R$95.800,00
Carta Convite 016/2007:
Aterro hidráulico e construção de dois molhes.
VALOR CONTRATADO: R$95.800,00
![Page 3: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/3.jpg)
Projeto Executivo
Contrato 19/2007 – 27/03/2007Recomposição da praia e construção de molhes
![Page 4: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/4.jpg)
R$35.600,00Carta Convite 017/2008: Recuperação do molhe
•EXTRAÍDO DO PROJETO ANTERIOR
•MESMO RESPONSÁVEL TÉCNICO
•SEM ART
VALOR CONTRATADO: R$35.600,00
PROJETO: março/2008LICITAÇÃO: 07 de abril de 2008
![Page 5: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/5.jpg)
Tomada de preços 025/2008
![Page 6: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/6.jpg)
Maio de 2008 Projeto de 2008
Levantamento 2011
![Page 7: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/7.jpg)
3,50 3,60
![Page 8: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/8.jpg)
2,873,60
![Page 9: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/9.jpg)
Área reduzida
3,60
Mesmo com a redução da área, aumentou-se o volume de pedras
![Page 10: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/10.jpg)
Aditivo de R$89.807,90
Ofício 461/2008/SEDUMA
Solicita aditivo de 1.861,89 toneladas de pedras
![Page 11: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/11.jpg)
Alteração do projeto
Revisão do contrato 031/2008 de 18/04/2008 para construção do
cabeço do molhe
![Page 12: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/12.jpg)
CARTA CONVITE -016/2007
RECUPERAÇÃO
da PRAIA
GEODÉSIA ESTUDOS PROJETOS E ASSES. LTDA
OTREBOR SUPERV. E ASSES. GEREN. SEV. OBRAS
PROSUL PROJETOS SUPERV. E PLANEJ LTDA
AGUACON ENG. E CONTROLE DE QUALIDADE LTDA
GANHADOR PROSUL PROJETOS SUPERV. E PLANEJ LTDA
Responsável técnico: Engº Braga Martins
![Page 13: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/13.jpg)
CARTA CONVITE 017/2008
RECUPERAÇÃO MOLHE
GEODÉSIA ESTUDOS PROJETOS E ASSES. LTDA
IGUATEMI CONSULTORIA E SERV. ENGENH. LTDA
OTREBOR SUPERV E ASSES. GEREN. SERV. OBRAS
GANHADOR OTREBOR SUPERV E ASSES. GEREN. SERV. OBRAS
Responsável técnico: Engº Braga Martins
![Page 14: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/14.jpg)
CARTA CONVITE 042/2008
FISCALIZAÇÃO RECUPERAÇÃO PRAIA CENTRAL
GEODÉSIA ESTUDOS PROJETOS E ASSES. LTDA
OTREBOR SUPERV. E ASSES. GEREN. SEV. OBRAS
IGUATEMI CONSULTORIA E SEV. ENGENH. LTDA
TERRAPLENAGEM E TRANSP. AZZA LTDA
GANHADOR GEODÉSIA ESTUDOS PROJETOS E ASSES. LTDA
Responsável técnico: Engº Braga Martins
![Page 15: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/15.jpg)
CONCORRÊNCIA -014/2008
EXECUÇÃO RECUP. PRAIA
TERRAPLENAGEM E TRANSP. AZZA LTDA
STER ENGENHARIA LTDA
GANHADOR STER ENGENHARIA LTDA
![Page 16: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/16.jpg)
TOMADA DE PREOÇO0 25/2008
EXECUÇÃO DO MOLHE DA BARRA
TERRAPLENAGEM E TRANSP. AZZA LTDA
GANHADOR TERRAPLENAGEM E TRANSP. AZZA LTDA
![Page 17: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/17.jpg)
![Page 18: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/18.jpg)
Informações de altura, ângulos, diferenças de nível ou distância vertical do terreno.
![Page 19: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/19.jpg)
Levantamento realizado em 2011 revela que, mesmo com os aditivos contratados, em nenhum ponto a obra foi executada dentro do projeto.
![Page 20: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/20.jpg)
Informações de quantidade de material utilizado na ampliação do molhe da da barra em 2008.
Volume projetado – 5.353,30m³ - 9.448,750 toneladas
Volume pago – 6.390,19m³ - 11.310,638 toneladas
Volume realizado - 2.302,08m³ - 4.074,690 toneladas
![Page 21: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/21.jpg)
![Page 22: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/22.jpg)
Valores corrigidos para 12/2011
12/201102 Novos Molhes
05/2008Molhe da Barra
CONTRATADO
32.676,10 toneladas
CONTRATADO
11.310,64 toneladas
CUSTO MÉDIO DA TONELADA
R$35,70
CUSTO MÉDIO DA TONELADA
R$58,57
![Page 23: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/23.jpg)
Valores corrigidos em 12/2012
2008Molhe da Barra
VALOR TOTAL
R$662.510,82
REALIZADO
R$ 238.671,40
DIFERENÇA
R$432.839,42
![Page 24: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/24.jpg)
Quanto custaria a ampliação do molhe da barra hoje se contratada pelo mesmo custo dos dois novos molhes
2012 2008
CUSTO TONELADA CORRIGIDO
R$35,70
DIFERENÇA
R$517.044,39
CUSTO TONELADA CORRIGIDO
R$58,77
TOTAL CORRIGIDO
R$145.466,43TOTAL CORRIGIDO
R$662.510,82
![Page 25: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/25.jpg)
• Dupla contratação de um mesmo serviço
• Superfaturamento de obra
• Direcionamento de licitação
• Pagamento por serviço não realizado
![Page 26: Molhe da barra 2008](https://reader033.fdocuments.net/reader033/viewer/2022042817/55a6c3a71a28ab95428b4662/html5/thumbnails/26.jpg)
Jornal do Comércio 31/05/2008
“A obra teve seu custo ampliado em função da demora na liberação do projeto. Agora serão depositados 144.697 mil metros cúbicos ao custo de R$2,160 milhões”
A areia que será jogada na orla piçarrenseé diferente da atual, com grãos mais finos.“Essa areia é típica da nossa praia e vai durar mais tempo”, garante.
“Nossos estudos revelaram que os bancos de areia estão na saída da barra e próximos à praia Alegre”