Update: May 2014
The Action concerns the elaboration of the documentation (construction designs, tender documentation, etc) required for modernisation works on the railway line 447, section Warszawa Włochy-Grodzisk Mazowiecki (24 km, part of PP23). The completion of the action contributes to increasing the capacity of the PP23 in the densely populated area of the country. Action is closed.
TEN-T Annual Programme
Member States involved: Poland Implementation schedule Start date: July 2012 End date: December 2014
Budget:
EU contribution: €689,500
Additional information:
European Commission, DG MOVE http://ec.europa.eu/transport/ index_en.html Innovation and Networks Executive Agency (INEA) http://inea.ec.europa.eu Beneficiary & Implementing body: PKP Polskie Linie Kolejowe S.A. www.plk-sa.pl
Modernisation of the railway line Warszawa Wlochy–Grodzisk Mazowiecki–preparatory
works
2011-PL-93141-S