Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf ·...

27
US Army Corps of Engineers Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects Lyndell (Lyn) Hales US Army Engineer Research and Development Center Coastal and Hydraulics Laboratory Vicksburg, Mississippi Transforming the Marine Transportation System A Vision for Research and Development June 29 – July 1, 2010 The Beckman Center of the National Academies Irvine, California

Transcript of Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf ·...

Page 1: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Monitoring Completed USACE Navigation Projects

Lyndell (Lyn) HalesUS Army Engineer Research and Development Center

Coastal and Hydraulics LaboratoryVicksburg, Mississippi

Transforming the Marine Transportation SystemA Vision for Research and Development

June 29 –

July 1, 2010The Beckman Center of the National Academies

Irvine, California

Page 2: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

USACE Support to the Marine Transportation System (MTS)

Resilience and Reliability

MTS includes ocean, coastal, and inland waterways, ports, and intermodal connections for commercial, military, and recreational craft.

Segments of the MTS are showing signs of strain which will intensify as projected cargo and passenger traffic increase.

Growth at containerized ports requires additional staging areas,

expanded landside access, and logistics technologies.

Inland waterway systems are generally viewed as reliable, but face increasing operational and maintenance challenges as locks age, and repairs become more extensive and expensive.

Page 3: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Resilience

Increasing quantities of containerized goods and other commodities upon which our economy relies are moving through the ports. The Military’s need to deliver troops, equipment, and supplies through U.S. ports to defense forces around the world emphasizes the importance of the MTS. The MTS must have the capability to respond quickly to disruptions.

Reliability

The USACE “Monitoring Completed Navigation Projects (MCNP)”

program supports the Corps’

Navigation

Business Line by addressing Maintenance and Rehabilitation issues at both coastal and inland navigation structures.

Page 4: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Purpose of the MCNP Program

The Advancement of Coastal and Hydraulic Engineering Technology

To determine how well Coastal and Inland Navigation projects are

accomplishing their purposes (how well they are resisting attacks by the physical environment)

Create more accurate and economical engineering solutions •

Strengthen design criteria and methodology •

Improve construction practices and cost effectiveness •

Enhance Operation and Maintenance techniques•

Reduce O&M Cost

MCNP program identifies where current technology is inadequate.(Determines where additional research is required.)

Page 5: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

MCNP Program is Field Driven, addressing real-world problems.

Nominations for New Monitoring Projects are solicited from Corps

Divisions and Districts by HQ as funding becomes available.

Nominations are Evaluated and Prioritized by the Corps’

Navigation Research Area Review Group.

Structures with Unique Features

and/or Distinct Problems.

Site-specific monitoring is intended to produce Generic results with conclusions applicable on a regional and/or national basis.

Page 6: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Monitoring Completed USACE Navigation Projects FY10 Program

Kaumalapau Harbor,

Island of Lanai, HI

John Day L&D

John T. Myers L&D

Burns HarborCleveland Harbor

Keweenaw Waterway

Montgomery Point L&D

Periodic Inspections (coastal around the Nation)

Marmet L&D

Galveston Ship Channel

Page 7: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Periodic Inspections, Coastal Nationwide

Problem

Lack of long-term structure performance data in a consistent format.

Need to gather, analyze, and archive detailed coastal structure condition, performance, and response data on a relatively small number of structures.

Benefits

Better performance knowledge translates to better designs and lower O&M costs.

Page 8: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Galveston Ship Channel, TX

0

5

10

15

20

25

1950 1960 1970 1980 1990 2000 2010

Year

Cum

ulat

ive

Volu

me

Dre

dged

, 10

6 cu

m

Pre-DeepeningPost-DeepeningNew Work

176,000 cu m/yr12.2 x 122 m

625,800 cu m/yr15.5 x 152 m

Page 9: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Montgomery Point Lock and Dam, White River, AK

Page 10: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Marmet Locks and Dam, Kanawha River, WVA

Page 11: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

John Day Lock and Dam, Columbia River

Page 12: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Kaumalapau Harbor Breakwater

Before After

Page 13: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Great Lakes Breakwater Armor, Stone Testing Protocols and Durability

Product Delivery TeamDanny Harrelson (PI) and Joe Tom, GSL, ERDC; Mansour Zakikhani, EL, ERDCDistrict Team Members: Joe Kissane, LRC; Michael Allis, LRE; Jon Kolber, LRB

Ron Erickson, Consultant (formerly LRE District Geologist)

ProblemSpecifications for armor stone for breakwaters and jetties include

objective criteria

from laboratory tests, and subjective criteria

based on quarries and stockpiles. Issues related to stone durability. Variability of quality between and within quarries exceedingly problematic.

ASTM tests presently used were designed for small concrete aggregate and stone many orders of magnitude smaller than stone on breakwaters. These small-scale tests are not appropriate for stone weighing tens of tons.

Page 14: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Present Lab Test Criteria

Specific Gravity

ASTM C 127

Absorption

ASTM C 127

Los Angeles Abrasion

ASTM C 535

Freeze/Thaw

ASTM D 5312

Wetting/Drying

ASTM D 5313

Petrographic

Examination ASTM C 295

Field Examination

ASTM D 4992

Page 15: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Great Lakes Armor StoneDesign

Field Monitoring and Observations

Laboratory Testing and Analyses

Numerical Modeling and Software Development

Innovative Technology Development

Page 16: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Index Stone on Keweenaw Waterway Structure, MI Lake Superior

Page 17: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Concrete Armor Units, Ashtabula Harbor Breakwater, OH Lake Erie

Page 18: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Selected Sites (Index Stones):

1)

Burns Harbor (10)2)

Cleveland Harbor (10)3)

Keweenaw Waterway (10)

Great Lakes Armor Stone StudyGreat Lakes Armor Stone StudyField Monitoring and Field Monitoring and ObservationsObservations

Conducted six rounds of monitoring at Keweenaw Waterway

Conducted five rounds of monitoring at Cleveland Harbor

Conducted four rounds of monitoring at Burns Harbor

Cleveland breakwater

Page 19: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Great Lakes Armor Stone StudyGreat Lakes Armor Stone StudyLaboratory Testing and AnalysisLaboratory Testing and Analysis

Laboratory Test Stones

1)

Granite2)

Quartzite3)

Valders Limestone4)

Indiana Limestone5)

Cleveland Sandstone

Laboratory Tests:

1)

Abrasion 2)

Freeze-Thaw 3) Wet-Dry

Optimum Rock Size:

3 ft x 3 ft x 3 ft

Page 20: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Degradation Model Degradation Model Assessment Assessment

Heterogeneity AssessmentHeterogeneity Assessment

Great Lakes Armor Stone StudyGreat Lakes Armor Stone StudyNumerical Modeling and Software DevelopmentNumerical Modeling and Software Development

Site Video Report

FreezeFreeze--Thaw Intensity Model Assessment Thaw Intensity Model Assessment

Evaluation Models:

1)

Degradation Model2)

Freeze-Thaw Model3)

Heterogeneity Model

Other Options:

1)

Optimization2)

Design3)

Animation4)

Statistical

Page 21: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

MCNPMCNP--

Great Lakes Armor Stone StudyGreat Lakes Armor Stone StudyInnovative Technology DevelopmentInnovative Technology Development

Armor Design AssessmentArmor Design Assessment

Development of

Advanced Field, Laboratory, and Numerical Techniques

1)

Seismic2)

Magnetic Resonance Imaging3)

Rock Heterogeneity & Design

Magnetic Resonance Images

Page 22: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

John T. Myers Locks and Dam, Ohio River

Page 23: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

John T. Myers Lock and Dam, Ohio River

Page 24: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Upstream Entrance Innovative Repair Demonstration 2006

Page 25: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Downstream Entrance Innovative Repair Demonstration 2007

Page 26: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

1,200-ft Guide Wall Innovative Repair Demonstration 2008

Page 27: Monitoring Completed USACE Navigation Projectsonlinepubs.trb.org/onlinepubs/mb/MTS/Hales.pdf · Coastal and Hydraulics Laboratory - ERDC Monitoring Completed USACE Navigation Projects

US Army Corpsof Engineers Coastal and Hydraulics Laboratory - ERDC

Comments

Questions?