Mohammed Asif Mohammed Mustafa

5

Click here to load reader

Transcript of Mohammed Asif Mohammed Mustafa

Page 1: Mohammed Asif Mohammed Mustafa

MOHAMMED ASIF

Mobile: +966591697274 [email protected]

Career ObjectiveTo achieve continuous personal growth through speed and hard work and to be a key factor in the success of the organization by exhibiting skills, determination, dedication and meticulousness. To work in a reputed company and to achieve excellence and dedicated to the work. Summary

8+ Years of experience as Telecom Implementation Engineer. Saudi Aramco Work Permit Receiver (WPR) Certificate. Work experience as Work Permit Receiver in Aramco Plants. Task completed related to Hot work permit Cold work permit, and Confined Space Entry

work permit. Huawei Hardware Installation Training Certificate. Having a Good Knowledge of Alcatel Lucent, NSN, Huawei and Ericsson. Working experience with GSM, CDMA, WCDMA, LTE equipments. Good Knowledge on Frequency Band Spectrum 2G (900 & 1800), 3G (900 & 2100), 4G. Strong ability on logical analysis and problem solving/trouble shooting. Proven ability to quickly learn and apply new technologies. Strong work ethics and willingness to work hard to achieve employer objectives.

Professional ExperienceAugust 2013 Till Now.Operator- Zain (FTK).Vendor- Huawei

Huawei.co (Saudi Arabia).Telecom Implementation Manager (Microwave & Wireless).Roles & ResponsibilitiesZain FTK Project

2G Integration using btsm software. 3G Nodeb Integration on

1. UMPT & 2. WMPT

LTE eNodeb Integration LMPT. Configuration of BTS 3900, BTS 3900L,

DBS3900. Installation and Commissioning of RRU and BTS

DBS3900 (2G & 3G). Measurement of Voltage Standing Wave Ratio

(VSWR). Measurement of Distance to Fault (DTF). SMU Rectifier External Alarm configuration. Installation, Integration Huawei Transmission

RTN-905, RTN-910, RTN-950, RTN980.

Page 2: Mohammed Asif Mohammed Mustafa

Nov 2012- Aug 2013.Operator- STC.Vendor- Alcatel.

Dec 2010 – Oct 2012Operator- Mobily, Zain.Vendor- NSN, Huawei.

DBS 3900.

IGTL (Saudi Arabia).Telecom Project Coordinator.Roles & ResponsibilitiesAlcatel (Microwave Link, 2G, 3G, LTE)

Alcatel MPR9500 slot-4 and slot-8. Alcatel Microwave Links from 0.3mtr to 2.4mtr

Antenna Installation, Commissioning and Alignment.

Alcatel MPR9500-CoreE card, MPT Access card, 32 PDH card.

Cross Connection, IP Configuration, RSL (Receive Signal Level) Link.

(1+0), (1+1SD), (2+2), SD (Space Diversity Link), FD (Frequency Diversity), Xpic configuration Link.

Alcatel 2G (900 & 1800). Alcatel 3G (900 & 2100). Alcatel LTE for 4G.

DELTA-UNITED (Saudi Arabia)Telecom Implementation Engineer.

Roles & ResponsibilitiesHuawei (2G, 3G, 4G, LTE, Microwave Link)

Configuration of BSC 6900. Indoor and Outdoor BTS installation which

includes Laying and Grounding of Celli Flex cable. BTS cabinet and interface cabling installation. Rectifier with back up battery installation. Electrical and Alarm cable wiring inside shelter. Digital Distribution Frame installation (DDF). Commissioning of GRFU 900 and GRFU 1800. Swap of Motorola BTS to Huawei BTS-3900 and. Swap of NSN BTS to Huawei BTS-3900. Preliminary Acceptance Test (PAT) for Huawei. Configuration, Commissioning using two methods,

1. Using USB.2. Using LMT software.

Installation of WRFU 2100.

Page 3: Mohammed Asif Mohammed Mustafa

Reforming of Frequency Band 2G (1800) to 2G (900).

NSN (Microwave Link) NSN Transmission Links. Installation, Commissioning & Trouble shooting of

NSN Transmission. E1 Cross Connection from SDH Node to PDH

Node. E1 Cascading.

Equipments Installed NSN FIU19, XC, Flexi Hybrid, Flexi Packet. Alcatel Lucent MPR-9500, Alcatel 2G, 3G, LTE. Huawei BTS3012, BTS3812, BTS 3900, BTS

3900L, BTS 3900A, RRU Indoor & outdoor, BSC 6900, RTN 980, 950, 910.

Testing Equipments NSN Flexi Hopper Manager-FIU19

NSN HUB Manager-XC ANRITSU S331d, ANRITSU S332d and,

ANRITSU S333d. LMT (Local Maintenance Terminal). Web LCT (Local Craft Terminal). Bird Sitemaster. Line Sweep Application Tool. RTN-910, 950, 980. Alcatel Lucent Neto Application 3.2, 3.3, 4.0, 4.1.

Dec 2007–Nov 2010Operator-TATA & Airtel.Vendor- Alcatel Lucent.

NUTEK & TVSTelecom Field Engineer

Having a sound knowledge of Alcatel Lucent CDMA Modular Cell.

Micro wave (MW) site surveys. Installation and commissioning of antennas and

antenna lines. Installation, Commissioning and integration of

base stations, microwave links and fixed transmission equipment.

BTS Installation activities are carried out according to sites specific installation plan.

Installation and termination of radio feeder cables, antennas and grounding kits.

Integrate the BTS to Base Station Controller

Page 4: Mohammed Asif Mohammed Mustafa

(BSC).

Education

Nov 2007: Bachelor of Technology (ECE)Hi-Point college of Engineering and Technology (JNTU), Hyderabad.

May 2003: Higher Secondary School Certificate Vikas junior college, Hyderabad.

May 2001: Secondary School CertificateNagarjuna High School, Hyderabad.

Personal Information

Full Name: MOHAMMED ASIF

Age: 31 Years

Nationality: INDIAN

Marital Status: Married

Visa: Valid and Transferable

Residence Location: Kingdom of Saudi Arabia

Driving License: Yes

Languages Known: English, Urdu, Hindi, Telugu, Arabic.

Place: Date:

MOHAMMED ASIF