mohamed safy cv

4
Of 4 1 | Page Work Experience " Detailed Projects List" Tasks: 1- Full Construction Drawings "autocad" "participation" - Plans - Elevations - Sections - Details 2- Co-ordination With Structural & MEP "Autocad" "participation " 3- Life Safety Plans "autocad" "participation" Porto New Cairo "SK Studio" Date of birth : 10/01/1990 Address : 140 masr helwan street Maadi , Cairo Egypt Mobile : (+20)01159060077 [email protected] Email : Military Status : Exempted Architect visualizator interior designer Education *Bachelor of Architecture sciences, El- Shrouk Academy 2013/2014 Accumulative Degree: good Graduation Project "mixed use high rise tower" very good Summary Quick Architecture Designer Sustainable Buildings Designer Landscape Designer Construction Drawings Drafter Architecture Visualizator Good Presentator Interior Designer Task Planner Mohamed Safy is Smoker Computer Driver Draft Drawer Slow Learner Delayer unambitious pessimistic Lazy Mohamed Safy isNot Scan This To Add me on Your Cell Phone 1Year Experience in 1 Architecture Consultant office 1 Real estate company SK Studio: 1- Porto Saeed 2- The square Mall ksa 3- Al-Rajhi Hotel & mall ksa 4- Mecca Governmental Complex ksa 5- Wadi el dawaser city ksa 6- Porto new cairo 7- Porto October 8- Porto Dubai 9- Porto Heliopolis 10- Residential Building new Cairo 11- Residential villa ksa M.N.S ( Me'amar Al- Mnsor 1- la jour compound complex 2- elite complex 3- other Resdiential estates 0 50 100 ARABIC ENGLISH FRENCH LANGUAGES UNDERSTAND WRITE SPEAK

Transcript of mohamed safy cv

Page 1: mohamed safy cv

Of 41 | P a g e

            

 

 

 

Work Experience " Detailed Projects List"

Tasks: 1- Full Construction Drawings "autocad" "participation"

- Plans - Elevations - Sections - Details

2- Co-ordination With Structural & MEP "Autocad" "participation " 3- Life Safety Plans "autocad" "participation"

Porto New Cairo "SK Studio"

Date of birth : 10/01/1990 Address : 140 masr helwan street Maadi , Cairo Egypt  Mobile : (+20)01159060077 

[email protected] :  Military Status : Exempted 

Architect visualizator interior designer

Education*Bachelor of Architecture sciences, El- Shrouk Academy 2013/2014 Accumulative Degree: good Graduation Project "mixed use high rise tower" very good

Summary Quick Architecture Designer

Sustainable Buildings Designer

Landscape Designer

Construction Drawings Drafter

Architecture Visualizator

Good Presentator

Interior Designer

Task Planner

MohamedSafy

is

Smoker

Computer Driver

Draft Drawer

Slow LearnerDelayer

unambitious

pessimistic

Lazy

MohamedSafyisNot

Scan This To Add me on Your Cell Phone

1Year Experience in 1 Architecture Consultant office 1 Real estate company  SK Studio:

1- Porto Saeed 2- The square Mall ksa 3- Al-Rajhi Hotel & mall ksa 4- Mecca Governmental Complex ksa 5- Wadi el dawaser city ksa 6- Porto new cairo 7- Porto October 8- Porto Dubai 9- Porto Heliopolis

10- Residential Building new Cairo 11- Residential villa ksa

M.N.S ( Me'amar Al- Mnsor 1- la jour compound complex 2- elite complex 3- other Resdiential estates

0 50 100

ARABIC

ENGLISH

FRENCH

LANGUAGES

UNDERSTAND WRITE SPEAK

Page 2: mohamed safy cv

Of 42 | P a g e

Tasks: 1- Design of the Street Elevation "Sketchup" "Standalone" 2- Full Construction Drawings "autocad" "participation"

- Plans - Elevations - Sections  - Details

3- Co-ordination With Structural & MEP "Autocad" "participation"

Porto October "SK Studio"

Tasks: 1- Design of the project main building " the island" residential apartments"Standalone" 2- Conceptual design phase layout options "sketchup" "participation" 3- Building the Revit Model of Building B , C, D, E DD phase "participation" 4- graphical presentation Of plans " photoshop" "participation"

Porto Saeed "SK Studio"

Tasks: 1- Area Quantity take off "participation"

Porto dubai

Studio""SK

Tasks: 1-Design of

- Mezzanine plan - First plan " main restaurant

- Business center " - Roof plan "Gym+Swimming pool " "Standalone"

2- 3d Modelling "participation" 3- graphical presentation Of plans " photoshop" "participation" 4- Graphical presentations of Sections "Standalone"

Rajhi -Alhotel & Mall hail Ksa "SK Studio"

Tasks: 1- Design of 2 Conceptual Alternatives out of 3 Alternatives "sketchup" "Standalone" 2- Interior Design of - Main Court "Standalone" -secondary court

- Island interior garden -Commercial oassage

3- 3d Exterior Modelling participation 4- Co-ordination with mep & structure 6- Setting the egress passways 7- Building the revit model "participation" 8- graphical presentation Of plans " photoshop""participation" 9- Graphical presentations of Sections "photosjop" 10 - Rendering of The Mall "lumion&vray photoshop post production "Standalone"

The Square Mall in Khamees Masheet KSA "SK Studio"

Page 3: mohamed safy cv

Of 43 | P a g e

Tasks: 1- 3D Animation "sketchup + Lumion " "Standalone"

5 Star Hotel Muscat oman "SK Studio"

Tasks: 1- Design of 3 Conceptual Architectural Facades of the city "sketchup" "Standalone" 2- Conceptual Design of

- Justice Courtyard -Entrance facade and courtyards " Sketchup "

3- Digital Renderings of The city "vray + Photoshop post production"

"participation" 4- Graphical Presentations of the studies of the city

Mecca Governmental

KSA Complex "SK Studio"

Tasks: 1- Design Development of the Master plan "participation" 2- Design Development of Administration Buildings of The city "participation" 3- Design Of The Gate of the Main Spine of the City "sketchup" "Standalone" 4- Graphical Presentations of 3D shots of some parts of the city " photoshop " "participation"

Wadi El KSADawasir

"SK Studio"

Tasks: 1- Building the Revit Model

"participation" 2- Construction Drawing

"participation"

La jour compound "m.n.s"

Tasks: 1- Building the Revit Model

"participation" 2- Construction Drawing

"participation" 3- Shop Drawings

"participation"

Ellite Compund "M.N.S"

 

Activities 1- Attending ECG's University to work Training for 25 weeks 2-Participating in Feda's Week 2014 Competition " The Future House" 3- Participating in Feda's Week 2013 Competition " Future Bridge " 4- Participating in Competition To Design Summer houses for Engineering syndicate

Honors & Awards prize stWinner of the 1-1

of ECG's "University To Work "

2- Reaching The Finals In Feda 2014 Competition

Best Working Drawings Project -3

year of study 98/100 thin the 4

Page 4: mohamed safy cv

Of 44 | P a g e

Design Skills Hotels & Recreational facilities

1- Full knowledge of Egyptian Hotel Design Codes 2- Full knowledge of Egyptian Life safety Code for Hotels 3- Participating in Co-ordination phase with MEP & Structural engineers

Malls 1‐ Full knowledge of Design Codes For Malls 2- Full knowledge of Egyptian Life Safety Code For Malls 3- Participating in Co-ordination phase with MEP & Structural engineers

Administration Buildings 1‐ Full knowledge of Administration Design basics and rules  2- Participating in Professional Administration Projects 3- Part of the Graduation Project was Administration

High Rise Building Buildings 1‐ Full knowledge of High rise Buildings Design basics and rules  2- Full knowledge of high rise structural systems 3- Graduation Project 130 level complex skyscraper 4- 4th year working drawing project 40 level complex building

  Sustainable Design Skills 1- Graduation Project was Sustainable Zero Energy Skyscraper 2- Working Drawing Project "le cinq" high rise Building was submitted as sustainable detailed project 3- Attending University to work Sustainable design lectures and workshops 4- Very Good knowledge in using BIM's Vasari Tool for simulating Buildings Energy

modeling 5- Attending many other lectures and workshops in sustainable Design 6- Currently Preparing to Gain GA Certificate From USBGC

  

AutoCad / AutoCad Architecture

Sketchup

BIM Revit

Vasari

Photoshop

Vray

Lumion

Ecotect

Climate Consultant

Arc GIS

Leed & Sustainable Principles

20%

Sustainble Softwares

20%

Parametric Design10%

Co‐ordination

10%

Life Safety10%

Soft Skills10%

Airports Design10%

Hospitals Design10%

ECG TrainingOctober 2013

to May 2014

Training

Construction drawings29%

Hotels Designs29%

Autocad & Sketchup14%

Complex Facilitites Design14%

Life Safety Drawings

14%

SK STUDIOMAY 2013

to SEPTEMPER

201

Construction Drawings

50%

Photoshop Presentation

50%

Etqan Training

August 2012 to

Septemper 2012

Quantity Take Off100%

EGPC training

June 2012 to

July2012

Tools

Objective

Mohamed Safy is seeking a career in Sustainable Buildings Design in an organization where He can leverage his experience, education, leadership and team building skills, and insightful vision to take any leadership role He is assigned to the next level.