MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

26
MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE

Transcript of MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

Page 1: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

MOLALLA RIVER SCHOOL DISTRICTFACILITIES DEPARTMENT

SUMMER 2015 DEFERRED

MAINTENANCE

Page 2: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

MOLALLA HIGH SCHOOL HVAC REPAIRS 2015

• REPLACED BELTS ON A/C UNIT 3• REPAIRED GYM UNIT COMPRESSOR• REPAIRED COOLING TOWER PUMP• REPAIRED GIRLS LOCKER ROOM UNIT ECONOMIZER• REPLACED VARIABLE SPEED DRIVE IN A/C UNIT 1• REPLACED BELTS ON A/C UNITS 1 AND 2• REPLACED SHAFT ON A/C UNIT 2• REPLACED SUPPLY MOTOR FOR RTU 8• REPLACED RETURN MOTOR, BEARINGS, AND SHAFT FOR

RTU 2• REPLACED COMPRESSOR ON DRY SYSTEM IN CANOPY

AREA• REPAIRED PUMP ON RTU 8

Page 3: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

HIGH SCHOOL NEW STEAM OVEN AND FILTER SYSTEM

Page 4: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

HIGH SCHOOL OLD BOOSTER HEATER AND NEW BOOSTER HEATER

Page 5: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

NEW LED FIXTURES FOR STAFF/ATHLETIC PARKING LOT AT HS

Page 6: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

MOLALLA ELEMENTARY CARPET

Page 7: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

HALLWAY AND LIBRARY

Page 8: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

POD AND HALLWAY

Page 9: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

MES PAVING UPPER PARKING LOT AND WALKWAYS

Page 10: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

SEALED BUS LANE AT MES

Page 11: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

MIDDLE SCHOOL EIGHTH GRADE WING EXTERIOR BLINDS FOR TEMP. CONTROL

Page 12: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

MIDDLE SCHOOL BOYS LOCKER ROOM PAINTING

Page 13: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

MIDDLE SCHOOL GIRLS LOCKER ROOM BEFORE

Page 14: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

AND AFTER

Page 15: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

NEW SIDEWALK AT MULINO-AROUND THE FRONT TO THE WEST ENTRANCE

Page 16: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

MULINO DRAINAGE WORK PREP

Page 17: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

MULINO DRAINAGE WORK AFTER

Page 18: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

RURAL DELL HALLWAYS PAINTING

Page 19: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

NEW SINKS AND FAUCETS AT RURAL DELL

Page 20: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

RURAL DELL LOCKER ROOM REMODEL FOR SUPPORTED ED CLASSROOM

Page 21: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

ROOFING AT RURAL DELL

Page 22: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

RURAL DELL AND CLARKES NEW PRESSURE TANKS

Page 23: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

CLARKES BOILER TRANSFORMER BEFORE AND AFTER REPLACEMENT

Page 24: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

NEW PHONE SYSTEM HANDSETS

Page 25: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

MAIN SERVER AT DISTRICT OFFICE AND INTERCOM SPEAKER

Page 26: MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

FOOTBALL FIELD HOMECOMING 2015