    CARA PEMBUATAN OBAT YANGBAIK (CPOB)

    Excellent in Quality, Competitiveness, and Care (e-QCC)

    Modul matrikulasi UKAI

    1

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    2/275

    2

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    3/275

    Penerapan CPOB

    1. PIC/S

    2. Harmonisasi ASEAN

    3. ICH

    4. Paradigma QbD

    3

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    4/275

    1. PIC/S

    The Pharmaceutical Inspection Convention and PharmaceuticalInspection Co-operation Scheme (jointly referred to as PIC/S)are two international instruments between countries andpharmaceutical inspection authorities, which provide together

    an active and constructive co-operation in the field of GMP. PIC/S' mission is "to lead the international development,

    implementation and maintenance of harmonised GoodManufacturing Practice (GMP) standards and quality systemsof inspectorates in the field of medicinal products."

    46 participating authorities (member PIC/S)

    http://www.picscheme.org/

    4

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    5/275

    BPOM sudah menjadi anggota PIC/S

    artinya apabila Industri Farmasi mengikuti

    aturan CPOB maka produk yang dihasilkan

    dapat diekspor ke LN tanpa negara tujuanekspor tersebut mengaudit. Data hasil audit

    hanya diperoleh dari BPOM yang telah

    terlebih dahulu melakukan audit

    5

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    6/275

    2. Harmonisasi ASEAN

    Merupakan bagian dari ASEAN Commitment yang ditandatanganiPimpinan ASEAN, ada 11 sektor prioritas termasuk kesehatan

    Dengan adanya Harmonisasi Asean (2008), semua jenis obat yangdiproduksi di seluruh Asean akan mempunyai kualitas dan standaryang sama.

    Mengatur cara pembuatan obat yang baik dari soal pengemasanhingga pendaftaran obat serta masalah sistem serta dokumentasidari setiap pekerjaan.

    Persaingan terbuka industri farmasi di ASEAN

    Pemerintah tidak dapat memberi proteksiMRA (Mutual

    Recognition Agreement), GMP inspection Mutu, keamanan, dan khasiat

    Indonesiapasar terbesar ASEAN, kapabilitas industri farmasi >>

    6

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    7/275

    3. International Conference on Harmonisation

    www.ich.org

    7

    http://www.ich.org/http://www.ich.org/
  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    8/275

    Quality Guideline

    Safety Guideline

    Efficacy Guideline

    Multidisiplinary

    Guideline

    8

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    9/275

    9

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    10/275

    4. Paradigma Quality by Design (QbD)

    Trevor Schoerie, 2014

    10

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    11/275

    Pedoman di Indonesia

    http://jdih.pom.go.id/

    11

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    12/275

    CPOB

    Peraturan Kepala Badan POM RI No.HK.03.1.33.12.12.8195 Tahun 2012, tentangPenerapan Pedoman Cara Pembuatan Obat yangBaik

    Petunjuk Operasional Penerapan CPOB 2012 jilid 1berisi penjelasan tentang bab-bab Pedoman CPOB2012

    Petunjuk Operasional Penerapan CPOB 2012 jilid 2berisi penjelasan tentang aneks-aneks PedomanCPOB 2012.

    12

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    13/275

    Aspek-aspek Pedoman CPOB 2012

    1. Manajemen mutu

    2. Personalia

    3. Bangunan & Fasilitas

    4. Peralatan

    5. Sanitasi & Higiene6. Produksi

    7. Pengawasan mutu

    8. Inspeksi diri, audit mutu, dan audit dan persetujuan pemasok

    9. Penanganan keluhan terhadap produk dan penarikan

    10. Dokumentasi

    11. Pembuatan dan analisis berdasarkan kontrak

    12. Kualifikasi & Validasi

    13

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    14/275

    Aneks-aneks Pedoman CPOB 2012

    1. Pembuatan produk steril

    2. Pembuatan obat produk biologi

    3. Pembuatan gas medisinal

    4. Pembuatan inhalasi dosis terukur bertekanan (aerosol)

    5. Pembuatan produk dari darah atau plasma manusia

    6. Pembuatan obat investigasi untuk uji klinis7. Sistem komputerisasi

    8. Cara pembuatan bahan baku aktif obat yang baik

    9. Pembuatan radiofarmaka

    10. Penggunaan radiasi pengion dalam pembuatan obat

    11. Sampel pembanding dan sampel pertinggal12. Cara penyimpanan dan pengiriman obat yang baik

    13. Pelulusan parametris

    14. Manajemen resiko mutu

    Glosarium

    14

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    15/275

    CPOTB

    Peraturan Kepala Badan POM RI No.

    HK.00.05.4.1380 Tahun 2005 tentang Pedoman

    Cara Pembuatan Obat Tradisional yang Baik

    tidak berlaku Peraturan Kepala Badan POM RI No.

    HK.03.1.23.06.11.5629 Tahun 2011 tentang

    Persyaratan Teknis Cara Pembuatan Obat

    Tradisional yang Baik (CPOTB)

    15

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    16/275

    CPKB

    Keputusan Kepala Badan POM RI No.

    HK.00.05.4.3870 Tahun 2003 tentang Pedoman

    Cara Pembuatan Kosmetik yang Baik

    Peraturan Kepala Badan POM RI No.HK.03.42.06.10.4556 Tahun 2010 tentang Petunjuk

    Operasional Pedoman CPKB

    16

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    17/275

    Perbandingan

    No CPOB 2012 CPOTB 2011 CPKB 2003

    1 Manajemen Mutu - (Manajemen Mutu) Pendahuluan (Manajemen Mutu)

    2 Personalia Personalia (Ketentuan Umum )

    3 Bangunan dan Fasilitas Bangunan, Fasilitas, Peralatan Personalia

    4 Peralatan Sanitasi dan higiene Bangunan dan Fasilitas

    5 Sanitasi dan higiene Dokumentasi Peralatan

    6 Produksi Produksi Sanitasi dan higiene

    7 Pengawasan mutu Pengawasan mutu Produksi

    8 Inspeksi diri, audit mutu, dan audit

    dan persetujuan pemasok

    Pembuatan dan Analisis Berdasarkan

    Kontrak

    Pengawasan mutu

    9 Penanganan keluhan terhadap produk

    dan penarikan

    Cara Penyimpanan dan Pengiriman Obat

    Tradisional yang Baik

    Dokumentasi

    10 Dokumentasi Penanganan Keluhan terhadap Produk,

    Penarikan Kembali Produk, dan Produk

    Kembalian

    Audit Internal

    11 Pembuatan dan analisis berdasarkan

    kontrak

    Inspeksi Diri Penyimpanan

    12 Kualifikasi dan validasi Kontrak Produksi dan Pengujian

    13 Penanganan Keluhan dan Penarikan Obat

    17

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    18/275

    like learning to drive a car - one can read the

    instruction manual and guidelines of traffic codes etc

    but until we get into a car and drive we can'tunderstand the complexity of it all! GMP is like that

    (Linda AmbrosePIC/S Executive Committee)

    18

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    19/275

    review

    End goal of CPOB

    Aspects of CPOB ?

    PIC/S

    ICH

    QbD

    19

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    20/275

    SISTEM MANAJEMEN MUTU

    Excellent in Quality, Competitiveness, and Care (e-QCC)

    20

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    21/275

    1. QMS

    Manajemenada kebijakan mutu

    Didesain scr menyeluruh

    Diterapkan scr benar oleh semua personil

    Penggabungan penerapan CPOB, QC, dan QRM Konsisten

    Didokumentasikan dan dimonitor efektivitasnya

    Menghasilkan obat yang:

    - sesuai dengan tujuan penggunaannya- memenuhi persyaratan dalam dokumen izin edar (registrasi)

    - tidak menimbulkan risiko yang membahayakan penggunanya

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    22/275

    2. Unsur dasar QMS

    a) infrastruktur/sistem mutu yang tepat mencakup

    struktur organisasi, prosedur, proses dan sumber

    daya; dan

    b) tindakan sistematis /Pemastian Mutu

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    23/275

    3. Aspek QMS dan kaitannya

    a) Pemastian Mutu (QA)

    totalitas semua pengaturan untuk menghasilkan obat berkualitas.

    b) Cara Pembuatan Obat yang Baik (CPOB)

    bagian dari Pemastian Mutu yang memastikan bahwa obat dibuat dandikendalikan secara konsisten untuk mencapai standar mutu yang sesuai

    tujuan penggunaan, dipersyaratkan dalam izin edar dan spesifikasiproduk.

    mencakup produksi dan pengawasan mutu.

    c) Pengawasan Mutu (QC)

    bagian dari CPOB yang berhubungan dengan pengambilansampel, spesifikasi dan pengujian, organisasi, dokumentasi dan prosedurpelulusan yang memastikan bahwa pengujian yang diperlukan danrelevan telah dilakukan.

    d) Manajemen Resiko Mutu (QRM)

    suatu proses sistematis untuk melakukan penilaian, pengendaliandan pengkajian risiko terhadap mutu suatu produk.

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    24/275

    Glosarium24

    Pembuatan : Seluruh rangkaian kegiatan dalam

    menghasilkan suatu obat, meliputi produksi dan

    pengawasan mutu, mulai dari pengadaan

    bahan awal dan bahan pengemas, prosespengolahan, pengemasan sampai obat jadi

    untuk didistribusi.

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    25/275

    25

    Pengawasan Mutu : Semua upaya pengawasan

    yang dilakukan selama pembuatan produk dan

    dirancang untuk menjamin agar produk

    senantiasa memenuhi spesifikasi, identitas,kekuatan, kemurnian dan karakteristik lain yang

    telah ditetapkan.

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    26/275

    26

    Produksi : Seluruh kegiatan dalam pembuatan

    obat, mulai dari penerimaan bahan, dilanjutkan

    dengan pengolahan, pengemasan dan

    pengemasan ulang, penandaan dan penandaanulang sampai menghasilkan produk jadi.

    Pengolahan : Bagian dari siklus produksi mulai

    dari penimbangan bahan awal sampai

    menghasilkan produk ruahan.

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    27/275

    27

    Pengemasan : Bagian siklus produksi yang

    dilakukan terhadap produk ruahan untuk

    menghasilkan produk jadi.

    Catatan:Lazimnya proses pengisian steril tidak dianggap

    sebagai bagian dari pengemasan. Dalam hal ini

    produk ruahan steril adalah produk yang sudahterisi dalam kemasan primer sebelum

    dilanjutkan ke proses pengemasan akhir.

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    28/275

    28

    Bets : Sejumlah obat yang mempunyai sifat dan mutuyang seragam yang dihasilkan dalam satu sikluspembuatan atas suatu perintah pembuatan tertentu. Esensisuatu bets adalah homogenitasnya.

    Lot : Bagian tertentu dari suatu bets yang memiliki sifatdan mutu yang seragam dalam batas yang telahditetapkan.

    Spesifikasi Bahan : Deskripsi suatu bahan awal, produkantara, produk ruahan atau obat jadi mengenai sifatkimiawi, fisis dan biologis jika ada.

    Spesifikasi tersebut menyatakan standar dan toleransiyang diperbolehkan yang biasanya dinyatakan secaradeskriptif dan numeris.

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    29/275

    29

    Bahan : Istilah umum yang dipakai untukmenunjukkan bahan awal (bahan aktif obat daneksipien), reagensia, pelarut, bahan pembantuproses, produk antara, bahan pengemas danbahan penandaan (label).

    Bahan Awal : Semua bahan, baik yangberkhasiat atau tidak berkhasiat, yang berubah

    atau tidak berubah, yang digunakan dalampengolahan obat walaupun tidak semua bahantersebut akan tertinggal di dalam produk ruahan.

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    30/275

    30

    Bahan Pengemas : Tiap bahan, termasuk bahan

    cetak, yang digunakan dalam proses

    pengemasan obat, tetapi tidak termasuk kemasan

    luar yang digunakan untuk transportasi ataukeperluan pengiriman ke luar pabrik.

    Bahan pengemas disebut primer atau sekunder

    tergantung tujuan penggunaan apakah

    bersentuhan langsung dengan produk atau tidak.

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    31/275

    31

    Produk Antara : Tiap bahan atau campuran

    bahan yang masih memerlukan satu atau lebih

    tahap pengolahan lanjutan untuk menjadi produk

    ruahan. Produk Ruahan : Bahan yang telah selesai diolah

    dan tinggal memerlukan kegiatan pengemasan

    untuk menjadi obat jadi.

    Produk Jadi : Produk (Obat) yang telah melalui

    seluruh tahap proses pembuatan.

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    32/275

    PERSONALIA, HYGIENE

    Excellent in Quality, Competitiveness, and Care (e-QCC)

    32

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    33/275

    Personalia

    Struktur organisasi

    Uraian tugas dan kewenangan tertulis, termasuk

    delegasi/perwakilan

    Personil kunci

    Kepala bag produksi

    Kepala bag pengawasan mutu

    Kepala bag manajemen mutu (pemastian mutu)Harus independen

    Pelatihan

    33

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    34/275

    Kepala bag produksi

    memastikan bahwa obat diproduksi dan disimpan sesuaiprosedur agar memenuhi persyaratan mutu yang ditetapkan;

    memberikan persetujuan petunjuk kerja yang terkait denganproduksi dan memastikan bahwa petunjuk kerja diterapkansecara tepat;

    memastikan bahwa catatan produksi telah dievaluasi danditandatangani oleh kepala bagian Produksi sebelumdiserahkan kepada kepala bagian Manajemen Mutu (PemastianMutu);

    memeriksa pemeliharaan bangunan , fasilitas, serta peralatan dibagian produksi;

    memastikan bahwa validasi yang sesuai telah dilaksanakan; dan

    memastikan bahwa pelatihan awal dan berkesinambungan bagipersonil di departemennya dilaksanakan dan diterapkan sesuaikebutuhan.

    34

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    35/275

    Kepala bag pengawasan mutu

    menyetujui atau menolak bahan awal, bahan pengemas,produk antara, produk ruahan dan produk jadi;

    memastikan bahwa seluruh pengujian yang diperlukan telahdilaksanakan;

    memberi persetujuan terhadap spesifikasi, petunjuk kerja

    pengambilan sampel, metode pengujian, dan prosedurpengawasan mutu lain;

    memberi persetujuan dan memantau semua analisisberdasarkan kontrak;

    memeriksa pemeliharaan bangunan, fasilitas, serta peralatan di

    bagian pengawasan mutu; memastikan bahwa validasi yang sesuai telah dilaksanakan; dan

    memastikan bahwa pelatihan awal dan berkesinambungan bagipersonil di departemennya dilaksanakan dan diterapkan sesuai

    kebutuhan.

    35

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    36/275

    Kepala bag pemastian mutu

    memastikan penerapan sistem mutu; ikut serta dalam atau memprakarsai pembentukan manual

    mutu perusahaan;

    memprakarsai dan mengawasi audit internal atau inspeksi diriberkala;

    melakukan pengawasan terhadap fungsi bagian Pengawasan Mutu; memprakarsai dan berpartisipasi dalam pelaksanaan audit

    eksternal (audit terhadap pemasok);

    memprakarsai dan berpartisipasi dalam program validasi;

    memastikan pemenuhan persyaratan teknik atau peraturanBadan POM yang berkaitan dengan mutu produk jadi;

    mengevaluasi/mengkaji catatan bets; dan

    meluluskan atau menolak produk jadi untuk penjualan denganmempertimbangkan semua faktor terkait.

    36

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    37/275

    Hygiene personil

    Pakaian pelindung sesuai dengan kegiatan

    APD lainnya : penutup kepala, masker, sarung

    tangan, sepatu khusus

    Pemeriksaan kesehatan di awal perekrutan dan scrberkala

    Sehat (tidak sdg sakit atau ada luka terbuka)

    Prosedur higiene perorangan jelas

    37

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    38/275

    38

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    39/275

    BANGUNAN DAN FASILITAS

    Excellent in Quality, Competitiveness, and Care (e-QCC)

    39

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    40/275

    Prinsip40

    Harus memiliki desain, konstruksi dan letak yangmemadai, serta disesuaikan kondisinya dan dirawatdengan baik untuk memudahkan pelaksanaanoperasi yang benar.

    Tata letak dan desain ruangan harus dibuatsedemikian rupa untuk:

    - memperkecil risiko terjadi kekeliruan,

    - pencemaran silang dan kesalahan lain,

    - memudahkan pembersihan, sanitasi, perawatan yg efektif

    Tidak menurunkan mutu obat.

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    41/275

    Area penimbangan41

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    42/275

    Aliran udara

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    43/275

    Area penyimpanan43

    Kapasitas memadai Rapi dan teratur, pemisahan/penandaan antar bahan jelas

    Kondisi penyimpanan sesuai stabilitas bahan

    Area terpisah dgn lingkungan terkendali untuk sampling

    bahan awal Area terpisah dan terkunci untuk :

    - bahan aktif potensi tinggi, radioaktif

    - narkotik, psikotropik, obat berbahaya/resiko tinggi

    disalahgunakan- bahan mudah terbakar/meledak

    - bahan pengemas cetakan/bahan label

    - bahan/produk ditolak, produk kembalian

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    44/275

    44

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    45/275

    Area pengawasan mutu45

    Terpisah dari area produksi

    Luas memadaimencegah pencampurbauran dankontaminasi silang

    Ruang terpisah untuk area uji biologi/mikrobiologi,instrumen, reagen, sampel, baku pembanding,

    pelarut, dan catatan.

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    46/275

    46

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    47/275

    Area produksi47

    Tata letak ruang produksi sebaiknya dirancang

    sedemikian rupa untuk:

    a) memungkinkan kegiatan produksi dilakukan di area

    yang saling berhubungan antara satu ruangan denganruangan lain mengikuti urutan tahap produksi dan

    menurut kelas kebersihan yang dipersyaratkan;

    b) mencegah kesesakan dan ketidak-teraturan; dan

    c) memungkinkan komunikasi dan pengawasanyang efektif terlaksana.

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    48/275

    Kelas kebersihan

    A,B,C,D untuk produksi steril

    E untuk produksi non steril

    48

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    49/275

    Rekomendasi AHU untuk tiap kelas

    POPP lampiran 3.5b hal 78-79

    49

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    50/275

    50

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    51/275

    51

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    52/275

    52

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    53/275

    53

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    54/275

    Sarana khusus dan self-contained

    Untuk pengolahan produk di bawah ini:

    - antibiotika golongan betalaktam penisilin,

    - antibiotika golongan betalaktam nonpenisilin,

    - hormon seks,

    - onkologi,

    - preparat biologi (selama masih belum diinaktivasi),

    - produk darah, dan

    - vaksin

    54

    Permukaan dinding lantai langit2

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    55/275

    Permukaan dinding, lantai, langit2,

    pintu

    Dicat dengan epoksi, poliakrilik, atau poliuretan Kedap air

    Tidak terdapat sambungan, rata

    Tidak merupakan media tumbuh mikroba

    Mudah dibersihkan Tahan terhadap proses pembersihan

    Sebaiknya tidak dari kayu

    Lampu rata dgn langit2

    Pipa saluran udara dipasang diatas langit2

    Pipa yang ada diruang produksi, tidak menempel dgn dinding Pipa diberi penandaan (isi dan arah) yang jelas

    55

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    56/275

    Alur barang dan personil56

    57

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    57/275

    SARANA PENUNJANG

    Excellent in Quality, Competitiveness, and Care (e-QCC)

    57

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    58/275

    58

    Air Handling Unit (AHU) / Heating, Ventilation andAir- Conditioning (HVAC)

    Sistem pengolahan air

    Sistem pengolahan limbah

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    59/275

    Supplementary Training Modules on GMP

    Heating, Ventilation and Air- Conditioning

    (HVAC)

    Part 1 :

    Introduction and overview

    WHO Technical Report Series, No.937, 2006. Annex 2

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    60/275

    HVAC

    Introduction and Scope

    HVAC systems can have an impact on product quality

    It can provide comfortable conditions for operators The impact on premises and prevention of contamination and

    cross-contamination to be considered at the design stage

    Temperature, relative humidity control where appropriate

    Supplement to basic GMP text

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    61/275

    HVAC

    The guideline further focuses on three conceptsof the system: Product protection

    Contamination

    Cross-contamination

    Environmental conditions Personnel protection

    Prevent contact

    Comfort conditions Environment protection

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    62/275

    Factors contributing to quality

    products

    Starting materials

    Personnel

    Procedures

    Validated processes

    Equipment

    Premises

    Environment

    Packing materials

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    63/275

    The manufacturing environment is critical for product quality.

    Factors to be considered include:1. Light

    2. Temperature

    3. Relative humidity

    4. Air movement

    5. Microbial contamination

    6. Particulate contamination

    Uncontrolled environment can lead to product degradation

    product contamination (including cross-contamination)

    loss of product and profit

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    64/275

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    65/275

    What is Cross-contamination?

    "Contamination of a starting material, intermediate product, orfinished product with another starting material or product duringproduction".

    Cross-contamination can result from, e.g.

    1. Poorly designed, operated or maintained air-handling systems anddust extraction systems

    2. Inadequate procedures for, and movement of personnel, materialsand equipment

    3. Insufficiently cleaned equipment

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    66/275

    Contamination

    Contaminant

    from

    Environment

    Operators

    Contaminant

    from

    Equipment

    CrossContamination

    Product

    fromEnvironment

    Operators

    Productfrom

    Equipment

    Cross-Contamination

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    67/275

    Cross-contamination can be minimized by, e.g.1. Personnel procedures

    2. Adequate premises

    3. Use of closed production systems

    4. Adequate, validated cleaning procedures

    5. Appropriate levels of protection of product

    6. Correct air pressure cascade

    HVAC

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    68/275

    HVAC

    The classification should beachieved in the state as

    specified (1):

    "As built"

    Bare room, without equipment or

    personnel

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    69/275

    HVAC

    The classification should beachieved in the state as

    specified (2):

    "At rest"

    Equipment may be operating, but

    no operators present

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    70/275

    HVAC

    The classification should beachieved in the state as

    specified (3):

    "In operation"

    Normal production process with

    equipment and personnel,

    Clean up time validated

    normally in the order of 20

    minutes

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    71/275

    Definition of Conditions

    air

    as built

    airair

    at rest in operation

    HVAC

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    72/275

    HVAC

    Level of protection and air cleanliness

    determined according to:

    Product to be manufactured

    Process to be used Product susceptibility to degradation

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    73/275

    Parameters influencing Levels of Protection

    Number of particles in the air, number of microorganisms in the airor on surfaces

    Number of air changes for each room Air velocity and airflow pattern

    Filters (type, position)

    Air pressure differentials between rooms

    Temperature, relative humidity

    HVAC

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    74/275

    Air Handling

    System

    Production Room

    WithDefined

    Requirements

    Supply

    AirOutlet

    Air

    HVAC

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    75/275

    Tools to help achieve the desired Level of Protection

    Air-handling system can be the main tool for reaching requiredparameters

    May not be sufficient as such Need for additional measures such as

    appropriate gowning (type of clothing, properchangingrooms)

    validated sanitation

    adequate transfer procedures for materials andpersonnel

    HVAC

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    76/275

    Cleanroom Classdefined by

    Critical Parameters

    Air Handling

    SystemAdditional Measures

    HVAC

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    77/275

    Examples of Levels of Protection

    Types of Clean room classes

    WHO, EC, PIC/S: A, B, C, D

    US FDA: Critical and controlled

    ISPE: Level 1, 2 or 3

    ISO: Class 5, 6, 7 or 8

    HVAC

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    78/275

    HVAC

    Air Filtration

    Degree of filtration is important to prevent contamination

    Type of filters to be used dependent on the quality of ambient air,

    return air and air change rates Manufacturer to determine, select and prove appropriate filters

    for use considering level of ambient air contamination, national

    requirements, product specific requirements

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    79/275

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    80/275

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    81/275

    HVAC

    Airflow patternsFiltered air entering a production room or covering a

    process can be

    turbulent, or

    unidirectional (laminar)

    GMP aspect

    economical aspect

    Other technologies: barrier technology/isolator technology.

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    82/275

    Unidirectional/laminar

    displacement of dirty air

    Turbulent

    dilution of dirty air

    Airflow patterns

    HVAC

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    83/275

    HVAC

    Infiltration

    Facilities normally under positive pressure to

    the outside

    Prevent infiltration of unfiltered, contaminatedair from outside

    Some cases - negative pressure (e.g. penicillin

    manufacture). Special precautions to be taken

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    84/275

    HVAC

    Pressure differential concept

    Calibrated monitoring devices, set to alarm system

    Monitoring and recording of results Doors open to higher pressure

    Dust extraction system design

    Interlocked with air-handling system

    No airflow between rooms linked to same system

    Room pressure imbalance

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    85/275

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    86/275

    86

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    87/275

    HVAC

    Temperature and relative humidity (RH)

    Controlled, monitored and recorded where relevant

    Materials and product requirements, operator comfort

    Minimum and maximum limits Premises design appropriate, e.g. low humidity areas, well

    sealed and airlocks where necessary

    HVAC designalso prevent moisture migration

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    88/275

    HVAC

    Dust Control

    Dust and vapour removed at source

    Point of use extractionfixed points or movable hood

    plus general directional airflow in room

    Ensure sufficient transfer velocity to prevent dust settling in

    ducting

    Risk analysisairflow direction, hazards, operator

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    89/275

    HVAC

    Protection of the environment (Exhaust air dust) Exhaust air from equipment and some areas of production carry

    heavy loads of dust (e.g. FBD, coating, weighing)

    Filtration needed to prevent ambient contamination

    Not highly potent material

    EN779 F9 filter recommended

    Harmful substances (e.g. hormones)

    EN1822 H12 (HEPA) filter recommended

    In some cases two banks of HEPA filters

    Safe change filter housings ("bag-in bag-out" filters)

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    90/275

    Heating, Ventilation and Air- Conditioning (HVAC)

    Part 2:

    HVAC systems and components

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    91/275

    HVAC

    General

    Design of HVAC is dependent on required degree of air

    cleanliness

    Suitable components should be selected including:

    fans,

    driers,

    filters,

    ducts, grilles, etc.

    HVAC Main subsystems

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    92/275

    +

    Production Room

    Exhaust air treatment

    Central air handling unit

    Terminal air treatmentat production room level

    Fresh air treatment

    (make-up air)

    HVAC Main subsystems

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    93/275

    FilterSilencer

    Terminal filter

    Weather louvre Control damper

    FanFlow rate controller

    Humidifier

    Heatingcoil

    Cooling coil

    with dropletseparator

    Production Room

    Overview components

    +

    Prefilter

    Exhaust Air Grille

    Heater

    Secondary Filter

    Recirculated air

    HVAC

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    94/275

    Weather louvre

    Silencer

    Flow rate controller

    Control damper

    To prevent insects, leaves, dirt and rain

    from entering

    To reduce noise caused by air circulation Automated adjustment of volume of air

    (night and day, pressure control)

    Fixed adjustment of volume of air

    Components (1)

    V C

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    95/275

    Heating unit

    Cooling unit/dehumidifier

    Humidifier

    Filters

    Ducts

    To heat the air to the proper

    temperature

    To cool the air to the required

    temperature or to remove moisture from

    the air To bring the air to the proper humidity, if

    too low

    To eliminate particles of predetermined

    dimensions and/or microorganisms To transport the air

    Components (2)

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    96/275

    Control damper for airflow

    De-humidification

    Filter PressureGauges

    AHU with fan Variable

    Speed Controller

    Humid room air

    Air heater

    Regeneration air

    Humid room airAdsorber wheel Dry air

    Air-handling unit

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    97/275

    Humidifier Silencer Heating and

    cooling units

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    98/275

    Filter classes Dust filters

    Standard Aerosol

    FineCoarse ULPAHEPA

    10 m > Dp > 1 mDp > 10 m Dp < 1 m

    F5 - F9G1 - G4 U 14- 17H 11 - 13

    EN 1822 StandardEN 779 Standard

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    99/275

    Primary panel filter

    Secondary filter

    HEPA or tertiary filter

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    100/275

    Average EfficiencyIntegral Value

    Peak ArrestanceLocal Value

    Retention in%

    Penetration Efficiency Penetration

    F9 85 0.15

    H11 95 0.05

    H12 99.5 5x10-3

    97.5 25x10-3

    H13 99.95 5x10-4

    99.75 25x10-4

    U14 99.995 5x10-5 99.975 25x10-5

    Classification of filters according to their efficiency

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    101/275

    Positioning of filters (1)

    Filter in terminal positionAHU mounted final filter

    Production Room

    +

    Production Room

    HEPA Filter

    HEPA Filter

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    102/275

    Prefilter

    AHU

    Main filter

    1 2 3

    Low level exhausts

    Ceiling

    exhausts

    Positioning of filters (2)

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    103/275

    AHU

    Prefilter

    Final filter

    21

    Positioning of filters (3)

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    104/275

    Swirl Type air diffusors with

    terminal filters1 Filter2 Tightening frame

    3 Register outlet

    4 Screw fixation for register

    1

    2

    3

    4

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    105/275

    Low induction

    swirl diffusor

    (preferred)

    High induction

    office type diffusor

    (avoid)

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    106/275

    Regulation of room pressure

    pressure differentials concept

    Room pressure

    gauges

    Room pressure indication panel

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    107/275

    Flow rate controller

    Control damper

    Humidifier

    Cooling battery

    Filters

    Ducts

    Blocked

    Poorly adjusted, bad pressure differential

    system

    Bad water/steam quality/

    poor drainage

    No elimination of condensed water/ poor

    drainage

    Incorrect retention rate/damaged/badly

    installed

    Inappropriate material/internal insulator

    leaking

    Problems with components

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    108/275

    HVAC

    In the next slidesConsider different air types, e.g.:

    Supply air

    Return air (recirculated air)

    Fresh air (make-up air) Exhaust air

    And: Concepts of air delivery to production areas:

    Recirculation systems

    Full fresh-air systems

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    109/275

    +

    Production Room

    Exhaust air

    Return air

    (recirculated)

    Fresh air

    (make-up air)Supply

    air

    Air types

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    110/275

    Recirculation systems There should be no risk of contamination and cross-contamination

    when air is recirculated

    Normally, HEPA filters (EN1822 H13) needed in supply air stream

    Not required in single product facility with no risk of cross-contamination Not required where no dust generation (e.g. secondary packaging)

    HEPA filters placed in AHU or terminally

    Dust from highly toxic processes should not be recirculated

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    111/275

    Ventilation with recirculated air + make-up air

    Central Air-Handling Unit

    Return air

    Exhaust Unit

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    112/275

    Full fresh-air systems 100% fresh air - normally where toxic products are processed, and

    recirculation not recommended

    No contamination from fresh airsufficient filtration needed

    Degree of filtration on exhaust dependent on exhaust aircontaminants and environment regulations

    Energy-recovery wheels

    Should not be source of contamination

    Relative pressure between supply and exhaust air

    HVAC

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    113/275

    Ventilation with 100% fresh air (no air recirculation)

    W

    Washer (optional)

    Central Air-Handling Unit

    Production Rooms

    Exhaust Unit

    Supplementary Training Modules onGood Manufacturing Practice

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    114/275

    Water forPharmaceutical Use

    Part 1:Introduction and

    treatment

    Good Manufacturing Practice

    WHO Technical Report Series No929, 2005. Annex 3

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    115/275

    Additional guidelines

    WHO Guideline for Drinking water quality (WHO)

    Water and steam systems (ISPE)

    Bioprocessing Equipment Standard (ASMEBPE 2000)

    European Pharmacopoeia, United States Pharmacopeia,International Pharmacopoeia

    Inspection of Utilities (PIC/S)

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    116/275

    Principles

    Like any starting material, production of water should conform to

    Good Manufacturing Practice (GMP) norms

    Potential for microbial growth

    Systems must be properly validated / qualified

    Water for parenteral use should not be contaminated with pyrogens

    or endotoxins

    Specifications and periodic testing are required

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    117/275

    Why purify raw water?

    Although reasonably pure, it is always variable due to

    seasonal variations, regional variation in water quality

    Must remove impurities and control microbes to avoid

    contaminating products

    Treatment depends on waters chemistry and contaminants,

    influenced by, e.g. rainfall, erosion, pollution, dissolution,

    sedimentation, decomposition

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    118/275

    Biofilm formation1. Free-swimming aquatic bacteria use polymucosaccharidesto

    colonize surfaces

    2. Complex communities evolve which shed

    microcolonies and bacteria

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    119/275

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    120/275

    Background to water requirements and use (2)

    Control quality of water

    Production Storage and distribution

    Contaminants, microbial and chemical quality

    Microbial contamination risk and concern

    Water is used on demand

    not subjected to testing and batch or lot release before use,

    therefore has to meet specification "on demand" when used Micro test results require incubation periods

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    121/275

    Water system requirements

    Design, installation, commissioning, qualification / validation,operation, performance and maintenance to ensure reliable,

    consistent production of water of required quality Operate within design capacity

    Prevent unacceptable microbial, chemical and physicalcontamination during production, storage and distribution

    Quality Assurance involved in approval of use after installationand maintenance work

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    122/275

    Water system requirements (2)

    Monitoring of water sources regularly

    Chemical and microbiological

    Endotoxin level where relevant Monitoring of system performance, storage and distribution

    systems

    Records of results, and action taken

    Validated sanitization procedure followed on a routine basis

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    123/275

    Water quality specifications

    Here address water in bulk(not for patient administration)

    Specifications in pharmacopoeiarelevant to national orinternational recommendations.Types of water include:

    Drinking water / potable water

    Purified water (PW)

    Highly Purified Water (HPW)

    Water for Injection (WFI)

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    124/275

    Drinking water / potable water

    Must comply with specification (WHO, ISO and national orregional agencies)regular testing needed

    Supplied under continuous positive pressure

    Defect free plumbing system to prevent contamination

    Could be from public water supply system or natural sources

    Source water quality influences the treatment required

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    125/275

    Drinking water:Natural sources could include

    springs, wells, rivers and lakes

    Treatment includes softening,

    ion removal, particlereduction, antimicrobialtreatment

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    126/275

    Purified Water (PW)

    Prepared from potable water source

    Meet pharmacopoeia specification for chemical and microbial

    purity

    Protected from recontamination

    Protected from microbial proliferation

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    127/275

    Highly Purified Water (HPW)

    Prepared from potable water source

    Specification only in the European Pharmacopoeia

    Same quality standard as WFI including limit for endotoxins,but treatment method considered less reliable than distillation

    Prepared by combination of methods including reverse osmosis(RO), ultrafiltration (UF) and deionization (DI)

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    128/275

    Water for Injections (WFI)

    Prepared from potable water source

    WFI is not steril

    WFI is not a final dosage form

    WFI is an intermediate bulk product

    According to The International and European Pharmacopoeias

    final purification step should be distillation

    Spesifikasi

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    129/275

    129

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    130/275

    Application of specific water to processes and dosageforms

    Water used for different stages of:

    Washing, preparation, synthesis, production,

    formulation, control

    Which grade of water is suitable for a particular stage?

    Consider nature and intended use of intermediate or finished

    product, and stage at which water is used

    Let's look at types of water and indicate their use

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    131/275

    Complete the table

    Which type of w ater?Use

    ?Preparation of injectable

    products

    ?Final rinse of equipment aftercleaning

    ?Final rinse of equipment and

    components that come into

    contact with injectable products

    HPW?

    Potable water?

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    132/275

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    133/275

    Water purification system considerations

    Leaching from contact materials

    Adsorption

    Hygienic and sanitary design

    Corrosion resistance

    Leakage

    Proliferation of microbiological organisms

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    134/275

    Pre-treatment steps

    Primary filtration and multimedia filter

    Coagulation or flocculation

    Desalination Softening

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    135/275

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    136/275

    136

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    137/275

    137

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    138/275

    138

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    139/275

    raw water

    High pressure

    Feed

    water

    under

    pressure

    Reject

    water

    Semi-permeable

    memb

    rane

    Permeate

    water

    drain or recycle

    Low pressure

    Purified water

    Reverse osmosis (RO) theory

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    140/275

    System sanitization and bioburden control

    Systems in place to control proliferation of microbes

    Techniques for sanitizing or sterilization

    Consideration already during design stagethen validated Special precautions if water not kept in the range of 70 to 80

    degrees Celsius

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    141/275

    Storage and distribution Pipes and heat exchangers

    Continuous circulating loop needed

    Filtration not recommended in loop and take-off point

    Heat exchangers: Double tube plate or double plate and frame type

    Designed to ensure no stasis of water

    Where water is cooled before use, done in minimum time, and

    validated process

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    142/275

    Water must

    be kept

    circulating

    Spray ball

    Cartridge

    filter 1 m

    Air break

    to drain

    Outlets

    Hygienic pump

    Optional

    in-line filter

    0,2 m

    UV light

    Feed Water from

    DI or RO

    Heat Exchanger

    Ozone Generator

    Hydrophobic air filter

    & burst disc

    Typical water storage and distribution schematic

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    143/275

    Biocontamination control techniques

    Continuous turbulent flow circulation

    Specified velocity proven (qualification), and

    monitored Avoid dead legs

    Hygienic pattern diaphragm valves

    Shortest possible length of pipe work

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    144/275

    Biocontamination control techniques

    There should be no dead legs

    Water scours dead leg

    If D=25mm & distance X is

    greater than 50mm, we have

    a dead leg that is too long

    Dead leg section

    >1.5D

    Flow direction arrows

    on pipes are important

    Sanitary Valve

    D

    X

    Water for Pharmaceutical Use

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    145/275

    Biocontamination control techniques

    Periodic sanitization with hot water

    Periodic sanitization with super-heated hot water or clean steam

    Reliable

    Monitoring temperature during cycle

    Routine chemical sanitization using, e.g. ozone

    Removal of agent before use of water important

    6.5.3

    Penanganan Limbah

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    146/275

    146

    Limbah cair- IPAL

    - Perlakuan khusus untuk limbah produksi betalaktam dan sitotoksik.

    Limbah padat

    - Limbah B3 (Bahan Berbahaya dan Beracun) dalam bentuk padatdiolah menggunakan incenerator.

    Limbah udara

    - debu produksi dikumpulkan dalam dust collector.

    Limbah suara- berasal dr mesin produksi, mesin AHU, boiler, genset

    - tolok ukur : angka kebisingan (maks. 65 dB), getaran (maks. 7,5 Hz)

    Alur pengolahan limbah cair scr umum

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    147/275

    147

    Bak penampungan awal

    Bak ekualisasi untuk limbah betalaktam dan sitotoksik

    Bak netralisasi

    membuat pH limbah berada pada pH 6-9

    Bak aerasi

    untuk menumbuhkan bakteri dalam air sehingga senyawa-senyawa organik yang

    ada di dalam limbah dapat diubah menjadi senyawa yang lebih sederhana. Bak sedimentasi

    Limbah kemudian dipisahkan antara cairan limbah (filtrasi) dengan lumpur(masuk limbah B3).

    Bak filtrasi

    Proses filtrasi dilakukan dengan melewatkan limbah cairan melalui filter ijuk,pasir kerikir, dan karbon aktif. Setelah melewati serangkaian filter tersebut, limbahcairan dilewatkan resin kation dan resin anion untuk menghilangkan muatan limbah.

    Bak penampungan akhir

    Bak kontrol (kolam ikan) untuk memantau keamanan air limbah dan diujifiltratnya di laboratorium

    Limbah cair betalaktam

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    148/275

    148

    Prinsip : pemecahan cincin beta laktam Cara :

    - hidrolisis dengan basa (NaOH) sampai pH 10-12lbhdipilih.

    - hidrolisis dengan asam- Hidrolisis dengan merkuri klorida

    Cth proses ekualisasi limbah :

    Pada bak equalisasi dilakukan proses alkalinasi dengan

    menambahkan NaOH dengan konsentrasi 40% hingga pHcairan limbah lebih dari 9. Setelah itu, ditambahkankaporit 100 g untuk menghilangkan bau dan warna.

    Alur pengolahan limbah cair sitotoksik

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    149/275

    149

    Proses penonaktifan struktur senyawa sitotoksik

    dibantu dengan senyawa Natrium Hipoklorit(NaOCl) melalui reaksi oksidasi.

    Baku mutu limbah cair

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    150/275

    150

    Menurut Peraturan Menteri Lingkungan Hidup No. 5Tahun 2014, persyaratan air limbah yaitu:

    Total Suspended Solid (TTS) : 75 mg/L

    pH : 6,0-9,0 COD : 150 mg/L

    BOD5 : 75 mg/L

    151

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    151/275

    PERALATAN DAN SANITASI

    Excellent in Quality, Competitiveness, and Care (e-QCC)

    Peralatan

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    152/275

    Luas area kerja produksi min 2 kali luas yg diperlukanuntuk penempatan peralatan

    Bagian peralatan yang bersentuhan dengan produkharus inert (tidak ada reaksi, adisi, absorbsi)

    Desain peralatan:

    - sederhana, sesuai tujuan penggunaan, mudahdibongkar dan dipasang kembali stlh dibersihkan

    - semua bagian terjangkau pada pembersihan

    - tidak ada bagian yang menahan sisa produk atau larpencuci- tidak berkarat dan tidak mudah tergores

    152

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    153/275

    Satu ruangan untuk satu atau satu set peralatan, jarakcukup

    Produksi campaignpembersihan antar bets ditentukan,jumlah maksimal bets ditentukan

    Bahan pelumas food grade

    Mesinterkualifikasi Alat ukurterkalibrasi dan diperiksa pada interval waktu

    ttt.

    Buku log permakaian dan perawatan

    Pembersihan peralatan sesuai prosedur (mencegahkontaminasi silang)

    Perawatantidak berpengaruh thd mutu

    153

    154

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    154/275

    PRODUKSI

    Excellent in Quality, Competitiveness, and Care (e-QCC)

    Prinsip

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    155/275

    155

    Tujuan :menghasilkan produk yang memenuhi persyaratan mutu serta memenuhiketentuan izin pembuatan dan izin edar.

    Produksi hendaklah dilaksanakan dengan :

    - memenuhi ketentuan CPOB- mengikuti prosedur yang telah ditetapkan (tervalidasi)

    - oleh personel yang kompeten

    - bahan yang jelas dan memenuhi spesifikasi

    - peralatan yang sesuai

    Untuk mencegah :- pencemaran silang (cross contamination)

    - ketercampurbauran (mix-up)

    Alur produksi

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    156/275

    156

    Produksi : Seluruh kegiatan dalam pembuatanobat, mulai dari penerimaan bahan, dilanjutkan

    dengan pengolahan, pengemasan dan

    pengemasan ulang, penandaan dan penandaan

    ulang sampai menghasilkan produk jadi.

    Pengolahan : Bagian dari siklus produksi mulai

    dari penimbangan bahan awal sampai

    menghasilkan produk ruahan.

    157

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    157/275

    157

    Pengemasan : Bagian siklus produksi yangdilakukan terhadap produk ruahan untuk

    menghasilkan produk jadi.

    Catatan:

    Lazimnya proses pengisian steril tidak dianggap

    sebagai bagian dari pengemasan. Dalam hal ini

    produk ruahan steril adalah produk yang sudah

    terisi dalam kemasan primer sebelumdilanjutkan ke proses pengemasan akhir.

    Pencemaran silang158

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    158/275

    158

    Pencemaran bahan awal atau produk olehbahan atau produk lain.

    Penyebab :

    - tidak terkendalinya debu, gas, uap, percikan atauorganisme dari bahan atau produk yang sedang

    diproses,

    - dari sisa yang tertinggal pada alat,- dari pakaian kerja operator.

    Pencegahan pencemaran silang159

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    159/275

    159

    produksi di dalam gedung terpisah (diperlukan untuk produk sepertipenisilin, hormon seks, sitotoksik tertentu, vaksin hidup, dan sediaanyang mengandung bakteri hidup dan produk biologi lain sertaproduk darah);

    tersedia ruang penyangga udara dan penghisap udara;

    memperkecil risiko pencemaran yang disebabkan oleh udara yang

    disirkulasi ulang atau masuknya udara yang tidak diolah atauudara yang diolah secara tidak memadai;

    memakai pakaian pelindung yang sesuai di area di mana produkyang berisiko tinggi terhadap pencemaran silang diproses;

    melaksanakan prosedur pembersihan dan dekontaminasi yang

    terbukti efektif, karena pembersihan alat yang tidak efektifumumnya merupakan sumber pencemaran silang;

    menggunakan sistem self-contained;

    pengujian residu dan menggunakan label status kebersihan padaalat.

    Sistem penomoran bets160

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    160/275

    160

    Sebagai identitas produk. Mempermudah dentifikasi produk.

    Mempermudah pencocokan dan pelacakan produk.

    Penerimaan bahan awal &bahan pengemas

    161

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    161/275

    161

    Dari pemasok yang telah disetujui Disertai certificate of analysis (CoA)

    Bahan awal dan pengemas dikarantina

    dilakukan sampling dan pengujian kesesuaiandengan spesifikasi

    Pelabelan jelas

    Hanya bahan yang diluluskan (oleh QC/QA) yg

    bisa digunakan untuk proses produksi Sistem pengeluaran bahanFIFO atau FEFO

    Penimbangan & penyerahan bahan untukproduksi

    162

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    162/275

    162

    Sesuai formula dalam catatan bets Kapasitas dan ketelitian alat timbang sesuai

    Re-check hasil penimbanganprint-out

    penimbangan dan oleh supervisor produksi Peralatan bersih dan sesuai

    Pengolahan produk padat dan kering163

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    163/275

    163

    Produk padat dan kering Produk cair, krim, dan salep non steril

    Produk steril

    Pengemasan164

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    164/275

    164

    Pencegahan ketercampurbaurandilakukan line clearance sblm proses

    Sesuai prosedur pengemasan.

    In process control165

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    165/275

    165

    Ada prosedur tertulis untuk sampling dan pengujianselama proses produksi

    Selama proses pengolahan dan pengemasan bets

    hendaklah diambil sampel pada awal, tengah dan

    akhir proses oleh personil yang ditunjuk

    Hasil pengujian/inspeksi selama-proses dicatat dan

    menjadi bagian dari Catatan Bets.

    Proses karantina dan penyerahanproduk jadi

    166

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    166/275

    166

    Selama karantina dilakukan sampling danpengujian oleh QC

    Produk yang memenuhi spesifikasi diluluskan oleh

    QA.

    Diambil sampel pertinggal

    Produk jadi yang sudah diloloskan diserahkan ke

    bagian gudang, dicatat dlm kartu stok.

    Pengolahan ulang (rework)167

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    167/275

    167

    Produk jadi tidak memenuhi spesifikasi dan kriteriamutu lain yang ditetapkan

    Prosesnya dikerjakan menurut prosedur yang ada

    dan telah disetujui oleh QA

    mutu produk akhir tidak terpengaruhmemenuhi

    spesifikasi

    Penyimpanan168

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    168/275

    Penyimpanan dilakukan secara rapi dan teraturuntuk mencegah risiko kecampurbauran

    Kondisi penyimpanan disesuaikan berdasarkan

    hasil uji stabilitas

    Bahan dan produk hendaklah diletakkan tidak

    langsung di lantai dan dengan jarak yang cukup

    terhadap sekelilingnya

    Identitas/penandaan jelas

    Dokumentasi169

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    169/275

    Dokumen produksi induk Dokumen prosedur pengolahan induk

    Dokumen prosedur pengemasan induk

    Catatan pengolahan bets Catatan pengemasan bets

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    170/275

    PEMBUATAN DAN ANALISISBERDASARKAN KONTRAK

    Excellent in Quality, Competitiveness, and Care (e-QCC)

    CPOB 2012

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    171/275

    Bab 11 : pembuatan dan analisis berdasarkankontrak

    Pemberi kontrakkey performance indicator

    Penerima kontrakkompetensi

    Sertifikat CPOB Kontrak tertulistanggung jawab dan kewajiban

    masing-masing pihak

    Produk dan analisa sesuai ijin edar

    Prosedur pelulusan bets jelasoleh kepala bagQA (pemberi kontrak)

    Latar belakang

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    172/275

    Tuntutan ketersediaan produk dan penurunan hargaobat

    Efisiensi dan efektivitas produksiutilitas mesin

    investasi teknologi canggih pada produksi ?

    Maintenance ?

    Mempercepat waktu tercapainya produk ke pasar

    (time to market)

    Pemberi kontrak

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    173/275

    Menilai kompetensi penerima kontrak Menyediakan semua informasi yang diperlukan

    Memastikan semua produk/bahan dari penerima

    kontrak memenuhi spesifikasi

    Penerima kontrak

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    174/275

    Mempunyai gedung, peralatan, pengetahuan danpengalaman, personil yang kompeten

    Memiliki sertifikat CPOB

    Memastikan semua bahan/produk sesuai tujuanpenggunaan

    Tidak mengalihkan pekerjaan ke pihak ketiga,

    tanpa dievaluasi dan disetujui pemberi kontrak

    Menjaga mutu produk

    Pemilihan penerima kontrak

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    175/275

    Kompetensi dan stabilitas keuangan jangkapanjangreputasi

    Validasi proses yang terintegrasi dengan

    dokumentasi

    Beaya produk dan waktu untuk transfer teknologi

    Jaminan kualitas

    Isi kontrak

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    176/275

    Tanggung jawab tiap pihak Prosedur pelulusan bets

    Penanggung jawab pengadaan, pengujian, pelulusan,

    produksi, pengendalian mutu, IPC, dan sampling

    Penanganan catatan pembuatan, analisis, distribusi,

    sampel pertinggal

    Penanganan bahan awal, bahan pengemas, produk

    antara, produk ruahan, dan produk jadi yang ditolak Izin untuk audit

    Jenis kerjasama

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    177/275

    Jasapemberi kontrak menyediakan rawmaterials

    Pembelian finished goodpemberi kontrak hanyaberikan rolling forecast

    Penyewaan mesinoperator dari penerima

    kontrak

    178

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    178/275

    PENGAWASAN MUTU

    Excellent in Quality, Competitiveness, and Care (e-QCC)

    Materi179

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    179/275

    Peranan QC Personil

    GLP

    Dokumentasi Sampling

    Pengujian

    Stabilitas on-going

    180

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    180/275

    Pembuatan : rangkaian kegiatan untukmenghasilkan produk/obat, meliputi produksi dan

    pengawasan mutu.

    Memastikan produk mempunyai mutu yang sesuai

    dgn tujuan pemakaiannya scr konsisten.

    Aspek QMS181

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    181/275

    a) Pemastian Mutu (QA)

    totalitas semua pengaturan untuk menghasilkan obat berkualitas.b) Cara Pembuatan Obat yang Baik (CPOB)

    bagian dari Pemastian Mutu yang memastikan bahwa obat dibuatdan dikendalikan secara konsisten untuk mencapai standar mutu yangsesuai tujuan penggunaan, dipersyaratkan dalam izin edar dan

    spesifikasi produk.mencakup produksi dan pengawasan mutu.

    c) Pengawasan Mutu (QC)

    bagian dari CPOB yang berhubungan dengan pengambilansampel, spesifikasi, pengujian, organisasi, dokumentasi dan prosedur

    pelulusan yang memastikan bahwa pengujian yang relevan telahdilakukan.

    d) Manajemen Resiko Mutu (QRM)

    suatu proses sistematis untuk melakukan penilaian,pengendalian dan pengkajian risiko terhadap mutu suatu produk.

    Personil182

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    182/275

    Kepala bag QC tmsk personil kunci, independen,qualified, membawahi bbrp lab.

    Personil di bag QC qualified sesuai dgntugasnya

    Tugas dan wewenang ?

    GLP (Good Laboratory Practice)183

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    183/275

    Personil Bangunan dan fasilitas

    Peralatan

    Pereaksi dan media perbenihan

    - prosedur pembuatan jelas dan tertulis

    - label : konsentrasi, faktor standardisasi, masa simpan,

    tgl standardisasi ulang, kondisi penyimpanan

    - tanggal dan ttd petugas pembuat- kontrol positif, kontrol negatif

    184

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    184/275

    Baku pembanding- personil penanggungjawab

    - sesuai dgn peruntukannya

    - working standard terkoreksi

    - penyimpanan dan penanganan, mutu terjaga

    - label : kadar, MD, ED, tanggal pertama kali tutup wadah

    dibuka, kondisi penyimpanan

    Instruksi penggunaan, penyimpanan, penanganan,atau perawatan jelas

    Hewan uji

    Dokumentasi185

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    185/275

    Dokumen yang ada di QC :- Spesifikasi

    - Prosedur sampling

    - Prosedur dan catatan pengujian

    - Laporan/sertifikat analisis

    - Catatan validasi metode analisis- Prosedur dan catatan kalibrasi alat

    - Prosedur penggunaan dan perawatan alat

    - Data pemantauan lingkungan

    Review berkala

    Dokumen terkait catatan bets disimpan sampai 1 tahunstlh ED.

    Sampling186

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    186/275

    Harus mewakili satu bets Prosedur tertulis utk sampling mencakup:

    - metode sampling

    - alat sampling

    - jumlah sampel yg diambil

    - instruksi pembagian sampel yg diperlukan

    - tipe dan kondisi wadah sampel

    - penandaan wadah sampel (nama, no.bets, no. wadah yg disampling,

    tgl sampling, ttd petugas)

    - tindakan khusus yang diperhatikan.- kondisi penyimpanan

    - instruksi pembersihan dan penyimpanan alat sampling

    187

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    187/275

    Sampel pembanding/sampel pertinggal disimpanmin 1 tahun setelah ED, min. dlm kemasan primer.

    Jumlah sampel pembanding/pertinggal min 2x

    analisis lengkap sesuai ijin edar.

    Pengujian188

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    188/275

    Metode analisis tervalidasi Catatan pengujian mencakup :

    - nama bahan/produk

    - no.bets, pembuat/pemasok

    - rujukan spesifikasi dan prosedur pengujian- hasil pengujian

    - tanggal pengujian

    - paraf analis

    - paraf orang yg melakukan verifikasi pengujian/hasil- pernyataan pelulusan/penolakan, tanggal dan ttd

    penanggungjawab

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    189/275

    Uji stabilitas on-going190

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    190/275

    Setelah produk dipasarkan. Tujuan : memantau produk slm masa edar tetap

    memenuhi spesifikasi dlm kondisi penyimpanan

    yang tertera pada label.

    Berlaku bagi produk dlm kemasan yg dijual.

    Alat (stability chamber) terkualifikasi

    DokumentasiProtokol dan laporan uji

    191

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    191/275

    Cakupan protokol uji :- jumlah bets per dosis

    - metode pengujian

    - kriteria keberterimaan

    - rujukan metode pengujian

    - uraian sistem tutup wadah/kemasan

    - interval pengujian

    - uraian kondisi penyimpanan (menurut standar ICH utkuji jangka panjang sesuai penandaan produk)

    - Parameter lain yg spesifik utk produk

    192

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    192/275

    Jumlah bets dan frekuensi uji ckp utk membuatanalisis tren.

    Min 1 bets produk pertahun utk tiap dosis dan tiapjenis kemasan primer.

    Desain bracketing dan matrixing dpt diterapkanjika ada justifikasi ilmiah.

    HULS atau tren negatif diselidiki, dicatat, dandilaporkan ke BPOM , terkait dampak produk yg

    mungkin ada di pasaranpenangan keluhan danpenarikan kembali.

    193

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    193/275

    INSPEKSI DIRI, AUDIT MUTU, DANAUDIT PEMASOK

    Excellent in Quality, Competitiveness, and Care (e-QCC)

    Inspeksi diri194

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    194/275

    Tujuan inspeksi diri :

    - untuk mengevaluasi apakah semua aspek produksi danpengawasan mutu industri farmasi memenuhi ketentuan CPOB.

    - untuk mendeteksi kelemahan dalam pelaksanaan CPOB danuntuk menetapkan tindakan perbaikan yang diperlukan.

    Inspeksi diri hendaklah dilakukan secara independen dan rinci.

    Oleh petugas yang kompeten dan obyektif.

    Dilakukan secara rutin, minimal 1 kali/tahun

    Prosedur dan catatan inspeksi diri didokumentasikan.

    Hasil inspeksiCAPA (Corrective Action an Preventive Action)dilaksanakan.

    Audit mutu195

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    195/275

    Sebagai pelengkap inspeksi diri. Audit mutu meliputi pemeriksaan dan penilaian

    semua atau sebagian dari sistem manajemen mutu.

    Dilaksanakan oleh spesialis dari luar atau

    independen atau suatu tim yang dibentuk khusus

    oleh manajemen perusahaan.

    Audit mutu juga dapat diperluas terhadap

    pemasok dan penerima kontrak.

    Audit pemasok196

    b l M M

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    196/275

    Penanggung jawab : Kepala Bagian Manajemen Mutu(Pemastian Mutu)

    Dibuat daftar pemasok yang disetujui untuk bahanawal dan bahan pengemas.

    Dilakukan evaluasi sebelum pemasok disetujui dan

    dimasukkan ke dalam daftar pemasok,mempertimbangkan riwayat pemasok dan sifat bahanyang dipasok.

    Jika audit diperlukan, audit tersebut hendaklahmenetapkan kemampuan pemasok dalam pemenuhan

    standar CPOB. Semua pemasok yang telah ditetapkan dievaluasi

    secara teratur.

    197

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    197/275

    PENANGANAN KELUHAN DANPENARIKAN KEMBALI

    Excellent in Quality, Competitiveness, and Care (e-QCC)

    Penanganan keluhan198

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    198/275

    Keluhan mutu produk bisa berasal dr:- dalam industri : bag produksi, QC, gudang,

    pemasaran, dsb.

    - luar industri : pasien, dokter, paramedis, klinik, RS,apotek, distributor, dan Badan POM.

    Personil penanggung jawab di bag pemastian mutu

    atau lainnya (terlatih dan mampu).

    Prosedur tertulis mengenai penyelidikan, evaluasi,

    serta tindak lanjut.

    199

    E l i k i

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    199/275

    Evaluasi terkait :

    - pengkajian seluruh informasi laporan/keluhan

    - pengujian sampel yg dikeluhkan/diterima, bila perlu

    sampel pertinggal bets yg sama

    - pengkajian semua data dan dokumentasi(catatan bets, pengujian, dan distribusi)

    Tindak lanjut :

    - tindakan perbaikan (perubahan formula, prosespembuatan, bahan pengemas, kondisi penyimpanan)

    - penarikan kembali

    - tindakan lain yg tepat.

    200

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    200/275

    CAPA

    keberulangan keluhan FarmakovigilansMESO

    Perhatian khusus utk keluhan krn pemalsuan.

    Dikoordinasikan dan dilaporkan ke Badan POM.

    Penarikan kembali201

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    201/275

    Penarikan satu/bbrp/seluruh bets produk tertentudr rantai distribusi karena keputusan produk tidak

    layak lagi utk diedarkan.

    Produk cacat mutu atau ada reaksi merugikan.

    2 jenis penarikan kembali :

    - mandatoryatas perintah Badan POM

    - sukarela/inisiatif industri.

    202

    Ad i j k ik k b li d k

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    202/275

    Ada sistem manajemen untuk menarik kembali produkyang diketahui atau diduga cacat dr peredaran scrcepat, efektif, dan tuntassmp tingkat konsumen.

    Personil penanggung jawab di bag pemastian mutuatau lainnya (terlatih dan mampu).

    Prosedur penarikan kembali tertulis, review berkala.

    Dibutuhkan catatan distribusi.

    Rekonsiliasi hasil penarikan produk

    Identifikasi, pemisahan, dan penyimpanan produk ygditarik kembali jelas.

    Dikoordinasikan dan dilaporkan ke Badan POM.

    203

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    203/275

    VALIDASI

    Excellent in Quality, Competitiveness, and Care (e-QCC)

    Definition of Validation204

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    204/275

    DOCUMENTED EVIDENT/PROGRAM WHICHPROVIDE A HIGH DEGREE OF ASSURANCE

    THAT MANUFACTURING PROCESS IS CAPABLE

    OF CONSISTENTLY DELIVERING PRODUCT

    MEETING ITS RELEASE SPECIFICATIONS,

    CRITICAL QUALITY ATTRIBUTE, AND PROCESS

    PARAMETER WITHIN THE ESTABLISHED

    RANGE.

    New life cycle concept for validation

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    205/275

    Development

    I Process design

    Defined

    manufacturing

    process (CPP,

    CQA,CMA)Define a strategy of

    process control

    Develop process

    knowledge and

    understanding

    III Continued Process

    Verifications

    Continuous

    assurance that

    the process

    remains in state

    of control

    Statistic based

    continuous

    monitoring

    Improvement

    and optimizethe process

    II Process Qualification

    Evaluation process

    capability in

    commercial scale

    Facility design,equipment

    qualification and

    utilities

    PPQ (Process

    performancequalifications)

    Operations Quality andcompliance

    Life Cycle of Validation206

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    206/275

    Qualification and Validation

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    207/275

    Qualification and validation are essentially components of the

    same concept

    The term qualificationis normally used for machinery, equipment,utilities and systems

    The term validationis normally used for processes

    In this sense, qualification is part of validation

    Qualification should be completed before process validation is

    performed

    Validation Master Plan (VMP)

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    208/275

    Contains key elements of the validation programme. Concise, clear, contain at least:

    a validation policy

    organizational structure of validation activities

    summary of facilities, systems, equipment andprocesses validated (and to be validated)

    documentation format (e.g. protocol and report)

    planning and scheduling

    change control and references to existing documents

    Validation should be performed:

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    209/275

    Validation should be performed: for new premises, equipment, utilities and

    systems, and processes and procedures; at periodic intervals; and when major changes have been made.

    Following are components of validation ;

    Risk assessment

    PPQ/validation protocol

    PPQ/validation report.

    Type of validation210

    PROCESS VALIDATION

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    210/275

    PROCESS VALIDATION

    Validation of manufacturing process of pharmaceutical products

    CLEANING VALIDATION

    Validation of equipment cleaning procedure

    COMPUTERIZED SYSTEM VALIDATION

    Validation of computerized system of equipment/instrument

    ANALYTICAL METHOD VALIDATION

    Validation of analytical method

    PROCESS Validation

    Introduction

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    211/275

    Validation is an essential part of GMP, and an element of QA

    Basic principles include:

    Safety, quality and efficacy of products

    Regulatory compliance

    Built into the product

    Critical steps in the process need to be validated

    Need for confidence that the product will consistently meet

    predetermined specifications and attributes

    The BasicsApproach of Validation

    Prospective Validation (evidence obtained through testing)

    212

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    212/275

    Prospective Validation (evidence obtained through testing) Conducted prior to use or to distribute the products Preferred

    Concurrent Validation Validation is conducted during first use of system and during the routine

    process

    No longer encouraged Retrospective Validation

    Conducted using historical data

    Least common

    Highest risk

    Only used when absolutely necessary 10-30 batches

    Approaches to validation

    Both prospective and concurrent validation, may include:

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    213/275

    extensive product testing

    extensive sample testing

    demonstration of batch homogeneity;

    simulation process trials; challenge/worst case tests, which determine the

    robustness of the process; and

    control of process parameters being monitored

    during normal production runs to obtain additionalinformation on the reliability of the process.

    Validation Strategy

    Validation requires an appropriate and sufficient infrastructure

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    214/275

    Va da o equ es a app op a e a d su c e as uc u e

    including: organization, documentation, personnel and finances

    Involvement of management and quality assurance personnel

    Personnel with appropriate qualifications and experience (QA,QC, Production, Validation, Engineering)

    Extensive preparation and planning before validation is performed

    Validation done in a structured way according to documentationincluding procedures and protocols.

    Documentation and quality critical associated with process validation:

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    215/275

    q y p

    Validation Master Plan (VMP)

    SOPs (Machine, Process, etc), Development report (Manufacturing specifications)

    Specifications (Testing specification, method) for release

    Master batch record

    Qualification protocols and reports of the equipment

    Validation protocols and reports (Process and Analytical method)

    Stability protocol

    The quality critical should be completed and verified before process: premises, equipment, utilities and systems qualification

    Validation analytical method

    Calibration of machine, instrument

    Approved protocols and BR

    Training

    Components of validation ;

    216

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    216/275

    Components of validation ;

    Risk assessment

    PPQ/validation protocol

    PPQ/validation report.

    Computerized Systems, Validation & Compliance / Mario Hertlein

    217

    Quality Risk Management Process (ICH Q9)

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    217/275

    Computerized Systems, Validation & Compliance / Mario Hertlein

    FMEA

    Criticallity

    and risk

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    218/275

    Scope of validation study including the objectives, approach,type of validation and personnel

    Short description of the process (process flow)

    Batch size and number of batches that are validated

    Equipment list and room list (if applicable)

    Formula and material source (manufacturer)

    Sampling plan

    Risk assessment

    Key process parameter (IPC, final product release, additional

    testing) based on RA Acceptance criteria and reference

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    219/275

    Cross-reference to the validation protocol Detail material : Batch number and material lot no

    Equipment, procedures and test methods

    Process parameter of each validation batch

    Sample analytical results

    Results evaluated, analyzed and compared against thepre-determined acceptance criteria

    Discrepancy/deviation and or change to the protocols withappropriate justifications,

    Conclusion of the validation studies whether process is state

    of the controls Approval

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    220/275

    Revalidation may be required, at periodic interval

    and/or when changes are made in equipment, utility

    systems, process or component which could impact

    current validation status.

    Revalidation may be required as a result from

    periodic review and/or product quality review.

    Change control

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    221/275

    Changes should be formally requested, documented andapproved before implementation

    Describe the actions to be taken, including the need for and

    extent of qualification or validation

    Records should be maintained

    Changes requiring revalidation should be defined in thevalidation plan and may include:

    changes in starting materials e.g. including physical properties, such as density,

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    222/275

    change of starting material manufacturer

    transfer of processes to a different site

    changes of primary packaging material

    changes in the manufacturing process

    changes in the equipment

    production area and support system changes

    appearance of negative quality trends

    appearance of new findings based on currentknowledge

    support system changes

    g g p y p p , y,viscosity or particle size distribution that may affect theprocess or product

    e.g. change of facilities and installations which influencethe process

    e.g. substituting plastic for glass

    e.g. mixing times or drying temperatures

    e.g. addition of automatic detection systems, installationof new equipment, major revisions to machinery orapparatus and breakdowns

    e.g. rearrangement of areas, or a new water treatmentmethod

    e.g. new technology

    223

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    223/275

    KUALIFIKASI PERALATAN

    Excellent in Quality, Competitiveness, and Care (e-QCC)

    General Principles

    Validation of Equipment is the documented

    224

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    224/275

    Validation of Equipment is the documented

    evidence/program that provides a high degree of

    assurance that the system will consistently meet

    predetermined requirements and functions as designed

    Qualification is the part of validation that incorporates

    relevant testing, verification, and documentation to

    establish that Equipment and ancillary systems meet

    predetermined requirements and function as designed

    Qualification Model (simple)

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    225/275

    Qualification Phase

    User Requirement

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    226/275

    Document regarding baseline requirements of the

    equipment/instrument/systems, e.g. the relevance of GxP, desired function,

    operating environment.

    Functional Requirement

    Document regarding more detailed technical specification that derives from

    URS, e.g. modes of operation.

    Design Requirement

    Document regarding detail design of the facilities, equipment, or systems, e.g.dimension of equipment, construction materials.

    Qualification Phase

    Installation Qualification

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    227/275

    Documented verification that the equipment and systems comply with the

    approved design and are correctly installed.

    IQ should include, but not be limited to the following:

    Installation of equipment, piping, services and instrumentation checked to

    current engineering drawings and specifications Collection and collation of supplier operating instructions;

    Maintenance requirements, e.g. change parts and recommended frequency

    of maintenance; Calibration requirements; Cleaning requirements;

    Verification of materials of construction;

    Technical documentation;

    Acceptance criteria

    Qualification Phase

    Operational Qualification

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    228/275

    Documented verification that the equipment and systems perform as defined inthe design specification/user requirements.

    OQ should include, but not be limited to the following:

    Tests that have been developed from knowledge of processes, systems andequipment;

    Tests should include a condition or a set of conditions encompassing upperand lower operating limits, sometimes referred to as worst case conditions

    and alarm points;

    Acceptance criteria

    The completion of a successful Operational Qualification should allow the

    finalization of calibration, operating and cleaning procedures, operatortraining and preventative maintenance requirements.

    Qualification Phase

    Equipment Essential Recommended

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    229/275

    Mixer/Dissolving Machine Speed of revolution Operating procedure;Safety device; Switch

    operation; Operation

    time

    Granulator Speed of revolution Same as above

    Dryer Temperature Same as aboveOscillator Speed Same as above

    Tablet Compression Pressure Same as above

    Coating machine Speed of revolution;

    Temperature; Air

    volume; Pressure

    Same as above

    Qualification requirements of Korean FDA

    Qualification Phase

    Performance Qualification

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    230/275

    Documented verification that the equipment and ancillary systems, asconnected together, can perform effectively and reproducibly based on theapproved process/method and specifications.

    PQ should include, but not be limited to the following:

    Tests, using production materials, qualified substitutes or simulated product,

    that have been developed from knowledge of the process and the facilities,systems or equipment;

    Tests should include a condition or set of conditions representative for theprocess. If appropriate the PQ testing should include a verification of upperand lower operating limits,

    Although PQ is described as a separate activity, it may in some cases beappropriate to perform PQ in conjunction with OQ or with process validation.

    Qualification Phase

    Equipment Essential Recommended

    Mixer/Dissolving Machine Speed of revolution Operating procedure;

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    231/275

    / g Speed of revolution Operating procedure;

    Safety device; Switch

    operation; Operation time

    Granulator Speed of revolution;

    Weight/Volume

    Same as above

    Dryer Temperature;

    Weight/Volume

    Same as above

    Oscillator Speed Same as above

    Tablet Compression Pressure; Weight/Volume;

    Pressure

    Same as above

    Coating machine Speed of revolution;

    Temperature; Air volume;

    Pressure; spray volume

    Same as above

    Qualification requirements of Korean FDA

    Qualification Phase

    Test Item

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    232/275

    Equipment Essential Test ItemMixer/ Dissolving

    MachineUniformity of content Appearance; Angle of repose;

    pH; Moisture (LOD); Particle size

    distribution

    Granulator Uniformity of content;

    Dissolution

    Appearance; Moisture (LOD);

    Particle size distribution

    Dryer - Appearance; Moisture (LOD

    Oscillator - Appearance; Moisture (LOD);

    Particle size distribution

    Tablet Compression Uniformity of content;

    Dissolution

    Appearance; Air tightness;

    Friability; Moisture (LOD);

    Hardness; Weight variation;Disintegration; Thickness

    Coating machine Dissolution Appearance; Moisture (LOD);

    Hardness; Weight variation;

    Disintegration; ThicknessQualification requirements of Korean FDA

    Life Cycle for Validation of Equipment(Future requirement)

    233

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    233/275

    Validation Determination

    Specification and Design

    Phase

    Planning for System

    Implementation and

    Validation

    System Build and Installation

    Retirement

    Operational Use

    Verification (Qualification)

    Phase

    System Changes

    and Improvements

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    234/275

    UJI BIOEKIVALENSI

    Excellent in Quality, Competitiveness, and Care (e-QCC)

    Sejarah

    1934-1970 : uji waktu hancur obat

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    235/275

    j

    1970-1995 : uji disolusi (kelarutan obat thd waktu)

    Sekarang : uji BA-BE (kadar obat dalam

    darah/urin thd waktu)

    Data yang dibutuhkan untuk registrasi

  • 7/25/2019 Modul Matrikulasi CPOB_Bu Beti

    236/275

    Data administratif

    Summary Product Characteristics(SPC)

    Expert report

    Komposisi produk obat Deskripsi proses pembuatan (sesuai

    cGMP)

    Spesifikasi starting material

    Spesifikasi produk jadi

    Stability test (API dan produk jadi) Profil disolusi

    Dokumentasi uji pre-klinik dan klinik