Oxford Business Group THE INSIDE EDGE Mongolia’s expected power requirements until 2015 New Approach

description

Mongolia’s expected power requirements until 2015Paulius Kuncinas, Ulaanbaatar, May 24th, 2012Opportunities for upgrading Mongolia’s existing power plants Plans for introducing new power plants within the near future. Introducing new technologies to Mongolian power plants e.g. air cooled power plants – Will these be to the country’s advantage?

Transcript of Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Page 1: Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Oxford Business Group THE INSIDE EDGE

Mongolia’s expected power requirements until 2015

New Approach

Page 2: Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Oxford Business Group THE INSIDE EDGE

Paulius Kuncinas

Regional Editor, AsiaOxford Business Group

Page 3: Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Oxford Business Group THE INSIDE EDGE

•Opportunities for upgrading Mongolia’s existing power plants

•Plans for introducing new power plants within the near future

•Introducing new technologies to Mongolian power plants

•Air cooled power plants

Key Themes:

Page 4: Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Oxford Business Group THE INSIDE EDGE

Main Sources of Demand:

Rapid Urbanization - Ulaanbaatar

Mining Sector – Oyu Tolgoy

New Industries

Page 5: Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Oxford Business Group THE INSIDE EDGE

80% TPPs, 12% imports, 2.5% hydro

Soviet Design

State Dominated

CES 95% of the 814-MW

Last Greenfield in 1991

Page 6: Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Oxford Business Group THE INSIDE EDGE

814MW vs 614.3 available

Unerpowered & Underinvested

Last Investment in 1991

  Available Capacity (MW)

TPP2 17.6

TPP3 105.1

TPP4 432

Darkhan 38.6

Erdenet 21

   

Total 614.3

Page 7: Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Oxford Business Group THE INSIDE EDGE

CES - 95% of 814-MW

CES - 220KV line to Russia

100% Coal-fired

Page 8: Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Oxford Business Group THE INSIDE EDGE

TPPs account for 85% of domestic consumption of coal

Tariffs set below market price

Tariff for sale to the TPPs is $14.04 vs $ 17 production cost

Page 9: Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Oxford Business Group THE INSIDE EDGE

Upgrading Existing TPPs

New TPPs

Renewables

Nuclear

Energy Efficiency

Page 10: Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Oxford Business Group THE INSIDE EDGE

Open Minded Policy Makers

Focus on Clean Coal

Air Cooling & Water Management

Energy Efficiency

Page 11: Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Oxford Business Group THE INSIDE EDGE

Establish supply to every settlement

220MW Hydro on the Egiin River

TPP 5, w 450-MW electricity and 587-MW thermal capacity

Nuclear remains an option

Page 12: Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Oxford Business Group THE INSIDE EDGE

Technological Leapfrog

Engage Policy Makers

Superior Investment Opportunity

Page 13: Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Oxford Business Group THE INSIDE EDGE

THANK YOU!