Moline Bridge Closure
Unclassified1 31500ZDec09
US Army Garrison – Rock Island Arsenal
Moline Bridge Closure
Moline Bridge Closure
Unclassified2 31500ZDec09
AGENDA
• Closure Schedule
• Traffic Patterns
• Emergency Evacuation
Moline Bridge Closure
Unclassified3 31500ZDec09
Moline Arsenal BridgeClosure Begins 26 JAN 2010
Basic Moline Bridge Closure ScheduleActivity Duration Jan 2010 Aug 2011
RI Entrance TemporaryFacilities On Going
Moline Pool Spans Closed 9 months 26 Jan 2010 - 26 Oct 2010
Moline Bridge Open 27 Oct 2010 – Mar 2011
Moline Approach Spans Closed 5 months Mar 2011 – Aug 2011
Moline Bridge Open Aug 2011
Moline Bridge Closure
Unclassified4 31500ZDec09
Morning Traffic Patterns5:30 am – 8:30 am
Moline Bridge Closure
Unclassified5 31500ZDec09
MORNING TRAFFIC PATTERNS
LegendInbound TrafficOutbound TrafficCross TrafficOfficer LocationsTemp. Lane ClosurePerm. Road Closure
Morning TrafficApplicable times: 5:30 am – 8:30 amOutbound Traffic MUST exit at the Rock Island Gate
Fort Armstrong Ave. will be
Closed to Traffic Inbound Traffic MUST Merge to 1 Lane
Sylvan St. traffic STOPSBeck Ave. traffic does NOT
Rock Island Dr. does NOT connect to RI Gate
MORNING INBOUND traffic will be 2 lanes entering. (The Government Bridge will be 1-way traffic entering the Arsenal.) OUTBOUND traffic MUST use RI Gate.
NONLY for cross traffic not an exit
Moline Bridge Closure
Unclassified6 31500ZDec09
MORNING TRAFFIC PATTERNS – GOV BRIDGE
LegendInbound TrafficOfficer LocationsTemp. Lane Closure
MORNING INBOUND traffic will be 2 lanes entering. (The Government Bridge will be1-way traffic entering the Arsenal.) OUTBOUND traffic MUST use RI Gate.
Morning TrafficApplicable times: 5:30 am – 8:30 amOutbound Traffic MUST exit at the Rock Island Gate
Cross Island TrafficWill be Closed
OUTBOUND traffic MUST use RI Gate.
N
Moline Bridge Closure
Unclassified7 31500ZDec09
MORNING TRAFFIC PATTERNS - DAVENPORT
N
LegendInbound TrafficCross TrafficOfficer LocationsTemp. Lane Closure
Detour: River Drive traffic should use Le Claire or 2nd Street
MORNING INBOUND traffic will be 2 lanes entering. (The Government Bridge will be 1-way traffic entering the Arsenal.) OUTBOUND traffic MUST use RI Gate.
Moline Bridge Closure
Unclassified8 31500ZDec09
TRAFFIC PATTERNS – ROCK ISLAND VIADUCT and 92
LegendInbound TrafficOutbound Traffic
Moline Bridge Closure
Unclassified9 31500ZDec09
TRAFFIC PATTERNS – ROCK ISLAND DRIVE
LegendInbound TrafficOutbound TrafficOfficer LocationsTemp. Lane Closure
Moline Bridge Closure
Unclassified10 31500ZDec09
CoE and Naval MORNING TRAFFIC PATTERNS
Morning TrafficApplicable times: 5:30 am – 8:30 amOutbound Traffic MUST exit at the Rock Island GateNote: Afternoon traffic for the COE and Naval Facility will be the same as the rest of the island.
Fort Armstrong Ave. will be
Closed to Traffic
Rock Island Dr. does NOT connect to RI Gate
MORNING INBOUND traffic will be 2 lanes entering. (The Government Bridge will be 1-way traffic entering the Arsenal.) OUTBOUND traffic MUST use RI Gate.
NONLY for cross traffic not an exit
LegendInbound TrafficOutbound TrafficCoE and Naval TrafficCross TrafficOfficer LocationsTemp. Road ClosurePerm. Road Closure
Corps of Engineers
Naval
Facility
Parking
Parking
Parking
Parking
Parking
During Morning RUSH HOUR ONLY, COE and Naval vehicles will be allowed to enter their areas through the barricades. This is one way inbound traffic only.
NO vehicles will be allowed to exit this way.
Moline Bridge Closure
Unclassified11 31500ZDec09
Afternoon Traffic Patterns 2:30 pm – 5:30 pm
Moline Bridge Closure
Unclassified12 31500ZDec09
AFTERNOON TRAFFIC PATTERNS
LegendInbound TrafficOutbound RI TrafficOutbound Davenport TrafficCross TrafficOfficer LocationsTemp. Road ClosurePerm. Road Closure
Afternoon TrafficApplicable times: 2:30 pm – 5:30 pmInbound Traffic MUST enter at the Rock Island Gate
Fort Armstrong Ave. will be
Closed to Traffic
ALL Illinois bound traffic must turn south onto Sylvan Street.
(This is the last chance to turn south.Rock Island Ave. NO longer connects to the
Rock Island gate.)
ALL Iowa bound traffic continues toward Davenport Gate.
Sylvan St. traffic STOPSBeck Ave. traffic does NOT
Rock Island Dr. does NOT connect to RI Gate
AFTERNOON OUTBOUND Davenport traffic will be 2 lanes exiting. (The Government Bridge will be 1-way traffic exiting to Davenport.) INBOUND traffic MUST enter at the Rock Island Gate.
NONLY for cross
traffic not an exit
Moline Bridge Closure
Unclassified13 31500ZDec09
AFTERNOON TRAFFIC PATTERNS – GOV BRIDGE
LegendDavenport OutboundOfficer LocationsTemp. Lane Closure
Cross Island TrafficWill be Closed
N
Afternoon TrafficApplicable times: 2:30 pm – 5:30 pmInbound Traffic MUST enter at the Rock Island Gate
AFTERNOON OUTBOUND Davenport traffic will be 2 lanes exiting. (The Government Bridge will be 1-way traffic exiting to Davenport.) INBOUND traffic MUST enter at the Rock Island Gate.
Moline Bridge Closure
Unclassified14 31500ZDec09
AFTERNOON TRAFFIC PATTERNS - DAVENPORT
NAFTERNOON OUTBOUND Davenport traffic will be 2 lanes exiting. (The Government Bridge will be 1-way traffic exiting to Davenport.) INBOUND traffic MUST enter at the Rock Island Gate.
INBOUND traffic MUST use RI Gate.
LegendOutbound Davenport TrafficOfficer LocationsTemp. Road Closure
Afternoon TrafficApplicable times: 2:30 pm – 5:30 pmInbound Traffic MUST enter at the Rock Island Gate
Moline Bridge Closure
Unclassified15 31500ZDec09
Truck and Visitor TrafficALL DAY
Moline Bridge Closure
Unclassified16 31500ZDec09
TRAFFIC PATTERNS – VEHICLE INSPECTIONS
VISITORSVisitors must check in at the Visitor’s Center at the RI Gate before coming on post.
TRUCKSAll trucks must enter AND exit through the RI gate. Trucks will enter through the truck route shown and exit with the normal flow of traffic.
MORNING TRAFFICApplicable times: 5:30 am – 8:30 amOutbound traffic will be allowed to exit at the Rock Island gate ONLY.
AFTERNOON TRAFFICApplicable times: 2:30 pm – 5:30 pmInbound traffic will be allowed on post from the Rock Island gate ONLY.
LegendInbound TrafficVisitor TrafficTruck TrafficTemp. Road ClosurePerm. Road Closure
Fort Armstrong Ave. will be
Closed to Traffic
Ft. Armstrong Ave.
Rock
Isla
nd D
rive
Rock Island Dr. does NOT connect to RI Gate
ALL trucks and visitors keep right.
Moline Bridge Closure
Unclassified17 31500ZDec09
EMERGENCY TRAFFIC CONTROL
• Beck Ave. will be the primary inbound emergency traffic route
• TCPs may be set up on Rodman Ave. at East St., Gillespie St. and Sylvan Ave. and at Sylvan Ave. and Beck Ave.
• RIA Police Department will coordinate with RI and Davenport Law Enforcement to ensure proper traffic flow off the RI Viaduct and the Government Bridge