 3.47 3.35 3.38 3.12 3.14 3.11 3.03 3.17 2.98 2.95

8 Golf Course GEC 7044 3.82 3.47 4.55 4.63 4.78 4.40 4.71 4.53 4.74 4.12 2.95 1.98

9 Govindpuri GDPI 8015 4.02 3.82 3.87 3.64 4.90 5.12 4.80 5.11 4.98 4.51 4.29 4.12

10 Guru Dronacharya GE 11198 4.15 3.79 4.35 4.33 4.76 4.18 4.29 4.58 4.38 4.35 3.99 4.06

11 HUDA City Centre HCC 10689 4.49 4.11 4.83 5.04 5.81 5.70 5.75 5.64 5.62 5.65 5.18 5.04

12 IFFCO Chowk IFFCO 11145 3.37 3.09 3.34 3.67 4.06 3.77 3.46 3.73 3.59 3.38 3.59 3.62

13 Jasola Apollo JLA 12863 2.38 2.23 2.47 2.56 2.87 3.02 3.26 2.83 2.94 2.62 2.26 2.41

14 Jhilmil JLML 8148 3.71 3.11 4.09 4.22 4.26 4.61 4.25 4.84 4.21 4.26 3.70 3.57

15 Kalkaji KJMD 9165 3.32 3.27 3.40 3.45 3.46 4.04 3.74 3.72 3.93 3.65 2.90 3.30

16 Karkardooma KKDA 14346 3.46 3.31 2.54 3.82 3.74 3.36 3.60 3.58 3.49 3.76 3.51 3.65

17 Lajpat Nagar LJPN 9218 4.03 3.72 3.87 4.42 4.74 5.10 5.20 4.86 5.11 4.51 3.99 3.71

18 Mansarovar Park MPK 8149 3.61 3.13 3.59 3.73 4.43 4.34 4.02 4.16 3.91 3.82 3.60 3.42

19 Mayur Vihar Extension MVPE 8485 2.27 2.68 3.23 2.97 3.17 3.06 2.95 2.98 3.08 3.20 3.05 3.17

20 Mayur Vihar Phase-I MVP1 8485 3.07 2.94 3.70 3.73 3.84 3.60 3.54 3.71 3.63 3.80 3.56 3.70

21 MG Road MGRO 12157 3.22 3.01 3.36 3.52 4.03 3.63 3.50 3.48 3.58 3.57 3.33 3.03

22 Model Town MDTW 7187 4.69 3.76 3.46 4.65 5.40 6.59 4.41 4.22 6.23 4.39 3.78 5.70

23 Mohan Estate METE 8256 3.37 3.26 3.42 3.44 3.74 4.35 4.00 3.90 3.83 3.89 3.39 3.44

24 Moolchand MLCD 9128 3.67 3.22 3.38 3.83 4.09 4.13 4.26 4.73 4.00 3.90 3.71 3.59

25 Nehru Place NP 9884 3.05 3.19 3.16 3.50 4.65 4.75 4.67 4.73 4.81 4.16 2.92 3.20

26 Noida City Centre NCC 6230 5.99 5.57 6.70 7.00 7.72 7.07 7.22 7.18 7.42 6.09 7.21 6.24

27 Noida Sec-18 NSET 6121 4.81 4.21 5.34 6.29 7.07 5.58 5.89 5.90 6.01 5.94 5.48 5.00

28 Noida Sec-15 NSFT 6272 5.05 4.60 6.28 6.60 6.48 6.14 5.34 6.22 5.59 5.41 4.92 4.88

29 Noida Sec-16 NSST 6256 5.78 5.22 6.27 6.27 7.12 6.54 6.33 6.31 6.85 6.70 5.87 5.72

30 Qutab Minar QM 10139 4.47 4.01 4.25 4.51 4.93 4.68 4.63 4.73 4.61 4.42 4.02 3.94

31 Sarita Vihar STVR 7612 4.36 4.14 4.60 4.96 5.45 5.68 5.59 4.81 4.73 4.68 4.23 4.40

32 Satguru Ramsingh Marg SRSM 5228 4.28 3.59 4.22 4.21 5.08 5.03 4.87 4.85 4.69 4.38 3.94 4.02

33 Shivaji Park SHVP 9005 3.38 2.97 3.21 3.28 4.00 3.53 3.55 3.40 3.49 3.24 3.05 3.02

34 Sikanderpur SKRP 11215 3.34 3.01 3.61 3.59 4.21 3.65 3.56 3.39 3.59 3.77 3.49 3.52

35 Sultanpur SLTP 14936 3.22 3.08 3.67 3.64 3.65 3.43 3.46 3.38 3.38 3.39 3.28 3.21

36 Tughlakabad TKBD 12933 2.23 2.14 2.31 2.40 2.81 2.96 3.21 2.74 2.69 2.69 2.38 2.32

37 Yamuna Bank YB 10000 4.69 3.86 4.39 4.42 4.84 4.49 4.91 4.39 4.73 4.73 4.28 4.20

Page 27: Monitoring report form (Version 03.2)

F-GS VER-MR

Step 4:

Estimation of Energy Efficiency factor for each station in the month η_BL -η_PJ

2012

STATION NAME STATION CODE AREA (sqm) Janaury February March April May June July August September October November December

1 Adarsh Nagar AHNR 7187 0.92 0.96 1.58 1.76 1.09 1.32 1.00 0.99 0.88 1.30 0.97 0.88

2 Anand Vihar ISBT AVIT 9880 -1.61 -1.14 -1.28 -1.00 -1.15 -1.20 -0.82 -0.82 -0.74 0.15 -0.80 -1.18

3 Arjangarh ARJ 10974 3.32 2.89 3.14 3.60 3.76 3.84 3.97 4.57 2.41 2.89 2.03 1.87

4 Azadpur AZU 8421 0.97 0.98 1.36 1.59 1.41 1.17 1.52 1.47 1.40 2.18 1.21 1.04

5 Botanical Garden BCGN 6815 -1.38 0.34 1.38 1.69 0.56 -0.31 1.44 0.15 0.11 0.33 0.28 -0.43

6 Dwarka Sec-8 DEST 5133 -0.80 0.30 0.40 0.38 0.03 -0.94 0.81 -0.25 -0.39 0.32 -0.14 -0.69

7 Ghitorni GHTI 10961 1.92 1.85 2.27 2.56 2.58 2.79 2.77 2.77 2.36 2.81 1.74 1.58

8 Golf Course GEC 7044 2.52 2.43 2.52 2.91 2.74 0.86 1.28 1.36 1.13 1.69 1.34 1.03

9 Govindpuri GDPI 8015 0.61 0.38 0.91 0.87 1.11 1.29 1.44 1.37 1.04 1.89 0.98 1.05

10 Guru Dronacharya GE 11198 0.90 0.96 1.15 1.44 1.31 1.45 1.64 1.38 1.27 1.68 0.85 0.83

11 HUDA City Centre HCC 10689 2.54 2.22 2.53 2.60 2.35 2.32 2.40 2.99 0.83 1.20 0.61 0.59

12 IFFCO Chowk IFFCO 11145 1.90 1.77 2.14 2.61 2.84 2.89 2.73 2.86 3.40 2.72 1.82 1.58

13 Jasola Apollo JLA 12863 2.29 2.43 2.77 2.93 3.05 3.02 2.91 3.14 2.95 3.64 2.85 2.39

14 Jhilmil JLML 8148 0.74 1.02 1.23 1.40 1.01 0.56 0.71 1.19 0.95 1.82 1.30 1.56

15 Kalkaji KJMD 9165 1.70 1.69 1.96 2.21 2.36 2.41 2.47 2.39 1.82 2.73 2.22 1.67

16 Karkardooma KKDA 14346 2.18 2.29 2.89 2.68 1.60 0.80 2.36 2.13 1.54 1.77 1.33 1.54

17 Lajpat Nagar LJPN 9218 1.01 0.87 1.44 1.61 1.65 1.46 1.16 1.40 0.74 1.57 0.68 0.77

18 Mansarovar Park MPK 8149 1.33 1.56 1.74 2.27 2.02 1.95 1.94 1.52 1.61 1.47 0.85 1.04

19 Mayur Vihar Extension MVPE 8485 1.82 1.55 2.19 2.81 3.78 4.15 3.05 2.48 2.31 2.90 2.07 1.84

20 Mayur Vihar Phase-I MVP1 8485 1.88 1.58 2.28 2.06 2.77 2.52 2.20 2.64 2.35 2.67 1.82 1.64

21 MG Road MGRO 12157 2.01 1.80 1.95 2.46 2.61 2.59 2.67 2.48 2.44 2.83 1.85 1.72

22 Model Town MDTW 7187 2.25 2.58 3.01 2.65 2.65 2.33 2.75 2.31 2.50 2.70 -0.35 -0.34

23 Mohan Estate METE 8256 1.48 1.07 1.62 1.98 2.08 1.80 2.13 2.02 1.87 2.25 1.64 1.56

24 Moolchand MLCD 9128 1.37 1.47 1.83 2.06 2.19 2.14 2.14 1.27 1.82 2.44 1.48 1.32

25 Nehru Place NP 9884 0.87 0.85 1.54 1.56 1.78 1.64 1.60 1.31 0.36 2.12 2.17 1.81

26 Noida City Centre NCC 6230 0.97 0.81 1.61 1.85 1.51 1.12 1.32 -1.01 -1.10 -0.85 -1.09 -1.37

27 Noida Sec-18 NSET 6121 1.70 1.82 1.98 2.71 2.44 1.32 2.49 0.22 -0.22 -0.40 -0.05 0.13

28 Noida Sec-15 NSFT 6272 1.88 1.84 2.01 2.00 3.76 2.05 2.65 2.15 2.13 0.31 -0.40 0.08

29 Noida Sec-16 NSST 6256 -1.04 -0.62 -0.83 -0.72 -1.12 -2.32 -0.91 -1.29 -1.26 -1.01 -0.75 -0.88

30 Qutab Minar QM 10139 0.47 0.62 0.85 1.03 0.76 0.84 0.83 0.87 0.61 1.55 0.92 0.56

31 Sarita Vihar STVR 7612 0.15 0.70 0.91 1.03 0.85 0.54 0.67 1.28 1.27 1.59 0.85 0.52

32 Satguru Ramsingh Marg SRSM 5228 0.89 0.86 1.18 1.35 1.23 0.91 1.02 0.72 0.85 1.32 0.72 0.61

33 Shivaji Park SHVP 9005 1.11 1.24 1.74 2.10 1.88 1.80 2.19 2.22 2.01 2.59 1.65 1.56

34 Sikanderpur SKRP 11215 1.72 1.43 1.71 2.19 2.36 2.64 2.57 2.34 2.16 2.65 1.77 1.59

35 Sultanpur SLTP 14936 1.72 1.41 1.61 1.89 1.97 2.28 2.11 2.09 1.81 2.27 1.59 1.62

36 Tughlakabad TKBD 12933 2.82 2.70 3.02 3.52 3.48 3.25 3.04 3.24 3.10 3.45 2.55 2.59

37 Yamuna Bank YB 10000 0.74 0.45 1.66 1.02 2.21 1.87 1.50 2.58 0.84 1.79 0.63 0.61

Page 28: Monitoring report form (Version 03.2)

F-GS VER-MR

Estimation of Energy Efficiency factor for each station in the month η_BL -η_PJ 2013

STATION NAME

STATION CODE

AREA (sqm) January February March April May June July August September October November December

1 Adarsh Nagar AHNR 7187 1.06 1.29 1.15 1.15 1.22 1.26 1.04 1.00 0.64 1.10 0.55 0.49

2 Anand Vihar ISBT AVIT 9880 -1.19 -0.60 0.14 0.57 -0.21 0.09 -0.60 0.18 0.14 0.60 0.26 -1.28

3 Arjangarh ARJ 10974 1.84 1.84 2.25 2.69 2.84 3.02 2.77 2.48 2.30 2.80 1.98 1.69

4 Azadpur AZU 8421 1.31 1.42 1.45 1.80 1.57 1.60 1.63 1.40 1.22 1.58 0.69 0.53

5 Botanical Garden BCGN 6815 -0.44 -0.15 -0.27 0.35 0.46 0.76 0.71 0.22 -0.19 0.52 0.00 -0.28

6 Dwarka Sec-8 DEST 5133 -0.65 -0.12 -0.06 0.53 0.43 1.14 1.07 0.71 0.66 0.86 0.73 0.64

7 Ghitorni GHTI 10961 1.66 1.68 1.99 2.65 2.97 3.22 3.13 2.92 2.75 3.05 2.11 2.00

8 Golf Course GEC 7044 1.22 1.34 0.91 1.37 1.57 1.94 1.56 1.50 1.04 2.10 2.14 2.97

9 Govindpuri GDPI 8015 1.02 0.99 1.59 2.36 1.45 1.22 1.47 0.92 0.80 1.71 0.80 0.83

10 Guru Dronacharya GE 11198 0.89 1.02 1.11 1.67 1.59 2.16 1.98 1.45 1.40 1.87 1.10 0.89

11 HUDA City Centre HCC 10689 0.55 0.70 0.63 0.96 0.54 0.64 0.52 0.39 0.16 0.57 -0.09 -0.09

12 IFFCO Chowk IFFCO 11145 1.67 1.72 2.12 2.33 2.29 2.57 2.81 2.30 2.19 2.84 1.50 1.33

13 Jasola Apollo JLA 12863 2.66 2.58 2.99 3.44 3.48 3.32 3.01 3.20 2.84 3.60 2.83 2.54

14 Jhilmil JLML 8148 1.33 1.70 1.37 1.78 2.09 1.73 2.02 1.19 1.57 1.96 1.39 1.38

15 Kalkaji KJMD 9165 1.72 1.54 2.06 2.55 2.89 2.30 2.53 2.31 1.85 2.57 2.19 1.65

16 Karkardooma KKDA 14346 1.58 1.50 2.92 2.18 2.61 2.98 2.67 2.45 2.29 2.46 1.58 1.30

17 Lajpat Nagar LJPN 9218 1.01 1.09 1.59 1.58 1.61 1.24 1.07 1.17 0.67 1.71 1.10 1.24

18 Mansarovar Park MPK 8149 1.43 1.68 1.87 2.27 1.92 2.00 2.25 1.87 1.87 2.40 1.49 1.53

19 Mayur Vihar Extension MVPE 8485 2.77 2.13 2.23 3.03 3.18 3.28 3.32 3.05 2.70 3.02 2.04 1.78

20 Mayur Vihar Phase-I MVP1 8485 1.97 1.87 1.76 2.27 2.51 2.74 2.73 2.32 2.15 2.42 1.53 1.25

21 MG Road MGRO 12157 1.82 1.80 2.10 2.48 2.32 2.71 2.77 2.55 2.20 2.65 1.76 1.92

22 Model Town MDTW 7187 0.35 1.05 2.00 1.35 0.95 -0.25 1.86 1.81 -0.45 1.83 1.31 -0.75

23 Mohan Estate METE 8256 1.67 1.55 2.04 2.56 2.61 1.99 2.27 2.13 1.95 2.33 1.70 1.51

24 Moolchand MLCD 9128 1.37 1.59 2.08 2.17 2.26 2.21 2.01 1.30 1.78 2.32 1.38 1.36

25 Nehru Place NP 9884 1.99 1.62 2.30 2.50 1.70 1.59 1.60 1.30 0.97 2.06 2.17 1.75

26 Noida City Centre NCC 6230 -0.95 -0.76 -1.24 -1.00 -1.37 -0.73 -0.95 -1.15 -1.64 0.13 -2.12 -1.29

27 Noida Sec-18 NSET 6121 0.23 0.60 0.12 -0.29 -0.72 0.76 0.38 0.13 -0.23 0.28 -0.39 -0.05

28 Noida Sec-15 NSFT 6272 -0.01 0.21 -0.82 -0.60 -0.13 0.20 0.93 -0.19 0.19 0.81 0.17 0.07

29 Noida Sec-16 NSST 6256 -0.74 -0.41 -0.81 -0.27 -0.77 -0.20 -0.06 -0.28 -1.07 -0.48 -0.78 -0.77

30 Qutab Minar QM 10139 0.57 0.80 1.21 1.49 1.42 1.66 1.64 1.30 1.17 1.80 1.07 1.01

31 Sarita Vihar STVR 7612 0.68 0.67 0.86 1.04 0.90 0.66 0.68 1.22 1.05 1.54 0.86 0.55

32 Satguru Ramsingh Marg SRSM 5228 0.76 1.22 1.24 1.79 1.27 1.31 1.40 1.18 1.09 1.84 1.15 0.93

33 Shivaji Park SHVP 9005 1.66 1.84 2.25 2.72 2.35 2.81 2.72 2.63 2.29 2.98 2.04 1.93

34 Sikanderpur SKRP 11215 1.70 1.80 1.85 2.41 2.14 2.69 2.71 2.64 2.19 2.45 1.60 1.43

35 Sultanpur SLTP 14936 1.82 1.73 1.79 2.36 2.70 2.91 2.81 2.65 2.40 2.83 1.81 1.74

36 Tughlakabad TKBD 12933 2.81 2.67 3.15 3.60 3.54 3.38 3.06 3.29 3.09 3.53 2.71 2.63

37 Yamuna Bank YB 10000 0.35 0.95 1.07 1.58 1.51 1.85 1.36 1.64 1.05 1.49 0.81 0.75

Page 29: Monitoring report form (Version 03.2)

F-GS VER-MR

Step 3:

Energy Savings in kWh ESST

2012

STATION NAME STATION CODE AREA (sqm) January February March April May June July August September October November December

1 Adarsh Nagar AHNR 7187 6617 6878 11364 12645 7856 9514 7160 7128 6323 9347 6941 6289

2 Anand Vihar ISBT AVIT 9880 -15952 -11274 -12678 -9840 -11333 -11900 -8064 -8097 -7323 1473 -7930 -11674

3 Arjangarh ARJ 10974 36409 31679 34490 39466 41301 42114 43535 50191 26423 31708 22315 20570

4 Azadpur AZU 8421 8139 8276 11459 13348 11901 9893 12792 12372 11753 18367 10191 8798

5 Botanical Garden BCGN 6815 -9434 2311 9436 11501 3797 -2080 9839 999 717 2267 1937 -2958

6 Dwarka Sec-8 DEST 5133 -4130 1520 2036 1928 135 -4827 4164 -1288 -1991 1657 -713 -3526

7 Ghitorni GHTI 10961 21024 20322 24924 28060 28321 30550 30311 30396 25904 30770 19096 17319

8 Golf Course GEC 7044 17755 17136 17733 20468 19311 6081 9033 9587 7943 11899 9412 7271

9 Govindpuri GDPI 8015 4861 3045 7304 6954 8884 10369 11523 10992 8298 15121 7839 8421

10 Guru Dronacharya GE 11198 10093 10748 12907 16150 14700 16184 18412 15408 14175 18770 9525 9247

11 HUDA City Centre HCC 10689 27195 23730 27075 27821 25095 24794 25610 31972 8915 12861 6569 6346

12 IFFCO Chowk IFFCO 11145 21146 19679 23883 29071 31663 32231 30479 31822 37923 30349 20280 17606

13 Jasola Apollo JLA 12863 29501 31208 35577 37653 39286 38885 37490 40448 37891 46791 36644 30796

14 Jhilmil JLML 8148 6041 8322 10000 11418 8214 4568 5769 9656 7744 14855 10623 12751

15 Kalkaji KJMD 9165 15611 15503 17990 20213 21612 22115 22666 21911 16644 25041 20315 15341

16 Karkardooma KKDA 14346 31282 32897 41483 38505 23021 11457 33894 30600 22028 25340 19084 22087

17 Lajpat Nagar LJPN 9218 9344 8047 13287 14847 15225 13496 10733 12906 6778 14442 6224 7101

18 Mansarovar Park MPK 8149 10859 12726 14150 18485 16470 15890 15796 12358 13098 11982 6940 8484

19 Mayur Vihar Extension MVPE 8485 15405 13163 18595 23829 32080 35201 25844 21032 19638 24604 17560 15584

20 Mayur Vihar Phase-I MVP1 8485 15919 13416 19386 17502 23540 21415 18683 22369 19958 22626 15406 13938

21 MG Road MGRO 12157 24444 21851 23699 29934 31723 31528 32407 30100 29688 34384 22494 20871

22 Model Town MDTW 7187 16200 18557 21617 19048 19019 16713 19776 16614 17992 19404 -2525 -2462

23 Mohan Estate METE 8256 12196 8820 13404 16329 17214 14871 17564 16696 15453 18535 13556 12852

24 Moolchand MLCD 9128 12550 13429 16743 18839 20023 19531 19563 11634 16653 22316 13484 12032

25 Nehru Place NP 9884 8588 8385 15218 15435 17597 16234 15816 12993 3607 20940 21459 17891

26 Noida City Centre NCC 6230 6035 5030 10049 11555 9381 6988 8224 -6273 -6880 -5282 -6801 -8536

27 Noida Sec-18 NSET 6121 10384 11144 12102 16576 14942 8087 15230 1377 -1369 -2467 -336 774

28 Noida Sec-15 NSFT 6272 11783 11570 12590 12540 23565 12844 16641 13498 13351 1914 -2515 474

29 Noida Sec-16 NSST 6256 -6516 -3893 -5221 -4527 -7034 -14491 -5671 -8074 -7900 -6328 -4689 -5494

30 Qutab Minar QM 10139 4784 6335 8575 10460 7673 8492 8462 8826 6212 15720 9367 5689

31 Sarita Vihar STVR 7612 1172 5345 6923 7877 6445 4135 5077 9708 9665 12075 6480 3943

32 Satguru Ramsingh Marg SRSM 5228 4639 4477 6145 7038 6438 4756 5350 3775 4424 6888 3747 3175

33 Shivaji Park SHVP 9005 9960 11198 15692 18867 16967 16186 19724 19966 18137 23312 14887 14037

34 Sikanderpur SKRP 11215 19288 16060 19203 24615 26513 29611 28802 26211 24206 29693 19830 17849

35 Sultanpur SLTP 14936 25747 21011 24107 28245 29369 34091 31488 31152 27012 33894 23706 24179

36 Tughlakabad TKBD 12933 36535 34972 39077 45555 45067 41979 39340 41955 40032 44637 32977 33528

37 Yamuna Bank YB 10000 7422 4511 16610 10189 22068 18654 15012 25799 8446 17881 6277 6060

Page 30: Monitoring report form (Version 03.2)

F-GS VER-MR

Energy Savings in kWh ESST 2013

STATION NAME

STATION CODE

AREA (sqm) January February March April May June July August September October November December

1 Adarsh Nagar AHNR 7187 7621 9263 8275 8268 8738 9077 7461 7181 4597 7932 3930 3554

2 Anand Vihar ISBT AVIT 9880 -11718 -5929 1403 5676 -2058 846 -5948 1800 1421 5900 2579 -12670

3 Arjangarh ARJ 10974 20164 20142 24673 29498 31120 33193 30403 27230 25287 30710 21683 18540

4 Azadpur AZU 8421 11065 11968 12201 15148 13218 13489 13727 11749 10250 13327 5802 4423

5 Botanical Garden BCGN 6815 -3028 -1055 -1842 2389 3121 5211 4871 1522 -1292 3519 -11 -1936

6 Dwarka Sec-8 DEST 5133 -3346 -630 -314 2728 2195 5843 5514 3652 3369 4417 3747 3300

7 Ghitorni GHTI 10961 18223 18376 21829 29087 32513 35344 34322 32057 30103 33437 23080 21885

8 Golf Course GEC 7044 8576 9424 6415 9619 11051 13663 10999 10587 7346 14779 15093 20956

9 Govindpuri GDPI 8015 8181 7946 12717 18928 11660 9771 11768 7392 6388 13700 6413 6617

10 Guru Dronacharya GE 11198 9922 11370 12419 18745 17833 24218 22159 16271 15719 20975 12320 9972

11 HUDA City Centre HCC 10689 5832 7500 6698 10231 5772 6862 5591 4162 1707 6073 -996 -1014

12 IFFCO Chowk IFFCO 11145 18574 19117 23601 25981 25573 28637 31332 25578 24355 31692 16770 14847

13 Jasola Apollo JLA 12863 34233 33165 38507 44257 44744 42746 38671 41221 36541 46265 36407 32626

14 Jhilmil JLML 8148 10850 13813 11159 14464 17039 14126 16459 9697 12768 15970 11359 11280

15 Kalkaji KJMD 9165 15761 14089 18914 23398 26466 21037 23219 21186 16969 23526 20051 15116

16 Karkardooma KKDA 14346 22678 21537 41907 31338 37475 42684 38348 35175 32924 35349 22728 18687

17 Lajpat Nagar LJPN 9218 9344 10004 14699 14588 14837 11473 9904 10802 6174 15792 10127 11464

18 Mansarovar Park MPK 8149 11668 13723 15204 18478 15615 16338 18349 15246 15225 19575 12166 12453

19 Mayur Vihar Extension MVPE 8485 23521 18073 18927 25679 26974 27798 28191 25909 22914 25638 17272 15142

20 Mayur Vihar Phase-I MVP1 8485 16747 15888 14946 19292 21270 23261 23122 19692 18282 20497 13014 10568

21 MG Road MGRO 12157 22079 21885 25541 30194 28187 32956 33693 31019 26792 32275 21424 23351

22 Model Town MDTW 7187 2544 7542 14403 9700 6859 -1777 13366 13017 -3255 13161 9380 -5365

23 Mohan Estate METE 8256 13811 12807 16842 21152 21582 16448 18700 17615 16086 19218 14006 12504

24 Moolchand MLCD 9128 12496 14497 18945 19771 20655 20176 18314 11910 16272 21162 12597 12377

25 Nehru Place NP 9884 19692 15972 22687 24743 16765 15671 15778 12894 9629 20389 21417 17260

26 Noida City Centre NCC 6230 -5917 -4758 -7749 -6223 -8522 -4559 -5931 -7152 -10235 818 -13209 -8058

27 Noida Sec-18 NSET 6121 1389 3670 708 -1804 -4421 4626 2343 776 -1379 1719 -2371 -309

28 Noida Sec-15 NSFT 6272 -46 1315 -5162 -3749 -831 1236 5821 -1163 1182 5052 1046 457

29 Noida Sec-16 NSST 6256 -4626 -2544 -5042 -1685 -4793 -1261 -380 -1731 -6683 -2974 -4877 -4800

30 Qutab Minar QM 10139 5746 8161 12270 15128 14430 16851 16662 13175 11857 18238 10852 10252

31 Sarita Vihar STVR 7612 5202 5121 6584 7896 6833 4986 5162 9314 7992 11734 6543 4221

32 Satguru Ramsingh Marg SRSM 5228 3977 6377 6508 9374 6634 6827 7342 6152 5681 9609 5994 4848

33 Shivaji Park SHVP 9005 14961 16600 20247 24480 21146 25342 24521 23703 20643 26806 18374 17401

34 Sikanderpur SKRP 11215 19105 20169 20787 27037 23946 30173 30423 29574 24561 27467 17907 16058

35 Sultanpur SLTP 14936 27145 25841 26762 35272 40255 43529 41998 39630 35795 42265 27023 25928

36 Tughlakabad TKBD 12933 36373 34572 40675 46562 45737 43693 39598 42515 39990 45672 35017 34070

37 Yamuna Bank YB 10000 3530 9526 10663 15764 15147 18463 13624 16364 10485 14876 8087 7467

Page 31: Monitoring report form (Version 03.2)

F-GS VER-MR

Anual Energy Savings:

2012

Total Energy Savings January February March April May June July August September October November December

462897 468135 596932 668599 668049 596160 658475 618718 501569 657785 409655 366652

Energy Savings in MWh (ESm) 463 468 597 669 668 596 658 619 502 658 410 367

2013

Total Energy Savings January February March April May June July August September October November December

412330 444538 528005 641404 614766 658998 649497 585720 496461 696559 442743 383471

Energy Savings in MWh 412 445 528 641 615 659 649 586 496 697 443 383

Page 32: Monitoring report form (Version 03.2)

F-GS VER-MR

Document information

Version Date Description

03.2 5 November 2013 Editorial revision to correct table in page 1.

03.1 2 January 2013 Editorial revision to correct table in section E.5.

03.0 3 December 2012 Revision required to introduce a provision on reporting actual emission reductions or net anthropogenic GHG removals by

sinks for the period up to 31 December 2012 and the period from 1 January 2013 onwards (EB70, Annex 11).

02.0 13 March 2012 Revision required toensure consistency with the "Guidelines for completing the monitoring report form" (EB 66, Annex

20).

01 28 May 2010 EB 54, Annex 34. Initial adoption.

Decision Class:Regulatory

Document Type: Form

Business Function:issuance