Understanding Arra An array is simply a dimensional or two d dimensional array ca (a vertical array). three-dimensional ar As you’ll see, array formula to manipulat or reside in a singl • Multi Cells Array • Single Cell Array Array Formula Adva The advantages of usin They can sometimes u They can make your w They can eliminate t They can enable you A few disadvantages of Using many complex a They can make your w You must remember to The Microsoft Exce Function Name COLUMN COLUMNS GROWTH HLOOKUP INDEX (array form) LINEST LOGEST LOOKUP (array form) MATCH

description

Array Functions and Formulas

Transcript of Module 03 Do the Impossible With Array Formulas

Page 1: Module 03 Do the Impossible With Array Formulas

Understanding Array Formulas

An array is simply a collection of items operated on collectively or individually. In Excel, an array can be one

dimensional or two dimensional. These dimensions correspond to rows and columns. For example, a one dimensional array can be stored in a range that consists of one row (a horizontal array) or one column (a vertical array). A two-dimensional array can be stored in a rectangular range of cells. Excel doesn’t support three-dimensional arrays (but its VBA programming language does). that exist only in Excel’s memory.

As you’ll see, arrays need not be stored in cells. You can also work with arrays You can then use an array

formula to manipulate this information and return a result. An array formula can occupy multiple cells or reside in a single cell.

• Multi Cells Array • Single Cell Array

Array Formula Advantages & Disadvantages

The advantages of using array formulas rather than single-cell formulas include the following:

They can sometimes use less memory.They can make your work much more efficient.They can eliminate the need for intermediate formulas.They can enable you to do things that would be difficult or impossible otherwise.

A few disadvantages of using array formulas are the following:

Using many complex array formulas can sometimes slow your spreadsheet recalculation time to a crawl.They can make your worksheet more difficult for others to understand.You must remember to enter an array formula with a special key sequence (by pressing Ctrl+Shift+Enter).

The Microsoft Excel functions that work with arrays are included in the following table.

Function NameCOLUMN

COLUMNS

GROWTH

HLOOKUP

INDEX (array form)

LINEST

LOGEST

LOOKUP (array form)

MATCH

Page 2: Module 03 Do the Impossible With Array Formulas

MDETERM

MINVERSE

MMULT

ROW

ROWS

SUMPRODUCT

TRANSPOSE

TREND

VLOOKUP

Page 3: Module 03 Do the Impossible With Array Formulas

Understanding Array Formulas

An array is simply a collection of items operated on collectively or individually. In Excel, an array can be one

dimensional or two dimensional. These dimensions correspond to rows and columns. For example, a one dimensional array can be stored in a range that consists of one row (a horizontal array) or one column (a vertical array). A two-dimensional array can be stored in a rectangular range of cells. Excel doesn’t support three-dimensional arrays (but its VBA programming language does). that exist only in Excel’s memory.

As you’ll see, arrays need not be stored in cells. You can also work with arrays You can then use an array

formula to manipulate this information and return a result. An array formula can occupy multiple cells or reside in a single cell.

An array formula can produce a single result

It can produce multiple results - with each result displayed in a separate cell.

Array Formula Advantages & Disadvantages

The advantages of using array formulas rather than single-cell formulas include the following:

They can sometimes use less memory.They can make your work much more efficient.They can eliminate the need for intermediate formulas.They can enable you to do things that would be difficult or impossible otherwise.

A few disadvantages of using array formulas are the following:

Using many complex array formulas can sometimes slow your spreadsheet recalculation time to a crawl.They can make your worksheet more difficult for others to understand.You must remember to enter an array formula with a special key sequence (by pressing Ctrl+Shift+Enter).

The Microsoft Excel functions that work with arrays are included in the following table.

Array usageReturns an array when the argument is a range

Requires an array or cell range as an argument

Requires arrays or cell ranges as arguments and can return an array

Requires an array or cell range as an argument

Requires an array as an argument and can return an array

Always returns an array

Always returns an array

Requires an array or cell range as an argument

Requires an array or cell range as an argument

Page 4: Module 03 Do the Impossible With Array Formulas

Requires an array as an argument

Always returns an array

Always returns an array

Returns an array when the argument is a range

Requires an array or cell range as an argument

Requires arrays, cell ranges, or values as arguments

Always returns an array

Requires arrays or cell ranges as arguments and can return an array

Requires an array or cell range as an argument

Page 5: Module 03 Do the Impossible With Array Formulas

SALES REPORTPrice for the m/o October 2011

S. No Category Products Price1 Motor Cycle Sprinter ECO Euro 1 69,4002 Motor Cycle Sprinter Euro 2 72,9003 Motor Cycle GS 150 91,0004 Motor Cycle Shogun 82,0005 Auto Mobile Swift 1.3 DX 1,031,0006 Auto Mobile Liana 1.3L RXI MT CNG 1,301,0007 Auto Mobile Cultus VXRi CNG 965,0008 Auto Mobile Alto VXR CNG 771,0009 Auto Mobile Mehran VXR CNG 605,000

10 Auto Mobile Bolan VXR CNG 701,00011 Auto Mobile Ravi VX CNG 586,00012 Auto Mobile Cargo VAN 550,00013 Auto Mobile Jimny JLDX M/T 2,073,00014 Auto Mobile APV 1.5L CNG 1,984,000

TOTAL 10,882,300

0 0 0 0 0 0

Page 6: Module 03 Do the Impossible With Array Formulas

Qty Amount13

615151816

22

1814

797

12

154 -

TOTAL

0 0 0 0 0 0 0 0

Page 7: Module 03 Do the Impossible With Array Formulas

0

000000000000000000000

Page 8: Module 03 Do the Impossible With Array Formulas

Month Product 1 Product 2 Product 3 Product 4 Product 5

Jan/2008 9,879 8,832 5,660 6,197 1,494

Feb/2008 8,577 4,881 8,613 2,329 4,710

Mar/2008 #N/A 2,028 1,120 9,921 #DIV/0!

Apr/2008 6,467 3,475 7,135 7,039 7,896

May/2008 9,295 8,107 1,535 9,188 5,653

Jun/2008 1,296 5,112 #DIV/0! 4,765 4,424

Jul/2008 9,282 #DIV/0! 4,853 3,920 1,466

Aug/2008 3,791 8,372 2,939 8,107 1,788

Sep/2008 #DIV/0! 5,280 9,049 5,485 #DIV/0!

Oct/2008 3,137 3,416 #DIV/0! 5,551 2,275

Nov/2008 Err:509 4,714 2,067 7,255 5,951

Dec/2008 9,687 7,170 4,022 2,260 #DIV/0!

Jan/2009 3,345 9,380 8,967 9,935 1,757

Feb/2009 6,866 8,366 #DIV/0! 5,260 9,709

Mar/2009 1,235 6,195 4,708 6,327 --

TOTAL

ERRORS

Page 9: Module 03 Do the Impossible With Array Formulas

Product 6 TOTAL

3,535

7,775

4,027

3,273

5,093

#DIV/0!

5,302

8,606

4,660

7,603

2,641

8,568

4,143

7,353

9,526

Page 10: Module 03 Do the Impossible With Array Formulas

Year 2011Product Month Price Product

Alto January 775,900 Alto

Alto February 773,700

Alto March 774,200

Alto April 780,500

Alto May 786,300

Alto June 784,800

Alto July 793,400

Alto August 791,900

Alto September 790,600

Alto October 789,000

Alto November 788,900

Alto December 795,500

APV January 1,986,400

APV February 1,991,600

APV March 2,000,000

APV April 1,999,500

APV May 2,005,300

APV June 2,007,500

APV July 2,004,200

APV August 2,011,300

APV September 2,011,500

APV October 2,021,200

APV November 2,023,900

APV December 2,024,400

Bolan January 698,800

Bolan February 694,000

Bolan March 702,200

Bolan April 701,200

Bolan May 697,400

Bolan June 701,700

Bolan July 706,500

Bolan August 710,800

Bolan September 713,400

Bolan October 718,300

Bolan November 723,000

Bolan December 726,300

Page 11: Module 03 Do the Impossible With Array Formulas

Cargo Van January 545,300

Cargo Van February 551,200

Cargo Van March 560,200

Cargo Van April 560,900

Cargo Van May 562,400

Cargo Van June 558,200

Cargo Van July 560,500

Cargo Van August 559,200

Cargo Van September 559,200

Cargo Van October 557,300

Cargo Van November 554,100

Cargo Van December 563,000

Cultus January 963,100

Cultus February 972,500

Cultus March 979,400

Cultus April 975,700

Cultus May 976,500

Cultus June 983,100

Cultus July 985,800

Cultus August 993,200

Cultus September 990,400

Cultus October 993,000

Cultus November 993,300

Cultus December 991,100

GS150 January 89,600

GS150 February 95,200

GS150 March 97,700

GS150 April 99,200

GS150 May 102,100

GS150 June 97,600

GS150 July 95,600

GS150 August 102,600

GS150 September 111,200

GS150 October 107,100

GS150 November 103,300

GS150 December 108,400

Jimny January 2,069,800

Jimny February 2,076,100

Jimny March 2,072,900

Jimny April 2,078,700

Page 12: Module 03 Do the Impossible With Array Formulas

Jimny May 2,082,700

Jimny June 2,090,300

Jimny July 2,092,200

Jimny August 2,099,600

Jimny September 2,107,200

Jimny October 2,114,800

Jimny November 2,119,700

Jimny December 2,118,300

Liana January 1,297,100

Liana February 1,305,400

Liana March 1,311,000

Liana April 1,318,000

Liana May 1,321,400

Liana June 1,319,600

Liana July 1,323,600

Liana August 1,325,200

Liana September 1,320,300

Liana October 1,328,100

Liana November 1,332,000

Liana December 1,339,500

Mehran January 611,200

Mehran February 608,500

Mehran March 608,700

Mehran April 607,200

Mehran May 607,700

Mehran June 602,800

Mehran July 598,400

Mehran August 604,600

Mehran September 608,800

Mehran October 615,300

Mehran November 619,100

Mehran December 621,300

Ravi January 588,300

Ravi February 594,600

Ravi March 593,200

Ravi April 592,000

Ravi May 593,500

Ravi June 598,600

Ravi July 597,400

Ravi August 605,300

Page 13: Module 03 Do the Impossible With Array Formulas

Ravi September 614,300

Ravi October 615,600

Ravi November 612,300

Ravi December 616,200

Shogun January 82,100

Shogun February 85,600

Shogun March 90,100

Shogun April 94,800

Shogun May 90,000

Shogun June 91,000

Shogun July 90,400

Shogun August 90,000

Shogun September 92,700

Shogun October 90,300

Shogun November 92,100

Shogun December 95,100

SprinterECO January 71,200

SprinterECO February 75,600

SprinterECO March 82,000

SprinterECO April 85,400

SprinterECO May 95,400

SprinterECO June 97,700

SprinterECO July 104,700

SprinterECO August 100,700

SprinterECO September 109,100

SprinterECO October 114,000

SprinterECO November 120,600

SprinterECO December 123,800

SprinterEuro January 74,300

SprinterEuro February 71,900

SprinterEuro March 70,900

SprinterEuro April 77,600

SprinterEuro May 80,500

SprinterEuro June 90,100

SprinterEuro July 90,400

SprinterEuro August 97,100

SprinterEuro September 97,500

SprinterEuro October 94,000

SprinterEuro November 102,500

SprinterEuro December 109,900

Page 14: Module 03 Do the Impossible With Array Formulas

Swift January 1,037,400

Swift February 1,046,900

Swift March 1,044,600

Swift April 1,043,700

Swift May 1,052,700

Swift June 1,052,800

Swift July 1,055,000

Swift August 1,064,100

Swift September 1,069,700

Swift October 1,068,300

Swift November 1,073,500

Swift December 1,078,200

Page 15: Module 03 Do the Impossible With Array Formulas

Month Price Location

April

Page 16: Module 03 Do the Impossible With Array Formulas

Product MonthAlto January

APV February

Bolan March

Cargo Van April

Cultus May

GS150 June

Jimny July

Liana August

Mehran September

Ravi October

Shogun November

SprinterEC December

SprinterEurJanuary

Swift February

March

April

May

June

July

August

September

October

November

December

January

February

March

April

May

June

July

August

September

October

November

December

Page 17: Module 03 Do the Impossible With Array Formulas

January

February

March

April

May

June

July

August

September

October

November

December

January

February

March

April

May

June

July

August

September

October

November

December

January

February

March

April

May

June

July

August

September

October

November

December

January

February

March

April

Page 18: Module 03 Do the Impossible With Array Formulas

May

June

July

August

September

October

November

December

January

February

March

April

May

June

July

August

September

October

November

December

January

February

March

April

May

June

July

August

September

October

November

December

January

February

March

April

May

June

July

August

Page 19: Module 03 Do the Impossible With Array Formulas

September

October

November

December

January

February

March

April

May

June

July

August

September

October

November

December

January

February

March

April

May

June

July

August

September

October

November

December

January

February

March

April

May

June

July

August

September

October

November

December

Page 20: Module 03 Do the Impossible With Array Formulas

January

February

March

April

May

June

July

August

September

October

November

December

Page 21: Module 03 Do the Impossible With Array Formulas

S.No Employee Name Division ID

1 Mr. Obaid Rashid PSMCL/OP-472 Mr. Jamiluddin Aali PSMCL/AF-73 Mr. Mahdy PSMCL/FI-234 Mr. Mian Ikhlaq Ahmed PSMCL/PR-345 Mr. Abdul Qadir Khatti PSMCL/MA-76 Mr. Anwar Maqsood PSMCL/OP-477 Mr. Badr PSMCL/FI-238 Mr. Asif Mujtaba PSMCL/PR-349 Ms. Sana Sarfaraz PSMCL/QU-36

10 Mr. Farhan Pervaiz PSMCL/PR-3411 Mr. Ihsaan PSMCL/OP-4712 Mr. Jaafar PSMCL/PR-3413 Mr. Hasan Abidi PSMCL/OP-4714 Mr. Mohsin PSMCL/QU-3615 Mr. Abdul-Tawaab PSMCL/FI-2316 Mr. Ghaalib PSMCL/MA-717 Mr. Jahangir Khan PSMCL/QU-3618 Mr. Aslam Farrukhi PSMCL/PR-3419 Mr. Haroon Rasheed PSMCL/AF-720 Mr. Muhammad Ali PSMCL/FI-2321 Mr. Sibte Hassan PSMCL/MA-722 Mr. Abdul PSMCL/PR-3423 Mr. Abdul-Salaam PSMCL/PR-3424 Mr. Hamid Ali PSMCL/AF-725 Mr. Tabish Dehlvi PSMCL/QU-3626 Mr. Abdul-Samad PSMCL/OP-4727 Mr. Manzoor Ahmad PSMCL/FI-2328 Mr. Faarooq PSMCL/PR-3429 Mr. Kamal Warsi PSMCL/OP-4730 Mr. Abul Khair PSMCL/PR-3431 Mr. Abdullah PSMCL/QU-3632 Mr. Aamir Liaquat Hussain PSMCL/AF-733 Mr. Khaldoon PSMCL/MA-734 Mr. Imran Ali PSMCL/OP-4735 Mr. Ibn-e-Safi PSMCL/QU-3636 Mr. Abdul-Fataah PSMCL/QU-3637 Mr. Nasim Amrohvi PSMCL/QU-3638 Mr. Mustafa Zaidi PSMCL/OP-4739 Ms. Zamir Ali PSMCL/OP-47

Page 22: Module 03 Do the Impossible With Array Formulas

40 Mr. Abdul-Majeed PSMCL/PR-3441 Mr. Houd PSMCL/FI-2342 Mr. Anwar Ahmed PSMCL/AF-743 Mr. Marwan PSMCL/QU-3644 Mr. Behroze Sabzwari PSMCL/FI-2345 Mr. Fatima Surayya PSMCL/MA-746 Mr. Izhar PSMCL/QU-3647 Mr. Fareed PSMCL/QU-3648 Mr. Shahid Sharif PSMCL/QU-3649 Mr. Mohammad Sadiq Mohtasham PSMCL/PR-3450 Mr. Majdy PSMCL/AF-751 Mr. Shakeel Ahmed PSMCL/QU-3652 Mr. Abdul-Ghafaar PSMCL/PR-3453 Mr. Sardar Abdur Rab Nishtar PSMCL/OP-4754 Mr. Ghulam Mustafa PSMCL/AF-755 Mr. Bishr PSMCL/AF-756 Mr. Qaem Amrohvi PSMCL/AF-757 Mr. Idrees PSMCL/PR-3458 Mr. Syed Ahmed Shuja PSMCL/MA-759 Mr. Isaam PSMCL/OP-4760 Mr. Haaroon PSMCL/AF-761 Mr. S. M. Zeeshan Dawar PSMCL/QU-3662 Mr. Faakhir PSMCL/PR-3463 Mr. Asim Kamal PSMCL/FI-2364 Mr. Lutfi PSMCL/FI-2365 Mr. Tariq Mehmood PSMCL/MA-766 Mr. Imaad PSMCL/PR-3467 Mr. M. Ahmer Noman PSMCL/MA-768 Mr. Abul Lais PSMCL/AF-769 Mr. Iskander Mirza PSMCL/AF-770 Mr. Anas Khalil PSMCL/OP-4771 Mr. Shaukat Siddiqui PSMCL/MA-772 Mr. Amin Sabir Khan PSMCL/PR-3473 Mr. Mohsin Ali PSMCL/QU-3674 Mr. Zahid Nadeem Hashmi PSMCL/AF-775 Mr. Abdul-Aleem PSMCL/AF-776 Mr. Mushtaq Ahmed PSMCL/MA-777 Mr. Diyaa PSMCL/AF-778 Mr. Hasan Raza PSMCL/PR-3479 Mr. Muhammad Fawwad Khan PSMCL/MA-780 Ms. Zaib-un-Nissa PSMCL/AF-781 Mr. Abdul Hafeez Khan PSMCL/PR-3482 Mr. Zeeshan Baig PSMCL/OP-47

Page 23: Module 03 Do the Impossible With Array Formulas

83 Mr. Humam PSMCL/AF-784 Mr. Bilal Mansoor PSMCL/PR-3485 Mr. Amr PSMCL/QU-3686 Mr. Intizar Hussain PSMCL/AF-787 Mr. Haider Ali Kazmi PSMCL/FI-2388 Mr. Pirzada Qasim PSMCL/QU-3689 Mr. Syed Naeem Uddin PSMCL/FI-2390 Mr. Mamnoon PSMCL/PR-3491 Mr. Shoaib Mehmood PSMCL/AF-792 Mr. Abdul-Jaleel PSMCL/QU-3693 Mr. Jon Elia PSMCL/QU-3694 Mr. Abdul-Hameed PSMCL/FI-2395 Ms. Zohra Nigah PSMCL/QU-3696 Mr. Tazeen Ahmad PSMCL/PR-3497 Mr. Basel PSMCL/MA-798 Mr. Arif Masood PSMCL/PR-3499 Mr. Ashfaq Hussain PSMCL/FI-23

100 Mr. Mohammad Abdul PSMCL/FI-23101 Mr. Chaudhry Muhammad Ali PSMCL/PR-34102 Mr. M. Zubair PSMCL/PR-34103 Mr. Alaa PSMCL/AF-7104 Mr. Obaidullah Aleem PSMCL/FI-23105 Mr. Ataa PSMCL/QU-36106 Mr. Josh Malihabadi PSMCL/FI-23107 Mr. Abdul-Haady PSMCL/FI-23108 Mr. Abed PSMCL/AF-7109 Mr. Majd PSMCL/AF-7110 Mr. Hasan Askari PSMCL/OP-47111 Mr. Ayaz Akhtar Halepoto PSMCL/MA-7112 Mr. Qazi Samiullah PSMCL/FI-23113 Mr. Jawad PSMCL/QU-36114 Mr. Raees Warsi PSMCL/OP-47115 Mr. Zahir Ali PSMCL/QU-36116 Mr. Sadequain PSMCL/FI-23117 Mr. Atiq-uz-Zaman PSMCL/PR-34118 Mr. Ibn-e-Insha PSMCL/QU-36119 Mr. Imraan PSMCL/PR-34120 Mr. Abdul-Rasheed PSMCL/FI-23121 Mr. Ishtiaq Hussain PSMCL/PR-34122 Mr. Ghaazi PSMCL/QU-36123 Mr. Rais Amrohvi PSMCL/QU-36124 Mr. Hakeem Muhammad PSMCL/MA-7125 Mr. Agha Hilaly PSMCL/PR-34

Page 24: Module 03 Do the Impossible With Array Formulas

126 Ms. Mobeen Akhtar Jaffri PSMCL/OP-47127 Mr. Fawaz PSMCL/QU-36128 Mr. Baasim PSMCL/MA-7129 Mr. Farahnaz Ispahani PSMCL/OP-47130 Mr. Jameel Jalibi PSMCL/QU-36131 Mr. Kaamil PSMCL/MA-7132 Mr. Mir Sajjad Ali PSMCL/QU-36133 Mr. Muhammad Haris Javaid PSMCL/QU-36134 Mr. Chaman Subhani PSMCL/PR-34135 Ms. Shumaila Ayubi PSMCL/MA-7136 Mr. Iftikhar Arif PSMCL/AF-7137 Mr. Abdul-Mutaal PSMCL/AF-7138 Ms. Shaista Suhrawardy PSMCL/AF-7139 Mr. Sameer Khan PSMCL/MA-7140 Mr. Haashim PSMCL/OP-47141 Mr. Aamir PSMCL/FI-23142 Mr. Awad PSMCL/MA-7143 Mr. Jameel PSMCL/PR-34144 Mr. Fadl PSMCL/PR-34145 Mr. Sohail Siddique PSMCL/AF-7146 Mr. Moosa PSMCL/OP-47147 Mr. Wasim Bari PSMCL/AF-7148 Mr. Gurmukh Dass PSMCL/MA-7149 Mr. Shadab Kabir PSMCL/QU-36150 Mr. Kamran Ali Usto PSMCL/PR-34151 Mr. Fayaz Ahmed Abbasi PSMCL/OP-47152 Mr. Rafique Ahmed Khoso PSMCL/AF-7153 Mr. Rais Shahaid Hussain PSMCL/FI-23154 Mr. Habib Jalib PSMCL/PR-34155 Mr. Dilawer Figar PSMCL/PR-34156 Mr. Muhammad Ali PSMCL/MA-7157 Mr. Abdul-Raheem PSMCL/PR-34158 Mr. Arman Sabir PSMCL/QU-36159 Mr. Adham PSMCL/MA-7160 Mr. Ameer PSMCL/PR-34161 Mr. Fahad PSMCL/OP-47162 Ms. Uzma Ali PSMCL/OP-47163 Mr. Abdul-Hakeem PSMCL/AF-7164 Mr. Salman PSMCL/QU-36165 Mr. Husaam PSMCL/AF-7166 Mr. Lady Abdullah Haroon PSMCL/FI-23167 Mr. Azhar PSMCL/OP-47168 Mr. Muhammad Kashif Ansari PSMCL/FI-23

Page 25: Module 03 Do the Impossible With Array Formulas

169 Mr. Abdul-Waahid PSMCL/PR-34170 Mr. Ali PSMCL/QU-36171 Mr. Anees PSMCL/QU-36172 Mr. Abdul-Khaaliq PSMCL/OP-47173 Mr. Abdul-Kareem PSMCL/PR-34174 Mr. Ferhat Abbas PSMCL/MA-7175 Mr. Bashir Ahmad PSMCL/OP-47176 Mr. Maazin PSMCL/FI-23177 Mr. Hamza PSMCL/AF-7178 Mr. Imran Sabir PSMCL/OP-47179 Mr. Muhammad Adeel Mhughal PSMCL/QU-36180 Mr. Shafqaat Hussain PSMCL/PR-34181 Mr. Abdul-Qahaar PSMCL/OP-47182 Mr. Saud (actor) PSMCL/MA-7183 Mr. Kashif Ali Qureshi PSMCL/MA-7184 Mr. Syed Nisar Ali Shah PSMCL/QU-36185 Mr. Haseena Moin PSMCL/MA-7186 Mr. Khairy PSMCL/OP-47187 Mr. Irfan Yusuf PSMCL/QU-36188 Mr. Dawoud PSMCL/PR-34189 Mr. Haatim PSMCL/MA-7190 Mr. Yousuf Ludhianvi PSMCL/MA-7191 Ms. Zahida Hina PSMCL/QU-36192 Mr. Abdul-Nasser PSMCL/OP-47193 Mr. Aasim Alee PSMCL/AF-7194 Mr. Yasir Hammad PSMCL/MA-7195 Mr. Muhammad Shahab Uddin PSMCL/PR-34196 Mr. Tahir Ali PSMCL/FI-23197 Mr. Sahib Khan Mastoi PSMCL/QU-36198 Mr. Abdul-Baari PSMCL/AF-7199 Mr. Zeeshan PSMCL/OP-47200 Ms. Hira Zafar PSMCL/MA-7201 Ms. Ramsha Ali PSMCL/FI-23202 Mr. Asif PSMCL/MA-7203 Mr. Mahmoud PSMCL/OP-47204 Mr. Muhammad Nadeem PSMCL/AF-7205 Mr. Iesa PSMCL/MA-7206 Mr. Abdul-Mateen PSMCL/MA-7207 Mr. Abdul Hakim PSMCL/MA-7208 Mr. Muhammad Ghayoor Hayat PSMCL/MA-7209 Mr. Syed Qasim PSMCL/PR-34210 Mr. Sohail Abbas PSMCL/AF-7211 Mr. Bahiy PSMCL/AF-7

Page 26: Module 03 Do the Impossible With Array Formulas

212 Mr. Haady PSMCL/OP-47213 Mr. Muhammad Owais Raza Qadri PSMCL/OP-47214 Mr. Khaleel PSMCL/MA-7215 Mr. Nisar Ahmed PSMCL/MA-7216 Mr. Fehmida Riaz PSMCL/AF-7217 Mr. Jamaal PSMCL/QU-36218 Mr. Abdul Razaque Shaikh PSMCL/PR-34219 Mr. Mansoor Ali PSMCL/MA-7220 Mr. Haashim PSMCL/MA-7221 Mr. Talha Khalil PSMCL/AF-7222 Mr. Hameed Haroon PSMCL/AF-7223 Mr. Aadil PSMCL/PR-34224 Mr. Faris PSMCL/QU-36225 Mr. Zafar Abbas PSMCL/FI-23226 Mr. Anwar PSMCL/PR-34227 Mr. Abdul-Haq PSMCL/MA-7228 Mr. Umer Bin Ali PSMCL/QU-36229 Ms. Ayman PSMCL/AF-7230 Mr. Abid PSMCL/FI-23231 Mr. Arshad Ahmed Khan PSMCL/FI-23232 Mr. Abdullah PSMCL/MA-7233 Mr. Fahad Badar PSMCL/PR-34234 Mr. Aftab Ali PSMCL/QU-36235 Mr. Muhammad Kamran PSMCL/QU-36236 Mr. Abu Talib PSMCL/QU-36237 Mr. Abaan PSMCL/PR-34238 Mr. Aasim PSMCL/AF-7239 Mr. Farman Fatehpuri PSMCL/QU-36240 Mr. Humayun Saeed PSMCL/QU-36241 Mr. Amir Niaz PSMCL/AF-7242 Mr. Raafe Sarfaraz PSMCL/AF-7243 Mr. Muhammad. Zaka-ur-Rehman PSMCL/AF-7244 Mr. Masoud PSMCL/QU-36245 Mr. Baha PSMCL/FI-23246 Mr. Ahmad PSMCL/QU-36247 Mr. Khalique Ibrahim PSMCL/OP-47

Page 27: Module 03 Do the Impossible With Array Formulas

Division Hire Date Years Status Salary (PM)

Operations 1-Nov-01 21 Full Time 45,400 - After_Sales 28-Oct-99 23 Full Time 77,100 - Finance 6-Mar-06 17 Contract 57,600 - Production 13-Aug-07 15 Contract 52,500 52,500 Marketing 26-Feb-07 16 Full Time 20,300 - Operations 23-Aug-92 30 Full Time 53,300 - Finance 2-Feb-90 33 Full Time 62,700 - Production 6-Jul-96 26 Full Time 68,400 68,400 Quality_Assurance 6-Dec-93 29 Contract 26,000 - Production 16-Sep-89 33 Full Time 47,800 47,800 Operations 18-May-90 32 Full Time 54,800 - Production 17-Nov-90 32 Half-Time 28,800 28,800 Operations 16-Nov-89 33 Contract 49,900 - Quality_Assurance 23-Aug-07 15 Contract 50,500 - Finance 20-Jul-06 16 Full Time 32,000 - Marketing 15-Dec-96 26 Full Time 69,100 - Quality_Assurance 1-May-92 30 Contract 34,200 - Production 26-Nov-90 32 Contract 55,100 55,100 After_Sales 1-Nov-02 20 Contract 29,600 - Finance 14-Aug-97 25 Hourly 25,800 - Marketing 10-May-99 23 Contract 45,800 - Production 19-Apr-90 33 Full Time 64,100 64,100 Production 3-Jul-96 26 Full Time 34,300 34,300 After_Sales 24-Oct-89 33 Hourly 18,600 - Quality_Assurance 10-Dec-07 15 Contract 62,300 - Operations 14-Aug-07 15 Half-Time 50,600 - Finance 15-Apr-96 27 Full Time 63,500 - Production 23-Jul-92 30 Full Time 21,800 21,800 Operations 24-Jun-02 20 Full Time 36,000 - Production 8-Aug-99 23 Contract 76,900 76,900 Quality_Assurance 31-Oct-93 29 Full Time 56,000 - After_Sales 30-Aug-03 19 Full Time 64,200 - Marketing 9-Jul-88 34 Full Time 37,200 - Operations 1-Jun-92 30 Full Time 68,700 - Quality_Assurance 8-Jun-89 33 Full Time 57,900 - Quality_Assurance 12-Mar-88 35 Half-Time 40,500 - Quality_Assurance 5-Sep-90 32 Full Time 75,900 - Operations 14-Jun-04 18 Half-Time 75,100 - Operations 14-Mar-96 27 Hourly 20,700 -

Page 28: Module 03 Do the Impossible With Array Formulas

Production 18-Jan-96 27 Hourly 20,900 20,900 Finance 16-Dec-04 18 Full Time 32,900 - After_Sales 11-Sep-03 19 Full Time 22,800 - Quality_Assurance 7-Sep-98 24 Full Time 22,300 - Finance 22-Mar-91 32 Contract 53,500 - Marketing 19-Feb-95 28 Full Time 56,400 - Quality_Assurance 31-Aug-97 25 Full Time 28,100 - Quality_Assurance 4-Jul-96 26 Half-Time 38,800 - Quality_Assurance 2-Aug-01 21 Full Time 33,200 - Production 5-Jul-03 19 Full Time 72,000 72,000 After_Sales 1-Jul-96 26 Contract 20,600 - Quality_Assurance 19-Mar-07 16 Full Time 18,200 - Production 25-Jan-88 35 Full Time 38,900 38,900 Operations 13-Sep-04 18 Contract 26,100 - After_Sales 27-May-07 15 Full Time 47,500 - After_Sales 17-Nov-00 22 Full Time 29,400 - After_Sales 1-Nov-93 29 Full Time 54,700 - Production 2-Oct-92 30 Hourly 21,900 21,900 Marketing 24-Sep-97 25 Full Time 59,500 - Operations 25-Sep-98 24 Full Time 48,600 - After_Sales 1-Jan-90 33 Contract 39,600 - Quality_Assurance 7-Feb-04 19 Contract 24,200 - Production 10-Jun-91 31 Hourly 43,200 43,200 Finance 4-Mar-94 29 Half-Time 77,900 - Finance 16-Jan-06 17 Full Time 44,700 - Marketing 9-Jun-96 26 Full Time 51,800 - Production 12-Apr-91 32 Full Time 62,200 62,200 Marketing 15-May-99 23 Full Time 31,200 - After_Sales 31-Jul-90 32 Contract 72,300 - After_Sales 29-Jun-08 14 Hourly 39,400 - Operations 6-Aug-93 29 Full Time 48,600 - Marketing 14-May-88 34 Full Time 20,800 - Production 28-Jan-96 27 Contract 52,800 52,800 Quality_Assurance 26-Jan-07 16 Contract 32,100 - After_Sales 8-Dec-90 32 Contract 58,300 - After_Sales 28-Aug-03 19 Full Time 73,000 - Marketing 30-Jul-95 27 Full Time 38,100 - After_Sales 30-Oct-00 22 Half-Time 66,300 - Production 16-Jun-06 16 Contract 78,400 78,400 Marketing 1-Jul-99 23 Full Time 22,900 - After_Sales 31-Mar-97 26 Full Time 78,000 - Production 21-Oct-95 27 Contract 28,800 28,800 Operations 13-Dec-90 32 Half-Time 68,700 -

Page 29: Module 03 Do the Impossible With Array Formulas

After_Sales 27-Jan-94 29 Full Time 50,600 - Production 28-Feb-08 15 Hourly 51,300 51,300 Quality_Assurance 24-Oct-97 25 Full Time 50,500 - After_Sales 13-Aug-99 23 Full Time 68,200 - Finance 17-Oct-91 31 Full Time 55,400 - Quality_Assurance 2-Jan-94 29 Full Time 21,200 - Finance 14-Sep-90 32 Contract 56,900 - Production 30-Apr-92 30 Full Time 59,500 59,500 After_Sales 24-Dec-88 34 Full Time 51,900 - Quality_Assurance 19-Mar-88 35 Contract 45,800 - Quality_Assurance 18-Aug-88 34 Half-Time 36,200 - Finance 25-Jul-96 26 Half-Time 56,100 - Quality_Assurance 14-Oct-89 33 Full Time 24,500 - Production 23-Nov-95 27 Contract 29,900 29,900 Marketing 12-Aug-95 27 Hourly 30,500 - Production 9-Oct-92 30 Full Time 56,200 56,200 Finance 17-Mar-08 15 Contract 25,300 - Finance 13-Oct-96 26 Full Time 42,100 - Production 8-Jun-06 16 Contract 20,600 20,600 Production 6-Sep-96 26 Full Time 33,100 33,100 After_Sales 4-May-89 33 Contract 63,700 - Finance 31-Jul-95 27 Full Time 41,000 - Quality_Assurance 10-Jun-95 27 Contract 67,200 - Finance 1-Mar-99 24 Half-Time 37,800 - Finance 17-Sep-88 34 Half-Time 56,200 - After_Sales 7-Feb-91 32 Full Time 79,900 - After_Sales 10-Aug-93 29 Full Time 56,800 - Operations 14-Mar-96 27 Full Time 75,700 - Marketing 9-Aug-94 28 Full Time 63,800 - Finance 26-Aug-96 26 Full Time 69,000 - Quality_Assurance 20-Mar-03 20 Hourly 71,600 - Operations 16-Dec-04 18 Contract 54,500 - Quality_Assurance 30-Apr-06 16 Contract 68,300 - Finance 24-Sep-94 28 Full Time 22,100 - Production 26-Nov-99 23 Full Time 60,500 60,500 Quality_Assurance 6-Sep-90 32 Full Time 18,500 - Production 3-Aug-98 24 Full Time 50,400 50,400 Finance 18-Sep-94 28 Contract 79,100 - Production 6-Jun-05 17 Full Time 68,900 68,900 Quality_Assurance 28-Nov-88 34 Contract 54,900 - Quality_Assurance 18-Jul-98 24 Full Time 71,500 - Marketing 9-Apr-01 22 Full Time 49,600 - Production 24-Feb-97 26 Full Time 77,000 77,000

Page 30: Module 03 Do the Impossible With Array Formulas

Operations 16-Jul-95 27 Half-Time 76,000 - Quality_Assurance 29-Feb-96 27 Contract 25,000 - Marketing 7-Dec-98 24 Contract 35,000 - Operations 24-Jun-02 20 Full Time 78,500 - Quality_Assurance 24-Jan-98 25 Contract 68,200 - Marketing 23-Oct-94 28 Hourly 78,600 - Quality_Assurance 9-Oct-93 29 Full Time 44,200 - Quality_Assurance 1-Jun-98 24 Full Time 66,500 - Production 16-Sep-88 34 Full Time 59,300 59,300 Marketing 14-Sep-95 27 Contract 36,700 - After_Sales 16-Aug-97 25 Half-Time 70,000 - After_Sales 30-Sep-95 27 Full Time 69,100 - After_Sales 7-Jun-88 34 Full Time 61,000 - Marketing 9-Apr-94 29 Full Time 55,600 - Operations 20-Nov-98 24 Contract 64,800 - Finance 18-May-07 15 Half-Time 69,100 - Marketing 19-Aug-89 33 Full Time 42,100 - Production 27-Dec-93 29 Full Time 28,500 28,500 Production 9-Jul-01 21 Contract 65,300 65,300 After_Sales 14-Jul-00 22 Contract 58,900 - Operations 20-Jan-03 20 Full Time 71,800 - After_Sales 3-Sep-94 28 Full Time 45,700 - Marketing 18-Jan-89 34 Half-Time 23,700 - Quality_Assurance 23-Jun-90 32 Full Time 40,000 - Production 23-May-05 17 Full Time 55,700 55,700 Operations 19-Aug-05 17 Contract 64,100 - After_Sales 20-May-00 22 Full Time 71,700 - Finance 8-Jun-89 33 Full Time 25,500 - Production 28-Aug-94 28 Full Time 73,900 73,900 Production 5-Dec-96 26 Contract 62,200 62,200 Marketing 15-Sep-95 27 Full Time 20,200 - Production 25-May-88 34 Contract 66,200 66,200 Quality_Assurance 9-Oct-95 27 Contract 39,700 - Marketing 4-Jan-97 26 Hourly 76,900 - Production 5-May-96 26 Full Time 18,800 18,800 Operations 7-Sep-92 30 Full Time 56,100 - Operations 15-Nov-97 25 Half-Time 57,400 - After_Sales 16-Mar-96 27 Contract 65,400 - Quality_Assurance 29-May-08 14 Hourly 72,300 - After_Sales 22-May-08 14 Full Time 75,900 - Finance 7-Nov-94 28 Full Time 66,800 - Operations 4-Apr-89 34 Full Time 55,100 - Finance 1-Dec-88 34 Contract 79,700 -

Page 31: Module 03 Do the Impossible With Array Formulas

Production 24-Aug-93 29 Full Time 51,400 51,400 Quality_Assurance 31-Aug-92 30 Half-Time 38,200 - Quality_Assurance 5-Aug-89 33 Half-Time 32,700 - Operations 11-Dec-95 27 Full Time 59,900 - Production 17-Aug-00 22 Full Time 42,000 42,000 Marketing 9-Sep-96 26 Hourly 78,800 - Operations 19-Dec-97 25 Contract 47,700 - Finance 3-Jul-90 32 Contract 45,000 - After_Sales 26-Aug-04 18 Full Time 70,500 - Operations 20-Nov-88 34 Contract 73,800 - Quality_Assurance 15-Feb-01 22 Full Time 40,000 - Production 7-Mar-96 27 Full Time 22,000 22,000 Operations 28-Jun-93 29 Full Time 75,200 - Marketing 5-Nov-94 28 Full Time 63,800 - Marketing 23-Jan-98 25 Full Time 70,900 - Quality_Assurance 14-Jun-96 26 Contract 73,000 - Marketing 11-Jun-95 27 Half-Time 55,000 - Operations 13-Oct-08 14 Full Time 71,000 - Quality_Assurance 19-Apr-93 30 Full Time 77,300 - Production 23-Mar-06 17 Full Time 33,000 33,000 Marketing 27-Mar-97 26 Half-Time 18,900 - Marketing 9-Mar-97 26 Full Time 70,400 - Quality_Assurance 13-Jun-96 26 Full Time 57,200 - Operations 6-Jan-89 34 Full Time 58,300 - After_Sales 3-Mar-90 33 Full Time 51,900 - Marketing 20-Jul-88 34 Half-Time 65,300 - Production 24-Jul-92 30 Half-Time 43,800 43,800 Finance 8-Mar-92 31 Half-Time 27,100 - Quality_Assurance 21-Sep-07 15 Full Time 46,300 - After_Sales 6-Jan-89 34 Full Time 74,200 - Operations 8-Apr-07 16 Hourly 31,500 - Marketing 3-Jul-95 27 Full Time 66,500 - Finance 4-Jun-98 24 Half-Time 54,700 - Marketing 19-Apr-01 22 Hourly 59,300 - Operations 31-Aug-08 14 Full Time 27,700 - After_Sales 14-Dec-87 35 Full Time 73,000 - Marketing 16-Dec-91 31 Contract 50,300 - Marketing 24-Feb-00 23 Contract 26,800 - Marketing 30-Jun-96 26 Contract 53,000 - Marketing 4-Jun-93 29 Half-Time 71,400 - Production 12-Jun-89 33 Full Time 68,200 68,200 After_Sales 9-Jun-90 32 Contract 49,100 - After_Sales 8-May-94 28 Full Time 24,000 -

Page 32: Module 03 Do the Impossible With Array Formulas

Operations 6-Oct-96 26 Full Time 75,700 - Operations 3-Nov-96 26 Full Time 36,700 - Marketing 20-Dec-96 26 Half-Time 32,000 - Marketing 23-Oct-88 34 Full Time 28,200 - After_Sales 3-May-99 23 Full Time 51,100 - Quality_Assurance 12-Apr-90 33 Full Time 34,900 - Production 28-Sep-93 29 Half-Time 51,200 51,200 Marketing 8-Dec-07 15 Full Time 29,200 - Marketing 21-Feb-89 34 Contract 67,500 - After_Sales 25-Dec-05 17 Full Time 22,600 - After_Sales 20-Mar-97 26 Contract 32,800 - Production 9-Aug-02 20 Full Time 18,100 18,100 Quality_Assurance 22-Jul-96 26 Contract 49,700 - Finance 25-Jan-02 21 Full Time 43,100 - Production 18-Feb-94 29 Full Time 38,100 38,100 Marketing 28-Feb-89 34 Full Time 21,600 - Quality_Assurance 14-Oct-94 28 Contract 70,200 - After_Sales 8-Sep-95 27 Full Time 31,500 - Finance 28-Oct-95 27 Hourly 52,700 - Finance 5-Nov-01 21 Full Time 76,400 - Marketing 27-Aug-00 22 Hourly 59,800 - Production 3-Jul-94 28 Full Time 77,000 77,000 Quality_Assurance 11-Apr-92 31 Contract 23,000 - Quality_Assurance 18-Aug-06 16 Hourly 77,600 - Quality_Assurance 30-May-89 33 Full Time 40,300 - Production 2-Mar-89 34 Contract 70,400 70,400 After_Sales 12-Mar-90 33 Half-Time 19,200 - Quality_Assurance 19-Aug-94 28 Full Time 53,000 - Quality_Assurance 12-Aug-97 25 Contract 32,700 - After_Sales 11-Jun-90 32 Contract 50,100 - After_Sales 4-Oct-98 24 Full Time 68,700 - After_Sales 2-Aug-04 18 Full Time 54,500 - Quality_Assurance 25-Oct-88 34 Contract 22,800 - Finance 29-Jun-88 34 Full Time 25,800 - Quality_Assurance 9-Feb-88 35 Full Time 20,000 - Operations 26-Aug-94 28 Contract 54,500 -

Page 33: Module 03 Do the Impossible With Array Formulas

Bonus Tax Division ID Division

60,000 2,268.00 PSMCL/AF-7 After_Sales 60,000 7,389.00 PSMCL/PR-34 Production 50,000 3,706.00 PSMCL/FI-23 Finance 40,000 3,350.00 PSMCL/MA-7 Marketing 50,000 183.50 PSMCL/OP-47 Operations 60,000 3,498.00 PSMCL/QU-36 Quality_Assurance 60,000 5,077.50 60,000 5,505.00 60,000 465.00 60,000 2,376.00 BONUS CRITERIA 60,000 3,588.00 Tenure 60,000 845.00 1 5 60,000 3,294.00 6 10 40,000 2,422.50 11 15 50,000 904.17 16 20 60,000 5,557.50 21 25 60,000 1,372.00 60,000 3,606.00 50,000 844.17 60,000 462.00 TAX ASSUMPTIONS 60,000 2,286.00 Starting Ending 60,000 5,182.50 0 180,000 60,000 1,375.50 180,001 250,000 60,000 177.00 250,001 350,000 40,000 4,922.50 350,001 400,000 40,000 2,427.00 400,001 450,000 60,000 5,137.50 450,001 550,000 60,000 201.00 550,001 650,000 50,000 1,405.83 650,001 750,000 60,000 7,371.00 750,001 900,000 60,000 3,660.00 900,001 1,050,000 50,000 5,127.50 1,050,001 1,200,000 60,000 1,477.00 1,200,001 1,450,000 60,000 5,527.50 1,450,001 1,700,000 60,000 4,717.50 1,700,001 1,950,000 60,000 1,592.50 1,950,001 2,250,000 60,000 7,281.00 2,250,001 2,850,000 50,000 7,134.00 2,850,001 3,550,000 60,000 192.75 3,550,001 4,450,000

Page 34: Module 03 Do the Impossible With Array Formulas

60,000 194.25 4,450,001 8,650,000 50,000 926.67 8,650,001 SO ON 50,000 202.25 60,000 204.75 60,000 3,510.00 60,000 3,684.00 60,000 496.50 60,000 1,533.00 60,000 1,337.00 50,000 6,855.00 60,000 192.00 50,000 167.75 60,000 1,536.50 50,000 454.00 40,000 2,287.50 60,000 860.00 60,000 3,582.00 60,000 201.75 60,000 4,837.50 60,000 2,412.00 60,000 1,561.00 50,000 212.75 60,000 2,169.00 60,000 7,461.00 50,000 2,199.00 60,000 3,408.00 60,000 5,040.00 60,000 905.00 60,000 6,957.00 40,000 1,495.67 60,000 2,412.00 60,000 193.50 60,000 3,468.00 50,000 906.67 60,000 4,747.50 50,000 6,945.00 60,000 1,508.50 60,000 5,347.50 50,000 7,431.00 60,000 209.25 60,000 7,470.00 60,000 845.00 60,000 5,527.50

Page 35: Module 03 Do the Impossible With Array Formulas

60,000 3,336.00 40,000 3,278.00 60,000 3,330.00 60,000 5,490.00 60,000 3,624.00 60,000 196.50 60,000 3,714.00 60,000 4,837.50 60,000 3,414.00 60,000 2,286.00 60,000 1,442.00 60,000 3,666.00 60,000 442.50 60,000 872.50 60,000 887.50 60,000 3,672.00 40,000 214.75 60,000 2,119.50 50,000 185.75 60,000 1,333.50 60,000 5,152.50 60,000 2,070.00 60,000 5,415.00 60,000 1,498.00 60,000 3,672.00 60,000 7,641.00 60,000 3,708.00 60,000 7,263.00 60,000 5,160.00 60,000 5,550.00 50,000 6,819.00 50,000 3,520.00 50,000 5,435.00 60,000 203.25 60,000 4,912.50 60,000 176.25 60,000 3,324.00 60,000 7,569.00 50,000 5,480.00 60,000 3,594.00 60,000 6,885.00 60,000 3,276.00 60,000 7,380.00

Page 36: Module 03 Do the Impossible With Array Formulas

60,000 7,290.00 60,000 450.00 60,000 1,400.00 50,000 7,440.00 60,000 5,490.00 60,000 7,524.00 60,000 2,214.00 60,000 5,362.50 60,000 4,822.50 60,000 1,459.50 60,000 5,625.00 60,000 5,557.50 60,000 4,950.00 60,000 3,636.00 60,000 5,235.00 40,000 5,432.50 60,000 2,119.50 60,000 837.50 60,000 5,272.50 60,000 4,792.50 50,000 6,837.00 60,000 2,281.50 60,000 215.25 60,000 1,575.00 50,000 3,592.00 50,000 5,120.00 60,000 6,903.00 60,000 457.50 60,000 7,101.00 60,000 5,040.00 60,000 189.00 60,000 5,340.00 60,000 1,564.50 60,000 7,371.00 60,000 178.50 60,000 3,666.00 60,000 3,744.00 60,000 5,280.00 40,000 6,807.00 40,000 7,131.00 60,000 5,385.00 60,000 3,606.00 60,000 7,623.00

Page 37: Module 03 Do the Impossible With Array Formulas

60,000 3,384.00 60,000 1,512.00 60,000 1,319.50 60,000 4,867.50 60,000 2,115.00 60,000 7,542.00 60,000 2,371.50 60,000 2,250.00 50,000 5,600.00 60,000 7,092.00 60,000 1,575.00 60,000 202.50 60,000 7,218.00 60,000 5,160.00 60,000 6,831.00 60,000 7,020.00 60,000 3,600.00 40,000 5,575.00 60,000 7,407.00 50,000 929.17 60,000 179.25 60,000 6,786.00 60,000 3,732.00 60,000 4,747.50 60,000 3,414.00 60,000 5,272.50 60,000 2,196.00 60,000 481.50 40,000 2,233.50 60,000 7,128.00 50,000 891.67 60,000 5,362.50 60,000 3,582.00 60,000 4,822.50 40,000 465.50 60,000 7,020.00 60,000 3,318.00 60,000 477.00 60,000 3,480.00 60,000 6,876.00 60,000 5,490.00 60,000 2,434.50 60,000 217.50

Page 38: Module 03 Do the Impossible With Array Formulas

60,000 7,263.00 60,000 1,459.50 60,000 925.00 60,000 498.00 60,000 3,366.00 60,000 1,396.50 60,000 3,372.00 40,000 488.00 60,000 5,437.50 50,000 200.75 60,000 1,323.00 50,000 167.00 60,000 3,282.00 60,000 2,164.50 60,000 1,508.50 60,000 199.50 60,000 6,768.00 60,000 912.50 60,000 3,462.00 60,000 7,326.00 60,000 4,860.00 60,000 7,380.00 60,000 210.00 50,000 7,359.00 60,000 1,585.50 60,000 6,786.00 60,000 181.50 60,000 3,480.00 60,000 1,319.50 60,000 3,306.00 60,000 5,527.50 50,000 3,520.00 60,000 208.50 60,000 462.00 60,000 187.50 60,000 3,570.00

Page 39: Module 03 Do the Impossible With Array Formulas

Min Salary P.M Max Salary P.M BIN Frequency

#NAME? #NAME? 20,00030,00040,00050,00060,00070,00080,000

BONUS CRITERIABonues Amount BIN Frequency

20,000 20,00030,000 30,00040,000 40,00050,000 50,00060,000 60,000

TAX ASSUMPTIONSTax Rate

0.00%0.50%0.75%1.50%2.50%3.50%4.50%6.00%7.50%9.00%

10.00%11.00%12.50%14.00%15.00%16.00%17.50%18.50%

Page 40: Module 03 Do the Impossible With Array Formulas

19.00%20.00%

Page 41: Module 03 Do the Impossible With Array Formulas

finance #NAME?

Page 42: Module 03 Do the Impossible With Array Formulas

Date Unit Produced Months Unit Produced

1-Jan-10 338 1

2-Jan-10 594 2

3-Jan-10 598 3

4-Jan-10 524 4

5-Jan-10 272 5

6-Jan-10 338 6

7-Jan-10 604 7

8-Jan-10 649 8

9-Jan-10 556 9

10-Jan-10 422 10

11-Jan-10 418 11

12-Jan-10 597 12

13-Jan-10 401

14-Jan-10 333

15-Jan-10 352 Days SUM

16-Jan-10 434 Monday

17-Jan-10 508 Tuesday

18-Jan-10 340 Wednesday

19-Jan-10 615 Thursday

20-Jan-10 629 Friday

21-Jan-10 450 Saturday

22-Jan-10 300 Sunday

23-Jan-10 621

24-Jan-10 531

25-Jan-10 500

26-Jan-10 394

27-Jan-10 293

28-Jan-10 380

29-Jan-10 478

30-Jan-10 401

31-Jan-10 519

Page 43: Module 03 Do the Impossible With Array Formulas

1-Feb-10 627

2-Feb-10 587

3-Feb-10 383

4-Feb-10 513

5-Feb-10 271

6-Feb-10 441

7-Feb-10 361

8-Feb-10 571

9-Feb-10 253

10-Feb-10 498

11-Feb-10 534

12-Feb-10 267

13-Feb-10 432

14-Feb-10 398

15-Feb-10 494

16-Feb-10 358

17-Feb-10 589

18-Feb-10 486

19-Feb-10 458

20-Feb-10 633

21-Feb-10 507

22-Feb-10 365

23-Feb-10 440

24-Feb-10 627

25-Feb-10 312

26-Feb-10 550

27-Feb-10 525

28-Feb-10 627

1-Mar-10 477

2-Mar-10 642

3-Mar-10 451

4-Mar-10 641

5-Mar-10 415

6-Mar-10 413

7-Mar-10 334

8-Mar-10 276

9-Mar-10 481

Page 44: Module 03 Do the Impossible With Array Formulas

10-Mar-10 477

11-Mar-10 430

12-Mar-10 424

13-Mar-10 331

14-Mar-10 610

15-Mar-10 579

16-Mar-10 555

17-Mar-10 579

18-Mar-10 536

19-Mar-10 327

20-Mar-10 546

21-Mar-10 518

22-Mar-10 289

23-Mar-10 363

24-Mar-10 476

25-Mar-10 294

26-Mar-10 642

27-Mar-10 573

28-Mar-10 328

29-Mar-10 282

30-Mar-10 372

31-Mar-10 285

1-Apr-10 408

2-Apr-10 459

3-Apr-10 417

4-Apr-10 584

5-Apr-10 629

6-Apr-10 494

7-Apr-10 607

8-Apr-10 516

9-Apr-10 490

10-Apr-10 570

11-Apr-10 641

12-Apr-10 314

13-Apr-10 423

14-Apr-10 446

15-Apr-10 364

Page 45: Module 03 Do the Impossible With Array Formulas

16-Apr-10 541

17-Apr-10 599

18-Apr-10 464

19-Apr-10 498

20-Apr-10 525

21-Apr-10 349

22-Apr-10 296

23-Apr-10 307

24-Apr-10 617

25-Apr-10 631

26-Apr-10 441

27-Apr-10 275

28-Apr-10 291

29-Apr-10 545

30-Apr-10 601

1-May-10 562

2-May-10 629

3-May-10 562

4-May-10 543

5-May-10 446

6-May-10 607

7-May-10 593

8-May-10 624

9-May-10 555

10-May-10 623

11-May-10 457

12-May-10 367

13-May-10 507

14-May-10 571

15-May-10 522

16-May-10 278

17-May-10 459

18-May-10 452

19-May-10 310

20-May-10 322

21-May-10 404

22-May-10 572

Page 46: Module 03 Do the Impossible With Array Formulas

23-May-10 485

24-May-10 308

25-May-10 538

26-May-10 263

27-May-10 492

28-May-10 622

29-May-10 473

30-May-10 524

31-May-10 522

1-Jun-10 318

2-Jun-10 329

3-Jun-10 341

4-Jun-10 371

5-Jun-10 625

6-Jun-10 301

7-Jun-10 259

8-Jun-10 529

9-Jun-10 344

10-Jun-10 457

11-Jun-10 478

12-Jun-10 595

13-Jun-10 431

14-Jun-10 517

15-Jun-10 418

16-Jun-10 350

17-Jun-10 266

18-Jun-10 523

19-Jun-10 440

20-Jun-10 440

21-Jun-10 612

22-Jun-10 524

23-Jun-10 282

24-Jun-10 379

25-Jun-10 470

26-Jun-10 492

27-Jun-10 583

28-Jun-10 250

Page 47: Module 03 Do the Impossible With Array Formulas

29-Jun-10 406

30-Jun-10 509

1-Jul-10 406

2-Jul-10 312

3-Jul-10 441

4-Jul-10 584

5-Jul-10 253

6-Jul-10 286

7-Jul-10 632

8-Jul-10 560

9-Jul-10 422

10-Jul-10 307

11-Jul-10 462

12-Jul-10 409

13-Jul-10 396

14-Jul-10 383

15-Jul-10 262

16-Jul-10 637

17-Jul-10 450

18-Jul-10 497

19-Jul-10 392

20-Jul-10 313

21-Jul-10 467

22-Jul-10 520

23-Jul-10 357

24-Jul-10 558

25-Jul-10 425

26-Jul-10 611

27-Jul-10 432

28-Jul-10 389

29-Jul-10 294

30-Jul-10 378

31-Jul-10 480

1-Aug-10 336

2-Aug-10 557

3-Aug-10 594

4-Aug-10 452

Page 48: Module 03 Do the Impossible With Array Formulas

5-Aug-10 526

6-Aug-10 420

7-Aug-10 346

8-Aug-10 363

9-Aug-10 316

10-Aug-10 477

11-Aug-10 559

12-Aug-10 399

13-Aug-10 407

14-Aug-10 520

15-Aug-10 321

16-Aug-10 459

17-Aug-10 404

18-Aug-10 352

19-Aug-10 290

20-Aug-10 606

21-Aug-10 378

22-Aug-10 309

23-Aug-10 330

24-Aug-10 391

25-Aug-10 538

26-Aug-10 516

27-Aug-10 503

28-Aug-10 559

29-Aug-10 301

30-Aug-10 394

31-Aug-10 467

1-Sep-10 533

2-Sep-10 310

3-Sep-10 525

4-Sep-10 671

5-Sep-10 629

6-Sep-10 550

7-Sep-10 619

8-Sep-10 342

9-Sep-10 390

10-Sep-10 485

Page 49: Module 03 Do the Impossible With Array Formulas

11-Sep-10 638

12-Sep-10 443

13-Sep-10 494

14-Sep-10 563

15-Sep-10 331

16-Sep-10 357

17-Sep-10 415

18-Sep-10 337

19-Sep-10 402

20-Sep-10 298

21-Sep-10 559

22-Sep-10 600

23-Sep-10 341

24-Sep-10 372

25-Sep-10 419

26-Sep-10 387

27-Sep-10 450

28-Sep-10 392

29-Sep-10 320

30-Sep-10 272

1-Oct-10 315

2-Oct-10 416

3-Oct-10 316

4-Oct-10 555

5-Oct-10 536

6-Oct-10 535

7-Oct-10 392

8-Oct-10 474

9-Oct-10 601

10-Oct-10 644

11-Oct-10 603

12-Oct-10 361

13-Oct-10 418

14-Oct-10 563

15-Oct-10 496

16-Oct-10 435

17-Oct-10 607

Page 50: Module 03 Do the Impossible With Array Formulas

18-Oct-10 384

19-Oct-10 373

20-Oct-10 266

21-Oct-10 433

22-Oct-10 568

23-Oct-10 419

24-Oct-10 453

25-Oct-10 383

26-Oct-10 416

27-Oct-10 512

28-Oct-10 471

29-Oct-10 309

30-Oct-10 334

31-Oct-10 460

1-Nov-10 454

2-Nov-10 534

3-Nov-10 558

4-Nov-10 588

5-Nov-10 452

6-Nov-10 337

7-Nov-10 606

8-Nov-10 271

9-Nov-10 602

10-Nov-10 360

11-Nov-10 471

12-Nov-10 401

13-Nov-10 506

14-Nov-10 312

15-Nov-10 374

16-Nov-10 570

17-Nov-10 360

18-Nov-10 289

19-Nov-10 478

20-Nov-10 507

21-Nov-10 349

22-Nov-10 371

23-Nov-10 299

Page 51: Module 03 Do the Impossible With Array Formulas

24-Nov-10 560

25-Nov-10 431

26-Nov-10 284

27-Nov-10 605

28-Nov-10 387

29-Nov-10 557

30-Nov-10 523

1-Dec-10 287

2-Dec-10 254

3-Dec-10 322

4-Dec-10 624

5-Dec-10 610

6-Dec-10 570

7-Dec-10 456

8-Dec-10 476

9-Dec-10 560

10-Dec-10 639

11-Dec-10 559

12-Dec-10 380

13-Dec-10 376

14-Dec-10 542

15-Dec-10 618

16-Dec-10 417

17-Dec-10 265

18-Dec-10 610

19-Dec-10 482

20-Dec-10 478

21-Dec-10 590

22-Dec-10 622

23-Dec-10 616

24-Dec-10 619

25-Dec-10 329

26-Dec-10 532

27-Dec-10 504

28-Dec-10 411

29-Dec-10 592

30-Dec-10 369

Page 52: Module 03 Do the Impossible With Array Formulas

31-Dec-10 565

Page 53: Module 03 Do the Impossible With Array Formulas

Date Units Revenue

8/12/2009 64 4,900

3/5/2011 79 6,100

2/2/2010 60 8,800

3/6/2010 32 1,200

12/5/2011 79 9,700

8/14/2010 78 3,800

4/21/2011 43 1,300

7/25/2010 60 3,600

2/28/2009 23 6,300

1/9/2009 62 1,400

4/30/2010 62 4,200

4/1/2009 26 5,100

6/27/2009 76 5,100

5/15/2010 40 8,700

6/22/2009 74 2,300

9/21/2009 44 2,000

4/2/2010 34 9,100

3/15/2011 38 8,800

8/13/2010 24 7,900

11/4/2011 73 4,300

10/9/2010 70 1,500

11/12/2011 28 1,700

1/31/2009 77 4,900

1/10/2010 42 1,100

2/18/2010 45 3,500

8/27/2010 55 6,700

3/22/2011 80 8,300

2/8/2010 36 6,400

12/10/2011 51 7,200

8/25/2010 37 5,400

8/17/2011 61 8,000

Page 54: Module 03 Do the Impossible With Array Formulas

6/11/2011 39 5,100

3/22/2011 52 5,200

6/7/2009 22 1,700

3/22/2010 61 1,800

2/5/2009 24 6,100

1/4/2011 35 5,300

2/11/2009 54 6,100

9/11/2009 80 1,200

12/4/2010 44 5,600

10/23/2010 50 1,900

7/25/2011 24 3,400

10/18/2011 33 1,300

5/15/2010 80 1,600

3/12/2009 39 8,700

3/13/2011 71 2,600

3/15/2011 24 6,000

7/15/2009 28 2,900

8/21/2009 22 8,100

11/9/2011 43 9,400

2/5/2009 66 4,700

3/20/2011 29 10,000

8/3/2009 71 5,400

8/19/2010 56 4,500

5/17/2011 42 1,400

8/20/2009 63 9,100

12/13/2009 48 1,500

9/26/2011 43 4,300

8/20/2010 61 2,200

9/1/2009 75 7,600

12/25/2011 61 2,200

11/13/2011 45 9,600

7/1/2010 55 7,100

3/28/2010 61 1,100

9/11/2009 52 8,000

8/27/2011 33 6,000

10/23/2010 38 5,000

12/30/2010 31 3,100

Page 55: Module 03 Do the Impossible With Array Formulas

3/26/2011 47 7,000

3/9/2010 45 9,600

3/29/2010 45 8,000

5/22/2009 20 8,200

11/9/2011 67 6,400

2/24/2011 78 5,400

6/24/2010 42 3,800

9/20/2010 73 8,000

3/27/2009 69 1,800

6/17/2011 33 6,900

10/14/2010 46 9,100

11/19/2011 70 8,600

11/2/2009 71 4,900

9/4/2009 80 8,600

4/25/2009 24 5,400

3/6/2009 48 6,100

9/24/2011 64 6,100

4/9/2009 47 8,200

7/7/2011 21 5,700

1/27/2009 35 9,600

9/23/2010 69 3,600

3/2/2009 39 3,000

8/29/2009 20 3,700

6/24/2009 33 2,900

7/2/2010 26 2,200

6/30/2011 52 1,800

11/14/2009 53 9,900

10/26/2010 66 6,900

7/29/2009 55 6,700

3/3/2010 66 2,100

10/13/2009 34 4,100

9/5/2011 61 1,200

3/24/2009 31 5,000

4/7/2011 61 7,600

9/30/2010 52 9,900

9/28/2010 57 6,100

5/13/2011 67 3,800

Page 56: Module 03 Do the Impossible With Array Formulas

1/29/2009 58 2,500

10/24/2011 55 6,600

3/17/2009 38 1,900

4/6/2010 53 4,300

4/16/2010 68 4,700

12/28/2011 64 6,700

6/14/2011 24 9,400

10/12/2009 26 1,700

6/25/2009 31 5,200

3/7/2011 72 6,200

3/4/2011 50 3,900

1/13/2009 20 7,900

10/22/2010 68 8,500

8/2/2011 70 4,100

8/16/2009 71 3,600

12/9/2010 52 7,500

12/14/2009 26 5,800

1/25/2009 37 9,400

3/8/2010 20 5,700

10/3/2009 36 6,800

8/25/2009 42 2,800

8/11/2009 52 7,100

10/29/2010 59 5,500

12/27/2010 49 4,200

8/5/2011 77 9,100

9/12/2009 23 9,600

3/12/2009 77 8,500

6/5/2011 80 6,500

4/19/2011 27 4,900

6/17/2009 72 4,600

7/1/2010 43 7,500

1/20/2011 51 7,200

6/29/2011 20 7,100

1/8/2011 55 7,900

3/25/2011 67 2,600

12/15/2009 75 6,300

9/21/2009 80 5,300

Page 57: Module 03 Do the Impossible With Array Formulas

9/26/2009 23 1,500

11/22/2011 27 2,000

5/4/2009 50 6,000

1/11/2011 41 6,100

11/18/2009 44 5,300

9/20/2009 45 3,300

2/10/2011 53 8,100

3/17/2010 69 6,400

9/6/2009 40 2,200

5/18/2011 70 2,300

3/13/2009 40 7,900

4/13/2011 78 8,400

5/15/2009 64 9,500

6/26/2010 53 8,700

6/5/2010 54 1,700

11/27/2009 40 3,300

5/8/2011 26 3,700

6/6/2009 60 1,800

6/18/2011 59 4,300

2/23/2011 58 2,000

10/7/2009 26 5,600

6/15/2011 54 9,700

8/10/2010 28 9,100

1/15/2011 71 3,800

1/18/2011 31 8,500

5/9/2009 63 3,900

1/2/2011 56 4,500

5/7/2009 42 2,100

3/2/2009 47 4,300

9/5/2010 79 5,600

3/2/2009 66 5,900

6/25/2011 27 6,000

11/1/2009 67 4,500

3/7/2009 42 4,400

6/11/2010 57 7,600

8/27/2010 63 9,900

4/1/2009 66 5,600

Page 58: Module 03 Do the Impossible With Array Formulas

7/14/2010 37 9,500

3/19/2011 48 7,500

11/6/2009 58 5,200

6/12/2010 52 3,200

5/27/2010 56 8,700

3/20/2011 70 2,300

7/20/2010 54 2,200

10/8/2010 32 3,500

9/15/2011 54 4,100

9/9/2011 20 9,400

5/2/2009 45 3,700

4/4/2009 58 1,600

3/9/2010 56 4,100

4/3/2010 59 6,700

3/1/2011 48 3,200

3/28/2011 79 2,800

6/19/2011 66 9,200

6/30/2011 26 3,100

10/31/2011 27 9,600

4/25/2009 79 6,200

5/31/2011 72 3,100

11/1/2011 60 5,300

5/9/2009 67 4,500

5/24/2010 56 8,800

7/1/2009 65 9,900

11/21/2011 64 4,400

8/3/2010 67 1,400

11/15/2010 68 7,700

9/30/2011 41 1,300

8/2/2011 56 9,600

12/9/2011 63 4,700

11/16/2009 50 9,000

4/16/2009 68 3,200

5/10/2011 31 4,200

6/30/2011 38 4,800

7/23/2011 55 4,400

6/25/2010 74 5,100

Page 59: Module 03 Do the Impossible With Array Formulas

1/19/2011 68 9,400

4/14/2010 22 9,500

5/4/2009 36 5,500

10/18/2010 61 3,600

5/28/2009 40 2,200

6/14/2011 67 4,300

3/13/2011 74 2,600

6/13/2009 20 2,300

6/11/2010 28 9,400

8/22/2010 35 1,500

4/19/2010 72 2,000

12/16/2009 42 6,100

12/2/2009 26 5,600

5/31/2009 58 7,200

4/10/2010 37 1,200

7/29/2010 22 7,500

12/17/2011 22 1,900

4/27/2009 21 5,200

3/1/2011 25 1,900

1/8/2010 32 4,300

3/10/2011 45 4,900

10/8/2011 36 8,500

6/28/2011 75 9,100

7/9/2009 27 1,900

12/24/2010 21 9,900

5/3/2010 21 6,600

11/10/2011 52 7,300

6/7/2009 21 7,100

10/20/2010 36 9,300

1/3/2009 78 8,000

6/16/2011 40 1,900

5/13/2011 31 3,500

5/29/2010 25 1,300

11/6/2011 23 1,500

5/1/2011 20 1,500

9/11/2010 57 4,900

2/5/2009 43 3,100

Page 60: Module 03 Do the Impossible With Array Formulas

8/29/2009 47 5,000

12/12/2011 69 2,600

7/28/2009 35 8,300

7/10/2011 67 3,500

1/31/2011 51 2,100

6/11/2010 67 7,700

2/24/2010 70 3,900

5/25/2009 58 3,900

5/3/2009 71 6,100

9/7/2010 43 2,100

3/29/2011 76 5,700

1/26/2011 36 6,700

12/8/2011 52 4,000

6/20/2009 20 3,900

7/21/2010 65 8,600

6/3/2011 23 1,300

2/21/2010 34 3,100

6/9/2011 46 5,900

12/5/2010 21 5,200

9/14/2010 76 2,700

10/14/2010 75 5,700

12/18/2010 33 1,800

8/10/2010 64 1,700

4/9/2010 65 5,300

12/11/2009 51 7,400

11/27/2010 37 8,400

12/22/2011 66 4,900

11/11/2010 70 3,800

1/11/2009 29 3,300

7/14/2010 53 1,700

9/1/2009 64 5,800

11/12/2010 65 3,200

5/16/2009 47 2,000

7/2/2009 64 5,100

6/18/2011 54 1,600

1/2/2011 46 7,700

9/27/2010 58 3,400

Page 61: Module 03 Do the Impossible With Array Formulas

2/18/2011 73 3,700

3/28/2011 54 5,800

1/8/2009 50 2,900

9/17/2011 37 8,600

7/7/2009 32 9,700

11/7/2009 72 8,200

2/8/2011 78 7,400

5/10/2009 54 5,100

10/19/2010 31 9,300

9/4/2011 27 3,900

2/2/2009 78 7,500

12/1/2011 29 2,700

3/17/2009 48 7,500

2/2/2011 51 6,700

4/20/2009 60 2,400

5/8/2010 72 1,500

11/22/2011 61 4,800

7/2/2011 34 8,200

4/18/2011 28 3,400

1/26/2009 28 2,600

5/16/2010 24 8,800

3/29/2010 66 7,400

3/3/2010 69 7,500

2/5/2009 65 5,300

10/11/2009 55 2,200

10/16/2011 24 1,200

8/31/2010 39 4,000

11/1/2009 78 7,400

6/3/2011 36 8,800

8/27/2010 57 5,900

5/7/2010 32 8,700

7/28/2010 61 7,600

11/9/2009 33 5,900

2/26/2010 58 6,200

7/13/2009 68 2,000

9/23/2010 59 6,500

9/12/2010 50 6,300

Page 62: Module 03 Do the Impossible With Array Formulas

6/29/2011 34 4,100

10/23/2009 64 6,300

4/30/2011 43 4,800

7/20/2011 33 9,800

7/3/2010 26 1,900

3/23/2011 31 2,400

7/1/2009 33 9,500

12/6/2011 78 9,000

7/19/2011 39 5,600

6/30/2009 74 7,300

5/11/2011 70 6,000

8/14/2010 57 8,400

4/11/2011 21 9,300

3/15/2011 42 6,300

8/18/2011 41 5,500

8/16/2011 45 2,200

3/12/2011 59 5,000

2/6/2010 66 1,200

6/23/2010 55 3,400

5/23/2011 50 5,000

8/8/2009 22 3,300

4/26/2009 66 3,600

4/24/2010 57 4,400

11/5/2011 43 6,000

12/1/2011 51 3,300

8/18/2011 42 3,700

6/28/2010 47 8,600

4/17/2010 21 7,700

12/15/2011 48 5,700

12/17/2011 42 3,500

9/23/2009 66 5,500

3/23/2009 33 3,700

9/11/2011 45 9,800

3/6/2009 64 5,800

2/7/2010 73 8,100

12/22/2011 63 1,300

8/16/2010 80 6,700

Page 63: Module 03 Do the Impossible With Array Formulas

7/22/2009 56 1,500

Page 64: Module 03 Do the Impossible With Array Formulas

Month 2009 2010 2011 Revenue

January -

February -

March -

April -

May -

June -

July -

August -

September -

October -

November -

December -

TOTAL - - - -

Page 65: Module 03 Do the Impossible With Array Formulas

Summing Values For Multiple Criterion with ARRAY Formula Summing Values For Multiple Criterion with SUMIFS

2005 Products Dollars Trans Number Name Date Product Units Dollars Year 2004 Products Dollars

EmpName Printer Scanner Speakers Projector Laptop Total 1 Ali 4/1/2004 Printer 45.00 137.20 EmpName Printer Scanner Speakers Projector Laptop Total Ali - 2 Usto 3/10/2004 Scanner 50.00 152.01 Ali - Usto - 3 Salman 2/25/2005 Speakers 9.00 28.72 Usto - Salman - 4 Usto 5/22/2006 Printer 55.00 167.08 Salman - Imran - 5 Usto 6/17/2004 Printer 43.00 130.60 Imran - Tasawar - 6 Imran 11/27/2005 Projector 58.00 175.99 Tasawar - Kamran - 7 Tasawar 3/21/2004 Projector 8.00 25.80 Kamran - Hamid - 8 Imran 12/17/2006 Printer 72.00 217.84 Hamid - Wasi - 9 Salman 7/5/2006 Projector 75.00 226.64 Wasi - Total - - - - - - 10 Ali 8/7/2006 Printer 24.00 73.50 Total - - - - - -

11 Salman 11/29/2004 Laptop 43.00 130.84

12 Salman 11/18/2004 Printer 23.00 71.03

Calculating Frequency For Multiple Criterion with ARRAY Formula 13 Kamran 8/31/2005 Printer 49.00 149.59 Calculating Frequency For Multiple Criterion with COUNTIFS

2005 Products Dollars 14 Usto 1/1/2005 Projector 18.00 56.47 2006 Products Dollars EmpName Printer Scanner Speakers Projector Laptop Total 15 Usto 9/20/2006 Scanner (8.00) (21.99) EmpName Printer Scanner Speakers Projector Laptop Total

Ali - 16 Kamran 4/12/2004 Laptop 45.00 137.39 Ali - Usto - 17 Imran 4/30/2006 Laptop 66.00 199.65 Usto - Salman - 18 Hamid 8/31/2005 Printer 88.00 265.19 Salman - Imran - 19 Hamid 10/27/2004 Projector 78.00 236.15 Imran - Tasawar - 20 Usto 11/27/2005 Printer 57.00 173.12 Tasawar - Kamran - 21 Usto 6/2/2006 Laptop 12.00 38.08 Kamran - Hamid - 22 Ali 9/24/2004 Projector 28.00 86.51 Hamid - Wasi - 23 Imran 2/1/2006 Laptop 25.00 77.31 Wasi - Total - - - - - - 24 Usto 5/2/2005 Scanner 29.00 88.22 Total - - - - - -

25 Hamid 11/7/2004 Laptop (4.00) (9.94)

26 Kamran 12/6/2006 Printer 24.00 74.62

Calculating Average For Multiple Criterion with ARRAY Formula 27 Hamid 4/12/2004 Speakers 38.00 115.99 Calculating Average For Multiple Criterion with AVERAGEIFS 1

2005 Products Dollars 28 Tasawar 9/22/2005 Scanner 77.00 233.05 2004 Products Dollars 1

EmpName Printer Scanner Speakers Projector Laptop Total 29 Ali 10/23/2006 Scanner 77.00 233.36 EmpName Printer Scanner Speakers Projector Laptop Total 1

Ali - 30 Usto 11/16/2005 Scanner 60.00 182.25 Ali - 1

Usto - 31 Usto 9/11/2005 Printer 6.00 20.48 Usto - Salman - 32 Tasawar 3/28/2006 Printer 53.00 161.46 Salman - 1

Imran - 33 Wasi 6/17/2004 Laptop 41.00 125.27 Imran - 1

Tasawar - 34 Usto 9/9/2006 Laptop 19.00 59.15 Tasawar - 1

Kamran - 35 Hamid 12/28/2006 Scanner 39.00 119.30 Kamran - 1

Hamid - 36 Ali 9/13/2004 Printer 2.00 8.26 Hamid - 1

Wasi - 37 Usto 7/7/2005 Projector 34.00 103.44 Wasi - 1

Total - - - - - - 38 Kamran 3/8/2005 Scanner 59.00 179.01 Total - - - - - - 1

39 Wasi 2/23/2006 Scanner (9.00) (24.63) 1

40 Usto 6/24/2006 Scanner 38.00 115.58 1

41 Kamran 2/6/2004 Projector 25.00 76.56 1

42 Kamran 4/10/2005 Laptop 19.00 59.38 1

43 Ali 4/1/2004 Scanner 86.00 259.86 1

44 Imran 6/6/2004 Printer 55.00 167.12 1

45 Kamran 9/20/2006 Printer 2.00 7.85 1

46 Salman 8/9/2005 Laptop 93.00 280.69

47 Usto 9/24/2004 Projector 14.00 43.93

48 Kamran 5/24/2005 Projector 37.00 113.03

49 Ali 11/18/2004 Scanner 63.00 190.70

50 Usto 11/18/2004 Printer 1.00 5.60

51 Usto 6/15/2005 Projector 24.00 73.60

52 Usto 1/4/2004 Projector 83.00 250.33

53 Wasi 7/7/2005 Projector 49.00 148.51

54 Tasawar 4/10/2005 Printer 26.00 80.20

55 Hamid 5/22/2006 Printer 35.00 107.99

56 Tasawar 4/12/2004 Printer 8.00 26.91

57 Wasi 6/28/2004 Laptop 49.00 148.78

58 Tasawar 4/12/2004 Scanner 34.00 104.09

59 Tasawar 12/8/2005 Printer 8.00 26.24

60 Hamid 10/27/2004 Laptop 89.00 269.09

61 Imran 11/16/2005 Scanner 62.00 189.25

62 Kamran 8/11/2004 Scanner 23.00 71.31

63 Wasi 6/17/2004 Projector 95.00 287.76

64 Kamran 5/11/2006 Projector 41.00 125.00

65 Salman 4/10/2005 Printer (6.00) (15.94)

66 Ali 1/1/2005 Laptop 84.00 253.99

67 Usto 11/5/2005 Scanner 63.00 191.37

68 Usto 7/16/2006 Printer 0.00 2.37

69 Tasawar 1/23/2005 Projector 73.00 221.41

70 Kamran 12/21/2004 Projector 95.00 287.05

71 Salman 11/16/2005 Speakers 93.00 280.77

72 Usto 6/17/2004 Speakers 54.00 163.87

73 Tasawar 6/26/2005 Scanner 33.00 101.37

74 Salman 4/12/2004 Laptop 48.00 145.84

75 Hamid 1/23/2005 Projector (7.00) (18.53)

76 Imran 3/6/2006 Scanner (2.00) (3.94)

77 Tasawar 1/15/2004 Laptop 27.00 83.29

78 Kamran 12/17/2006 Scanner 56.00 170.24

79 Tasawar 2/14/2005 Laptop 70.00 212.29

80 Hamid 3/30/2005 Laptop 16.00 49.46

81 Hamid 1/10/2006 Printer 69.00 208.69

82 Imran 7/29/2005 Scanner 67.00 203.01

83 Wasi 11/7/2004 Scanner 82.00 248.10

84 Salman 10/1/2006 Projector 73.00 221.48

85 Wasi 2/17/2004 Scanner 80.00 241.26

86 Hamid 8/9/2005 Projector (2.00) (4.24)

87 Kamran 8/31/2005 Projector 5.00 17.03

88 Usto 12/19/2005 Projector 26.00 80.30

89 Wasi 3/19/2005 Scanner 1.00 5.01

90 Wasi 6/13/2006 Speakers (3.00) (7.62)

91 Ali 8/18/2006 Projector 83.00 251.18

92 Hamid 5/26/2004 Laptop 33.00 100.33

93 Usto 4/12/2004 Scanner 62.00 188.06

94 Imran 5/11/2006 Projector 58.00 176.47

95 Kamran 8/20/2005 Scanner 28.00 85.54

96 Hamid 12/17/2006 Printer 33.00 100.69

97 Tasawar 11/25/2006 Scanner 92.00 278.16

98 Hamid 4/12/2004 Printer 92.00 277.54

99 Imran 1/21/2006 Printer 75.00 226.74

100 Ali 10/3/2005 Projector 74.00 224.23

101 Usto 1/15/2004 Scanner 67.00 202.45

102 Tasawar 8/11/2004 Scanner 16.00 49.45

103 Usto 5/13/2005 Scanner 90.00 272.34

104 Hamid 3/17/2006 Speakers (8.00) (22.11)

105 Tasawar 9/13/2004 Speakers 51.00 155.30

106 Hamid 3/30/2005 Scanner (7.00) (19.53)

107 Kamran 3/21/2004 Printer 9.00 29.28

108 Wasi 8/31/2005 Printer (10.00) (28.41)

109 Salman 7/16/2006 Scanner 10.00 32.11

110 Salman 3/8/2005 Laptop 35.00 107.59

111 Wasi 10/5/2004 Laptop 81.00 244.46

112 Wasi 11/18/2004 Laptop 38.00 115.86

113 Kamran 12/6/2006 Laptop 26.00 80.49

114 Ali 9/22/2005 Speakers 77.00 233.33

115 Kamran 1/21/2006 Scanner 39.00 118.63

116 Usto 6/24/2006 Projector 22.00 68.07

117 Usto 6/2/2006 Scanner 68.00 205.77

118 Wasi 5/24/2005 Scanner 59.00 178.71

119 Imran 5/22/2006 Projector 20.00 62.37

120 Usto 10/25/2005 Laptop 61.00 184.56

121 Usto 3/6/2006 Scanner 30.00 92.43

122 Hamid 7/27/2006 Laptop 10.00 32.30

123 Usto 4/30/2006 Projector 72.00 217.45

124 Salman 1/10/2006 Projector 57.00 173.36

125 Usto 11/16/2005 Printer 41.00 124.39

126 Usto 4/23/2004 Projector 54.00 163.75

127 Kamran 7/7/2005 Speakers 9.00 29.26

128 Wasi 5/13/2005 Printer 1.00 5.01

129 Usto 2/12/2006 Laptop (10.00) (28.89)

130 Salman 11/14/2006 Scanner (9.00) (25.06)

131 Hamid 11/29/2004 Laptop 56.00 168.87

132 Wasi 3/21/2004 Speakers 28.00 85.60

133 Ali 7/9/2004 Laptop 11.00 34.42

134 Tasawar 12/17/2006 Printer 11.00 34.91

135 Tasawar 2/14/2005 Projector 67.00 202.87

136 Imran 3/30/2005 Printer 10.00 31.43

137 Kamran 10/27/2004 Scanner 40.00 121.95

138 Imran 7/7/2005 Laptop 77.00 233.08

139 Ali 5/24/2005 Speakers 50.00 152.04

140 Hamid 6/28/2004 Projector 80.00 242.50

141 Hamid 12/28/2006 Projector 83.00 250.79

142 Ali 2/1/2006 Printer (4.00) (9.50)

143 Imran 2/3/2005 Scanner 46.00 139.76

144 Salman 10/23/2006 Laptop 55.00 167.19

145 Wasi 9/24/2004 Laptop 89.00 269.40

146 Kamran 7/7/2005 Projector 59.00 179.12

147 Kamran 3/8/2005 Speakers 90.00 271.75

148 Salman 11/3/2006 Speakers 17.00 53.67

149 Wasi 3/8/2005 Speakers 37.00 113.65

150 Tasawar 3/17/2006 Scanner (4.00) (9.42)

151 Kamran 7/7/2005 Printer (8.00) (22.38)

152 Usto 9/2/2004 Speakers 6.00 20.32

153 Wasi 10/16/2004 Speakers 63.00 191.68

154 Hamid 8/11/2004 Speakers 16.00 49.94

155 Ali 2/3/2005 Laptop 22.00 67.81

156 Kamran 12/30/2005 Scanner 81.00 244.97

157 Kamran 9/11/2005 Printer 85.00 256.56

158 Hamid 5/15/2004 Scanner (3.00) (7.08)

159 Kamran 1/23/2005 Printer 51.00 154.49

160 Wasi 1/1/2005 Printer 72.00 217.42

161 Tasawar 2/17/2004 Printer 46.00 139.93

162 Usto 2/25/2005 Laptop (10.00) (28.00)

163 Wasi 8/9/2005 Scanner (5.00) (12.20)

164 Usto 10/12/2006 Projector 16.00 49.92

165 Usto 12/19/2005 Scanner 25.00 76.99

166 Kamran 3/30/2005 Projector 49.00 148.91

167 Ali 3/21/2004 Printer 21.00 64.33

168 Tasawar 5/22/2006 Printer 29.00 88.98

169 Salman 2/17/2004 Printer 63.00 191.11

170 Hamid 6/13/2006 Printer 21.00 64.60

171 Ali 10/14/2005 Scanner 93.00 280.17

172 Imran 2/28/2004 Scanner 55.00 167.55

173 Kamran 7/16/2006 Scanner 14.00 43.90

174 Hamid 3/10/2004 Speakers 91.00 275.24

175 Kamran 4/23/2004 Projector 80.00 242.45

176 Ali 11/27/2005 Projector 70.00 211.76

177 Wasi 7/20/2004 Laptop 54.00 164.30

178 Salman 12/19/2005 Laptop 19.00 58.36

179 Usto 9/22/2005 Scanner 38.00 115.83

180 Imran 5/26/2004 Speakers 60.00 182.02

181 Usto 10/14/2005 Speakers 51.00 155.74

182 Salman 5/4/2004 Printer 78.00 236.14

183 Usto 11/29/2004 Scanner 17.00 52.47

184 Hamid 8/22/2004 Projector 13.00 40.81

185 Kamran 7/7/2005 Laptop 2.00 8.04

186 Ali 11/25/2006 Laptop 74.00 223.88

187 Imran 3/17/2006 Scanner 57.00 172.92

188 Hamid 5/4/2004 Laptop 79.00 239.34

189 Imran 6/15/2005 Scanner 82.00 247.46

190 Wasi 10/1/2006 Printer 28.00 85.96

191 Hamid 2/6/2004 Laptop 63.00 191.03

192 Tasawar 10/3/2005 Scanner 72.00 217.59

193 Tasawar 1/10/2006 Speakers 68.00 205.93

194 Kamran 1/21/2006 Projector 8.00 26.14

195 Usto 12/10/2004 Speakers 62.00 188.52

196 Hamid 3/19/2005 Projector 5.00 16.35

197 Imran 2/6/2004 Laptop (5.00) (12.90)

198 Imran 5/22/2006 Laptop (4.00) (10.00)

199 Tasawar 11/25/2006 Laptop 81.00 244.68

200 Tasawar 3/17/2006 Projector 21.00 64.74

201 Wasi 6/26/2005 Projector 21.00 64.86

202 Usto 12/30/2005 Scanner (3.00) (7.15)

203 Wasi 12/28/2006 Printer 57.00 173.64

204 Wasi 8/18/2006 Printer 86.00 259.31

205 Hamid 4/19/2006 Scanner 14.00 44.14

206 Usto 12/6/2006 Speakers 20.00 61.96

207 Imran 2/6/2004 Laptop 60.00 181.94

208 Hamid 7/5/2006 Projector 45.00 137.16

209 Hamid 4/1/2004 Projector 7.00 23.00

210 Ali 3/6/2006 Printer (6.00) (16.33)

211 Hamid 4/30/2006 Printer 35.00 106.90

212 Imran 5/11/2006 Scanner 31.00 95.13

213 Hamid 11/16/2005 Printer 19.00 59.08

214 Usto 2/12/2006 Projector 35.00 106.64

215 Ali 1/1/2005 Speakers 51.00 154.60

216 Usto 2/23/2006 Laptop 1.00 5.39

217 Wasi 9/24/2004 Scanner 67.00 203.36

218 Wasi 3/30/2005 Laptop 23.00 71.41

219 Imran 2/3/2005 Scanner 41.00 125.23

220 Salman 1/15/2004 Laptop 27.00 83.20

221 Tasawar 9/20/2006 Scanner 56.00 170.18

222 Salman 7/20/2004 Laptop 67.00 203.35

223 Ali 9/13/2004 Scanner 94.00 283.74

224 Tasawar 10/5/2004 Projector 52.00 158.30

225 Usto 2/6/2004 Speakers 24.00 74.24

226 Hamid 6/6/2004 Printer (1.00) (0.92)

227 Usto 1/21/2006 Projector 37.00 112.52

228 Ali 2/23/2006 Scanner 63.00 191.45

229 Wasi 4/12/2004 Printer 13.00 41.01

230 Usto 11/25/2006 Printer 7.00 22.33

231 Usto 3/21/2004 Printer 64.00 193.84

232 Salman 6/6/2004 Printer 63.00 190.91

233 Kamran 8/11/2004 Laptop 57.00 173.59

234 Kamran 11/7/2004 Laptop 59.00 178.93

235 Hamid 12/21/2004 Scanner (3.00) (7.26)

236 Wasi 10/1/2006 Printer 86.00 260.33

237 Tasawar 9/24/2004 Projector (4.00) (9.99)

238 Salman 1/1/2005 Printer 7.00 23.65

239 Wasi 10/1/2006 Printer 43.00 131.68

240 Kamran 11/5/2005 Printer 2.00 7.63

241 Kamran 5/2/2005 Laptop 85.00 256.88

242 Kamran 4/21/2005 Projector 52.00 158.19

243 Imran 7/9/2004 Speakers (3.00) (7.40)

244 Tasawar 2/25/2005 Projector 8.00 25.55

245 Wasi 7/9/2004 Laptop 5.00 17.20

246 Usto 8/29/2006 Laptop 90.00 272.10

247 Ali 11/14/2006 Laptop 36.00 110.34

248 Usto 8/20/2005 Laptop 25.00 77.01

249 Ali 3/19/2005 Laptop 7.00 23.13

250 Imran 11/3/2006 Laptop 64.00 194.25

251 Imran 5/4/2004 Laptop 71.00 215.49

252 Salman 4/10/2005 Projector 41.00 124.81

253 Salman 9/24/2004 Scanner 84.00 253.29

Page 66: Module 03 Do the Impossible With Array Formulas

254 Kamran 3/30/2005 Projector 3.00 10.70

255 Salman 4/1/2004 Scanner 15.00 46.76

256 Usto 2/6/2004 Projector 1.00 4.88

257 Usto 7/7/2005 Laptop 10.00 32.47

258 Kamran 1/12/2005 Projector 77.00 233.40

259 Imran 2/14/2005 Speakers 65.00 196.49

260 Usto 1/15/2004 Projector 25.00 77.33

261 Wasi 7/16/2006 Laptop (1.00) (1.93)

262 Hamid 8/29/2006 Scanner 2.00 7.97

263 Usto 11/3/2006 Printer 62.00 187.62

264 Imran 5/13/2005 Scanner 28.00 86.79

265 Usto 7/18/2005 Projector 55.00 167.05

266 Imran 6/15/2005 Printer 28.00 86.64

267 Tasawar 7/29/2005 Scanner 5.00 16.67

268 Tasawar 11/7/2004 Projector 1.00 4.77

269 Tasawar 6/15/2005 Scanner 26.00 80.01

270 Usto 6/6/2004 Scanner 47.00 142.85

271 Usto 5/2/2005 Projector 74.00 224.75

272 Wasi 5/11/2006 Printer 22.00 68.71

273 Salman 6/24/2006 Speakers 70.00 212.26

274 Wasi 11/27/2005 Scanner 83.00 251.31

275 Usto 12/8/2005 Projector 59.00 179.39

276 Wasi 8/9/2005 Laptop 0.00 1.58

277 Usto 1/12/2005 Projector 82.00 247.58

278 Ali 3/8/2005 Projector 29.00 89.05

279 Wasi 5/15/2004 Scanner 63.00 191.09

280 Hamid 10/1/2006 Printer 67.00 203.11

281 Tasawar 7/29/2005 Projector 3.00 10.78

282 Usto 12/10/2004 Projector 65.00 197.41

283 Kamran 5/26/2004 Speakers 75.00 227.46

284 Kamran 8/22/2004 Printer 79.00 239.90

285 Hamid 8/18/2006 Laptop (5.00) (12.92)

286 Hamid 3/30/2005 Scanner 31.00 95.51

287 Salman 12/17/2006 Laptop 21.00 65.34

288 Salman 9/11/2005 Speakers (8.00) (21.91)

289 Hamid 7/7/2005 Speakers 88.00 266.05

290 Kamran 11/16/2005 Scanner 94.00 283.85

291 Usto 10/1/2006 Laptop 83.00 251.50

292 Salman 8/11/2004 Laptop 16.00 49.96

293 Ali 8/7/2006 Laptop 33.00 100.52

294 Ali 2/28/2004 Projector (1.00) (0.91)

295 Ali 7/27/2006 Laptop 94.00 284.14

296 Hamid 4/21/2005 Scanner 76.00 230.26

297 Ali 3/6/2006 Scanner 71.00 215.16

298 Usto 5/26/2004 Speakers 56.00 169.19

299 Usto 8/31/2005 Printer 81.00 245.59

300 Usto 6/28/2004 Projector 3.00 11.16

301 Usto 4/21/2005 Printer 60.00 182.21

302 Hamid 10/23/2006 Scanner 81.00 245.54

303 Imran 5/4/2004 Scanner 70.00 211.43

304 Wasi 5/22/2006 Laptop 18.00 56.27

305 Usto 2/14/2005 Speakers 73.00 221.17

306 Usto 2/25/2005 Scanner (7.00) (18.78)

307 Usto 8/20/2005 Scanner 55.00 166.61

308 Wasi 5/15/2004 Printer 7.00 23.39

309 Wasi 11/18/2004 Projector 63.00 191.45

310 Usto 7/7/2005 Printer 83.00 251.63

311 Ali 2/28/2004 Printer 43.00 130.97

312 Usto 7/31/2004 Projector 67.00 203.30

313 Imran 12/30/2005 Projector (9.00) (24.97)

314 Wasi 6/28/2004 Scanner (1.00) (1.48)

315 Ali 1/12/2005 Scanner 21.00 65.20

316 Tasawar 11/5/2005 Laptop 6.00 20.10

317 Tasawar 1/15/2004 Projector 0.00 1.61

318 Hamid 10/16/2004 Projector 20.00 61.99

319 Salman 11/7/2004 Scanner 70.00 212.50

320 Hamid 5/15/2004 Projector 94.00 283.88

321 Usto 10/16/2004 Printer 9.00 28.83

322 Hamid 6/26/2005 Laptop 27.00 83.64

323 Imran 3/17/2006 Speakers 43.00 130.95

324 Kamran 9/20/2006 Scanner 84.00 254.39

325 Usto 6/6/2004 Projector 83.00 251.63

326 Usto 8/11/2004 Speakers 89.00 268.67

327 Kamran 10/12/2006 Printer 7.00 22.67

328 Usto 7/9/2004 Scanner 68.00 205.76

329 Kamran 10/14/2005 Projector 38.00 116.14

330 Wasi 1/26/2004 Projector 90.00 271.33

331 Wasi 8/11/2004 Projector 10.00 31.74

332 Tasawar 11/3/2006 Scanner 13.00 40.18

333 Hamid 6/17/2004 Printer 68.00 206.38

334 Usto 6/6/2004 Scanner 40.00 122.17

335 Hamid 6/4/2005 Scanner 17.00 52.58

336 Tasawar 11/29/2004 Scanner 6.00 19.23

337 Tasawar 5/11/2006 Scanner 27.00 83.79

338 Usto 7/27/2006 Scanner 80.00 242.19

339 Imran 8/11/2004 Laptop (1.00) (0.93)

340 Usto 3/28/2006 Laptop 89.00 269.26

341 Usto 3/30/2005 Projector 21.00 65.22

342 Tasawar 12/17/2006 Printer 37.00 113.12

343 Imran 2/14/2005 Speakers 15.00 46.64

344 Salman 5/26/2004 Laptop 94.00 283.62

345 Wasi 7/18/2005 Laptop 85.00 257.29

346 Imran 11/18/2004 Printer 95.00 286.86

347 Kamran 5/24/2005 Speakers 25.00 76.37

348 Usto 4/19/2006 Laptop 69.00 208.61

349 Hamid 8/31/2005 Scanner 72.00 218.67

350 Usto 2/12/2006 Speakers (4.00) (9.50)

351 Imran 6/26/2005 Speakers 21.00 64.85

352 Imran 1/12/2005 Projector 85.00 256.97

353 Kamran 9/11/2005 Projector 85.00 257.10

354 Salman 10/14/2005 Printer 79.00 239.76

355 Hamid 9/9/2006 Printer 81.00 245.01

356 Salman 8/29/2006 Projector 76.00 229.58

357 Salman 6/15/2005 Printer 31.00 95.41

358 Usto 9/22/2005 Projector 44.00 133.84

359 Ali 12/17/2006 Speakers 44.00 133.91

360 Tasawar 5/26/2004 Laptop 70.00 211.69

361 Tasawar 11/29/2004 Scanner (4.00) (9.45)

362 Hamid 11/16/2005 Printer 28.00 86.33

363 Salman 10/12/2006 Laptop 83.00 250.61

364 Wasi 7/5/2006 Printer 46.00 140.48

365 Hamid 5/22/2006 Printer 88.00 266.35

366 Kamran 10/14/2005 Printer (9.00) (24.54)

367 Usto 8/9/2005 Scanner (8.00) (21.83)

368 Imran 7/5/2006 Scanner 37.00 113.01

369 Usto 2/28/2004 Scanner 20.00 61.68

370 Tasawar 9/11/2005 Printer 2.00 7.75

371 Salman 8/20/2005 Projector 36.00 110.59

372 Salman 10/3/2005 Laptop 34.00 103.89

373 Wasi 4/30/2006 Projector 84.00 253.89

374 Usto 8/18/2006 Laptop 89.00 268.48

375 Usto 2/1/2006 Printer 31.00 95.68

376 Wasi 3/21/2004 Printer 7.00 22.55

377 Usto 2/6/2004 Printer 7.00 22.94

378 Kamran 2/23/2006 Projector 76.00 229.89

379 Usto 7/31/2004 Scanner 6.00 19.56

380 Tasawar 10/23/2006 Printer 43.00 130.29

381 Wasi 1/15/2004 Laptop 20.00 62.18

382 Usto 3/17/2006 Speakers 11.00 35.08

383 Hamid 6/26/2005 Projector 35.00 107.05

384 Kamran 3/17/2006 Scanner 72.00 218.15

385 Wasi 5/26/2004 Scanner 49.00 148.93

386 Hamid 3/6/2006 Scanner 88.00 266.65

387 Salman 3/28/2006 Scanner 45.00 136.01

388 Salman 3/21/2004 Printer 37.00 112.93

389 Imran 4/10/2005 Printer 12.00 38.62

390 Hamid 5/15/2004 Laptop 18.00 55.93

391 Usto 1/21/2006 Printer 75.00 227.00

392 Hamid 2/25/2005 Scanner 8.00 26.31

393 Ali 4/1/2004 Printer 37.00 112.54

394 Salman 12/21/2004 Printer (6.00) (16.41)

395 Ali 5/15/2004 Speakers 56.00 169.28

396 Hamid 12/10/2004 Projector 53.00 161.33

397 Tasawar 5/26/2004 Printer 62.00 187.72

398 Salman 3/30/2005 Laptop 90.00 271.31

399 Salman 1/15/2004 Projector 30.00 92.29

400 Imran 2/14/2005 Scanner 36.00 110.39

401 Tasawar 3/8/2005 Projector 76.00 230.12

402 Kamran 4/10/2005 Printer (4.00) (10.05)

403 Imran 12/10/2004 Speakers 26.00 80.07

404 Tasawar 5/13/2005 Printer (5.00) (12.80)

405 Usto 5/4/2004 Scanner 44.00 133.92

406 Imran 2/17/2004 Laptop 91.00 274.81

407 Kamran 3/10/2004 Printer 78.00 235.99

408 Hamid 5/22/2006 Printer 69.00 208.59

409 Ali 10/16/2004 Laptop 74.00 224.04

410 Usto 7/29/2005 Scanner 71.00 215.12

411 Ali 9/9/2006 Speakers 34.00 103.85

412 Hamid 6/4/2005 Laptop 93.00 281.17

413 Usto 2/25/2005 Scanner 60.00 182.61

414 Wasi 4/23/2004 Scanner 37.00 112.43

415 Hamid 6/28/2004 Projector 26.00 79.91

416 Usto 7/7/2005 Projector 2.00 8.54

417 Tasawar 10/3/2005 Scanner (9.00) (25.92)

418 Ali 2/23/2006 Scanner 46.00 139.69

419 Tasawar 3/10/2004 Laptop 0.00 2.35

420 Usto 11/29/2004 Scanner 79.00 239.22

421 Salman 1/12/2005 Scanner 48.00 146.51

422 Usto 1/21/2006 Projector 77.00 233.08

423 Hamid 2/12/2006 Scanner (10.00) (26.97)

424 Ali 8/9/2005 Speakers 45.00 137.23

425 Imran 1/23/2005 Scanner 17.00 53.57

426 Hamid 8/20/2005 Projector (4.00) (10.36)

427 Usto 12/17/2006 Laptop 43.00 130.80

428 Imran 10/5/2004 Projector 41.00 125.19

429 Hamid 6/24/2006 Speakers (4.00) (9.88)

430 Kamran 9/13/2004 Scanner 6.00 20.39

431 Salman 5/11/2006 Scanner 8.00 25.12

432 Usto 7/9/2004 Projector 43.00 131.20

433 Ali 6/6/2004 Projector 47.00 142.67

434 Usto 8/18/2006 Printer 13.00 41.34

435 Hamid 2/1/2006 Scanner 9.00 28.80

436 Ali 2/28/2004 Projector 22.00 67.51

437 Usto 3/17/2006 Projector 87.00 263.07

438 Tasawar 10/23/2006 Scanner 15.00 46.30

439 Wasi 10/23/2006 Projector 27.00 83.41

440 Imran 4/30/2006 Speakers 78.00 236.44

441 Wasi 3/19/2005 Laptop 27.00 83.00

442 Wasi 1/26/2004 Scanner 19.00 59.62

443 Salman 2/17/2004 Laptop 0.00 2.37

444 Ali 12/10/2004 Projector 30.00 91.97

445 Tasawar 8/7/2006 Speakers 17.00 52.94

446 Usto 6/4/2005 Printer 36.00 109.95

447 Usto 1/21/2006 Scanner (4.00) (10.24)

448 Wasi 1/15/2004 Laptop 4.00 14.17

449 Salman 6/6/2004 Projector 81.00 244.97

450 Tasawar 12/21/2004 Projector 87.00 263.83

451 Ali 2/6/2004 Projector 13.00 40.51

452 Usto 5/4/2004 Printer 48.00 145.85

453 Ali 10/3/2005 Speakers 2.00 7.10

454 Hamid 6/17/2004 Printer 32.00 98.37

455 Salman 8/31/2005 Printer 13.00 41.17

456 Wasi 10/1/2006 Laptop 94.00 283.45

457 Hamid 3/6/2006 Laptop 63.00 190.84

458 Usto 6/13/2006 Scanner 45.00 136.98

459 Imran 4/10/2005 Laptop 71.00 214.77

460 Imran 4/23/2004 Laptop 74.00 224.18

461 Salman 1/26/2004 Laptop 48.00 145.65

462 Tasawar 2/28/2004 Printer 63.00 191.19

463 Imran 4/21/2005 Printer 48.00 145.69

464 Usto 8/29/2006 Laptop 26.00 80.61

465 Salman 6/13/2006 Projector 58.00 176.27

466 Usto 2/12/2006 Printer 2.00 8.75

467 Imran 8/7/2006 Printer 36.00 109.68

468 Wasi 6/26/2005 Laptop 22.00 68.36

469 Wasi 8/9/2005 Printer 92.00 277.67

470 Ali 10/5/2004 Scanner 29.00 88.71

471 Salman 10/12/2006 Printer 42.00 128.17

472 Tasawar 4/23/2004 Printer 25.00 77.32

473 Imran 3/19/2005 Scanner 40.00 122.54

474 Wasi 5/4/2004 Printer 3.00 10.57

475 Ali 7/18/2005 Scanner (1.00) (0.82)

476 Salman 9/9/2006 Scanner 12.00 37.69

477 Wasi 6/17/2004 Projector 0.00 2.00

478 Usto 2/12/2006 Printer 35.00 106.26

479 Kamran 5/24/2005 Scanner 2.00 7.68

480 Usto 5/22/2006 Speakers 10.00 31.79

481 Hamid 10/14/2005 Projector 6.00 19.73

482 Hamid 3/10/2004 Printer 4.00 14.10

483 Wasi 10/12/2006 Laptop 91.00 274.92

484 Hamid 7/5/2006 Printer 12.00 37.88

485 Usto 11/7/2004 Scanner 21.00 65.28

486 Hamid 3/30/2005 Laptop 44.00 134.31

487 Ali 1/23/2005 Projector 75.00 227.10

488 Ali 7/20/2004 Projector 37.00 113.00

489 Usto 7/27/2006 Projector 58.00 176.07

490 Hamid 2/12/2006 Projector 74.00 223.61

491 Usto 6/6/2004 Scanner 64.00 193.55

492 Ali 11/27/2005 Speakers 53.00 160.46

493 Salman 4/23/2004 Projector (1.00) (0.45)

494 Salman 3/6/2006 Laptop 21.00 65.07

495 Hamid 2/23/2006 Laptop 90.00 271.34

496 Hamid 10/25/2005 Speakers 61.00 184.83

497 Ali 5/13/2005 Laptop 64.00 193.98

498 Usto 3/6/2006 Projector 79.00 238.61

499 Usto 5/11/2006 Scanner 11.00 34.58

500 Imran 6/13/2006 Laptop 17.00 52.99

501 Imran 10/12/2006 Printer (10.00) (28.51)

502 Tasawar 5/4/2004 Laptop 61.00 185.38

503 Salman 7/7/2005 Projector 81.00 245.19

504 Imran 12/21/2004 Laptop 86.00 259.65

505 Tasawar 6/28/2004 Projector (6.00) (16.60)

506 Hamid 9/22/2005 Speakers 75.00 226.29

507 Usto 7/18/2005 Laptop 87.00 262.50

508 Wasi 7/16/2006 Scanner 15.00 47.14

509 Hamid 3/19/2005 Speakers 6.00 20.04

510 Usto 2/28/2004 Projector 4.00 14.01

511 Hamid 4/8/2006 Projector 56.00 169.25

512 Ali 5/4/2004 Scanner 76.00 230.18

Page 67: Module 03 Do the Impossible With Array Formulas

513 Usto 7/7/2005 Speakers 27.00 82.60

514 Ali 12/19/2005 Scanner 58.00 175.77

515 Hamid 2/17/2004 Speakers 67.00 202.62

516 Imran 9/11/2005 Printer 79.00 238.79

517 Tasawar 9/13/2004 Laptop 38.00 116.69

518 Ali 4/1/2004 Laptop 4.00 13.64

519 Usto 3/17/2006 Projector 45.00 137.07

520 Ali 5/15/2004 Scanner 10.00 32.19

521 Usto 11/5/2005 Scanner 86.00 260.40

522 Wasi 5/11/2006 Scanner 75.00 226.71

523 Kamran 3/19/2005 Projector 77.00 232.50

524 Kamran 3/21/2004 Projector 10.00 31.82

525 Tasawar 10/5/2004 Scanner 62.00 188.38

526 Ali 1/26/2004 Printer 73.00 221.29

527 Hamid 1/15/2004 Scanner 62.00 187.23

528 Usto 6/24/2006 Laptop 11.00 35.72

529 Usto 12/19/2005 Laptop 28.00 86.08

530 Usto 8/22/2004 Laptop 57.00 172.36

531 Wasi 12/10/2004 Projector 34.00 103.49

532 Hamid 10/14/2005 Projector 89.00 267.86

533 Usto 9/24/2004 Printer 32.00 97.89

534 Usto 11/25/2006 Projector 38.00 116.04

535 Tasawar 8/20/2005 Printer 82.00 248.05

536 Hamid 5/26/2004 Scanner 29.00 89.29

537 Kamran 10/1/2006 Speakers 17.00 52.25

538 Usto 8/11/2004 Projector 50.00 151.87

539 Imran 4/1/2004 Speakers 7.00 22.96

540 Salman 3/19/2005 Printer 50.00 151.36

541 Tasawar 2/25/2005 Speakers 20.00 61.88

542 Hamid 2/25/2005 Scanner 37.00 112.83

543 Usto 9/2/2004 Laptop 58.00 176.61

544 Imran 1/21/2006 Scanner 25.00 76.92

545 Usto 4/1/2004 Projector 34.00 103.18

546 Ali 10/23/2006 Scanner 3.00 11.58

547 Ali 10/1/2006 Speakers 63.00 190.59

548 Ali 1/10/2006 Projector 44.00 133.62

549 Wasi 4/12/2004 Projector 87.00 263.16

550 Hamid 2/25/2005 Speakers 4.00 14.19

551 Salman 4/19/2006 Scanner 93.00 281.17

552 Tasawar 11/29/2004 Speakers 10.00 32.07

553 Usto 12/17/2006 Laptop 19.00 58.97

554 Usto 7/18/2005 Projector 30.00 92.53

555 Salman 11/14/2006 Laptop (1.00) (1.28)

556 Hamid 4/30/2006 Projector 46.00 139.41

557 Tasawar 9/2/2004 Scanner 44.00 133.51

558 Ali 10/27/2004 Projector 47.00 143.21

559 Hamid 9/9/2006 Projector 86.00 260.39

560 Hamid 7/27/2006 Scanner 76.00 229.96

561 Usto 4/1/2004 Laptop 55.00 166.99

562 Salman 5/26/2004 Projector (1.00) (0.79)

563 Salman 7/20/2004 Laptop 62.00 187.63

564 Salman 1/26/2004 Scanner 73.00 220.97

565 Usto 11/7/2004 Speakers 12.00 38.44

566 Kamran 8/22/2004 Laptop 0.00 1.60

567 Wasi 8/18/2006 Projector 23.00 71.40

568 Wasi 1/23/2005 Projector 73.00 220.81

569 Hamid 6/4/2005 Printer 73.00 221.78

570 Kamran 3/19/2005 Scanner 43.00 131.06

571 Usto 7/27/2006 Speakers 60.00 182.29

572 Kamran 12/6/2006 Printer 40.00 121.87

573 Hamid 7/29/2005 Printer (7.00) (18.92)

574 Ali 9/24/2004 Scanner 39.00 118.37

575 Imran 1/1/2005 Laptop 84.00 253.79

576 Hamid 4/30/2006 Speakers 92.00 277.81

577 Usto 10/3/2005 Laptop 68.00 206.08

578 Usto 11/7/2004 Printer 7.00 23.19

579 Usto 10/12/2006 Projector (9.00) (24.84)

580 Wasi 10/14/2005 Laptop 51.00 154.40

581 Usto 11/27/2005 Printer 59.00 178.90

582 Tasawar 11/5/2005 Laptop 64.00 194.44

583 Wasi 11/16/2005 Printer 0.00 2.52

584 Hamid 2/14/2005 Laptop 81.00 243.82

585 Kamran 4/10/2005 Speakers 93.00 280.80

586 Wasi 2/1/2006 Printer 20.00 61.97

587 Salman 6/4/2005 Projector 39.00 119.91

588 Tasawar 10/27/2004 Scanner 6.00 20.02

589 Tasawar 2/17/2004 Scanner 34.00 103.68

590 Usto 2/1/2006 Printer 33.00 101.31

591 Salman 1/15/2004 Speakers (10.00) (28.46)

592 Wasi 8/7/2006 Projector 47.00 141.97

593 Kamran 1/15/2004 Scanner 94.00 284.61

594 Usto 6/2/2006 Scanner 92.00 278.23

595 Imran 1/12/2005 Printer 68.00 205.96

596 Hamid 3/21/2004 Printer 37.00 112.85

597 Kamran 7/20/2004 Projector 78.00 235.37

598 Usto 12/6/2006 Projector 14.00 43.76

599 Wasi 11/3/2006 Scanner 33.00 100.55

600 Kamran 6/17/2004 Projector 64.00 194.18

601 Usto 8/7/2006 Printer 6.00 20.23

602 Wasi 6/2/2006 Speakers 65.00 197.49

603 Ali 1/15/2004 Laptop 24.00 74.28

604 Imran 12/19/2005 Speakers 89.00 269.01

605 Imran 10/3/2005 Laptop 94.00 284.25

606 Usto 12/8/2005 Scanner 67.00 203.71

607 Imran 8/11/2004 Laptop 7.00 23.43

608 Imran 9/24/2004 Scanner 58.00 176.00

609 Hamid 6/17/2004 Laptop 77.00 232.67

610 Usto 9/11/2005 Projector 50.00 151.12

611 Ali 8/7/2006 Printer 10.00 32.14

612 Usto 8/31/2005 Laptop 2.00 7.78

613 Salman 7/27/2006 Laptop 17.00 53.69

614 Tasawar 5/2/2005 Laptop 90.00 272.41

615 Usto 11/25/2006 Scanner 58.00 175.59

616 Tasawar 1/21/2006 Laptop 66.00 199.93

617 Hamid 6/28/2004 Projector 6.00 20.24

618 Imran 4/19/2006 Printer 90.00 272.59

619 Imran 5/22/2006 Printer 38.00 115.86

620 Tasawar 10/5/2004 Laptop 3.00 10.91

621 Kamran 4/12/2004 Scanner (4.00) (10.39)

622 Salman 6/17/2004 Projector 8.00 25.90

623 Imran 4/1/2004 Laptop (8.00) (22.23)

624 Usto 9/24/2004 Laptop 72.00 218.69

625 Hamid 1/21/2006 Projector 83.00 250.67

626 Usto 6/2/2006 Scanner 12.00 38.98

627 Imran 5/22/2006 Scanner (8.00) (21.53)

628 Ali 2/12/2006 Projector 22.00 68.13

629 Tasawar 11/3/2006 Laptop (2.00) (3.83)

630 Usto 1/10/2006 Scanner 55.00 166.77

631 Hamid 6/24/2006 Projector 40.00 122.55

632 Ali 6/26/2005 Scanner 61.00 183.96

633 Usto 6/15/2005 Projector 40.00 122.54

634 Hamid 9/9/2006 Projector 31.00 94.68

635 Ali 4/23/2004 Laptop 6.00 20.45

636 Usto 10/25/2005 Scanner (6.00) (16.10)

637 Usto 7/7/2005 Projector 14.00 43.40

638 Usto 7/31/2004 Laptop 94.00 283.88

639 Hamid 7/29/2005 Laptop 70.00 212.27

640 Kamran 11/7/2004 Printer (8.00) (21.44)

641 Kamran 11/3/2006 Printer (8.00) (21.91)

642 Salman 12/30/2005 Laptop 2.00 7.64

643 Usto 1/4/2004 Speakers 10.00 31.84

644 Wasi 5/2/2005 Projector 51.00 154.53

645 Wasi 4/1/2004 Projector 5.00 16.85

646 Kamran 6/2/2006 Projector 39.00 119.49

647 Salman 3/21/2004 Projector 20.00 61.93

648 Kamran 11/29/2004 Scanner 29.00 88.79

649 Usto 2/1/2006 Scanner 43.00 130.60

650 Salman 9/2/2004 Laptop 40.00 122.34

651 Kamran 2/12/2006 Scanner 36.00 109.41

652 Kamran 1/23/2005 Projector 88.00 265.70

653 Ali 2/3/2005 Laptop 55.00 166.43

654 Hamid 12/21/2004 Projector 65.00 196.86

655 Hamid 7/7/2005 Printer 6.00 19.49

656 Wasi 5/22/2006 Scanner (1.00) (1.23)

657 Hamid 9/20/2006 Scanner 32.00 97.81

658 Usto 1/21/2006 Laptop 17.00 53.06

659 Usto 7/9/2004 Projector 25.00 76.38

660 Usto 3/30/2005 Projector 11.00 35.75

661 Usto 2/17/2004 Laptop 51.00 155.02

662 Kamran 11/3/2006 Speakers 25.00 78.07

663 Usto 11/14/2006 Projector 27.00 82.45

664 Ali 6/15/2005 Printer 38.00 116.79

665 Tasawar 9/20/2006 Scanner 27.00 82.57

666 Hamid 6/13/2006 Projector 59.00 178.63

667 Wasi 2/12/2006 Scanner 73.00 220.45

668 Imran 8/31/2005 Projector 43.00 131.45

669 Tasawar 7/5/2006 Laptop 51.00 154.78

670 Ali 9/13/2004 Printer 32.00 98.01

671 Usto 4/8/2006 Printer 89.00 268.59

672 Hamid 11/27/2005 Laptop (1.00) (0.61)

673 Usto 3/17/2006 Projector 26.00 81.09

674 Hamid 2/25/2005 Scanner 56.00 170.29

675 Ali 8/22/2004 Printer 10.00 32.45

676 Usto 2/6/2004 Speakers 8.00 25.64

677 Imran 5/2/2005 Projector 75.00 226.81

678 Hamid 2/3/2005 Scanner 79.00 239.48

679 Imran 5/13/2005 Scanner 25.00 75.94

680 Tasawar 10/12/2006 Printer 22.00 68.81

681 Ali 9/13/2004 Speakers 88.00 265.64

682 Kamran 11/7/2004 Scanner 94.00 284.33

683 Hamid 10/3/2005 Laptop 58.00 176.73

684 Kamran 6/4/2005 Printer 66.00 200.21

685 Hamid 8/7/2006 Projector 82.00 247.94

686 Usto 10/1/2006 Scanner 94.00 283.77

687 Salman 12/28/2006 Printer 27.00 82.88

688 Ali 4/12/2004 Speakers 56.00 169.96

689 Kamran 4/19/2006 Laptop 82.00 247.80

690 Kamran 9/11/2005 Laptop 7.00 23.07

691 Ali 1/10/2006 Printer 25.00 77.37

692 Salman 12/28/2006 Scanner 15.00 46.81

693 Hamid 10/5/2004 Scanner 39.00 118.82

694 Ali 10/3/2005 Printer 22.00 67.92

695 Usto 3/19/2005 Speakers 0.00 1.58

696 Ali 7/20/2004 Laptop 47.00 142.63

697 Hamid 3/6/2006 Speakers 36.00 110.26

698 Hamid 9/13/2004 Projector 46.00 139.53

699 Kamran 4/30/2006 Projector 84.00 253.68

700 Tasawar 3/21/2004 Printer 38.00 115.77

701 Ali 5/26/2004 Printer 13.00 40.47

702 Kamran 4/19/2006 Scanner 40.00 122.42

703 Imran 6/17/2004 Speakers 46.00 139.41

704 Wasi 7/31/2004 Projector 11.00 35.11

705 Salman 6/15/2005 Printer (1.00) (0.90)

706 Salman 3/10/2004 Printer 32.00 98.62

707 Wasi 1/15/2004 Scanner 78.00 235.38

708 Salman 1/23/2005 Speakers 71.00 215.14

709 Imran 4/23/2004 Printer 36.00 109.80

710 Hamid 8/22/2004 Laptop 79.00 238.75

711 Salman 8/9/2005 Speakers 92.00 278.34

712 Usto 1/15/2004 Scanner 38.00 116.20

713 Ali 12/6/2006 Laptop 50.00 152.08

714 Tasawar 2/23/2006 Scanner 31.00 93.73

715 Hamid 6/13/2006 Printer 9.00 29.39

716 Usto 2/25/2005 Projector 24.00 73.28

717 Salman 1/12/2005 Printer 50.00 152.59

718 Hamid 2/12/2006 Speakers 32.00 98.19

719 Wasi 9/13/2004 Scanner 71.00 214.93

720 Tasawar 11/3/2006 Laptop 28.00 86.11

721 Salman 10/23/2006 Printer 40.00 121.83

722 Tasawar 1/15/2004 Projector 75.00 226.99

723 Usto 8/22/2004 Printer 30.00 92.03

724 Hamid 12/8/2005 Printer 78.00 235.90

725 Imran 8/9/2005 Laptop 15.00 47.10

726 Tasawar 11/7/2004 Speakers 30.00 91.80

727 Usto 10/3/2005 Scanner 27.00 83.56

728 Usto 6/13/2006 Printer 95.00 286.68

729 Hamid 2/17/2004 Scanner 62.00 188.70

730 Tasawar 3/17/2006 Printer (4.00) (10.15)

731 Ali 7/20/2004 Laptop (3.00) (7.23)

732 Usto 7/7/2005 Laptop 62.00 187.71

733 Ali 8/11/2004 Speakers 92.00 277.68

734 Usto 12/17/2006 Scanner 35.00 107.10

735 Ali 5/2/2005 Projector 91.00 274.96

736 Tasawar 7/9/2004 Laptop 21.00 64.32

737 Imran 1/21/2006 Laptop 49.00 148.74

738 Usto 3/19/2005 Scanner 34.00 103.35

739 Usto 1/23/2005 Printer 56.00 170.12

740 Tasawar 5/26/2004 Projector 81.00 244.85

741 Ali 4/12/2004 Projector 63.00 191.25

742 Tasawar 5/2/2005 Scanner (3.00) (7.37)

743 Imran 7/7/2005 Scanner 8.00 25.81

744 Hamid 4/1/2004 Printer 46.00 139.62

745 Imran 2/14/2005 Printer 3.00 10.88

746 Imran 5/22/2006 Scanner 68.00 205.86

747 Ali 4/19/2006 Scanner 83.00 251.06

748 Tasawar 2/14/2005 Projector 51.00 155.12

749 Wasi 4/19/2006 Scanner 16.00 50.20

750 Wasi 5/11/2006 Projector (2.00) (3.91)

751 Tasawar 11/29/2004 Printer 6.00 20.37

752 Imran 10/25/2005 Printer (5.00) (12.57)

753 Ali 1/21/2006 Projector 42.00 127.71

754 Tasawar 1/12/2005 Projector 47.00 143.38

755 Usto 7/27/2006 Laptop 16.00 50.19

756 Wasi 5/15/2004 Printer 11.00 35.36

757 Ali 11/29/2004 Projector (10.00) (27.90)

758 Salman 3/10/2004 Projector 21.00 65.38

759 Wasi 10/25/2005 Laptop 52.00 157.73

760 Tasawar 4/12/2004 Speakers 5.00 17.01

761 Tasawar 7/29/2005 Projector 52.00 158.43

762 Imran 3/30/2005 Laptop 38.00 115.39

763 Kamran 5/11/2006 Laptop 84.00 254.26

764 Wasi 12/6/2006 Speakers 18.00 55.34

765 Hamid 5/4/2004 Printer (6.00) (15.74)

766 Wasi 4/1/2004 Printer 5.00 16.91

767 Imran 12/6/2006 Scanner 59.00 178.90

768 Imran 6/26/2005 Laptop (1.00) (1.43)

769 Hamid 1/23/2005 Speakers 12.00 37.85

770 Imran 3/21/2004 Speakers 25.00 76.81

771 Tasawar 6/26/2005 Laptop 33.00 101.42

Page 68: Module 03 Do the Impossible With Array Formulas

772 Ali 2/28/2004 Laptop 12.00 37.89

773 Kamran 8/9/2005 Projector 52.00 158.31

774 Hamid 3/30/2005 Projector 34.00 103.62

775 Tasawar 7/29/2005 Scanner 66.00 200.66

776 Tasawar 7/31/2004 Speakers 10.00 31.85

777 Wasi 2/28/2004 Scanner (5.00) (12.55)

778 Salman 8/9/2005 Laptop 89.00 269.49

779 Wasi 4/10/2005 Scanner 5.00 16.82

780 Hamid 10/12/2006 Laptop 48.00 145.99

781 Ali 12/6/2006 Laptop 36.00 109.92

782 Tasawar 11/14/2006 Laptop 80.00 242.00

783 Ali 11/25/2006 Printer 64.00 193.89

784 Ali 10/14/2005 Scanner 51.00 155.50

785 Salman 4/10/2005 Projector 92.00 278.34

786 Wasi 4/21/2005 Projector 93.00 280.86

787 Hamid 2/3/2005 Scanner 36.00 110.48

788 Salman 10/12/2006 Printer (9.00) (24.83)

789 Hamid 5/24/2005 Printer 48.00 146.23

790 Wasi 11/16/2005 Projector 11.00 34.55

791 Wasi 7/20/2004 Speakers 8.00 25.45

792 Imran 4/12/2004 Scanner 36.00 110.09

793 Wasi 11/5/2005 Laptop 93.00 280.78

794 Usto 4/12/2004 Printer 39.00 119.20

795 Usto 5/26/2004 Projector 72.00 218.08

796 Kamran 3/6/2006 Printer 3.00 10.42

797 Usto 1/1/2005 Laptop 47.00 142.84

798 Tasawar 12/28/2006 Laptop 72.00 217.32

799 Imran 12/6/2006 Laptop 26.00 79.75

800 Usto 10/5/2004 Projector 47.00 142.49

801 Tasawar 1/10/2006 Printer 14.00 43.40

802 Usto 6/26/2005 Laptop 71.00 215.08

803 Usto 8/18/2006 Scanner 95.00 287.80

804 Wasi 3/6/2006 Laptop 37.00 112.78

805 Usto 12/8/2005 Printer (1.00) (0.39)

806 Kamran 8/18/2006 Projector 26.00 80.21

807 Usto 1/4/2004 Projector 67.00 203.54

808 Kamran 2/17/2004 Printer 15.00 47.20

809 Hamid 2/23/2006 Printer 73.00 221.34

810 Hamid 10/5/2004 Laptop 13.00 40.90

811 Kamran 3/21/2004 Scanner 76.00 229.56

812 Wasi 6/6/2004 Projector (9.00) (24.93)

813 Imran 6/4/2005 Speakers 36.00 109.53

814 Salman 5/26/2004 Scanner 11.00 35.52

815 Imran 1/21/2006 Printer 73.00 220.50

816 Hamid 10/16/2004 Speakers 93.00 280.27

817 Ali 4/8/2006 Scanner 69.00 209.32

818 Usto 4/12/2004 Projector 86.00 259.48

819 Ali 6/2/2006 Laptop 54.00 164.38

820 Tasawar 4/21/2005 Laptop (2.00) (4.04)

821 Usto 9/20/2006 Scanner 83.00 250.17

822 Wasi 10/14/2005 Laptop 2.00 8.00

823 Imran 8/18/2006 Projector 54.00 164.15

824 Usto 4/1/2004 Scanner 76.00 230.42

825 Ali 8/31/2005 Projector 10.00 32.25

826 Hamid 10/12/2006 Scanner 81.00 245.04

827 Hamid 9/20/2006 Projector 83.00 251.14

828 Usto 11/3/2006 Scanner 6.00 19.52

829 Imran 11/14/2006 Laptop 77.00 233.16

830 Hamid 3/28/2006 Laptop 41.00 125.28

831 Salman 12/6/2006 Printer 80.00 241.71

832 Usto 5/22/2006 Projector 20.00 62.21

833 Kamran 1/26/2004 Projector 31.00 95.33

834 Usto 1/10/2006 Scanner 34.00 103.90

835 Salman 8/31/2005 Scanner 2.00 8.03

836 Hamid 2/12/2006 Scanner 17.00 53.33

837 Kamran 6/2/2006 Projector 16.00 50.31

838 Tasawar 3/6/2006 Scanner 54.00 163.70

839 Usto 2/17/2004 Printer (9.00) (24.92)

840 Usto 4/30/2006 Projector 94.00 284.54

841 Hamid 9/2/2004 Scanner (3.00) (7.45)

842 Tasawar 11/7/2004 Laptop 9.00 28.83

843 Usto 3/21/2004 Scanner 25.00 77.11

844 Salman 10/23/2006 Printer 29.00 89.31

845 Wasi 8/22/2004 Projector 37.00 113.21

846 Usto 6/26/2005 Scanner 19.00 59.00

847 Tasawar 4/12/2004 Printer 28.00 86.05

848 Hamid 6/6/2004 Projector 18.00 55.86

849 Salman 6/2/2006 Speakers 84.00 254.04

850 Kamran 10/16/2004 Scanner 79.00 238.83

851 Wasi 11/7/2004 Scanner 31.00 94.97

852 Hamid 7/27/2006 Speakers 34.00 103.40

853 Wasi 11/16/2005 Laptop 66.00 201.26

854 Kamran 5/22/2006 Laptop 44.00 134.45

855 Ali 1/23/2005 Projector 94.00 284.42

856 Imran 4/12/2004 Scanner 11.00 35.30

857 Usto 8/22/2004 Printer 74.00 223.97

858 Hamid 12/6/2006 Laptop 28.00 86.49

859 Tasawar 6/4/2005 Printer 40.00 121.92

860 Tasawar 2/6/2004 Printer 34.00 104.17

861 Ali 9/11/2005 Projector 38.00 115.85

862 Usto 6/15/2005 Laptop 69.00 209.14

863 Salman 8/20/2005 Projector 34.00 103.97

864 Ali 8/9/2005 Laptop 29.00 89.38

865 Imran 2/17/2004 Scanner (10.00) (27.72)

866 Wasi 10/27/2004 Speakers 42.00 128.43

867 Usto 3/17/2006 Laptop 58.00 175.97

868 Kamran 3/10/2004 Scanner 27.00 83.02

869 Wasi 7/5/2006 Projector 47.00 143.27

870 Kamran 2/6/2004 Scanner 29.00 88.70

871 Wasi 5/11/2006 Laptop 28.00 86.23

872 Ali 9/20/2006 Projector 79.00 239.06

873 Salman 11/7/2004 Projector 41.00 124.82

874 Kamran 7/7/2005 Speakers 57.00 172.96

875 Wasi 7/16/2006 Printer 45.00 137.62

876 Hamid 3/17/2006 Laptop 91.00 274.91

877 Kamran 1/23/2005 Laptop 49.00 149.04

878 Ali 9/24/2004 Printer 68.00 206.16

879 Imran 2/14/2005 Speakers 38.00 116.64

880 Salman 9/20/2006 Scanner 4.00 15.21

881 Kamran 4/10/2005 Laptop 45.00 137.05

882 Tasawar 12/10/2004 Laptop 85.00 256.66

883 Kamran 7/7/2005 Speakers 57.00 173.06

884 Usto 11/16/2005 Laptop (3.00) (6.36)

885 Wasi 8/7/2006 Scanner (9.00) (24.86)

886 Usto 4/23/2004 Projector 86.00 260.29

887 Hamid 3/8/2005 Scanner 11.00 35.04

888 Imran 1/15/2004 Laptop 87.00 262.76

889 Imran 7/31/2004 Projector 86.00 260.01

890 Ali 2/1/2006 Printer 62.00 187.81

891 Kamran 7/16/2006 Laptop 80.00 241.86

892 Imran 7/20/2004 Speakers 11.00 34.78

893 Imran 12/8/2005 Speakers 11.00 34.68

894 Wasi 11/5/2005 Projector (4.00) (9.79)

895 Tasawar 12/10/2004 Speakers 42.00 128.03

896 Tasawar 6/28/2004 Printer 51.00 154.72

897 Imran 7/20/2004 Scanner 91.00 274.77

898 Kamran 8/18/2006 Printer 24.00 73.41

899 Kamran 1/26/2004 Projector 19.00 59.12

900 Imran 3/21/2004 Printer 80.00 241.75

901 Ali 12/6/2006 Scanner 0.00 1.68

902 Hamid 10/1/2006 Scanner 69.00 209.14

903 Kamran 7/16/2006 Laptop 84.00 253.78

904 Usto 8/20/2005 Speakers 31.00 94.75

905 Usto 8/31/2005 Projector 11.00 35.27

906 Salman 3/30/2005 Printer 79.00 239.34

907 Hamid 6/24/2006 Projector 22.00 68.55

908 Ali 2/3/2005 Scanner 76.00 231.13

909 Salman 10/5/2004 Projector 0.00 2.74

910 Kamran 3/19/2005 Printer 94.00 283.56

911 Usto 11/7/2004 Scanner 14.00 44.25

912 Kamran 7/5/2006 Laptop 57.00 172.70

913 Hamid 4/21/2005 Printer 3.00 11.08

914 Wasi 7/5/2006 Printer 50.00 151.96

915 Salman 6/13/2006 Projector 25.00 76.62

916 Tasawar 8/31/2005 Scanner 46.00 140.27

917 Usto 7/16/2006 Printer 19.00 58.74

918 Kamran 5/22/2006 Projector 6.00 20.10

919 Hamid 7/5/2006 Speakers 8.00 26.08

920 Kamran 1/10/2006 Laptop (2.00) (3.73)

921 Usto 4/10/2005 Printer 80.00 240.69

922 Hamid 5/2/2005 Scanner 19.00 58.90

923 Ali 4/10/2005 Speakers 27.00 82.99

924 Salman 2/6/2004 Laptop 79.00 239.45

925 Hamid 1/10/2006 Scanner 57.00 173.33

926 Wasi 12/19/2005 Printer 47.00 143.60

927 Wasi 11/7/2004 Printer 9.00 28.83

928 Hamid 11/27/2005 Printer 65.00 196.86

929 Usto 3/10/2004 Scanner 58.00 175.22

930 Wasi 9/13/2004 Laptop 48.00 145.94

931 Usto 10/14/2005 Scanner 75.00 226.61

932 Wasi 1/21/2006 Scanner 59.00 179.37

933 Hamid 1/23/2005 Laptop 34.00 104.45

934 Usto 4/1/2004 Speakers 57.00 173.07

935 Kamran 3/28/2006 Printer 62.00 187.89

936 Tasawar 7/5/2006 Speakers 17.00 53.05

937 Salman 7/29/2005 Scanner 83.00 250.82

938 Salman 7/20/2004 Printer 56.00 169.84

939 Usto 2/28/2004 Printer 14.00 44.19

940 Imran 1/1/2005 Speakers (9.00) (24.56)

941 Ali 7/18/2005 Scanner 44.00 134.50

942 Usto 2/6/2004 Projector 32.00 97.65

943 Hamid 1/12/2005 Projector 85.00 256.97

944 Ali 9/24/2004 Printer (2.00) (3.72)

945 Kamran 2/3/2005 Speakers 31.00 94.44

946 Wasi 8/22/2004 Projector (7.00) (19.82)

947 Imran 1/26/2004 Speakers (1.00) (0.29)

948 Salman 11/25/2006 Printer 6.00 20.40

949 Tasawar 6/6/2004 Scanner 13.00 41.83

950 Salman 10/27/2004 Printer 70.00 212.46

951 Imran 6/17/2004 Scanner 15.00 47.75

952 Tasawar 4/19/2006 Laptop 18.00 56.26

953 Tasawar 2/23/2006 Projector 30.00 92.20

954 Usto 11/3/2006 Laptop 17.00 53.07

955 Usto 1/12/2005 Projector (1.00) (1.45)

956 Hamid 3/19/2005 Scanner 50.00 152.32

957 Salman 12/30/2005 Printer 83.00 251.09

958 Kamran 5/4/2004 Laptop 54.00 164.08

959 Salman 4/21/2005 Printer 16.00 49.97

960 Kamran 9/20/2006 Printer 53.00 160.96

961 Tasawar 1/10/2006 Projector 95.00 286.72

962 Salman 1/4/2004 Laptop 74.00 224.13

963 Imran 8/20/2005 Laptop 11.00 35.13

964 Usto 9/20/2006 Scanner 63.00 191.00

965 Ali 8/31/2005 Projector 53.00 161.24

966 Usto 7/27/2006 Printer 1.00 5.28

967 Tasawar 11/18/2004 Scanner 24.00 74.31

968 Usto 4/8/2006 Speakers 5.00 16.42

969 Ali 2/25/2005 Printer 35.00 107.34

970 Ali 5/22/2006 Projector 33.00 100.62

971 Kamran 2/1/2006 Laptop 65.00 196.64

972 Wasi 2/12/2006 Laptop 52.00 158.34

973 Wasi 8/18/2006 Laptop 44.00 133.42

974 Salman 10/12/2006 Speakers 72.00 218.06

975 Kamran 9/13/2004 Laptop 13.00 41.14

976 Usto 9/9/2006 Scanner 16.00 50.16

977 Wasi 2/12/2006 Scanner 19.00 59.27

978 Usto 5/13/2005 Laptop 67.00 203.43

979 Kamran 2/12/2006 Printer 2.00 8.31

980 Usto 6/2/2006 Laptop 28.00 85.79

981 Imran 8/20/2005 Scanner (6.00) (15.85)

982 Salman 3/30/2005 Laptop 70.00 212.03

983 Usto 2/23/2006 Printer 65.00 197.19

984 Kamran 12/28/2006 Scanner 39.00 119.05

985 Usto 8/29/2006 Scanner 72.00 218.19

986 Ali 5/2/2005 Speakers 47.00 142.54

987 Kamran 5/11/2006 Printer 94.00 283.58

988 Ali 5/13/2005 Printer 58.00 175.82

989 Hamid 5/15/2004 Projector (6.00) (17.29)

990 Imran 2/17/2004 Projector 38.00 115.96

991 Tasawar 1/15/2004 Projector (1.00) (1.02)

992 Hamid 11/16/2005 Projector 34.00 104.58

993 Usto 4/1/2004 Printer 30.00 91.72

994 Imran 5/26/2004 Scanner 62.00 187.43

995 Ali 2/12/2006 Printer 24.00 74.21

996 Imran 9/13/2004 Projector 4.00 13.65

997 Kamran 6/6/2004 Printer 88.00 265.29

998 Kamran 10/3/2005 Projector 78.00 235.69

999 Salman 10/14/2005 Projector 82.00 248.12

1000 Tasawar 5/13/2005 Printer 68.00 206.87

1001 Tasawar 2/17/2004 Scanner 20.00 61.60

1002 Imran 10/5/2004 Printer (10.00) (28.33)

1003 Usto 9/24/2004 Projector 94.00 283.99

1004 Usto 4/8/2006 Scanner 62.00 188.00

1005 Kamran 7/9/2004 Laptop 71.00 215.02

1006 Salman 3/21/2004 Speakers 70.00 211.52

1007 Wasi 4/12/2004 Scanner 17.00 52.01

1008 Salman 12/8/2005 Projector 51.00 154.87

1009 Ali 4/30/2006 Laptop 70.00 212.19

1010 Usto 6/24/2006 Projector 94.00 283.92

1011 Imran 12/10/2004 Laptop 70.00 211.85

1012 Salman 5/13/2005 Printer 89.00 269.19

1013 Imran 10/14/2005 Printer 26.00 79.31

1014 Wasi 12/8/2005 Projector 8.00 26.10

1015 Salman 2/1/2006 Scanner 8.00 26.08

1016 Wasi 10/12/2006 Projector 62.00 187.69

1017 Hamid 8/18/2006 Projector (9.00) (24.82)

1018 Usto 8/22/2004 Scanner 55.00 166.82

1019 Usto 9/2/2004 Speakers 71.00 215.35

1020 Kamran 3/17/2006 Laptop 5.00 17.43

1021 Imran 8/31/2005 Scanner 28.00 86.32

1022 Kamran 5/11/2006 Speakers 95.00 286.93

1023 Ali 9/22/2005 Projector 56.00 169.67

1024 Wasi 10/25/2005 Scanner 79.00 238.72

1025 Wasi 7/29/2005 Projector 10.00 32.24

1026 Usto 9/24/2004 Speakers 69.00 208.62

1027 Imran 3/17/2006 Printer 15.00 46.77

1028 Wasi 2/1/2006 Projector 0.00 1.78

1029 Wasi 7/7/2005 Speakers 78.00 236.10

1030 Usto 5/24/2005 Laptop 89.00 268.45

Page 69: Module 03 Do the Impossible With Array Formulas

1031 Wasi 2/14/2005 Laptop 94.00 284.11

1032 Ali 2/17/2004 Laptop (5.00) (13.09)

1033 Usto 12/6/2006 Printer 42.00 127.95

1034 Kamran 9/20/2006 Projector 9.00 29.03

1035 Kamran 4/10/2005 Scanner 8.00 26.40

1036 Ali 8/11/2004 Scanner 69.00 209.15

1037 Tasawar 10/12/2006 Laptop 2.00 7.73

1038 Wasi 9/24/2004 Projector 3.00 10.49

1039 Kamran 6/15/2005 Speakers 76.00 230.14

1040 Tasawar 6/28/2004 Projector (7.00) (18.43)

1041 Imran 7/5/2006 Laptop 24.00 74.04

1042 Hamid 9/9/2006 Scanner 35.00 106.67

1043 Wasi 3/21/2004 Scanner 23.00 71.10

1044 Usto 4/30/2006 Projector 32.00 97.98

1045 Tasawar 9/2/2004 Laptop 46.00 139.82

1046 Wasi 2/6/2004 Printer 28.00 85.91

1047 Wasi 2/3/2005 Speakers 58.00 176.38

1048 Kamran 11/16/2005 Printer 19.00 59.08

1049 Imran 8/11/2004 Printer 79.00 238.64

1050 Ali 12/10/2004 Laptop 31.00 94.12

1051 Wasi 11/16/2005 Projector 4.00 14.29

1052 Imran 3/28/2006 Scanner 91.00 275.51

1053 Usto 6/15/2005 Printer 51.00 154.75

1054 Kamran 1/15/2004 Projector 2.00 8.34

1055 Hamid 7/7/2005 Speakers 42.00 127.68

1056 Ali 11/18/2004 Printer 57.00 173.10

1057 Imran 9/24/2004 Scanner 63.00 190.21

1058 Ali 5/4/2004 Laptop 37.00 112.97

1059 Ali 3/10/2004 Printer 30.00 92.61

1060 Usto 3/28/2006 Scanner 31.00 95.22

1061 Tasawar 3/10/2004 Projector 55.00 167.33

1062 Hamid 12/19/2005 Projector (5.00) (12.64)

1063 Usto 4/23/2004 Printer 28.00 85.46

1064 Kamran 8/20/2005 Projector 93.00 280.15

1065 Hamid 10/14/2005 Speakers 13.00 40.97

1066 Ali 3/6/2006 Scanner 94.00 283.90

1067 Hamid 3/19/2005 Scanner 1.00 4.86

1068 Wasi 10/3/2005 Scanner 5.00 16.49

1069 Imran 6/2/2006 Laptop 60.00 181.33

1070 Usto 7/20/2004 Printer 67.00 203.02

1071 Usto 12/10/2004 Scanner 87.00 263.52

1072 Usto 11/18/2004 Laptop 53.00 161.07

1073 Hamid 8/9/2005 Printer 74.00 224.20

1074 Ali 11/14/2006 Printer 83.00 251.40

1075 Wasi 10/14/2005 Laptop 45.00 136.79

1076 Hamid 6/28/2004 Printer 36.00 109.96

1077 Usto 12/19/2005 Scanner 82.00 248.20

1078 Salman 8/29/2006 Scanner 18.00 56.51

1079 Kamran 4/12/2004 Scanner 21.00 64.57

1080 Imran 6/26/2005 Scanner 56.00 170.17

1081 Wasi 4/30/2006 Projector 51.00 154.96

1082 Tasawar 3/6/2006 Scanner 88.00 266.15

1083 Kamran 4/21/2005 Projector 93.00 280.96

1084 Salman 9/24/2004 Printer (4.00) (9.80)

1085 Imran 4/21/2005 Projector 30.00 91.84

1086 Hamid 12/19/2005 Scanner 81.00 245.62

1087 Imran 4/21/2005 Scanner 58.00 175.79

1088 Salman 1/4/2004 Laptop 50.00 151.96

1089 Usto 6/28/2004 Printer 92.00 277.65

1090 Salman 11/14/2006 Scanner 27.00 82.12

1091 Usto 8/22/2004 Scanner 61.00 184.45

1092 Imran 7/27/2006 Laptop 7.00 23.20

1093 Ali 12/10/2004 Printer 25.00 76.52

1094 Salman 8/22/2004 Printer 84.00 254.21

1095 Ali 4/1/2004 Projector 66.00 199.92

1096 Kamran 5/4/2004 Projector 89.00 269.23

1097 Tasawar 5/13/2005 Scanner 32.00 97.88

1098 Tasawar 7/5/2006 Printer 78.00 236.26

1099 Kamran 3/17/2006 Speakers 56.00 169.99

1100 Imran 12/28/2006 Scanner 80.00 241.54

1101 Wasi 2/3/2005 Laptop 72.00 218.33

1102 Usto 11/16/2005 Printer 23.00 71.30

1103 Wasi 3/6/2006 Laptop (2.00) (3.69)

1104 Imran 10/5/2004 Printer 81.00 245.37

1105 Kamran 11/5/2005 Speakers (4.00) (10.63)

1106 Ali 1/1/2005 Laptop 81.00 245.47

1107 Imran 3/10/2004 Speakers (9.00) (24.90)

1108 Usto 3/8/2005 Projector 67.00 203.39

1109 Ali 2/3/2005 Laptop 27.00 83.26

1110 Imran 3/6/2006 Laptop (1.00) (1.45)

1111 Salman 8/31/2005 Laptop 24.00 74.45

1112 Usto 2/1/2006 Projector 80.00 241.97

1113 Usto 10/5/2004 Printer 82.00 248.21

1114 Hamid 12/30/2005 Scanner 1.00 5.55

1115 Tasawar 4/12/2004 Scanner 11.00 35.28

1116 Ali 7/16/2006 Laptop 12.00 37.33

1117 Wasi 12/10/2004 Projector 54.00 164.38

1118 Hamid 11/3/2006 Laptop 78.00 236.66

1119 Wasi 2/6/2004 Laptop (8.00) (21.77)

1120 Ali 2/17/2004 Projector 6.00 19.84

1121 Usto 10/5/2004 Scanner 30.00 91.75

1122 Imran 2/1/2006 Printer 55.00 166.81

1123 Wasi 3/28/2006 Projector 53.00 161.24

1124 Salman 2/14/2005 Laptop 29.00 88.93

1125 Ali 4/12/2004 Printer 75.00 227.04

1126 Salman 11/29/2004 Scanner 78.00 235.68

1127 Usto 9/20/2006 Scanner 6.00 20.39

1128 Imran 7/29/2005 Printer 57.00 172.67

1129 Usto 4/10/2005 Projector 35.00 106.53

1130 Wasi 11/14/2006 Projector 72.00 217.37

1131 Hamid 6/17/2004 Laptop 79.00 238.32

1132 Wasi 4/21/2005 Printer 89.00 269.02

1133 Hamid 5/2/2005 Projector 84.00 252.58

1134 Tasawar 9/9/2006 Laptop 43.00 130.66

1135 Kamran 1/21/2006 Printer (4.00) (9.97)

1136 Kamran 1/12/2005 Scanner 51.00 154.66

1137 Ali 5/22/2006 Printer 17.00 53.07

1138 Usto 11/14/2006 Laptop 51.00 155.24

1139 Hamid 3/6/2006 Projector 14.00 44.20

1140 Salman 12/17/2006 Printer 60.00 181.87

1141 Wasi 11/18/2004 Laptop (8.00) (21.98)

1142 Imran 6/26/2005 Scanner 95.00 286.66

1143 Usto 2/1/2006 Scanner 66.00 199.59

1144 Usto 12/21/2004 Printer 77.00 232.63

1145 Usto 12/10/2004 Projector 65.00 197.33

1146 Usto 4/21/2005 Laptop 29.00 89.18

1147 Usto 7/9/2004 Speakers 8.00 26.09

1148 Salman 1/10/2006 Speakers 42.00 127.87

1149 Ali 2/28/2004 Scanner 93.00 280.72

1150 Usto 6/6/2004 Scanner 69.00 209.15

1151 Imran 7/5/2006 Laptop 91.00 274.80

1152 Usto 2/3/2005 Projector 11.00 34.52

1153 Usto 1/1/2005 Printer (1.00) (1.56)

1154 Hamid 12/21/2004 Laptop 52.00 158.21

1155 Ali 3/6/2006 Speakers (10.00) (28.64)

1156 Usto 11/25/2006 Laptop 33.00 100.51

1157 Ali 10/5/2004 Speakers (1.00) (1.12)

1158 Imran 8/29/2006 Laptop 24.00 73.54

1159 Hamid 5/15/2004 Scanner 71.00 214.70

1160 Usto 11/18/2004 Printer 88.00 265.86

1161 Ali 7/29/2005 Printer 16.00 49.99

1162 Wasi 6/15/2005 Scanner 7.00 23.19

1163 Kamran 9/24/2004 Laptop 46.00 140.48

1164 Salman 11/29/2004 Scanner (10.00) (27.58)

1165 Usto 6/24/2006 Printer 83.00 251.13

1166 Hamid 3/17/2006 Printer 85.00 256.23

1167 Usto 9/11/2005 Projector 18.00 56.22

1168 Tasawar 9/24/2004 Speakers 83.00 251.40

1169 Wasi 11/25/2006 Printer 71.00 214.72

1170 Kamran 9/2/2004 Projector 2.00 7.93

1171 Ali 11/14/2006 Scanner 71.00 215.03

1172 Usto 9/22/2005 Speakers 68.00 206.21

1173 Kamran 11/7/2004 Projector 30.00 92.33

1174 Usto 2/1/2006 Speakers 72.00 217.81

1175 Hamid 8/22/2004 Projector 73.00 221.37

1176 Ali 1/21/2006 Printer 28.00 86.47

1177 Wasi 3/17/2006 Laptop 40.00 122.64

1178 Kamran 12/6/2006 Scanner (8.00) (22.30)

1179 Salman 4/10/2005 Speakers 70.00 211.69

1180 Ali 12/19/2005 Projector 3.00 10.72

1181 Ali 12/10/2004 Projector 33.00 100.68

1182 Imran 8/22/2004 Printer 88.00 265.75

1183 Kamran 1/1/2005 Laptop 39.00 119.17

1184 Wasi 6/26/2005 Speakers 64.00 193.64

1185 Hamid 6/24/2006 Printer 0.00 2.13

1186 Tasawar 3/21/2004 Speakers 26.00 80.37

1187 Salman 3/10/2004 Printer 0.00 1.49

1188 Ali 6/13/2006 Scanner 76.00 229.77

1189 Kamran 10/27/2004 Projector 75.00 227.62

1190 Kamran 6/17/2004 Printer 61.00 184.47

1191 Wasi 7/18/2005 Projector (2.00) (4.28)

1192 Usto 2/6/2004 Speakers 40.00 122.55

1193 Imran 2/14/2005 Projector 5.00 17.38

1194 Imran 9/20/2006 Projector 57.00 172.52

1195 Hamid 3/28/2006 Projector 86.00 259.82

1196 Ali 6/17/2004 Speakers 15.00 46.53

1197 Wasi 9/9/2006 Projector 39.00 118.84

1198 Ali 5/4/2004 Scanner 94.00 284.28

1199 Ali 3/28/2006 Printer 78.00 235.95

1200 Wasi 1/21/2006 Projector 65.00 196.95

1201 Salman 12/17/2006 Projector 66.00 199.89

1202 Kamran 5/13/2005 Laptop 84.00 254.10

1203 Ali 3/17/2006 Laptop 35.00 107.42

1204 Tasawar 6/6/2004 Laptop 94.00 284.45

1205 Imran 4/10/2005 Printer 26.00 80.01

1206 Hamid 7/27/2006 Projector 80.00 242.69

1207 Tasawar 5/26/2004 Printer 7.00 22.75

1208 Usto 7/27/2006 Laptop 47.00 142.45

1209 Imran 9/13/2004 Printer 32.00 98.67

1210 Usto 11/27/2005 Printer 8.00 25.40

1211 Salman 7/31/2004 Laptop 33.00 100.91

1212 Hamid 9/2/2004 Projector 22.00 68.44

1213 Wasi 10/25/2005 Printer 81.00 244.70

1214 Wasi 6/13/2006 Speakers 81.00 244.87

1215 Salman 7/31/2004 Scanner 30.00 91.74

1216 Usto 9/13/2004 Printer (1.00) (1.15)

1217 Usto 5/22/2006 Laptop 35.00 106.85

1218 Wasi 3/17/2006 Laptop 78.00 235.96

1219 Ali 8/7/2006 Printer 15.00 47.23

1220 Hamid 1/23/2005 Laptop 75.00 226.88

1221 Kamran 10/12/2006 Projector 12.00 38.14

1222 Tasawar 11/16/2005 Laptop 30.00 91.98

1223 Tasawar 5/13/2005 Projector 42.00 128.05

1224 Kamran 1/4/2004 Projector (8.00) (22.15)

1225 Hamid 4/12/2004 Speakers 93.00 280.74

1226 Usto 8/29/2006 Projector 55.00 167.58

1227 Salman 2/25/2005 Printer 53.00 161.17

1228 Kamran 7/5/2006 Projector 20.00 61.77

1229 Usto 4/21/2005 Speakers 19.00 58.72

1230 Wasi 1/23/2005 Laptop 23.00 70.87

1231 Ali 3/6/2006 Scanner 68.00 205.91

1232 Imran 1/21/2006 Speakers 52.00 157.86

1233 Salman 7/18/2005 Projector 40.00 121.96

1234 Imran 2/23/2006 Laptop 22.00 67.71

1235 Imran 4/10/2005 Speakers 5.00 16.99

1236 Imran 4/8/2006 Laptop 30.00 92.28

1237 Imran 4/1/2004 Projector 6.00 20.24

1238 Hamid 9/24/2004 Speakers 92.00 277.63

1239 Usto 5/22/2006 Laptop (5.00) (12.43)

1240 Tasawar 5/11/2006 Printer 20.00 61.84

1241 Kamran 12/28/2006 Laptop 54.00 163.09

1242 Imran 4/10/2005 Projector 9.00 29.21

1243 Usto 5/13/2005 Projector 6.00 19.96

1244 Kamran 5/4/2004 Printer 47.00 142.83

1245 Salman 11/16/2005 Laptop (10.00) (27.09)

1246 Wasi 5/15/2004 Laptop 90.00 272.34

1247 Ali 2/6/2004 Scanner 48.00 146.43

1248 Kamran 4/10/2005 Scanner 55.00 167.33

1249 Ali 6/24/2006 Laptop 42.00 128.48

1250 Wasi 2/1/2006 Projector 39.00 119.43

1251 Imran 11/16/2005 Laptop 26.00 79.64

1252 Ali 2/12/2006 Laptop 26.00 79.50

1253 Ali 12/19/2005 Projector 52.00 158.28

1254 Imran 11/18/2004 Scanner 19.00 58.77

1255 Salman 8/11/2004 Laptop 18.00 55.68

1256 Usto 11/25/2006 Laptop 87.00 263.04

1257 Imran 10/16/2004 Projector 46.00 139.94

1258 Ali 7/16/2006 Laptop 54.00 163.69

1259 Usto 2/28/2004 Laptop 21.00 64.70

1260 Imran 2/6/2004 Scanner (6.00) (16.24)

1261 Tasawar 11/18/2004 Scanner 47.00 142.41

1262 Hamid 4/23/2004 Scanner 14.00 44.24

1263 Hamid 10/1/2006 Scanner 73.00 220.50

1264 Hamid 12/17/2006 Printer 14.00 44.42

1265 Usto 4/8/2006 Printer 95.00 286.76

1266 Tasawar 2/17/2004 Projector 64.00 193.37

1267 Wasi 10/5/2004 Projector 47.00 143.14

1268 Tasawar 11/29/2004 Scanner 20.00 61.94

1269 Usto 12/21/2004 Printer 71.00 215.33

1270 Tasawar 10/14/2005 Projector 66.00 199.50

1271 Usto 10/5/2004 Scanner 79.00 239.44

1272 Usto 10/25/2005 Laptop (7.00) (18.40)

1273 Ali 10/3/2005 Scanner 72.00 217.35

1274 Usto 10/5/2004 Speakers 91.00 275.37

1275 Imran 3/10/2004 Laptop 57.00 173.48

1276 Wasi 9/24/2004 Scanner (8.00) (21.83)

1277 Tasawar 9/11/2005 Scanner 45.00 136.96

1278 Usto 10/27/2004 Projector 92.00 278.05

1279 Imran 9/2/2004 Laptop 28.00 86.46

1280 Ali 1/23/2005 Speakers 79.00 238.99

1281 Hamid 1/23/2005 Scanner 92.00 277.54

1282 Tasawar 4/23/2004 Laptop 11.00 34.46

1283 Imran 1/23/2005 Projector 23.00 70.70

1284 Ali 4/19/2006 Projector 2.00 8.80

1285 Kamran 1/1/2005 Projector (2.00) (3.45)

1286 Usto 6/4/2005 Printer 33.00 100.69

1287 Kamran 6/24/2006 Laptop 10.00 31.30

1288 Salman 11/29/2004 Speakers 84.00 254.12

1289 Usto 12/21/2004 Laptop 88.00 266.39

Page 70: Module 03 Do the Impossible With Array Formulas

1290 Ali 7/7/2005 Projector 95.00 286.61

1291 Usto 2/14/2005 Laptop 3.00 11.90

1292 Ali 4/30/2006 Printer 72.00 217.58

1293 Wasi 3/8/2005 Projector 58.00 176.65

1294 Salman 6/6/2004 Projector 19.00 59.64

1295 Ali 4/21/2005 Laptop 35.00 106.51

1296 Usto 11/29/2004 Scanner 80.00 242.63

1297 Tasawar 1/26/2004 Projector 26.00 80.05

1298 Usto 7/7/2005 Printer 93.00 280.93

1299 Imran 11/5/2005 Projector 29.00 90.06

1300 Imran 4/23/2004 Scanner 88.00 266.37

1301 Hamid 8/18/2006 Projector 5.00 16.87

1302 Imran 8/9/2005 Laptop 64.00 194.03

1303 Kamran 12/30/2005 Printer 38.00 116.03

1304 Hamid 10/16/2004 Scanner 21.00 65.60

1305 Usto 7/18/2005 Projector 61.00 184.44

1306 Usto 5/4/2004 Projector 53.00 160.80

1307 Ali 2/1/2006 Laptop 28.00 86.32

1308 Usto 8/29/2006 Laptop 39.00 119.49

1309 Usto 11/3/2006 Printer 89.00 268.72

1310 Ali 4/23/2004 Scanner 72.00 218.16

1311 Imran 8/22/2004 Printer 63.00 191.08

1312 Tasawar 12/28/2006 Scanner 47.00 142.15

1313 Salman 7/7/2005 Laptop 8.00 25.62

1314 Ali 11/7/2004 Printer 88.00 265.57

1315 Salman 8/22/2004 Printer 12.00 37.82

1316 Hamid 11/27/2005 Laptop 79.00 239.18

1317 Imran 6/17/2004 Speakers 39.00 118.94

1318 Hamid 2/12/2006 Laptop 61.00 185.06

1319 Hamid 9/20/2006 Printer 12.00 38.28

1320 Usto 11/7/2004 Laptop 25.00 76.65

1321 Wasi 11/27/2005 Scanner 82.00 248.26

1322 Salman 12/21/2004 Laptop 4.00 14.48

1323 Salman 12/17/2006 Speakers 22.00 68.23

1324 Salman 10/1/2006 Laptop 81.00 244.62

1325 Usto 2/25/2005 Projector 34.00 103.85

1326 Salman 11/18/2004 Laptop 89.00 269.74

1327 Usto 2/3/2005 Laptop 6.00 20.31

1328 Hamid 6/26/2005 Projector 78.00 236.00

1329 Wasi 5/13/2005 Printer 9.00 28.85

1330 Tasawar 12/28/2006 Laptop 9.00 29.72

1331 Tasawar 4/19/2006 Scanner 73.00 221.18

1332 Ali 1/15/2004 Printer 13.00 41.92

1333 Imran 3/8/2005 Projector 14.00 44.00

1334 Ali 5/24/2005 Speakers 33.00 100.31

1335 Ali 4/1/2004 Scanner 17.00 53.12

1336 Usto 7/5/2006 Printer 9.00 29.50

1337 Hamid 2/23/2006 Laptop 15.00 47.31

1338 Salman 9/9/2006 Speakers 50.00 152.31

1339 Hamid 11/7/2004 Speakers 13.00 40.56

1340 Usto 9/13/2004 Printer 24.00 74.73

1341 Ali 12/30/2005 Printer 77.00 232.89

1342 Usto 5/11/2006 Laptop 21.00 65.21

1343 Wasi 7/7/2005 Laptop 80.00 240.76

1344 Usto 11/7/2004 Laptop 56.00 170.51

1345 Tasawar 4/10/2005 Scanner 28.00 86.00

1346 Hamid 11/27/2005 Speakers 50.00 151.57

1347 Tasawar 4/10/2005 Projector 23.00 71.41

1348 Hamid 6/6/2004 Printer 77.00 232.85

1349 Ali 2/17/2004 Laptop 56.00 170.26

1350 Wasi 4/19/2006 Printer 26.00 79.76

1351 Salman 2/17/2004 Scanner 18.00 55.93

1352 Tasawar 2/17/2004 Printer 40.00 121.10

1353 Usto 2/17/2004 Laptop 75.00 227.07

1354 Imran 2/25/2005 Speakers 61.00 184.75

1355 Salman 12/21/2004 Speakers 35.00 106.74

1356 Wasi 7/29/2005 Scanner 42.00 127.74

1357 Usto 11/18/2004 Projector 47.00 142.59

1358 Salman 10/16/2004 Laptop 74.00 225.02

1359 Salman 5/24/2005 Laptop 55.00 166.25

1360 Usto 9/22/2005 Printer 87.00 263.11

1361 Salman 6/28/2004 Scanner 75.00 227.33

1362 Kamran 6/13/2006 Scanner 91.00 274.61

1363 Salman 12/19/2005 Printer 79.00 238.21

1364 Wasi 6/17/2004 Laptop 31.00 94.92

1365 Usto 10/5/2004 Projector 36.00 109.87

1366 Hamid 6/28/2004 Laptop 80.00 242.06

1367 Ali 3/17/2006 Printer 32.00 98.11

1368 Usto 6/28/2004 Speakers 29.00 89.17

1369 Usto 5/13/2005 Scanner 64.00 193.52

1370 Tasawar 3/10/2004 Printer 27.00 83.67

1371 Wasi 9/24/2004 Printer 36.00 109.81

1372 Ali 12/6/2006 Laptop 36.00 109.46

1373 Hamid 10/23/2006 Laptop 32.00 97.34

1374 Tasawar 8/29/2006 Laptop 9.00 29.17

1375 Usto 5/22/2006 Scanner 78.00 235.64

1376 Usto 1/23/2005 Speakers 55.00 167.69

1377 Usto 8/22/2004 Laptop 79.00 239.26

1378 Usto 1/4/2004 Projector 9.00 29.37

1379 Ali 12/17/2006 Scanner 4.00 14.28

1380 Usto 4/19/2006 Laptop 6.00 20.17

1381 Wasi 5/24/2005 Projector 18.00 55.92

1382 Usto 10/25/2005 Projector 14.00 44.49

1383 Tasawar 8/18/2006 Printer 91.00 275.50

1384 Usto 12/8/2005 Projector 74.00 224.07

1385 Ali 7/31/2004 Printer 47.00 143.86

1386 Imran 11/3/2006 Scanner 28.00 86.47

1387 Imran 9/20/2006 Projector 21.00 64.78

1388 Tasawar 3/30/2005 Scanner 52.00 157.69

1389 Usto 6/28/2004 Speakers 33.00 101.09

1390 Imran 2/6/2004 Laptop (7.00) (19.44)

1391 Tasawar 4/1/2004 Printer 12.00 38.24

1392 Usto 2/28/2004 Projector 1.00 4.50

1393 Ali 1/26/2004 Laptop 56.00 169.76

1394 Tasawar 6/26/2005 Scanner 34.00 104.48

1395 Wasi 2/25/2005 Scanner 83.00 250.39

1396 Imran 3/19/2005 Projector (4.00) (10.16)

1397 Tasawar 2/3/2005 Scanner 9.00 29.70

1398 Usto 5/15/2004 Projector 64.00 193.99

1399 Wasi 5/15/2004 Printer 13.00 40.95

1400 Usto 4/23/2004 Printer 9.00 28.68

1401 Kamran 9/20/2006 Printer 6.00 19.55

1402 Salman 5/22/2006 Scanner 55.00 167.09

1403 Hamid 6/2/2006 Speakers 64.00 194.83

1404 Ali 6/15/2005 Printer 27.00 82.65

1405 Hamid 10/16/2004 Printer 4.00 14.36

1406 Wasi 11/5/2005 Printer 17.00 53.45

1407 Salman 8/18/2006 Printer 24.00 74.29

1408 Kamran 12/8/2005 Printer 87.00 262.88

1409 Usto 11/18/2004 Laptop 10.00 31.76

1410 Tasawar 10/16/2004 Laptop 0.00 1.83

1411 Tasawar 1/23/2005 Printer 73.00 221.01

1412 Usto 3/21/2004 Printer 66.00 200.12

1413 Ali 8/18/2006 Printer 70.00 211.75

1414 Usto 12/10/2004 Scanner 78.00 235.91

1415 Hamid 11/5/2005 Laptop 22.00 66.97

1416 Kamran 10/5/2004 Laptop 21.00 65.22

1417 Ali 10/16/2004 Printer 8.00 25.82

1418 Salman 2/17/2004 Laptop 62.00 187.80

1419 Imran 5/11/2006 Laptop 81.00 244.51

1420 Usto 12/21/2004 Printer 72.00 218.17

1421 Usto 10/12/2006 Projector 13.00 41.36

1422 Ali 8/31/2005 Speakers 52.00 157.42

1423 Tasawar 1/21/2006 Projector 49.00 148.11

1424 Tasawar 3/21/2004 Projector 82.00 248.17

1425 Usto 4/8/2006 Projector 5.00 17.02

1426 Hamid 9/22/2005 Laptop 45.00 136.86

1427 Kamran 12/8/2005 Laptop (10.00) (27.35)

1428 Salman 12/6/2006 Projector 53.00 160.85

1429 Usto 3/30/2005 Speakers 24.00 73.62

1430 Tasawar 7/16/2006 Printer 27.00 83.23

1431 Hamid 4/30/2006 Scanner 52.00 158.63

1432 Usto 10/23/2006 Scanner 0.00 1.78

1433 Tasawar 6/17/2004 Laptop 92.00 278.65

1434 Kamran 10/23/2006 Laptop 22.00 67.71

1435 Wasi 4/30/2006 Projector 67.00 202.90

1436 Usto 10/14/2005 Laptop 7.00 23.03

1437 Wasi 5/15/2004 Projector (10.00) (27.96)

1438 Imran 8/18/2006 Laptop 10.00 31.67

1439 Tasawar 6/26/2005 Scanner 15.00 46.48

1440 Salman 6/26/2005 Speakers 0.00 2.13

1441 Usto 3/17/2006 Scanner 93.00 280.91

1442 Usto 1/21/2006 Scanner 57.00 172.62

1443 Tasawar 9/24/2004 Printer 69.00 208.77

1444 Wasi 12/30/2005 Scanner 53.00 161.65

1445 Salman 10/23/2006 Speakers 67.00 203.57

1446 Wasi 4/1/2004 Projector 23.00 70.71

1447 Imran 6/17/2004 Laptop 43.00 131.16

1448 Hamid 10/23/2006 Printer 69.00 209.40

1449 Usto 10/1/2006 Speakers 45.00 136.50

1450 Usto 11/5/2005 Projector 70.00 211.70

1451 Imran 10/23/2006 Laptop 91.00 274.50

1452 Kamran 12/17/2006 Laptop 33.00 100.48

1453 Imran 8/7/2006 Scanner 90.00 272.36

1454 Imran 12/21/2004 Laptop 17.00 52.52

1455 Usto 7/31/2004 Projector (7.00) (18.92)

1456 Salman 9/2/2004 Laptop 21.00 64.91

1457 Hamid 8/9/2005 Scanner 14.00 44.33

1458 Usto 4/19/2006 Speakers 84.00 254.27

1459 Tasawar 1/21/2006 Speakers 92.00 278.13

1460 Usto 10/23/2006 Printer (1.00) (0.13)

1461 Usto 5/13/2005 Printer 73.00 222.09

1462 Wasi 1/10/2006 Scanner 48.00 146.42

1463 Wasi 12/10/2004 Projector 72.00 217.08

1464 Ali 7/5/2006 Scanner 42.00 127.61

1465 Usto 12/21/2004 Scanner 80.00 242.21

1466 Usto 8/31/2005 Scanner 56.00 170.86

1467 Hamid 1/26/2004 Laptop 46.00 140.58

1468 Ali 6/2/2006 Projector 45.00 136.77

1469 Salman 6/4/2005 Scanner 53.00 160.40

1470 Salman 10/3/2005 Projector 51.00 155.05

1471 Tasawar 12/19/2005 Laptop 64.00 193.30

1472 Ali 11/7/2004 Projector 15.00 47.09

1473 Usto 4/1/2004 Speakers 33.00 101.70

1474 Kamran 5/11/2006 Projector 31.00 95.05

1475 Salman 12/19/2005 Speakers 51.00 155.18

1476 Tasawar 8/18/2006 Scanner (7.00) (18.64)

1477 Salman 5/13/2005 Projector 37.00 112.07

1478 Ali 6/15/2005 Scanner 43.00 130.97

1479 Wasi 5/22/2006 Laptop 63.00 190.69

1480 Imran 7/9/2004 Projector 29.00 89.59

1481 Wasi 12/8/2005 Laptop 20.00 61.94

1482 Kamran 3/28/2006 Projector 48.00 146.44

1483 Ali 7/29/2005 Projector 94.00 284.31

1484 Ali 9/9/2006 Scanner 41.00 124.88

1485 Ali 1/23/2005 Projector 45.00 137.55

1486 Hamid 5/13/2005 Printer 69.00 208.61

1487 Salman 4/1/2004 Laptop 48.00 146.17

1488 Tasawar 1/23/2005 Laptop 38.00 115.70

1489 Ali 1/21/2006 Printer 49.00 149.11

1490 Imran 9/2/2004 Scanner 79.00 239.15

1491 Salman 7/18/2005 Scanner 93.00 281.34

1492 Imran 12/21/2004 Scanner 67.00 202.44

1493 Ali 5/22/2006 Scanner 13.00 41.32

1494 Salman 10/14/2005 Printer 71.00 215.36

1495 Ali 10/23/2006 Scanner 15.00 46.39

1496 Usto 9/11/2005 Projector 89.00 269.12

1497 Usto 10/25/2005 Laptop 65.00 197.50

1498 Usto 12/21/2004 Projector 16.00 49.98

1499 Ali 6/2/2006 Printer 48.00 146.13

1500 Usto 8/31/2005 Projector 78.00 235.94

1501 Wasi 1/26/2004 Printer 5.00 17.19

1502 Kamran 1/10/2006 Printer 33.00 101.71

1503 Salman 3/28/2006 Scanner 73.00 220.63

1504 Ali 7/20/2004 Laptop 93.00 280.86

1505 Ali 12/30/2005 Scanner 37.00 113.24

1506 Imran 7/29/2005 Printer 23.00 70.34

1507 Imran 11/27/2005 Printer (3.00) (7.21)

1508 Hamid 2/23/2006 Projector 39.00 118.96

1509 Ali 4/30/2006 Projector 83.00 251.40

1510 Kamran 8/29/2006 Scanner 65.00 197.81

1511 Ali 11/29/2004 Printer 13.00 41.74

1512 Kamran 11/16/2005 Scanner 9.00 28.86

1513 Tasawar 12/17/2006 Projector (4.00) (10.35)

1514 Salman 10/27/2004 Laptop 22.00 67.75

1515 Usto 3/30/2005 Laptop (3.00) (6.89)

1516 Imran 7/31/2004 Laptop 58.00 176.20

1517 Tasawar 8/22/2004 Projector 65.00 196.64

1518 Imran 6/28/2004 Projector 9.00 28.46

1519 Kamran 10/23/2006 Speakers 18.00 56.30

1520 Usto 5/4/2004 Scanner 55.00 166.78

1521 Tasawar 1/12/2005 Projector 69.00 209.57

1522 Usto 4/12/2004 Projector 51.00 155.56

1523 Salman 1/21/2006 Speakers 23.00 71.15

1524 Ali 4/19/2006 Printer 38.00 115.81

1525 Usto 11/29/2004 Speakers (8.00) (22.29)

1526 Usto 10/23/2006 Projector 20.00 61.78

1527 Tasawar 7/7/2005 Printer 25.00 76.80

1528 Ali 10/23/2006 Projector (6.00) (16.11)

1529 Usto 7/27/2006 Printer 88.00 266.77

1530 Hamid 5/22/2006 Projector 62.00 187.54

1531 Usto 1/4/2004 Speakers 80.00 242.16

1532 Wasi 3/10/2004 Speakers 66.00 199.70

1533 Kamran 11/7/2004 Scanner 34.00 104.45

1534 Usto 12/10/2004 Projector 49.00 149.82

1535 Wasi 7/20/2004 Printer 45.00 136.92

1536 Tasawar 12/19/2005 Scanner 16.00 49.65

1537 Hamid 8/20/2005 Speakers 45.00 136.64

1538 Salman 6/17/2004 Projector 1.00 5.73

1539 Wasi 7/29/2005 Laptop 33.00 100.97

1540 Usto 8/31/2005 Speakers 37.00 113.04

1541 Salman 7/7/2005 Projector 46.00 139.34

1542 Ali 2/6/2004 Scanner 71.00 215.35

1543 Usto 11/29/2004 Laptop 59.00 179.12

1544 Usto 4/21/2005 Speakers 84.00 253.54

1545 Usto 6/24/2006 Projector 91.00 274.23

1546 Tasawar 3/10/2004 Printer 33.00 100.23

1547 Wasi 12/21/2004 Projector 34.00 104.04

1548 Usto 10/23/2006 Printer 1.00 5.32

Page 71: Module 03 Do the Impossible With Array Formulas

1549 Usto 2/28/2004 Projector 42.00 128.73

1550 Wasi 12/19/2005 Projector 45.00 137.93

1551 Kamran 10/16/2004 Printer 26.00 80.03

1552 Salman 1/26/2004 Projector 72.00 218.33

1553 Usto 7/27/2006 Projector (5.00) (13.39)

1554 Imran 3/21/2004 Scanner 31.00 94.66

1555 Wasi 1/4/2004 Printer 48.00 145.91

1556 Imran 11/3/2006 Laptop 84.00 253.60

1557 Usto 2/23/2006 Projector 54.00 163.90

1558 Imran 1/15/2004 Laptop 44.00 134.19

1559 Tasawar 10/27/2004 Printer 40.00 122.05

1560 Ali 8/31/2005 Printer 25.00 76.90

1561 Kamran 2/28/2004 Printer (8.00) (21.48)

1562 Tasawar 5/11/2006 Projector 59.00 178.70

1563 Usto 12/21/2004 Projector 59.00 179.10

1564 Kamran 11/16/2005 Scanner 34.00 103.72

1565 Kamran 11/29/2004 Laptop 27.00 82.68

1566 Wasi 10/23/2006 Scanner 3.00 10.70

1567 Usto 8/20/2005 Laptop 89.00 269.12

1568 Usto 5/13/2005 Projector 58.00 175.98

1569 Wasi 1/12/2005 Speakers 52.00 158.05

1570 Wasi 7/27/2006 Laptop 32.00 98.05

1571 Tasawar 9/11/2005 Laptop 3.00 10.58

1572 Usto 11/18/2004 Projector 45.00 137.08

1573 Imran 11/29/2004 Projector 91.00 275.56

1574 Usto 2/12/2006 Scanner (8.00) (21.45)

1575 Ali 3/19/2005 Laptop (7.00) (19.14)

1576 Usto 11/5/2005 Scanner 33.00 100.89

1577 Imran 5/13/2005 Printer (7.00) (18.81)

1578 Imran 10/12/2006 Scanner 82.00 248.43

1579 Salman 6/6/2004 Projector 87.00 262.85

1580 Wasi 2/14/2005 Laptop 93.00 281.53

1581 Tasawar 10/14/2005 Scanner 72.00 218.17

1582 Hamid 10/16/2004 Laptop 11.00 35.12

1583 Imran 7/16/2006 Printer 18.00 55.78

1584 Ali 8/18/2006 Scanner 93.00 281.26

1585 Usto 8/20/2005 Scanner 56.00 170.43

1586 Salman 9/24/2004 Printer 66.00 199.70

1587 Salman 1/12/2005 Printer 95.00 286.76

1588 Usto 7/7/2005 Laptop 61.00 184.84

1589 Imran 7/16/2006 Printer 26.00 79.32

1590 Kamran 12/8/2005 Laptop 29.00 89.12

1591 Kamran 2/14/2005 Printer 61.00 184.79

1592 Usto 6/13/2006 Laptop (3.00) (7.01)

1593 Wasi 1/10/2006 Scanner 40.00 122.05

1594 Usto 7/16/2006 Scanner 86.00 260.37

1595 Wasi 6/4/2005 Speakers 58.00 176.58

1596 Usto 2/14/2005 Projector 13.00 41.16

1597 Wasi 12/28/2006 Projector 14.00 44.43

1598 Kamran 4/21/2005 Laptop 85.00 256.68

1599 Tasawar 2/1/2006 Printer 42.00 127.60

1600 Wasi 11/14/2006 Speakers 11.00 35.43

1601 Hamid 1/26/2004 Printer 32.00 98.41

1602 Usto 1/23/2005 Printer 79.00 239.26

1603 Kamran 6/17/2004 Printer 25.00 77.05

1604 Tasawar 11/27/2005 Scanner 94.00 284.06

1605 Imran 11/14/2006 Projector 6.00 20.06

1606 Usto 6/15/2005 Speakers 15.00 46.57

1607 Tasawar 6/28/2004 Projector 15.00 47.25

1608 Kamran 3/10/2004 Scanner 81.00 244.71

1609 Ali 4/10/2005 Projector 94.00 283.46

1610 Usto 1/15/2004 Laptop 11.00 35.19

1611 Imran 4/1/2004 Projector 12.00 38.18

1612 Usto 8/31/2005 Projector 85.00 257.14

1613 Usto 11/25/2006 Projector 39.00 119.06

1614 Usto 7/9/2004 Scanner 9.00 29.11

1615 Usto 2/3/2005 Laptop 25.00 77.54

1616 Hamid 6/6/2004 Projector 79.00 239.89

1617 Usto 5/26/2004 Projector 83.00 250.62

1618 Usto 12/8/2005 Scanner (3.00) (6.44)

1619 Wasi 2/23/2006 Laptop 62.00 188.24

1620 Wasi 2/6/2004 Projector 6.00 19.32

1621 Salman 4/8/2006 Laptop 13.00 41.39

1622 Kamran 9/22/2005 Projector 88.00 266.15

1623 Kamran 4/12/2004 Projector 35.00 106.70

1624 Tasawar 10/16/2004 Projector 61.00 185.38

1625 Usto 7/29/2005 Projector 95.00 287.15

1626 Kamran 1/1/2005 Projector 30.00 92.42

1627 Kamran 7/16/2006 Projector (1.00) (1.64)

1628 Ali 1/1/2005 Speakers 5.00 16.93

1629 Ali 3/8/2005 Scanner 42.00 127.32

1630 Usto 5/2/2005 Projector 14.00 44.54

1631 Tasawar 8/9/2005 Projector (4.00) (10.01)

1632 Wasi 1/21/2006 Scanner 27.00 82.26

1633 Wasi 5/4/2004 Laptop 5.00 17.11

1634 Salman 3/19/2005 Laptop 57.00 173.30

1635 Usto 10/5/2004 Printer 78.00 235.61

1636 Wasi 9/9/2006 Laptop 11.00 35.30

1637 Tasawar 10/5/2004 Printer 55.00 166.93

1638 Salman 10/5/2004 Laptop 15.00 46.99

1639 Tasawar 2/6/2004 Projector 53.00 161.39

1640 Usto 8/20/2005 Printer 70.00 212.01

1641 Wasi 8/18/2006 Scanner 56.00 170.03

1642 Usto 5/22/2006 Projector 91.00 275.47

1643 Hamid 12/21/2004 Speakers 55.00 167.81

1644 Tasawar 10/25/2005 Laptop 1.00 4.71

1645 Tasawar 2/3/2005 Projector 23.00 70.74

1646 Usto 12/19/2005 Printer 0.00 2.30

1647 Tasawar 12/21/2004 Laptop 86.00 259.96

1648 Imran 4/1/2004 Projector 13.00 40.99

1649 Salman 4/19/2006 Laptop 54.00 163.69

1650 Imran 3/10/2004 Laptop 82.00 247.66

1651 Kamran 2/14/2005 Scanner 27.00 82.65

1652 Usto 10/12/2006 Speakers 84.00 254.58

1653 Salman 5/4/2004 Projector 56.00 170.25

1654 Ali 2/28/2004 Speakers 92.00 277.27

1655 Ali 1/15/2004 Printer 25.00 77.55

1656 Ali 1/1/2005 Projector 67.00 203.00

1657 Wasi 4/12/2004 Speakers 75.00 226.86

1658 Kamran 9/22/2005 Projector 14.00 44.14

1659 Tasawar 12/19/2005 Printer 48.00 145.81

1660 Imran 5/15/2004 Scanner 73.00 221.17

1661 Usto 6/4/2005 Scanner 28.00 85.65

1662 Salman 11/27/2005 Projector 12.00 38.54

1663 Wasi 5/2/2005 Printer 50.00 152.11

1664 Tasawar 10/1/2006 Scanner (5.00) (12.64)

1665 Usto 1/23/2005 Printer 6.00 19.48

1666 Usto 2/25/2005 Scanner 63.00 190.57

1667 Kamran 6/13/2006 Scanner 33.00 100.75

1668 Wasi 9/24/2004 Projector 61.00 185.17

1669 Imran 12/10/2004 Scanner 16.00 50.71

1670 Hamid 6/2/2006 Projector 15.00 47.14

1671 Imran 7/27/2006 Projector (1.00) (0.60)

1672 Usto 6/4/2005 Printer 28.00 85.36

1673 Hamid 10/1/2006 Scanner 74.00 223.54

1674 Kamran 4/12/2004 Printer 60.00 182.53

1675 Tasawar 5/2/2005 Laptop 26.00 79.64

1676 Usto 2/28/2004 Scanner 41.00 124.81

1677 Salman 5/15/2004 Printer (1.00) (0.73)

1678 Salman 7/5/2006 Printer 89.00 268.72

1679 Usto 6/6/2004 Laptop 12.00 38.03

1680 Tasawar 10/16/2004 Projector 21.00 65.91

1681 Hamid 6/24/2006 Laptop 23.00 71.52

1682 Wasi 3/30/2005 Scanner (7.00) (18.64)

1683 Ali 3/10/2004 Scanner 35.00 106.65

1684 Salman 9/13/2004 Laptop 94.00 283.80

1685 Salman 11/5/2005 Projector 88.00 265.96

1686 Salman 3/10/2004 Speakers 26.00 79.80

1687 Wasi 7/9/2004 Scanner 83.00 250.99

1688 Kamran 6/2/2006 Laptop 11.00 34.68

1689 Imran 9/20/2006 Scanner 18.00 56.57

1690 Usto 3/19/2005 Projector 90.00 272.36

1691 Imran 10/3/2005 Laptop 12.00 38.36

1692 Imran 1/26/2004 Printer 39.00 118.64

1693 Imran 2/17/2004 Speakers 45.00 137.71

1694 Usto 12/6/2006 Scanner 74.00 223.24

1695 Imran 7/18/2005 Scanner 95.00 286.98

1696 Usto 6/6/2004 Printer 48.00 145.48

1697 Ali 10/16/2004 Laptop (3.00) (7.06)

1698 Tasawar 5/24/2005 Speakers 92.00 278.52

1699 Usto 3/8/2005 Laptop 17.00 53.28

1700 Usto 10/27/2004 Printer 45.00 136.31

1701 Tasawar 10/12/2006 Speakers 62.00 187.97

1702 Usto 10/27/2004 Scanner 52.00 158.05

1703 Usto 5/26/2004 Speakers 73.00 221.24

1704 Wasi 7/18/2005 Speakers 38.00 116.54

1705 Usto 12/19/2005 Projector 0.00 1.71

1706 Hamid 10/16/2004 Projector 70.00 211.81

1707 Wasi 5/13/2005 Scanner (8.00) (22.16)

1708 Wasi 4/30/2006 Projector 65.00 196.95

1709 Wasi 11/25/2006 Printer (5.00) (12.24)

1710 Wasi 7/29/2005 Scanner 34.00 104.46

1711 Imran 3/28/2006 Printer 72.00 217.89

1712 Hamid 2/3/2005 Projector (1.00) (0.65)

1713 Kamran 12/8/2005 Printer 40.00 122.14

1714 Usto 9/9/2006 Laptop 65.00 196.70

1715 Wasi 7/5/2006 Printer 77.00 232.42

1716 Hamid 4/19/2006 Laptop 51.00 155.00

1717 Usto 4/10/2005 Scanner (9.00) (25.10)

1718 Hamid 3/30/2005 Laptop 17.00 52.73

1719 Salman 4/10/2005 Projector 11.00 34.81

1720 Kamran 6/24/2006 Printer 40.00 121.65

1721 Salman 8/20/2005 Scanner 67.00 202.72

1722 Wasi 7/29/2005 Speakers 79.00 239.25

1723 Usto 5/15/2004 Scanner (7.00) (19.16)

1724 Usto 5/24/2005 Laptop 72.00 218.06

1725 Imran 7/29/2005 Projector 53.00 160.77

1726 Kamran 7/5/2006 Projector 35.00 107.41

1727 Salman 11/3/2006 Printer 39.00 118.67

1728 Imran 7/9/2004 Laptop (7.00) (19.35)

1729 Tasawar 6/17/2004 Projector 68.00 206.34

1730 Kamran 10/27/2004 Projector 86.00 260.29

1731 Ali 8/31/2005 Speakers 84.00 254.78

1732 Tasawar 11/25/2006 Laptop 6.00 19.97

1733 Ali 1/10/2006 Speakers (5.00) (12.77)

1734 Tasawar 4/8/2006 Printer 22.00 67.94

1735 Ali 12/8/2005 Projector 29.00 89.11

1736 Wasi 11/7/2004 Printer 3.00 10.89

1737 Salman 3/28/2006 Projector 88.00 265.53

1738 Kamran 2/25/2005 Projector 41.00 124.99

1739 Hamid 2/14/2005 Scanner 59.00 178.84

1740 Hamid 10/5/2004 Laptop 29.00 89.26

1741 Salman 2/17/2004 Laptop 43.00 130.30

1742 Wasi 4/19/2006 Printer 75.00 227.52

1743 Ali 8/22/2004 Laptop 40.00 121.71

1744 Wasi 11/18/2004 Laptop 78.00 235.89

1745 Usto 3/19/2005 Projector 38.00 115.80

1746 Kamran 6/4/2005 Laptop (3.00) (6.35)

1747 Usto 4/23/2004 Scanner 34.00 103.90

1748 Salman 5/4/2004 Projector 85.00 256.45

1749 Tasawar 11/16/2005 Scanner 70.00 212.03

1750 Kamran 11/3/2006 Projector 86.00 259.76

1751 Wasi 12/17/2006 Scanner 47.00 142.93

1752 Imran 6/13/2006 Speakers 20.00 62.60

1753 Hamid 5/15/2004 Laptop 33.00 101.42

1754 Tasawar 11/7/2004 Laptop (10.00) (27.87)

1755 Wasi 12/6/2006 Printer 40.00 122.40

1756 Kamran 7/20/2004 Scanner 13.00 40.44

1757 Salman 8/29/2006 Printer 20.00 62.16

1758 Kamran 2/28/2004 Projector 22.00 68.78

1759 Usto 9/11/2005 Scanner 91.00 275.56

1760 Ali 5/11/2006 Printer 17.00 53.54

1761 Usto 11/7/2004 Printer 77.00 232.78

1762 Tasawar 12/6/2006 Laptop 8.00 25.17

1763 Salman 8/20/2005 Projector (1.00) (0.69)

1764 Usto 6/4/2005 Printer 52.00 158.07

1765 Wasi 8/31/2005 Laptop 50.00 152.60

1766 Wasi 6/24/2006 Scanner 69.00 209.27

1767 Kamran 6/2/2006 Laptop (10.00) (28.43)

1768 Usto 9/13/2004 Scanner (10.00) (27.79)

1769 Hamid 10/25/2005 Laptop 90.00 272.47

1770 Salman 11/14/2006 Scanner (4.00) (9.80)

1771 Ali 8/18/2006 Printer 14.00 44.07

1772 Kamran 12/19/2005 Printer 13.00 41.65

1773 Imran 7/20/2004 Scanner (10.00) (27.45)

1774 Wasi 2/14/2005 Scanner 81.00 244.96

1775 Ali 1/1/2005 Scanner 91.00 274.02

1776 Tasawar 12/21/2004 Printer 7.00 23.10

1777 Ali 12/19/2005 Projector 95.00 286.41

1778 Imran 3/17/2006 Laptop 7.00 23.46

1779 Kamran 4/10/2005 Laptop 9.00 29.50

1780 Kamran 5/4/2004 Scanner 16.00 50.32

1781 Salman 2/25/2005 Printer 37.00 112.64

1782 Wasi 10/1/2006 Printer 38.00 115.87

1783 Ali 9/20/2006 Speakers 43.00 130.38

1784 Wasi 7/5/2006 Laptop (5.00) (12.65)

1785 Kamran 11/14/2006 Projector 9.00 28.95

1786 Ali 1/10/2006 Printer (9.00) (24.65)

1787 Hamid 8/31/2005 Speakers 24.00 74.61

1788 Wasi 5/4/2004 Printer 30.00 91.37

1789 Tasawar 12/8/2005 Printer 83.00 250.85

1790 Kamran 3/21/2004 Printer 90.00 271.87

1791 Imran 3/30/2005 Projector 82.00 248.23

1792 Usto 10/25/2005 Projector 51.00 155.23

1793 Wasi 1/4/2004 Printer 66.00 200.13

1794 Kamran 12/30/2005 Laptop 29.00 89.02

1795 Salman 10/3/2005 Printer 93.00 280.87

1796 Hamid 10/12/2006 Projector (3.00) (6.54)

1797 Salman 9/9/2006 Printer (2.00) (3.64)

1798 Tasawar 10/5/2004 Speakers 79.00 239.25

1799 Ali 12/28/2006 Printer 31.00 94.72

1800 Usto 5/13/2005 Scanner 46.00 140.22

1801 Kamran 12/28/2006 Scanner 93.00 281.79

1802 Kamran 3/10/2004 Printer 82.00 247.02

1803 Wasi 12/6/2006 Speakers 87.00 263.72

1804 Salman 12/10/2004 Scanner 62.00 187.57

1805 Tasawar 12/21/2004 Scanner 31.00 94.57

1806 Salman 8/11/2004 Laptop 43.00 131.33

1807 Tasawar 11/7/2004 Printer 78.00 236.44

Page 72: Module 03 Do the Impossible With Array Formulas

1808 Tasawar 7/31/2004 Printer (1.00) (0.44)

1809 Usto 3/10/2004 Speakers 5.00 17.47

1810 Tasawar 5/22/2006 Speakers 30.00 92.31

1811 Usto 4/19/2006 Projector 65.00 197.18

1812 Wasi 5/11/2006 Laptop 14.00 43.80

1813 Wasi 11/27/2005 Scanner 10.00 31.26

1814 Ali 3/10/2004 Speakers 31.00 94.73

1815 Ali 4/19/2006 Laptop 25.00 77.10

1816 Ali 3/19/2005 Speakers 11.00 35.30

1817 Ali 1/15/2004 Scanner 62.00 187.51

1818 Salman 1/26/2004 Scanner 4.00 14.19

1819 Usto 9/9/2006 Projector 4.00 13.71

1820 Tasawar 11/27/2005 Printer 71.00 215.12

1821 Hamid 5/22/2006 Speakers 67.00 203.18

1822 Kamran 4/21/2005 Printer 19.00 59.45

1823 Wasi 6/26/2005 Printer 12.00 37.63

1824 Usto 6/24/2006 Printer 50.00 151.67

1825 Ali 2/12/2006 Speakers 73.00 221.23

1826 Wasi 8/18/2006 Speakers 30.00 91.69

1827 Salman 9/13/2004 Laptop 19.00 59.10

1828 Hamid 6/4/2005 Projector 48.00 145.22

1829 Usto 5/22/2006 Laptop (8.00) (21.60)

1830 Wasi 8/18/2006 Printer (8.00) (22.14)

1831 Wasi 3/30/2005 Printer 28.00 85.91

1832 Usto 9/22/2005 Laptop 81.00 245.21

1833 Usto 1/12/2005 Printer 12.00 37.99

1834 Usto 3/6/2006 Projector 54.00 164.03

1835 Usto 5/24/2005 Scanner 70.00 212.31

1836 Usto 8/9/2005 Projector 89.00 269.07

1837 Tasawar 9/11/2005 Scanner 10.00 32.27

1838 Ali 1/4/2004 Scanner 52.00 158.18

1839 Tasawar 7/7/2005 Laptop 85.00 257.82

1840 Salman 6/26/2005 Scanner 31.00 93.98

1841 Kamran 3/17/2006 Laptop 36.00 110.03

1842 Imran 4/12/2004 Printer 80.00 241.83

1843 Imran 7/29/2005 Laptop 27.00 82.46

1844 Tasawar 5/4/2004 Scanner 46.00 140.39

1845 Tasawar 7/20/2004 Scanner 29.00 89.58

1846 Hamid 2/12/2006 Printer 55.00 167.04

1847 Kamran 9/13/2004 Laptop 2.00 7.32

1848 Ali 6/24/2006 Scanner 60.00 182.39

1849 Usto 7/29/2005 Printer 12.00 37.85

1850 Hamid 5/15/2004 Laptop 52.00 157.88

1851 Salman 4/23/2004 Printer 37.00 113.27

1852 Salman 9/24/2004 Speakers 36.00 110.52

1853 Wasi 4/23/2004 Printer 87.00 262.81

1854 Tasawar 2/1/2006 Laptop 16.00 50.28

1855 Kamran 7/18/2005 Printer 50.00 152.13

1856 Usto 2/1/2006 Laptop 53.00 160.63

1857 Wasi 5/26/2004 Scanner 61.00 184.76

1858 Salman 7/7/2005 Scanner 95.00 286.83

1859 Imran 8/22/2004 Speakers (6.00) (16.59)

1860 Kamran 8/11/2004 Printer (9.00) (24.76)

1861 Tasawar 3/17/2006 Projector 74.00 223.83

1862 Usto 12/8/2005 Printer 18.00 55.52

1863 Usto 3/6/2006 Projector 73.00 220.67

1864 Kamran 12/10/2004 Projector 62.00 188.43

1865 Imran 7/5/2006 Scanner (2.00) (3.59)

1866 Tasawar 10/1/2006 Scanner (7.00) (18.94)

1867 Tasawar 8/18/2006 Laptop 73.00 220.77

1868 Usto 4/10/2005 Projector 24.00 73.59

1869 Ali 10/3/2005 Speakers 18.00 56.08

1870 Usto 11/25/2006 Laptop 49.00 149.40

1871 Wasi 1/1/2005 Laptop 21.00 64.68

1872 Imran 5/15/2004 Scanner 2.00 7.99

1873 Wasi 11/18/2004 Scanner 83.00 250.88

1874 Imran 1/1/2005 Printer 63.00 191.15

1875 Tasawar 2/28/2004 Speakers 54.00 163.87

1876 Imran 9/13/2004 Printer 19.00 59.72

1877 Wasi 9/13/2004 Projector 66.00 199.36

1878 Ali 5/26/2004 Printer 60.00 182.28

1879 Salman 8/18/2006 Projector 90.00 271.85

1880 Kamran 12/17/2006 Printer 59.00 178.65

1881 Kamran 10/3/2005 Scanner 0.00 2.66

1882 Hamid 3/21/2004 Scanner 72.00 217.90

1883 Ali 7/20/2004 Printer (6.00) (15.74)

1884 Usto 5/22/2006 Printer 89.00 269.40

1885 Salman 5/11/2006 Printer 12.00 37.84

1886 Tasawar 8/9/2005 Laptop 89.00 269.15

1887 Usto 4/21/2005 Printer 61.00 185.31

1888 Imran 7/18/2005 Projector 24.00 73.81

1889 Kamran 11/25/2006 Projector 76.00 229.92

1890 Wasi 6/15/2005 Scanner 16.00 49.75

1891 Ali 4/10/2005 Scanner 39.00 119.19

1892 Wasi 2/23/2006 Laptop 92.00 278.43

1893 Wasi 7/31/2004 Scanner 20.00 61.92

1894 Imran 5/15/2004 Printer 60.00 181.87

1895 Kamran 11/27/2005 Projector 15.00 47.16

1896 Salman 2/14/2005 Scanner 36.00 109.84

1897 Imran 11/5/2005 Printer 46.00 140.41

1898 Usto 1/15/2004 Speakers 72.00 217.84

1899 Usto 11/3/2006 Projector 28.00 85.66

1900 Tasawar 6/13/2006 Projector 54.00 164.49

Page 73: Module 03 Do the Impossible With Array Formulas

Summing Values For Multiple Criterion with ARRAY Formula Summing Values For Multiple Criterion with SUMIFS

2005 Products Dollars Trans Number Name Date Product Units Dollars Year 2005 Products Dollars

EmpName Printer Scanner Speakers Projector Laptop Total 1 Ali 4/1/2004 Printer 45.00 137.20 EmpName Printer Scanner Speakers Projector Laptop Total Ali - 2 Usto 3/10/2004 Scanner 50.00 152.01 Ali - Usto - 3 Salman 2/25/2005 Speakers 9.00 28.72 Usto - Salman - 4 Usto 5/22/2006 Printer 55.00 167.08 Salman - Imran - 5 Usto 6/17/2004 Printer 43.00 130.60 Imran - Tasawar - 6 Imran 11/27/2005 Projector 58.00 175.99 Tasawar - Kamran - 7 Tasawar 3/21/2004 Projector 8.00 25.80 Kamran - Hamid - 8 Imran 12/17/2006 Printer 72.00 217.84 Hamid - Wasi - 9 Salman 7/5/2006 Projector 75.00 226.64 Wasi - Total - - - - - - 10 Ali 8/7/2006 Printer 24.00 73.50 Total - - - - - -

11 Salman 11/29/2004 Laptop 43.00 130.84

12 Salman 11/18/2004 Printer 23.00 71.03

Calculating Frequency For Multiple Criterion with ARRAY Formula 13 Kamran 8/31/2005 Printer 49.00 149.59 Calculating Frequency For Multiple Criterion with COUNTIFS

2005 Products Dollars 14 Usto 1/1/2005 Projector 18.00 56.47 2005 Products Dollars EmpName Printer Scanner Speakers Projector Laptop Total 15 Usto 9/20/2006 Scanner (8.00) (21.99) EmpName Printer Scanner Speakers Projector Laptop Total

Ali - 16 Kamran 4/12/2004 Laptop 45.00 137.39 Ali - Usto - 17 Imran 4/30/2006 Laptop 66.00 199.65 Usto - Salman - 18 Hamid 8/31/2005 Printer 88.00 265.19 Salman - Imran - 19 Hamid 10/27/2004 Projector 78.00 236.15 Imran - Tasawar - 20 Usto 11/27/2005 Printer 57.00 173.12 Tasawar - Kamran - 21 Usto 6/2/2006 Laptop 12.00 38.08 Kamran - Hamid - 22 Ali 9/24/2004 Projector 28.00 86.51 Hamid - Wasi - 23 Imran 2/1/2006 Laptop 25.00 77.31 Wasi - Total - - - - - - 24 Usto 5/2/2005 Scanner 29.00 88.22 Total - - - - - -

25 Hamid 11/7/2004 Laptop (4.00) (9.94)

26 Kamran 12/6/2006 Printer 24.00 74.62

Calculating Average For Multiple Criterion with ARRAY Formula 27 Hamid 4/12/2004 Speakers 38.00 115.99 Calculating Average For Multiple Criterion with AVERAGEIFS 1

2005 Products Dollars 28 Tasawar 9/22/2005 Scanner 77.00 233.05 2005 Products Dollars 1

EmpName Printer Scanner Speakers Projector Laptop Total 29 Ali 10/23/2006 Scanner 77.00 233.36 EmpName Printer Scanner Speakers Projector Laptop Total 1

Ali - 30 Usto 11/16/2005 Scanner 60.00 182.25 Ali - 1

Usto - 31 Usto 9/11/2005 Printer 6.00 20.48 Usto - Salman - 32 Tasawar 3/28/2006 Printer 53.00 161.46 Salman - 1

Imran - 33 Wasi 6/17/2004 Laptop 41.00 125.27 Imran - 1

Tasawar - 34 Usto 9/9/2006 Laptop 19.00 59.15 Tasawar - 1

Kamran - 35 Hamid 12/28/2006 Scanner 39.00 119.30 Kamran - 1

Hamid - 36 Ali 9/13/2004 Printer 2.00 8.26 Hamid - 1

Wasi - 37 Usto 7/7/2005 Projector 34.00 103.44 Wasi - 1

Total - - - - - - 38 Kamran 3/8/2005 Scanner 59.00 179.01 Total - - - - - - 1

39 Wasi 2/23/2006 Scanner (9.00) (24.63) 1

40 Usto 6/24/2006 Scanner 38.00 115.58 1

41 Kamran 2/6/2004 Projector 25.00 76.56 1

42 Kamran 4/10/2005 Laptop 19.00 59.38 1

43 Ali 4/1/2004 Scanner 86.00 259.86 1

44 Imran 6/6/2004 Printer 55.00 167.12 1

45 Kamran 9/20/2006 Printer 2.00 7.85 1

46 Salman 8/9/2005 Laptop 93.00 280.69

47 Usto 9/24/2004 Projector 14.00 43.93

48 Kamran 5/24/2005 Projector 37.00 113.03

49 Ali 11/18/2004 Scanner 63.00 190.70

50 Usto 11/18/2004 Printer 1.00 5.60

51 Usto 6/15/2005 Projector 24.00 73.60

52 Usto 1/4/2004 Projector 83.00 250.33

53 Wasi 7/7/2005 Projector 49.00 148.51

54 Tasawar 4/10/2005 Printer 26.00 80.20

55 Hamid 5/22/2006 Printer 35.00 107.99

56 Tasawar 4/12/2004 Printer 8.00 26.91

57 Wasi 6/28/2004 Laptop 49.00 148.78

58 Tasawar 4/12/2004 Scanner 34.00 104.09

59 Tasawar 12/8/2005 Printer 8.00 26.24

60 Hamid 10/27/2004 Laptop 89.00 269.09

61 Imran 11/16/2005 Scanner 62.00 189.25

62 Kamran 8/11/2004 Scanner 23.00 71.31

63 Wasi 6/17/2004 Projector 95.00 287.76

64 Kamran 5/11/2006 Projector 41.00 125.00

65 Salman 4/10/2005 Printer (6.00) (15.94)

66 Ali 1/1/2005 Laptop 84.00 253.99

67 Usto 11/5/2005 Scanner 63.00 191.37

68 Usto 7/16/2006 Printer 0.00 2.37

69 Tasawar 1/23/2005 Projector 73.00 221.41

70 Kamran 12/21/2004 Projector 95.00 287.05

71 Salman 11/16/2005 Speakers 93.00 280.77

72 Usto 6/17/2004 Speakers 54.00 163.87

73 Tasawar 6/26/2005 Scanner 33.00 101.37

74 Salman 4/12/2004 Laptop 48.00 145.84

75 Hamid 1/23/2005 Projector (7.00) (18.53)

76 Imran 3/6/2006 Scanner (2.00) (3.94)

77 Tasawar 1/15/2004 Laptop 27.00 83.29

78 Kamran 12/17/2006 Scanner 56.00 170.24

79 Tasawar 2/14/2005 Laptop 70.00 212.29

80 Hamid 3/30/2005 Laptop 16.00 49.46

81 Hamid 1/10/2006 Printer 69.00 208.69

82 Imran 7/29/2005 Scanner 67.00 203.01

83 Wasi 11/7/2004 Scanner 82.00 248.10

84 Salman 10/1/2006 Projector 73.00 221.48

85 Wasi 2/17/2004 Scanner 80.00 241.26

86 Hamid 8/9/2005 Projector (2.00) (4.24)

87 Kamran 8/31/2005 Projector 5.00 17.03

88 Usto 12/19/2005 Projector 26.00 80.30

89 Wasi 3/19/2005 Scanner 1.00 5.01

90 Wasi 6/13/2006 Speakers (3.00) (7.62)

91 Ali 8/18/2006 Projector 83.00 251.18

92 Hamid 5/26/2004 Laptop 33.00 100.33

93 Usto 4/12/2004 Scanner 62.00 188.06

94 Imran 5/11/2006 Projector 58.00 176.47

95 Kamran 8/20/2005 Scanner 28.00 85.54

96 Hamid 12/17/2006 Printer 33.00 100.69

97 Tasawar 11/25/2006 Scanner 92.00 278.16

98 Hamid 4/12/2004 Printer 92.00 277.54

99 Imran 1/21/2006 Printer 75.00 226.74

100 Ali 10/3/2005 Projector 74.00 224.23

101 Usto 1/15/2004 Scanner 67.00 202.45

102 Tasawar 8/11/2004 Scanner 16.00 49.45

103 Usto 5/13/2005 Scanner 90.00 272.34

104 Hamid 3/17/2006 Speakers (8.00) (22.11)

105 Tasawar 9/13/2004 Speakers 51.00 155.30

106 Hamid 3/30/2005 Scanner (7.00) (19.53)

107 Kamran 3/21/2004 Printer 9.00 29.28

108 Wasi 8/31/2005 Printer (10.00) (28.41)

109 Salman 7/16/2006 Scanner 10.00 32.11

110 Salman 3/8/2005 Laptop 35.00 107.59

111 Wasi 10/5/2004 Laptop 81.00 244.46

112 Wasi 11/18/2004 Laptop 38.00 115.86

113 Kamran 12/6/2006 Laptop 26.00 80.49

114 Ali 9/22/2005 Speakers 77.00 233.33

115 Kamran 1/21/2006 Scanner 39.00 118.63

116 Usto 6/24/2006 Projector 22.00 68.07

117 Usto 6/2/2006 Scanner 68.00 205.77

118 Wasi 5/24/2005 Scanner 59.00 178.71

119 Imran 5/22/2006 Projector 20.00 62.37

120 Usto 10/25/2005 Laptop 61.00 184.56

121 Usto 3/6/2006 Scanner 30.00 92.43

122 Hamid 7/27/2006 Laptop 10.00 32.30

123 Usto 4/30/2006 Projector 72.00 217.45

124 Salman 1/10/2006 Projector 57.00 173.36

125 Usto 11/16/2005 Printer 41.00 124.39

126 Usto 4/23/2004 Projector 54.00 163.75

127 Kamran 7/7/2005 Speakers 9.00 29.26

128 Wasi 5/13/2005 Printer 1.00 5.01

129 Usto 2/12/2006 Laptop (10.00) (28.89)

130 Salman 11/14/2006 Scanner (9.00) (25.06)

131 Hamid 11/29/2004 Laptop 56.00 168.87

132 Wasi 3/21/2004 Speakers 28.00 85.60

133 Ali 7/9/2004 Laptop 11.00 34.42

134 Tasawar 12/17/2006 Printer 11.00 34.91

135 Tasawar 2/14/2005 Projector 67.00 202.87

136 Imran 3/30/2005 Printer 10.00 31.43

137 Kamran 10/27/2004 Scanner 40.00 121.95

138 Imran 7/7/2005 Laptop 77.00 233.08

139 Ali 5/24/2005 Speakers 50.00 152.04

140 Hamid 6/28/2004 Projector 80.00 242.50

141 Hamid 12/28/2006 Projector 83.00 250.79

142 Ali 2/1/2006 Printer (4.00) (9.50)

143 Imran 2/3/2005 Scanner 46.00 139.76

144 Salman 10/23/2006 Laptop 55.00 167.19

145 Wasi 9/24/2004 Laptop 89.00 269.40

146 Kamran 7/7/2005 Projector 59.00 179.12

147 Kamran 3/8/2005 Speakers 90.00 271.75

148 Salman 11/3/2006 Speakers 17.00 53.67

149 Wasi 3/8/2005 Speakers 37.00 113.65

150 Tasawar 3/17/2006 Scanner (4.00) (9.42)

151 Kamran 7/7/2005 Printer (8.00) (22.38)

152 Usto 9/2/2004 Speakers 6.00 20.32

153 Wasi 10/16/2004 Speakers 63.00 191.68

154 Hamid 8/11/2004 Speakers 16.00 49.94

155 Ali 2/3/2005 Laptop 22.00 67.81

156 Kamran 12/30/2005 Scanner 81.00 244.97

157 Kamran 9/11/2005 Printer 85.00 256.56

158 Hamid 5/15/2004 Scanner (3.00) (7.08)

159 Kamran 1/23/2005 Printer 51.00 154.49

160 Wasi 1/1/2005 Printer 72.00 217.42

161 Tasawar 2/17/2004 Printer 46.00 139.93

162 Usto 2/25/2005 Laptop (10.00) (28.00)

163 Wasi 8/9/2005 Scanner (5.00) (12.20)

164 Usto 10/12/2006 Projector 16.00 49.92

165 Usto 12/19/2005 Scanner 25.00 76.99

166 Kamran 3/30/2005 Projector 49.00 148.91

167 Ali 3/21/2004 Printer 21.00 64.33

168 Tasawar 5/22/2006 Printer 29.00 88.98

169 Salman 2/17/2004 Printer 63.00 191.11

170 Hamid 6/13/2006 Printer 21.00 64.60

171 Ali 10/14/2005 Scanner 93.00 280.17

172 Imran 2/28/2004 Scanner 55.00 167.55

173 Kamran 7/16/2006 Scanner 14.00 43.90

174 Hamid 3/10/2004 Speakers 91.00 275.24

175 Kamran 4/23/2004 Projector 80.00 242.45

176 Ali 11/27/2005 Projector 70.00 211.76

177 Wasi 7/20/2004 Laptop 54.00 164.30

178 Salman 12/19/2005 Laptop 19.00 58.36

179 Usto 9/22/2005 Scanner 38.00 115.83

180 Imran 5/26/2004 Speakers 60.00 182.02

181 Usto 10/14/2005 Speakers 51.00 155.74

182 Salman 5/4/2004 Printer 78.00 236.14

183 Usto 11/29/2004 Scanner 17.00 52.47

184 Hamid 8/22/2004 Projector 13.00 40.81

185 Kamran 7/7/2005 Laptop 2.00 8.04

186 Ali 11/25/2006 Laptop 74.00 223.88

187 Imran 3/17/2006 Scanner 57.00 172.92

188 Hamid 5/4/2004 Laptop 79.00 239.34

189 Imran 6/15/2005 Scanner 82.00 247.46

190 Wasi 10/1/2006 Printer 28.00 85.96

191 Hamid 2/6/2004 Laptop 63.00 191.03

192 Tasawar 10/3/2005 Scanner 72.00 217.59

193 Tasawar 1/10/2006 Speakers 68.00 205.93

194 Kamran 1/21/2006 Projector 8.00 26.14

195 Usto 12/10/2004 Speakers 62.00 188.52

196 Hamid 3/19/2005 Projector 5.00 16.35

197 Imran 2/6/2004 Laptop (5.00) (12.90)

198 Imran 5/22/2006 Laptop (4.00) (10.00)

199 Tasawar 11/25/2006 Laptop 81.00 244.68

200 Tasawar 3/17/2006 Projector 21.00 64.74

201 Wasi 6/26/2005 Projector 21.00 64.86

202 Usto 12/30/2005 Scanner (3.00) (7.15)

203 Wasi 12/28/2006 Printer 57.00 173.64

204 Wasi 8/18/2006 Printer 86.00 259.31

205 Hamid 4/19/2006 Scanner 14.00 44.14

206 Usto 12/6/2006 Speakers 20.00 61.96

207 Imran 2/6/2004 Laptop 60.00 181.94

208 Hamid 7/5/2006 Projector 45.00 137.16

209 Hamid 4/1/2004 Projector 7.00 23.00

210 Ali 3/6/2006 Printer (6.00) (16.33)

211 Hamid 4/30/2006 Printer 35.00 106.90

212 Imran 5/11/2006 Scanner 31.00 95.13

213 Hamid 11/16/2005 Printer 19.00 59.08

214 Usto 2/12/2006 Projector 35.00 106.64

215 Ali 1/1/2005 Speakers 51.00 154.60

216 Usto 2/23/2006 Laptop 1.00 5.39

217 Wasi 9/24/2004 Scanner 67.00 203.36

218 Wasi 3/30/2005 Laptop 23.00 71.41

219 Imran 2/3/2005 Scanner 41.00 125.23

220 Salman 1/15/2004 Laptop 27.00 83.20

221 Tasawar 9/20/2006 Scanner 56.00 170.18

222 Salman 7/20/2004 Laptop 67.00 203.35

223 Ali 9/13/2004 Scanner 94.00 283.74

224 Tasawar 10/5/2004 Projector 52.00 158.30

225 Usto 2/6/2004 Speakers 24.00 74.24

226 Hamid 6/6/2004 Printer (1.00) (0.92)

227 Usto 1/21/2006 Projector 37.00 112.52

228 Ali 2/23/2006 Scanner 63.00 191.45

229 Wasi 4/12/2004 Printer 13.00 41.01

230 Usto 11/25/2006 Printer 7.00 22.33

231 Usto 3/21/2004 Printer 64.00 193.84

232 Salman 6/6/2004 Printer 63.00 190.91

233 Kamran 8/11/2004 Laptop 57.00 173.59

234 Kamran 11/7/2004 Laptop 59.00 178.93

235 Hamid 12/21/2004 Scanner (3.00) (7.26)

236 Wasi 10/1/2006 Printer 86.00 260.33

237 Tasawar 9/24/2004 Projector (4.00) (9.99)

238 Salman 1/1/2005 Printer 7.00 23.65

239 Wasi 10/1/2006 Printer 43.00 131.68

240 Kamran 11/5/2005 Printer 2.00 7.63

241 Kamran 5/2/2005 Laptop 85.00 256.88

242 Kamran 4/21/2005 Projector 52.00 158.19

243 Imran 7/9/2004 Speakers (3.00) (7.40)

244 Tasawar 2/25/2005 Projector 8.00 25.55

245 Wasi 7/9/2004 Laptop 5.00 17.20

246 Usto 8/29/2006 Laptop 90.00 272.10

247 Ali 11/14/2006 Laptop 36.00 110.34

248 Usto 8/20/2005 Laptop 25.00 77.01

249 Ali 3/19/2005 Laptop 7.00 23.13

250 Imran 11/3/2006 Laptop 64.00 194.25

251 Imran 5/4/2004 Laptop 71.00 215.49

252 Salman 4/10/2005 Projector 41.00 124.81

253 Salman 9/24/2004 Scanner 84.00 253.29

Page 74: Module 03 Do the Impossible With Array Formulas

254 Kamran 3/30/2005 Projector 3.00 10.70

255 Salman 4/1/2004 Scanner 15.00 46.76

256 Usto 2/6/2004 Projector 1.00 4.88

257 Usto 7/7/2005 Laptop 10.00 32.47

258 Kamran 1/12/2005 Projector 77.00 233.40

259 Imran 2/14/2005 Speakers 65.00 196.49

260 Usto 1/15/2004 Projector 25.00 77.33

261 Wasi 7/16/2006 Laptop (1.00) (1.93)

262 Hamid 8/29/2006 Scanner 2.00 7.97

263 Usto 11/3/2006 Printer 62.00 187.62

264 Imran 5/13/2005 Scanner 28.00 86.79

265 Usto 7/18/2005 Projector 55.00 167.05

266 Imran 6/15/2005 Printer 28.00 86.64

267 Tasawar 7/29/2005 Scanner 5.00 16.67

268 Tasawar 11/7/2004 Projector 1.00 4.77

269 Tasawar 6/15/2005 Scanner 26.00 80.01

270 Usto 6/6/2004 Scanner 47.00 142.85

271 Usto 5/2/2005 Projector 74.00 224.75

272 Wasi 5/11/2006 Printer 22.00 68.71

273 Salman 6/24/2006 Speakers 70.00 212.26

274 Wasi 11/27/2005 Scanner 83.00 251.31

275 Usto 12/8/2005 Projector 59.00 179.39

276 Wasi 8/9/2005 Laptop 0.00 1.58

277 Usto 1/12/2005 Projector 82.00 247.58

278 Ali 3/8/2005 Projector 29.00 89.05

279 Wasi 5/15/2004 Scanner 63.00 191.09

280 Hamid 10/1/2006 Printer 67.00 203.11

281 Tasawar 7/29/2005 Projector 3.00 10.78

282 Usto 12/10/2004 Projector 65.00 197.41

283 Kamran 5/26/2004 Speakers 75.00 227.46

284 Kamran 8/22/2004 Printer 79.00 239.90

285 Hamid 8/18/2006 Laptop (5.00) (12.92)

286 Hamid 3/30/2005 Scanner 31.00 95.51

287 Salman 12/17/2006 Laptop 21.00 65.34

288 Salman 9/11/2005 Speakers (8.00) (21.91)

289 Hamid 7/7/2005 Speakers 88.00 266.05

290 Kamran 11/16/2005 Scanner 94.00 283.85

291 Usto 10/1/2006 Laptop 83.00 251.50

292 Salman 8/11/2004 Laptop 16.00 49.96

293 Ali 8/7/2006 Laptop 33.00 100.52

294 Ali 2/28/2004 Projector (1.00) (0.91)

295 Ali 7/27/2006 Laptop 94.00 284.14

296 Hamid 4/21/2005 Scanner 76.00 230.26

297 Ali 3/6/2006 Scanner 71.00 215.16

298 Usto 5/26/2004 Speakers 56.00 169.19

299 Usto 8/31/2005 Printer 81.00 245.59

300 Usto 6/28/2004 Projector 3.00 11.16

301 Usto 4/21/2005 Printer 60.00 182.21

302 Hamid 10/23/2006 Scanner 81.00 245.54

303 Imran 5/4/2004 Scanner 70.00 211.43

304 Wasi 5/22/2006 Laptop 18.00 56.27

305 Usto 2/14/2005 Speakers 73.00 221.17

306 Usto 2/25/2005 Scanner (7.00) (18.78)

307 Usto 8/20/2005 Scanner 55.00 166.61

308 Wasi 5/15/2004 Printer 7.00 23.39

309 Wasi 11/18/2004 Projector 63.00 191.45

310 Usto 7/7/2005 Printer 83.00 251.63

311 Ali 2/28/2004 Printer 43.00 130.97

312 Usto 7/31/2004 Projector 67.00 203.30

313 Imran 12/30/2005 Projector (9.00) (24.97)

314 Wasi 6/28/2004 Scanner (1.00) (1.48)

315 Ali 1/12/2005 Scanner 21.00 65.20

316 Tasawar 11/5/2005 Laptop 6.00 20.10

317 Tasawar 1/15/2004 Projector 0.00 1.61

318 Hamid 10/16/2004 Projector 20.00 61.99

319 Salman 11/7/2004 Scanner 70.00 212.50

320 Hamid 5/15/2004 Projector 94.00 283.88

321 Usto 10/16/2004 Printer 9.00 28.83

322 Hamid 6/26/2005 Laptop 27.00 83.64

323 Imran 3/17/2006 Speakers 43.00 130.95

324 Kamran 9/20/2006 Scanner 84.00 254.39

325 Usto 6/6/2004 Projector 83.00 251.63

326 Usto 8/11/2004 Speakers 89.00 268.67

327 Kamran 10/12/2006 Printer 7.00 22.67

328 Usto 7/9/2004 Scanner 68.00 205.76

329 Kamran 10/14/2005 Projector 38.00 116.14

330 Wasi 1/26/2004 Projector 90.00 271.33

331 Wasi 8/11/2004 Projector 10.00 31.74

332 Tasawar 11/3/2006 Scanner 13.00 40.18

333 Hamid 6/17/2004 Printer 68.00 206.38

334 Usto 6/6/2004 Scanner 40.00 122.17

335 Hamid 6/4/2005 Scanner 17.00 52.58

336 Tasawar 11/29/2004 Scanner 6.00 19.23

337 Tasawar 5/11/2006 Scanner 27.00 83.79

338 Usto 7/27/2006 Scanner 80.00 242.19

339 Imran 8/11/2004 Laptop (1.00) (0.93)

340 Usto 3/28/2006 Laptop 89.00 269.26

341 Usto 3/30/2005 Projector 21.00 65.22

342 Tasawar 12/17/2006 Printer 37.00 113.12

343 Imran 2/14/2005 Speakers 15.00 46.64

344 Salman 5/26/2004 Laptop 94.00 283.62

345 Wasi 7/18/2005 Laptop 85.00 257.29

346 Imran 11/18/2004 Printer 95.00 286.86

347 Kamran 5/24/2005 Speakers 25.00 76.37

348 Usto 4/19/2006 Laptop 69.00 208.61

349 Hamid 8/31/2005 Scanner 72.00 218.67

350 Usto 2/12/2006 Speakers (4.00) (9.50)

351 Imran 6/26/2005 Speakers 21.00 64.85

352 Imran 1/12/2005 Projector 85.00 256.97

353 Kamran 9/11/2005 Projector 85.00 257.10

354 Salman 10/14/2005 Printer 79.00 239.76

355 Hamid 9/9/2006 Printer 81.00 245.01

356 Salman 8/29/2006 Projector 76.00 229.58

357 Salman 6/15/2005 Printer 31.00 95.41

358 Usto 9/22/2005 Projector 44.00 133.84

359 Ali 12/17/2006 Speakers 44.00 133.91

360 Tasawar 5/26/2004 Laptop 70.00 211.69

361 Tasawar 11/29/2004 Scanner (4.00) (9.45)

362 Hamid 11/16/2005 Printer 28.00 86.33

363 Salman 10/12/2006 Laptop 83.00 250.61

364 Wasi 7/5/2006 Printer 46.00 140.48

365 Hamid 5/22/2006 Printer 88.00 266.35

366 Kamran 10/14/2005 Printer (9.00) (24.54)

367 Usto 8/9/2005 Scanner (8.00) (21.83)

368 Imran 7/5/2006 Scanner 37.00 113.01

369 Usto 2/28/2004 Scanner 20.00 61.68

370 Tasawar 9/11/2005 Printer 2.00 7.75

371 Salman 8/20/2005 Projector 36.00 110.59

372 Salman 10/3/2005 Laptop 34.00 103.89

373 Wasi 4/30/2006 Projector 84.00 253.89

374 Usto 8/18/2006 Laptop 89.00 268.48

375 Usto 2/1/2006 Printer 31.00 95.68

376 Wasi 3/21/2004 Printer 7.00 22.55

377 Usto 2/6/2004 Printer 7.00 22.94

378 Kamran 2/23/2006 Projector 76.00 229.89

379 Usto 7/31/2004 Scanner 6.00 19.56

380 Tasawar 10/23/2006 Printer 43.00 130.29

381 Wasi 1/15/2004 Laptop 20.00 62.18

382 Usto 3/17/2006 Speakers 11.00 35.08

383 Hamid 6/26/2005 Projector 35.00 107.05

384 Kamran 3/17/2006 Scanner 72.00 218.15

385 Wasi 5/26/2004 Scanner 49.00 148.93

386 Hamid 3/6/2006 Scanner 88.00 266.65

387 Salman 3/28/2006 Scanner 45.00 136.01

388 Salman 3/21/2004 Printer 37.00 112.93

389 Imran 4/10/2005 Printer 12.00 38.62

390 Hamid 5/15/2004 Laptop 18.00 55.93

391 Usto 1/21/2006 Printer 75.00 227.00

392 Hamid 2/25/2005 Scanner 8.00 26.31

393 Ali 4/1/2004 Printer 37.00 112.54

394 Salman 12/21/2004 Printer (6.00) (16.41)

395 Ali 5/15/2004 Speakers 56.00 169.28

396 Hamid 12/10/2004 Projector 53.00 161.33

397 Tasawar 5/26/2004 Printer 62.00 187.72

398 Salman 3/30/2005 Laptop 90.00 271.31

399 Salman 1/15/2004 Projector 30.00 92.29

400 Imran 2/14/2005 Scanner 36.00 110.39

401 Tasawar 3/8/2005 Projector 76.00 230.12

402 Kamran 4/10/2005 Printer (4.00) (10.05)

403 Imran 12/10/2004 Speakers 26.00 80.07

404 Tasawar 5/13/2005 Printer (5.00) (12.80)

405 Usto 5/4/2004 Scanner 44.00 133.92

406 Imran 2/17/2004 Laptop 91.00 274.81

407 Kamran 3/10/2004 Printer 78.00 235.99

408 Hamid 5/22/2006 Printer 69.00 208.59

409 Ali 10/16/2004 Laptop 74.00 224.04

410 Usto 7/29/2005 Scanner 71.00 215.12

411 Ali 9/9/2006 Speakers 34.00 103.85

412 Hamid 6/4/2005 Laptop 93.00 281.17

413 Usto 2/25/2005 Scanner 60.00 182.61

414 Wasi 4/23/2004 Scanner 37.00 112.43

415 Hamid 6/28/2004 Projector 26.00 79.91

416 Usto 7/7/2005 Projector 2.00 8.54

417 Tasawar 10/3/2005 Scanner (9.00) (25.92)

418 Ali 2/23/2006 Scanner 46.00 139.69

419 Tasawar 3/10/2004 Laptop 0.00 2.35

420 Usto 11/29/2004 Scanner 79.00 239.22

421 Salman 1/12/2005 Scanner 48.00 146.51

422 Usto 1/21/2006 Projector 77.00 233.08

423 Hamid 2/12/2006 Scanner (10.00) (26.97)

424 Ali 8/9/2005 Speakers 45.00 137.23

425 Imran 1/23/2005 Scanner 17.00 53.57

426 Hamid 8/20/2005 Projector (4.00) (10.36)

427 Usto 12/17/2006 Laptop 43.00 130.80

428 Imran 10/5/2004 Projector 41.00 125.19

429 Hamid 6/24/2006 Speakers (4.00) (9.88)

430 Kamran 9/13/2004 Scanner 6.00 20.39

431 Salman 5/11/2006 Scanner 8.00 25.12

432 Usto 7/9/2004 Projector 43.00 131.20

433 Ali 6/6/2004 Projector 47.00 142.67

434 Usto 8/18/2006 Printer 13.00 41.34

435 Hamid 2/1/2006 Scanner 9.00 28.80

436 Ali 2/28/2004 Projector 22.00 67.51

437 Usto 3/17/2006 Projector 87.00 263.07

438 Tasawar 10/23/2006 Scanner 15.00 46.30

439 Wasi 10/23/2006 Projector 27.00 83.41

440 Imran 4/30/2006 Speakers 78.00 236.44

441 Wasi 3/19/2005 Laptop 27.00 83.00

442 Wasi 1/26/2004 Scanner 19.00 59.62

443 Salman 2/17/2004 Laptop 0.00 2.37

444 Ali 12/10/2004 Projector 30.00 91.97

445 Tasawar 8/7/2006 Speakers 17.00 52.94

446 Usto 6/4/2005 Printer 36.00 109.95

447 Usto 1/21/2006 Scanner (4.00) (10.24)

448 Wasi 1/15/2004 Laptop 4.00 14.17

449 Salman 6/6/2004 Projector 81.00 244.97

450 Tasawar 12/21/2004 Projector 87.00 263.83

451 Ali 2/6/2004 Projector 13.00 40.51

452 Usto 5/4/2004 Printer 48.00 145.85

453 Ali 10/3/2005 Speakers 2.00 7.10

454 Hamid 6/17/2004 Printer 32.00 98.37

455 Salman 8/31/2005 Printer 13.00 41.17

456 Wasi 10/1/2006 Laptop 94.00 283.45

457 Hamid 3/6/2006 Laptop 63.00 190.84

458 Usto 6/13/2006 Scanner 45.00 136.98

459 Imran 4/10/2005 Laptop 71.00 214.77

460 Imran 4/23/2004 Laptop 74.00 224.18

461 Salman 1/26/2004 Laptop 48.00 145.65

462 Tasawar 2/28/2004 Printer 63.00 191.19

463 Imran 4/21/2005 Printer 48.00 145.69

464 Usto 8/29/2006 Laptop 26.00 80.61

465 Salman 6/13/2006 Projector 58.00 176.27

466 Usto 2/12/2006 Printer 2.00 8.75

467 Imran 8/7/2006 Printer 36.00 109.68

468 Wasi 6/26/2005 Laptop 22.00 68.36

469 Wasi 8/9/2005 Printer 92.00 277.67

470 Ali 10/5/2004 Scanner 29.00 88.71

471 Salman 10/12/2006 Printer 42.00 128.17

472 Tasawar 4/23/2004 Printer 25.00 77.32

473 Imran 3/19/2005 Scanner 40.00 122.54

474 Wasi 5/4/2004 Printer 3.00 10.57

475 Ali 7/18/2005 Scanner (1.00) (0.82)

476 Salman 9/9/2006 Scanner 12.00 37.69

477 Wasi 6/17/2004 Projector 0.00 2.00

478 Usto 2/12/2006 Printer 35.00 106.26

479 Kamran 5/24/2005 Scanner 2.00 7.68

480 Usto 5/22/2006 Speakers 10.00 31.79

481 Hamid 10/14/2005 Projector 6.00 19.73

482 Hamid 3/10/2004 Printer 4.00 14.10

483 Wasi 10/12/2006 Laptop 91.00 274.92

484 Hamid 7/5/2006 Printer 12.00 37.88

485 Usto 11/7/2004 Scanner 21.00 65.28

486 Hamid 3/30/2005 Laptop 44.00 134.31

487 Ali 1/23/2005 Projector 75.00 227.10

488 Ali 7/20/2004 Projector 37.00 113.00

489 Usto 7/27/2006 Projector 58.00 176.07

490 Hamid 2/12/2006 Projector 74.00 223.61

491 Usto 6/6/2004 Scanner 64.00 193.55

492 Ali 11/27/2005 Speakers 53.00 160.46

493 Salman 4/23/2004 Projector (1.00) (0.45)

494 Salman 3/6/2006 Laptop 21.00 65.07

495 Hamid 2/23/2006 Laptop 90.00 271.34

496 Hamid 10/25/2005 Speakers 61.00 184.83

497 Ali 5/13/2005 Laptop 64.00 193.98

498 Usto 3/6/2006 Projector 79.00 238.61

499 Usto 5/11/2006 Scanner 11.00 34.58

500 Imran 6/13/2006 Laptop 17.00 52.99

501 Imran 10/12/2006 Printer (10.00) (28.51)

502 Tasawar 5/4/2004 Laptop 61.00 185.38

503 Salman 7/7/2005 Projector 81.00 245.19

504 Imran 12/21/2004 Laptop 86.00 259.65

505 Tasawar 6/28/2004 Projector (6.00) (16.60)

506 Hamid 9/22/2005 Speakers 75.00 226.29

507 Usto 7/18/2005 Laptop 87.00 262.50

508 Wasi 7/16/2006 Scanner 15.00 47.14

509 Hamid 3/19/2005 Speakers 6.00 20.04

510 Usto 2/28/2004 Projector 4.00 14.01

511 Hamid 4/8/2006 Projector 56.00 169.25

512 Ali 5/4/2004 Scanner 76.00 230.18

Page 75: Module 03 Do the Impossible With Array Formulas

513 Usto 7/7/2005 Speakers 27.00 82.60

514 Ali 12/19/2005 Scanner 58.00 175.77

515 Hamid 2/17/2004 Speakers 67.00 202.62

516 Imran 9/11/2005 Printer 79.00 238.79

517 Tasawar 9/13/2004 Laptop 38.00 116.69

518 Ali 4/1/2004 Laptop 4.00 13.64

519 Usto 3/17/2006 Projector 45.00 137.07

520 Ali 5/15/2004 Scanner 10.00 32.19

521 Usto 11/5/2005 Scanner 86.00 260.40

522 Wasi 5/11/2006 Scanner 75.00 226.71

523 Kamran 3/19/2005 Projector 77.00 232.50

524 Kamran 3/21/2004 Projector 10.00 31.82

525 Tasawar 10/5/2004 Scanner 62.00 188.38

526 Ali 1/26/2004 Printer 73.00 221.29

527 Hamid 1/15/2004 Scanner 62.00 187.23

528 Usto 6/24/2006 Laptop 11.00 35.72

529 Usto 12/19/2005 Laptop 28.00 86.08

530 Usto 8/22/2004 Laptop 57.00 172.36

531 Wasi 12/10/2004 Projector 34.00 103.49

532 Hamid 10/14/2005 Projector 89.00 267.86

533 Usto 9/24/2004 Printer 32.00 97.89

534 Usto 11/25/2006 Projector 38.00 116.04

535 Tasawar 8/20/2005 Printer 82.00 248.05

536 Hamid 5/26/2004 Scanner 29.00 89.29

537 Kamran 10/1/2006 Speakers 17.00 52.25

538 Usto 8/11/2004 Projector 50.00 151.87

539 Imran 4/1/2004 Speakers 7.00 22.96

540 Salman 3/19/2005 Printer 50.00 151.36

541 Tasawar 2/25/2005 Speakers 20.00 61.88

542 Hamid 2/25/2005 Scanner 37.00 112.83

543 Usto 9/2/2004 Laptop 58.00 176.61

544 Imran 1/21/2006 Scanner 25.00 76.92

545 Usto 4/1/2004 Projector 34.00 103.18

546 Ali 10/23/2006 Scanner 3.00 11.58

547 Ali 10/1/2006 Speakers 63.00 190.59

548 Ali 1/10/2006 Projector 44.00 133.62

549 Wasi 4/12/2004 Projector 87.00 263.16

550 Hamid 2/25/2005 Speakers 4.00 14.19

551 Salman 4/19/2006 Scanner 93.00 281.17

552 Tasawar 11/29/2004 Speakers 10.00 32.07

553 Usto 12/17/2006 Laptop 19.00 58.97

554 Usto 7/18/2005 Projector 30.00 92.53

555 Salman 11/14/2006 Laptop (1.00) (1.28)

556 Hamid 4/30/2006 Projector 46.00 139.41

557 Tasawar 9/2/2004 Scanner 44.00 133.51

558 Ali 10/27/2004 Projector 47.00 143.21

559 Hamid 9/9/2006 Projector 86.00 260.39

560 Hamid 7/27/2006 Scanner 76.00 229.96

561 Usto 4/1/2004 Laptop 55.00 166.99

562 Salman 5/26/2004 Projector (1.00) (0.79)

563 Salman 7/20/2004 Laptop 62.00 187.63

564 Salman 1/26/2004 Scanner 73.00 220.97

565 Usto 11/7/2004 Speakers 12.00 38.44

566 Kamran 8/22/2004 Laptop 0.00 1.60

567 Wasi 8/18/2006 Projector 23.00 71.40

568 Wasi 1/23/2005 Projector 73.00 220.81

569 Hamid 6/4/2005 Printer 73.00 221.78

570 Kamran 3/19/2005 Scanner 43.00 131.06

571 Usto 7/27/2006 Speakers 60.00 182.29

572 Kamran 12/6/2006 Printer 40.00 121.87

573 Hamid 7/29/2005 Printer (7.00) (18.92)

574 Ali 9/24/2004 Scanner 39.00 118.37

575 Imran 1/1/2005 Laptop 84.00 253.79

576 Hamid 4/30/2006 Speakers 92.00 277.81

577 Usto 10/3/2005 Laptop 68.00 206.08

578 Usto 11/7/2004 Printer 7.00 23.19

579 Usto 10/12/2006 Projector (9.00) (24.84)

580 Wasi 10/14/2005 Laptop 51.00 154.40

581 Usto 11/27/2005 Printer 59.00 178.90

582 Tasawar 11/5/2005 Laptop 64.00 194.44

583 Wasi 11/16/2005 Printer 0.00 2.52

584 Hamid 2/14/2005 Laptop 81.00 243.82

585 Kamran 4/10/2005 Speakers 93.00 280.80

586 Wasi 2/1/2006 Printer 20.00 61.97

587 Salman 6/4/2005 Projector 39.00 119.91

588 Tasawar 10/27/2004 Scanner 6.00 20.02

589 Tasawar 2/17/2004 Scanner 34.00 103.68

590 Usto 2/1/2006 Printer 33.00 101.31

591 Salman 1/15/2004 Speakers (10.00) (28.46)

592 Wasi 8/7/2006 Projector 47.00 141.97

593 Kamran 1/15/2004 Scanner 94.00 284.61

594 Usto 6/2/2006 Scanner 92.00 278.23

595 Imran 1/12/2005 Printer 68.00 205.96

596 Hamid 3/21/2004 Printer 37.00 112.85

597 Kamran 7/20/2004 Projector 78.00 235.37

598 Usto 12/6/2006 Projector 14.00 43.76

599 Wasi 11/3/2006 Scanner 33.00 100.55

600 Kamran 6/17/2004 Projector 64.00 194.18

601 Usto 8/7/2006 Printer 6.00 20.23

602 Wasi 6/2/2006 Speakers 65.00 197.49

603 Ali 1/15/2004 Laptop 24.00 74.28

604 Imran 12/19/2005 Speakers 89.00 269.01

605 Imran 10/3/2005 Laptop 94.00 284.25

606 Usto 12/8/2005 Scanner 67.00 203.71

607 Imran 8/11/2004 Laptop 7.00 23.43

608 Imran 9/24/2004 Scanner 58.00 176.00

609 Hamid 6/17/2004 Laptop 77.00 232.67

610 Usto 9/11/2005 Projector 50.00 151.12

611 Ali 8/7/2006 Printer 10.00 32.14

612 Usto 8/31/2005 Laptop 2.00 7.78

613 Salman 7/27/2006 Laptop 17.00 53.69

614 Tasawar 5/2/2005 Laptop 90.00 272.41

615 Usto 11/25/2006 Scanner 58.00 175.59

616 Tasawar 1/21/2006 Laptop 66.00 199.93

617 Hamid 6/28/2004 Projector 6.00 20.24

618 Imran 4/19/2006 Printer 90.00 272.59

619 Imran 5/22/2006 Printer 38.00 115.86

620 Tasawar 10/5/2004 Laptop 3.00 10.91

621 Kamran 4/12/2004 Scanner (4.00) (10.39)

622 Salman 6/17/2004 Projector 8.00 25.90

623 Imran 4/1/2004 Laptop (8.00) (22.23)

624 Usto 9/24/2004 Laptop 72.00 218.69

625 Hamid 1/21/2006 Projector 83.00 250.67

626 Usto 6/2/2006 Scanner 12.00 38.98

627 Imran 5/22/2006 Scanner (8.00) (21.53)

628 Ali 2/12/2006 Projector 22.00 68.13

629 Tasawar 11/3/2006 Laptop (2.00) (3.83)

630 Usto 1/10/2006 Scanner 55.00 166.77

631 Hamid 6/24/2006 Projector 40.00 122.55

632 Ali 6/26/2005 Scanner 61.00 183.96

633 Usto 6/15/2005 Projector 40.00 122.54

634 Hamid 9/9/2006 Projector 31.00 94.68

635 Ali 4/23/2004 Laptop 6.00 20.45

636 Usto 10/25/2005 Scanner (6.00) (16.10)

637 Usto 7/7/2005 Projector 14.00 43.40

638 Usto 7/31/2004 Laptop 94.00 283.88

639 Hamid 7/29/2005 Laptop 70.00 212.27

640 Kamran 11/7/2004 Printer (8.00) (21.44)

641 Kamran 11/3/2006 Printer (8.00) (21.91)

642 Salman 12/30/2005 Laptop 2.00 7.64

643 Usto 1/4/2004 Speakers 10.00 31.84

644 Wasi 5/2/2005 Projector 51.00 154.53

645 Wasi 4/1/2004 Projector 5.00 16.85

646 Kamran 6/2/2006 Projector 39.00 119.49

647 Salman 3/21/2004 Projector 20.00 61.93

648 Kamran 11/29/2004 Scanner 29.00 88.79

649 Usto 2/1/2006 Scanner 43.00 130.60

650 Salman 9/2/2004 Laptop 40.00 122.34

651 Kamran 2/12/2006 Scanner 36.00 109.41

652 Kamran 1/23/2005 Projector 88.00 265.70

653 Ali 2/3/2005 Laptop 55.00 166.43

654 Hamid 12/21/2004 Projector 65.00 196.86

655 Hamid 7/7/2005 Printer 6.00 19.49

656 Wasi 5/22/2006 Scanner (1.00) (1.23)

657 Hamid 9/20/2006 Scanner 32.00 97.81

658 Usto 1/21/2006 Laptop 17.00 53.06

659 Usto 7/9/2004 Projector 25.00 76.38

660 Usto 3/30/2005 Projector 11.00 35.75

661 Usto 2/17/2004 Laptop 51.00 155.02

662 Kamran 11/3/2006 Speakers 25.00 78.07

663 Usto 11/14/2006 Projector 27.00 82.45

664 Ali 6/15/2005 Printer 38.00 116.79

665 Tasawar 9/20/2006 Scanner 27.00 82.57

666 Hamid 6/13/2006 Projector 59.00 178.63

667 Wasi 2/12/2006 Scanner 73.00 220.45

668 Imran 8/31/2005 Projector 43.00 131.45

669 Tasawar 7/5/2006 Laptop 51.00 154.78

670 Ali 9/13/2004 Printer 32.00 98.01

671 Usto 4/8/2006 Printer 89.00 268.59

672 Hamid 11/27/2005 Laptop (1.00) (0.61)

673 Usto 3/17/2006 Projector 26.00 81.09

674 Hamid 2/25/2005 Scanner 56.00 170.29

675 Ali 8/22/2004 Printer 10.00 32.45

676 Usto 2/6/2004 Speakers 8.00 25.64

677 Imran 5/2/2005 Projector 75.00 226.81

678 Hamid 2/3/2005 Scanner 79.00 239.48

679 Imran 5/13/2005 Scanner 25.00 75.94

680 Tasawar 10/12/2006 Printer 22.00 68.81

681 Ali 9/13/2004 Speakers 88.00 265.64

682 Kamran 11/7/2004 Scanner 94.00 284.33

683 Hamid 10/3/2005 Laptop 58.00 176.73

684 Kamran 6/4/2005 Printer 66.00 200.21

685 Hamid 8/7/2006 Projector 82.00 247.94

686 Usto 10/1/2006 Scanner 94.00 283.77

687 Salman 12/28/2006 Printer 27.00 82.88

688 Ali 4/12/2004 Speakers 56.00 169.96

689 Kamran 4/19/2006 Laptop 82.00 247.80

690 Kamran 9/11/2005 Laptop 7.00 23.07

691 Ali 1/10/2006 Printer 25.00 77.37

692 Salman 12/28/2006 Scanner 15.00 46.81

693 Hamid 10/5/2004 Scanner 39.00 118.82

694 Ali 10/3/2005 Printer 22.00 67.92

695 Usto 3/19/2005 Speakers 0.00 1.58

696 Ali 7/20/2004 Laptop 47.00 142.63

697 Hamid 3/6/2006 Speakers 36.00 110.26

698 Hamid 9/13/2004 Projector 46.00 139.53

699 Kamran 4/30/2006 Projector 84.00 253.68

700 Tasawar 3/21/2004 Printer 38.00 115.77

701 Ali 5/26/2004 Printer 13.00 40.47

702 Kamran 4/19/2006 Scanner 40.00 122.42

703 Imran 6/17/2004 Speakers 46.00 139.41

704 Wasi 7/31/2004 Projector 11.00 35.11

705 Salman 6/15/2005 Printer (1.00) (0.90)

706 Salman 3/10/2004 Printer 32.00 98.62

707 Wasi 1/15/2004 Scanner 78.00 235.38

708 Salman 1/23/2005 Speakers 71.00 215.14

709 Imran 4/23/2004 Printer 36.00 109.80

710 Hamid 8/22/2004 Laptop 79.00 238.75

711 Salman 8/9/2005 Speakers 92.00 278.34

712 Usto 1/15/2004 Scanner 38.00 116.20

713 Ali 12/6/2006 Laptop 50.00 152.08

714 Tasawar 2/23/2006 Scanner 31.00 93.73

715 Hamid 6/13/2006 Printer 9.00 29.39

716 Usto 2/25/2005 Projector 24.00 73.28

717 Salman 1/12/2005 Printer 50.00 152.59

718 Hamid 2/12/2006 Speakers 32.00 98.19

719 Wasi 9/13/2004 Scanner 71.00 214.93

720 Tasawar 11/3/2006 Laptop 28.00 86.11

721 Salman 10/23/2006 Printer 40.00 121.83

722 Tasawar 1/15/2004 Projector 75.00 226.99

723 Usto 8/22/2004 Printer 30.00 92.03

724 Hamid 12/8/2005 Printer 78.00 235.90

725 Imran 8/9/2005 Laptop 15.00 47.10

726 Tasawar 11/7/2004 Speakers 30.00 91.80

727 Usto 10/3/2005 Scanner 27.00 83.56

728 Usto 6/13/2006 Printer 95.00 286.68

729 Hamid 2/17/2004 Scanner 62.00 188.70

730 Tasawar 3/17/2006 Printer (4.00) (10.15)

731 Ali 7/20/2004 Laptop (3.00) (7.23)

732 Usto 7/7/2005 Laptop 62.00 187.71

733 Ali 8/11/2004 Speakers 92.00 277.68

734 Usto 12/17/2006 Scanner 35.00 107.10

735 Ali 5/2/2005 Projector 91.00 274.96

736 Tasawar 7/9/2004 Laptop 21.00 64.32

737 Imran 1/21/2006 Laptop 49.00 148.74

738 Usto 3/19/2005 Scanner 34.00 103.35

739 Usto 1/23/2005 Printer 56.00 170.12

740 Tasawar 5/26/2004 Projector 81.00 244.85

741 Ali 4/12/2004 Projector 63.00 191.25

742 Tasawar 5/2/2005 Scanner (3.00) (7.37)

743 Imran 7/7/2005 Scanner 8.00 25.81

744 Hamid 4/1/2004 Printer 46.00 139.62

745 Imran 2/14/2005 Printer 3.00 10.88

746 Imran 5/22/2006 Scanner 68.00 205.86

747 Ali 4/19/2006 Scanner 83.00 251.06

748 Tasawar 2/14/2005 Projector 51.00 155.12

749 Wasi 4/19/2006 Scanner 16.00 50.20

750 Wasi 5/11/2006 Projector (2.00) (3.91)

751 Tasawar 11/29/2004 Printer 6.00 20.37

752 Imran 10/25/2005 Printer (5.00) (12.57)

753 Ali 1/21/2006 Projector 42.00 127.71

754 Tasawar 1/12/2005 Projector 47.00 143.38

755 Usto 7/27/2006 Laptop 16.00 50.19

756 Wasi 5/15/2004 Printer 11.00 35.36

757 Ali 11/29/2004 Projector (10.00) (27.90)

758 Salman 3/10/2004 Projector 21.00 65.38

759 Wasi 10/25/2005 Laptop 52.00 157.73

760 Tasawar 4/12/2004 Speakers 5.00 17.01

761 Tasawar 7/29/2005 Projector 52.00 158.43

762 Imran 3/30/2005 Laptop 38.00 115.39

763 Kamran 5/11/2006 Laptop 84.00 254.26

764 Wasi 12/6/2006 Speakers 18.00 55.34

765 Hamid 5/4/2004 Printer (6.00) (15.74)

766 Wasi 4/1/2004 Printer 5.00 16.91

767 Imran 12/6/2006 Scanner 59.00 178.90

768 Imran 6/26/2005 Laptop (1.00) (1.43)

769 Hamid 1/23/2005 Speakers 12.00 37.85

770 Imran 3/21/2004 Speakers 25.00 76.81

771 Tasawar 6/26/2005 Laptop 33.00 101.42

Page 76: Module 03 Do the Impossible With Array Formulas

772 Ali 2/28/2004 Laptop 12.00 37.89

773 Kamran 8/9/2005 Projector 52.00 158.31

774 Hamid 3/30/2005 Projector 34.00 103.62

775 Tasawar 7/29/2005 Scanner 66.00 200.66

776 Tasawar 7/31/2004 Speakers 10.00 31.85

777 Wasi 2/28/2004 Scanner (5.00) (12.55)

778 Salman 8/9/2005 Laptop 89.00 269.49

779 Wasi 4/10/2005 Scanner 5.00 16.82

780 Hamid 10/12/2006 Laptop 48.00 145.99

781 Ali 12/6/2006 Laptop 36.00 109.92

782 Tasawar 11/14/2006 Laptop 80.00 242.00

783 Ali 11/25/2006 Printer 64.00 193.89

784 Ali 10/14/2005 Scanner 51.00 155.50

785 Salman 4/10/2005 Projector 92.00 278.34

786 Wasi 4/21/2005 Projector 93.00 280.86

787 Hamid 2/3/2005 Scanner 36.00 110.48

788 Salman 10/12/2006 Printer (9.00) (24.83)

789 Hamid 5/24/2005 Printer 48.00 146.23

790 Wasi 11/16/2005 Projector 11.00 34.55

791 Wasi 7/20/2004 Speakers 8.00 25.45

792 Imran 4/12/2004 Scanner 36.00 110.09

793 Wasi 11/5/2005 Laptop 93.00 280.78

794 Usto 4/12/2004 Printer 39.00 119.20

795 Usto 5/26/2004 Projector 72.00 218.08

796 Kamran 3/6/2006 Printer 3.00 10.42

797 Usto 1/1/2005 Laptop 47.00 142.84

798 Tasawar 12/28/2006 Laptop 72.00 217.32

799 Imran 12/6/2006 Laptop 26.00 79.75

800 Usto 10/5/2004 Projector 47.00 142.49

801 Tasawar 1/10/2006 Printer 14.00 43.40

802 Usto 6/26/2005 Laptop 71.00 215.08

803 Usto 8/18/2006 Scanner 95.00 287.80

804 Wasi 3/6/2006 Laptop 37.00 112.78

805 Usto 12/8/2005 Printer (1.00) (0.39)

806 Kamran 8/18/2006 Projector 26.00 80.21

807 Usto 1/4/2004 Projector 67.00 203.54

808 Kamran 2/17/2004 Printer 15.00 47.20

809 Hamid 2/23/2006 Printer 73.00 221.34

810 Hamid 10/5/2004 Laptop 13.00 40.90

811 Kamran 3/21/2004 Scanner 76.00 229.56

812 Wasi 6/6/2004 Projector (9.00) (24.93)

813 Imran 6/4/2005 Speakers 36.00 109.53

814 Salman 5/26/2004 Scanner 11.00 35.52

815 Imran 1/21/2006 Printer 73.00 220.50

816 Hamid 10/16/2004 Speakers 93.00 280.27

817 Ali 4/8/2006 Scanner 69.00 209.32

818 Usto 4/12/2004 Projector 86.00 259.48

819 Ali 6/2/2006 Laptop 54.00 164.38

820 Tasawar 4/21/2005 Laptop (2.00) (4.04)

821 Usto 9/20/2006 Scanner 83.00 250.17

822 Wasi 10/14/2005 Laptop 2.00 8.00

823 Imran 8/18/2006 Projector 54.00 164.15

824 Usto 4/1/2004 Scanner 76.00 230.42

825 Ali 8/31/2005 Projector 10.00 32.25

826 Hamid 10/12/2006 Scanner 81.00 245.04

827 Hamid 9/20/2006 Projector 83.00 251.14

828 Usto 11/3/2006 Scanner 6.00 19.52

829 Imran 11/14/2006 Laptop 77.00 233.16

830 Hamid 3/28/2006 Laptop 41.00 125.28

831 Salman 12/6/2006 Printer 80.00 241.71

832 Usto 5/22/2006 Projector 20.00 62.21

833 Kamran 1/26/2004 Projector 31.00 95.33

834 Usto 1/10/2006 Scanner 34.00 103.90

835 Salman 8/31/2005 Scanner 2.00 8.03

836 Hamid 2/12/2006 Scanner 17.00 53.33

837 Kamran 6/2/2006 Projector 16.00 50.31

838 Tasawar 3/6/2006 Scanner 54.00 163.70

839 Usto 2/17/2004 Printer (9.00) (24.92)

840 Usto 4/30/2006 Projector 94.00 284.54

841 Hamid 9/2/2004 Scanner (3.00) (7.45)

842 Tasawar 11/7/2004 Laptop 9.00 28.83

843 Usto 3/21/2004 Scanner 25.00 77.11

844 Salman 10/23/2006 Printer 29.00 89.31

845 Wasi 8/22/2004 Projector 37.00 113.21

846 Usto 6/26/2005 Scanner 19.00 59.00

847 Tasawar 4/12/2004 Printer 28.00 86.05

848 Hamid 6/6/2004 Projector 18.00 55.86

849 Salman 6/2/2006 Speakers 84.00 254.04

850 Kamran 10/16/2004 Scanner 79.00 238.83

851 Wasi 11/7/2004 Scanner 31.00 94.97

852 Hamid 7/27/2006 Speakers 34.00 103.40

853 Wasi 11/16/2005 Laptop 66.00 201.26

854 Kamran 5/22/2006 Laptop 44.00 134.45

855 Ali 1/23/2005 Projector 94.00 284.42

856 Imran 4/12/2004 Scanner 11.00 35.30

857 Usto 8/22/2004 Printer 74.00 223.97

858 Hamid 12/6/2006 Laptop 28.00 86.49

859 Tasawar 6/4/2005 Printer 40.00 121.92

860 Tasawar 2/6/2004 Printer 34.00 104.17

861 Ali 9/11/2005 Projector 38.00 115.85

862 Usto 6/15/2005 Laptop 69.00 209.14

863 Salman 8/20/2005 Projector 34.00 103.97

864 Ali 8/9/2005 Laptop 29.00 89.38

865 Imran 2/17/2004 Scanner (10.00) (27.72)

866 Wasi 10/27/2004 Speakers 42.00 128.43

867 Usto 3/17/2006 Laptop 58.00 175.97

868 Kamran 3/10/2004 Scanner 27.00 83.02

869 Wasi 7/5/2006 Projector 47.00 143.27

870 Kamran 2/6/2004 Scanner 29.00 88.70

871 Wasi 5/11/2006 Laptop 28.00 86.23

872 Ali 9/20/2006 Projector 79.00 239.06

873 Salman 11/7/2004 Projector 41.00 124.82

874 Kamran 7/7/2005 Speakers 57.00 172.96

875 Wasi 7/16/2006 Printer 45.00 137.62

876 Hamid 3/17/2006 Laptop 91.00 274.91

877 Kamran 1/23/2005 Laptop 49.00 149.04

878 Ali 9/24/2004 Printer 68.00 206.16

879 Imran 2/14/2005 Speakers 38.00 116.64

880 Salman 9/20/2006 Scanner 4.00 15.21

881 Kamran 4/10/2005 Laptop 45.00 137.05

882 Tasawar 12/10/2004 Laptop 85.00 256.66

883 Kamran 7/7/2005 Speakers 57.00 173.06

884 Usto 11/16/2005 Laptop (3.00) (6.36)

885 Wasi 8/7/2006 Scanner (9.00) (24.86)

886 Usto 4/23/2004 Projector 86.00 260.29

887 Hamid 3/8/2005 Scanner 11.00 35.04

888 Imran 1/15/2004 Laptop 87.00 262.76

889 Imran 7/31/2004 Projector 86.00 260.01

890 Ali 2/1/2006 Printer 62.00 187.81

891 Kamran 7/16/2006 Laptop 80.00 241.86

892 Imran 7/20/2004 Speakers 11.00 34.78

893 Imran 12/8/2005 Speakers 11.00 34.68

894 Wasi 11/5/2005 Projector (4.00) (9.79)

895 Tasawar 12/10/2004 Speakers 42.00 128.03

896 Tasawar 6/28/2004 Printer 51.00 154.72

897 Imran 7/20/2004 Scanner 91.00 274.77

898 Kamran 8/18/2006 Printer 24.00 73.41

899 Kamran 1/26/2004 Projector 19.00 59.12

900 Imran 3/21/2004 Printer 80.00 241.75

901 Ali 12/6/2006 Scanner 0.00 1.68

902 Hamid 10/1/2006 Scanner 69.00 209.14

903 Kamran 7/16/2006 Laptop 84.00 253.78

904 Usto 8/20/2005 Speakers 31.00 94.75

905 Usto 8/31/2005 Projector 11.00 35.27

906 Salman 3/30/2005 Printer 79.00 239.34

907 Hamid 6/24/2006 Projector 22.00 68.55

908 Ali 2/3/2005 Scanner 76.00 231.13

909 Salman 10/5/2004 Projector 0.00 2.74

910 Kamran 3/19/2005 Printer 94.00 283.56

911 Usto 11/7/2004 Scanner 14.00 44.25

912 Kamran 7/5/2006 Laptop 57.00 172.70

913 Hamid 4/21/2005 Printer 3.00 11.08

914 Wasi 7/5/2006 Printer 50.00 151.96

915 Salman 6/13/2006 Projector 25.00 76.62

916 Tasawar 8/31/2005 Scanner 46.00 140.27

917 Usto 7/16/2006 Printer 19.00 58.74

918 Kamran 5/22/2006 Projector 6.00 20.10

919 Hamid 7/5/2006 Speakers 8.00 26.08

920 Kamran 1/10/2006 Laptop (2.00) (3.73)

921 Usto 4/10/2005 Printer 80.00 240.69

922 Hamid 5/2/2005 Scanner 19.00 58.90

923 Ali 4/10/2005 Speakers 27.00 82.99

924 Salman 2/6/2004 Laptop 79.00 239.45

925 Hamid 1/10/2006 Scanner 57.00 173.33

926 Wasi 12/19/2005 Printer 47.00 143.60

927 Wasi 11/7/2004 Printer 9.00 28.83

928 Hamid 11/27/2005 Printer 65.00 196.86

929 Usto 3/10/2004 Scanner 58.00 175.22

930 Wasi 9/13/2004 Laptop 48.00 145.94

931 Usto 10/14/2005 Scanner 75.00 226.61

932 Wasi 1/21/2006 Scanner 59.00 179.37

933 Hamid 1/23/2005 Laptop 34.00 104.45

934 Usto 4/1/2004 Speakers 57.00 173.07

935 Kamran 3/28/2006 Printer 62.00 187.89

936 Tasawar 7/5/2006 Speakers 17.00 53.05

937 Salman 7/29/2005 Scanner 83.00 250.82

938 Salman 7/20/2004 Printer 56.00 169.84

939 Usto 2/28/2004 Printer 14.00 44.19

940 Imran 1/1/2005 Speakers (9.00) (24.56)

941 Ali 7/18/2005 Scanner 44.00 134.50

942 Usto 2/6/2004 Projector 32.00 97.65

943 Hamid 1/12/2005 Projector 85.00 256.97

944 Ali 9/24/2004 Printer (2.00) (3.72)

945 Kamran 2/3/2005 Speakers 31.00 94.44

946 Wasi 8/22/2004 Projector (7.00) (19.82)

947 Imran 1/26/2004 Speakers (1.00) (0.29)

948 Salman 11/25/2006 Printer 6.00 20.40

949 Tasawar 6/6/2004 Scanner 13.00 41.83

950 Salman 10/27/2004 Printer 70.00 212.46

951 Imran 6/17/2004 Scanner 15.00 47.75

952 Tasawar 4/19/2006 Laptop 18.00 56.26

953 Tasawar 2/23/2006 Projector 30.00 92.20

954 Usto 11/3/2006 Laptop 17.00 53.07

955 Usto 1/12/2005 Projector (1.00) (1.45)

956 Hamid 3/19/2005 Scanner 50.00 152.32

957 Salman 12/30/2005 Printer 83.00 251.09

958 Kamran 5/4/2004 Laptop 54.00 164.08

959 Salman 4/21/2005 Printer 16.00 49.97

960 Kamran 9/20/2006 Printer 53.00 160.96

961 Tasawar 1/10/2006 Projector 95.00 286.72

962 Salman 1/4/2004 Laptop 74.00 224.13

963 Imran 8/20/2005 Laptop 11.00 35.13

964 Usto 9/20/2006 Scanner 63.00 191.00

965 Ali 8/31/2005 Projector 53.00 161.24

966 Usto 7/27/2006 Printer 1.00 5.28

967 Tasawar 11/18/2004 Scanner 24.00 74.31

968 Usto 4/8/2006 Speakers 5.00 16.42

969 Ali 2/25/2005 Printer 35.00 107.34

970 Ali 5/22/2006 Projector 33.00 100.62

971 Kamran 2/1/2006 Laptop 65.00 196.64

972 Wasi 2/12/2006 Laptop 52.00 158.34

973 Wasi 8/18/2006 Laptop 44.00 133.42

974 Salman 10/12/2006 Speakers 72.00 218.06

975 Kamran 9/13/2004 Laptop 13.00 41.14

976 Usto 9/9/2006 Scanner 16.00 50.16

977 Wasi 2/12/2006 Scanner 19.00 59.27

978 Usto 5/13/2005 Laptop 67.00 203.43

979 Kamran 2/12/2006 Printer 2.00 8.31

980 Usto 6/2/2006 Laptop 28.00 85.79

981 Imran 8/20/2005 Scanner (6.00) (15.85)

982 Salman 3/30/2005 Laptop 70.00 212.03

983 Usto 2/23/2006 Printer 65.00 197.19

984 Kamran 12/28/2006 Scanner 39.00 119.05

985 Usto 8/29/2006 Scanner 72.00 218.19

986 Ali 5/2/2005 Speakers 47.00 142.54

987 Kamran 5/11/2006 Printer 94.00 283.58

988 Ali 5/13/2005 Printer 58.00 175.82

989 Hamid 5/15/2004 Projector (6.00) (17.29)

990 Imran 2/17/2004 Projector 38.00 115.96

991 Tasawar 1/15/2004 Projector (1.00) (1.02)

992 Hamid 11/16/2005 Projector 34.00 104.58

993 Usto 4/1/2004 Printer 30.00 91.72

994 Imran 5/26/2004 Scanner 62.00 187.43

995 Ali 2/12/2006 Printer 24.00 74.21

996 Imran 9/13/2004 Projector 4.00 13.65

997 Kamran 6/6/2004 Printer 88.00 265.29

998 Kamran 10/3/2005 Projector 78.00 235.69

999 Salman 10/14/2005 Projector 82.00 248.12

1000 Tasawar 5/13/2005 Printer 68.00 206.87

1001 Tasawar 2/17/2004 Scanner 20.00 61.60

1002 Imran 10/5/2004 Printer (10.00) (28.33)

1003 Usto 9/24/2004 Projector 94.00 283.99

1004 Usto 4/8/2006 Scanner 62.00 188.00

1005 Kamran 7/9/2004 Laptop 71.00 215.02

1006 Salman 3/21/2004 Speakers 70.00 211.52

1007 Wasi 4/12/2004 Scanner 17.00 52.01

1008 Salman 12/8/2005 Projector 51.00 154.87

1009 Ali 4/30/2006 Laptop 70.00 212.19

1010 Usto 6/24/2006 Projector 94.00 283.92

1011 Imran 12/10/2004 Laptop 70.00 211.85

1012 Salman 5/13/2005 Printer 89.00 269.19

1013 Imran 10/14/2005 Printer 26.00 79.31

1014 Wasi 12/8/2005 Projector 8.00 26.10

1015 Salman 2/1/2006 Scanner 8.00 26.08

1016 Wasi 10/12/2006 Projector 62.00 187.69

1017 Hamid 8/18/2006 Projector (9.00) (24.82)

1018 Usto 8/22/2004 Scanner 55.00 166.82

1019 Usto 9/2/2004 Speakers 71.00 215.35

1020 Kamran 3/17/2006 Laptop 5.00 17.43

1021 Imran 8/31/2005 Scanner 28.00 86.32

1022 Kamran 5/11/2006 Speakers 95.00 286.93

1023 Ali 9/22/2005 Projector 56.00 169.67

1024 Wasi 10/25/2005 Scanner 79.00 238.72

1025 Wasi 7/29/2005 Projector 10.00 32.24

1026 Usto 9/24/2004 Speakers 69.00 208.62

1027 Imran 3/17/2006 Printer 15.00 46.77

1028 Wasi 2/1/2006 Projector 0.00 1.78

1029 Wasi 7/7/2005 Speakers 78.00 236.10

1030 Usto 5/24/2005 Laptop 89.00 268.45

Page 77: Module 03 Do the Impossible With Array Formulas

1031 Wasi 2/14/2005 Laptop 94.00 284.11

1032 Ali 2/17/2004 Laptop (5.00) (13.09)

1033 Usto 12/6/2006 Printer 42.00 127.95

1034 Kamran 9/20/2006 Projector 9.00 29.03

1035 Kamran 4/10/2005 Scanner 8.00 26.40

1036 Ali 8/11/2004 Scanner 69.00 209.15

1037 Tasawar 10/12/2006 Laptop 2.00 7.73

1038 Wasi 9/24/2004 Projector 3.00 10.49

1039 Kamran 6/15/2005 Speakers 76.00 230.14

1040 Tasawar 6/28/2004 Projector (7.00) (18.43)

1041 Imran 7/5/2006 Laptop 24.00 74.04

1042 Hamid 9/9/2006 Scanner 35.00 106.67

1043 Wasi 3/21/2004 Scanner 23.00 71.10

1044 Usto 4/30/2006 Projector 32.00 97.98

1045 Tasawar 9/2/2004 Laptop 46.00 139.82

1046 Wasi 2/6/2004 Printer 28.00 85.91

1047 Wasi 2/3/2005 Speakers 58.00 176.38

1048 Kamran 11/16/2005 Printer 19.00 59.08

1049 Imran 8/11/2004 Printer 79.00 238.64

1050 Ali 12/10/2004 Laptop 31.00 94.12

1051 Wasi 11/16/2005 Projector 4.00 14.29

1052 Imran 3/28/2006 Scanner 91.00 275.51

1053 Usto 6/15/2005 Printer 51.00 154.75

1054 Kamran 1/15/2004 Projector 2.00 8.34

1055 Hamid 7/7/2005 Speakers 42.00 127.68

1056 Ali 11/18/2004 Printer 57.00 173.10

1057 Imran 9/24/2004 Scanner 63.00 190.21

1058 Ali 5/4/2004 Laptop 37.00 112.97

1059 Ali 3/10/2004 Printer 30.00 92.61

1060 Usto 3/28/2006 Scanner 31.00 95.22

1061 Tasawar 3/10/2004 Projector 55.00 167.33

1062 Hamid 12/19/2005 Projector (5.00) (12.64)

1063 Usto 4/23/2004 Printer 28.00 85.46

1064 Kamran 8/20/2005 Projector 93.00 280.15

1065 Hamid 10/14/2005 Speakers 13.00 40.97

1066 Ali 3/6/2006 Scanner 94.00 283.90

1067 Hamid 3/19/2005 Scanner 1.00 4.86

1068 Wasi 10/3/2005 Scanner 5.00 16.49

1069 Imran 6/2/2006 Laptop 60.00 181.33

1070 Usto 7/20/2004 Printer 67.00 203.02

1071 Usto 12/10/2004 Scanner 87.00 263.52

1072 Usto 11/18/2004 Laptop 53.00 161.07

1073 Hamid 8/9/2005 Printer 74.00 224.20

1074 Ali 11/14/2006 Printer 83.00 251.40

1075 Wasi 10/14/2005 Laptop 45.00 136.79

1076 Hamid 6/28/2004 Printer 36.00 109.96

1077 Usto 12/19/2005 Scanner 82.00 248.20

1078 Salman 8/29/2006 Scanner 18.00 56.51

1079 Kamran 4/12/2004 Scanner 21.00 64.57

1080 Imran 6/26/2005 Scanner 56.00 170.17

1081 Wasi 4/30/2006 Projector 51.00 154.96

1082 Tasawar 3/6/2006 Scanner 88.00 266.15

1083 Kamran 4/21/2005 Projector 93.00 280.96

1084 Salman 9/24/2004 Printer (4.00) (9.80)

1085 Imran 4/21/2005 Projector 30.00 91.84

1086 Hamid 12/19/2005 Scanner 81.00 245.62

1087 Imran 4/21/2005 Scanner 58.00 175.79

1088 Salman 1/4/2004 Laptop 50.00 151.96

1089 Usto 6/28/2004 Printer 92.00 277.65

1090 Salman 11/14/2006 Scanner 27.00 82.12

1091 Usto 8/22/2004 Scanner 61.00 184.45

1092 Imran 7/27/2006 Laptop 7.00 23.20

1093 Ali 12/10/2004 Printer 25.00 76.52

1094 Salman 8/22/2004 Printer 84.00 254.21

1095 Ali 4/1/2004 Projector 66.00 199.92

1096 Kamran 5/4/2004 Projector 89.00 269.23

1097 Tasawar 5/13/2005 Scanner 32.00 97.88

1098 Tasawar 7/5/2006 Printer 78.00 236.26

1099 Kamran 3/17/2006 Speakers 56.00 169.99

1100 Imran 12/28/2006 Scanner 80.00 241.54

1101 Wasi 2/3/2005 Laptop 72.00 218.33

1102 Usto 11/16/2005 Printer 23.00 71.30

1103 Wasi 3/6/2006 Laptop (2.00) (3.69)

1104 Imran 10/5/2004 Printer 81.00 245.37

1105 Kamran 11/5/2005 Speakers (4.00) (10.63)

1106 Ali 1/1/2005 Laptop 81.00 245.47

1107 Imran 3/10/2004 Speakers (9.00) (24.90)

1108 Usto 3/8/2005 Projector 67.00 203.39

1109 Ali 2/3/2005 Laptop 27.00 83.26

1110 Imran 3/6/2006 Laptop (1.00) (1.45)

1111 Salman 8/31/2005 Laptop 24.00 74.45

1112 Usto 2/1/2006 Projector 80.00 241.97

1113 Usto 10/5/2004 Printer 82.00 248.21

1114 Hamid 12/30/2005 Scanner 1.00 5.55

1115 Tasawar 4/12/2004 Scanner 11.00 35.28

1116 Ali 7/16/2006 Laptop 12.00 37.33

1117 Wasi 12/10/2004 Projector 54.00 164.38

1118 Hamid 11/3/2006 Laptop 78.00 236.66

1119 Wasi 2/6/2004 Laptop (8.00) (21.77)

1120 Ali 2/17/2004 Projector 6.00 19.84

1121 Usto 10/5/2004 Scanner 30.00 91.75

1122 Imran 2/1/2006 Printer 55.00 166.81

1123 Wasi 3/28/2006 Projector 53.00 161.24

1124 Salman 2/14/2005 Laptop 29.00 88.93

1125 Ali 4/12/2004 Printer 75.00 227.04

1126 Salman 11/29/2004 Scanner 78.00 235.68

1127 Usto 9/20/2006 Scanner 6.00 20.39

1128 Imran 7/29/2005 Printer 57.00 172.67

1129 Usto 4/10/2005 Projector 35.00 106.53

1130 Wasi 11/14/2006 Projector 72.00 217.37

1131 Hamid 6/17/2004 Laptop 79.00 238.32

1132 Wasi 4/21/2005 Printer 89.00 269.02

1133 Hamid 5/2/2005 Projector 84.00 252.58

1134 Tasawar 9/9/2006 Laptop 43.00 130.66

1135 Kamran 1/21/2006 Printer (4.00) (9.97)

1136 Kamran 1/12/2005 Scanner 51.00 154.66

1137 Ali 5/22/2006 Printer 17.00 53.07

1138 Usto 11/14/2006 Laptop 51.00 155.24

1139 Hamid 3/6/2006 Projector 14.00 44.20

1140 Salman 12/17/2006 Printer 60.00 181.87

1141 Wasi 11/18/2004 Laptop (8.00) (21.98)

1142 Imran 6/26/2005 Scanner 95.00 286.66

1143 Usto 2/1/2006 Scanner 66.00 199.59

1144 Usto 12/21/2004 Printer 77.00 232.63

1145 Usto 12/10/2004 Projector 65.00 197.33

1146 Usto 4/21/2005 Laptop 29.00 89.18

1147 Usto 7/9/2004 Speakers 8.00 26.09

1148 Salman 1/10/2006 Speakers 42.00 127.87

1149 Ali 2/28/2004 Scanner 93.00 280.72

1150 Usto 6/6/2004 Scanner 69.00 209.15

1151 Imran 7/5/2006 Laptop 91.00 274.80

1152 Usto 2/3/2005 Projector 11.00 34.52

1153 Usto 1/1/2005 Printer (1.00) (1.56)

1154 Hamid 12/21/2004 Laptop 52.00 158.21

1155 Ali 3/6/2006 Speakers (10.00) (28.64)

1156 Usto 11/25/2006 Laptop 33.00 100.51

1157 Ali 10/5/2004 Speakers (1.00) (1.12)

1158 Imran 8/29/2006 Laptop 24.00 73.54

1159 Hamid 5/15/2004 Scanner 71.00 214.70

1160 Usto 11/18/2004 Printer 88.00 265.86

1161 Ali 7/29/2005 Printer 16.00 49.99

1162 Wasi 6/15/2005 Scanner 7.00 23.19

1163 Kamran 9/24/2004 Laptop 46.00 140.48

1164 Salman 11/29/2004 Scanner (10.00) (27.58)

1165 Usto 6/24/2006 Printer 83.00 251.13

1166 Hamid 3/17/2006 Printer 85.00 256.23

1167 Usto 9/11/2005 Projector 18.00 56.22

1168 Tasawar 9/24/2004 Speakers 83.00 251.40

1169 Wasi 11/25/2006 Printer 71.00 214.72

1170 Kamran 9/2/2004 Projector 2.00 7.93

1171 Ali 11/14/2006 Scanner 71.00 215.03

1172 Usto 9/22/2005 Speakers 68.00 206.21

1173 Kamran 11/7/2004 Projector 30.00 92.33

1174 Usto 2/1/2006 Speakers 72.00 217.81

1175 Hamid 8/22/2004 Projector 73.00 221.37

1176 Ali 1/21/2006 Printer 28.00 86.47

1177 Wasi 3/17/2006 Laptop 40.00 122.64

1178 Kamran 12/6/2006 Scanner (8.00) (22.30)

1179 Salman 4/10/2005 Speakers 70.00 211.69

1180 Ali 12/19/2005 Projector 3.00 10.72

1181 Ali 12/10/2004 Projector 33.00 100.68

1182 Imran 8/22/2004 Printer 88.00 265.75

1183 Kamran 1/1/2005 Laptop 39.00 119.17

1184 Wasi 6/26/2005 Speakers 64.00 193.64

1185 Hamid 6/24/2006 Printer 0.00 2.13

1186 Tasawar 3/21/2004 Speakers 26.00 80.37

1187 Salman 3/10/2004 Printer 0.00 1.49

1188 Ali 6/13/2006 Scanner 76.00 229.77

1189 Kamran 10/27/2004 Projector 75.00 227.62

1190 Kamran 6/17/2004 Printer 61.00 184.47

1191 Wasi 7/18/2005 Projector (2.00) (4.28)

1192 Usto 2/6/2004 Speakers 40.00 122.55

1193 Imran 2/14/2005 Projector 5.00 17.38

1194 Imran 9/20/2006 Projector 57.00 172.52

1195 Hamid 3/28/2006 Projector 86.00 259.82

1196 Ali 6/17/2004 Speakers 15.00 46.53

1197 Wasi 9/9/2006 Projector 39.00 118.84

1198 Ali 5/4/2004 Scanner 94.00 284.28

1199 Ali 3/28/2006 Printer 78.00 235.95

1200 Wasi 1/21/2006 Projector 65.00 196.95

1201 Salman 12/17/2006 Projector 66.00 199.89

1202 Kamran 5/13/2005 Laptop 84.00 254.10

1203 Ali 3/17/2006 Laptop 35.00 107.42

1204 Tasawar 6/6/2004 Laptop 94.00 284.45

1205 Imran 4/10/2005 Printer 26.00 80.01

1206 Hamid 7/27/2006 Projector 80.00 242.69

1207 Tasawar 5/26/2004 Printer 7.00 22.75

1208 Usto 7/27/2006 Laptop 47.00 142.45

1209 Imran 9/13/2004 Printer 32.00 98.67

1210 Usto 11/27/2005 Printer 8.00 25.40

1211 Salman 7/31/2004 Laptop 33.00 100.91

1212 Hamid 9/2/2004 Projector 22.00 68.44

1213 Wasi 10/25/2005 Printer 81.00 244.70

1214 Wasi 6/13/2006 Speakers 81.00 244.87

1215 Salman 7/31/2004 Scanner 30.00 91.74

1216 Usto 9/13/2004 Printer (1.00) (1.15)

1217 Usto 5/22/2006 Laptop 35.00 106.85

1218 Wasi 3/17/2006 Laptop 78.00 235.96

1219 Ali 8/7/2006 Printer 15.00 47.23

1220 Hamid 1/23/2005 Laptop 75.00 226.88

1221 Kamran 10/12/2006 Projector 12.00 38.14

1222 Tasawar 11/16/2005 Laptop 30.00 91.98

1223 Tasawar 5/13/2005 Projector 42.00 128.05

1224 Kamran 1/4/2004 Projector (8.00) (22.15)

1225 Hamid 4/12/2004 Speakers 93.00 280.74

1226 Usto 8/29/2006 Projector 55.00 167.58

1227 Salman 2/25/2005 Printer 53.00 161.17

1228 Kamran 7/5/2006 Projector 20.00 61.77

1229 Usto 4/21/2005 Speakers 19.00 58.72

1230 Wasi 1/23/2005 Laptop 23.00 70.87

1231 Ali 3/6/2006 Scanner 68.00 205.91

1232 Imran 1/21/2006 Speakers 52.00 157.86

1233 Salman 7/18/2005 Projector 40.00 121.96

1234 Imran 2/23/2006 Laptop 22.00 67.71

1235 Imran 4/10/2005 Speakers 5.00 16.99

1236 Imran 4/8/2006 Laptop 30.00 92.28

1237 Imran 4/1/2004 Projector 6.00 20.24

1238 Hamid 9/24/2004 Speakers 92.00 277.63

1239 Usto 5/22/2006 Laptop (5.00) (12.43)

1240 Tasawar 5/11/2006 Printer 20.00 61.84

1241 Kamran 12/28/2006 Laptop 54.00 163.09

1242 Imran 4/10/2005 Projector 9.00 29.21

1243 Usto 5/13/2005 Projector 6.00 19.96

1244 Kamran 5/4/2004 Printer 47.00 142.83

1245 Salman 11/16/2005 Laptop (10.00) (27.09)

1246 Wasi 5/15/2004 Laptop 90.00 272.34

1247 Ali 2/6/2004 Scanner 48.00 146.43

1248 Kamran 4/10/2005 Scanner 55.00 167.33

1249 Ali 6/24/2006 Laptop 42.00 128.48

1250 Wasi 2/1/2006 Projector 39.00 119.43

1251 Imran 11/16/2005 Laptop 26.00 79.64

1252 Ali 2/12/2006 Laptop 26.00 79.50

1253 Ali 12/19/2005 Projector 52.00 158.28

1254 Imran 11/18/2004 Scanner 19.00 58.77

1255 Salman 8/11/2004 Laptop 18.00 55.68

1256 Usto 11/25/2006 Laptop 87.00 263.04

1257 Imran 10/16/2004 Projector 46.00 139.94

1258 Ali 7/16/2006 Laptop 54.00 163.69

1259 Usto 2/28/2004 Laptop 21.00 64.70

1260 Imran 2/6/2004 Scanner (6.00) (16.24)

1261 Tasawar 11/18/2004 Scanner 47.00 142.41

1262 Hamid 4/23/2004 Scanner 14.00 44.24

1263 Hamid 10/1/2006 Scanner 73.00 220.50

1264 Hamid 12/17/2006 Printer 14.00 44.42

1265 Usto 4/8/2006 Printer 95.00 286.76

1266 Tasawar 2/17/2004 Projector 64.00 193.37

1267 Wasi 10/5/2004 Projector 47.00 143.14

1268 Tasawar 11/29/2004 Scanner 20.00 61.94

1269 Usto 12/21/2004 Printer 71.00 215.33

1270 Tasawar 10/14/2005 Projector 66.00 199.50

1271 Usto 10/5/2004 Scanner 79.00 239.44

1272 Usto 10/25/2005 Laptop (7.00) (18.40)

1273 Ali 10/3/2005 Scanner 72.00 217.35

1274 Usto 10/5/2004 Speakers 91.00 275.37

1275 Imran 3/10/2004 Laptop 57.00 173.48

1276 Wasi 9/24/2004 Scanner (8.00) (21.83)

1277 Tasawar 9/11/2005 Scanner 45.00 136.96

1278 Usto 10/27/2004 Projector 92.00 278.05

1279 Imran 9/2/2004 Laptop 28.00 86.46

1280 Ali 1/23/2005 Speakers 79.00 238.99

1281 Hamid 1/23/2005 Scanner 92.00 277.54

1282 Tasawar 4/23/2004 Laptop 11.00 34.46

1283 Imran 1/23/2005 Projector 23.00 70.70

1284 Ali 4/19/2006 Projector 2.00 8.80

1285 Kamran 1/1/2005 Projector (2.00) (3.45)

1286 Usto 6/4/2005 Printer 33.00 100.69

1287 Kamran 6/24/2006 Laptop 10.00 31.30

1288 Salman 11/29/2004 Speakers 84.00 254.12

1289 Usto 12/21/2004 Laptop 88.00 266.39

Page 78: Module 03 Do the Impossible With Array Formulas

1290 Ali 7/7/2005 Projector 95.00 286.61

1291 Usto 2/14/2005 Laptop 3.00 11.90

1292 Ali 4/30/2006 Printer 72.00 217.58

1293 Wasi 3/8/2005 Projector 58.00 176.65

1294 Salman 6/6/2004 Projector 19.00 59.64

1295 Ali 4/21/2005 Laptop 35.00 106.51

1296 Usto 11/29/2004 Scanner 80.00 242.63

1297 Tasawar 1/26/2004 Projector 26.00 80.05

1298 Usto 7/7/2005 Printer 93.00 280.93

1299 Imran 11/5/2005 Projector 29.00 90.06

1300 Imran 4/23/2004 Scanner 88.00 266.37

1301 Hamid 8/18/2006 Projector 5.00 16.87

1302 Imran 8/9/2005 Laptop 64.00 194.03

1303 Kamran 12/30/2005 Printer 38.00 116.03

1304 Hamid 10/16/2004 Scanner 21.00 65.60

1305 Usto 7/18/2005 Projector 61.00 184.44

1306 Usto 5/4/2004 Projector 53.00 160.80

1307 Ali 2/1/2006 Laptop 28.00 86.32

1308 Usto 8/29/2006 Laptop 39.00 119.49

1309 Usto 11/3/2006 Printer 89.00 268.72

1310 Ali 4/23/2004 Scanner 72.00 218.16

1311 Imran 8/22/2004 Printer 63.00 191.08

1312 Tasawar 12/28/2006 Scanner 47.00 142.15

1313 Salman 7/7/2005 Laptop 8.00 25.62

1314 Ali 11/7/2004 Printer 88.00 265.57

1315 Salman 8/22/2004 Printer 12.00 37.82

1316 Hamid 11/27/2005 Laptop 79.00 239.18

1317 Imran 6/17/2004 Speakers 39.00 118.94

1318 Hamid 2/12/2006 Laptop 61.00 185.06

1319 Hamid 9/20/2006 Printer 12.00 38.28

1320 Usto 11/7/2004 Laptop 25.00 76.65

1321 Wasi 11/27/2005 Scanner 82.00 248.26

1322 Salman 12/21/2004 Laptop 4.00 14.48

1323 Salman 12/17/2006 Speakers 22.00 68.23

1324 Salman 10/1/2006 Laptop 81.00 244.62

1325 Usto 2/25/2005 Projector 34.00 103.85

1326 Salman 11/18/2004 Laptop 89.00 269.74

1327 Usto 2/3/2005 Laptop 6.00 20.31

1328 Hamid 6/26/2005 Projector 78.00 236.00

1329 Wasi 5/13/2005 Printer 9.00 28.85

1330 Tasawar 12/28/2006 Laptop 9.00 29.72

1331 Tasawar 4/19/2006 Scanner 73.00 221.18

1332 Ali 1/15/2004 Printer 13.00 41.92

1333 Imran 3/8/2005 Projector 14.00 44.00

1334 Ali 5/24/2005 Speakers 33.00 100.31

1335 Ali 4/1/2004 Scanner 17.00 53.12

1336 Usto 7/5/2006 Printer 9.00 29.50

1337 Hamid 2/23/2006 Laptop 15.00 47.31

1338 Salman 9/9/2006 Speakers 50.00 152.31

1339 Hamid 11/7/2004 Speakers 13.00 40.56

1340 Usto 9/13/2004 Printer 24.00 74.73

1341 Ali 12/30/2005 Printer 77.00 232.89

1342 Usto 5/11/2006 Laptop 21.00 65.21

1343 Wasi 7/7/2005 Laptop 80.00 240.76

1344 Usto 11/7/2004 Laptop 56.00 170.51

1345 Tasawar 4/10/2005 Scanner 28.00 86.00

1346 Hamid 11/27/2005 Speakers 50.00 151.57

1347 Tasawar 4/10/2005 Projector 23.00 71.41

1348 Hamid 6/6/2004 Printer 77.00 232.85

1349 Ali 2/17/2004 Laptop 56.00 170.26

1350 Wasi 4/19/2006 Printer 26.00 79.76

1351 Salman 2/17/2004 Scanner 18.00 55.93

1352 Tasawar 2/17/2004 Printer 40.00 121.10

1353 Usto 2/17/2004 Laptop 75.00 227.07

1354 Imran 2/25/2005 Speakers 61.00 184.75

1355 Salman 12/21/2004 Speakers 35.00 106.74

1356 Wasi 7/29/2005 Scanner 42.00 127.74

1357 Usto 11/18/2004 Projector 47.00 142.59

1358 Salman 10/16/2004 Laptop 74.00 225.02

1359 Salman 5/24/2005 Laptop 55.00 166.25

1360 Usto 9/22/2005 Printer 87.00 263.11

1361 Salman 6/28/2004 Scanner 75.00 227.33

1362 Kamran 6/13/2006 Scanner 91.00 274.61

1363 Salman 12/19/2005 Printer 79.00 238.21

1364 Wasi 6/17/2004 Laptop 31.00 94.92

1365 Usto 10/5/2004 Projector 36.00 109.87

1366 Hamid 6/28/2004 Laptop 80.00 242.06

1367 Ali 3/17/2006 Printer 32.00 98.11

1368 Usto 6/28/2004 Speakers 29.00 89.17

1369 Usto 5/13/2005 Scanner 64.00 193.52

1370 Tasawar 3/10/2004 Printer 27.00 83.67

1371 Wasi 9/24/2004 Printer 36.00 109.81

1372 Ali 12/6/2006 Laptop 36.00 109.46

1373 Hamid 10/23/2006 Laptop 32.00 97.34

1374 Tasawar 8/29/2006 Laptop 9.00 29.17

1375 Usto 5/22/2006 Scanner 78.00 235.64

1376 Usto 1/23/2005 Speakers 55.00 167.69

1377 Usto 8/22/2004 Laptop 79.00 239.26

1378 Usto 1/4/2004 Projector 9.00 29.37

1379 Ali 12/17/2006 Scanner 4.00 14.28

1380 Usto 4/19/2006 Laptop 6.00 20.17

1381 Wasi 5/24/2005 Projector 18.00 55.92

1382 Usto 10/25/2005 Projector 14.00 44.49

1383 Tasawar 8/18/2006 Printer 91.00 275.50

1384 Usto 12/8/2005 Projector 74.00 224.07

1385 Ali 7/31/2004 Printer 47.00 143.86

1386 Imran 11/3/2006 Scanner 28.00 86.47

1387 Imran 9/20/2006 Projector 21.00 64.78

1388 Tasawar 3/30/2005 Scanner 52.00 157.69

1389 Usto 6/28/2004 Speakers 33.00 101.09

1390 Imran 2/6/2004 Laptop (7.00) (19.44)

1391 Tasawar 4/1/2004 Printer 12.00 38.24

1392 Usto 2/28/2004 Projector 1.00 4.50

1393 Ali 1/26/2004 Laptop 56.00 169.76

1394 Tasawar 6/26/2005 Scanner 34.00 104.48

1395 Wasi 2/25/2005 Scanner 83.00 250.39

1396 Imran 3/19/2005 Projector (4.00) (10.16)

1397 Tasawar 2/3/2005 Scanner 9.00 29.70

1398 Usto 5/15/2004 Projector 64.00 193.99

1399 Wasi 5/15/2004 Printer 13.00 40.95

1400 Usto 4/23/2004 Printer 9.00 28.68

1401 Kamran 9/20/2006 Printer 6.00 19.55

1402 Salman 5/22/2006 Scanner 55.00 167.09

1403 Hamid 6/2/2006 Speakers 64.00 194.83

1404 Ali 6/15/2005 Printer 27.00 82.65

1405 Hamid 10/16/2004 Printer 4.00 14.36

1406 Wasi 11/5/2005 Printer 17.00 53.45

1407 Salman 8/18/2006 Printer 24.00 74.29

1408 Kamran 12/8/2005 Printer 87.00 262.88

1409 Usto 11/18/2004 Laptop 10.00 31.76

1410 Tasawar 10/16/2004 Laptop 0.00 1.83

1411 Tasawar 1/23/2005 Printer 73.00 221.01

1412 Usto 3/21/2004 Printer 66.00 200.12

1413 Ali 8/18/2006 Printer 70.00 211.75

1414 Usto 12/10/2004 Scanner 78.00 235.91

1415 Hamid 11/5/2005 Laptop 22.00 66.97

1416 Kamran 10/5/2004 Laptop 21.00 65.22

1417 Ali 10/16/2004 Printer 8.00 25.82

1418 Salman 2/17/2004 Laptop 62.00 187.80

1419 Imran 5/11/2006 Laptop 81.00 244.51

1420 Usto 12/21/2004 Printer 72.00 218.17

1421 Usto 10/12/2006 Projector 13.00 41.36

1422 Ali 8/31/2005 Speakers 52.00 157.42

1423 Tasawar 1/21/2006 Projector 49.00 148.11

1424 Tasawar 3/21/2004 Projector 82.00 248.17

1425 Usto 4/8/2006 Projector 5.00 17.02

1426 Hamid 9/22/2005 Laptop 45.00 136.86

1427 Kamran 12/8/2005 Laptop (10.00) (27.35)

1428 Salman 12/6/2006 Projector 53.00 160.85

1429 Usto 3/30/2005 Speakers 24.00 73.62

1430 Tasawar 7/16/2006 Printer 27.00 83.23

1431 Hamid 4/30/2006 Scanner 52.00 158.63

1432 Usto 10/23/2006 Scanner 0.00 1.78

1433 Tasawar 6/17/2004 Laptop 92.00 278.65

1434 Kamran 10/23/2006 Laptop 22.00 67.71

1435 Wasi 4/30/2006 Projector 67.00 202.90

1436 Usto 10/14/2005 Laptop 7.00 23.03

1437 Wasi 5/15/2004 Projector (10.00) (27.96)

1438 Imran 8/18/2006 Laptop 10.00 31.67

1439 Tasawar 6/26/2005 Scanner 15.00 46.48

1440 Salman 6/26/2005 Speakers 0.00 2.13

1441 Usto 3/17/2006 Scanner 93.00 280.91

1442 Usto 1/21/2006 Scanner 57.00 172.62

1443 Tasawar 9/24/2004 Printer 69.00 208.77

1444 Wasi 12/30/2005 Scanner 53.00 161.65

1445 Salman 10/23/2006 Speakers 67.00 203.57

1446 Wasi 4/1/2004 Projector 23.00 70.71

1447 Imran 6/17/2004 Laptop 43.00 131.16

1448 Hamid 10/23/2006 Printer 69.00 209.40

1449 Usto 10/1/2006 Speakers 45.00 136.50

1450 Usto 11/5/2005 Projector 70.00 211.70

1451 Imran 10/23/2006 Laptop 91.00 274.50

1452 Kamran 12/17/2006 Laptop 33.00 100.48

1453 Imran 8/7/2006 Scanner 90.00 272.36

1454 Imran 12/21/2004 Laptop 17.00 52.52

1455 Usto 7/31/2004 Projector (7.00) (18.92)

1456 Salman 9/2/2004 Laptop 21.00 64.91

1457 Hamid 8/9/2005 Scanner 14.00 44.33

1458 Usto 4/19/2006 Speakers 84.00 254.27

1459 Tasawar 1/21/2006 Speakers 92.00 278.13

1460 Usto 10/23/2006 Printer (1.00) (0.13)

1461 Usto 5/13/2005 Printer 73.00 222.09

1462 Wasi 1/10/2006 Scanner 48.00 146.42

1463 Wasi 12/10/2004 Projector 72.00 217.08

1464 Ali 7/5/2006 Scanner 42.00 127.61

1465 Usto 12/21/2004 Scanner 80.00 242.21

1466 Usto 8/31/2005 Scanner 56.00 170.86

1467 Hamid 1/26/2004 Laptop 46.00 140.58

1468 Ali 6/2/2006 Projector 45.00 136.77

1469 Salman 6/4/2005 Scanner 53.00 160.40

1470 Salman 10/3/2005 Projector 51.00 155.05

1471 Tasawar 12/19/2005 Laptop 64.00 193.30

1472 Ali 11/7/2004 Projector 15.00 47.09

1473 Usto 4/1/2004 Speakers 33.00 101.70

1474 Kamran 5/11/2006 Projector 31.00 95.05

1475 Salman 12/19/2005 Speakers 51.00 155.18

1476 Tasawar 8/18/2006 Scanner (7.00) (18.64)

1477 Salman 5/13/2005 Projector 37.00 112.07

1478 Ali 6/15/2005 Scanner 43.00 130.97

1479 Wasi 5/22/2006 Laptop 63.00 190.69

1480 Imran 7/9/2004 Projector 29.00 89.59

1481 Wasi 12/8/2005 Laptop 20.00 61.94

1482 Kamran 3/28/2006 Projector 48.00 146.44

1483 Ali 7/29/2005 Projector 94.00 284.31

1484 Ali 9/9/2006 Scanner 41.00 124.88

1485 Ali 1/23/2005 Projector 45.00 137.55

1486 Hamid 5/13/2005 Printer 69.00 208.61

1487 Salman 4/1/2004 Laptop 48.00 146.17

1488 Tasawar 1/23/2005 Laptop 38.00 115.70

1489 Ali 1/21/2006 Printer 49.00 149.11

1490 Imran 9/2/2004 Scanner 79.00 239.15

1491 Salman 7/18/2005 Scanner 93.00 281.34

1492 Imran 12/21/2004 Scanner 67.00 202.44

1493 Ali 5/22/2006 Scanner 13.00 41.32

1494 Salman 10/14/2005 Printer 71.00 215.36

1495 Ali 10/23/2006 Scanner 15.00 46.39

1496 Usto 9/11/2005 Projector 89.00 269.12

1497 Usto 10/25/2005 Laptop 65.00 197.50

1498 Usto 12/21/2004 Projector 16.00 49.98

1499 Ali 6/2/2006 Printer 48.00 146.13

1500 Usto 8/31/2005 Projector 78.00 235.94

1501 Wasi 1/26/2004 Printer 5.00 17.19

1502 Kamran 1/10/2006 Printer 33.00 101.71

1503 Salman 3/28/2006 Scanner 73.00 220.63

1504 Ali 7/20/2004 Laptop 93.00 280.86

1505 Ali 12/30/2005 Scanner 37.00 113.24

1506 Imran 7/29/2005 Printer 23.00 70.34

1507 Imran 11/27/2005 Printer (3.00) (7.21)

1508 Hamid 2/23/2006 Projector 39.00 118.96

1509 Ali 4/30/2006 Projector 83.00 251.40

1510 Kamran 8/29/2006 Scanner 65.00 197.81

1511 Ali 11/29/2004 Printer 13.00 41.74

1512 Kamran 11/16/2005 Scanner 9.00 28.86

1513 Tasawar 12/17/2006 Projector (4.00) (10.35)

1514 Salman 10/27/2004 Laptop 22.00 67.75

1515 Usto 3/30/2005 Laptop (3.00) (6.89)

1516 Imran 7/31/2004 Laptop 58.00 176.20

1517 Tasawar 8/22/2004 Projector 65.00 196.64

1518 Imran 6/28/2004 Projector 9.00 28.46

1519 Kamran 10/23/2006 Speakers 18.00 56.30

1520 Usto 5/4/2004 Scanner 55.00 166.78

1521 Tasawar 1/12/2005 Projector 69.00 209.57

1522 Usto 4/12/2004 Projector 51.00 155.56

1523 Salman 1/21/2006 Speakers 23.00 71.15

1524 Ali 4/19/2006 Printer 38.00 115.81

1525 Usto 11/29/2004 Speakers (8.00) (22.29)

1526 Usto 10/23/2006 Projector 20.00 61.78

1527 Tasawar 7/7/2005 Printer 25.00 76.80

1528 Ali 10/23/2006 Projector (6.00) (16.11)

1529 Usto 7/27/2006 Printer 88.00 266.77

1530 Hamid 5/22/2006 Projector 62.00 187.54

1531 Usto 1/4/2004 Speakers 80.00 242.16

1532 Wasi 3/10/2004 Speakers 66.00 199.70

1533 Kamran 11/7/2004 Scanner 34.00 104.45

1534 Usto 12/10/2004 Projector 49.00 149.82

1535 Wasi 7/20/2004 Printer 45.00 136.92

1536 Tasawar 12/19/2005 Scanner 16.00 49.65

1537 Hamid 8/20/2005 Speakers 45.00 136.64

1538 Salman 6/17/2004 Projector 1.00 5.73

1539 Wasi 7/29/2005 Laptop 33.00 100.97

1540 Usto 8/31/2005 Speakers 37.00 113.04

1541 Salman 7/7/2005 Projector 46.00 139.34

1542 Ali 2/6/2004 Scanner 71.00 215.35

1543 Usto 11/29/2004 Laptop 59.00 179.12

1544 Usto 4/21/2005 Speakers 84.00 253.54

1545 Usto 6/24/2006 Projector 91.00 274.23

1546 Tasawar 3/10/2004 Printer 33.00 100.23

1547 Wasi 12/21/2004 Projector 34.00 104.04

1548 Usto 10/23/2006 Printer 1.00 5.32

Page 79: Module 03 Do the Impossible With Array Formulas

1549 Usto 2/28/2004 Projector 42.00 128.73

1550 Wasi 12/19/2005 Projector 45.00 137.93

1551 Kamran 10/16/2004 Printer 26.00 80.03

1552 Salman 1/26/2004 Projector 72.00 218.33

1553 Usto 7/27/2006 Projector (5.00) (13.39)

1554 Imran 3/21/2004 Scanner 31.00 94.66

1555 Wasi 1/4/2004 Printer 48.00 145.91

1556 Imran 11/3/2006 Laptop 84.00 253.60

1557 Usto 2/23/2006 Projector 54.00 163.90

1558 Imran 1/15/2004 Laptop 44.00 134.19

1559 Tasawar 10/27/2004 Printer 40.00 122.05

1560 Ali 8/31/2005 Printer 25.00 76.90

1561 Kamran 2/28/2004 Printer (8.00) (21.48)

1562 Tasawar 5/11/2006 Projector 59.00 178.70

1563 Usto 12/21/2004 Projector 59.00 179.10

1564 Kamran 11/16/2005 Scanner 34.00 103.72

1565 Kamran 11/29/2004 Laptop 27.00 82.68

1566 Wasi 10/23/2006 Scanner 3.00 10.70

1567 Usto 8/20/2005 Laptop 89.00 269.12

1568 Usto 5/13/2005 Projector 58.00 175.98

1569 Wasi 1/12/2005 Speakers 52.00 158.05

1570 Wasi 7/27/2006 Laptop 32.00 98.05

1571 Tasawar 9/11/2005 Laptop 3.00 10.58

1572 Usto 11/18/2004 Projector 45.00 137.08

1573 Imran 11/29/2004 Projector 91.00 275.56

1574 Usto 2/12/2006 Scanner (8.00) (21.45)

1575 Ali 3/19/2005 Laptop (7.00) (19.14)

1576 Usto 11/5/2005 Scanner 33.00 100.89

1577 Imran 5/13/2005 Printer (7.00) (18.81)

1578 Imran 10/12/2006 Scanner 82.00 248.43

1579 Salman 6/6/2004 Projector 87.00 262.85

1580 Wasi 2/14/2005 Laptop 93.00 281.53

1581 Tasawar 10/14/2005 Scanner 72.00 218.17

1582 Hamid 10/16/2004 Laptop 11.00 35.12

1583 Imran 7/16/2006 Printer 18.00 55.78

1584 Ali 8/18/2006 Scanner 93.00 281.26

1585 Usto 8/20/2005 Scanner 56.00 170.43

1586 Salman 9/24/2004 Printer 66.00 199.70

1587 Salman 1/12/2005 Printer 95.00 286.76

1588 Usto 7/7/2005 Laptop 61.00 184.84

1589 Imran 7/16/2006 Printer 26.00 79.32

1590 Kamran 12/8/2005 Laptop 29.00 89.12

1591 Kamran 2/14/2005 Printer 61.00 184.79

1592 Usto 6/13/2006 Laptop (3.00) (7.01)

1593 Wasi 1/10/2006 Scanner 40.00 122.05

1594 Usto 7/16/2006 Scanner 86.00 260.37

1595 Wasi 6/4/2005 Speakers 58.00 176.58

1596 Usto 2/14/2005 Projector 13.00 41.16

1597 Wasi 12/28/2006 Projector 14.00 44.43

1598 Kamran 4/21/2005 Laptop 85.00 256.68

1599 Tasawar 2/1/2006 Printer 42.00 127.60

1600 Wasi 11/14/2006 Speakers 11.00 35.43

1601 Hamid 1/26/2004 Printer 32.00 98.41

1602 Usto 1/23/2005 Printer 79.00 239.26

1603 Kamran 6/17/2004 Printer 25.00 77.05

1604 Tasawar 11/27/2005 Scanner 94.00 284.06

1605 Imran 11/14/2006 Projector 6.00 20.06

1606 Usto 6/15/2005 Speakers 15.00 46.57

1607 Tasawar 6/28/2004 Projector 15.00 47.25

1608 Kamran 3/10/2004 Scanner 81.00 244.71

1609 Ali 4/10/2005 Projector 94.00 283.46

1610 Usto 1/15/2004 Laptop 11.00 35.19

1611 Imran 4/1/2004 Projector 12.00 38.18

1612 Usto 8/31/2005 Projector 85.00 257.14

1613 Usto 11/25/2006 Projector 39.00 119.06

1614 Usto 7/9/2004 Scanner 9.00 29.11

1615 Usto 2/3/2005 Laptop 25.00 77.54

1616 Hamid 6/6/2004 Projector 79.00 239.89

1617 Usto 5/26/2004 Projector 83.00 250.62

1618 Usto 12/8/2005 Scanner (3.00) (6.44)

1619 Wasi 2/23/2006 Laptop 62.00 188.24

1620 Wasi 2/6/2004 Projector 6.00 19.32

1621 Salman 4/8/2006 Laptop 13.00 41.39

1622 Kamran 9/22/2005 Projector 88.00 266.15

1623 Kamran 4/12/2004 Projector 35.00 106.70

1624 Tasawar 10/16/2004 Projector 61.00 185.38

1625 Usto 7/29/2005 Projector 95.00 287.15

1626 Kamran 1/1/2005 Projector 30.00 92.42

1627 Kamran 7/16/2006 Projector (1.00) (1.64)

1628 Ali 1/1/2005 Speakers 5.00 16.93

1629 Ali 3/8/2005 Scanner 42.00 127.32

1630 Usto 5/2/2005 Projector 14.00 44.54

1631 Tasawar 8/9/2005 Projector (4.00) (10.01)

1632 Wasi 1/21/2006 Scanner 27.00 82.26

1633 Wasi 5/4/2004 Laptop 5.00 17.11

1634 Salman 3/19/2005 Laptop 57.00 173.30

1635 Usto 10/5/2004 Printer 78.00 235.61

1636 Wasi 9/9/2006 Laptop 11.00 35.30

1637 Tasawar 10/5/2004 Printer 55.00 166.93

1638 Salman 10/5/2004 Laptop 15.00 46.99

1639 Tasawar 2/6/2004 Projector 53.00 161.39

1640 Usto 8/20/2005 Printer 70.00 212.01

1641 Wasi 8/18/2006 Scanner 56.00 170.03

1642 Usto 5/22/2006 Projector 91.00 275.47

1643 Hamid 12/21/2004 Speakers 55.00 167.81

1644 Tasawar 10/25/2005 Laptop 1.00 4.71

1645 Tasawar 2/3/2005 Projector 23.00 70.74

1646 Usto 12/19/2005 Printer 0.00 2.30

1647 Tasawar 12/21/2004 Laptop 86.00 259.96

1648 Imran 4/1/2004 Projector 13.00 40.99

1649 Salman 4/19/2006 Laptop 54.00 163.69

1650 Imran 3/10/2004 Laptop 82.00 247.66

1651 Kamran 2/14/2005 Scanner 27.00 82.65

1652 Usto 10/12/2006 Speakers 84.00 254.58

1653 Salman 5/4/2004 Projector 56.00 170.25

1654 Ali 2/28/2004 Speakers 92.00 277.27

1655 Ali 1/15/2004 Printer 25.00 77.55

1656 Ali 1/1/2005 Projector 67.00 203.00

1657 Wasi 4/12/2004 Speakers 75.00 226.86

1658 Kamran 9/22/2005 Projector 14.00 44.14

1659 Tasawar 12/19/2005 Printer 48.00 145.81

1660 Imran 5/15/2004 Scanner 73.00 221.17

1661 Usto 6/4/2005 Scanner 28.00 85.65

1662 Salman 11/27/2005 Projector 12.00 38.54

1663 Wasi 5/2/2005 Printer 50.00 152.11

1664 Tasawar 10/1/2006 Scanner (5.00) (12.64)

1665 Usto 1/23/2005 Printer 6.00 19.48

1666 Usto 2/25/2005 Scanner 63.00 190.57

1667 Kamran 6/13/2006 Scanner 33.00 100.75

1668 Wasi 9/24/2004 Projector 61.00 185.17

1669 Imran 12/10/2004 Scanner 16.00 50.71

1670 Hamid 6/2/2006 Projector 15.00 47.14

1671 Imran 7/27/2006 Projector (1.00) (0.60)

1672 Usto 6/4/2005 Printer 28.00 85.36

1673 Hamid 10/1/2006 Scanner 74.00 223.54

1674 Kamran 4/12/2004 Printer 60.00 182.53

1675 Tasawar 5/2/2005 Laptop 26.00 79.64

1676 Usto 2/28/2004 Scanner 41.00 124.81

1677 Salman 5/15/2004 Printer (1.00) (0.73)

1678 Salman 7/5/2006 Printer 89.00 268.72

1679 Usto 6/6/2004 Laptop 12.00 38.03

1680 Tasawar 10/16/2004 Projector 21.00 65.91

1681 Hamid 6/24/2006 Laptop 23.00 71.52

1682 Wasi 3/30/2005 Scanner (7.00) (18.64)

1683 Ali 3/10/2004 Scanner 35.00 106.65

1684 Salman 9/13/2004 Laptop 94.00 283.80

1685 Salman 11/5/2005 Projector 88.00 265.96

1686 Salman 3/10/2004 Speakers 26.00 79.80

1687 Wasi 7/9/2004 Scanner 83.00 250.99

1688 Kamran 6/2/2006 Laptop 11.00 34.68

1689 Imran 9/20/2006 Scanner 18.00 56.57

1690 Usto 3/19/2005 Projector 90.00 272.36

1691 Imran 10/3/2005 Laptop 12.00 38.36

1692 Imran 1/26/2004 Printer 39.00 118.64

1693 Imran 2/17/2004 Speakers 45.00 137.71

1694 Usto 12/6/2006 Scanner 74.00 223.24

1695 Imran 7/18/2005 Scanner 95.00 286.98

1696 Usto 6/6/2004 Printer 48.00 145.48

1697 Ali 10/16/2004 Laptop (3.00) (7.06)

1698 Tasawar 5/24/2005 Speakers 92.00 278.52

1699 Usto 3/8/2005 Laptop 17.00 53.28

1700 Usto 10/27/2004 Printer 45.00 136.31

1701 Tasawar 10/12/2006 Speakers 62.00 187.97

1702 Usto 10/27/2004 Scanner 52.00 158.05

1703 Usto 5/26/2004 Speakers 73.00 221.24

1704 Wasi 7/18/2005 Speakers 38.00 116.54

1705 Usto 12/19/2005 Projector 0.00 1.71

1706 Hamid 10/16/2004 Projector 70.00 211.81

1707 Wasi 5/13/2005 Scanner (8.00) (22.16)

1708 Wasi 4/30/2006 Projector 65.00 196.95

1709 Wasi 11/25/2006 Printer (5.00) (12.24)

1710 Wasi 7/29/2005 Scanner 34.00 104.46

1711 Imran 3/28/2006 Printer 72.00 217.89

1712 Hamid 2/3/2005 Projector (1.00) (0.65)

1713 Kamran 12/8/2005 Printer 40.00 122.14

1714 Usto 9/9/2006 Laptop 65.00 196.70

1715 Wasi 7/5/2006 Printer 77.00 232.42

1716 Hamid 4/19/2006 Laptop 51.00 155.00

1717 Usto 4/10/2005 Scanner (9.00) (25.10)

1718 Hamid 3/30/2005 Laptop 17.00 52.73

1719 Salman 4/10/2005 Projector 11.00 34.81

1720 Kamran 6/24/2006 Printer 40.00 121.65

1721 Salman 8/20/2005 Scanner 67.00 202.72

1722 Wasi 7/29/2005 Speakers 79.00 239.25

1723 Usto 5/15/2004 Scanner (7.00) (19.16)

1724 Usto 5/24/2005 Laptop 72.00 218.06

1725 Imran 7/29/2005 Projector 53.00 160.77

1726 Kamran 7/5/2006 Projector 35.00 107.41

1727 Salman 11/3/2006 Printer 39.00 118.67

1728 Imran 7/9/2004 Laptop (7.00) (19.35)

1729 Tasawar 6/17/2004 Projector 68.00 206.34

1730 Kamran 10/27/2004 Projector 86.00 260.29

1731 Ali 8/31/2005 Speakers 84.00 254.78

1732 Tasawar 11/25/2006 Laptop 6.00 19.97

1733 Ali 1/10/2006 Speakers (5.00) (12.77)

1734 Tasawar 4/8/2006 Printer 22.00 67.94

1735 Ali 12/8/2005 Projector 29.00 89.11

1736 Wasi 11/7/2004 Printer 3.00 10.89

1737 Salman 3/28/2006 Projector 88.00 265.53

1738 Kamran 2/25/2005 Projector 41.00 124.99

1739 Hamid 2/14/2005 Scanner 59.00 178.84

1740 Hamid 10/5/2004 Laptop 29.00 89.26

1741 Salman 2/17/2004 Laptop 43.00 130.30

1742 Wasi 4/19/2006 Printer 75.00 227.52

1743 Ali 8/22/2004 Laptop 40.00 121.71

1744 Wasi 11/18/2004 Laptop 78.00 235.89

1745 Usto 3/19/2005 Projector 38.00 115.80

1746 Kamran 6/4/2005 Laptop (3.00) (6.35)

1747 Usto 4/23/2004 Scanner 34.00 103.90

1748 Salman 5/4/2004 Projector 85.00 256.45

1749 Tasawar 11/16/2005 Scanner 70.00 212.03

1750 Kamran 11/3/2006 Projector 86.00 259.76

1751 Wasi 12/17/2006 Scanner 47.00 142.93

1752 Imran 6/13/2006 Speakers 20.00 62.60

1753 Hamid 5/15/2004 Laptop 33.00 101.42

1754 Tasawar 11/7/2004 Laptop (10.00) (27.87)

1755 Wasi 12/6/2006 Printer 40.00 122.40

1756 Kamran 7/20/2004 Scanner 13.00 40.44

1757 Salman 8/29/2006 Printer 20.00 62.16

1758 Kamran 2/28/2004 Projector 22.00 68.78

1759 Usto 9/11/2005 Scanner 91.00 275.56

1760 Ali 5/11/2006 Printer 17.00 53.54

1761 Usto 11/7/2004 Printer 77.00 232.78

1762 Tasawar 12/6/2006 Laptop 8.00 25.17

1763 Salman 8/20/2005 Projector (1.00) (0.69)

1764 Usto 6/4/2005 Printer 52.00 158.07

1765 Wasi 8/31/2005 Laptop 50.00 152.60

1766 Wasi 6/24/2006 Scanner 69.00 209.27

1767 Kamran 6/2/2006 Laptop (10.00) (28.43)

1768 Usto 9/13/2004 Scanner (10.00) (27.79)

1769 Hamid 10/25/2005 Laptop 90.00 272.47

1770 Salman 11/14/2006 Scanner (4.00) (9.80)

1771 Ali 8/18/2006 Printer 14.00 44.07

1772 Kamran 12/19/2005 Printer 13.00 41.65

1773 Imran 7/20/2004 Scanner (10.00) (27.45)

1774 Wasi 2/14/2005 Scanner 81.00 244.96

1775 Ali 1/1/2005 Scanner 91.00 274.02

1776 Tasawar 12/21/2004 Printer 7.00 23.10

1777 Ali 12/19/2005 Projector 95.00 286.41

1778 Imran 3/17/2006 Laptop 7.00 23.46

1779 Kamran 4/10/2005 Laptop 9.00 29.50

1780 Kamran 5/4/2004 Scanner 16.00 50.32

1781 Salman 2/25/2005 Printer 37.00 112.64

1782 Wasi 10/1/2006 Printer 38.00 115.87

1783 Ali 9/20/2006 Speakers 43.00 130.38

1784 Wasi 7/5/2006 Laptop (5.00) (12.65)

1785 Kamran 11/14/2006 Projector 9.00 28.95

1786 Ali 1/10/2006 Printer (9.00) (24.65)

1787 Hamid 8/31/2005 Speakers 24.00 74.61

1788 Wasi 5/4/2004 Printer 30.00 91.37

1789 Tasawar 12/8/2005 Printer 83.00 250.85

1790 Kamran 3/21/2004 Printer 90.00 271.87

1791 Imran 3/30/2005 Projector 82.00 248.23

1792 Usto 10/25/2005 Projector 51.00 155.23

1793 Wasi 1/4/2004 Printer 66.00 200.13

1794 Kamran 12/30/2005 Laptop 29.00 89.02

1795 Salman 10/3/2005 Printer 93.00 280.87

1796 Hamid 10/12/2006 Projector (3.00) (6.54)

1797 Salman 9/9/2006 Printer (2.00) (3.64)

1798 Tasawar 10/5/2004 Speakers 79.00 239.25

1799 Ali 12/28/2006 Printer 31.00 94.72

1800 Usto 5/13/2005 Scanner 46.00 140.22

1801 Kamran 12/28/2006 Scanner 93.00 281.79

1802 Kamran 3/10/2004 Printer 82.00 247.02

1803 Wasi 12/6/2006 Speakers 87.00 263.72

1804 Salman 12/10/2004 Scanner 62.00 187.57

1805 Tasawar 12/21/2004 Scanner 31.00 94.57

1806 Salman 8/11/2004 Laptop 43.00 131.33

1807 Tasawar 11/7/2004 Printer 78.00 236.44

Page 80: Module 03 Do the Impossible With Array Formulas

1808 Tasawar 7/31/2004 Printer (1.00) (0.44)

1809 Usto 3/10/2004 Speakers 5.00 17.47

1810 Tasawar 5/22/2006 Speakers 30.00 92.31

1811 Usto 4/19/2006 Projector 65.00 197.18

1812 Wasi 5/11/2006 Laptop 14.00 43.80

1813 Wasi 11/27/2005 Scanner 10.00 31.26

1814 Ali 3/10/2004 Speakers 31.00 94.73

1815 Ali 4/19/2006 Laptop 25.00 77.10

1816 Ali 3/19/2005 Speakers 11.00 35.30

1817 Ali 1/15/2004 Scanner 62.00 187.51

1818 Salman 1/26/2004 Scanner 4.00 14.19

1819 Usto 9/9/2006 Projector 4.00 13.71

1820 Tasawar 11/27/2005 Printer 71.00 215.12

1821 Hamid 5/22/2006 Speakers 67.00 203.18

1822 Kamran 4/21/2005 Printer 19.00 59.45

1823 Wasi 6/26/2005 Printer 12.00 37.63

1824 Usto 6/24/2006 Printer 50.00 151.67

1825 Ali 2/12/2006 Speakers 73.00 221.23

1826 Wasi 8/18/2006 Speakers 30.00 91.69

1827 Salman 9/13/2004 Laptop 19.00 59.10

1828 Hamid 6/4/2005 Projector 48.00 145.22

1829 Usto 5/22/2006 Laptop (8.00) (21.60)

1830 Wasi 8/18/2006 Printer (8.00) (22.14)

1831 Wasi 3/30/2005 Printer 28.00 85.91

1832 Usto 9/22/2005 Laptop 81.00 245.21

1833 Usto 1/12/2005 Printer 12.00 37.99

1834 Usto 3/6/2006 Projector 54.00 164.03

1835 Usto 5/24/2005 Scanner 70.00 212.31

1836 Usto 8/9/2005 Projector 89.00 269.07

1837 Tasawar 9/11/2005 Scanner 10.00 32.27

1838 Ali 1/4/2004 Scanner 52.00 158.18

1839 Tasawar 7/7/2005 Laptop 85.00 257.82

1840 Salman 6/26/2005 Scanner 31.00 93.98

1841 Kamran 3/17/2006 Laptop 36.00 110.03

1842 Imran 4/12/2004 Printer 80.00 241.83

1843 Imran 7/29/2005 Laptop 27.00 82.46

1844 Tasawar 5/4/2004 Scanner 46.00 140.39

1845 Tasawar 7/20/2004 Scanner 29.00 89.58

1846 Hamid 2/12/2006 Printer 55.00 167.04

1847 Kamran 9/13/2004 Laptop 2.00 7.32

1848 Ali 6/24/2006 Scanner 60.00 182.39

1849 Usto 7/29/2005 Printer 12.00 37.85

1850 Hamid 5/15/2004 Laptop 52.00 157.88

1851 Salman 4/23/2004 Printer 37.00 113.27

1852 Salman 9/24/2004 Speakers 36.00 110.52

1853 Wasi 4/23/2004 Printer 87.00 262.81

1854 Tasawar 2/1/2006 Laptop 16.00 50.28

1855 Kamran 7/18/2005 Printer 50.00 152.13

1856 Usto 2/1/2006 Laptop 53.00 160.63

1857 Wasi 5/26/2004 Scanner 61.00 184.76

1858 Salman 7/7/2005 Scanner 95.00 286.83

1859 Imran 8/22/2004 Speakers (6.00) (16.59)

1860 Kamran 8/11/2004 Printer (9.00) (24.76)

1861 Tasawar 3/17/2006 Projector 74.00 223.83

1862 Usto 12/8/2005 Printer 18.00 55.52

1863 Usto 3/6/2006 Projector 73.00 220.67

1864 Kamran 12/10/2004 Projector 62.00 188.43

1865 Imran 7/5/2006 Scanner (2.00) (3.59)

1866 Tasawar 10/1/2006 Scanner (7.00) (18.94)

1867 Tasawar 8/18/2006 Laptop 73.00 220.77

1868 Usto 4/10/2005 Projector 24.00 73.59

1869 Ali 10/3/2005 Speakers 18.00 56.08

1870 Usto 11/25/2006 Laptop 49.00 149.40

1871 Wasi 1/1/2005 Laptop 21.00 64.68

1872 Imran 5/15/2004 Scanner 2.00 7.99

1873 Wasi 11/18/2004 Scanner 83.00 250.88

1874 Imran 1/1/2005 Printer 63.00 191.15

1875 Tasawar 2/28/2004 Speakers 54.00 163.87

1876 Imran 9/13/2004 Printer 19.00 59.72

1877 Wasi 9/13/2004 Projector 66.00 199.36

1878 Ali 5/26/2004 Printer 60.00 182.28

1879 Salman 8/18/2006 Projector 90.00 271.85

1880 Kamran 12/17/2006 Printer 59.00 178.65

1881 Kamran 10/3/2005 Scanner 0.00 2.66

1882 Hamid 3/21/2004 Scanner 72.00 217.90

1883 Ali 7/20/2004 Printer (6.00) (15.74)

1884 Usto 5/22/2006 Printer 89.00 269.40

1885 Salman 5/11/2006 Printer 12.00 37.84

1886 Tasawar 8/9/2005 Laptop 89.00 269.15

1887 Usto 4/21/2005 Printer 61.00 185.31

1888 Imran 7/18/2005 Projector 24.00 73.81

1889 Kamran 11/25/2006 Projector 76.00 229.92

1890 Wasi 6/15/2005 Scanner 16.00 49.75

1891 Ali 4/10/2005 Scanner 39.00 119.19

1892 Wasi 2/23/2006 Laptop 92.00 278.43

1893 Wasi 7/31/2004 Scanner 20.00 61.92

1894 Imran 5/15/2004 Printer 60.00 181.87

1895 Kamran 11/27/2005 Projector 15.00 47.16

1896 Salman 2/14/2005 Scanner 36.00 109.84

1897 Imran 11/5/2005 Printer 46.00 140.41

1898 Usto 1/15/2004 Speakers 72.00 217.84

1899 Usto 11/3/2006 Projector 28.00 85.66

1900 Tasawar 6/13/2006 Projector 54.00 164.49

Page 81: Module 03 Do the Impossible With Array Formulas

SUMPRODUCT

Item Sold price

Tyres 5 100

Filters 2 10

Bulbs 3 2

Total Sales Value : 526 =SUMPRODUCT(D4:D6,E4:E6)

What Does It Do ?

This function uses at least two columns of values.The values in the first column are multipled with the corresponding value in the second column.The total of all the values is the result of the calculation.

Syntax

=SUMPRODUCT(Range1, Range, Range3 through to Range255)

Formatting

No special formatting is needed.

Example

The following table was used by a drinks merchant to keep track of stock.The merchant needed to know the total purchase value of the stock, and the potentialvalue of the stock when it is sold, takinging into account the markup percentage.

The =SUMPRODUCT() function is used to multiply the Cases In Stock with the Case Price tocalculate what the merchant spent in buying the stock.

The =SUMPRODUCT() function is used to multiply the Cases In Stock withthe Bottles In Case and the Bottle Setting Price, to calculate the potential value of thestock if it is all sold.

Product Case Price Bottle Cost Markup

PEPSI 10 120 10 12.00 25%

DUE 8 130 10 13.00 25%

FANTA 5 200 6 33.33 80%

BUBBLE UP 50 24 12 2.00 20%

COCO COLA 100 30 12 2.50 25%

=D39/E39

Total Value Of Stock : 7,440.00 =SUMPRODUCT(C35:C39,D35:D39)

Total Selling Price Of Stock : 9,790.00 =SUMPRODUCT(C35:C39,E35:E39,H35:H39)

Profit : 2,350.00 =E44-E43

Cases In Stock

BottlesIn Case

Page 82: Module 03 Do the Impossible With Array Formulas

=SUMPRODUCT(D4:D6,E4:E6)

The values in the first column are multipled with the corresponding value in the second column.

15.00

16.25

60.00

2.40

3.13

=F39+F39*G39

=SUMPRODUCT(C35:C39,D35:D39)

=SUMPRODUCT(C35:C39,E35:E39,H35:H39)

Bottle Selling Price